PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal

Size: px
Start display at page:

Download "PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal"

Transcription

1 1.0 SUMMARY OF THE PROJECT PRE-FEASIBILITY REPORT Project Name of Company / Mine Location Village Taluka District State Sand mine Gram Panchayat Tarrighat, Sand mine Tarrighat Tarrighat Patan Durg Chhattisgarh 1 Mining Lease Area & Type of land 5.0 Hectare sand mine under bhu-jal 2 Geographical co-ordinates Corner Latitude Longitude A B C D E F G H Name of Rivers/Nallahs/Tanks/ Springs/Lakes etc River Kharun lies in the lease area. Nearest Seasonal Nallah is at a distance of 10 m from the lease area. Canal lies at a distance of about 1.8 km from the lease 4 Name of Reserve Forest(s) Wild life Sanctuary/ National Parks etc. area. Nil 5 Topography of the area The lease area is falling in the Kharun river bed on south-west bank. Since, the sand area falling in the river bed, the general surface level of the lease area is comparatively lower than the surroundings. The general surface level is around 285 mrl to 286 mrl on the river bank and in the lease area on river bed the surface level is about 282 mrl, thus the area is about 3 to 4 m below from the general surface level. The flow direction of River is towards south to north direction. 6 Project Proposal The proposed project is a manual opencast sand (minor) project and is classified as CATEGORY B2 by Ministry of Environment, Forests & Climate Change, New Delhi 7 Name of Mineral mined Sand 8 Rate of Production (in tons) 85,000 tonnes per year(up to 2.0 meter depth) 9 Mineral Reserve in Million Tons Total mineable reserves of sand is 86,140 cum (1,46,438 T) 19 P a g e

2 10 Life of mine The Proved Mineable reserves of ordinary sand is 86,140 cum (1,46,438 T) and the proposed production rate of about 50,000 cum (85,000 tonnes) per year. Due to continues sand deposition in the area during rainy season there will not be much depletion in the reserve of sand, hence reserve is likely to be remain same every year and in future also. 11 Drilling/ Blasting No drilling and blasting is required, since the sand is a loose / semi-compact / incompact formation. The production of sand has been proposed to about 50,000 cum (85,000 tonnes) per annum 12 Mining method The mining will be carried out upto 2m of depth from surface level. The five years of the mining plan period will be to The proposed method of mining was open-cast mechanized by using excavator-tipper combination. The excavation of sand and loading of the same will be carried out by excavator of two cum capacity. The sand will be extracted by phased manner, two stages maintaining pit slope less than The excavated sand will be directly loaded into truck/tipper/dumpers. Since, there will not be pit formation, hence development of pit is not considered and sand is deposited directly in every monsoon. As mentioned previously, lease area located within the river bed and there will be continuous deposition in the area every year during monsoon and sand will get refilled wherever mined out area during the year. So the mining activity need not be properly lined out as seen the other mineral cases. In the case of sand mining, the mined out areas will get refilled during monsoon and again mining can be carried out in same location. Since, mining will not be possible during rainy season; the working will be carried out only about 8 months and working days considered as max. 200 days in a year. No drilling and blasting is required, since the sand is a loose / semi-compact / incompact formation. The production of sand has been proposed to about 85,000 tonnes (50,000 cum) per annum. 13 Ground water table Intersection Ground water table intersection do not exist in the lease area 20 P a g e

