1 I-15 South, MP 0 to MP 16 Environmental Assessment Public Hearing August 7, :00 PM to 7:00 PM 1

2 PROJECT OVERVIEW The Federal Highway Administration (FHWA) and the Utah Department of Transportation (UDOT) have completed an Environmental Assessment (EA) to analyze the need for transportation improvements to I-15 between mileposts 0 and 16 in Washington County, UtahThe. EA identifies current and future transportation needs within the project area and evaluates alternatives and their associated impacts to the natural and built environment. 2

3 Project Purpose The purpose of the project is to address the projected 2040 travel demand on the I-15 corridor between MP 0 and MP 16. PURPOSE AND NEED Project Need The project is needed because the I-15 corridor between MP 0 and MP 16 lacks the capacity to accommodate the 2040 future travel demand. The projected travel demand will increase congestion on I-15 between MP 0 and MP 16. The increasing congestion will be a result of: Population growth Traffic volume growth High volumes of freight traffic 3

4 Level-of-Service Level-of-Service (LOS) characterizes the traffic operations of a roadway in terms of: speed average travel delay travel times freedom to maneuver driver comfort/convenience LOS ranges from A to F (see table). For planning purposes, facilities with current or projected 2040 LOS D or better are acceptable for urbanized areas. Between the Southern Parkway and SR-9, I-15 will operate at an unacceptable LOS in EXISTING AND PROJECTED TRAFFIC Existing Traffic Projected 2040 No-action Traffic 4

5 Dixie Metropolitan Planning Organization CONSISTENCY WITH LOCAL PLANS I-15 is listed for widening from MP 0 to MP 16 in the Dixie Metropolitan Planning Organization s Regional Transportation Plan City of St. George The St. George Master Traffic and Transportation Study (2008) recognizes the need for capacity improvements to I-15 in the study area 5

6 The Preferred Alternative would include: PREFERRED ALTERNATIVE Constructing an additional general purpose lane on I-15 in both the northbound and southbound directions between Southern Parkway and SR-9 Constructing auxiliary lanes between the Port-of-Entry and Southern Parkway, Brigham Road and Dixie i Drive, and Washington Parkway and SR-9 Improving and/or re-configuring interchanges at: Brigham Road St. George Boulevard Green Springs Drive SR-9 6

7 Environmental Issue Pedestrian and Bicyclist Issues Noise Cultural l Resources SUMMARY OF IMPACTS AND MITIGATION Preferred Alternative Would construct new pedestrian facilities that would cross I- 15 at Brigham Road and St. George Boulevard Noise levels would increase over existing noise levels (noise levels l would range from 58 dba to 81 dba, with an average noise level of about 66 dba) Would have an overall adverse effect on historic properties Wtl Wetlands No impacts to wetlands, minor impacts to four drainages Water Quality Floodplains Would increase impervious surface area by 41% over existing I-15 Detention basins and Best Management Practices would be used to treat t increases in stormwater t runoff, resulting in a minimal effect to water quality Impacts to floodplains would not cause a 1 foot increase in the 100-year flood elevation Mitigation No mitigation required 8 noise walls meet criteria outlined in UDOT s Noise Policy and are recommended, pending balloting efforts (see map) A Programmatic Agreement (PA) will be developed to resolve potential adverse effects The PA will require development of a written data recovery plan and research design Section 404 Permit will be obtained from the U.S. Army Corps of Engineers Detention ponds will be provided for water quality treatment where necessary to detain runoff to reduce peak flow rate Will comply with applicable local, state, and federal regulations 7

