2009 Louisiana Transportation Conference February 9, 2009 Session 9. LA DOTD s Design-Build Procurement For the I-12 Widening Project

Size: px
Start display at page:

Download "2009 Louisiana Transportation Conference February 9, 2009 Session 9. LA DOTD s Design-Build Procurement For the I-12 Widening Project"

Transcription

1 2009 Louisiana Transportation Conference February 9, 2009 Session 9 LA DOTD s Design-Build Procurement For the I-12 Widening Project

2 Jeff Burst, P.E. Project Management Administrator Louisiana Department of Transportation and Development

3 DB Perspective DB is a different way of doing business Built on the tenets of teamwork, trust, and ownership The team is DOTD and the Design-Builder working together for the success of the Project The relationship is not arms length or adversarial Quality is embodied in the process

4 DB Perspective DB is a different way of doing business continued Flexibility and opportunity for innovation and creativity are encouraged Uses partnering Empowers decision-making at the lowest levels of the team

5 I-12 Widening Design-Build

6 O'Neal Lane Interchange

7 Project Corridor Limits

8 Project Scope Design-Build to Budget - $100,000,000 Widen I-12 to 6 lanes Beginning at O Neal Lane Interchange Eastward to the maximum extent allowable within the stated budget All Designs conforming to AASHTO and DOTD Standards

9 Major Project Elements Widening the mainline of Interstate 12 from four (4) lanes to six (6) lanes. Widening to the median side of the existing pavement Required bridge structure modifications/replacements.

10 Amite River Bridge Structure 2 new parallel bridge structures to replace the existing 4 bridge structures. Approx. 2,615 feet of main line bridge structure. Degrading existing embankment plug between the Main and Relief structures. The proposed finished bridge grade raised a few feet and vertically tie into the existing roadway elevation at the approaches.

11 Overpass Bridge Structures O Neal lane Interchange (LA 3245): Interior widening of Interchange overpass structure. 4-H Road Overpass (LA 1032): Providing interior widening of the overpass structure. Range Ave. Interchange (LA 3002): Providing interior widening of the Interchange overpass structure

12

13 DB Approach Two-Phase Procurement Request for Qualifications with Statement of Qualifications (RFQ/SOQ); and Scope of Services Package with Technical and Price Proposals

14 Procurement Timeline Notice of Intent April 30, 2008 Letters of Interest June 6, 2008 Request for Statements of June 18, 2008 Qualification Shortlist Announced August 22, 2008 Scope of Services Package September 12, 2008 One-on-One Meetings Sept. & Oct. 2008

15 Procurement Timeline Proposal Due Date November 10, 2008 Price Proposal Opening December 8, 2008 Contract Award December 15, 2008 Contract Execution/NTP December 30, 2008

16 DB Approach Phase 1 RFQ/SOQ Standing Consultant Evaluation Committee Resulted in the Short-List of the most highly rated Proposers Austin Bridge & Road Gilchrist Construction Company James Construction Company Scott Bridge Company & Barber Brothers JV TEAM 12

17 RFQ Evaluation Factors (Pass/Fail) Legal (Pass/Fail) Financial Organization and Key Managers Experience Past Performance Backlog/Capacity Project Understanding

18 RFQ Project Goals 1. NTP by the end of Compliance with all DOTD and AASHTO standards and specifications. 3. Quality design and construction producing a durable product. 4. Minimize life cycle costs. 5. Maximize lane openings and minimize queuing.

19 RFQ Project Goals 6. No major injury or loss of life. 7. Positive public perception of project. 8. Extend 6 lane widening:o Neal Lane as far East as funding/innovation will allow. 9. No claims. 10.Complete by the end of 2011.

20 DB Approach Phase 2 Scope of Services Package/Proposals Technical Review Committees Successful Proposer will be the lowest adjusted score considering the following: Overall Technical Score; Price; and Time/value.

21 I-12 DB Proposal Evaluation Criteria Scope of Services Package Evaluation Factors: (Pass/Fail) Legal (Pass/Fail) Financial Technical Solutions Key Personnel and Experience Management Approach Technical evaluation factors are listed in descending order of importance

22 Technical Solutions Length of I-12 reconstruction and functional benefit: (Significantly most important) Maintenance of Traffic (MOT) Bridge Concepts Roadway, Pavement Design, and Hydraulics (Equal importance) Miscellaneous Project Elements (Less important)

23 Key Personnel and Experience Evaluation of the Design-Builder s staff quality committed to the project.

24 Management Approach Project Management Plan Project Controls Organization Sub-factors are listed in descending order of importance

25 I-12 Design-Build Procurement The Proposal Evaluation Process Evaluation Sub Committee Teams provide evaluation recommendations Clarifications if needed Adjectival Ratings Main Technical Review Committee Decides Overall Adjectival Rating and Score

26 I-12 Design-Build Procurement The Evaluation Process: All Members rate all factors Consensus of all members for Final Factor and Overall Ratings is required. Conversion Table to Point Scores from Final Adjectival Ratings.

