1 Contaminated Media Management Plan DEQ UST Site # Del Oeste Veterinary Clinic Prairie Road Eugene, Oregon March 2014

2 This page left intentionally blank. 2

3 Overview This Contaminated Media Management Plan (CMMP) provides information needed to identify, properly manage, and dispose of contaminated media at the Del Oeste Veterinary Clinic (DOVC or Site) in Eugene, Oregon. The objectives of the CMMP are to: Protect construction and excavation workers from potential exposure to contamination during future soil disturbing activities. Manage, store, and/or dispose of disturbed soil in compliance with applicable and appropriate regulations. This CMMP establishes the minimum requirements approved by the Oregon Department of Quality (DEQ). Additional requirements and protocols may be specified by DEQ for projectspecific construction activities. Site Background The Site is located at Prairie Road, Eugene, Oregon (Figure 1). The Site has been assigned DEQ Tank File # Historical information indicates there were two 1,000- gallon underground storage tanks (UST) associated with a service station formerly located on the properties owned by Northwest Hardwood (NWH) and DOVC. The fuel tanks contained gasoline and possibly diesel. The service station property was subdivided and the two former USTs were located on, and adjacent to, the property line separating the NWH and DOVC properties. Figure 2 provides a map showing the location of the former USTs. The two former USTs were discovered in 1995 and decommissioned in Site Conditions The nature and extent of impacted soil and groundwater associated with the leaking USTs are provided in the Summary Report for Northwest Hardwoods/Del Oeste Veterinary Clinic UST Site, Eugene, Oregon (# ), prepared by GSI Water Solutions, Inc., Portland, Oregon, February 25, Petroleum-impacted soils have been found primarily to the south and east of the former USTs. Chemicals of concern (COC) include gasoline-range total petroleum hydrocarbons (TPH-Gx); diesel-range total petroleum hydrocarbons (TPH-D); oil-range total petroleum hydrocarbons (TPH-O); benzene, toluene, ethylbenzene, and xylene (BTEX) compounds; naphthalene; and other volatile organic compounds. COCs are found at depth in soil, typically below the shallow water table. COCs in groundwater are the same as those for soil. 1

4 Soil and Groundwater Management Contaminated media could be encountered during soil-disturbing activities that may include, but are not limited to, clearing and grubbing, grading, excavation, utility trenching, dewatering, and well decommissioning. Figure 3 shows the area of the Del Oeste property where COCs may be encountered. COCs may also be encountered along Prairie Road during road maintenance involving excavating and utility trenching. Soil Identification of Contaminated Material Soil will be field screened for signs of contamination during soil-disturbing activities by visual inspection and odor. Field screening will consist of periodically collecting discrete samples for observation. Petroleum-contaminated soils can be identified in soil by the presence of liquid-phase petroleum, petroleum staining, petroleum odor, or any combination of these. Staining associated with petroleum contamination may have a bluegreen hue or may be gray or black in appearance. Clean Material For the purposes of this CMMP, clean material is defined as soil, gravel, concrete, or brick that has no evidence of contamination. This is consistent with Oregon Administrative Rules (OAR) (16) that define clean fill. Clean fill may be used onsite or offsite and must be placed so that it is not in contact with or does not adversely impact surface water in the drainage canal. Debris Large debris, such as asphalt and concrete, should be segregated and recycled to the extent practical. Contaminated Material For the purposes of this CMMP, contaminated material is defined as soil that is visibly contaminated and/or contains COCs above levels defined as clean fill by DEQ. Table 1 provides a summary of COC screening values. Handling of Contaminated Material Handling of contaminated material will follow the guidelines below for stockpiling, characterizing, and disposing of contaminated material. Stockpiling Contaminated Material Soil and debris may be stored in temporarily stockpiles. Stockpiled soil will be managed in a manner that minimizes erosion, contact with stormwater runoff, dust generation, and worker contact. Characterizing Contaminated Material Collect composite representative samples of the stockpiled material and test for: 2