8 Environmental Issue Threatened & Endangered Species Wildlife SUMMARY OF IMPACTS AND MITIGATION Preferred Alternative Likely to adversely affect the desert tortoise and desert tortoise Critical Habitat Likely to adversely affect the dwarf bear-poppy Likely to adversely affect the holmgren milk-vetch and holmgren milk- vetch Critical Habitat. Likely to adversely affect the Virgin River chub and Virgin River chub Critical Habitat Likely to adversely affect the woundfin and woundfin Critical Habitat Not likely l to adversely affect the southwestern t willow flycatcher and would not affect southwestern willow flycatcher Critical Habitat Not likely to adversely affect the yellow-billed cuckoo and would not affect yellow-billed cuckoo Critical Habitat Would negatively affect the Virgin spinedace and the flannelmouth sucker Mitigation Requirements outlined in the Biological Opinion from the U.S. Fish and Wildlife Service will be implemented to reduce the effect to Threatened ed & Endangered ed Species Same requirements outlined in the Biological Opinion from the U.S. Fish and Wildlife Service will be implemented 8

9 NOISE WALLS The UDOT Noise Abatement Policy states that noise walls will only be considered for properties that are impacted by noise. Typical Noise Levels in A-weighted decibels (dba) How Does UDOT Define a Noise Impact? 66 dba or more for residences, schools, churches 71 dba or more for businesses OR 10 dba or more above the existing noise level 9

10 NOISE WALLS How does UDOT determine if a noise wall will be constructed? The UDOT Noise Abatement Policy states that the following criteria must be met: Noise walls need to reduce noise levels by at least 8 dba to properties adjacent to the noise wall The cost of noise walls must be reasonable Property owners and residences need to be in favor of noise walls (balloting would be conducted during the design phase, should a build alternative be selected) Where is the I-15 South Environmental Assessment recommending noise walls? See map for potential noise wall locations (pending balloting efforts) 10

11 WHAT COULD THE NOISE WALLS LOOK LIKE? The UDOT Standard Drawings identify five panel surface texture options for noise walls: Ashlar Stone Exposed Aggregate Fractured Fin River Rock Stacked Stone 11

12 ENVIRONMENTAL ASSESSMENT PROCESS & SCHEDULE 12

13 Old Slides 13

14 BRIGHAM ROAD INTERCHANGE OPTIONS The Single Point Interchange (SPI) Option was selected for the following reasons: Provides for better interchange driver expectancy Would eliminate the roundabouts and alleviate public concerns Would better accommodate heavy truck movements 14

15 ST. GEORGE BOULEVARD INTERCHANGE OPTIONS The Diverging Diamond Interchange (DDI) Option was selected for the following reasons: Would use the existing bridge structure Provides for better traffic operations and performance than the Tight Diamond Option, and is comparable to the Single Point Option 15

16 SR-9 INTERCHANGE OPTIONS The Trumpet Option was selected for the following reasons: Would use existing infrastructure by closely matching the existing design layout/footprint Provides for better traffic operations and performance Provides for better safety since all conflicts are removed 16

17 KEY ENVIRONMENTAL ISSUES Archaeology Floodplains l Prehistoric (Lithic Scatters, Rock Shelter, Camp Sites, Habitation, Rock Art) Historic (Settlement, Farming and Ranching, Mining, Transportation) Noise Noise walls were evaluated for a number of residential and commercial areas Virgin and Santa Clara Rivers Stream/Wash crossings Threatened & Endangered Species Bird (Southwest Willow Flycatcher, Western Yellowbilled Cuckoo) Fish (Virgin River Chub, Woundfin Minnow) Plant (Dwarf Bear Poppy, Holmgren Milk-vetch) Reptile (Desert Tortoise) 17

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report APPENDIX B Excerpts from the October 2002 Interstate 83 and PA Route 921 The objective for the SR 921 interchange site was to study alternatives for construction of a new interchange. There are no short-term

More information

FINDINGS OF FACT and CONCLUSIONS

FINDINGS OF FACT and CONCLUSIONS FINDINGS OF FACT and CONCLUSIONS I-694/ I-494/ I-94 Interchange Improvements State Project No. 8286-81 Prepared by: Minnesota Department of Transportation July, 2018 CONTENTS STATEMENT OF ISSUE... 2 ADMINISTRATIVE

More information

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables Highway 400 Improvements from 1 km South of Highway 89 to the Junction of Highway 11 Appendix C - Highway 400 Widening and Interchange Tables Prepared for: Ontario Ministry of Transportation Four General

