1 AGI Project No B Subsurface Investigation Report For the Proposed Roosevelt Middle School Site Improvements 7560 Oak Avenue River Forest, Illinois Prepared for Mr. Jerry Pilipowicz Terra Engineering, Ltd. 225 West Ohio Street, 4 th Floor Chicago, Illinois Prepared by 2385 Hammond Dr., Suite 6 Schaumburg, Illinois February 19, 2013

2 February 19, 2013 Mr. Jerry Pilipowicz Terra Engineering, Ltd. 225 West Ohio Street, 4 th Floor Chicago, Illinois Re: Subsurface Investigation Report Proposed Roosevelt Middle School Site Improvements 7560 Oak Avenue River Forest, Illinois AGI Project No B Dear Mr. Pilipowicz: The subsurface exploration at the above-referenced site has been completed. The attached report represents the findings of the subsurface exploration and provides the geotechnical analysis for the project. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the contents of this report, or if we may be of further service to you in any way, please do not hesitate to contact us. Sincerely, APPLIED GEOSCIENCE, INC. Adam M. Moghamis, P.E. Principal Engineer enc.

3 Roosevelt Middle School Site Improvements INTRODUCTION (AGI) has completed the subsurface investigation for the proposed site improvements at Roosevelt Middle School located at 7560 Oak Avenue in River Forest, Illinois. It is our understanding that parking lot, driveway, playground, sidewalk, and other flatwork improvements are planned at the site. Results of field and laboratory testing and final guideline recommendations based upon these data are included in this report. The soil boring logs, a boring location diagram, percolation test results, and general notes are included with this report. Applied GeoScience, Inc. personnel established the boring locations in the field based on a sketch by Terra Engineering, without the aid of sophisticated surveying techniques and as such, the locations are considered to be approximate. SUBSURFACE EXPLORATION PROCEDURES Three (3) soil borings were extended to depths of 9 to 15 feet on February 9, 2013 as part of the soils exploration. Borings B-1 and B-2 were performed with a truck-mounted rotary drilling rig using continuous flight augers. Representative samples were obtained using the split-barrel sampling procedure according to ASTM Specification D In the split-barrel sampling procedure, a 2- inch O.D. split-barrel sampling spoon is driven into the ground with a 140-pound hammer, free falling a distance of 30 inches. The blows required to advance the sampling spoon by 12 inches after an initial 6 inch penetration are reported as the penetration resistance (N) values. These values are shown on the boring logs at their test depths. The penetration resistance value is an indication of the relative density of in-place granular soil and, to a lesser degree of accuracy, the consistency of cohesive soil. Cohesive soil samples were tested for unconfined compressive strength using a calibrated penetrometer test device. Due to access and utility conflicts, boring B-3 was conducted using a portable diamond-bit core drill and extended using a hand auger technique. Upon completion of the drilling, the borings were filled with auger cuttings. All soil samples obtained from the drilling operation were visually classified in the field. Samples were sealed and returned to AGI s laboratory for further examination, classification and testing. Destructive testing was completed which consisted of cutting one (1) core of the existing pavement in Oak Avenue using a portable diamond-bit core drill. Water was used as a coolant. Upon completion of the core, the core hole was patched with concrete to match the existing grade. The pavement core was measured and visually inspected in the field. The surface condition of the core was also inspected. Field logs of each boring and pavement core were prepared by our field engineer. These logs include visual classifications of the materials encountered during drilling as well as the engineer s interpretation of the subsurface conditions between samples, where applicable. Final boring and coring logs included with this report represent an interpretation of the field logs and include modifications based on the laboratory testing of the samples. February 19, 2013 Page 1