27 The Evaluation Philosophy A+ G G G- A A-

28 Adjectival Ratings EXCEPTIONAL ~ The Proposer has demonstrated an approach that is considered to significantly exceed stated criteria in a way that is beneficial to the LA DOTD. This rating indicates a consistently outstanding level of quality with very little or no risk that this Proposer would fail to meet the requirements of the solicitation. There are essentially no Weaknesses. GOOD ~ The Proposer has demonstrated an approach that is considered to exceed stated criteria. This rating indicates a generally better than acceptable quality with little risk that this Proposer would fail to meet the requirements of the solicitation. Weaknesses, if any, are very minor. ACCEPTABLE ~ The Proposer has demonstrated an approach that is considered to meet the stated criteria. This rating indicates an acceptable level of quality. The Technical Proposal demonstrates a reasonable probability of success. Weaknesses are minor and can be readily corrected. UNACCEPTABLE ~ The Proposer has demonstrated an approach that indicates significant Weaknesses/Deficiencies and/or unacceptable quality. The Technical Proposal fails to meet the stated criteria and/or lacks essential information and is conflicting and/or unproductive. There is no reasonable likelihood of success; Weaknesses/Deficiencies are so major and/or extensive that a major revision to the Technical Proposal would be necessary. In assigning ratings the LA DOTD may assign + or - (such as, exceptional -, good +, and acceptable + ) to the ratings to better differentiate within a rating in order to more clearly differentiate between the Proposers.

29 Legal & Financial Evaluation Evaluation Factor Gilchrist James Legal Scott Bridge and Barber Brothers (Pass/Fail) Pass Pass Pass Financial (Pass/Fail) Pass Pass Pass

30 Technical Evaluation Ratings Technical Evaluation Factors Technical Solutions Key Personnel & Experience Management Approach Gilchrist James Scott Bridge and Barber Brothers A+ G- A- G- G- G+ G- A+ A+ Overall Rating A+ G- A-

31 Technical Scoring System Overall Proposal Technical Rating Final Total Technical Score Exceptional + 1,750 Exceptional 1,350 Exceptional - 1,150 Good + 1,050 Good 1,000 Good Acceptable Acceptable 825 Acceptable - 625

32 Selected Design-Build Team Adjusted Score = $100 Million + ($10,000/day)(# of days) Technical Score Adjusted Score = $100 Million + ($10,000/day)(1057days) 975 = 113,405

33 Selected Design-Build Team

34

35 Project Phasing

36 Project Phasing

37 Project Schedule

38 Project Schedule

39 Possible Future DB Procurement Improvements More face to face meetings with Proposers presentations and discussions. Operations, Maintenance, and Longterm Warranties Proposal Preparation Time extend where possible

40 Possible Future DB Procurement Improvements SOQ only as needed or combined with NOI s Short-list Number Project-by-Project Trend LA DB Procurements toward the FHWA DB Regulations

41 Questions?

I-64 Capacity Improvements Segment III RFQ Information Meeting

I-64 Capacity Improvements Segment III RFQ Information Meeting I-64 Capacity Improvements Segment III RFQ Information Meeting April 5, 2017 Janet Hedrick, P.E. Design Project Manager Joseph Clarke, P.E. APD Project Manager and POC I-64 Capacity Improvements Segment

More information

DESIGN BUILD LA 318 INTERCHANGE FUTURE I-49 SOUTH

DESIGN BUILD LA 318 INTERCHANGE FUTURE I-49 SOUTH DESIGN BUILD LA 318 INTERCHANGE FUTURE I-49 SOUTH Timothy Nickel, P.E. Project Management Administrator (225) 379-1110 Timothy.Nickel@la.gov Post Office Box 94245 Baton Rouge, LA 70804-9245 A Project within

More information

RFQ Information Meeting

RFQ Information Meeting August 25, 2016 RFQ Information Meeting I-64 Southside Widening & High Rise Bridge Phase 1 Widen From 4 Lanes to 6 Lanes Rick Correa, PE Project Manager Jeff Roby, PE APD Project Manager and POC Agenda

More information

GDOT s Design-Build Program Past, Present and Future

GDOT s Design-Build Program Past, Present and Future GDOT s Design-Build Program Past, Present and Future John D. Hancock, P.E. Assistant State Innovative Program Delivery Engineer September 16, 2013 Agenda Program Overview GA Code 32-2-81 (SB 70) Look Ahead

More information

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager Interstate 66 Widening from Gainesville to Haymarket RFQ Information Meeting January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager John C. Daoulas, P.E. APD Project Manager and POC Introduction

More information

Gloucester Parkway Extension RFQ Information Meeting

Gloucester Parkway Extension RFQ Information Meeting Gloucester Parkway Extension RFQ Information Meeting May 24, 2013 Tim Hartzell, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC Topics Project Location & Overview RFQ Information