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VIII. ENGINEERING AND ENVIRONMENTAL EVALUATION INTERSECTION IMPROVEMENTS SOUTHERN For the southern end of the corridor, traffic volumes are expected to increase over existing levels. The Phase A Report

More information

River Valley. Intermodal Facilities. February Prepared by: Federal Highway Administration Draft Environmental Impact Statement

River Valley. Intermodal Facilities. February Prepared by: Federal Highway Administration Draft Environmental Impact Statement Prepared by: River Valley Intermodal Facilities Federal Highway Administration Draft Environmental Impact Statement River Valley Regional Intermodal Facilities Authority February 2006 and Arkansas State

More information

5. Other Environmental Consequences

5. Other Environmental Consequences 5. Other Environmental Consequences 5.1 Unavoidable Adverse Impacts Impacts to the following environmental resources were evaluated for Alternative D, the preferred alternative, to determine if they would

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY)

I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY) I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY) TO WEST OF SR 435 (KIRKMAN ROAD) ORANGE COUNTY, FLORIDA Financial Project

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

Puget Sound Gateway Program Phase 1 of the SR 509 Completion Project

Puget Sound Gateway Program Phase 1 of the SR 509 Completion Project Puget Sound Gateway Program Phase 1 of the SR 509 Completion Project 23 CFR 771.129 Washington State Department of Transportation/Federal Highway Administration REGION/MODE SR PROJECT PROGRAM# FEDERAL

More information

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project

More information

REEVALUATION FORM. Page 1. Code:

REEVALUATION FORM. Page 1. Code: Page 1 COLORADO DEPARTMENT OF TRANSPORTATION Original NEPA Reevaluation Project Approval Date: Date: Code: REEVALUATION FORM FONSI 9/2004 August 31, 2012 17354 Project Name and Location: Interstate 25,

More information

Free Bridge Congestion Relief Project: Using FHWA s Eco-Logical Process

Free Bridge Congestion Relief Project: Using FHWA s Eco-Logical Process Free Bridge Congestion Relief Project: Using FHWA s Eco-Logical Process An Ecosystem Approach to Developing Infrastructure Projects June 27, 2014 Charlottesville Albemarle Metropolitan Planning Organization

More information

I-95 Corridor Study Phase II Highway Element

I-95 Corridor Study Phase II Highway Element I-95 Corridor Study Phase II Highway Element FAMPO Policy Committee July 16, 2018 1 I-95 Phase 2 Study Final Report A final report is being created to document the findings of the I-95 Phase 2 Study and

More information

Section 7 Environmental Constraints

Section 7 Environmental Constraints Section 7 Environmental Constraints i Yakima Valley Metropolitan and Regional Transportation Plan Public Comment DRAFT 1/27/2016 Environmental Constraints Analysis A programmatic-level review of potential

More information

Alternatives Evaluation Methodology

Alternatives Evaluation Methodology Alternatives Evaluation Methodology www.vision54 56.com B 1 Phase 2 Alternatives Evaluation Methodology PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION November, 2014 TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY POND SITING REPORT Summary of section 1.0 & 2.0. Specify datum used in the design calculations and the construction plans.

More information

FINDINGS OF FACT And CONCLUSIONS

FINDINGS OF FACT And CONCLUSIONS FINDINGS OF FACT And CONCLUSIONS SOUTHWEST RECONNECTION PROJECT Highway 61/101 Flood Mitigation State Project No. 1009-24 and State Aid Project No. 010-661-002 Prepared for: Carver County September 2013

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R October 26, 2018

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R October 26, 2018 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2018-822 October 26, 2018 Application

More information

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?