5 Gasoline-range organics by NWTPH-Gx Diesel-range organics by NWTPH-D Oil-range organics by NWTPH-O BTEX by U.S Environmental Protection Agency Method 8021 Management/Disposal of Contaminated Material Soils that are visibly clean and/or have COCs concentrations below screening levels can be managed onsite. Soils that are visibly contaminated and/or have COCs concentrations above screening levels will be managed in accordance with solid waste and/or hazardous waste rules and will be disposed of at an Oregon-permitted landfill. Record Keeping Prepare and maintain documentation describing the activities related to soil disturbance, material handling and stockpiling; any laboratory test results; waste profiles; shipping manifests; landfill disposal tickets; and backfill material information. If onsite material treatment is conducted, document the treatment activities, and confirm sample test results and onsite disposal of the treated material. Decontamination Procedures Soil adhered to excavation equipment, vehicles, or tooling will be cleaned after the completion of construction activities and before the equipment leaves the Site. In the event that contaminated soil is encountered during excavation work, decontamination water will be containerized and disposed of under applicable City of Eugene (City) and state regulations. Groundwater Groundwater generated during construction activities, such as dewatering, will be managed and disposed of under a Site-specific groundwater plan that meets applicable and appropriate City and state regulations. 3

6 Table 1. Summary of DEQ Screening Values for Chemicals of Concern Del Oeste Veterinary Clinic, Eugene, Oregon Chemical of Concern Screening Level Soil 1 mg/kg TPH-Gx (Gasoline) 1,200 TPH-D (Diesel) 1,100 TPH-O (Oil) 1,500 Benzene 0.08 Toluene 200 Ethylbenzene 0.82 Total Xylene 100 Naphthalene ,2,4-trimethyl-benzene ,3,5-trimethyl-benzene 12 Isopropyl-benzene -- Notes: 1 = Oregon DEQ Clean Fill Table ( ) Acronyms TPH = total petroleum hydrocarbons Units mg/kg = milligrams per kilogram 4

7 FIGURE 1 PRAIRIE RD General Location Map Del Oestra Veterinary Clinic Eugene, Oregon BEACON DR AWBREY LN LEGEND Site Location RIVE R LOOP Major Roads Waterbodies IRVING TON DR WILKES DR SITE LOCATION RIV E P RAIR R RD 99 IE RD CLEAR LAKE RD BEAVER ST IRVING RD BELT LINE HWY NOR RIVE R AV E T HW EST EXP Y ette llam Wi er R iv 0 MAXW ELL RD MAP NOTES: Date: February 14, 2014 Data Sources: ESRI, Photo by USDA 2009 Document Path: P:\Portland\171 - Weyerhaeuser\6- NW Hardwoods\Project_GIS\Project_mxds\Contaminant_Management_Plan\Figure1_General_Location_Map.mxd 0.25 Miles 0.5

8 Prairie RD FIGURE 2 Site Features Del Oestra Veterinary Clinic Eugene, Oregon BARN HORSE BARN FORMER UST #2 FORMER UST #1 MW-10 SUMP DEL OESTE VETERINARY CLINIC MW-5 DOVC-1 DOVC-2 LEGEND Monitoring Well Monitoring/Product Recovery Well Building Property Boundary MW-8 RW-1/DOVC-3 MW-9 DRAINAGE CANAL Feet MAP NOTES: Date: February 14, 2014 Data Sources: ESRI, Photo by USDA 2009 Document Path: P:\Portland\171 - Weyerhaeuser\6- NW Hardwoods\Project_GIS\Project_mxds\Contaminant_Management_Plan\Figure2_Site_Map.mxd

9 Prairie RD FIGURE 3 Managed Areas Del Oestra Veterinary Clinic Eugene, Oregon MW-10 RW-1/DOVC-3 MW-5 DOVC-1 DOVC-2 LEGEND Monitoring Well Monitoring/Product Recovery Well Managed Area Property Boundary MW-8 MW Feet MAP NOTES: Date: February 14, 2014 Data Sources: ESRI, Photo by USDA 2009 Document Path: P:\Portland\171 - Weyerhaeuser\6- NW Hardwoods\Project_GIS\Project_mxds\Contaminant_Management_Plan\Figure3_Managed_Areas.mxd

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY File No. 0506-013-07 Contaminated Media Management Plan Midland

More information

MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39

MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39 MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No. 2015031067) Van Nuys Fire Station 39 W.O. E170094B ENGINEERING mtm CITY OF LOS ANGELES Transmittal