3 14 Drainage pattern/ water SW-NW courses 15 Break-up of Land Utilization Pattern It is a river bed sand mining project; notified by the competent authority. 16 Water requirement & Source About 4 KLPD of water will be required for mining operations including drinking as well as plantation. Plantation: 2 KLPD Drinking/Domestic: 1 KLPD Dust Suppression: 1KLPD Source: Hired Water Tanker 17 Solid waste/ Tailings There is no generation of a soild waste. The entire sand will be used. 18 IBM Approval : Date - 19 Cost of project (Rs. Lakhs) The capital cost for the project will be 5 lakhs including proposed lease area and machinery. 20 Any Other (specify) Not Applicable 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION Name and address of the company Sarpanch Gram Panchayat Tarrighat Registered Office Gram Panchayt Tarrighat Village Tarrighat, Tehsil Patan, District Durg in Chhattisgarh Mine office Gram Panchayat Tarrighat Prospecting Agency The existence of sand in mining area is available and it has been notified by the District Collector Type of Activity Sand mining Utilities (Power, water Water is required for mining Requirement) operations/establishment mainly for sprinkling on haulage roads and at faces for suppression of dust. Water is also required for washing and servicing utilities for equipment. Water requirement for the proposed mining activity is about 4 m 3 /day. Manpower Requirement The mining establishment presents vast opportunities of employment to various posts and under various cadres such as Management, Supervisory, skilled workmen and unskilled workmen will be 10. Sarpanch, Gram Panchayat Tarrighat, Tehsil Patan & District Durg (C.G) is having the lease of Sand (minor mineral) over an area of 5.0 Hectare at village Tarrighat of Tehsil-Patan & District Durg (C.G). The area applied under mining lease falls under the survey of India Toposheet no. 64 G/6 bounded by latitude of 21 0'52.45"N to 21 1'11.42"N & longitude of 81 36'24.09"E to 81 36'39.97"E. The area selected has a sufficient reserve of the Sand (minor) 21 P a g e

4 The purpose of this Pre feasibility report is to assess the various types of environmental features and baseline information present in the mine area and delineate an effective environmental management plan that will reduce or minimize the adverse environmental impact to a manageable level for the project. The report is based on preliminary information about the project details, site conditions, field visits, literature studies that are carried out. The details of the mine is that it covers an area of 5.0 Hectare having part of khasra no at village- Tarrighat, Tehsil-Patan & District Durg (C.G). It is a non forest government land under bhu jal. 2.1 Nature of the Project The proposed project is a manual opencast sand (minor) project and is classified as CATEGORY B2 by Ministry of Environment, Forests & Climate Change, New Delhi 2.2 Need for the Project and its importance to the country and or region Exploiting this sand deposit (minor mineral) is important for the country s long term economic growth and regional growth. By mining the deposit, the lessee acts as country with increased government earnings and revenues transform the region s economy from predominantly agricultural to significantly industrial and accelerate the pace of regional development of region. The project shall also provide additional revenue to State Government and create direct and indirect employment opportunities, which will catalyze overall growth of the State and improve the quality of life of the people living in the region. 2.3 Demand Supply Gap The area has been notified for lease contains deposit of sand. Exploiting this sand deposit (minor mineral) is important for the country s long term economic and regional growth. By mining the deposit, the lessee acts as a bridge between the gap of demand and supply of sand in the market and will provide the country with increased government earnings and revenues that will transform the region s economy from predominantly agricultural to significantly industrial and accelerate the pace of development in the region. The project shall also provide additional revenue to State Government and create direct and indirect employment opportunities, which will catalyze overall growth of the State and improve the quality of life of the people living in the region. 2.4 Employment Generation (Direct and Indirect) Due to the Project The mining establishment presents vast opportunities of employment to various posts and under various cadres such as Management, Supervisory, skilled workmen and unskilled workmen. Sr. Designation Qualification No. Nos. Required 1 Supervisor Experienced 1 No. 2 Excavator operator Experienced 1 Nos. 3 Unskilled Worker Nos. TOTAL 10 Nos. 22 P a g e

5 3. PROJECT DESCRIPTION S.No Particulars Details 1. Proposed Production 85,000 tonnes per year 2. Lease Area 5.0 Hectare 3. Expected Project cost 5 Lakhs 4. Method of mining Open cast mechanized method 5. Water Requirement 4 KLD 6. Manpower Requirement Forest if any Not in the existing lease area 3.1 Topography: The lease area is falling in the Kharun river bed on south-west bank. Since, the sand area falling in the river bed, the general surface level of the lease area is comparatively lower than the surroundings. The general surface level is around 285 mrl to 286 mrl on the river bank and in the lease area on river bed the surface level is about 282 mrl, thus the area is about 3 to 4 m below from the general surface level. The flow direction of River is from south west to north west direction. 3.2 Geology: Regional Geology: The rock and associated formation which is occurring near this village a part of Chhattisgarh Synclinorium and belonging to Gunderdehi Formation of the Raipur Group of Chhattisgarh Supergroup. The general geology of the area belongs to Gunderdehi Formation of Raipur Group of Chhattisgarh Supergroup. In this area, calcareous shale belonging to Gunderdehi Formation along with the pockets of limestone. The shales is generally purple in colour, although greenish grey, buff and dark brown varieties are also present. They are compact, thickly bedded, calcareous and impermeable in nature. The calcareous shales is almost horizontally bedded with local dip from 2 0 to 5 0 towards north and general strike is east-west. The general lithological sequence of the area is as under: Supergroup Group Formation Lithology Chhattisgarh Supergroup Raipur Group Chandrapur Group Alluvial gravel, sand, clay and silt 15 to 40 m Gunderdehi Charmuriya Kanspather Chapordih Lohardih Unconformity Archaean Purple shale Flaggy and cherty limestone White to pinkish glauconite quartz arenite Purple, green, grey and black shale with fine quartz arenite intercalation Ferruginous purple arkose and gritty wacke arenite with shale partings and conglomerate at the base Granite 23 P a g e

