1 related to Dagny field Classification: Internal Status: Final Expiry date: Page 1 of 9

2 Classification: Internal Status: Final Expiry date: Page 2 of 9

3 Table of contents 1 Introduction Scope of work Input data Field data Scenarios for produced water amounts and oil in water concentrations Produced Water Composition Results References... 9 Classification: Internal Status: Final Expiry date: Page 3 of 9

4 1 Introduction The Environmental Impact Factor (EIF) is an environmental index quantifying the environmental risk of produced water discharges and is used for identification and prioritisation of alternative measures for risk reduction. The EIF is based on a combined environmental risk and hazard assessment, accounting for both composition and amount of the produced water discharge. A thorough description of the EIF and its practical application is given in Frost et al., 2009 (1) and Smit et al (2). 2 Scope of work In this document the EIF tool is applied for discharges of produced water from the Dagny Oil and Gas Field, which is under development. The EIF tool is used in order to compare the potential environmental benefit of alternative measures to reduce the potential impact of produced water discharges, and to form a basis for a cost-effective total approach to produced water management. 3 Input data 3.1 Field data The Dagny Field is located in the Norwegian Sea with geographical coordinates 58 34' 19,848" North and 01 41' 48,436" East. The discharge depth is 10 m below sea surface. 3.2 Scenarios for produced water amounts and oil in water concentrations For this study, EIF is calculated for 8 different scenarios listed in Table 1 below. These alternatives differ in oil (aliphatic hydrocarbons) concentration and produced water management solutions, as re-injection (E) and discharge to sea (A D) being the two options. The daily discharge rates for produced water amounts and the oil in water concentrations for Dagny presented in Table 1 are used for calculating the annual Environmental Impact Factor (EIF) for Dagny. Table 1: Produced water amounts and oil in water concentrations for Dagny Scenario Produced water discharge rate [Sm 3 /d] Oil in Water concentration [ppm] A A B B C C D D E 0 Re-injection Classification: Internal Status: Final Expiry date: Page 4 of 9

5 The oil in water concentrations were set based on both the maximum concentration, which is the upper limit of discharge by the authorities (29 ppm) and the probable lowest concentration, which can be obtained through an optimal design of the produced water handling (10 ppm). 3.3 Produced Water Composition For the EIF simulation, man-made chemicals are selected among the tentative products used for Gudrun Design basis, which were chosen from the project as comparable, for a worst case scenario i.e. products with highest potential environmental impact (i.e. hazardous properties) are selected and presented in Table 2 together with their injection rate, which equals their concentrations in produced water. Table 2: Chemicals and their concentrations in produced water Type of chemical to be used at Dagny Selected products for simulation based on products used at Gudrun Scale inhibitor SI Emulsion breaker DMO Flocculant WT Proposed injection rate in ppmv (mg/l) for Dagny Concentrations of natural occurring compounds for Dagny, are listed in Table 3, excluding the aliphatic hydrocarbon concentrations since it will vary for each scenario. In cooperation with the discipline ladder Flow Assurance the project came to the result that Norne oil will be the most representative oil regarding the natural occurring compounds. Therefore the values for 2009 for Norne were taken as input data for the EIF model for Dagny. Classification: Internal Status: Final Expiry date: Page 5 of 9

6 Table 3: Natural occurring compounds concentrations for Norne 2009 used in the EIF model for Dagny Compound Concentration (mg/l) Sum BTEX 23,3968 Sum Naphtalen 1, ring PAH 0, ring PAH 0,00066 Fenol C0-C3 8,81394 Alkylfenoler C4-C5 0,22522 Alkylfenoler C6-C9 0,00126 Zn 0,0063 Cu 0,00022 Ni 0,00117 Cd 0,00005 Pb 0,00028 Hg 0, Results The EIF results for all 8 scenarios for Dagny are presented in Table 4. Table 4: EIF results for Dagny Scenario PW discharge rate [Sm 3 /d[ Oil in Water concentration [ppm] A A B B C C D D E 0 Re-injection 0 EIF As can be seen in table 4, the maximum EIF value (EIF = 13) occurs for scenario A1, which has the highest discharge rate for produced water combined with the highest oil in water content. The EIF value for scenario A2 with the same discharge rate, but lower oil in water concentration (10 ppm) has been calculated to EIF = 10. Generally these EIF values are low. For all other scenarios EIF has been calculated to EIF = 0. Classification: Internal Status: Final Expiry date: Page 6 of 9

7 Figure 1 shows, which components are contributing to EIF = 13 in scenario A1. Generally the natural occurring compounds are dominating the contribution to EIF with about 98 %. Main contributor is aliphates (42 %) followed by phenols C4-C5 (17 %) and 2-3 ring PAH (10 %). Added chemicals are just contributing with about 2 %. Dagny 4000/29 EIF = 13 SI 1 KII Em 1 KVI BTEX 7 % Naphthalenes 9 % 2-3 ring PAH 10 % Alifater 42 % 4-ring+ PAH Phenol C0-C3 9 % Phenol C6-C9 Phenol C4-C5 17 % Figure 1: Contribution to EIF for Dagny scenario A1 Classification: Internal Status: Final Expiry date: Page 7 of 9