More information

County Road 61 (Shady Oak Road): CR 3 (Excelsior Boulevard) WELCOME. November 1, 2012

County Road 61 (Shady Oak Road): CR 3 (Excelsior Boulevard) WELCOME. November 1, 2012 : CR 3 (Excelsior Boulevard) WELCOME November 1, 2012 Highway Traffic Noise Facts & FAQs Why is traffic noise analyzed? In 1972, US Congress passed legislation to provide mitigation for exterior highway

More information

State Route 8 Bridge Replacement Project

State Route 8 Bridge Replacement Project OPEN HOUSE PUBLIC INVOLVEMENT MEETING Celebration Church 688 Dan Street, Akron, Ohio Tuesday, July 14, 2015 5:00 PM to 7:00 PM State Route 8 Bridge Replacement Project Existing Bridge Future Bridges: Steel

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

Chapter 9 Wetlands Park Study Team

Chapter 9 Wetlands Park Study Team Chapter 9 Wetlands Park Study Team Objective How can we help Clark County facilitate implementation of the Clark County Wetlands Park Master Plan, and provide for the management of various ecosystems within

More information

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION AUGUST 2015 Table of Contents 1 Decision... 1 1.1 Project Description... 2 1.2 Basis for the FHWA Decision... 7 1.2.1

More information

LOCATION HYDRAULIC REPORT

LOCATION HYDRAULIC REPORT Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID

More information

I-17 and Happy Valley Road Diverging Diamond Interchange (DDI)

I-17 and Happy Valley Road Diverging Diamond Interchange (DDI) I-17 and Happy Valley Road Diverging Diamond Interchange (DDI) Bharat Kandel (ADOT) and Jeremy Neuman (HDR) February 28, 2018 Project Purpose and Overview New interchange will accommodate current and future

More information

Downtown Estes Loop Project Frequently Asked Questions

Downtown Estes Loop Project Frequently Asked Questions May 15 th, 2015 Project Status 1) Has Alternative 1 already been selected? Is it a done deal? Response: The NEPA process will proceed with environmental analysis of both the No Action and Alternative 1.

More information

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018 What is the Carolina Crossroads Project? The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing to upgrade and redesign a key

More information

I-15/US 93 Garnet Interchange & US 93 Improvements WELCOME. Public Information Meeting October 6, 2016

I-15/US 93 Garnet Interchange & US 93 Improvements WELCOME. Public Information Meeting October 6, 2016 I-15/US 93 Garnet Interchange & US 93 Improvements WELCOME Public Information Meeting October 6, 2016 Slide 1 What to Expect Tonight Project background Project goals Alternatives considered and proposed

More information

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7 TRANSPORTATION Like many growing western counties, Douglas County focuses on one of the most integral elements in land-use planning: transportation. The primary purpose of a transportation network is to

More information

Charlottesville Albemarle MPO:

Charlottesville Albemarle MPO: Charlottesville Albemarle MPO: Applying The Eco-Logical Approach To Small MPOs September 21, 2015 Charlottesville Albemarle Metropolitan Planning Organization (CAMPO) and The Thomas Jefferson Planning

More information

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4 When will the Turnpike have right-of-way and parcel maps available? We anticipate receipt of 100% plans, parcel sketches and legal descriptions in late June or early July of 2015. When will the Turnpike

More information

9.0 I-26 & I-526 Interchange Improvements

9.0 I-26 & I-526 Interchange Improvements 9.0 I-26 & I-526 Interchange Improvements The I-26 & I-526 System-to-System interchange currently consists of a combination of directional and loop ramps providing for all movements from one Interstate

More information

PUBLIC HEARING US 69 WIDENING. Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas

PUBLIC HEARING US 69 WIDENING. Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas PUBLIC HEARING US 69 WIDENING Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas CSJs: 0065-07-062 and 0200-11-095 Footer Text Thursday, April 26, 2018 Date ELECTED

More information

POLICY FOR CONSTRUCTION OF NOISE BARRIERS IN RESIDENTIAL AREAS

POLICY FOR CONSTRUCTION OF NOISE BARRIERS IN RESIDENTIAL AREAS POLICY FOR CONSTRUCTION OF NOISE BARRIERS IN RESIDENTIAL AREAS I. Introduction Effective Date: October 31, 2006 The New Jersey Turnpike Authority (the Authority ) has reviewed and reexamined its current