More information

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction I-395 Reconstruction MDX SR 83611 Improvements I-95 Concrete Pavement Reconstruction FTBA Conference February 10, 2016 Presentation Outline Project Overview I-395 Reconstruction MDX SR 83611 I-95 Pavement

More information

VDOT Major Projects Update

VDOT Major Projects Update VDOT Major Projects Update April 20, 2017 Agenda Introduction Peninsula Projects Southside Projects Harbor Crossing Questions/Comments 2 Summary Construction Execution Timeline I-64 Peninsula Seg. I PE

More information

I-64/ Route 15 (Zion Crossroads) RFQ Information Meeting

I-64/ Route 15 (Zion Crossroads) RFQ Information Meeting I-64/ Route 15 (Zion Crossroads) Diverging Diamond Interchange RFQ Information Meeting December 13, 2011 Brian Arnold District Project Manager Ian Millikan, PE APD Project Manager and POC Introduction

More information

Route 7 Truck Climbing Lane. RFQ Information Meeting

Route 7 Truck Climbing Lane. RFQ Information Meeting Route 7 Truck Climbing Lane From West Market Street to Route 9 RFQ Information Meeting November 9, 2012 Mark Gibney, PE District Project Manager Ian Millikan, PE APD Project Manager and POC Introduction

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

Five approved ATCs that reduce project capital costs by an estimated $1.5 million.

Five approved ATCs that reduce project capital costs by an estimated $1.5 million. INTRODUCTION McCarthy Building Companies, Inc. (McCarthy) is one of the nation s leading design-build contractors. For the SH 71 Toll Lanes project, has recruited top tier talent from the transportation

More information

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016 I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia RFQ Information Meeting - November 9, 2016 Krishna Potturi, PE Project Manager Suril Shah APD Project

More information

Advanced Construction Techniques

Advanced Construction Techniques Alaskan Way Viaduct Replacement Program Organization University of Washington Date October 20, 2011 Presentation Overview SR 99 south end viaduct replacement. Design-build contracting. SR 99 tunnel project.

More information

PRE-REQUEST FOR PROPOSAL (RFP) MEETING GENERAL ENGINEERING CONSULTANT (GEC) FOR I-2/I-69C INTERCHANGE PHARR DISTRICT

PRE-REQUEST FOR PROPOSAL (RFP) MEETING GENERAL ENGINEERING CONSULTANT (GEC) FOR I-2/I-69C INTERCHANGE PHARR DISTRICT PRE-REQUEST FOR PROPOSAL (RFP) MEETING GENERAL ENGINEERING CONSULTANT (GEC) FOR I-2/I-69C INTERCHANGE PHARR DISTRICT RFQ No. 21-9SDP5001 601CT0000003698 November 19, 2018 Safety Minute Purpose of Meeting

More information

TAMPA BAY NEXT MAJOR PROJECTS UPDATE

TAMPA BAY NEXT MAJOR PROJECTS UPDATE TAMPA BAY NEXT MAJOR PROJECTS UPDATE Marshall Hampton, FDOT District Seven Tampa Bay Next Program Manager January 18, 2019 1 2 Program Overview Funding Priorities Fiscal Year 2018 2019 2020 2021 2022 2023

More information

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC #105515 RFQ Information Meeting Raina Rosado, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC July 11,

More information

Design-Build Selmon West Extension

Design-Build Selmon West Extension TAMPA-HILLSBOROUGH COUNTY EXPRESSWAY AUTHORITY Letter of Clarification No. 1 FOR REQUESTS FOR PROPOSALS Design-Build Selmon West Extension Page 1 of 8 Letter of Clarification No. 1 ~ Date of Letter of

More information

Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013

Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013 PROJECT MANAGEMENT IN A DOT ENVIRONMENT Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013 Mission Safe Transportation

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

Route 29 Solutions. October 23, 2014 Rt. 29 Project Delivery Advisory Panel Meeting

Route 29 Solutions. October 23, 2014 Rt. 29 Project Delivery Advisory Panel Meeting October 23, 2014 Rt. 29 Project Delivery Advisory Panel Meeting Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Viewers:

More information

Route 29 Solutions. September 11, 2014 Rt. 29 Project Delivery Advisory Panel Meeting

Route 29 Solutions. September 11, 2014 Rt. 29 Project Delivery Advisory Panel Meeting September 11, 2014 Rt. 29 Project Delivery Advisory Panel Meeting Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Viewers:

More information

395 Express Lanes Project Design-Build Procurement Industry Outreach. March 23, 2016

395 Express Lanes Project Design-Build Procurement Industry Outreach. March 23, 2016 395 Express Lanes Project Design-Build Procurement Industry Outreach March 23, 2016 INTRODUCTIONS Karl Rohrer, Head of Delivery, Transurban Susan Shaw, Regional Transportation Program Director, VDOT Sean

