International Existing Building Code 2006
|
|
- Sharyl Stevens
- 5 years ago
- Views:
Transcription
1 International Existing Building Code 2006 The 2006 International Existing Building Code contains requirements intended to encourage the use and reuse of existing buildings. The Code provides an understanding of applying current building regulations to existing buildings. For example the existing building may require a full electrical upgrade inside home dwelling and may require a new outside breaker panel box to handle the new electric load calculations that comply with local National Electrical Code that jurisdiction has adopted. The Code covers repair, alteration, addition, and change of occupancy for existing buildings and historic buildings. It conforms to appropriate levels of safety without requiring full compliance with the new construction requirements in the building code. Also, code does not require the entire structure to be erected, altered to meet code. The addition and repair of an existing structure can be done, along as buiding inspector and/or structural engineer inspects the premises and enforces compliance with the provisions of this code.
2 Reinforcing the existing building materials for example can be used on a historical adobe home structure. One method used before on a traditional adobe home, by way of using threaded rod anchors toe into adobe with a two part epoxy fast set. This process can better anchor an historical adobe home roof structure, along as building inspector and/or structural engineer inspects the adobe walls and determine if entire adobe wall structure is stable enough. Furthermore, building codes allow for alternative building materials such as stabilize adobe. Adobe construction building codes requires builders to add a stabilizer such as liquid asphalt mix or portland cement to adobe brick. By adding a stabilizer to adobe brick it would increase the compressive strength of the block. See attached pictures below on a traditional home dwelling that used the threaded rod anchors.
3 ½ in. rebar placed along threaded rods anchored to adobe and strapped down with bailing wire. The two part epoxy fast set bonds to threaded rod & adobe. Then filled in with cement.
4 Threaded rods are not placed over door and window openings. Threaded rods are 2 ft. long and ½ in. thickness. Also, requires a ¾ in. masonry bit to drill the 1 ft. bore hole into the adobe wall. Bore hole will need to be cleaned out and crews will utilize an air hose connected to an air compressor to blow dust out. Then threaded rod will be placed into new bore hole and filled in with two part fast set Anchoring Epoxy. As epoxy sets crews use a small level to set the new anchor.
5 Home dwelling located in Pisinemo District, Santa Cruz Community. Traditional home existing roof structure blown away by high winds during summer monsoon 2010.
6 (2) top plates 2x6 pressure treated wood tied into new threaded rod anchors and bolted down. Wood shims used to keep top plates level.
7 H 2.5 hurricane ties 2x8 rafters tied into top plate and rafters anchored to H 2.5 hurricane ties.
8 90# rolled roofing over 15# felt underlayment. Pisinemo District workers built a cricket between existing restroom addition and adobe home. Purpose to divert rain water away where two structures meet.
9 Electrical improvements to existing light fixtures, outlets, and light switches inside home dwelling to meet current electrical building codes. R 30 batt insulation installed in ceiling before drywall installation.
10 Exposed adobe by soffit end will be plastered with a mixture of lime, local wash sand and Portland cement.
11 Exterior facing north
12 Interior ceiling with new light fixture improvement
13 Interior Ceiling bedroom area
14 Interior Ceiling by kitchen area
15 Interior ceiling bedroom area
16 Exterior facing southwest
17 Exterior facing south
18 Exterior traditional home attached to a wood frame bathroom addition
19 Exterior Top View Roof Section
20 Adobe home structure in Pisinemo Community damaged by high winds during summer monsoon Existing roof structure came apart due to roof not anchored properly to top plates. Traditional construction anchoring methods at the time used barb wire wrapped around adobe wall and pressure treated wood top plate. Barb wire through time will tend to rust and break apart.
The Inspection Process. Waxhaw N.C.