6 Local Geology: River & Drainage - The lease area forms the river bed of Kharun River which flow towards north west direction. Transportation of Sand - The sand is not a insitu materials but being carried out by flowing water during the monsoon every year from various catchment areas of the river and getting accumulated at convenient locations like bends, escarpments etc. and as such the sand of the lease area is a carried material brought from various locations and getting accumulated at convenient places in the flow direction of the River. The size of the accumulated sand varies due to the time factor taken by the river as well as the quantity of flow water. The depositions normally take place on winding course (bends)/meanders/loops/circuitous journey (of a river) in flow direction The maximum and minimum width of River bed is about 256 m and 156 m respectively and the maximum and minimum width of the mining lease area is about 106 m and 81 m respectively. 3.3 Location Details with coordinates. Enclosed Location Map in Annexure as Maps The detail of the area is as under: District : Durg Tehsil : Patan Village : Tarrighat Area (ha) : 5.0 Hectare The coordinates of the area : Corners Latitude Longitude A B C D E F G H ANALYSIS OF ALTERNATIVE It is necessary that one should try to find various alternatives and what is environmentally best being preferred. There can be many points for which alternatives must be found. This is attempted here, irrespective of whether scoping has asked so or not. This is done voluntarily and submitted herein below. Alternatives: A number of decisions are required to be taken and for each step. Selection is thus all the more critical in an industrial development where time, economic cost, environment and natural resources are at stake. Site alternatives: No alternate site has been considered for the project 24 P a g e

7 The sand mine is located at Tarrighat, Tehsil-Patan & District is Durg in Chhattisgarh State. The site is well approachable No endangered species are found in the proposed site. Easy availability of manpower in nearby villages. On this examination, the present site was selected for the proposed lease area. The site indeed has served the purpose well resulting in minimal impact on environment. 3.5 Magnitude of operation It has already been mentioned that the area is falling in the river bed of Kharun river on south-west bank. Since, the sand area falling in the riverbed, the general surface level of the lease area is comparatively lower than the surroundings. The sand mine area is very much within the River. The flow direction of the Kharun river is towards north west direction in the lease area. The general topographic elevation of the river bank is around 285 mrl to 286 mrl and the lower elevation of the river bank is about 282 mrl, thus the area is about 3 to 4 m below from the general surface level The method of mining operation will be in small scale. By virtue of the market demand intending to the regional and economical growth of the region; the proposed production will be 51,000 Tons per year. Since, there will not be pit formation, hence development of pit is not considered and sand is deposited directly in every monsoon. As mentioned previously, lease area located within the river bed and there will be continuous deposition in the area every year during monsoon and sand will get refilled wherever mined out area during the year. So the mining activity need not be properly lined out as seen the other mineral cases. In the case of sand mining, the mined out areas will get refilled during monsoon and again mining can be carried out in same location. Since, mining will not be possible during rainy season; the working will be carried out only about 8 months and working days considered as max. 200 days in a year. 3.6 Method of Mining The proposed method of mining was open-cast mechanized by using excavator-tipper combination. The excavation of sand and loading of the same will be carried out by excavator of two cum capacity. The sand will be extracted by phased manner, two stages maintaining pit slope less than The excavated sand will be directly loaded into truck/tipper/dumpers. Since, there will not be pit formation, hence development of pit is not considered and sand is deposited directly in every monsoon. As mentioned previously, lease area located within the river bed and there will be continuous deposition in the area every year during monsoon and sand will get refilled wherever mined out area during the year. So the mining activity need not be properly lined out as seen the other mineral cases. In the case of sand mining, the mined out areas will get refilled during monsoon and again mining can be carried out in same location. Since, mining will not be possible during rainy season; the working will be carried out only about 8 months and working days considered as max. 200 days in a year. 25 P a g e

