1 02 Section 02 SUBSTRUCTURE 1. Trenches to be level, square and free from loose material and standing water. Steps and sides of foundations must be plumb. 2. All tree roots must be removed. Trench depths may vary refer to NHBC Standards Ensure foundation depths take into consideration drainage depths within the vicinity of the plot. 4. All substructure, block/brickwork to be fully pointed and follow the relevant Standard Detail(s). 5. Do not breach cavities with block and beam. DPC must be present under beam ends. 6. Cap off all drainage to prevent debris falling in and creating blockages. 7. Telescopic vents must not be positioned within door openings or service meter locations whilst maintaining a maximum distance of 2m apart and 450mm from external corners.
2 8. Aco drainage to be only installed as per the Standard Details, generally at front doors where level or sloping towards the property. 9. Finished ground level must be 150mm below DPC. 10. Shingle must be installed prior to the sub-structure drainage being laid. 11. When positioning manholes and inspection chambers take care to ensure these are set out within the property s footpaths or landscaping. Avoid the manhole being half in, half out of the path. During construction, manholes must be protected and signed. 12. When constructing substructures ensure water services are built in with consideration given to frost protection.
3 SUBSTRUCTURE 02 Clean and tidy foundation excavation. Well formed foundation steps. Correct width bucket must be used for each trench. (Picture taken from outside trench.) Foundation coordinates to be accurately plotted, and checked by the Engineer and Site Manager. 2-1
4 02 SUBSTRUCTURE All substructure blockwork to be fully pointed. Ensure poured strips are level. Trench blocks - external wall centred on strip foundation. 2-2
5 SUBSTRUCTURE 02 Garage foundation - Ensure well presented, tidy finish. Pile positioning and mesh. Note spacers to corners to ensure adequate cover. Neatly compacted granular fill ready for sand blinding/ DPM, drainage capped off and sacrificial insulation to cavity. Neatly installed pre-cast concrete beam. 2-3
6 02 SUBSTRUCTURE Block and beam slurry coated and sanded off. For accurate results consider core drilling drainage penetrations in block and beam floors. All grouting to be completed prior to screed rails being built. Ventilators need to be installed at maximum 2m centres, 450mm from ends and fully pointed. 2-4
7 SUBSTRUCTURE 02 Soil pipes capped during construction. Area between soil pipe and insulation filled with fire resistant expanding foam. Use a brick or blockette to gauge (65mm-75mm) the toilet bowl outlet position if not dimensioned on the drawing. Haunching to drainage to protect from damage when insufficient cover is available. (Note Lintel to be installed as low as possible and ground conditions/heave to be allowed for.) 2-5
8 02 SUBSTRUCTURE 150mm ducts to be built in external walls for drainage penetrations. Lintels to be installed over drainage penetrations at lowest possible point. Openings to be sealed and vermin proof, ensure Rockwool or adequate expanding foam is installed. Note end caps in soil pipes during construction. Water pipe to be installed set off from blockwork. Insulation to be installed around pipe and duct to be gas sealed. 2-6
9 SUBSTRUCTURE 02 Check to ensure Drain running away from house Drain Test 1 - Testing draining prior to casting slab. Drain Test 2 Ensure pipework joined and falls correctly. Drain Test 3 - Soil pipe neatly taped to insulation. (Cap to be replaced following drain test). 2-7
10 02 SUBSTRUCTURE Ensure reinforcement follows engineer s design and has perimeter spacers installed. Ensure party walls are square, in line and 100mm cavity for masonry. Water pipes to be insulated and ducts to be gas sealed. All SVP s to be protected during construction. 2-8
11 SUBSTRUCTURE 02 Clear cavity, ready for Platinum Insulation to be installed. DPM bedded into slab. Blue bricks only to be used in line with site requirements. DPM bedded into slab. Sacrificial insulation MUST always be removed. Consistently sized and clean cavity, with fully pointed brick and blockwork. Must be checked prior to commencing superstructure. Slab insulation taped and joints staggered. 2-9
12 02 SUBSTRUCTURE Straight, plumb and clean masonry below DPC. Drainage to be completed and correctly supported with correct falls. Avoiding siting drainage on hard spots, ensuring ground below is stable, and bedded on pea gravel. Slab sanded off. Note artstone and manholes protected. Keep externals tidy and complete in line with brickwork. 2-10