More information

The Gateway Expressway FTBA Conference. February 2-3, 2017

The Gateway Expressway FTBA Conference. February 2-3, 2017 The Gateway Expressway FTBA Conference February 2-3, 2017 256996-1 SR 686 (Roosevelt Blvd.) at CR 611 (49th St. N) PD&E 256866-1 Segment 2A 256997-1 SR 686 (Roosevelt Blvd.) from 49th St. Bridge to north

More information

FTBA 2018 Construction Conference Major Projects Update

FTBA 2018 Construction Conference Major Projects Update FTBA 2018 Construction Conference Major Projects Update Bill Jones, P.E. FDOT District 7 Director of Transportation Development 1 2 3 FUNDED PROJECTS Howard Frankland Bridge Industry Forum September 2018

More information

Right-of-Way Permit Process

Right-of-Way Permit Process Right-of-Way Permit Process 2018 Louisiana Transportation Conference Joy K. Johnson, P.E. Right-of-Way Permit Engineer Road Design Section History 1938 First R/W permit issued at DOTD HQ» Project Permit

More information

Design-Build and Design-Bid-Build

Design-Build and Design-Bid-Build Design-Build and Design-Bid-Build Comparison of Overall Cost and Time Question: How does the total cost and time to deliver a $55,000,000 and 814 day design-build project compare to using design-bid-build

More information

I-70 East Webinar for Subcontractors. April 14, 2015

I-70 East Webinar for Subcontractors. April 14, 2015 I-70 East Webinar for Subcontractors April 14, 2015 Today s Presenters Peter Kozinski, I-70 East Project Director peter.kozinski@state.co.us Rebecca White, I-70 East Communications Manager rebecca.white@state.co.us

More information

Existing FAST Act Funding. Wes Bolinger FHWA LA Division Administrator

Existing FAST Act Funding. Wes Bolinger FHWA LA Division Administrator Existing FAST Act Funding Wes Bolinger FHWA LA Division Administrator Existing FAST Act Funding Build America Bureau TIGER Questions? Thank You! Goal: $1.5 trillion investment over 10 years $200 billion

More information

Tarbutton Road Interchange and I-20 Frontage Roads. Estimating and Planning Group

Tarbutton Road Interchange and I-20 Frontage Roads. Estimating and Planning Group Tarbutton Road Interchange and I-20 Frontage Roads Dr. N. Wasiuddin Braden Smith Jared Taylor John Harrison Sarah Wells Samantha Tatro Ryan Ross Instructor Project Manager Transportation Group Geotechnical

More information

PEPS Pre-RFQ Meeting. IH 10 and US 59 Freeway Expansion from 4 to 6 Lanes CEI Beaumont District. March 5, Date. Footer Text

PEPS Pre-RFQ Meeting. IH 10 and US 59 Freeway Expansion from 4 to 6 Lanes CEI Beaumont District. March 5, Date. Footer Text PEPS Pre-RFQ Meeting IH 10 and US 59 Freeway Expansion from 4 to 6 Lanes CEI Beaumont District March 5, 2018 Footer Text Housekeeping Thanks for coming! Be sure to provide your information on the sign-in

More information

Matanuska- Susitna Borough Subdivision Construction Manual Update, Phase 1 4/6/2018 Summary of Changes

Matanuska- Susitna Borough Subdivision Construction Manual Update, Phase 1 4/6/2018 Summary of Changes Summary of Changes Throughout document Introduction Index Remove gendered pronouns Standardize language, vocabulary, acronyms Refer to latest edition of referenced publications Tie in subdivision code

More information

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013)

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013) SH 183 Managed Lanes Project RFQ Q & A MATRIX #2 (June 4, 2013) No. Current language states: Project experience provided by a parent or sister company of the Lead Engineering Firm, Lead Contractor or Lead

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form

More information

TRANSPARENCY IN STRATEGIC PROJECTS DIVISION

TRANSPARENCY IN STRATEGIC PROJECTS DIVISION TRANSPARENCY IN STRATEGIC PROJECTS DIVISION Scott Spradlin, P.E. Strategic Projects Division, TxDOT Footer Text October 13, 2015 Date INNOVATIVE PROJECT DELIVERY INNOVATIVE PROJECT DELIVERY AUTHORITY AND

More information

Executive Summary ORGANIZATION CHANGES MANAGEMENT, DECISION- MAKING, AND DAY-TO-DAY OPERATION STRUCTURE

Executive Summary ORGANIZATION CHANGES MANAGEMENT, DECISION- MAKING, AND DAY-TO-DAY OPERATION STRUCTURE Executive Summary The Lane Construction Corporation and HDR have once again assembled a strong team (Lane-HDR) that provides the best value to TxDOT and the CTRMA. Our success in delivering design-build