4 Roosevelt Middle School Site Improvements SOIL AND PAVEMENT CONDITIONS The conditions encountered at the pavement core and soil boring locations are shown on the attached logs. The pavement core consisted of two distinct layers of asphalt surface course totaling 4.0 inches in thickness over 10.5 inches of sand and gravel subbase. The asphalt pavement appeared to be in fair condition and exhibited voids and aggregate segregation. In general, the soil borings encountered 2.25 to 3.75 inches of asphalt at the ground surface. A sand and gravel subbase 6.25 inches in thickness was encountered beneath the asphalt in boring B-1, and sandy silty clay, topsoil, and gravel fill materials were encountered beneath the asphalt in the remaining borings and extending to depths of 2 to 3 feet below ground surface. Fill materials were generally underlain by clayey silt to silty clay materials in a stiff to hard condition extending to depths of 5 to 8 feet below ground surface. Silty clay and clayey silt materials were underlain by sand in a loose to medium dense condition extending to the boring termination depth of 15 feet in boring B-1 and the termination depth of 9 feet in boring B-3. In boring B-2, clayey silt in a medium dense condition was encountered at a depth of 14 feet beneath the sand materials and extending to the boring termination depth of 15 feet. The stratification lines shown on the boring logs represent the approximate boundary between soil types. The actual transition may be more gradual. PERCOLATION TESTING Percolation testing to determine the site s hydraulic conductivity was conducted by AMC Septic. The double-ring infiltrometer method based on ASTM standard D was utilized. Tests were conducted in the vicinity of the borings as indicated on the attached boring location diagram. The average infiltration rate, or K value, of the three test sites was 3.3 inches/hour (2.3x10-3 cm/sec). Full infiltration test results are included in Appendix C. LABORATORY TESTING PROGRAM The geotechnical testing program consisted of performing water content tests on selected soil samples according to ASTM D-2216 and calibrated penetrometer tests on the cohesive samples recovered. These tests were performed upon representative portions of the samples obtained in the field. The results of all testing performed, along with a visual classification of the material based upon both a textural analysis and the Unified Soil Classification System, are indicated on the boring logs. February 19, 2013 Page 2

5 Roosevelt Middle School Site Improvements GROUNDWATER CONDITIONS Water level observations were recorded while drilling and immediately after completion of the borings. Groundwater was encountered during drilling at depths of 8.5 to 12.0 feet in borings B-1 and B-2. Groundwater was not encountered in boring B-3. The borings were backfilled immediately after drilling for safety reasons. Groundwater observations in the borings provide an approximate indication of the groundwater conditions at the time the borings were drilled. Since some of the soils encountered were cohesive, which have a low coefficient of permeability, much time may be required for the groundwater to seep into the boreholes and attain an equilibrium level. Longer-term observations in cased holes or piezometers would be necessary for a more accurate evaluation of the groundwater conditions at this site. Fluctuations in the groundwater level and the possible development of perched water table should be anticipated throughout the year depending on variations in climatological conditions and other factors not apparent at the time the borings were performed. The possibility of groundwater level fluctuation should be considered when developing the design and construction plans for the project. ANALYSIS AND GUIDELINE RECOMMENDATIONS The following guideline recommendations assume that the scope of the project as described in the beginning of this report does not change, and that no significant variations in soil conditions occur from those reported on our final boring logs. The boring logs and laboratory test results depict subsurface conditions only at the specified locations on the site. Our recommendations are based upon the assumption that the proposed grades will be approximately equivalent to the existing grades. With these limitations, the following geotechnical recommendations are given for the proposed improvements. It is our understanding that the existing playground, parking lot, driveways, sidewalks, and other flatwork will be reconfigured as part of the proposed improvements, including new flatwork construction in some areas. Subgrade Preparation / Flatwork Beneath the existing asphalt pavement, soil borings encountered variable topsoil, silty sandy clay, and gravel fill materials extending to a depth of 2 to 3 feet below ground surface, followed by relatively impermeable silty clay and clayey silt soils extending to depths of 5 to 8 feet. We recommend that all existing asphalt and any loose, soft, or otherwise unsuitable materials be removed from any new pavement area. The necessary stripping depths will vary and should be closely monitored during construction to verify that all unsuitable materials have been removed. Some existing fill materials, such as the sand and gravel subbase encountered in the vicinity of boring B-1, may be compacted and reused as engineering fill provided that they are free of loose, soft, and organic matter or large debris and are approved by AGI prior to placement. February 19, 2013 Page 3