More information

I-95/US 322 Interchange Improvement Project. Website Update

I-95/US 322 Interchange Improvement Project. Website Update I-95/US 322 Interchange Improvement Project Website Update The following is an outline of the I-95/US 322 website showing the primary pages and then sub-pages within the primary pages. The outline indicates

More information

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: 2014-00083-1 Date: December 22, 2014 Comments Due: January 16, 2015 TO WHOM

More information

State Route 189, International Border to Grand Avenue

State Route 189, International Border to Grand Avenue State Route 189, International Border to Grand Avenue Nogales, Santa Cruz County, Arizona 189 SC 000 H8045 01L October 2017 This page is intentionally left blank. 189 SC 000 H8045 01L This page is intentionally

More information

Traffic Impact Analysis (TIA) POLICY

Traffic Impact Analysis (TIA) POLICY Ascension Parish Planning Commission Traffic Impact Analysis (TIA) POLICY This policy establishes requirements for studies that provide information on traffic projected to be generated by all proposed

More information

SR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING MAY 25, 2017

SR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING MAY 25, 2017 PUBLIC MEETING MAY 25, 2017 AGENDA MEETING PURPOSE CSVT NORTHERN SECTION UPDATE FEBRUARY PUBLIC MEETING RECAP DESIGN CHANGES ACID ROCK ALIGNMENT SHIFT ASH BASIN AVOIDANCE ALTERNATIVES NEXT STEPS OPEN HOUSE

More information

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project. MEMORANDUM TO: FROM: Highway 36/Rice Street PMT Mark Benson DATE: March 23, 2009 RE: Selection of a Preferred Alternative SEH No. 105803 The purpose of this memorandum is to document the process for selecting

More information

Chester Bridge Environmental Assessment (EA) CAG Meeting #2. October 12, 2017

Chester Bridge Environmental Assessment (EA) CAG Meeting #2. October 12, 2017 Chester Bridge Environmental Assessment (EA) CAG Meeting #2 October 12, 2017 Agenda Introductions Purpose & Need review and Merger Approval Review of the Conceptual Alternatives Recap of the Public Meeting

More information

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects Lake Elmo Airport Environmental Assessment (EA)/ Environmental Assessment (EAW) Worksheet October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects Agenda Public Event #2

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico DDI s Can Move More Than Cars Alex Ariniello Presentation for the ITE Western District Annual Meeting July, 2016 in Albuquerque, New Mexico In January, 2016, a Diverging Diamond Interchange (DDI) opened

More information

I-10 CONNECT. Public Meeting #1

I-10 CONNECT. Public Meeting #1 I-10 CONNECT Public Meeting #1 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

HIGHWAY 412 EXECUTIVEXECUTIVE SUMMARYUMMARY FINAL ENVIRONMENTAL IMPACT STATEMENT. Benton and Washington Counties. October 2005

HIGHWAY 412 EXECUTIVEXECUTIVE SUMMARYUMMARY FINAL ENVIRONMENTAL IMPACT STATEMENT. Benton and Washington Counties. October 2005 EXECUTIVEXECUTIVE SUMMARYUMMARY FINAL ENVIRONMENTAL IMPACT STATEMENT SPRINGDALE NORTHERN BYPASS HIGHWAY 412 Benton and Washington Counties October 2005 Federal Highway Administration Arkansas State Highway

More information

INTERCHANGE MODIFICATION REPORT

INTERCHANGE MODIFICATION REPORT INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange

More information

PennDOTDistrict 8 I-83 East Shore Section 1 Improvements Project. Final Design Noise Analysis & Mitigation Recommendations

PennDOTDistrict 8 I-83 East Shore Section 1 Improvements Project. Final Design Noise Analysis & Mitigation Recommendations PennDOTDistrict 8 I-83 East Shore Section 1 Improvements Project Final Design Noise Analysis & Mitigation Recommendations Open House Formal Presentation Project Overview/Schedule Definitions of Common

More information

PUBLIC INFORMATION MEETING TUESDAY MARCH 9, 2010

PUBLIC INFORMATION MEETING TUESDAY MARCH 9, 2010 St. Francis Drive Corridor Study Draft Phase B Review 1 PUBLIC INFORMATION MEETING TUESDAY MARCH 9, 2010 Objective Present Alternatives Evaluated Solicit Feedback On Selection of Recommended Projects 2