13 SUBSTRUCTURE 02 External rainwater drainage pipes must be finished at least 150mm below DPC. Telescopic vents must not be positioned within door openings, maintaining a maximum distance of 2m apart and 450mm from external corners. Drainage location to avoid manholes being located half in, half out of the path. Sub-structure drainage must be laid on pea gravel. Slabs must be cut neatly around external door cills. Drainage is only required if paving is level or sloping towards door. If paving slopes away a 10-18mm gap is acceptable. 2-11
PRELIMINARY INSPECTION FRAMEWORK
PRELIMINARY INSPECTION FRAMEWORK 1. Oversite Striping of topsoil Forming site entrance Clearing off topsoil for service roadway Roadside drainage continued under entrance bay Any mature trees in vicinity
More informationPAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping
PAGE 415 Part 9 External works 9.2 Drives, paths and landscaping Part 9 External works Chapter CONTENTS SCOPE Clause DESIGN Design standards D1 1 Statutory requirements D2 1 Garage foundations D3 1 Garage
More informationPart 5 Substructure and ground floors. Chapter 5.2. Suspended ground floors
Part 5 Substructure and ground floors Chapter CONTENTS SCOPE Clause Page DESIGN - General Design standards D1 1 Statutory and other requirements D2 1 Resistance to ground contaminants D3-D4 1 This Chapter
More informationSITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT
SETTING OUT Correct to boundaries Correct to building lines? Diagonals accurate? Levels correct? EXCAVATIONS Adjoining structures OK? Centres of foundations line with walls? Bottoms of trenches uniform,
More informationTypical detail: New roof with breathable underlay
New roof with breathable underlay 6. WALLTITE CL00 insulation to achieve target U-value. Vapour control layer. Plasterboard and skim. Unventilated air space 5. WALLTITE returned to insulated cavity stop
More informationESTIMATE FOR BUILDING WORKS BARONS COURT ROAD
ESTIMATE FOR BUILDING WORKS BARONS COURT ROAD 26TH JANUARY 2017 Project: Barons Court Date: 26/01/2017 QUALIFICATIONS, ASSUMPTIONS & EXCLUSIONS: 1 Qualifications:- 1.1 Prices exclude 20% VAT 1.2 Pre-start
More informationConstruction Technology Revision Guide
Construction Technology Revision Guide Sub structures and Super structures Super structure (Wall, floors roof) Sub structure (Foundations) 2 Thermal Insulation Thermal insulation helps to prevent heat
More informationInstallation Information 2016
Installation Information 2016 DENDRO-SCOTT Root Barrier... why use anything else? DENDRO-SCOTT Root Barrier, recognised by the Environment Agency, is known for its quality and reliability. It is flexible
More informationInstallation Information 2018
Installation Information 2018 DENDRO-SCOTT Root Barrier... why use anything else? DENDRO-SCOTT Root Barrier, recognised by the Environment Agency, is known for its quality and reliability. It is flexible
More informationDRAFT. Draft Bill of Quantities. Drainage
Draft Bill of Quantities September 2015 STORM DRAINAGE INFORMATION Measurement notes Drawings used : WYG (80) 140 Rev T1, D-(80) 001 Rev T1, D-(80) 002 Rev T1, D-(80) 003 Rev T1 and D-(80) 004 Rev T1 All
More informationBelow ground System of pipework required to carry waste fluids from building to disposal site.
1 Below ground System of pipework required to carry waste fluids from building to disposal site. Disposal site County Council sewage treatment facility. Septic tank system or alternative systems 2 1. Layout
More informationPreliminary Inspection Plan Certification On Site Inspection. Ancillary Design... Ancillary Construction Inspecti... Testing Requirement
1 Commencement Setting Out Ground Location of existing below ground service Ground Location of site gas CSD Ground Location of site water mains CSD Ground Location of below ground drainage FFA Ground Location
More informationPreliminary Inspection Plan Certification On Site Inspection. Ancillary Design... Ancillary Construction Inspecti... Testing Requirement
1 Commencement Setting Out Ground Location of existing below ground service Ground Location of site gas CSD Ground Location of site water mains CSD Ground Location of below ground drainage FFA Ground Location
More informationOS Thermal System Installation Guide
OS Thermal System Installation Guide cube6.co.uk 2 A thermal resistance many times greater than aerated concrete blocks It s more than just insulation CUBE6 Oversheet Thermal Floor System (OS) is the innovative,
More informationCavity Tray Application
Cavity Trays Cavity Tray Block Cavity Trays Page 4 Door & Window Cavity Trays Page 8 Lead Chimney Trays Page 9 Inter-loc Horizontal Cavity Trays Page 7 Lintel Cavity Trays Page 8 Brick Cavity Trays Page
More informationKGN-BDD TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY.
KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-BDD-07-2017 TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY. 11 th May 2017 In accordance
More informationCHAPTER 8. Concrete Work
Concrete Work Clay Bricklaying Made Easy CONCRETE WORK Foundations for walls and piers All loadbearing walls and piers are required to stand on a concrete foundation, which must be able to receive and
More informationGETTING IT RIGHT FIRST TIME! YOUR GUIDE TO THE BUILDING INSPECTION PROCESS
GETTING IT RIGHT FIRST TIME! YOUR GUIDE TO THE BUILDING INSPECTION PROCESS The intention of this booklet is to help prevent failed inspections and to save money and time. Failed inspections may result
More information6219 Entry Level and Level 1 Awards, Certificates and Diplomas in Construction Skills
6219 Entry Level and Level 1 Awards, Certificates and Diplomas in Construction Skills Candidate task manual Wall and floor tiling, Construction operations, Painting and decorating www.cityandguilds.com
More information84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.
84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes 90 System Components installation/ SYSTEM COMPONENTS INSTALLATION ADVICE LAPPING and JOINTING
More informationSection 11 FIRE STOPPING
Section 11 This section highlights the key points relating to Fire Stopping. It is imperative that sites teams understand the importance of fire stopping and check it is completed correctly. It is to be
More information84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 protecting Membranes 90 System Components.
84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 protecting Membranes 90 System Components installation/ SYSTEM COMPONENTS INSTALLATION ADVICE LAPPING and JOINTING
More informationHIGH PERFORMANCE BARRIER MEMBRANES Effective protection against CO 2, Radon, Methane, Hydrocarbons & VOCs
HIGH PERFORMANCE BARRIER MEMBRANES Effective protection against CO 2, Radon, Methane, Hydrocarbons & VOCs Powerbase vapour and gas barriers provide protection against naturally occurring hazardous gases
More informationBEAM & BLOCK SYSTEM. 108mm. 175mm Deep (160mm) Wide Beam. 160mm
RH F RACKHAM HOUSEFLOORS BEAM & BLOCK SYSTEM BEAM & BLOCK SYSTEM 1. THE BEAMS 60mm 108mm 90mm 75mm 75mm 100mm 175mm 100mm 175mm 125mm 100mm 175mm Deep Beam 175mm Deep (160mm) Wide Beam 225mm Deep Beam
More informationSECTION UNDERGROUND ELECTRICAL CONSTRUCTION
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION A. This section specifies the furnishing, installation, and connection of precast manholes and pullboxes with ducts
More informationColphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate
Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,
More informationResidential Construction Minimum Required Inspections
Residential Construction Minimum Required Inspections The permit which you have been issued gives authority for work to commence. The stamped, approved plans, returned with this permit, shall be retained
More informationPremier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017
Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins
More informationVitripiazza Installation Guide
Vitripiazza Installation Guide Italian vitrified porcelain paving A. Planning and Sub base Once you ve decided where your patio is going, draw a detailed plan to scale on graph paper. Put in all the dimensions
More informationConcrete Slab-on-Ground
Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and
More informationGuidance notes for Pride in the Job marking sheets
Guidance notes for Pride in the Job marking sheets The following notes are for use as guidance when marking individual score lines on the Pride in the Job (PIJ) marking sheets. They are intended as an
More informationD R A F T. NBS Domestic sample NBS. A9 General requirements. D2 Site preparation. E1 Concrete foundations and floors. F1 Masonry walling
NBS Domestic sample NBS Containing: A9 General requirements D2 Site preparation E1 Concrete foundations and floors F1 Masonry walling G2 Structural timber and general carpentry Q1 Landscape R1 Above and
More informationCITY OF SELMA, TEXAS Inspection Guidelines: Residential
Selma, Texas, located in Bexar, Comal, and Guadalupe Counties Responsible party: Larry Verner, P.E. City Engineer Ph. (210) 651-7828 lverner@ci.selma.tx.us The Permits and Inspections Department welcomes
More informationResidential Building Inspections
Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved
More informationRequirements for Measuring and Pricing of Drainage and Service Ducts