6 Roosevelt Middle School Site Improvements Prior to fill placement and after rough grading is completed, the exposed subgrade should be proofrolled. Proofrolling aids in providing a firm subgrade for new pavement and for delineating soft or disturbed areas that may exist at or slightly below subgrade level. Unsuitable areas observed at this time should be undercut and replaced with suitable fill if they cannot be compacted in place. Proofrolling may be accomplished with a fully loaded, tandem-axle dump truck or other equipment providing an equivalent subgrade loading. A minimum gross weight of 25 tons is recommended for the proofrolling equipment. Proofrolling should be performed in dry weather conditions only as a wet subgrade will not allow detection of buried weak soils. Although the soil borings encountered 2 to 3 feet of fill materials, no remedial action will be required if the proofroll indicates no deflection. If significant deflection is observed, the soil engineer may recommend undercutting and replacing with geofabric and PGEs. The amount of undercut, if any, should be determined in the field. Wet and unstable subgrade soils may occur where perched or shallow groundwater is present. For stabilizing wet and soft subgrade areas, undercutting and/or placement of a layer of crushed stone, with or without a geotextile fabric, may be considered. Undercutting should be performed in a manner which will minimize disturbance of the undercut subgrade. Heavy equipment traffic directly on these materials should be minimized and, in some cases, undercutting with a backhoe would be preferable. However, it may be possible to disc, aerate and dewater these higher moisture content clay soils. Any new fill placed in the upper 12 inches below any pavement section should consist of approved granular material that is free of organic matter and debris. The fill should be placed and compacted in lifts not exceeding 9 inches in loose thickness. Each fill lift should be compacted to a minimum of 95% of the maximum dry density of the material as determined by ASTM Specification D All fill should be compacted at a moisture content within 2% of the optimum moisture content as determined by the modified Proctor test. Appropriate laboratory testing should be performed on samples of proposed off-site borrow materials before they are used for fill, particularly if they are to be placed within 2 feet of the finished pavement subgrade elevation. If some settlement can be tolerated, periodic maintenance of any new asphalt pavement placed on the existing subgrade should be anticipated. Periodic maintenance will maximize the service life of both the light and heavy traffic pavement sections. Such maintenance should include patching and repair of deteriorated areas, crack sealing, and surface sealing. Thicker pavement sections, in addition to the subgrade preparation procedures described below, could be used to reduce the required maintenance and extend the expected service life of the pavements. February 19, 2013 Page 4

7 Roosevelt Middle School Site Improvements Drainage Considerations Based on the results of infiltrometer tests at the four boring locations, the subgrade soils encountered below a depth of 2 feet exhibit moderate to high permeability. However, it is our engineering opinion that the installation of a seepage bed is recommended for drainage purposes in areas where impermeable soil is encountered. The seepage bed consists of 18 to 24 inches of washed gravel or equivalent, compacted to a minimum of 90% of the maximum dry density of the material as determined by ASTM Specification D If the base course layer is not as smooth as desired, or there are undesired undulations, it may be necessary to add a layer of fines (stone dust, screenings, manufactured sand, etc.) to fill in the low spots or create a smooth surface. This layer should be kept to a minimum, preferably no more than two to three inches. This layer must be compacted with a heavy roller. A vibratory compactor should not be used. An underdrainage system of 4 diameter perforated distribution lines should be placed within in the granular material to direct water toward the permanent sewer system. As an alternative to removal of the existing impermeable silty clay soils, consideration may be given to the use of dry wells to enable proper drainage. For downward percolation of surface water, dry wells should extend to the sand and silty sand layers encountered below depths of 5 to 8 feet. The wells must be filled with clean coarse sand or fine gravel for conveyance of surface water into the lower permeable sands. For sizing the dry wells, a coefficient of permeability of the lower fine sandy silt soils can be considered as 1x10-3 cm/sec and a vertical hydraulic gradient of 1.0 should be used. CONSTRUCTION CONSIDERATIONS As a general precaution, the exposed subgrade soils should be kept free of standing water or excessive runoff. Due to the potential for soil variations and loose natural soils, it is recommended that soils at subgrade elevation be observed and tested by an representative prior to concrete placement to evaluate the suitability and uniformity of the soils for support of the design at any flatwork or pavement areas. New requirements of the Illinois Environmental Protection Agency mandate that all uncontaminated soil that is to be removed from the site, including soil mixed with other clean construction or demolition debris (CCDD), sent to either a CCDD or an uncontaminated soil fill operation must be certified to be uncontaminated soil in accordance with Section 22.52(f)(2)(B) or Section 22.51a(d)(2)(B), respectively, of the Environmental Protection Act [415 ILCS 5]. Certifications for commercial/industrial properties must be made by a licensed professional engineer. Certifications for uncontaminated soil removed from a site that has not been used for commercial or industrial purposes may be made by either the site owner/operator or by a licensed professional engineer on the IEPA s forms. These forms, along with the analytical results, must be submitted to the fill operation prior to disposal of any soils excavated from the site. AGI s environmental professionals are qualified to perform testing and certifications in accordance with the IEPA s regulations. February 19, 2013 Page 5

