Renton Library. Lot size: 46,400 SF Building size: 19,718 GSF Location: Renton, WA Project Type: Built

Size: px
Start display at page:

Download "Renton Library. Lot size: 46,400 SF Building size: 19,718 GSF Location: Renton, WA Project Type: Built"

Transcription

1 Renton Library Lot size: 46,400 SF Building size: 19,718 GSF Location: Renton, WA Project Type: Built

2 RENTON LIBRARY The original 1966 library structure was constructed to iconically straddle the Cedar River with views to the water, railway, and active salmon habitat. Its unique location was well loved by generations of community members and well worth preserving. When built in 1966, the original building was an engineering feat. Its pre-cast concrete T s, concrete columns and wood truss-joists created an impressive 80 central clear span on the interior. By 2015, however, the exterior envelope was failing and not compliant with current energy codes. Its structural system was not fit to withstand current seismic criteria nor potential liquefaction of the alluvial soils. In addition, its building systems were not able to keep up with the increased demands of a 21st century library heavy in power and data usage. The team s design goal was to celebrate and reveal the inherent bridge structure in a language recalling the Renton s legacy of engineering. New cross bracing and raw aluminum siding was detailed to celebrate a structurally expressive and finely crafted exterior expression. The renovation maintained the original super structure, but introduced a new energy efficient exterior envelope with floor to ceiling views to the river. By removing the interior attic space concealing the trusses, the interior volume increased by nearly 5. Trimming back the existing overhang brought more daylight into the building and created a lightweight, taut bridge expression. Redistributing services throughout the concrete bridge structure proved to be problematic, so out of necessity, all of the building s systems are revealed in the main public space as a way of putting the building s machine on display. Digital information essential to a 21st century library was given celebrity status via power and data drops from the ceiling. These drops combine aircraft cable with steel connections and visually anchor the computer station hubs and study tables.

3 Inspiration for the renovation came from revealing the true nature of the library as bridge, expressed in a finely engineered raw aluminum and glass enclosure.

4 CONTEXT Renton, WA, located on the south shore of Lake Washington, has a long history of engineering and manufacturing including companies like PACCAR and Boeing. At the same time the library s structure is one of a series of bridges vehicular, rail and pedestrian crossing the Cedar River within the downtown core.

5 BEFORE & AFTER The original library was unique for its location and unobstructed interior clear spans. However, its lack of transparency and impression of a thick roof plane created an expression that was at odds with its impressive overwater site. Today, the library s raw aluminum panels, expressed structure and full height views bring the library s mission to life and connect users to the river below.

6 SITE CONSTRAINTS The original 1966 structure, while iconic, could not have been built over the river with today s environmental restrictions. This meant that all construction activity was required to remain outside of an area defined by the Ordinary High Water Mark and Base Flood Elevation. In order to seismically upgrade the building, the team creatively found a way to buttress the existing structure and soils using landward pilings avoiding years of permitting oversight and habitat disruption. During construction, the contractor kept all construction activity and materials inside the bridge footprint, without the use of scaffolding or platforms that would disrupt the river s hydraulic patterns Finish Floor Base Flood Elevation (BFE) Ordinary High Water Mark (OHWM) NO CONSTRUCTION ZONE Due to the fragile river ecosystem, no new construction could occur below or waterward of the Base Floor Elevation (BFE).

7 ELEVATIONS SOUTH ELEVATION WEST ELEVATION

8 DECONSTRUCTION/CONSTRUCTION 1. EXISTING STRUCTURE 2. REMOVE 1980 s ADDITION & CLERESTORY 3. TRIM back ROOF STRUCTURE 4. ADD AUGER CAST PILES 5. ERECT BRACED FRAMES 6. INSERT NEW ENERGY EFFICIENT ENVELOPE & FULL HEIGHT GLAZING 7. INSTALL PERIMETER SUNSHADE 8. IMPROVE BRIDGE & RAILING 9. RENOVATED LIBRARY

9 SITE PLAN The library s location straddling the river was an iconic one and provided an important connection between the downtown and City Park. Public art located on both sides of the building and within the building enliven the city trail and bridge route for pedestrians. Views of the building from nearby bridges downriver and upriver now reflect a glowing destination of community activity. N

10 FLOOR PLAN CEDAR RIVER The floor plan was designed to celebrate the 80 central clear span, and preserve views to the river. Enclosed spaces such as staff work areas, study rooms and building support were collected at each end of the bridge. The central clear span, with full height glazing, houses highly active program elements such as computers, browsing collections, childrens spaces and reading areas. The relocated entry is now accessible and visible from the parking lot. The new meeting room opens up to the library space, giving it valuable spill-out potential PEDESTRIAN BRIDGE N KEY: 1. Entry 2. Periodicals 3. Meeting Room 4. Teen Area 5. Study 6. Conference Room 7. Non-Fiction Collection 8. Computer Stations 9. Fiction 10. Children s Area 11. Work Room

11 The existing pedestrian connection between the parking lot and City park is now accessible, well lit, and has a traction coating for safer crossing during wet/icy weather. The new railing is designed to feel transparent and allow better views to the river below. Lighting was incorporated into the railing for safety, yet is angled to prevent light spillage affecting salmon habitat.