More information

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study Florida Department of Transportation District Four KICK-OFF MEETING I-95 at Southern Boulevard (SR 80) Project Development and Environment Study Palm Beach County, Florida Financial Project ID No.: 435516-1-22-02

More information

Draft Environmental Impact Report

Draft Environmental Impact Report Revised Draft Environmental Impact Report San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101 This notice announces that a Draft Environmental

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4G From: Date: Subject: Staff May 16, 2008 Council Meeting Intergovernmental Coordination and Review Log The

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to

More information

SR 50 PD&E Study

SR 50 PD&E Study SR50 Project Development & Environment Study Public Hearing November 1, 2011 SR 50 PD&E Study 427056-1-22-01 1 Purpose of the Public Hearing Afford persons the opportunity to express their views about

More information

APPENDIX A. NEPA Assessment Checklist

APPENDIX A. NEPA Assessment Checklist APPENDI A NEPA Assessment Checklist NEPA CHECKLIST DATE: January 12, 2009 PREPARER: Frederick Wells, RLA PIN and Project Title: Surplus Property Request Wilder Balter Partners Marketplace Town of Newburgh,

More information

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 TRANSPORTATION INTERSTATE 87 INTERCHANGE 11A TOWN OF MALTA SARATOGA COUNTY, NY DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 PROJECT REPORT NEW YORK STATE DEPARTMENT OF TRANSPORTATION JOSEPH

More information

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT Project Name: Project Location: Lead Agency & Contact Person: SEQRA Classification: Project Sponsors:

More information

State Road (S.R.) 12 (Florida Arts Trail PD&E)

State Road (S.R.) 12 (Florida Arts Trail PD&E) State Road (S.R.) 12 (Florida Arts Trail PD&E) from North Corry Street to S.R. 63 (U.S. 27) Gadsden County, Florida FPID Number: 433380-1-32-01 CRTPA Briefing September 2015 Today s Presentation Evolution

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION S.2 PURPOSE AND NEED

SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION S.2 PURPOSE AND NEED S SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION The Virginia Department of Transportation (VDOT), in cooperation with the Federal Highway Administration (FHWA), is studying alternatives to meet transportation

More information

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District Notice of Intent to Prepare a Draft Environmental Impact Statement for the Proposed Jasper Ocean Terminal in Jasper County,

More information

NEPA and Design Public Hearings

NEPA and Design Public Hearings NEPA and Design Public Hearings Monday, December 5, 2016 Washington-Lee High School 1301 N. Stafford Street Arlington, VA 22201 Thursday, December 8, 2016 Mary Ellen Henderson Middle School 7130 Leesburg

More information

Table of Contents. ES Executive Summary. 1.0 Introduction to the Project. 2.0 Alternatives Screened and Evaluated VOLUME 1. Page

Table of Contents. ES Executive Summary. 1.0 Introduction to the Project. 2.0 Alternatives Screened and Evaluated VOLUME 1. Page VOLUME 1 ES Executive Summary ES.1 Project Overview ES.2 Proposed Action ES.3 Other Alternatives Evaluated ES.4 Summary of Beneficial and Adverse Impacts of the Preferred Alternative ES.5 Other Government

More information

Executive Summary. ES.1 Project Overview

Executive Summary. ES.1 Project Overview ES.1 Project Overview The New Hampshire Department of Transportation (NHDOT) and the Federal Highway Administration (FHWA) have prepared this Environmental Assessment/Draft Section 4(f) Evaluation (EA/4(f))

More information

Northern Branch Corridor CLC Meeting. June 30, 2008

Northern Branch Corridor CLC Meeting. June 30, 2008 Northern Branch Corridor CLC Meeting June 30, 2008 Agenda Introductions Project Status Environmental Process Technical Findings Capital Costs Next Steps Break Out Areas Introductions Project Status Preliminary