8 Roosevelt Middle School Site Improvements No unique soil-related construction problems other than those discussed in previous sections are foreseen. An experienced soil engineer should be retained to oversee all soil-related operations. Occupational Safety and Health Administration (OSHA) and other applicable federal, state, and local regulations regarding work in excavations and trenches should be reviewed and followed. GENERAL COMMENTS The analysis and recommendations presented in this report are based upon the data obtained from the soil borings performed at the indicated locations and from any other information discussed in this report. This report does not reflect any variations that may occur across the site. The nature and extent of such variations may not become evident until construction. If variations appear evident, it will be necessary to reevaluate the recommendations of the report. It is recommended that an geotechnical engineer be given the opportunity to review the plans and specifications so that comments can be made regarding the interpretation and implementation of our geotechnical recommendations in the design and specifications. It is further recommended that the geotechnical engineer be retained for testing and observation during earthwork construction phases to help determine that the design requirements are fulfilled. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No other warranties, either expressed or implied, are intended or made. In the event that any changes in the nature, design or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and the conclusions of this report modified or verified in writing by the geotechnical engineer. February 19, 2013 Page 6

9 APPENDIX A Boring Location Diagram

10 25' 56' B-1 B-3 38' 38' 39' B-2 25' 44' C-1 7' PROJECT NUMBER: B APPENDIX A: CLIENT NAME: TERRA DATE: February 9, 2013 Boring Location Diagram SITE LOCATION: Roosevelt Middle School 7560 Oak Avenue River Forest, Illinois N Not to Scale 2385 Hammond Drive, Suite 6 Schaumburg, Illinois (847)

11 APPENDIX B Boring Logs

12 Project No B Roosevelt Middle School Pavement Coring CORE C-1 Diagram Roosevelt Middle School 7560 Oak Avenue Thickness (in) Condition Surface Fair to Good Surface Fair Total Pavement 4.00 Oak Avenue 44' C-1 7' Subbase N Sand & Gravel

13 AGI Job No B BORING LOG NO. B-1 Sheet 1 of 1 CLIENT Terra Engineering LTD PROJECT Roosevelt Middle School STATION AND OFFSET(ft): LOCATION 7560 Oak Avenue COUNTY: Cook SAMPLES TESTS CITY & STATE: SURFACE ELEVATION 0.8 River Forest, Illinois Datum: 3.75 in. asphalt over 6.25 in. sand & gravel FILL, sandy silty clay, crushed stone, brick chips, black GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT. 8 NUMBER S-1 TYPE % RECOVERY 17 MOISTURE, % HNu Units ppm Qu tsf Failure Type DRY DENSITY PCF ORGANIC CONTENT, % 3.0 CLAYEY SILT, trace sand & gravel, brown, very loose, (ML) 3 S SAND, trace gravel, brown to brown-gray, medium dense, moist at 9 feet, (SP) 5 16 S S SAND, trace gravel, gray, medium dense, wet, (SP) 12 S End Of Boring S-6 67 WATER LEVEL OBSERVATIONS WL WL WL 12 WS 2385 Hammond Drive, Suite 6 Schaumburg, Illinois Tel: (847) Fax: (847) AGI COPY B TERRA 3 SCHOOLS ROOSEVELT MIDDLE SCHOOL 7560 OAK AVENUE RIVER FOREST.GPJ 2/19/13 STARTED DRILL CO. DRILLER ENG/GEOL Williams Pecka JG FINISHED DRILL RIG A'T DRILLER APPROVED C AM