More information

Clearview Parkway LA 3152 Stage 0 Feasibility Study and Environmental Inventory

Clearview Parkway LA 3152 Stage 0 Feasibility Study and Environmental Inventory Clearview Parkway LA 3152 Stage 0 Feasibility Study and Environmental Inventory Public Information Meeting Thursday, February 21, 2008 6:30 p.m., Eastbank Council Chambers, Yenni Building Project Sponsors

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS PROJECT: ISSUE DATE: October 22, 2018 ISSUED BY: INQUIRIES: SUBMISSION DEADLINE: SUBMIT TO: City of Delaware, Ohio Public Works Department, Traffic & Engineering Services 440

More information

Alternative Project Delivery Status Update 2013

Alternative Project Delivery Status Update 2013 Alternative Project Delivery Status Update 2013 Eric Kahlig Division of Construction Management Alternative Project Delivery Innovative Contracting Manual Separate from Division of Innovative Delivery

More information

PRE-RFQ MEETING SAN ANTONIO DISTRICT PLANS, SPECIFICATIONS, & ESTIMATE (PS&E) DECEMBER 3, 4:00PM

PRE-RFQ MEETING SAN ANTONIO DISTRICT PLANS, SPECIFICATIONS, & ESTIMATE (PS&E) DECEMBER 3, 4:00PM PRE-RFQ MEETING SAN ANTONIO DISTRICT PLANS, SPECIFICATIONS, & ESTIMATE (PS&E) DECEMBER 3, 2018 @ 4:00PM Procurement for: LP 1604 (from SH 16 to IH 35 North) PEPS Professional Engineering Procurement Services

More information

I-81 Exit 114 Bridge Replacement Project RFQ Information Meeting

I-81 Exit 114 Bridge Replacement Project RFQ Information Meeting I-81 Exit 114 Bridge Replacement Project RFQ Information Meeting July 25, 2017 Phil Hammack, P.E. Design Project Manager Stephen Kindy, P.E. APD Division Project Manager and POC I-81 Bridge Replacement

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

STAGE 0 Preliminary Scope and Budget Checklist

STAGE 0 Preliminary Scope and Budget Checklist STAGE 0 Preliminary Scope and Budget Checklist A. Project Background District 04 Parish Caddo Route LA 3132 Control Section 427-01 Begin Log Mile 10.22 (LA 3132@ LA 523 terminus) End Log Mile 12.80 (LA

More information

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018 What is the Carolina Crossroads Project? The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing to upgrade and redesign a key

More information

TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY

TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY FLOOD MITIGATION AT THE HUGH L CAREY TUNNEL AND THE QUEENS MIDTOWN TUNNEL DESIGN-BUILD CONTRACT TUN-MIT-01 R EQUEST FOR E XPRESSIONS OF I NTEREST (EOI) I NFORMATIONAL

More information

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange I-290 Phase I Study West of US 45 (Mannheim Road) to Racine Avenue Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange Technical Memorandum Prepared By: Huff & Huff, Inc.

More information

Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods

Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods February 21, 2018 James S. Utterback HRBT Project Director Virginia Department of Transportation Ten Hampton Roads Tunnels

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

PROFESSIONAL SERVICES BULLETIN 17-2 ADDENDUM 1

PROFESSIONAL SERVICES BULLETIN 17-2 ADDENDUM 1 PROFESSIONAL SERVICES BULLETIN 17-2 ADDENDUM 1 ADDENDUM 1 does not change the due date or time. STATEMENTS OF INTEREST are due by 4:30 p.m. (Central Standard Time) Due Date: March 27, 2017 Successful Offerors

More information

I-40 in Oklahoma County from MM 167 to MM 173

I-40 in Oklahoma County from MM 167 to MM 173 I-40 in Oklahoma County from MM 167 to MM 173 From East of Choctaw Road, East to the Pottawatomie County Line March 4, 2014 6:00 p.m. 1 Purpose of Meeting Present purpose and need for the proposed project

More information

Progressive Design Build

Progressive Design Build Progressive Design Build July 19, 2018 Ash Dhingra P.E.,S.E TRADITIONAL PROCUREMENT Design-Bid-Build (DBB) Design to 100%, procurement (bid), and construction proceed sequentially Construction contract

More information

US-101 CORRIDOR ADVISOR S UPDATE

US-101 CORRIDOR ADVISOR S UPDATE US-101 CORRIDOR ADVISOR S UPDATE MONTECITO ASSOCIATION BOARD OF DIRECTORS 12 MAY 2015 1 SCOPE OF SERVICES Identify & evaluate innovative project delivery strategies: Avoid & minimize delays / expedite

More information

Request for Proposals Final with Addendum 3

Request for Proposals Final with Addendum 3 Request for Proposals Final with Addendum 3 Interstate 85 Reconstruction and Widening from Approximate MM 77 to MM 98 Project ID P027114 A Design-Build Project Spartanburg and Cherokee Counties, South

More information

The sections below include examples of HSM implementation activities undertaken by various transportation agencies.