8 Figure 2 shows, which components are contributing to EIF = 10 in scenario A2. Also here the natural occurring compounds are dominating the contribution to EIF with about 98 %. Main contributor is phenols C4-C5 (25 %) followed by aliphates (18 %) and 2-3 ring PAH (14 %). Added chemicals are just contributing with about 2 %. Dagny 4000/10 EIF = 10 SI 1 KII Em 1 KVI BTEX 1 Alifater 18 % Naphthalenes 13 % Phenol C6-C9 2 % 2-3 ring PAH 14 % Phenol C4-C5 25 % 4-ring+ PAH Phenol C0-C3 13 % Figure 2: Contribution to EIF for Dagny scenario A2 The maximum EIF for Dagny is 13 (scenario A1). This is a low EIF and figure 3 gives an indication how the EIF for Dagny can be evaluated related to EIF values for 2009 for Statoil s existing fields on the Norwegian Continental Shelf (NCS). Classification: Internal Status: Final Expiry date: Page 8 of 9

9 700 EIF 2009, Statoil Norwegian Continental Shelf EIF Statfjord C Gullfaks B Statfjord B Gullfaks A Gullfaks C Statfjord A Veslefrikk Norne Snorre A/Vigdis Glitne Troll C Troll B Brage Heidrun Kristin Dagny Snorre B Grane Oseberg C Sleipner A/Øst Åsgard A Åsgard B Oseberg F Huldra Oseberg Øst Oseberg Sør Visund Sleipner T/Vest Troll A Njord Heimdal Kvitebjørn Figure 3: EIF 2009, Statoil Norwegian Continental Shelf Dagnys contribution to the environmental risk on the NCS is very limited. The impact on the environment is small. 5 References (1) Frost, T. K., Johnsen, S. Torvik, H. and Eide, T.E. (2009). Application of the Environmental Impact Factor (EIF) as a risk management tool to discharges forproduced water on the Norwegian Continental Shelf. NEL Produced Water Workshop Aberdeen, October th (2) Smit, M.G.D, Frost, T.K. and S. Johnsen (2011). Achievements of risk-based produced water management on the Norwegian continental shelf ( ). Integrated Environmental Assessment and Management (IEAM), Society of Environmental Toxicology and Chemistry (SETAC). Classification: Internal Status: Final Expiry date: Page 9 of 9

CO 2 for EOR Norwegian Continental Shelf. Possibilities and Challenges

CO 2 for EOR Norwegian Continental Shelf. Possibilities and Challenges CO 2 for EOR Norwegian Continental Shelf Possibilities and Challenges Gunnar Berge, Director General NPD Carbon Capture and Storage where are we today? Felix Conference Center Oslo, 26 April 2005 CO2-injection

More information

Reservoir Management

Reservoir Management Reservoir Management Goals for Reservoir Management Primary Goal Maximizing the value of the asset (reservoir) Net Present Value For the owner For the society Secondary Goals Get sufficient information

More information

The Environment Impact Factor (EIF) for produced water discharges a tool for reducing environmental impacts

The Environment Impact Factor (EIF) for produced water discharges a tool for reducing environmental impacts The Environment Impact Factor (EIF) for produced water discharges a tool for reducing environmental impacts H. Rye 1, M. Reed 1, M. Kristin Ditlevsen 1, S. Berntsen 2 & E. Garpestad 2 1 SINTEF Applied

More information

NEL Produced Water & Environmental Conference

NEL Produced Water & Environmental Conference NEL Produced Water & Environmental Conference Safina Jivraj, Environmental Skills Group Manager (London) 20 th November 2013, Kuala Lumpur Genesis In operation for 25 years, Genesis is an O&G consultancy,

More information

Modellverktøy. Mathijs Smit, Principle researcher, Miljøteknologi Statoil R&D

Modellverktøy. Mathijs Smit, Principle researcher, Miljøteknologi Statoil R&D Modellverktøy Mathijs Smit, Principle researcher, Miljøteknologi Statoil R&D OG21 Olje og Gass i det 21. århundre Norges teknologistrategi for petroleumsindustrien www.og21.no Message Modelling tools e.g.

More information

CASE STUDIES CARRIED OUT BY AQUATEAM

CASE STUDIES CARRIED OUT BY AQUATEAM CASE STUDIES CARRIED OUT BY AQUATEAM Summary document updated 01.06.2011 Water injection Block 34/7 Formation and injection water test at well no.34/4-7 Selection of Seawater intake depth. Impact on seawater

More information

Acknowledgements. Finally I want to thank my family for their continuous support and encouragement during the period of completing this thesis.

Acknowledgements. Finally I want to thank my family for their continuous support and encouragement during the period of completing this thesis. 0 Acknowledgements I would like to thank my supervisor Professor Torleiv Bilstad for guidance and advice. And I would like to especially thank Professor Leif Ydstebø for all the help and support during

More information

SPE Enablers for the Successful Implementation of Intelligent Energy

SPE Enablers for the Successful Implementation of Intelligent Energy SPE 111470 Enablers for the Successful Implementation of Intelligent Energy Transforming Offshore Operations - Working with Digital Technology Stavanger November 29 2017 Integrated Operations People Technology

More information

Environmental Status of the Norwegian Offshore Sector Based on the Petroleum Regional Monitoring Programme,

Environmental Status of the Norwegian Offshore Sector Based on the Petroleum Regional Monitoring Programme, Environmental Status of the Norwegian Offshore Sector Based on the Petroleum Regional Monitoring Programme, 1996-1998 Prepared for the Norwegian Oil Industry Association (OLF) Lead Authors: Michael Carroll

More information

Exploration activity. Exploration policy in mature and frontier areas

Exploration activity. Exploration policy in mature and frontier areas The Norwegian Petroleum Industry from well to MARket 4 From the Kollsnes gas processing plant in Hordaland County. Gas from a number of fields, including Troll, is processed here (Photo: Øyvind Sætre/Gassco)