14 AGI Job No B BORING LOG NO. B-2 Sheet 1 of 1 CLIENT Terra Engineering LTD PROJECT Roosevelt Middle School STATION AND OFFSET(ft): LOCATION 7560 Oak Avenue COUNTY: Cook SAMPLES TESTS CITY & STATE: SURFACE ELEVATION 0.6 River Forest, Illinois 3 in. asphalt over 4 in. gravel Datum: FILL, sandy silty clay, sand, gravel, topsoil, & brick, black & brown GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT. 13 NUMBER S-1 TYPE % RECOVERY 72 MOISTURE, % 21 HNu Units ppm Qu tsf Failure Type 4.5 DRY DENSITY PCF ORGANIC CONTENT, % 3.0 SILTY CLAY, trace sand & gravel, brown-gray to brown, hard, (CL) 7 S S SILTY SAND, brown, medium dense, wet, (SM) SAND, trace gravel, brown to gray, medium dense, wet, (SP) S S CLAYEY SILT, trace sand & gravel, gray, medium dense, wet, (ML) End Of Boring 15 8 S WATER LEVEL OBSERVATIONS WL WL WL 8.5 WS 2385 Hammond Drive, Suite 6 Schaumburg, Illinois Tel: (847) Fax: (847) AGI COPY B TERRA 3 SCHOOLS ROOSEVELT MIDDLE SCHOOL 7560 OAK AVENUE RIVER FOREST.GPJ 2/19/13 STARTED DRILL CO. DRILLER ENG/GEOL Williams Pecka JG FINISHED DRILL RIG A'T DRILLER APPROVED C AM

15 AGI Job No B BORING LOG NO. B-3 Sheet 1 of 1 CLIENT Terra Engineering LTD PROJECT Roosevelt Middle School STATION AND OFFSET(ft): LOCATION 7560 Oak Avenue COUNTY: Cook SAMPLES TESTS CITY & STATE: SURFACE ELEVATION River Forest, Illinois 2.25 in. asphalt over 6.5 in. gravel FILL, silty sandy clay, black SILTY CLAY, trace sand & gravel, brown-gray, stiff to very stiff, (CL) Datum: GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT. 6 NUMBER S-1 S-2 TYPE HA HA % RECOVERY MOISTURE, % HNu Units ppm Qu tsf Failure Type 1.5 DRY DENSITY PCF ORGANIC CONTENT, % 9 S-3 HA SAND, trace gravel, brown-gray to gray, loose, moist at 8.5 ft, (SP) 5 6 S-4 HA S-5 HA End Of Boring 7 S-6 HA 100 WATER LEVEL OBSERVATIONS WL WL WL Dry 2385 Hammond Drive, Suite 6 Schaumburg, Illinois Tel: (847) Fax: (847) AGI COPY B TERRA 3 SCHOOLS ROOSEVELT MIDDLE SCHOOL 7560 OAK AVENUE RIVER FOREST.GPJ 2/19/13 STARTED DRILL CO. DRILLER ENG/GEOL Williams Pecka JG FINISHED DRILL RIG A'T DRILLER APPROVED C AM

16

17 UNIFIED SOIL CLAIFICATION SYSTEM Note: Dual symbols are used to indicate borderline soil classifications Geotechnical, Environmental & Materials Engineering

18 APPENDIX C Infiltration Test Results

19 AMC SEEPPTIIC DEEIIGN & PEERCOLLATIION TEETIING SEERVIICEE INFILTRATION TEST RESULTS DOUBLE-RING INFILTROMETER METHOD (with presoak) Date of Test: February 9, 2013 Location: Roosevelt Junior High School, 7560 Oak Avenue, River Forest, Illinois Client: AMC Project: Test Strata: standard 24 Precipitation: 1.0 ± in previous 72 hours Weather Conditions: 33 F, clear Test Hole #1 Test Hole #2 Test Hole #3 Test No. Min/in. K in/hr Test No Min/in. K in/hr Test No Min/in. K in/hr Steady Steady Steady Rate Rate Rate Design Design Design K K K Cm/sec x 10ˉ³ Cm/sec x 10ˉ³ Cm/sec x 10ˉ³ Illinois Indiana Wisconsin Michigan

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

Subsurface Investigation Report

Subsurface Investigation Report AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062.

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062. GEOTECHNICAL ENGINEERING REPORT KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas April 1, 2016 Prepared for: University of Kansas Bartlett & West Prepared by: GeoSource, LLC April 1, 2016

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES FAMILY DOLLAR OF ROCKFORD 09 & CHARLES STREET ROCKFORD, ILLINOIS ECS PROJECT NO. 16:1181 FOR NATIONAL RETAIL DEVELOPMENT LLC CHICAGO,

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,

More information

SUBSURFACE EXPLORATION RECOMMENDATIONS

SUBSURFACE EXPLORATION RECOMMENDATIONS SUBSURFACE EXPLORATION RECOMMENDATIONS PROPOSED STONEBRIDGE INDUSTRIAL DEVELOPMENT Lafayette Center and Fogwell Drive Fort Wayne (Allen County), Indiana GME TESTING PROJECT NO. G13-052421 PREPARED FOR