The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"
More informationTable of Contents. Page Title
Page Title Table of Contents 1 Floor plan/ Room utilization 2 Elevation (EAST) 3 Elevation (SOUTH) 4 Elevation (WEST) 5 Elevation (NORTH) 6 Foundation plan details 7 Foundation cross sections A Main grade
More informationABOVEGROUND HOME FALLOUT SHELTER H-12-2 / November 1983 (Supercedes H-12-2 dated June 1980)
ABOVEGROUND HOME FALLOUT SHELTER H-12-2 / November 1983 (Supercedes H-12-2 dated June 1980) Page 1 General Information This family shelter is intended for persons who prefer an aboveground shelter or,
More informationResidential Building Plans
Residential Building Plans 1. Building Site Plan indicating: a. Location of Proposed and Existing Buildings b. Location of Property Lines c. Building Setback Dimensions d. Location and Depth of Building
More informationCity of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)
City of Hughson Building Safety Division 7018 Pine Street Hughson, CA 95326 (209) 883-4054 RESIDENTIAL ATTACHED PATIO COVERS Patio covers are one story roofed structures not more than 12 feet above grade,
More informationICBO Evaluation Service, Inc Workman Mill Road, Whittier, California
Reissued June 1, 2002 ICBO Evaluation Service, Inc. 5360 Workman Mill Road, Whittier, California 90601 www.icboes.org Filing Category: DESIGN Concrete DURISOL WALL FORMS FOR CONCRETE CONSTRUCTION DURISOL
More informationACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings
ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory
More informationBuilding Division Informational Handout
CITY OF SAN JOSÉ, CALIFORNIA Building Division Informational Handout Conventional Light Frame Construction Design Provisions 2007 CBC Handout No. 2-21 Published: 1/1/08 Page 1 of 3 This document summarizes
More informationAdministrative Changes
Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings
More informationPermit Posting and Inspection Procedures
Permit Posting and Inspection Procedures Boone County Area Plan Commission 116 Washington Street Room 101 * Lebanon, IN 46052 * (765) 482-3821 * www.boonecounty.in.gov/apc 1. Permit. The following permit
More informationORDINANCE NO BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BOULDER, COLORADO: CHAPTER 98 - Baled Straw Structures SECTION PURPOSE
ORDINANCE NO. 5891 AN ORDINANCE AMENDING CHAPTER 10-5, B.R.C. 1981, CONCERNING ALTERNATIVE BUILDING MATERIALS, INCLUDING ADOBE AND STRAW BALE CONSTRUCTION AND RECYCLED LUMBER. BE IT ORDAINED BY THE CITY
More informationHOTEL SPECIFICATION SECTION 08100
Part 1 General HOTEL SPECIFICATION SECTION 08100 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified including, but not limited
More information2003 International Residential Building Code
2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less
More informationBuilding Construction Occupations
Job Ready Assessment Blueprint Building Construction Occupations Test Code: 2011 / Version 01 Measuring What Matters Specific Competencies and Skills Tested in this Assessment: Safety and General Knowledge
More informationCOLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100
COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,
More informationTEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM Form 15 Work Write-Up Owner-Builder Applicant Owner-Builder Co-Applicant Physical Address: City,
More informationCITY OF SELMA, TEXAS Inspection Guidelines: Residential
Selma, Texas, located in Bexar, Comal, and Guadalupe Counties Responsible party: Larry Verner, P.E. City Engineer Ph. (210) 651-7828 lverner@ci.selma.tx.us The Permits and Inspections Department welcomes
More informationAbout Insulation & R Value - cmhc.ca
About Insulation & R Value - cmhc.ca Insulating Your House While previous generations may have been content to live in drafty houses, most people now want comfortable warm houses. A healthy house today
More informationInspection Fundamentals: Stucco & EIFS