The sections below include examples of HSM implementation activities undertaken by various transportation agencies. NCHRP 17-50 TECHNICAL BRIEFINGS This series of technical briefings provide a reference for highway agencies that are interested in initiating the implementation of the American Association of State Highway

More information

Recommended AASHTO Design-Build Procurement Guide

Recommended AASHTO Design-Build Procurement Guide Recommended AASHTO Design-Build Procurement Guide NCHRP Project 20-7/172 Presentation to the AASHTO Subcommittee on Design Annual Meeting Chicago, Illinois June 28, 2005 University of Colorado Keith R.

More information

Managing a Design-Build vs. Bid-Build Project

Managing a Design-Build vs. Bid-Build Project Managing a Design-Build vs. Bid-Build Project January 30, 2018 Claude Ipock, P.E. SCDOT State Construction Engineer Jay Thompson, P.E. SCDOT State Pavement Design Engineer Contract Documents Bonds Performance

More information

I-64 Pavement Rehabilitation

I-64 Pavement Rehabilitation LETTER OF SUBMITTAL I-64 Pavement Rehabilitation From: Hampton Roads Bridge Tunnel (East Abutment) To: Little Creek Road Bridge (West Abutment) A Design-Build Project Norfolk, Virginia Proposal Submitted

More information

Design-Build Reconstruction of I-494 in Plymouth, Minnetonka and Eden Prairie, Minnesota. PMI MN 2009 Professional Development Days

Design-Build Reconstruction of I-494 in Plymouth, Minnetonka and Eden Prairie, Minnesota. PMI MN 2009 Professional Development Days Design-Build Reconstruction of I-494 in Plymouth, Minnetonka and Eden Prairie, Minnesota PMI MN 2009 Professional Development Days Agenda Project Overview Best Practices: Knowing the Right Things Doing

More information

I-80/I-580/US 95 Reno Spaghetti Bowl. Presentation to NDOT Transportation Board June 6, 2016 John M. Terry, P.E.

I-80/I-580/US 95 Reno Spaghetti Bowl. Presentation to NDOT Transportation Board June 6, 2016 John M. Terry, P.E. I-80/I-580/US 95 Reno Spaghetti Bowl Presentation to NDOT Transportation Board June 6, 2016 John M. Terry, P.E. Long-term solutions to Reno Spaghetti Bowl Begin National Environmental Policy Act (NEPA)

More information

Nancy Daubenberger, MnDOT Assistant Commissioner Engineering Services

Nancy Daubenberger, MnDOT Assistant Commissioner Engineering Services Nancy Daubenberger, MnDOT Assistant Commissioner Engineering Services Kevin Western, MnDOT State Bridge Engineer House Transportation Policy and Finance Committee April 11, 2016 Introduction to Design

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update

I-64 Capacity Improvements Segment I Financial Plan Annual Update I-64 Capacity Improvements Segment I December 1, 2016 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479), NHA-064-3(479) UPC 104905

More information

Highway and Freight Current Investment Direction and Plan. TAC August 2, 2017

Highway and Freight Current Investment Direction and Plan. TAC August 2, 2017 Highway and Freight Current Investment Direction and Plan TAC August 2, 2017 Today s Topics Highway & Freight Where are we now? The Highway Story What are the issues? How is the system performing? Where

More information

Principal Arterial Intersection Conversion Study

Principal Arterial Intersection Conversion Study Principal Arterial Intersection Conversion Study Technical Advisory Committee February 1, 2017 Presentation Overview Background Need for Study, Objectives Phase I Screening (Completed Spring 2016) 374

More information

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge Client: AJR or IJR? This is a TO-MAY-TO This is a TO-MAH-TO Practical Design PRACTICAL

More information

Request for Letter of Interest (Electronic Submittal Required)

Request for Letter of Interest (Electronic Submittal Required) Request for Letter of Interest (Electronic Submittal Required) Skyline Drive Engineering Design and Right-of-Way Acquisition October 2017 Page 1 of 10 Overview: Consultant selection is a Qualification-Based

More information

Performance Based Practical Design. An FHWA Perspective

Performance Based Practical Design. An FHWA Perspective Performance Based Practical Design An FHWA Perspective Early Adopters Research on PBPD and Background Materials http://www.fhwa.dot.gov/design/pbpd/ FAST Act Changes that Encourage PBPD On the NHS, design

More information

I-64 Capacity Improvements Segment II Financial Plan Annual Update October 30, 2017

I-64 Capacity Improvements Segment II Financial Plan Annual Update October 30, 2017 I-64 Capacity Improvements Segment II Financial Plan Annual Update October 30, 2017 State Project # 0064-965-264, P101, R201, C501, B627, B628, B629, B630, B631, B632, B633, B634, B635, D603, D604, D605,

More information

Design-Build. Authorization. Criteria Selection/Award Process. Design-Build Construction Engineering and Inspection