12

13 INTERIOR EXPRESSION The interior of the building was renovated to honor the large open spans and industrial structure. Clean simple shapes and color palette were crafted to recall Renton s manufacturing history, and colors used in those environments (safety orange and yellow).

14 Power/data distribution vital for library functionality in 2015 was problematic to expand in a concrete precast structure. The team designed overhead power drops using aircraft able and steel connections to deliver power to study tables and computer stations. The unconcealed power and data cabling suggests a raw honesty for the information age library.

15

STEEL STRUCTURAL SYSTEMS

STEEL STRUCTURAL SYSTEMS STEEL STRUCTURAL SYSTEMS Steel elements are of two basic types: Structural steel shapes are formed into their final shapes by hot-rolling. This method produces such common elements as wide flange sections,

More information

Trolley Square Whole Foods Store & Parking Structure. Case Study CS 2. Grounded in strength.

Trolley Square Whole Foods Store & Parking Structure. Case Study CS 2. Grounded in strength. Trolley Square Whole Foods Store & Parking Structure CS 2 Case Study Grounded in strength. Forterra Structural & Specialty Products Thin Brick Precast Walls Copy the Look of Century-Old Trolley Barns Project

More information

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options River Tower at Christina Landing Wilmington, DE Joseph Bednarz Structural Option Faculty Advisor: Dr. Boothby Executive Summary January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign

More information

Providing Engineered Concrete Solutions. Precast and Mission Critical Facilities A Natural Fit

Providing Engineered Concrete Solutions. Precast and Mission Critical Facilities A Natural Fit Providing Engineered Concrete Solutions Precast and Mission Critical Facilities A Natural Fit Total precast solutions eliminate trade overlap in the construction of the core and shell system A total precast

More information

JAMES DEAN BAKER ALCOA CORPORATE CENTER STRUCTURAL OPTION 201 ISABELLA STEET

JAMES DEAN BAKER ALCOA CORPORATE CENTER STRUCTURAL OPTION 201 ISABELLA STEET JAMES DEAN BAKER STRUCTURAL OPTION ALCOA CORPORATE CENTER 201 ISABELLA STEET PRESENTATION OUTLINE Introduction Existing Conditions Structural Existing Conditions Design Goals and Criteria Suspension Design

More information

Questions and Answers Construction of New Amenities At Folly Beach County Park

Questions and Answers Construction of New Amenities At Folly Beach County Park Questions and Answers Construction of New Amenities At Folly Beach County Park 2019-003 1. A410, Keynotes 11.34 Responsibility Chart -stainless steel table does not indicate if it is provided by the owner

More information

LPA Inc./Cris Costea Photography Inc.

LPA Inc./Cris Costea Photography Inc. A new community college student center takes advantage, and not-so-subtly displays the versatility and sustainability, of structural steel. Light as AIR BY BRYAN SEAMER, SE, AND DANIEL WANG, SE FEBRUARY

More information

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS Please note: This construction plan component list is to be used as a guide to assist you with your project. There may be elements unique to your project not

More information

FDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider

FDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider Executive Summary: The FDA-CDRH Laboratory is currently being built on the Food and Drug Administration s White Oak Consolidation Campus. It is a four story building with a full below grade ground floor

More information

Screen & 3-Season Porches

Screen & 3-Season Porches Screen & 3-Season Porches PERMIT SUBMITAL CHECKLIST : City of New Prague Building Inspections Department 118 Central Ave N New Prague, MN 56071 (952) 758-4401 Fax (952) 758-1149 Signed completed Building

More information

Above the Flood: Elevating Your Floodprone House. FEMA 347/ May 2000 FEMA

Above the Flood: Elevating Your Floodprone House. FEMA 347/ May 2000 FEMA Above the Flood: Elevating Your Floodprone House FEMA 347/ May 2000 FEMA Cover photograph provided by The Weather Channel. Table of Contents Chapter 1 Introduction...1-1 Chapter 2 Homeowner Options...2-1

More information

RR Building Area: (sf) 13,000 sf. Cost per Square Foot: $208/sf. Construction Cost $2.7 million. Date of Completion: March 2014

RR Building Area: (sf) 13,000 sf. Cost per Square Foot: $208/sf. Construction Cost $2.7 million. Date of Completion: March 2014 Program Summary: Façade renovation and new infill of a pre-turn-of-the-century warehouse into offices for an architectural firm located in New Orleans. Program Statement: The existing pre-turn-of-the-century

More information

By Thomas Taylor, PE, Datum Engineers Inc.