8 No drilling and blasting is required, since the sand is a loose / semi-compact / incompact formation. The production of sand has been proposed to about 85,000 tonnes (50,000 cum) per annum. Requirement of excavator / loader for loading of ROM. S. No. Particulars ROM 1 Production during a year 50,000 cum 2 Excavation per day (taking 200 days) 250 cum 3 Bucket capacity of Excavator(C) 2 cum 4 Fill Factor (F) Swell factor for broken mass (S) 0.65 (65%) 6 Overall efficiency = (Availability x utilization x operating 0.46 (46%) efficiency) (n) 7 Cycle time in seconds for loading by excavator 2 minutes (t) 120 seconds 8 Formula: Ah = hourly production of 1 cum excavator = (3600 x C x F x S x n)/ t Say 27 cum = (3600 x 2 x 0.9 x 0.76 x 0.65)/120 = cum 9 Handling required per hour = 250/ 10 (hours) = cum 10 Therefore nos. of excavator required = material handling / hourly production = 25 / 27 = 0.93 Haulage and Transporting: Say 1 no. For transportation of loadable sand from lease area to consumers, mostly 20 cum capacity dumpers/tippers will be utilized. S. No. Particulars ROM 1 Production during a year 50,000 cum 2 Excavation per day (taking 200 days) 250 cum 3 Dumper capacity 20 cum 4 One dumper can carry (as safety measures) 18 cum 5 Nos. of trips required per day (250 / 18 = 13.88) Say 14 trips Note: Transportation of sand will be carried out by user; hence there is no requirement of truck, tipper/dumper to the lessee. 26 P a g e

9 3.7 Water Requirement: Water is required for mining operations/establishment mainly for sprinkling on haulage roads and at faces for suppression of dust. Water is also required for washing and servicing utilities for equipment. Water requirement for the proposed mining activity is about 4 m 3 /day. Plantation: 2 KLPD Drinking/Domestic: 1 KLPD Dust Suppression: 1 KLPD Source: Hired Water Tanker 4.0 SITE ANALYSIS: 4.1 Connectivity: The area can be approached from Durg-Patan-Abhanpur State Highway road. After 16.5 km from Abhanpur towards Patan there is a diversion towards left hand side. The area is connected from tar and fair weather road which is at a distance of 2.0 km from the lease area.(road distance) 4.2 Climate The climate of this region is moderate to extreme intensely hot in summer and moderately cold in winter. The temperature in summer goes up to 46 C. and in winter comes down 8 C. The average rainfall is around 1200 mm. (based on ten year average) with maximum precipitation during monsoon months, commencing from mid June to mid September. Wind direction varies in summer and winter seasons. It blows West & South West directions in the summer season and mostly North East direction in the winter season. Five years average ( ) Wind speed recorded in the area is maximum 27kms/hr in May months and minimum 2kms/hr in the October months. 5.0 PLANNING BRIEF The economic growth of the area in terms of employment generation, consumption behavior and market growth are expected outcome of the project. It is assumed that the generation of indirect employment would be multiple of direct employment. The significant positive impact on employment and occupation is envisaged on account of Better economic status of the community due to better earnings. To be mindful of its social and moral responsibilities to consumers, employees, shareholders, society and local community. The proposal will ensure the continuous sand (minor) supply for the building and construction materials in the surrounding areas for the improvement in social & regional development. 27 P a g e