Inspection Fundamentals: Stucco & EIFS By Ben Gromicko To be able to identify the stucco system you must understand system components. You should understand the basic components of the most common stucco
More informationInspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011
Inspection Report Prepared for: Gil Turiel Property Address: Loganville, GA 30052 Date: July 17, 2011 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS CLIENT
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationGarris Evans Estimating Department. Project Name: Project Address: Customer Phone Number: Project Type: Residential Commercial Homeowner
Garris Evans Estimating Department Date: Project Name: Project Address: Customer Phone Number: Customer email: Salesman: Project Type: Residential Commercial Homeowner The following information is both
More informationOpenings in Walls I: Reinforcement
Openings in Walls I: Reinforcement INTRODUCTION These general construction techniques are chosen to introduce low-tech and low-cost construction. Combined with good quality control, they can create buildings
More informationREO Client Safety Hazard Requirements
REO Client Safety Hazard Requirements Safety Hazards Safeguards clients are continually reporting missing safety hazards or allowables across the nation and it is jeopardizing our relationship with our
More information1 AND 2 FAMILY DWELLING REQUIREMENTS
PLAN REQUIREMENTS: 1 AND 2 FAMILY DWELLING REQUIREMENTS All residential plans including additions and attached garages shall be designed to the current edition of the International Residential Code. Plans
More informationGYPSUM BOARD. 2x WALL FRAMING EXTERIOR SHEATHING 3/4" PT WOOD FURRING WEATHER RESISTIVE BARRIER FIBERCEMENT SIDING COR-A-VENT OR SIM PT STARTER STRIP
6' - 0" 6' - 0" 10x12 BEDROOM BATHROOM 36" CLEAR @ KITCHEN DECK 10x12 LIVING ROOM PORCH 3' - 0" 6' - 0" 3' - 0" 6' - 0" 14' - 0" 6' - 0" 12' - 0" OPTIONAL DOOR/WINDOW/SLIDING DOOR 1 BEDROOM 380 SF 1 FLOOR
More informationWALL CONSTRUCTION CHAPTER 6
CHAPTER 6 WALL CONSTRUCTION SECTION R601 GENERAL R601.1 Application. The provisions of this chapter shall control the design and construction of all walls and partitions for all buildings. R601.2 Requirements.
More informationACCESSORY BUILDING. Building Permit Requirements: (must be completed before submitting application)
ACCESSORY BUILDING Before your application can be deemed complete and ready for processing you will need the following: (Please hand in entire application package including this cover sheet) Zoning- check
More informationResidential Building Inspections
Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved
More information109 S. MARKET CURTIS ARCHITECTURE & DESIGN PC SITE MAP EXISTING PHOTOGRAPH PROPOSED RENDERING
HISTORIC PHOTOGRAPH EXISTING PERSPECTIVE PROPOSED PERSPECTIVE TUCKPOINT ENTIRE BUILDING FACADE WITH MORTAR MATCHING ORIGINAL, REMOVE ALL FASTENERS, BRACKETS & MISC. METAL. REPAIR STAINED GLASS ABOVE EACH
More informationDETACHED GARAGES. Construction requirements for detached garages and storage sheds for residential dwellings. Portage la Prairie Planning District
Every effort has been made to ensure the accuracy of the information contained in this brochure. However, in case of a discrepancy between this brochure and the respective By-laws, the applicable By-law
More informationADDENDUM A CONSTRUCTION SPECIFICATIONS
ADDENDUM A Description of Improvements: CONSTRUCTION SPECIFICATIONS The Improvements shall consist of constructing an approximate square foot single-family residence including car garage on the real property
More informationBUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)
BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL 32907 Phone: (321) 953-8924 Fax: (321) 953-8925 CUSTOMER SERVICE INFORMATION ON RESIDENTIAL PLAN REVIEW REQUIRED DOCUMENTS MUST BE SUBMITTED AT TIME
More informationFraming Methods Structural Components