More information

A decline rate study of Norwegian Oil Production

A decline rate study of Norwegian Oil Production Published in Energy Policy Volume 36, Issue 11, November 2008, Pages 4262-4271 http://dx.doi.org/10.1016/j.enpol.2008.07.039 A decline rate study of Norwegian Oil Production Mikael Höök a, Kjell Aleklett

More information

STATOIL s view on R&D directions

STATOIL s view on R&D directions STATOIL s view on R&D directions 1. Introduction 2. Background of Norwegian oil sector development 3. Statoils business challenges and technology needs 4. How to stimulate Technology development 5. The

More information

Model-driven integration architecture for IO G2

Model-driven integration architecture for IO G2 Model-driven integration architecture for IO G2 Digital Platform for next generation IO: A prerequisite for the High North? The 5th International Conference on Integrated Operations in the Petroleum Industry

More information

Semantically aware integration architecture for oil & gas solutions

Semantically aware integration architecture for oil & gas solutions Semantically aware integration architecture for oil & gas solutions Frode Myren, IBM myren@no.ibm.com ISO 15926 and Semantic Technologies 2009 Sogndal, September 10, 2009 2009 IBM Corporation ISO 15926-

More information

ERMS Environmental Risk Management System

ERMS Environmental Risk Management System ERMS Environmental Risk Management System by Ivar Singsaas (ivar.singsaas@sintef.no) Coordinator Background Norwegian authorities requirements of 1997: Zero discharges to sea DREAM (Dose-related Risk and

More information

Natural Gas Developments

Natural Gas Developments Natural Gas Developments EPPM, Bangkok, 9 October 2008 Technical trends, challenges and solutions Issues related to global warming and what are the solutions Role of government and industry Kjetil Tungland,

More information

Discharges, Spills and Emissions from Offshore Oil and Gas Installations in Offshore Oil & Gas Industry Series

Discharges, Spills and Emissions from Offshore Oil and Gas Installations in Offshore Oil & Gas Industry Series Discharges, Spills and Emissions from Offshore Oil and Gas Installations in 2016 Offshore Oil & Gas Industry Series 2018 Discharges, Spills and Emissions from Offshore Oil and Gas Installations in 2016

More information

CONTENTS PART I. REPORT FROM THE CEO

CONTENTS PART I. REPORT FROM THE CEO ANNUAL REPORT 2015 CONTENTS PART I. REPORT FROM THE CEO 2015 5 PART II. INTRODUCTION TO THE ORGANISATION AND KEY FIGURES 10 Supervision and directorate 10 Organisation 11 Key priorities in 2015 11 Resource

More information

Tertiary CO 2 EOR in 23 North Sea Oil Fields - Combined CO 2 Storage Based in Industrial Sources CO2

Tertiary CO 2 EOR in 23 North Sea Oil Fields - Combined CO 2 Storage Based in Industrial Sources CO2 Tertiary CO 2 EOR in 23 North Sea Oil Fields - Combined CO 2 Storage Based in Industrial Sources CO2 Erik Lindeberg, SINTEF Norway CCUS STUDENT WEEK 2018, Oct. 2018, Golden CO Results 23 selected mature

More information

Toxic and non-toxic disturbances PNEC estimation and validation. Tone Frost, Statoil

Toxic and non-toxic disturbances PNEC estimation and validation. Tone Frost, Statoil Toxic and nontoxic disturbances PNEC estimation and validation Tone Frost, Statoil EIF DD framework Release information 1. Hazard identification Literature information 2. Exposure Modeling (PEC) 3. Effect

More information

StrålevernRapport 2011:4. Radioactivity in the Marine Environment 2008 and Results from the Norwegian Marine Monitoring Programme (RAME)

StrålevernRapport 2011:4. Radioactivity in the Marine Environment 2008 and Results from the Norwegian Marine Monitoring Programme (RAME) StrålevernRapport 2011:4 Radioactivity in the Marine Environment 2008 and 2009 Results from the Norwegian Marine Monitoring Programme (RAME) Reference: NRPA. Radioactivity in the Marine Environment 2008

More information

Framework for the Environmental Impact Factor for drilling discharges

Framework for the Environmental Impact Factor for drilling discharges TNO 2006-DH-R0045/B Open Date: 18.07.2006 ERMS Report no. 3 Framework for the Environmental Impact Factor for drilling discharges M.G.D. Smit, R.G. Jak, H. Rye, T.K. Frost Laan van Westenenk 501 Postbus

More information

Removal of Toxic Contents from Gas/Condensate Produced Water by the Macro Porous Polymer Extraction Technology

Removal of Toxic Contents from Gas/Condensate Produced Water by the Macro Porous Polymer Extraction Technology Veolia MPP Systems www.vwsmppsystems.com Removal of Toxic Contents from Gas/Condensate Produced Water by the Macro Porous Polymer Extraction Technology SPE Workshop SPE Oil and Gas Effluent Discharge Management

More information

ISO 15926, interoperability and Integrated Operations (IO)

ISO 15926, interoperability and Integrated Operations (IO) PCA FORUM 2009 AND MEMBERS MEETING 20-21 October 2009, Hotel Nikko Kuala Lumpur ISO 15926, interoperability and Integrated Operations (IO) Thore Langeland, Ph.D. Manager IO, OLF Chairman of PCA (tla@olf.no,

More information

Studies of produced water toxicity using luminescent marine bacteria

Studies of produced water toxicity using luminescent marine bacteria Environmental Toxicology 111 Studies of produced water toxicity using luminescent marine bacteria S. Grigson, C. Cheong & E. Way Heriot-Watt University, Scotland, UK Abstract The main aqueous discharge