Requirements for Measuring and Pricing of Drainage and Service Ducts October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for
More informationITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal
EARTHWORKS Excavation for foundations 5E343.2 In class III material m³ 1,260 Max. Depth: 0.50 1 m For disposal 5E334.2 In class III material m³ 720 Max. Depth: 1 2 m For disposal Filling Ancillaries 5E723.0
More informationWorking Together to Deliver High Levels of Construction Quality
Working Together to Deliver High Levels of Construction Quality Construction Quality Reviews by NHBC NHBC has developed a programme focusing on construction quality that will help the house building industry
More informationAIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7
AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting
More informationPolyfoam Floorboard For thermal insulation of floors
Strong Water resistant Versatile Lightweight Ozone friendly Recyclable Description is a high performance, 100% ozone friendly, extruded polystyrene, rigid board insulation. It is lightweight, yet has excellent
More informationPROGRESS REPORT NAMILANGI SCHOOL PROJECT PHASE III
ZAMBIA OFFICE PROGRESS REPORT NAMILANGI SCHOOL PROJECT PHASE III December,2016 1 P a g e BACKGROUND In 2014, Lions Aid Norway (LAN) in partnership with Lions District 413, Zambia embarked on a project
More informationJabfloor is also available in higher grades up to Jabfloor 250 which may be required in certain specialist industrial and commercial applications.
JABLITE JABFLOOR Screed Finish Vapour Control Layer Concrete Slab Jabfloor Classic Damp-proof Membrane Jabfloor insulation can be used in all floor constructions for both domestic and commercial buildings.
More informationSPACE TYPE: OUTSIDE PARKING (STRUCTURE)
SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.
More informationSeven Wonders of the Ancient World
Seven Wonders of the Ancient World Pyramid of Meidum shed 250,000 tons of limestone outer casings Typical Pyramid Pyramid at Meidum Mexico Alameda buildings Palace of Fine Arts National Theater
More informationConstruction and the Built Environment. Unit 1: The Construction Industry for the 21st Century [GCB11] MONDAY 14 MAY, AFTERNOON
Centre Number 71 Candidate Number General Certificate of Secondary Education 2012 Construction and the Built Environment Unit 1: The Construction Industry for the 21st Century [GCB11] GCB11 MONDAY 14 MAY,
More informationProofex Cavitydrain PM20
Section A : Health, Safety and Environment A1. Personal safety requirements: 1 Observe the site owner s Health, Safety and Environment policy at all times and obey all written and verbal instructions from
More informationFirstEnergy Program Overview
FirstEnergy Program Overview Builder incentives $400 per unit + $0.10/kWh in projected savings Eligibility Located in service area of a FirstEnergy Utility Certificate of Occupancy Dates: FirstEnergy Ohio
More informationPLOT GROUNDWORKS TRADE SPECIFICATION
PLOT GROUNDWORKS TRADE SPECIFICATION GENERAL a) BDW Trading Limited Barratt Homes and David Wilson Homes are trading names of BDW Trading Limited the Company. b) Clearing The Contractor is responsible
More informationInspecting and certifying consented building work
Inspecting and certifying consented building work The Building Consent process Steps 3 & 4 July 2017 2 INSPECTING AND CERTIFYING CONSENTED BUILDING WORK DECEMBER 2013 Contents Building Consents Step 3:
More informationTHE CONSTRUCTION OF BUILDINGS
THE CONSTRUCTION OF BUILDINGS Volume 1 FOUNDATIONS AND OVERSITE CONCRETE, WALLS, FLOORS, ROOFS FIFfH EDITION R. BARRY ARCHITECT 105017 IIIIIII i l ~ 11 1 ~! I~I I ill 111 ~II Malta. College of Arts, Science
More informationSTOTHERM INSULATED FACADE SYSTEM FOUNDATION SLAB-ON-GROUND
INTERIOR LINING TIMBER FRAMING TO NZS 3604 20mm VH CAVITY BATTENS RENDER CAVITY SPACERS TO SUIT S INSULATION AS PER NZBC H1/AS1 DPM clad. CONCRETE SLAB/REINFORCING AS PER NZS 3604 OR ENGINEER SPECIFIC
More informationGetting the best from Wienerberger Bricks A Guidance Note on Garden & Retaining Walls
Getting the best from Wienerberger Bricks A Guidance Note on Garden & Retaining Walls Introduction Correct construction and detailing of freestanding garden and retaining walls is important to ensure long
More informationInstallation Guidelines for DENDRO-SCOTT Root Barrier
JOINTING PIECES OF DENDRO-SCOTT ROOT BARRIER TO FIT THE AREA YOU REQUIRE DENDRO-SCOTT Root Barrier membrane comes in various roll sizes, but it may necessary to cut and joint to achieve the shape you require.