Framing Methods Structural Components Balloon Framing *Balloon framing or Eastern framing the exterior studs run from the top of the foundation to the top of the highest level. Benefits of this type of
More informationRESIDENTIAL BUILDING PLAN REQUIREMENTS
CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS
More informationREPAIR OF WOOD FRAMED STRUCTURES WITH BRICK MASONRY VENEERS. Prepared for FEMA
REPAIR OF WOOD FRAMED STRUCTURES WITH BRICK MASONRY VENEERS Prepared for FEMA 09 When the flooding of buildings consisting of wood frame construction and brick veneer occurs, complete demolition is not
More informationFeature Zone IECC 2009 IECC
Feature Zone 3 2006 IECC 2009 IECC Window U factor 0.65 0.50 Skylight U factor 0.65 0.65 Window SHGC 0.40 0.30 Ceiling R value 30 30 Wood frame R value 13 13 Mass wall R value 1 5 5/8 Floor R value 19
More informationINDEX. 1. DuoTec. Product Information. 2. Market Offering. 3. DuoTec Advantages. 4. Product Range & Packaging. 5. Technical Data
INDEX 1. DuoTec. Product Information 2. Market Offering 3. DuoTec Advantages 4. Product Range & Packaging 5. Technical Data 1. Product Information The innovate toggle bolt for heavy loads in all types
More informationTown of Pawling Residential Building Permit Application
Town of Pawling Residential Building Permit Application Property Address: Street: City: Zip: Grid Number: Zoning District: Project Description: Owners Name: Phone: (H) (W) Address: Street: City: State:
More informationRental Inspection Checklist
Rental Inspection Checklist Address: Date: NOTE: The water, gas and/or electrical services were off at the time of inspection. A re-inspection at a later date SHALL BE required to inspect these items.
More informationOwner Builder Inspection Report
www.sherspec.com Owner Builder Inspection Report PREPARED FOR USE IN ASSESSING A PROPOSAL FOR WARRANTY INSURANCE TO BE ISSUED UNDER SECTION 137B (2)(a) OF THE BUILDING ACT 1993 INSPECTION DETAILS Registered
More informationRESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)
www.shawneeok.org RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6) Planning Office 405-878-1666 222 N Broadway Ave Shawnee OK 74801-6917 FAX: (405) 878-1587 cosinspections@shawneeok.org
More informationFast Track Re-Roof Permit Checklist
Fast Track Re-Roof Permit Checklist ADDRESS I will abide by attached City Re-Roofing Building Permit Required Guidelines, including applicable Siding and Roofing Match and Smoke Detector requirements.
More informationCAREERS. in the Construction TRADES
CAREERS in the Construction TRADES Electrical Modern life would not be possible without electricians. If you like to know how electric currents make things work, then this is the trade for you. Qualified
More informationThermaSteel Corporation ASSEMBLY MANUAL
ThermaSteel Corporation ASSEMBLY MANUAL TABLE OF CONTENTS 1- INTRODUCTION 1.1 THERMASTEEL TM WALL PANELS 1.2 Drawing and Element Numbers 2- ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation of Foundation
More informationTown of Pawling Residential Building Permit Application
Town of Pawling Residential Building Permit Application Property Address: Street: City: Zip: Grid Number: Zoning District: Project Description: Owners Name: Phone: H W/C Address: Street: City: State: Zip:
More informationCarroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage
Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public
More informationAlabama Home Inspections
Cover Page Property Inspection Report 1000 Sample Dr., Sampletown USA Inspection prepared for: Report Sample Inspection Date: 1/21/2010 Time: 400pm Size: Approx. 2,200sf Weather: Cloudy 62 Inspector: Bobby
More informationINSULATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings
SUCCESS WITH 2012 IECC DELAWARE Recommended Practices for Optimized Energy Savings for Builders & Trades COPYRIGHT 2015 ADVANCED ENERGY. ALL RIGHTS RESERVED VERSION 2015.1.0 DELAWARE For vented attics,
More informationContractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.