More information

Full gass fremover i Europa? Johan Hustad, direktør NTNU Energi. Norwegian University of Science and Technology

Full gass fremover i Europa? Johan Hustad, direktør NTNU Energi. Norwegian University of Science and Technology Full gass fremover i Europa? Johan Hustad, direktør NTNU Energi Norwegian University of Science and Technology Johan Hustad Eleni Patanou Hege Tunstad Direktør koordinator Kommunikasjonsansvarlig 2 Arbeidsområder

More information

REMOVAL OF DISSOLVED AND DISPERSED HYDROCARBONS FROM OIL AND GAS PRODUCED WATER WITH MPPE TECHNOLOGY TO REDUCE TOXICITY AND ALLOW WATER REUSE

REMOVAL OF DISSOLVED AND DISPERSED HYDROCARBONS FROM OIL AND GAS PRODUCED WATER WITH MPPE TECHNOLOGY TO REDUCE TOXICITY AND ALLOW WATER REUSE Lead author Dick Meijer REMOVAL OF DISSOLVED AND DISPERSED HYDROCARBONS FROM OIL AND GAS PRODUCED WATER WITH MPPE TECHNOLOGY TO REDUCE TOXICITY AND ALLOW WATER REUSE D.T. Meijer 1 and C. Madin 2 1 Veolia

More information

Summary of KonKraft report 5. The petroleum industry and climate issues

Summary of KonKraft report 5. The petroleum industry and climate issues Summary of KonKraft report 5 The petroleum industry and climate issues The petroleum industry and climate issues Broad scientific agreement prevails that human-produced (anthropogenic) greenhouse gas emissions

More information

CO2 Storage Experiences Why is it safe?

CO2 Storage Experiences Why is it safe? CO2 Storage Experiences Why is it safe? Dr. Ing. Tore A Torp, Adviser CO 2 Storage, Statoil, Norway 1 CO2 Storage Experiences Why is it safe? CONTENT: Challenge, Vision & History Sleipner, In Salah & Snohvit

More information

Concentration of Metals (Cd, Hg, Ag; mean +SD) in sediment samples collected from Pit Specific Sediment Chemistry Monitoring for CMP 1 in May 2014.

Concentration of Metals (Cd, Hg, Ag; mean +SD) in sediment samples collected from Pit Specific Sediment Chemistry Monitoring for CMP 1 in May 2014. Figure 1: Concentration of Metals (Cr, Cu, Ni, Pb, Zn, As; mean +SD) in sediment samples collected from Pit Specific Sediment Chemistry Monitoring for CMP 1 in May 2014. Figure 2: Concentration of Metals

More information

Framework for the Environmental Impact Factor for Drilling Discharges (EIF DD ) Mathijs.G.D. Smit Formerly TNO-IMARES, Presently IRIS / Statoil

Framework for the Environmental Impact Factor for Drilling Discharges (EIF DD ) Mathijs.G.D. Smit Formerly TNO-IMARES, Presently IRIS / Statoil Framework for the Environmental Impact Factor for Drilling Discharges (EIF DD ) Mathijs.G.D. Smit Formerly TNO-IMARES, Presently IRIS / Statoil Outline Introduction Development of a framework Identification

More information

ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE

ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE This series of fact sheets was prepared as part of UN Environment s environmental audit of the

More information

Date: 15.12.2006 ERMS Report no. 4 Toxicity of Drilling Discharges Tone Karin Frost, Ingunn Nilssen, Statoil Jerry Neff, Battelle, Dag Altin, BioTrix Kristin Eide Lunde, Norsk Hydro 2 Abbreviations...

More information

REQUIREMENTS FOR DISCHARGING OF WASTE WATER FROM THE CHEMICAL INDUSTRY

REQUIREMENTS FOR DISCHARGING OF WASTE WATER FROM THE CHEMICAL INDUSTRY CONVENTION ON THE PROTECTION OF THE MARINE ENVIRONMENT OF THE BALTIC SEA AREA HELSINKI COMMISSION - Baltic MarineHELCOM 16/17 Environment Protection Commission Annex 9 16th Meeting Helsinki, 14-17 March

More information

Mark Recht Telecommunications VP

Mark Recht Telecommunications VP Overview of the Oil & Gas Industry Mark Recht Telecommunications VP Good afternoon ladies and gentlemen, It is my job to try to revive everyone after a rather good lunch. My objective is to give you an

More information

ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE

ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE This series of fact sheets was prepared as part of UN Environment s environmental audit of the

More information

Brent s evolution as a global benchmark

Brent s evolution as a global benchmark Brent s evolution as a global benchmark Dave Ernsberger Global Head of Energy Pricing, S&P Global Platts September 2017 Evolution of the North Sea Benchmark 1976 First oil from the Brent oilfield 2007

More information

Offshore Industry Series --------------------------------------------------------------------------------------------------------------------------------------- Addendum to the OSPAR Background Document

More information

History Matching what is sufficient HM for prediction/well planning

History Matching what is sufficient HM for prediction/well planning History Matching what is sufficient HM for prediction/well planning FORCE LUNCH Meeting December 10th 2015 NPD Stavanger Anders Gjesdal, Chief Engnieer Reservoir Technology - Statoil ASA Classification:

More information

Contamination of fjords by urban run-off

Contamination of fjords by urban run-off Contamination of fjords by urban run-off NGI NIVA FMBu Arne Pettersen Gijs Breedveld Espen Eek Elisabeth Nesse Aud Helland Inger Staubo Contaminated sediments in the Drammensfjord The Drammensfjord has