By Thomas Taylor, PE, Datum Engineers Inc. Project Profile: Irving Convention Center The Art of Structure By Thomas Taylor, PE, Datum Engineers Inc. The 275,000 sq ft Irving Convention Center, in Irving, TX is recognized for its unique architecture

More information

D Other: D D. D Restaurant [Z] Office D. Pinellas County Certificate of Appropriateness Application. Guju restaurant and bar

D Other: D D. D Restaurant [Z] Office D. Pinellas County Certificate of Appropriateness Application. Guju restaurant and bar Pinellas County Certificate of Appropriateness Application For Staff Use Only COA# ~~~~~~~~~~~~~~~~ DATE: HPB/Staff Decision Staff Signature Instructions: Your application cannot be evaluated unless it

More information

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding

More information

INSPIRED. by Collaboration

INSPIRED. by Collaboration Close collaboration between structural engineers and architects results in an expressive structural steel-enhanced ethereal experience for a new church in suburban Kansas City. INSPIRED by Collaboration

More information

Ames Public Library. Ames Public Library

Ames Public Library. Ames Public Library Public Forum Library Planning Associates (Library Planning) Meyer, Scherer & Rockcastle, Ltd. (Architecture, Interior Design, and Furniture) with TSP, Inc. (Architecture and Engineering), CPMI, Inc. (Cost

More information

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire Additional Instructions and Clarifications 1. Please review ARC 4496 before beginning the project identification

More information

SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON STRUCTURAL EVALUATION FOR PREPARED BY PCS STRUCTURAL SOLUTIONS

SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON STRUCTURAL EVALUATION FOR PREPARED BY PCS STRUCTURAL SOLUTIONS STRUCTURAL EVALUATION FOR SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON PREPARED BY PCS STRUCTURAL SOLUTIONS NOVEMBER 1, 2017 17-733 TABLE OF CONTENTS Page I. PREFACE ii II. EXECUTIVE

More information

How to Estimate the Cost of a Building Exterior Enclosure at a Conceptual Level

How to Estimate the Cost of a Building Exterior Enclosure at a Conceptual Level John Meese, CPE Chapter 14 Atlanta How to Estimate the Cost of a Building Exterior Enclosure at a Conceptual Level TABLE OF CONTENTS Section 1: Introduction Section 2: Types and Methods of Measurements

More information

Fundamentals of Building Construction: Materials and Methods

Fundamentals of Building Construction: Materials and Methods Fundamentals of Building Construction: Materials and Methods Allen, Edward ISBN-13: 9780470074688 Table of Contents Preface. Chapter 1: Making Buildings. Learning to Build. Sustainability. The Work of

More information

Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk

Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk Presented by Raymond Wong Wai Man, Division of Building Science & Technology, City University of Hong Kong Raymond

More information

EXTREME. Makeover. Nu Skin Enterprises Utah campus gets a fresh new look.

EXTREME. Makeover. Nu Skin Enterprises Utah campus gets a fresh new look. EXTREME Makeover Nu Skin Enterprises Utah campus gets a fresh new look. BY RON KLEMENCIC, S.E., P.E. THE NU SKIN INNOVATION CENTER brings a new face to Nu Skin Enterprises. The anti-aging product company

More information

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing DIVISION 05 METALS 05 00 00 METALS 05 01 00 Maintenance of Metals 05 01 10 Maintenance of Structural Metal Framing 05 10 20 Maintenance of Metal Joists 05 10 30 Maintenance of Metal Decking 05 10 40 Maintenance

More information

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31 Contents Preface to the Sixth Edition xi 1 Making Buildings 3 Learning to Build 4 Buildings and the Environment 5 The Work of the Design Professional 11 The Work of the Construction Professional 19 Trends

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

6" TRIM AT GARAGE DOORS (TYP) 6" TRIM (TYP) OPTIONAL PATIO DOOR

6 TRIM AT GARAGE DOORS (TYP) 6 TRIM (TYP) OPTIONAL PATIO DOOR GABLE END x0 TRIM (TYP) A6. PTD. ALUM GUTTER (TYP) MODEL 67 - OVATION MODEL - BRAVO 0.670.7 09'- /8" 00'-0" " WATER 6" CORNER TRIM (TYP) 6" TRIM AT GARAGE DOORS (TYP) OPTIONAL PATIO DOOR AMERICAN TRADITIONAL