More information

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE 199 Highland Vista Dr., Suite 170 (703) 726-8030 www.geoconcepts-eng.com TO: LETTER OF TRANSMITTAL Mr. Rob McGinnis FASLA FROM: Rebecca L. Smith-Zakowicz, CPG 108 Second Street, SW, Unit #36 Charlottesville,

More information

REPORT OF GEOTECHNICAL CONSULTING SERVICES

REPORT OF GEOTECHNICAL CONSULTING SERVICES REPORT OF GEOTECHNICAL CONSULTING SERVICES Escambia County Public Works Department Thompson, Crary and McNeal Roadway Project Escambia County, Century,FL Thompson Engineering Project No.: 15-1101-0297

More information

PROJECT INFORMATION EVALUATION PROCEDURES

PROJECT INFORMATION EVALUATION PROCEDURES April 10, 2012 Board of Directors Hunters Ridge Amenities Association, Inc. 422 Hunters Circle Greenville, SC 29617 Attention: Mr. Jerry Miller Mr. Bruce Williams Re: Engineering Evaluation of Existing

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES NORTH SHORE SCHOOL DISTRICT 11 HIGHLAND PARK, ILLINOIS ECS PROJECT NO. 1:8 FOR NORTH SHORE SCHOOL DISTRICT 11 SEPTEMBER, 1 REPORT

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Caswell County Public Library Yanceyville, North Carolina June 15, 2017 Project No. 75175054 Revised Prepared for: Gunn Memorial Public Library Yanceyville, North Carolina

More information

REPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No.

REPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No. REPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No. 1583-12-129 Prepared for: City of Winston-Salem Engineering 100

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI 4810-4800 GEOTECHNICAL INVESTIGATION FOR Proposed Pavement Rehabilitation Parking Lots

More information

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio 1915 North 12 th Street Toledo, OH 43604-5305 T 419-324-2222 F 419-241-1808 www.ttlassoc.com August 3, 2018 TTL Project No. 1706701 Mr. Vito Melilli Coastal Engineer KS Associates, Inc. 260 Burns Road,

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 May 10, 2016 Banner Associates, Inc. 2307 W. 57 th Street, Suite

More information

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma 10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 September 8, 2016 City of Viborg 101 N. Main Street 57070 Attn:

More information

EEI PROJECT NUMBER 5891G-NC PREPARED FOR: HILCO LTD 1435 US HIGHWAY 285 N KINSTON, NC SUBMITTED BY: MATTHEW C. KIRCHNER, E.I.

EEI PROJECT NUMBER 5891G-NC PREPARED FOR: HILCO LTD 1435 US HIGHWAY 285 N KINSTON, NC SUBMITTED BY: MATTHEW C. KIRCHNER, E.I. SUMMARY REPORT OF GEOTECHNICAL SUBSURFACE EXPLORATION AND ENGINEERING EVALUATION PROPOSED PINEY GROVE NURSING & REHABILIATION CENTER EXPANSION 728 PINEY GROVE RD KERNERSVILLE, NORTH CAROLINA EEI PROJECT

More information

APPENDIX A REPORT OF GEOTECHNICAL EXPLORATION

APPENDIX A REPORT OF GEOTECHNICAL EXPLORATION APPENDIX A REPORT OF GEOTECHNICAL EXPLORATION THIS PAGE IS INTENTIONALLY LEFT BLANK Report of Geotechnical Exploration Proposed Stormwater Drainage Improvements (Segments B-F) Governor Road, La Honda Drive,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report The Residence at Yukon Hills Cornwell Drive and Vandament Avenue Yukon, Oklahoma May 20, 2016 Terracon Project No. 03165108 Prepared for: Jones Gillam Renz Architects, Inc. Salina, Kansas Prepared by:

More information

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California Lansing Companies 12671 High Bluff Drive, Suite 150 San Diego, California 92130 April 18, 2017 Project No. 11607.001 Attention: Subject: References: Mr. Casey Malone Results of Onsite Percolation Testing

More information

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of

More information

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146 GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,

More information

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared

More information

Subsurface Environmental Investigation

Subsurface Environmental Investigation Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 5-06 Template Version: C40606 - RW APPENDIX A GEOTECHNICAL REPORT AECOM 99 Commerce Drive 04 477 538 tel Winnipeg, MB, Canada R3P 0Y7 04 84 040 fax www.aecom.com