More information

Baltic Sea Region CCS policies (BASREC)

Baltic Sea Region CCS policies (BASREC) Baltic Sea Region CCS policies (BASREC) Stockholm, 19 September 2012 Kristoffer Stabrun Norwegian CCS policy CCS enables us to reduce emissions from the production and use of fossil fuels, and must be

More information

Norway as a CO 2 Laboratory

Norway as a CO 2 Laboratory Norway as a CO 2 Laboratory Tore A Torp, Dr.ing. Adviser CO 2 Storage, StatoilHydro, Norway Worst case scenario is business as usual! Need to get started now! 3 Norway as a CO 2 -laboratory - Cleaning

More information

WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES

WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES 1. Introduction This guidance document applies to soil recovery facilities which exceed the operational

More information

ECOLOGICAL MONITORING IN THE MOLIKPAQ AREA

ECOLOGICAL MONITORING IN THE MOLIKPAQ AREA ECOLOGICAL MONITORING IN THE MOLIKPAQ AREA 1998-24 Vityaz Complex Molikpaq Floating Storage and Offloading Vessel Single Anchor Mooring Bouy Underwater Pipeline Monitoring programs Compliance monitoring

More information

IFE/HR/E 2007/044. Integrated Operations and Insights on Functional Analysis Techniques

IFE/HR/E 2007/044. Integrated Operations and Insights on Functional Analysis Techniques IFE/HR/E 2007/044 Integrated Operations and Insights on Functional Analysis Techniques Address Telephone Telefax KJELLER NO-2027 Kjeller, Norway +47 63 80 60 00 +47 63 81 63 56 HALDEN NO-1751 Halden, Norway

More information

Offshore Enhanced Oil Recovery (EOR): State of the Art and Experience Current UK Direction

Offshore Enhanced Oil Recovery (EOR): State of the Art and Experience Current UK Direction www.senergyworld.com Offshore Enhanced Oil Recovery (EOR): State of the Art and Experience Current UK Direction David S Hughes Principal Reservoir Engineer/EOR Specialist Senergy (david.hughes@senergyworld.com)

More information

N O R W E G I A N C O N T I N E N T A L S H E L F P E T R O L E U M D I R E C T O R AT E

N O R W E G I A N C O N T I N E N T A L S H E L F P E T R O L E U M D I R E C T O R AT E N O R W E G I A N C O N T I N E N T A L A J O U R N A L F R O M T H E N O R W E G I A N P E T R O L E U M D I R E C T O R AT E 2-2005 2 N O R W E G I A N CONTINENTAL 3 NORWEGIAN GAS AT A CROSSROADS f o

More information

ROLE OF BIOCHAR AS AMENDMENT FOR POLLUTED MATRIXES: IMPACT ON THE CONTAMINANTS BEHAVIOUR IN TWO CASE STUDIES.

ROLE OF BIOCHAR AS AMENDMENT FOR POLLUTED MATRIXES: IMPACT ON THE CONTAMINANTS BEHAVIOUR IN TWO CASE STUDIES. ROLE OF BIOCHAR AS AMENDMENT FOR POLLUTED MATRIXES: IMPACT ON THE CONTAMINANTS BEHAVIOUR IN TWO CASE STUDIES. Guido Fellet Department of Agriculture and Environmental Sciences, University of Udine, Udine,

More information

Remediation Stugsundsudden Söderhamn

Remediation Stugsundsudden Söderhamn Remediation Stugsundsudden Söderhamn Objectives of stabilisation/solidification Major objective: risk reduction of pollutants concerned, through reduction in mobility/leachability of pollutants into water

More information

DREDGED MATERIAL. Rules, Regulations and Practice. Workshop Piombino - Oct Frederik J. MINK

DREDGED MATERIAL. Rules, Regulations and Practice. Workshop Piombino - Oct Frederik J. MINK DREDGED MATERIAL Rules, Regulations and Practice Workshop Piombino - Oct 2012 Frederik J. MINK Advisor to European Dredging Association 1 Guidance Rules Worldbank PIANC OECD ICES? Good Practices INTER-

More information

Risk level in the petroleum activity Risk of acute discharges Norwegian continental shelf

Risk level in the petroleum activity Risk of acute discharges Norwegian continental shelf Risk of acute discharges Norwegian continental shelf 2001-09 Norwegian continental shelf 2001 09 (Page blank) Report Report Report title Risk level in the petroleum activity project report acute discharges

More information

Fields and projects under development

Fields and projects under development Fields and projects under development (Approved developments regarded as an upgrade to existing fields are covered in chapter 2, even if the project has required separate approval of a plan for development

More information

8. Storage options with EOR

8. Storage options with EOR 8. Storage with EOR 151 8. 8 Storage Storage with with EOR EOR Injection of CO 2 in oil fields has for many years been used as a method to enhance oil recovery (EOR), primarily in the United States, where

More information

aquateam A Review of PWRI experience: Souring Mitigation, MIC Control and Monitoring

aquateam A Review of PWRI experience: Souring Mitigation, MIC Control and Monitoring A Review of PWRI experience: Souring Mitigation, MIC Control and Monitoring TEKNA Produced Water Management Conference 2011, Stavanger, Norway Anthony J Dinning, PhD Microbiologist Aquateam www..no The

More information

Violeta Velikova Black Sea Commission

Violeta Velikova Black Sea Commission www.blacksea-commission.org Violeta Velikova Black Sea Commission Convention on the Protection of the Black Sea against Pollution (1992) The underlying principles of the Convention on Protection of the