More information

Traci Peterson Option: Structural Faculty Consultant: Memari. Executive Summary

Traci Peterson Option: Structural Faculty Consultant: Memari. Executive Summary 1 Traci Peterson Option: Structural Faculty Consultant: Memari The Del Monte Center at The North Shore Pittsburgh, PA Thesis Proposal Date of Submission: 12/10/04 Executive Summary Currently under construction

More information

Accepted Architectural Styles 1. Classical Revival 2. French 3. Texas Regional Vernacular 4. Tudor 5. Mediterranean 6. Modern Classical Revival Classical Revival design seeks to emulate elements of Ancient

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

RATIONALE AND REASONING The following information is provided in response to the issues raised by the Board of Regents at the September 2012 meeting:

RATIONALE AND REASONING The following information is provided in response to the issues raised by the Board of Regents at the September 2012 meeting: a contract within the Total Project Cost budget of $123.2 million, and to proceed with project construction not to exceed a Total Project Cost of $62.6 million. This motion is effective September 27, 2012.

More information

NC 2009 Residential Code changes (Highlights on changes between the 2006 and 2009 NC Residential Code)

NC 2009 Residential Code changes (Highlights on changes between the 2006 and 2009 NC Residential Code) NC 2009 Residential changes (Highlights on changes between the 2006 and 2009 NC Residential ) Chapters 1 and 2: Administration and Definitions Section Title R101.2 Scope Added the words ABOVE GRADE. R101.5

More information

City of Richmond Zoning Ordinance Page 12-1

City of Richmond Zoning Ordinance Page 12-1 ARTICLE 12 BUILDING DESIGN AND COMPOSITION Section 12.01 Purpose. High quality architectural design and building composition are important elements in reinforcing a comfortable, human-scale environment,

More information

CHAPTER 7 STRUCTURAL SYSTEMS

CHAPTER 7 STRUCTURAL SYSTEMS BTB.Senior.Ch07 11/25/03 8:42 AM Page 163 CHAPTER 7 STRUCTURAL SYSTEMS Senior housing and care facilities have used virtually every structural system normally employed in relatively simple structures:

More information

Building Design Data

Building Design Data Building Design Data.. 1. Building Design The KORE ICF System is designed to meet the requirements of the Building Regulations 1997-2006, in the case of two storeys, single occupancy dwellings. If the

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

SOUTHMERE VILLAGE LIBRARY

SOUTHMERE VILLAGE LIBRARY SOUTHMERE VILLAGE LIBRARY FINAL PRESENTATION Spring 2018_ARCH454 University of Idaho Chase Macaw, Giovanni Florenca, Haonan Xu Instructor: Bruce Haglund 05/02/2018 Design Introduction Design Intention:

More information

Expanding the Indiana Convention

Expanding the Indiana Convention An architectural design reminiscent of a welcoming gesture now graces downtown Indianapolis. Expanding the Indiana Convention Center By David Mauser, P.E. and, P.E. T Glass entry cube and cantilever structure

More information

R CODE CHANGE PROPOSAL FORM (See instructions on page 2)

R CODE CHANGE PROPOSAL FORM (See instructions on page 2) CODE CHANGE PROPOSAL FORM (See instructions on page 2) Code: IRC 12/13 Sections 301.2.2.2.1 Proponent: Charles S. Bajnai, Chesterfield County, VA, ICC Building Code Action Committee 1. Delete as shown

More information

executive summary Executive Summary University of Florida, Gymnastics Planning Study Project Description

executive summary Executive Summary University of Florida, Gymnastics Planning Study Project Description executive summary University of Florida, Gymnastics Planning Study Executive Summary Project Description University of Florida s Athletics Association (UAA) has begun studying the possibilities of providing

More information

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014 Program Summary: This project involves renovating 80,000 SF of an existing warehouse to provide new classrooms, internal medicine clinics, radiology clinics, and laboratory. Program Statement: The first

More information

DEVELOPMENT PERMIT ITEM NO: 02 DP NO:

DEVELOPMENT PERMIT ITEM NO: 02 DP NO: TO THE CALGARY PLANNING COMMISSION DEVELOPMENT PERMIT ITEM NO: 02 CPC DATE: 2010 February 04 DP NO: DP2009-2984 DOWNTOWN COMMERCIAL CORE (Ward 7 - Alderman Farrell) Page 1 DP2009-2984 CPC 2010 February

More information

0103 Plan Reading 4% Read plans to verify the project conforms with the code, approved plans, and construction documents.