More information

Environme ntal Assessment Addendum

Environme ntal Assessment Addendum FI Improved Interchange at I-71 and Routes 36/37 and Proposed Sunbury Parkway Environme ntal Assessment Addendum DEL-71-7.91 PID 90200 September 20, 2017 The environmental review, consultation, and other

More information

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA PUBLIC OFFICIALS MEETING MAY 11, 2016 AGENDA I. INTRODUCTIONS V. CURRENT PROJECT STATUS VI. PROJECT SCHEDULE VII. UPCOMING ACTIVITIES VOPEN DISCUSSION & QUESTIONS IX. ACTION ITEMS 1 A. Bridge Lighting

More information

PARLEY S INTERCHANGE. I-80 /I-215 Eastside WELCOME. Parley s Interchange EIS. Public Scoping Meeting. March 6, :00pm 7:00pm

PARLEY S INTERCHANGE. I-80 /I-215 Eastside WELCOME. Parley s Interchange EIS. Public Scoping Meeting. March 6, :00pm 7:00pm E N V I R O N M E N TA L I M PA C T S TAT E M E N T I- /I-215 Eastside WELCOME Parley s Interchange EIS Public Scoping Meeting March 6, 2018 4:00pm 7:00pm THE PURPOSE OF TONIGHT S SCOPING MEETING Describe

More information

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Municipal Class Environmental Assessment Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Date: Thursday, June 20, 2013 Time: 6:30 p.m. 8:30 p.m.

More information

Public Notice ISSUED: 20-JAN-2016 EXPIRES: 19-FEB-2016

Public Notice ISSUED: 20-JAN-2016 EXPIRES: 19-FEB-2016 APPLICANT: Shakopee Mdewakanton Sioux Community Public Notice ISSUED: 20-JAN-2016 EXPIRES: 19-FEB-2016 REFER TO: MVP-2015-04726-RMM SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge

More information

Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018

Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018 APPLICANT: Sargento Foods Inc. Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018 REFER TO: 2010-2909-RJH SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge dredged and fill

More information

SECONDARY WETLAND IMPACTS ANALYSIS

SECONDARY WETLAND IMPACTS ANALYSIS SECONDARY WETLAND IMPACTS ANALYSIS USACE File. SWG-2012-00153 During the development of the Grand Parkway (State Highway 99) Segments H and I-1 from United States Highway 59/Interstate Highway 69 N to

More information

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. Located in the heart of South Carolina, the I-20/26/126 Corridor is the crossroads of the state

More information

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS). This document is scheduled to be published in the Federal Register on 11/18/2015 and available online at http://federalregister.gov/a/2015-29418, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

Clinton Keith Road Extension Project

Clinton Keith Road Extension Project Clinton Keith Road Extension Project Addendum to Supplemental Environmental Impact Report (SCH#1995062022) Clinton Keith Road Extension Project Riverside County, California Prepared for County of Riverside

More information

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Appendix M. Criteria, Measures and Indicators for Effects Assessment Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,

More information

Torbram Road Improvements From Queen Street East to Bovaird Drive

Torbram Road Improvements From Queen Street East to Bovaird Drive Torbram Road Improvements From Queen Street East to Bovaird Drive Municipal Class EA Study Public Information Centre No. 1 November 16 2017 6:30 pm 8:30 pm Please sign in so we can keep you updated on

More information

Community Advisory Committee Meeting No. 2. June 22, 2006

Community Advisory Committee Meeting No. 2. June 22, 2006 Community Advisory Committee Meeting No. 2 June 22, 2006 Introductions The Study Team KDOT Wichita Partners Consultants CAC members Overview Today s Agenda Opinion Survey Study Status Starting Concept

More information

TABLE OF CONTENTS 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

TABLE OF CONTENTS 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES TABLE OF CONTENTS 1.0 PURPOSE AND NEED -------------------------------------------------------------------------------------------- 1-1 1.1 STUDY AREA -----------------------------------------------------------------------------------------------------

More information

Utah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life. March Washington, DC