More information

Subsurface Investigation and Geotechnical Engineering Report Proposed Volvo Dealership 1022 Hingham Street Rockland, Massachusetts

Subsurface Investigation and Geotechnical Engineering Report Proposed Volvo Dealership 1022 Hingham Street Rockland, Massachusetts HML ASSOCIATES Geotechnical and Civil Engineers March 31, 17 19 Rockwood Road Hingham, MA 43 (Phone/Fax)781-74-9999 Mr. Joe Rose Prime Motor Group 42 Providence Highway Westwood, MA 9 RE: Subsurface Investigation

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154 Report of Geotechnical Investigation Woodhaven Retirement Community Addition 9 Wentworth Street Livonia, Michigan 81 Latitude.08 N Longitude 8.898 W Prepared for: Fusco, Shaffer & Pappas, Inc. 0 E. Nine

More information

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5 TABLE OF CONTENTS Page No. PROJECT INFORMATION... 1 Project Authorization... 1 Project Description... 1 Purpose and Scope of Services... 1 SITE AND SUBSURFACE CONDITIONS... 2 Site Location and Description...

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199 REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO. 3-6187-A CLIENT ID: 0199 Prepared for: JEA 1 West Church Street Jacksonville, Florida

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION SHEETZ CONVENIENCE STORE FREEPORT ROAD AND CALIFORNIA AVENUE NATRONA HEIGHTS, PENNSYLVANIA Prepared For: Mr. David J. Mastrostefano, P.E. Sheetz Incorporated 817 Brookfield Drive

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

March 10, 2017 SITE AND PROJECT INFORMATION

March 10, 2017 SITE AND PROJECT INFORMATION March 10, 2017 Derek Hawkes, PE NASH COUNTY 120 W. Washington Street - Suite 2004 Nashville, NC 27856 Re: Report of Subsurface Investigation Middlesex Corporate Park, Lot 3 Middlesex, North Carolina GeoTechnologies

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY HERITAGE BAY MASTER PUMP STATION ISSUED FOR BID REPORT OF GEOTECHNICAL EXPLORATION PROPOSED INLINE WASTEWATER BOOSTER STATION Collier

More information

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California Mr. Victor Garcia The Holt Group 1601 N. Imperial Ave. El Centro, California 92243 September 28, 2017 Project No. EC595 SUBJECT: REFERENCE: GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for

More information

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 April 21, 2016 Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 Re: GEOTECHNICAL ENGINEERING REPORT Proposed San Elizario Retail Center Socorro Road & Chicken

More information

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No.

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No. Central Florida Testing Laboratories, Inc. Testing, Development and Research 12625-40th Street North Clearwater, Florida 33762 ENGINEERING BUSINESS NO. 1066 GEOLOGY BUSINESS NO. 224 TAMPA BAY AREA (727)

More information

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO. - Prepared for: IPG Architects, Inc. Northwood Park Drive Valdosta, Georgia Prepared by: Ellis & Associates,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Proposed Abbington Crossing Apartments 119 Lipscomb Road Wilson, North Carolina March 18, 2016 Project No. 7216011 Prepared for: Rea Ventures Group, LLC Atlanta, Georgia

More information

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Project: NW Bucklin Hill at Silverdale Way NW Project Number: 12023 Prepared for: Barber Development P.O. Box 473 Redmond, WA 98073 Prepared by: South Sound Geotechnical

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,

More information

5.0 SITE CONDITIONS. 5.1 Surface Conditions

5.0 SITE CONDITIONS. 5.1 Surface Conditions 5.0 SITE CONDITIONS 5.1 Surface Conditions The project site is located at approximately along Ashdown Forest Road and Nichols Canyon Road in the Fiddlers Canyon Area of Cedar City, Utah. At the time of

More information

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017 October 31, 2017 City of Oelwein c/o Fox Engineering 414 South 17 th Street, Suite 107 Ames, IA 50010 Attn: Re: Ms. Jessica M.B. Fisher, P.E. Project Manager P: (515) 233-0000 E: jmf@foxeng.com Proposal

More information

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 October 28, 2016 City of Vermillion 25 Center Street 57069 Attn:

More information

AECOM tel 558 North Main Street fax Oshkosh, Wisconsin 54901

AECOM tel 558 North Main Street fax Oshkosh, Wisconsin 54901 920.2.0270 tel 8 North Main Street 920.2.021 fax Oshkosh, Wisconsin 4901 May 8, 2012 Mr. James Rabe P.E., CPESC Civil Engineer II City of Oshkosh 21 Church Avenue Oshkosh, WI 490 Subject: Subsurface Exploration

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 203 to 210 Drainage Structure Pipe Jacking Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

May 1, THE CORRADINO GROUP 4055 N.W. 97 th Avenue Miami, Florida Mr. Carlos E. Verson, P.E. Project Manager

May 1, THE CORRADINO GROUP 4055 N.W. 97 th Avenue Miami, Florida Mr. Carlos E. Verson, P.E. Project Manager May 1, 213 THE CORRADINO GROUP 455 N.W. 97 th Avenue Miami, Florida 33178 Attention: Mr. Carlos E. Verson, P.E. Project Manager Re: Report of Geotechnical Engineering Services - Roadway Soil Survey Bird

More information

Geotechnical Engineering Report

Geotechnical Engineering Report BIG CYPRESS SEMINOLE INDIAN RESERVATION WATER TREATMENT FACILITY October 29, 2015 Terracon Project No. HD155065 Prepared for: REISS ENGINEERING, INC. 1016 Spring Villas Pt. Winter Springs, FL 32708 Prepared

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Parking Lot Evaluation & Physical Plant Additions Rogers State University Claremore, Oklahoma May 20, 2015 Terracon Project No. 04155080 Prepared for: Rogers State University

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 November 1, 2016 City of Viborg PO Box 56 57070-0056 Attn: Lori

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: 01-143 TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report In-Place Soil Survey North Western Road From West Hall of Fame Avenue to West Lakeview Road Stillwater, Oklahoma June 18, 2 Terracon Project No. 36622 Prepared for: Olsson

More information

GEOTECHNICAL ENGINEERING STUDY. MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER:

GEOTECHNICAL ENGINEERING STUDY. MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER: GEOTECHNICAL ENGINEERING STUDY MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER: 016-043 Prepared By American Geotechnical & Environmental, Inc.

More information

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE APPENDIX A - TEST HOLE LOGS PORTAGE AVE TH -9 CONTRACT E- DR DR BOURKEVALE CAVELL WINSTON DR PARKSIDE DR ASSINIBOINE AVE AUTHORIZED BY: DATE: CONSULTING GEOTECHNICAL ENGINEERS AUTHORIZED /0/ CLIENT DRAWING

More information

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE Report of Geotechnical Exploration Addie s Corner Entry Bridge and Lake Areas 8799 Immokalee Road Naples, Collier County, Florida October 26, 2016

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report O Reilly Auto Parts Store 1311 E. Nine Mile Road Highland Springs, Virginia August 8, 2012 Project No. 70125105 Prepared for: Oglesby Partners, Inc. Chattanooga, Tennessee

More information

PROJECT NO A. ISSUED: February 29, 2016

PROJECT NO A. ISSUED: February 29, 2016 INTERPRETIVE REPORT FOR INFILTRATION SYSTEM DESIGN, PROPOSED VILLA VERONA APARTMENT COMMUNITY, ASSESSOR S PARCEL NUMBERS 311-040-015, 311-040-021, 311-040-024, 311-040-026 AND 311-040-013, LOCATED ON THE

More information

HAENGEL & ASSOCIATES ENGINEERING, Inc.

HAENGEL & ASSOCIATES ENGINEERING, Inc. PROPOSED ROAD RECONSTRUCTION BERWYCK-ON-THE PARK ASSOCIATION OAKLAND COUNTY MILFORD, MI 48381 GEOTECHNICAL EXPLORATION AND ENGINEERING REPORT Mr. Robert O. Craigmile, PE Senior Project Manager Orchard,

More information

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC DRAINAGE STUDY PHASE ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE C IMPROVEMENTS ` FOR: LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC APPENDIX A J-.000 Prepared by: Savannah, GA Charleston, SC Myrtle

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Mobile Offices and Future Service Center Range Road Eglin Air Force Base, Florida November 2, 2016 Project No. EA165075 Prepared for: American States Utility Services, Inc. Prepared by: Terracon Consultants,

More information

June i TABLE OF CONTENTS

June i TABLE OF CONTENTS June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS COLORADO SPRINGS COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services 1420 Austin Bluffs Parkway Colorado Springs Colorado 80918

More information