0103 Plan Reading 4% Read plans to verify the project conforms with the code, approved plans, and construction documents. Certification: Commercial Building Inspector Exam ID: B2 Scope: A Commercial Building Inspector will be responsible for performing inspections of structures to determine compliance with the various Building

More information

Christopher McCune Structural Option 2006 Senior Thesis Penn State Architectural Engineering. Eight Tower Bridge Conshohocken, Pennsylvania

Christopher McCune Structural Option 2006 Senior Thesis Penn State Architectural Engineering. Eight Tower Bridge Conshohocken, Pennsylvania Christopher McCune Structural Option 2006 Senior Thesis Penn State Architectural Engineering Outline Project Original Proposal Structural Design Proposal Design Objectives Design Criteria Presentation

More information

Proposal. PricewaterhouseCoopers Oslo, Norway

Proposal. PricewaterhouseCoopers Oslo, Norway Proposal James Wilson Structural Option AE 481W Senior Thesis The Pennsylvania State University Faculty Consultant: Professor M. Kevin Parfitt Table of Contents Executive Summary...2 1. Existing Conditions...3

More information

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014 Program Summary: This project involves renovating 80,000 SF of an existing warehouse to provide new classrooms, internal medicine clinics, radiology clinics, and laboratory. Program Statement: The first

More information

04/05/2014. Introductions. Agenda. Heritage Adaptive Reuse: A Catalyst for Revitalization

04/05/2014. Introductions. Agenda. Heritage Adaptive Reuse: A Catalyst for Revitalization Heritage Adaptive Reuse: A Catalyst for Revitalization Susan Spencer Lewin, OAA, CS&P Architects Scott Weir, OAA, ERA Architects Introductions Susan Spencer Lewin, CS&P Architects Scott Weir, ERA Architects

More information

Wood Decks. Zoning and Construction requirements for open non-sheltered wood decks for residential dwellings.

Wood Decks. Zoning and Construction requirements for open non-sheltered wood decks for residential dwellings. Wood Decks Zoning and Construction requirements for open non-sheltered wood decks for residential dwellings. General Information 3 Zoning 7 Foundations 8 Structural 11 Design 16 Compliance 20 NOTE The

More information

Category: 11 Best Building Project GC ($70M) Contractor: Saunders Construction. Project Name: 16 Chestnut Office Tower, Denver, Colorado

Category: 11 Best Building Project GC ($70M) Contractor: Saunders Construction. Project Name: 16 Chestnut Office Tower, Denver, Colorado Category: 11 Best Building Project GC ($70M) Contractor: Saunders Construction Project Name: 16 Chestnut Office Tower, Denver, Colorado Denver is growing up. So many cranes have been visible for so long

More information

Main Floor Plan Scale: 1/8"=1'-0"

Main Floor Plan Scale: 1/8=1'-0 16'-0" 1 6'-6" 1 36'-0" Future Deck 10'-6" 4'-11" 4'-11" 10'-6" 36'-0" Future Deck 1 6'-6" 1 16'-0" 6068 3030 3030 6068 1 20'-9 1/2" 20'-9 1/2" 1 D/W D/W 26'-4" 24'-8" 2'-0" '-4" '-4" '- 1/2" 20'-10 1/2"

More information

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II Fire Inspection and Code Enforcement, 7 th Edition Chapter 6 Building Construction: Components Today we will Discuss fire walls, party walls, fire partitions, and curtain walls Discuss roof types and coverings

More information

SECTION 11 Architectural and Nonstructural Elements Field Investigation

SECTION 11 Architectural and Nonstructural Elements Field Investigation SECTION 11 Architectural and Nonstructural Elements Field Investigation Types of Data to Be Collected and Recorded Research in these fields should be directed at determining the effect that architecture

More information

AIR CRE Industrial Building Standards

AIR CRE Industrial Building Standards AIR CRE Industrial Building Standards Established March 1993 AIR CRE 500 N Brand Blvd, Suite 900, Glendale CA, 91203 AIR CRE INDUSTRIAL BUILDING STANDARDS TABLE OF CONTENTS SECTION 1 Introduction P. 1

More information

ROOT VEGETABLE STORAGE WAREHOUSES

ROOT VEGETABLE STORAGE WAREHOUSES TECHNICAL BULLETIN No.35-091212 WAREHOUSES Designers, builders and owners of root vegetable storage warehouses know that there are two key objectives to good design and construction of root storage facilities:

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

8.0 COMMERCIAL FAÇADE DESIGN GUIDELINES

8.0 COMMERCIAL FAÇADE DESIGN GUIDELINES 8.0 COMMERCIAL FAÇADE DESIGN GUIDELINES 8.1 Purpose The Commercial Façade Design Guidelines express the Town s design expectations for development review and are meant to assist in raising the standard

More information

DESIGN FORM. Rapid River Rustic, Inc. Cedar Log Homes and Fencing B.I. PHONE: CROSS-SECTION ENGINEER STAMP ARCHITECT STAMP

DESIGN FORM. Rapid River Rustic, Inc. Cedar Log Homes and Fencing B.I. PHONE: CROSS-SECTION ENGINEER STAMP ARCHITECT STAMP NAME: ADDRESS: JOB NUMBER: DEALER: PH: WORK PH: BUILDER: SEND DRAWINGS TO: CUSTOMER DEALER SITE ADDRESS: B.I. NAME: B.I. PHONE: COUNTY: SNOW LOAD (PSF): SPECIAL LOCAL CODE REQUIREMENTS: PLANS PRELIMINARY:

More information

Section 5 - Project Logistics

Section 5 - Project Logistics Section 5 - Project Logistics The project schedule for the Pearland Recreation Center and Natatorium begins with commencement of design on March 1, 2007 and ends with substantial completion on May 12,

More information

The Butler Gallery at the Evans Home CONSERVATION REPORT. McCullough Mulvin Architects. September 2016

The Butler Gallery at the Evans Home CONSERVATION REPORT. McCullough Mulvin Architects. September 2016 The Butler Gallery at the Evans Home CONSERVATION REPORT McCullough Mulvin Architects September 2016 To be read in conjunction with impact statement and condition survey / recommendations in Carrig reports

More information

Demolition Safety!!!!

Demolition Safety!!!! Sample Written Program For Your Company For Demolition Safety Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-718-4957 Email: info@se-safety.com Demolition Safety Program Purpose

More information

COMPETENCY ANALYSIS PROFILE General Carpenter 403A. (All unshaded skill sets must be demonstrated/completed)

COMPETENCY ANALYSIS PROFILE General Carpenter 403A. (All unshaded skill sets must be demonstrated/completed) COMPETENCY ANALYSIS PROFILE General Carpenter 403A (All unshaded skill sets must be demonstrated/completed) PROTECT SELF AND OTHERS Apply safety legislation Use personal protective equipment Apply safety

More information

CE410. CE 410 Guidelines to Structural Design Drawings

CE410. CE 410 Guidelines to Structural Design Drawings CE 410 Guidelines to Structural Design Drawings As an essential part of your structural design projects all groups in CE 410 are going to develop their designs in reference to simplified architectural

More information

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY

More information

5.0 Elevating Your Home

5.0 Elevating Your Home 5.0 Elevating Your Home One of the most common retrofitting methods for homes is elevation. When a home is properly elevated, the living area should be above most flood levels. Several elevation techniques

More information

Building Guide. Colorado Chapter of the International Code Council

Building Guide. Colorado Chapter of the International Code Council 12/29/16 Building uide Colorado Chapter of the International Code Council How to Use this uide Check with your jurisdiction regarding type of submittal (paper or electronic) and for additional requirements.draw

More information

ADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services

ADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services ADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services Addenda Dated: 01/25/2019 PURPOSE: The purpose of this Addenda #9 is to provide a

More information

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3% CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,

More information

Suspended Metal lath and Cement Plaster. Coverings Rigid Insulation, 1/2 - in 0.75 psf. Floor Fill Lightweight Concrete, per inch 8 psf

Suspended Metal lath and Cement Plaster. Coverings Rigid Insulation, 1/2 - in 0.75 psf. Floor Fill Lightweight Concrete, per inch 8 psf Dead Loads Ceiling Suspended Metal lath and Cement Plaster 15 psf Coverings Rigid Insulation, 1/2 - in 0.75 psf Floor Fill Lightweight Concrete, per inch 8 psf Floor Finish Frame Partitions Ceramic or

More information

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 10 Building Construction Roof Types Revised

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 10 Building Construction Roof Types Revised Truck Module Page 1 of 10 BASIC ROOF TYPES The following roof types will summarize the majority of different types of roofs found within the City of Escondido and surrounding areas. There are several others,

More information

9'-2 1/2" 72" Whirlpool Tub Unit 6'-0" 9'-2" x 11'-6" Bathroom. 66" Vanity. 60" Shower 5'-0" 5'-8" Laundry Room 9'-2" x 5'-7" 5'-7 1/2"