More information

TIE and TMDL Approaches for Legacy Sediment Contaminants: Arsenic and Petrochemical Case Studies

TIE and TMDL Approaches for Legacy Sediment Contaminants: Arsenic and Petrochemical Case Studies SETAC 2002 TIE and TMDL Approaches for Legacy Sediment Contaminants: Arsenic and Petrochemical Case Studies BW Brooks, PK Turner, JK Stanley, WT Waller, TW La Point, R Palachek & JA Sullivan UNT Institute

More information

REDUCTION OF DISCHARGES AND EMISSIONS FROM THE METAL SURFACE TREATMENT 1)

REDUCTION OF DISCHARGES AND EMISSIONS FROM THE METAL SURFACE TREATMENT 1) CONVENTION ON THE PROTECTION OF THE MARINE ENVIRONMENT OF THE BALTIC SEA AREA HELSINKI COMMISSION - Baltic Marine HELCOM 23/2002 Environment Protection Commission Minutes of the Meeting 23rd Meeting Annex

More information

FINAL PUBLISHABLE REPORT

FINAL PUBLISHABLE REPORT FINAL PUBLISHABLE REPORT CONTRACT N : ACRONYM: ENK6-CT-2001-00501 AEOLOS TITLE : ASSESSMENT OF IMPACT OF SF 6 AND PFCs RESERVOIR TRACERS ON GLOBAL WARMING PROJECT CO-ORDINATOR: NCSR DEMOKRITOS (NCSRD,

More information

SITE 2: VRIDI CANAL 1 (CAP LOGISTICS) ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE

SITE 2: VRIDI CANAL 1 (CAP LOGISTICS) ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE This series of fact sheets was prepared as part of UN Environment s environmental audit of the

More information

DECISION ON MARINE DISCHARGE CONSENT APPLICATION

DECISION ON MARINE DISCHARGE CONSENT APPLICATION DECISION ON MARINE DISCHARGE CONSENT APPLICATION Application Ref: EEZ300006 Tamarind Taranaki Limited Application to discharge harmful substances from the Tui offshore facilities This page is intentionally

More information

DICK TH. MEIJER, VWS MPP Systems / VWS Oil & Gas, Veolia Water Solutions & Technologies, Ede, the Netherlands,

DICK TH. MEIJER, VWS MPP Systems / VWS Oil & Gas, Veolia Water Solutions & Technologies, Ede, the Netherlands, Toxic dissolved and dispersed hydrocarbons removal and reuse in the oil & gas industry, gas/condensate, shale gas produced water, refinery process water and groundwater with the Macro Porous Polymer Extraction

More information

Petroleum law Spring 2011 System operation

Petroleum law Spring 2011 System operation Petroleum law Spring 2011 System operation Mette Karine Gravdahl Agerup Assistant Director General Upstream: Gas production on the field The gas chain Transportation of produced gas from the field to a

More information

The impact of industrial pollution on levels of contaminants in humans and locally harvested food in the Norwegian, Finnish and Russian border region

The impact of industrial pollution on levels of contaminants in humans and locally harvested food in the Norwegian, Finnish and Russian border region The impact of industrial pollution on levels of contaminants in humans and locally harvested food in the Norwegian, Finnish and Russian border region Martine Dalgaard Hansen MSc Clinical Nutrition & BSc

More information

A Survey of North Sea Enhanced-Oil-Recovery Projects Initiated During the Years 1975 to 2005

A Survey of North Sea Enhanced-Oil-Recovery Projects Initiated During the Years 1975 to 2005 A Survey of North Sea Enhanced-Oil-Recovery Projects Initiated During the Years 1975 to 2005 A.R. Awan, SPE, NTNU/Total E&P Norge; R. Teigland, SPE, Total E&P Norge; and J. Kleppe, SPE, NTNU Summary This

More information

Simulation of the EU gas transportation system view from the RF experience and concerns point of view

Simulation of the EU gas transportation system view from the RF experience and concerns point of view Presentation at 4-th ERGEG Workshop on the 10-Year Network Development Plan June 14, 2010 Simulation of the EU gas transportation system view from the RF experience and concerns point of view Dr. Vladimir

More information

Cyanide Analysis: Cyanide Chemistry, Methodology, Interferences, Sample Handling and Regulatory Updates

Cyanide Analysis: Cyanide Chemistry, Methodology, Interferences, Sample Handling and Regulatory Updates Cyanide Analysis: Cyanide Chemistry, Methodology, Interferences, Sample Handling and Regulatory Updates Distribution of the Industrial Uses of CN Who is measuring cyanide? NPDES Pretreatment SDWA Industrial

More information

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed Sl Product / Material of test 1 Wastewater Colour, true colour units, 2 Turbidity, NTU 3 Total dissolved solids mg/1, IS-3025 (Part 4) -1983 2005: 2120 /C IS-3025 (Part 10)-1984 2005: 2130/B IS-3025 (Part

More information

API SOIL & GROUNDWATER RESEARCH BULLETIN

API SOIL & GROUNDWATER RESEARCH BULLETIN American Petroleum Institute API SOIL & GROUNDWATER A summary of research results from API s Soil and Groundwater Technical Task Force RESEARCH BULLETIN No. 4 July 1998 Selective Subcritical Water Extraction

More information

APPENDIX I. LAMPIRAN I - RKL DAN RPL KEGIATAN TERPADU PROYEK PENGEMBANGAN TANGGUH LNG i

APPENDIX I. LAMPIRAN I - RKL DAN RPL KEGIATAN TERPADU PROYEK PENGEMBANGAN TANGGUH LNG i APPENDIX I Table 1 Emission Standards from Flare, Gas Turbine, Boiler, Acid Gas Incinerator and Internal Combustion Engine... 1 Table 2 n-hazardous Waste Incinerator Standard... 3 Table 3 Hazardous Waste

More information

Norway in pole position: 20 years of CCS

Norway in pole position: 20 years of CCS Norway in pole position: 20 years of CCS North Sea CCS: innovation and impact Aberdeen, September 7, 2017 Bamshad Nazarian Philip Ringrose Per Ivar Karstad Sveinung Hagen Britta Paasch Anne-Kari Furre

More information

Updates to the emissions and discharge permit for Brage.