10 Project Proponent should do following: To keep transparent relations with the neighbours in the area To strengthen the Gram Panchayat democratic set up, by paying taxes. To prevent wasting of rainwater and to recharge the groundwater. To strengthen the physical infrastructure. To create greenery within the lease premises and develop green belt around the mine lease area. Plantation program outside to some Extent in villages. 6.0 PROPOSED INFRASTRUCTURE Due to the proposed Mines, there is a positive impact by way of employment, education, better socioeconomic conditions, improved local and regional economy, etc. Rural / Village & community welfare development of sheds, road repairs etc. Sanitation & drinking water provision and repair of bore wells and sanitation The project proponent shall earmark funds for social development and welfare measures in the surrounding villages. These measures shall include funding for: Repair and improvement of community centers, building etc. Drinking water availability efforts. Statutory Requirement: The following site services will be provided close to the mine in private premises: Rest Shelters Drinking Water Urinals and Latrines First aid room 7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN The river bed material normally consists of sand (< 2 mm size), small gravels (> 2mm < 20 mm size) and gravels (>200 mm size). These materials comes down mostly rolling over the river bed from steep stream/river slopes and settles down when the velocity of flowing water decrease at the confluence of hilly & plain areas. The deposition of these materials diverts the river flow in different direction thus forming islands varying sizes. These islands are dynamic in nature and their location is not fixed. The river flow may strike left or right bank of the depending upon the rate of discharge, type and volume of river bed material (RBM) brought from a rain storm etc. this phenomenon may not become significant in a year or two but has its effect over longer period of time. Principally the extraction of annual quantity of RBM should not be exceeding the RBM brought during the monsoon of that year. However, the recommended quantity of extraction of RBM is limited to 30 to 90% of the RBM brought during the monsoon. Methodology of extraction of RBM is more critical / relevant than quantity of extraction of RBM. Improper method of extraction of RBM of even less quantity may be more critical. As the replenishment of sand in monsoon season is a regular process. Based on the last five years observation, it s experienced that the average 2 m sand has been replenished every year. 28 P a g e

11 Development works undertaken on river/stream bank becomes vulnerable due to frequent striking of river/stream flow on river bank. It therefore becomes necessary to guide the flow to the centre of the river/stream. Extraction of RBM with proper and careful method is one of such measures to channelize the flow to the centre so as to avoid stream bank erosion. The other measures are treatment of catchment with suitable soil and water conservation measures so that the soil/gravel are not carried out down from their location; following drainage line treatment viz spurs, retards, wattling, planting of suitable vegetation on river bank etc. Plantation will be carried preferably on the River bank and also along the road used for transportation or the area proposed by the Gram Panchayat. 29 P a g e

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

PRE-FEASIBILITY REPORT Hectare limestone mine, Non forest Private land

PRE-FEASIBILITY REPORT Hectare limestone mine, Non forest Private land 1.0 SUMMARY OF THE PROJECT PRE-FEASIBILITY REPORT Project Name of Company / Mine Location Village Taluka District State Limestone mine Alpa Shrivastava, Medesara Limestone mines, Limestone mine Medesara

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

TABLE OF CONTENTS. S.No Contents Page No. 1. Introduction Project Description Geology Mining

TABLE OF CONTENTS. S.No Contents Page No. 1. Introduction Project Description Geology Mining TABLE OF CONTENTS S.No Contents Page No. 1. Introduction 1 4 2. Project Description 5 6 3. Geology 7 9 4. Mining 5. Blasting 6. Mine Drainage 7. Analysis of Alternative 8. Socio economic Measures 9. Project

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent PRE FEASIBILITY REPORT PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent M/s Veet Rag Homes Pvt. Ltd. 267, Ganesh Phadnavis Bhavan,

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT EXCUTIVE SUMMARY Project : Mining Lease of Iron Ore (Ari Dongri Iron Ore Mine) Name of Company / Mine Owner : Godawari Power and Ispat Limited Location Village : Tehsil : District

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

ENVIRONMENTAL MANAGEMENT PLAN PHASIGUDA SAND QUARRY. For Sri Kalu Charan Behera. Prepared By AMARESH RATH RQP/OD/076/2017

ENVIRONMENTAL MANAGEMENT PLAN PHASIGUDA SAND QUARRY. For Sri Kalu Charan Behera. Prepared By AMARESH RATH RQP/OD/076/2017 ENVIRONMENTAL MANAGEMENT PLAN OF PHASIGUDA SAND QUARRY OVER AN AREA OF 12.842 ACRE / 5.196 HA IN VILLAGE PHASIGUDA OF DIGAPAHANDI TAHASIL OF GANJAM DISTRICT OF ODISHA. For Sri Kalu Charan Behera Village

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8.