9'-2 1/2 72 Whirlpool Tub Unit 6'-0 9'-2 x 11'-6 Bathroom. 66 Vanity. 60 Shower 5'-0 5'-8 Laundry Room 9'-2 x 5'-7 5'-7 1/2 37'-0" 1 '-" 18'-" 18'-" 2030 11'-1" 8'-1" 11'-7" 7'-2 1/2" 0" Tub/Shower '-0" Bedroom #2 11'-0" x 11'-0" 7'-1" x 1'-11" Linen 48" Vanity 28 Bedroom #3 11'-0" x 11'-" 3'-7" 42" Archway 011 3535 Dining

More information

South Main Station. 150 Main Street, Longmont, Colorado 16" COMMON PARAPET DETAIL AREA. Date

South Main Station. 150 Main Street, Longmont, Colorado 16 COMMON PARAPET DETAIL AREA. Date NOTES: A primary objective of the building design is to continue the urban street character of Downtown Main Street and while still evoking the industrial character of the South Main area. This is achieved

More information

SAN MATEO DOWNTOWN PRELIMINARY PLANNING APPLICATION

SAN MATEO DOWNTOWN PRELIMINARY PLANNING APPLICATION SAN MATEO DOWNTOWN PRELIMINARY PLANNING APPLICATION 12.20.2018 SHEET INDEX 01 COVER SHEET 02 PROJECT OVERVIEW 03 CIVIL PLAN 04 GROUND FLOOR PLAN 0 PLAN 06 PLAN 07 PLAN 08 LEVEL PLAN 09 LEVEL 6 PLAN 10

More information

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows as

More information

Robert I. Schroder Pedestrian Overcrossing Walnut Creek, Calif.

Robert I. Schroder Pedestrian Overcrossing Walnut Creek, Calif. Case Studies in Structural Steel 2 Robert I. Schroder Pedestrian Overcrossing Walnut Creek, Calif. Glenn Flemming Each arch rib was fabricated in two segments that could be transported by road without

More information

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule

More information

Mick Leso Structural Option 2006 Penn State AE Senior Thesis RESEARCH

Mick Leso Structural Option 2006 Penn State AE Senior Thesis RESEARCH RESEARCH CANTILEVERS To thoroughly understand the Renick Building requires background knowledge of cantilever structures. A cantilever is described as a projecting beam or a member supported at only one

More information

Introduction to Construction, June 2013, page 1 of 6

Introduction to Construction, June 2013, page 1 of 6 Indiana Department of Education Academic Content Framework INTRODUCTION TO CONSTRUCTION Introduction to Construction is a course that will offer hands-on activities and real world experiences related to

More information

Dead Loads (psf): Concrete Floor Slab on Metal Deck 45 psf Mechanical and Ceiling 7 psf Miscellaneous 5 psf Exterior Wall 80 psf

Dead Loads (psf): Concrete Floor Slab on Metal Deck 45 psf Mechanical and Ceiling 7 psf Miscellaneous 5 psf Exterior Wall 80 psf CODES AND REQUIREMENTS The structural design of Northbrook Corporate Center was based on the International Building Code 2003, which incorporates many of the provisions of ASCE 7. The lateral load design

More information

CONTRACT NO. DOL-ETA-16-C-0043

CONTRACT NO. DOL-ETA-16-C-0043 CONTRACT NO. DOL-ETA-16-C-0043 EXTERIOR FAÇADE WALL BRACING GULFPORT JOB CORPS CENTER GULFPORT, MISSISSIPPI SEPTEMBER 2016 PREPARED FOR: U.S. DEPARTMENT OF LABOR PREPARED BY: September 30, 2016 Maria J.

More information

HEAVY STEEL CONSTRUCTION

HEAVY STEEL CONSTRUCTION HEAVY STEEL CONSTRUCTION PRE-ENGINEERED PRE ENGINEERED STEEL BUILDINGS Prismatic Constructions Work Shops, Storage Buildings etc. Figure 1 Figure 2 Prismatic steel constructions can be manufactured as

More information

Stephan Northrop Structural Option Dr. Linda Hanagan. North Shore Equitable Building Pittsburgh, PA Senior Thesis Proposal

Stephan Northrop Structural Option Dr. Linda Hanagan. North Shore Equitable Building Pittsburgh, PA Senior Thesis Proposal Stephan Northrop NORTHROP THESIS PROPOSAL PAGE - 1 TABLE OF CONTENTS Executive Summary.. 3 1. Introduction.. 4 2. Structural Systems.. 5 Foundation.. 5 General Floor Framing.. 6 Turret Framing.. 7 Roof