Updates to the emissions and discharge permit for Brage. Miljødirektoratet Mihaela Ersvik Postboks 5672 Sluppen 7485 Trondheim Your reference 2013/1216 Our reference BR00-LE-WIN-MD-0030 Our date 19.12.2017 Updates to the emissions and discharge permit for Brage.

More information

ASSET PERFORMANCE MANAGEMENT STRATEGY

ASSET PERFORMANCE MANAGEMENT STRATEGY IFSworld.com ASSET PERFORMANCE MANAGEMENT STRATEGY SOME CHALLENGES, ENABLERS AND TOOLS MAGNE HALVORSEN M.Sc. Business Advisor IFS CENTRE OF EXCELLENCE OIL&GAS 2 3 AGENDA 14:00 CET Asset Performance Management

More information

Date Application Signed: Principal Executive Officer / Owner Signature FOR OFFICIAL USE ONLY

Date Application Signed: Principal Executive Officer / Owner Signature FOR OFFICIAL USE ONLY FORM A (Revision May 2010) (Rules 4, 6) THE WATER POLLUTION RULES 2001 (as amended) THE ENVIRONMENTAL MANAGEMENT ACT CHAPTER 35:05 APPLICATION FOR SOURCE REGISTRATION GENERAL INSTRUCTIONS: Three (3) copies

More information

Groundwater Quality Results: Is it natural or not? Frans Hettinga and Brian Tsang

Groundwater Quality Results: Is it natural or not? Frans Hettinga and Brian Tsang Groundwater Quality Results: Is it natural or not? Frans Hettinga and Brian Tsang Contents Groundwater monitoring requirements Regulatory framework (focus on Alberta) Case studies Conclusions Groundwater

More information

The Norwegian gas infrastructure future challenges

The Norwegian gas infrastructure future challenges The Norwegian gas infrastructure future challenges Thor Otto Lohne, Executive Vice President Sandnessjøen, 10 June 2010 Gassco s basic principles are safety, reliability and cost effectiveness Safety Reliability

More information

Deborah French McCay, PhD Applied Science Associates (ASA) South Kingstown, RI, USA

Deborah French McCay, PhD Applied Science Associates (ASA) South Kingstown, RI, USA Risk Assessment Issues from Potentially- Polluting Wrecks: Screening Modeling Approach Applied to Wrecks in US RULET Database with NOAA OR&R, Research Planning Inc, and Environmental Research Consulting

More information

Laboratory Turnaround Times and Prices

Laboratory Turnaround Times and Prices 4619 N. Santa Fe Ave. Oklahoma City, OK 73118 (405) 488-2400 Laboratory Turnaround Times and Prices The enclosed prices reflect a five (5) business day turnaround. There will be a minimum charge of $25.00

More information

Floating Production / Offshore solutions for tough challenges

Floating Production / Offshore solutions for tough challenges Floating Production / Offshore solutions for tough challenges siemens.com/answers Siemens Sectors and Divisions Energy Healthcare Industry Infrastructure & Cities Divisions Fossil Power Generation Wind

More information

22 nd World Gas Conference, June 1 5, 2003, Tokyo.

22 nd World Gas Conference, June 1 5, 2003, Tokyo. 22 nd World Gas Conference, June 1 5, 2003, Tokyo. Reduction of green-house gases in the natural gas industry. What can be done, in physical and economical terms. Stig Bergseth, Statoil 1. Introduction.

More information

EU ECOLABEL USER MANUAL GROWING MEDIA, SOIL IMPROVERS AND MULCH

EU ECOLABEL USER MANUAL GROWING MEDIA, SOIL IMPROVERS AND MULCH Part E: Checklist Applicant s Checklist This checklist summarises the documentation to be provided for each criterion. This checklist must be completed by the applicant. Part C: Application form Mark when

More information

WA Waste Classification. Analytical Guide 2018 Update

WA Waste Classification. Analytical Guide 2018 Update WA Waste Classification Analytical Guide 2018 Update WA Waste Classification and Definitions 2018 Analytical Guide 2018 Update Eurofins mgt offers a complete analytical service to support assessment of

More information

Noise and shock absorbing, gentle and safe storage

Noise and shock absorbing, gentle and safe storage Noise and shock absorbing, gentle and safe storage Semek supplies specially designed, molded plastic products in polyurethane. Reduction of noise and vibration. Gentle storage of sensitive equipment. Shock

More information

LABORATORY TURNAROUND TIMES AND CHARGES

LABORATORY TURNAROUND TIMES AND CHARGES LABORATORY TURNAROUND TIMES AND CHARGES The enclosed prices reflect a 5 business day turnaround time. There will be a $25.00 minimum charge per report. Same Day Rush 24 Hour Rush 48 Hour Rush 72 Hour Rush