FINISH BASEMENT/ADDITION/REMODEL PLAN CORRECTIONS LIST (Based on the current Editions of the International Codes and National Electrical Code) PLAN CHECKED BY: LOT/SUBDIVISION/ADDRESS: CONTRACTOR OR OWNER/BUILDER:
More informationBuilding Guide. olorado Chapter of the International Conference of Building Officials. Lancaster County Building Department
olorado Chapter of the International Conference of Building Officials Lancaster County Building Department Single Family Residential One Story Detached Garage How to Use this Guide Provide two sets of
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationNassau County Building Department
July 6, 2018 Nassau County Building Department Inspection Types ALL INSPECTION REQUESTS ARE REQUIRED TO BE INITIATED BY THE PERMIT HOLDER, ALL INSPECTION REQUESTS SHALL SUPPLY THE PERMIT NUMBER FOR EACH
More informationThe following report that you are about to view was an actual claim.
Time and material reports can be difficult to understand. Basically each item that is to be repaired or remodeled is listed. The costs of the material and the labor costs to install or removal of that
More informationSECTION METAL DOORS & FRAMES
SECTION 08100 METAL DOORS & FRAMES PART 1 GENERAL 1.1 SCOPE Drawings and general provisions of the Contract, including General and Supplementary General Conditions and other Division 00 & 01 specification
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationHUMBOLDT COUNTY BUILDING & SAFETY DEPARTMENT CITY OF WINNEMUCCA BUILDING DEPARTMENT
HUMBOLDT COUNTY BUILDING & SAFETY DEPARTMENT CITY OF WINNEMUCCA BUILDING DEPARTMENT FOR PRIVATE THREE-SIDED POST FRAMED (NON-ENGINEERED) OUTBUILDINGS LOCATED ON RESIDENTIAL LOTS ONLY Buildings must meet
More informationLonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507)
Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN 55046 (507) 744-2327 fax (507) 744-5554 2006 RESIDENTIAL CONSTRUCTION CHECKLIST The following checklist has been designed
More informationThe better way to build TM. Installation Manual NAILBASE PANELS
The better way to build TM Installation Manual PANELS November 2018 SIPs Installation Manual Table of Contents Topics General Requirements................................... 3 Materials..............................................
More informationInspection Report. Property Address:
Inspection Report provided by: Safe Side Home Inspection Inspector: Corey Stuart TN License # 778 434 Margaret Circle McMinnville, TN 37110 safesideinspection@blomand.net Property Address: 1234 Anywhere
More informationGLOBAL PROPERTY INSPECTIONS TECHNICAL BULLETIN
GLOBAL PROPERTY INSPECTIONS TECHNICAL BULLETIN TM June 1, 2002 TOPIC: Exterior Coverings This is the sixth in a series of technical bulletins in which an over-all examination of the home will be discussed
More informationIncorporated Village of Lawrence
Incorporated 196 Central Ave Lawrence NY 11559 516-239-3987 Fax 516-239-9657 Building Department Permit Application Instructions Application must be complete Application must be accompanied by a filing
More informationPerkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet
Perkins Statewide Articulation Agreement Documentation item: Secondary Task List Coversheet The Secondary School agrees to: A. Implement the approved PDE Program(s) of Study. B. Provide assessment of student
More informationChapter 14 - Air Sealing
Chapter 14 - Air Sealing Contents Chapter 14 - Air Sealing... 14-1 Pre-Mechanicals Activities... 14-3 Insulate Bathtub Enclosures... 14-3 Insulate Double Walls and Chases... 14-3 Pre-Inspection Checklist...