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8. PRE-FEASIBILITY EXECUTIVE SUMMARY Shri Vishwas Parmani S/o Shri H. Parmani is the lessee for the RBM (River Betwa) for an area of 22 Acres (8.90 Ha) in Gata No. 747/16,Village- Patharehta, Tehsil- Kalpi,

More information

Prefeasibility Report Of Gram Sattipara for River Bed Mining of Sand of area 4.96 hectares for proposed production capacity of Cum/Y (ROM) at

Prefeasibility Report Of Gram Sattipara for River Bed Mining of Sand of area 4.96 hectares for proposed production capacity of Cum/Y (ROM) at Of Gram Sattipara for River Bed Mining of Sand of area 4.96 hectares for proposed production capacity of 141360 Cum/Y (ROM) at Village Sattipara, Tehsil Pratappur & District Surajpur (C.G.) 1. SUMMARY

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details: 2015 PRE-FEASIBILITY REPORT (FOR TOR) OF GADABAVALASA MANGANESE ORE MINES, AT: GADABAVALASA, GARIVIDI MANDAL, DIST: VIZIANAGRAM FOR PRODUCTION OF 12,000TPA OF MANGANESE ORE OVER AN AREA OF 12.691 HA. OF

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Page 0 of 14 EXECUTIVE SUMMARY The proposed project of 24.0 Ha or 59.28 Acre area is of stream bed sand mining and falls under Category- B1 as per EIA Notification 2006 amended till

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

1/1, Index INDEX ANY, SHOULD

1/1, Index INDEX ANY, SHOULD River Sand (Minor Mineral) Mining Project for River Yamuna in Gata No. 1/1, Production (9, 47,368 TPA), M.L Area 52.63 ha, near village: Index 1 2 INDEX EXECUTIVE SUMMARY... 2 INTRODUCTION OF THE OBJECT/

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

CHAPTER VII ADDITIONAL STUDIES

CHAPTER VII ADDITIONAL STUDIES 7.1 INTRODUCTION CHAPTER VII ADDITIONAL STUDIES The proposed project is for the mining (removal/ collection of sand), from the river bed of Saraswati & Sagarmati by opencast manual method of mining. As

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

M/s. Bharat Clays Private Limited Pre-Feasibility Report

M/s. Bharat Clays Private Limited Pre-Feasibility Report 1. EXECUTIVE SUMMARY 1.1 Introduction is a private partnership firm. They applied for a mining lease for China Clay over an extent of 2.023 Hectares in Sy. No: 102/3 & 102/4P of Jaggampeta Village, Jaggampeta

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

Shree Swami Samarth Stone Crusher

Shree Swami Samarth Stone Crusher PREFEASIBILITY STUDY FOR SHREE SWAMI SAMARTH STONE CRUSHER. Sadekar Enviro Engineers Pvt. Ltd Page 1 Executive summary Shree Swami Samarth Stone Crusher. has been granted a quarrying over an area 1.00

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND PRE-FEASIBILITY REPORT PREPARED FOR D. SESHA REDDY [Mine Lease Area 3.253 Ha.] Sy. No. 12/D Nagarur Village, Yadiki Mandal, Ananthapur District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified Accredited

More information

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co.

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co. Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co. Limited GENERAL: 1. Lease number and lease period since execution

More information

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD Madhya Pradesh State Mining Corporation Ltd (MPSMCL), a company of Government of Madhya Pradesh has been allotted Amelia (North) Coal Mining

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT This proposal of Nuagaon Iron ore mines of M/s K.J.S.Ahluwalia is for expansion of Iron ore production capacity from 5.62 MTPA to 7.99MTPA of ROM along with existing beneficiation

More information

1. EXECUTIVE SUMMARY. Brief outline stating name of river bed, proposed project area, location, method of mining, period etc. to be mentioned.