More information

Reference List - Major Projects. Reference List 2017 Major Projects

Reference List - Major Projects. Reference List 2017 Major Projects Reference List - Major Projects 1 Reference List 2017 Major Projects 2 Content 1 2 3 4 Drillships 3 Semisubmersible Platforms 10 Jack-up Platforms 23 Platform Rigs 27 Reference List - Major Projects 3

More information

Advanced technologies portfolio for Produced Water treatment and reuse proposed by VEOLIA

Advanced technologies portfolio for Produced Water treatment and reuse proposed by VEOLIA Advanced technologies portfolio for Produced Water treatment and reuse proposed by VEOLIA M. HENDOU TECHNICAL DIRECTOR VEOLIA OIL & GAS GEOENERGY DAYS July 4, 2018 Produced water main components Water

More information

Is this the right tool for your needs? Lester McKee San Francisco Estuary Institute (SFEI) May 2001

Is this the right tool for your needs? Lester McKee San Francisco Estuary Institute (SFEI) May 2001 The use of the Simple Model for informing environmental science and management: Is this the right tool for your needs? Lester McKee San Francisco Estuary Institute (SFEI) May 2001 Fact: Field data collection

More information

Characterization of Chars Produced in the Co-pyrolysis of Different Waste: Decontamination and Leaching Studies

Characterization of Chars Produced in the Co-pyrolysis of Different Waste: Decontamination and Leaching Studies Characterization of Chars Produced in the Co-pyrolysis of Different Waste: Decontamination and Leaching Studies Maria Bernardo 1*, Nuno Lapa 1, Margarida Gonçalves 1, Benilde Mendes 1, Filomena Pinto 2

More information

Keep Your Eye on the Sky - Clouds and Weather

Keep Your Eye on the Sky - Clouds and Weather Keep Your Eye on the Sky - Clouds and Weather Student Worksheet #1: The Clouds Below Name: How do meteorologists predict and forecast our weather? Meteorologists use weather instruments to measure weather

More information

Statoil-specific guidelines Supplemental to GOMO and Operations manual for OSV NcS

Statoil-specific guidelines Supplemental to GOMO and Operations manual for OSV NcS Supplemental to GOMO and Operations manual for OSV NcS Classification:Open Status: Draft Expiry Date: 2013-02-01 Page 1 of 16 Title: Statoil-specific guidelines Supplemental to GOMO and Operations manual

More information

Offshore Enhanced Oil Recovery (EOR): State of the Art and Experience. David S Hughes Principal Reservoir Engineer/EOR Specialist Senergy

Offshore Enhanced Oil Recovery (EOR): State of the Art and Experience. David S Hughes Principal Reservoir Engineer/EOR Specialist Senergy Offshore Enhanced Oil Recovery (EOR): State of the Art and Experience David S Hughes Principal Reservoir Engineer/EOR Specialist Senergy Outline Size of the prize (concentrating UKCS) Worldwide status

More information

New trends in electron beam flue gas treatment

New trends in electron beam flue gas treatment New trends in electron beam flue gas treatment Andrzej Pawelec Institute of Nuclear Chemistry and Technology, Warsaw, Poland Warsaw, 11.04.2013 Part-financed by the European Union (European Regional Development

More information

Ecological Investigation Levels and Ecological Screening Levels Naomi Cooper (Ecotoxicologist) and Antti Mikkonen

Ecological Investigation Levels and Ecological Screening Levels Naomi Cooper (Ecotoxicologist) and Antti Mikkonen Ecological Investigation Levels and Ecological Screening Levels Naomi Cooper (Ecotoxicologist) and Antti Mikkonen 17 June 2014 1 What we will run through EILs and ESLs definitions What has changed? When

More information

Environmental Monitoring in Offshore Oil&Gas Industry

Environmental Monitoring in Offshore Oil&Gas Industry Environmental Monitoring in Offshore Oil&Gas Industry Author: Vincenzo Piemonte, Associate Professor, University UCBM Rome (Italy) 1. Theme description The global environmental situation of the Earth is

More information

SITE 13: AKOUÉDO 3 ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE

SITE 13: AKOUÉDO 3 ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE ENVIRONMENTAL AUDIT OF THE SITES IMPACTED BY THE PROBO KOALA TOXIC WASTE DUMPING IN ABIDJAN, CÔTE D IVOIRE This series of fact sheets was prepared as part of UN Environment s environmental audit of the

More information

Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b

Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b Krackser Straße 12 33659 Germany [Arrival date CTL] [Test] Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b Part 1a Investigationn of aromatic amines with carcinogenic,

More information

Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b

Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b Krackser Straße 12 33659 Germany [Arrival date CTL] [Test] Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b Part 1a Investigationn of aromatic amines with carcinogenic,

More information

Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b

Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b Krackser Straße 12 33659 Germany [Arrival date CTL] [Test] Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b Part 1a Investigationn of aromatic amines with carcinogenic,

More information

Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b

Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b Krackser Straße 12 33659 Germany [Arrival date CTL] [Test] Aromatic amines and carcinogens acc. to COE Resolution ResAP(2008)1: Part 1a, Part 1b Part 1a Investigationn of aromatic amines with carcinogenic,

More information

environm ental servic es and produc ts

environm ental servic es and produc ts environm ental servic es and produc ts Initial Screening Assessment of BP s UKCS Cuttings Piles Aquatera Ltd Stromness Business Centre Stromness, Orkney, Scotland KW16 3AW This study was completed for:

More information

Evaluation of the potential of the use of recycled aggregates for concrete production

Evaluation of the potential of the use of recycled aggregates for concrete production Evaluation of the potential of the use of recycled aggregates for concrete production Vladimíra Vytlačilová Czech Technical University in Prague Faculty of Civil Engineering Department of Concrete and

More information