Utah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life. March Washington, DC Utah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life March 2015 Washington, DC 202-466-6706 Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Chapter 4: Transportation and Circulation

Chapter 4: Transportation and Circulation Chapter 4: Transportation and Circulation 4.1 Introduction Circulation improvements constructed for the West Valley Logistics Center will improve the functional efficiency of the circulation system in

More information

HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY

HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY DRAFT December 2017 Highway 71 Corridor Improvement Study Bella Vista Bypass to Missouri State Line BENTON COUNTY

More information

acquiring, managing, and disposing of federal lands and facilities;

acquiring, managing, and disposing of federal lands and facilities; 2.2.1 HYDROLOGY AND FLOODPLAIN This section discusses and analyzes the surface hydrology and water quality characteristics of the project. The information provided in this section is based on the Preliminary

More information

D R A F T. SECTION 4(f) EVALUATION. INTERSTATE 73 From I-95 to the Myrtle Beach Region

D R A F T. SECTION 4(f) EVALUATION. INTERSTATE 73 From I-95 to the Myrtle Beach Region D R A F T SECTION 4(f) EVALUATION INTERSTATE 73 From I-95 to the Myrtle Beach Region INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 USC 303 requires that prior to the use

More information

Notice of Preparation for the Copeland Creek Stormwater Detention Basin (CIP Project )

Notice of Preparation for the Copeland Creek Stormwater Detention Basin (CIP Project ) Copeland Creek Stormwater Detention Basin (CIP Project 2006-04) Date: December 20, 2017 To: Public Agencies and Interested Persons From: Mary Grace Pawson, Director of Development Services, City of Rohnert

More information

Final Air Quality Report

Final Air Quality Report Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026

More information

4.9 TRANSPORTATION AND CIRCULATION

4.9 TRANSPORTATION AND CIRCULATION 4.9 TRANSPORTATION AND CIRCULATION 4.9 TRANSPORTATION AND CIRCULATION This section describes the current transportation setting for and generally assesses the impacts of future dairy development on the

More information

APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION

APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION TH 36/STH 64 St. Croix River Crossing 2005 Water Resources Preliminary Design Report APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION within the project area. Other methods of attaining this reduction

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: September 19, 2013 Comment Deadline: October 19, 2013 Corps Action ID Number: SAW-2004-11082 The Wilmington District, Corps of Engineers

More information

Article 16 Traffic Impact Analysis

Article 16 Traffic Impact Analysis Article 16 Traffic Impact Analysis Table of Contents... 16-1 Chapter 16.1 Purpose and Intent... 16-2 Chapter 16.2 Applicability... 16-2 Chapter 16.3 Exemptions... 16-2 Chapter 16.4 Trip Generation Data...

More information

JULY Introduction/Proposed Action

JULY Introduction/Proposed Action DRAFT ADOPTION OF ENVIRONMENTAL ASSESSMENT (EA), ACCEPTANCE OF APPLICANT ENVIRONMENTAL ANALYSIS, AND FINDING OF NO SIGNIFICANT IMPACT (FONSI) WILSON BRIDGE BOAT RAMP IMPROVEMENTS SECTION 408 PERMISSION

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

An Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process

An Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process Introduction This document provides a brief overview of the policy and procedures that govern the environmental evaluation process that the Tennessee Department of Transportation (TDOT) must follow for

More information

INFORMATION REQUIRED FOR PROBABLE CATEGORICAL EXCLUSION (SECTION (d))

INFORMATION REQUIRED FOR PROBABLE CATEGORICAL EXCLUSION (SECTION (d)) Grant Applicant: Proposed Project: Date: August 03, 2010 Northern Virginia Transportation Commission, Arlington County Government, and Washington Metropolitan Area Transit Authority Crystal City/Potomac

More information

MOSLEY STREET URBANIZATION TH

MOSLEY STREET URBANIZATION TH Public Information Centre 1 (PIC 1) MOSLEY STREET URBANIZATION TH 45 BEACHWOOD ROAD TO STREET Class Environmental Assessment November 29, 2016 Welcome 2 This Public Information Centre will: establish channels

More information