More informationColorado Chapter of the International Conference of Building Officials. Building Guide. The Colorado Chapter of the International
Building Guide Colorado Chapter of the International Conference of Building Officials Colorado Building Chapter of the International Guide Code Council Single Family Residential One Story Detached Garage
More informationKEEP YOUR FAMILY SAFER FROM EARTHQUAKES AND TYPHOONS BY MAKING SURE YOUR HOUSE FOLLOWS THESE 6 BASIC PRINCIPLES
KEEP YOUR FAMILY SAFER FROM EARTHQUAKES AND TYPHOONS BY MAKING SURE YOUR HOUSE FOLLOWS THESE 6 BASIC PRINCIPLES 5. WELL BRACED WALLS FIRMLY CONNECTED TO THE FOUNDATION 6. STURDY ROOF FIRMLY CONNECTED TO
More informationProperty Inspection Report
Herman Lloyd 340-344-2791 cechlloyd@gmail.com Property Inspection Report Elysian (Cowpet Beach Resort) 312/313/314 St.Thomas, V.I., V.I. 00802 Page 1 of 45 Table of Contents Definitions 2 General Information
More informationPulaski County, Virginia Practical Wall Bracing
Pulaski County, Virginia Practical Wall Bracing Based on the 2012 Virginia Residential Code The information herein provides guidelines for complying with the most common Practical Wall Bracing provisions
More informationGARAGE MAIN FLOOR PLAN
#G389 14' X 24' X 8', Custom detached garage By Page 1 Page 2 Page 3 Page 4 Page BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. GARAGE
More informationBuilding Guide. Colorado Chapter of the International Conference of Building Officials. Building Guide
12/29/16 Building Guide Colorado Chapter of the International Conference of Building Officials Building Guide Colorado Chapter of the International Code Council Single Family Residential Enclosing Existing
More informationRENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.
CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street, Room 201, Manassas, VA 20110 P.O. Box 560 Manassas, VA 20108 Phone: 703-257-8278 Fax: 703-257-5831
More informationCAREERS. in the Construction TRADES
CAREERS in the Construction TRADES Electrical Modern life would not be possible without electricians. If you like to know how electric currents make things work, then this is the trade for you. Qualified
More informationTORQUE TESTING & INSTALLATION INSPECTION OF DRILLED - IN ANCHORS
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0501 Effective: 04/30/02 DOCUMENT NO. P/BC 2002-092 Revised: Previously Issued As: Guideline #3 TORQUE TESTING & INSTALLATION INSPECTION
More informationBUILDING CODES Presented by CORUM ENGINEERING
BUILDING CODES Presented by CORUM ENGINEERING AGENDA I. The Basics of Foundations A. Footer Designs B. Foundation Walls 1. Non-Backfilled Walls 2. Backfilled Walls (Retaining Walls) C. Slabs vs. Crawl
More informationA Rater s perspective from the field. Thomas H. Marston, February 21, 2007
A Rater s perspective from the field Thomas H. Marston, February 21, 2007 The checklist looks at the thermal envelope - the place where air sealing and insulation meet. Each of the items addresses a potential
More informationUCC Permit Application Procedures
How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.
More informationHome Not Anchored to Foundation
IDENTIFY WEAKNESSES Home Not Anchored to Foundation Houses that are not bolted to the foundation can move off their foundations during earthquakes. Go down into the crawl space the area between the first
More informationResidential fall protection. Presented by Minnesota OSHA
Residential fall protection Presented by Minnesota OSHA Fall protection 29 CFR 1926 Subpart M 1926.501(b)(13) Residential construction policy changes effective June 16, 2011 Residential construction policy
More informationEntry Level Assessment Blueprint Building Construction Occupations
Blueprint Test Code: 4011 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Safety and General Knowledge Carpentry Masonry Recognize and adhere to worksite safety issues (housekeeping
More informationSUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:
IRC CODE UPDATES TO: RESIDENTIAL BUILDING CONTRACTORS FROM: GARY STABER, BUILDING OFFICIAL SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: 6/1/2003 INTERNATIONAL RESIDENTIAL CODE (IRC) APPLICABILITY:
More informationSureHome Inspection Company. Home Inspection. Grant st Street Omaha, NE 68048
Home Inspection Grant 7142 21st Street Omaha, NE 68048 Page 1 of 13 Table of Contents Definitions 2 General Information 2 Roof 3 Exterior 4 Grounds 5 Attic 5 Garage 6 Bathroom 6 Interior 7 Kitchen 7 Laundry
More informationFOUR CORNERS CUSTOM BUILDERS, LLC
TEMPLE Tier 2 Four Corners Custom Builders, LLC 146 Fredericksville Road Mertztown, PA 19539 (610) 682-0758 info@fourcornerscb.com www.fourcornerscb.com PA128784 TEMPLE PRICE: $169,900 SERIES: Tier 2 TYPE:
More informationMSA MOORE & SPENCE ARCHITECTS, P.A.