More information

McNichols Civic Center Building City & County of Denver Proposed New Terrace and South Facade Rehabilitation Denver, Colorado

McNichols Civic Center Building City & County of Denver Proposed New Terrace and South Facade Rehabilitation Denver, Colorado McNichols Civic Center Building City & County of Denver Proposed New Terrace and South Facade Rehabilitation Denver, Colorado Denver Landmark Preservation Commission Infill Mass & Scale Submittal 04 September

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax:

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax: ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA 02144 Tel: 617.628.1700 Fax: 617.628.1711 March 3, 2016 Mr. Jeff Hoover, Principal Tappe Architects, 6 Edgerly Place

More information

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently

More information

Signage Code. H101.2 Signs exempt from permits. The following signs are exempt from the requirements to obtain a permit before erection:

Signage Code. H101.2 Signs exempt from permits. The following signs are exempt from the requirements to obtain a permit before erection: Signage Code ICC Code: Appendix H: Signs SECTION H101 GENERAL H101.1 General. A sign shall not be erected in a manner that would confuse or obstruct the view of or interfere with exit signs required by

More information

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows

More information

Salt lake city Public Safety Building. Case Study CS 2. Grounded in strength.

Salt lake city Public Safety Building. Case Study CS 2. Grounded in strength. Salt lake city Public Safety Building CS 2 Case Study Grounded in strength. Forterra Structural & Specialty Products High-Efficiency Design, Precast Envelope System Put Dramatic Public Safety Building

More information

The Construction of the Langham Place in Mong Kok An Introduction

The Construction of the Langham Place in Mong Kok An Introduction The Construction of the Langham Place in Mong Kok An Introduction Artist Impression of Langham Place r o j e c t c o m p r i s i n g a i l / h o t e l c o m p a n o f f i c e / r e t Fast Fact The site

More information

National Truss for Historic Preservation

National Truss for Historic Preservation National Truss for Historic Preservation JANUARY 2019 A new truss brings structural modernization to a century-old Washington apartment building. BY JASON MYERS, SE, PE, SHANE MAXEMOW, SE, PE, AND TIMON

More information

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete

More information

The concrete grid topping the St. Louis Art Museum s new East Wing is a work of art in and of itself.

The concrete grid topping the St. Louis Art Museum s new East Wing is a work of art in and of itself. 1 of 9 8/2/2013 2:20 PM From: ARCHITECT July 2013 Posted on: July 24, 2013 DETAIL The concrete grid topping the St. Louis Art Museum s new East Wing is a work of art in and of itself. By Katie Gerfen When

More information

APPENDIX 1 PROJECT REQUIREMENTS

APPENDIX 1 PROJECT REQUIREMENTS APPENDIX 1 PROJECT REQUIREMENTS I) Scope of Work This section contains a general summary of the work the Contractor shall perform under this contract. If any conflict exists between the work described

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

An atrium of exposed structural steel offers an impressive welcome to visitors to the convention center in Austin, TX.

An atrium of exposed structural steel offers an impressive welcome to visitors to the convention center in Austin, TX. G. Charles Naeve, P.E., Richard A. Martin, P.E. and Brian Johnson An atrium of exposed structural steel offers an impressive welcome to visitors to the convention center in Austin, TX. In 1998, The City

More information

One & Two Family Residential ADDITIONS

One & Two Family Residential ADDITIONS City of St. Petersburg Development Services One & Two Family Residential ADDITIONS (Effective Date: 5/1/03) This checklist is subject to change and improvement at any time. Please determine that you have

More information

NFPA 13D, Standard for the Installation of Sprinkler. One- and Two-Family ANSI/AF&PA, Wood Frame Construction Manual (WFCM) for Oneand

NFPA 13D, Standard for the Installation of Sprinkler. One- and Two-Family ANSI/AF&PA, Wood Frame Construction Manual (WFCM) for Oneand Permanent Wood Foundation System Design Fabrication And Installation Manual WOOD FRAME CONSTRUCTION MANUAL. Wood Frame Construction design, accurate fabrication, and adequate supervision Structural systems

More information

THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA

THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA Amy Graver, Structural Option - Dr. Hanagan, Advisor 10.21.2002 PRO-CON STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS Executive Summary

More information

Boeing North Bridge in Washington State

Boeing North Bridge in Washington State Boeing North Bridge in Washington State Gregory A. Banks ABC-UTC Webinar May 2015 Project Overview -Location Located in Renton, WA PROJECT SITE RENTON 2 Project Overview Site Layout Lake Washington Existing

More information