More information11/09/2018 LBP licence classes
LBP licence classes Occupational Licensing aims to ensure that people in the building industry are competent and accountable so that homes and buildings are designed and built right first time. Summary
More informationThe Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits
The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits 3. Development and Septic Fees 4. Tarion New Home Warranty
More informationPROJECT: PROPOSED MIGRANTS RESOURCE CENTER - MOGADISHU - IMPLEMENTED BY: CLIENT.
PROJECT: PROPOSED MIGRANTS RESOURCE CENTER IMPLEMENTED BY: CLIENT. MIGRANTS RESOURCE CENTER RESOURCE CENTER IOM : FEBRUARY 2018 DRAWING INDEX SHEET N O 01. 01/24 02. 02/24 03. 03/24 04. 04/24 05. 05/24
More informationtechnical guidance for developers domestic gas In the case of a gas emergency call
technical guidance for developers domestic gas In the case of a gas emergency call 0800 111 999 TUC Tech Stds DOM Master Nov 16.indd 1 14/11/2016 10:16 contents This guide is here to help you prepare for
More informationUnited Nations Development Programme
PROJECT UPGRADE OF EXISTING ISLAND WASTE MANAGMENT CENTER AT FONADHOO ISLAND PREPARED BY CONTENT FONADHOO DRAWINGS SL.NO DRAWING NAME DRAWING NUMBER 1 SITE PLAN /2017/IWMC/FON/001 2 FLOOR PLAN /2017/IWMC/FON/002
More informationARCHITECTURAL DRAWINGS
PROJECT DETAILS Implementation Partner: Project title: Grant No.: KIS062 Content : ARCHITECTURAL DRAWINGS SHEET NO. REHABILITATION OF GRANT NO.: - KIS062 COVER SHEET INDEX SHEET CONTENTS 01 02 03 04 05
More informationGas barrier and damp proofing accessories
Gas barrier and damp proofing accessories Gas barriers and damp proofing 2-4 5 Gas barrier and damp proof membrane cavity tray systems and accessories Damp Proof coursing accessories 1 Call. 01405 765567
More informationSTOPOREN FACADE SYSTEM FOUNDATION SLAB-ON-GROUND
INTERIOR LINING TIMBER FRAMING TO NZS 3604 STO 20mm VH CAVITY BATTENS RENDER SYSTEM PANEL CAVITY SPACERS TO SUIT FIXINGS INSULATION AS PER NZBC H1/AS1 DPM clad. CONCRETE SLAB/REINFORCING AS PER NZS 3604
More informationCONCRETE SLABS Job Ready Checklist
CONCRETE SLABS Job Ready Checklist This list is to be reviewed by the Builder/Superintendent to verify that the job site is ready for the Trade Contractor to arrive and begin work. Check box when complete
More informationINTENDED USE: Driveways Pool sides Terraces Car parking. Expansion joints are necessary and joints must be filled with cementitious grout.