MSA MOORE & SPENCE ARCHITECTS, P.A. ADDENDUM NUMBER THREE (3): October 27, 2009 to the Construction Documents dated October 9, 2009 for: HACFM, Covington Meadows Apartments Lehigh Acres, Florida The following
More informationAPPLICATION FOR FINISHED BASEMENT PERMIT
APPLICATION FOR FINISHED BASEMENT PERMIT REAL ESTATE TAX I.D. #: - - _ - _ 7607 W College Drive Ph: (708) 361-1804 Fax: (708) 923-7112 building@palosheights.org APPLICANTS: COMPLETE ALL ITEMS AND SUBMIT
More informationCITY OF FATE SINGLE FAMILY BUILDING PERMIT PACKET. Adopted Codes:
CITY OF FATE SINGLE FAMILY BUILDING PERMIT PACKET Adopted Codes: 2015 INTERNATIONAL RESIDENTIAL CODE 2015 INTERNATIONAL FUEL GAS CODE 2015 INTERNATIONAL PLUMBING CODE 2015 INTERNATIONAL ENERGY CONSERVATION
More informationCity of Santa Monica Building and Safety Division
This is to be used as a general checklist; it is not inclusive of all code requirements and inspection criteria. General requirements Verify that address on permit matched Address, Description and Approvals:
More informationTHE SPENCER RESIDENCE J&S ARCHITECT
THE SPENCER RESIDENCE J&S ARCHITECT 75 POURED CONCRETE FOUNDATION WALL (0MPa) 97.94 50Ø WEEPER TILE C/W SOCK W/MIN. 50 GRANULAR COVER F.D. E.P.B. F.D. 00 POURED CONCRETE FOUNDATION WALL (0MPa) 475 X 00
More informationSECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:
SECTION 03470 TILT-UP PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Work includes, but is not limited to, the following: 1. Precast wall panels. 2. Forms and casting beds. 3. Concrete. 4. Reinforcing
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationINSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST
Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING
More informationFIELD COPY ATTACHMENT
FIELD COPY ATTACHMENT The released plans for the project must be on site and available to the inspectors at all times. No inspection will be done without the released field plans. If you have any questions,
More informationGARAGES/ONE-STORY City of Grand Rapids Building Safety Division
GARAGES/ONE-STORY City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building
More informationChapter 1: Application and Administration
Chapter 1: Application and Administration General Comments This chapter provides provisions regarding the purpose, scope, application, and administration of subsequent requirements of ICC 500. In addition
More information4 Structural Performance
Section 4 STRUCTURAL PERFORMANCE 4 Structural Performance The BPAT inspected the structural performance of three primary construction types: reinforced concrete, reinforced masonry, and wood-frame. Inspections
More informationSECTION UNIT MASONRY
SECTION 04200 UNIT MASONRY PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, and equipment and perform functions required in the installation and maintenance of the work covered by this Section.
More informationSPECIFICATION & DESIGN MANUAL " AISI 1060 to 1065 Rockwell Hardness 51 to 55 Perma-Seal coated Stick-E Pin 3/4" (Step Shank) 1"
Trak-It /Stick-E TM SPECIFICATION & DESIGN MANUAL TM Stick-E Electrical and Mechanical Fastening System PRODUCT DESCRIPTION The Stick-E fastening system uses Trak-It gas technology with specially designed
More informationf. Sign Installer/Hanger must submit the following to qualify for a license: i. Certificate of Insurance 1. $300,000 Minimum Liability Coverage
City of Arkansas City Contractor s License Application Information 1. Contractor must completely fill out the license application. 2. Decide what type of license to obtain. (Definitions on the back of
More information