Design-Build. Authorization. Criteria Selection/Award Process. Design-Build Construction Engineering and Inspection DESIGN-BUILD Design-Build Authorization Project Selection Criteria Selection/Award Process Warranties Design-Build Construction Engineering and Inspection Materials Acceptance DESIGN-BUILD AUTHORIZATION

More information

DESIGN BUILD LA 318 INTERCHANGE FUTURE I-49 SOUTH

DESIGN BUILD LA 318 INTERCHANGE FUTURE I-49 SOUTH DESIGN BUILD LA 318 INTERCHANGE FUTURE I-49 SOUTH Post Office Box 94245 Baton Rouge, LA 70804-9245 Timothy Nickel, P.E. Senior Project Manager (225) 379-1110 Timothy.Nickel@la.gov 1. First DOTD Design

More information

ALTERNATIVE PROJECT DELIVERY DIVISION

ALTERNATIVE PROJECT DELIVERY DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION ALTERNATIVE PROJECT DELIVERY DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design-Build Requirements for Advertisement SPECIFIC SUBJECT: APPROVED:

More information

Implementing Design-Build On a Small Scale Everett s East Clearwell Roof Replacement

Implementing Design-Build On a Small Scale Everett s East Clearwell Roof Replacement Richard Hefti, P.E., City of Everett, and Patrick Weber, P.E., Brown and Caldwell Implementing Design-Build On a Small Scale Everett s East Clearwell Roof Replacement April 27, 2018 Background: Everett

More information

Rte. 66/29 Interchange Reconstruction Project: ,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track

Rte. 66/29 Interchange Reconstruction Project: ,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track Rte. 66/29 Interchange Reconstruction Project: 0066-076-113,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track Mileposts B-8.1 thru B-8.8 DOT 714-363S, 714-364Y Gainesville,

More information

REQUEST FOR PROPOSAL (RFP) AS NEEDED ENGINEERING DESIGN SERVICES FOR 2019, 2020 & 2021

REQUEST FOR PROPOSAL (RFP) AS NEEDED ENGINEERING DESIGN SERVICES FOR 2019, 2020 & 2021 REQUEST FOR PROPOSAL (RFP) AS NEEDED ENGINEERING DESIGN SERVICES FOR 2019, 2020 & 2021 The Washtenaw County Road Commission (WCRC) invites qualified firms to submit Proposals for As Needed Engineering

More information

PRE-RFQ MEETING I-345 FEASIBILITY STUDY SCHEMATICS & ENVIRONMENTAL (SD)

PRE-RFQ MEETING I-345 FEASIBILITY STUDY SCHEMATICS & ENVIRONMENTAL (SD) PRE-RFQ MEETING I-345 FEASIBILITY STUDY SCHEMATICS & ENVIRONMENTAL (SD) Solicitation 18-8SDP5001 Footer Text Housekeeping Thanks for coming! Be sure to provide your information on the sign-in sheet Bathrooms

More information

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH Presentation Outline General Introduction Part II Site Preparation & Earthwork Part III Base Courses

More information

Northeast States Materials Engineers Meeting (NESMEA) October 9, 2006 Newark, DE

Northeast States Materials Engineers Meeting (NESMEA) October 9, 2006 Newark, DE Northeast States Materials Engineers Meeting (NESMEA) October 9, 2006 Newark, DE Delaware DOT s Use of Slag Cement Jim Pappas, P.E. Chief Materials & Research Engineer Materials & Research Section Outline

More information

Harlem Avenue Interchange Design Discussion. August 24, 2015

Harlem Avenue Interchange Design Discussion. August 24, 2015 Harlem Avenue Interchange Design Discussion August 24, 2015 1 Expressway Construction Pre-dates Modern Design Standards Expressway designed and constructed in 1950 s No past experience to base design standards

More information

Florida Department of Transportation DESIGN-BUILD PUSH BUTTON Contract

Florida Department of Transportation DESIGN-BUILD PUSH BUTTON Contract Florida Department of Transportation DESIGN-BUILD PUSH BUTTON Contract (FEDERAL SAFETY AND STATE FUNDS) Presentation to FHWA EDC 3 Systemic Safety Implementation Peer Exchange, Nashville, TN September

More information

TABLE OF CONTENTS. Manual Section. Introduction 1. Using This Manual 2-3. Administrative Actions 4-6. Road and Bridge Project Types 7

TABLE OF CONTENTS. Manual Section. Introduction 1. Using This Manual 2-3. Administrative Actions 4-6. Road and Bridge Project Types 7 ii TABLE OF CONTENTS Manual Section Pages Introduction 1 Using This Manual 2-3 Administrative Actions 4-6 Road and Bridge Project Types 7 Road and Bridge Funding Programs 8-9 Project Planning and Eligible