MANUAL LAYING ON SCREED WITH GLUE LAYING ON WET SAND WITH CEMENT RAISED LAYING WITH SUPPORTS LAYING ON GRAVEL LAYING ON SAND LAYING ON GRASS LAYING ON SCREED WITH ADHESIVE The advanced technical features
More informationTITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY
D DEMOLITION & SITE CLEARANCE D1 GENERAL CLEARANCE 6-D152 Open bush and thicket in and around ha 0.02 the ponds. Locally disposed. D2 REMOVAL OF TREES AND STUMPS 6-D212 Trees of girth: 150 mm - 500 mm
More informationINSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST
Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS
More informationProject: King Abdulaziz International Airport KAIA 2
Project: King Abdulaziz International Airport KAIA 2 Jeddah, KSA King Abdulaziz International Airport Phase 1 Development Project Project Newsletter Client / Owner: Saudi Binladin Group 22 June 2013. Newsletter
More informationSLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu
INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular
More informationDescription Unit Quantity Rate Kshs. Amount Kshs.
BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove
More informationFIRST TIME! GETTING IT RIGHT YOUR GUIDE TO THE BUILDING INSPECTION PROCESS
GETTING IT RIGHT FIRST TIME! YOUR GUIDE TO THE BUILDING INSPECTION PROCESS This is intended as a guide only, to help you prepare for inspections by Timaru District Council building inspectors IS-127 V2
More informationTABLE OF CONTENTS
DIVISION 33: SEWER AND SEPTIC SYSTEMS 33 3633 UTILITY SEPTIC TANK DRAINAGE FIELD TABLE OF CONTENTS 33 0000-1 SECTION 33 3633-- UTILITY SEPTIC TANK DRAINAGE FIELD PART 1 - GENERAL 1.1 SUMMARY A. Includes
More information11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...
Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3
More informationMeasuring Building Substructures: Solutions to First Year Introductory Level Examination Questions
Dublin Institute of Technology ARROW@DIT Other Resources School of Surveying and Construction Management 2016-08-04 Measuring Building Substructures: Solutions to First Year Introductory Level Examination
More informationCATCHMENT STRUCTURE 13M X 15M
BILL OF QUANTITIES AND SPECIFICATIONS CONSTRUCTION OF 100M3 DJABIA ITEM No. DESCRIPTION UNIT QUANTITY RATE AMOUNT KSHS CATCHMENT STRUCTURE 13M X 15M 1.1 Clear catchment site of all bushes, scrubs, undergrowth,
More informationRetaining Walls. Made Easy
Retaining Walls Made Easy Retaining Walls Made Easy! Contents Page 1 Contents Page 2 Foreword Page 3 Demolition Page 3 Removal Vegetation Page 3 Excavation Page 4 Reinforcement Steel Page 6 Concreting
More informationXtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)
CERTIFICATE NO. 03/0183 DETAIL SHEET 1 Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade) PRODUCT DESCRIPTION This Detail Sheet relates to Xtratherm Thin-R Partial Fill Cavity Wall Board, as
More informationSheetseal 226 RIW. Sheetseal 226
CI/SfB Vs1 April 2009 CERTIFICATE No 92/2817 Sheetseal 226 is a cold applied, high density polyethylene film, coated with a bitumen/rubber self adhesive layer with a removable reinforced silicone paper.
More informationFoundations. Issue. Slab-On-Grade Liquid Water Control (See Figure 2-2) Goals. Guidance
www.epa.gov/iaq/moisture Foundations Issue Building foundations are vulnerable to moisture problems for a number of reasons, including: Water from rain and from plumbing leaks is drawn by gravity to foundations,
More informationInspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.
Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure
More informationUnited Nations Development Programme
PROJECT UPGRADE OF EXISTING ISLAND WASTE MANAGMENT CENTER AT MUNDOO ISLAND PREPARED BY CONTENT MUNDHOO DRAWINGS SL.NO DRAWING NAME DRAWING NUMBER 1 SITE PLAN /2017/IWMC/MUN/001 2 FLOOR PLAN /2017/IWMC/MUN/002
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS The following instructions are provided for the installation of Radon Guard rigid board sub-slab insulation and radon gas mitigation. Radon Guard should be installed by a professional
More information1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT 1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. Clearing of site, site office/work shed, Toilet, etc. A provisional cost to be allocated in South African
More informationChapter 2: Foundation
Chapter 2: Foundation Crawlspace [V502.1.2] [V502.1.2] [V502.1.3] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup
More informationPART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):
PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer
More informationSTEP BY STEP GUIDE TO BUILDING YOUR CONSERVATORY OCT 2013 V.3
STEP BY STEP GUIDE TO BUILDING YOUR CONSERVATORY OCT 2013 V.3 2 Hello & Welcome... This step-by-step guide gives you an insight into the work that will take place at your home during the installation of
More informationHomeGuard GT Granular Termiticide
HomeGuard GT Granular Termiticide Product Manual Precision Termite Management This document is and will remain the property of FMC Australasia Pty Ltd. No part of this document can be copied and/or reproduced
More informationUnderfloor & through wall ventilation 99 Airbrick 100 Telescopic underfloor vent 101 Accessories 102 Cavity sleeves Internal grilles and
99 Airbrick 100 Telescopic underfloor vent 101 Accessories 102 Cavity sleeves 103-104 Internal grilles and airbrick cowls 105 Aero core anti-draught ventilators 106 Aero wall anti-draught ventilators 107
More informationSheetseal GR RIW. Sheetseal GR
CI/SfB Ln2 April 2009 Sheetseal GR is a cold applied, high density polyethylene film bonded to aluminium foil and coated with a bitumen / rubber self adhesive layer with a removable reinforced silicone
More informationWARMFLOOR. Installation Guide.
WARMFLOOR Installation Guide 9 7 8 5 3 1 Damp Proof Membrane (supplied by others to suit wall) 9 Air Brick / Vent (supplied by others) Product overview The Lynx Warmfloor system is a cost effective highly
More informationContract18. Vitrified paving FLAT ROOF BALCONY ROOF TERRACE DISPLAY AREA
Contract18 Vitrified paving FLAT ROOF BALCONY ROOF TERRACE DISPLAY AREA Contract 18 Vitrified Paving Installation Methods Installation Method 1 Dry Installation Using Our Range of Paving Support Pads Installation
More informationCAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION
CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL... 2 C222.01
More informationSeptic Tank Guidelines
Septic Tank Guidelines Septic tanks are suitable for conditions where the wastewater can drain away and be absorbed into the soil without contaminating ground water where it is extracted. Sealed solid
More informationBuilding Construction
Building Construction Shallow Foundations Module-III Introduction The foundation can be classified broadly into two types: Shallow foundations Deep foundations Shallow foundations Shallow Foundations When
More informationSikaProof Bentonite Plastic DPM overlap - Compacted Backfill Scale 1:5. Detail no: SB01 - Nov 2013
100 100 1.1 Metre wide piece of fully bonded to cast concrete 300 SikaSwell P Profile 2010H Compacted backfill Plastic DPM Min. 300mm overlap with Bentonite Paste in the lap 300 300 Plastic DPM overlap
More informationLeaving Certificate Revision Notes. Airtightness. Potential air leakage paths (the numbered points in section 2.1 give a description for
Leaving Certificate Revision Notes Airtightness 6 7 8 8 9 10 5 11 5 12 4 3 1 2 13 12 14 Potential air leakage paths (the numbered points in section 2.1 give a description for Airtightness Introduction
More informationTo be confirmed. Extent of any underbuild Gas regime
To be confirmed. Extent of any underbuild Gas regime 0 600 3450 375 375 650 3450 395 S.O.P Provide "hyrib" at beam / beam intersections to first pour (Typical) 5 0 395 0 3450 S.O.P 650 0 Gas membrane Gas
More informationPRODUCT & INSTALLATION GUIDE
quinn-therm.com APRIL 17 PRODUCT & INSTALLATION GUIDE www.quinn-buildingproducts.com1 Product & Installation Guide Product/APPLICATION selector WALL 08 Cavity walls: masonry - full fill 10 Cavity walls:
More informationGround Heave Solutions
Ground Heave Solutions Who are Cordek? Cordek provides technical solutions for a range of construction requirements. Innovative thinking, engineering expertise and extensive CAD/CAM capabilities enable
More informationAPPENDIX 5: CONSTRUCTION CHECKLISTS
APPENDIX 5: CONSTRUCTION CHECKLISTS This appendix presents the construction checklists for the various retaining wall mitigation strategies: 10.1 Void Fill 10.2 Surface Bond Overlay 10.3 Reinforced Overlay
More information