1. EXECUTIVE SUMMARY. Brief outline stating name of river bed, proposed project area, location, method of mining, period etc. to be mentioned. Pre-Feasibility Report for Mining of River Sand in the Kangsabati River at Mouza Rerapal, J.L. No.132, Plot 1. EXECUTIVE SUMMARY Brief outline stating name of river bed, proposed project area, location,

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

Annexure - I. Name of the Project Proponent District Mining Officer, Nashik Name of District Nashik. Latitude / Longitude

Annexure - I. Name of the Project Proponent District Mining Officer, Nashik Name of District Nashik. Latitude / Longitude Annexure - I Information with respect to the name of Project Proponent, location of sand ghat along with survey number, Gat number, Khasra number and all point latitude, longitude (geographic location)

More information

Grey Granite (Paradiso) Mine

Grey Granite (Paradiso) Mine Grey Granite (Paradiso) Mine PROJECT PROPONENT M/s. Karunai Granites Private Limited., Jagadevipalayam Village & Post, Krishnagiri Taluk, Krishnagiri District 635 203. Extent : 11.59.0 Hectares S.F. No.

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MINING PROJECT LOCATED AT TIKKA/ MOHAL SACHUHI, MAUJA JANGAL RAJGIR TEHSIL SUJANPUR, DISTRICT HAMIRPUR IN KHASRA NO 6, 7, 8 AND 9 MEASURING 04-84-35 HACTARES (126 03 KANALS) FOR

More information

(A govt. of Kerala Undertaking)

(A govt. of Kerala Undertaking) Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy

More information

SHRI.LAKSHMAN NAMDEV KOLI

SHRI.LAKSHMAN NAMDEV KOLI PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS

More information

[FORM-V] PART-A PART-B

[FORM-V] PART-A PART-B [FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 0 EXECUTIVE SUMMARY The proposed project of 343.98 Ha area is of river bed Sone sand (Silica sand) mining and falls under Category- A, as per EIA Notification 2006 & amendments

More information

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For M/s. Shah Shah Mines & Minerals, SY. NO. 206/1, Gangireddipalli Village, Thamballapalli Mandal, Chittoor District, Andhra Pradesh. INDEX ITEM PAGE NO. 1. EXECUTIVE SUMMARY 3

More information

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha.

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha. PRE FEASIBILITY REPORT For SILICA SAND MINE At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh 11.797 ha. Project Proponent Sri Yashpal Mendon 1 st Floor Mineral House, Hampankatta, Mangalore

More information

Risk Assessment Nagla

Risk Assessment Nagla Risk and Hazards HAZARD Major Risks involved in River Bed Mining are following: 1. River Bed Inundation 2. Soil Erosion 3. Disturbance of Ground water Level 4. Damage of River bank due to access of Ramps

More information

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA)

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) PRE FEASIBILITY REPORT ON GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) Lease Area: 18.687 acres or 7.562 Ha. of Sri Rama chandra Dash Polasara CHAPTER 1 EXECUTIVE SUMMARY Ghodapalana sand Quarry

More information

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions The lease area is being hold by M/s KJS Cement Ltd, and Pawan Kumar Ahluwalia is the Managing Director and correspondence address is M/s KJS

More information

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR STONE QUARRY - 3.40 ha VILLAGE - MARSUL T. SENDURSENA, TALUKA VASMAT DISTRICT HINGOLI MR. ASHISH ASHOK KASAT ENVIRO TECHNO CONSULT PVT.LTD. 68, MAHAKALI NAGAR MANEWADA HINGOLI

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Consultant-Ascenso Enviro Pvt. Ltd. Page 19 of 31 1.0 EXECUTIVE SUMMARY S.No. Information Details 1. Project name Sand Mining Project at Hatidah Ghat on River Ganga, District Patna,

More information

ENVIRONMENT MANAGMENT PLAN

ENVIRONMENT MANAGMENT PLAN ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Sarpanch, Gram Panchayat chando chando Sand Mine 2 S.. in schedule Category B, Project or Activity 1(a)

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P. PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.O, Ernakulam (Dist.) Survey No. 129/1-4,129/2-1, Arakuzha Village,

More information

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005 Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal

Environmental Management Plan. For Mining of. Building Stone & Road Metal Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT

More information

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict.

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict. PRE FEASIBILITY REPORT FOR Proposed Barytes Mine over an Extent of 49.46 Ha, In Sy. No. 1021/15, 1021/3, 1021/5 of Vemula Village, Vemula Mandal, Y.S.R.Kadapa District, Andhra Pradesh. Submitted To Ministry

More information