More information

ALTERNATE TECHNICAL CONCEPTS Missouri Department of Transportation

ALTERNATE TECHNICAL CONCEPTS Missouri Department of Transportation Missouri Department of Transportation INNOVATIVE CONTRACTING PROCESS Table of Contents Introduction... 1 Description... 2 General Conditions... 3 Submittal Process... 5 Evaluation Procedure... 7 Design

More information

I-64 Pavement Rehabilitation. I-264 Pavement Rehabilitation

I-64 Pavement Rehabilitation. I-264 Pavement Rehabilitation I-64 Pavement Rehabilitation From: Little Creek Road Bridge (East Abutment) To: Bridge over Curlew Drive & RR (West Abutment) and I-264 Pavement Rehabilitation From: Claiborne Avenue Bridge (East Abutment)

More information

AGENDA ESER 2014 Background Design-Build Procurement Design-Build - Builder s Perspective Project Approach

AGENDA ESER 2014 Background Design-Build Procurement Design-Build - Builder s Perspective Project Approach DBIA WESTERN PACIFIC REGION SAN FRANCISCO MARRIOTT UNION SQUARE AUGUST 14, 2018 BAY LUNCH PROGRAM DESIGN-BUILD PROGRESS AND SUCCESS IN SAN FRANCISCO AGENDA ESER 2014 Background Design-Build Procurement

More information

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report APPENDIX B Excerpts from the October 2002 Interstate 83 and PA Route 921 The objective for the SR 921 interchange site was to study alternatives for construction of a new interchange. There are no short-term

More information

Pushing the Envelope For 100 Years

Pushing the Envelope For 100 Years Pushing the Envelope For 100 Years Tunneling under the Chesapeake Bay The Parallel Thimble Shoal Highway Tunnel Presented by: Kevin Abt, PE Chesepeake Bay Bridge and Tunnel District Mike Kling, PE, PTOE

More information

Vista Ridge Integration Project Progressive Design-Build Services

Vista Ridge Integration Project Progressive Design-Build Services Vista Ridge Integration Project Progressive Design-Build Services Linda Bevis, P.E. Manager Water Resources/Vista Ridge Integration Diana L. Woltersdorf Manager Contract Administration Marisol Robles SMWVB

More information

NCDOT s Performance Based Contracting Experience in Charlotte. Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009

NCDOT s Performance Based Contracting Experience in Charlotte. Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009 NCDOT s Performance Based Contracting Experience in Charlotte Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009 Overview Performance Base Contracting in NC Project Scope Contract Development

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

PROFESSIONAL SERVICES BULLETIN 18-2 ADDENDUM 2

PROFESSIONAL SERVICES BULLETIN 18-2 ADDENDUM 2 PROFESSIONAL SERVICES BULLETIN 18-2 ADDENDUM 2 ADDENDUM 2 does not change the due date or time. STATEMENTS OF INTEREST are due by 4:30:00 p.m. (local time) Due Date: April 24, 2018 Successful Offerors

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS Village of La Grange Phase II Design Engineering Services for Submission Deadline: No later than 10:00 am on October 19, 2018 Published on: October 5, 2018 on the Village of

More information

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID 432430-1-32-13 TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES DISTRICT TWO November 27, 2017 Page 1 EXHIBIT A SCOPE

More information

CE & I for Construction. Brian Buckel. HQ Construction Division Chief Construction Engineer

CE & I for Construction. Brian Buckel. HQ Construction Division Chief Construction Engineer CE & I for Construction Brian Buckel. HQ Construction Division Chief Construction Engineer Talking Points Outline the duties and responsibilities of both a) the sponsor s personnel b) DOTD personnel Definitions

More information

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM 2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM A. District: 1 2 3 4 5 6 7 TPK C.O. B. Nomination Category: (Select only one category) Outstanding Major Project

More information

MEMORANDUM: INITIAL CONCEPTS SUMMARY

MEMORANDUM: INITIAL CONCEPTS SUMMARY MEMORANDUM: INITIAL CONCEPTS SUMMARY INTRODUCTION This memo presents a summary of initial concepts that have been identified as development of the project study has progressed, along with a recommendations

More information

AVIATION AUTHORITY POLICY

AVIATION AUTHORITY POLICY PURPOSE: To establish a policy for the selection of development related professional services firms, including design-build firms for professional services and the Consulting Engineer, pursuant to the

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

And Design-Build I-264 Pavement Rehabilitation From: Claiborne Ave. Bridge (East Abutment); To: Broad Creek Bridge (West Abutment) Norfolk, Virginia

And Design-Build I-264 Pavement Rehabilitation From: Claiborne Ave. Bridge (East Abutment); To: Broad Creek Bridge (West Abutment) Norfolk, Virginia Request for Proposal Letter of Submittal Design-Build I-64 Pavement Rehabilitation From: Little Creek Road Bridge (East Abutment); To: Bridge over Curlew Drive & RR (West Abutment) And Design-Build I-264

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information