More information

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS

More information

RE: Public Comment Period regarding proposed closure of the following four Leaking Underground Fuel Tank (LUFT) Cases:

RE: Public Comment Period regarding proposed closure of the following four Leaking Underground Fuel Tank (LUFT) Cases: 2646 Palma Drive, #450 Ventura, CA 93003 P 805-654-9611 F 805-654-9613 October 17, 2014 UCSB Environmental Health & Safety Attn: Ms. Jodi Woods 565 Mesa Road Santa Barbara, California 93106-5132 RE: Public

More information

IXPER 70C Calcium Peroxide CASE STUDY

IXPER 70C Calcium Peroxide CASE STUDY IXPER 70C INTRODUCTION TO ENHANCED AEROBIC BIOREMEDIATION Enhanced aerobic bioremediation is a well-established and viable remediation technology for in situ degradation of a variety of petroleum hydrocarbon

More information

SOIL MANAGEMENT PLAN

SOIL MANAGEMENT PLAN SOIL MANAGEMENT PLAN BELFAST BOATYARD 39 & 41 FRONT STREET BELFAST, MAINE Prepared by: Ransom Consulting, Inc. 400 Commercial Street, Suite 404 Portland, Maine 04101 (207) 772-2891 March 22, 2013 1.0 INTRODUCTION

More information

K ATALYST, INC. adding value to our natural resources facilitating community change

K ATALYST, INC. adding value to our natural resources facilitating community change GROUNDWATER INVESTIGATION: City of Medford Maintenance Center, Medford Oregon (ODEQ # 15-96-0066) Prepared for: Brice Perkins, P.E., City of Medford Prepared by: Robert Coffan, Principal Hydrologist and

More information

Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b

Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b Product Parameter/ Constituent Lab Test c Protocol &Number Cleanup Level d,e,h GA Groundwater Cleanup

More information

Construction Dewatering General Permit (GP) & Groundwater Remediation GP. Navigating the Permitting Process

Construction Dewatering General Permit (GP) & Groundwater Remediation GP. Navigating the Permitting Process Construction Dewatering General Permit (GP) & Groundwater Remediation GP Navigating the Permitting Process IECA Conference November 18, 2014 Margo Griffin Permits Section Water Quality Control Division

More information

Phase I Environmental Site Assessment

Phase I Environmental Site Assessment Phase I Environmental Site Assessment 97204 Prepared for: Multnomah County 401 NE Dixon Avenue, Suite 274 97227 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 1 2.0 PROPERTY AND REPORT INFORMATION... 3 2.1

More information

AM-PR-003 Construction Environmental Management Plan (C-EMP)

AM-PR-003 Construction Environmental Management Plan (C-EMP) OMS Procedure AM-PR-003 Construction Environmental Management Plan (C-EMP) Revision: 1 Prepared by: Shannon Holroyd Authorised by: Marcus Manning Authorisation Date: 18th May 2015 This document has been

More information

REMEDIAL ACTION COMPLETION REPORT

REMEDIAL ACTION COMPLETION REPORT REMEDIAL ACTION COMPLETION REPORT PROJECT SITE: CIVIC CENTER REDEVELOPMENT SITE # 1 (FORMER MUSSELMAN LUMBER / PACKER ENGINEERING SITE) 28W 751 MOUNT STREET WARRENVILLE, DUPAGE COUNTY, ILLINOIS IEPA BOL

More information

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of

More information

Collect deeper soil samples and groundwater from beneath site?

Collect deeper soil samples and groundwater from beneath site? Uncertainties for which sampling is (i.e., to be incorporated into Work Plan). No. Uncertainty Recommended Resolution/ 1 SS005 No evidence of Acquire samples from three closest MOGas in soil. Tank as surface

More information

CUMBERLAND COUNTY IMPROVEMENT AUTHORITY CUMBERLAND COUNTY SOLID WASTE COMPLEX SOIL ACCEPTANCE PROTOCOL

CUMBERLAND COUNTY IMPROVEMENT AUTHORITY CUMBERLAND COUNTY SOLID WASTE COMPLEX SOIL ACCEPTANCE PROTOCOL CUMBERLAND COUNTY IMPROVEMENT AUTHORITY CUMBERLAND COUNTY SOLID WASTE COMPLEX SOIL ACCEPTANCE PROTOCOL This protocol establishes procedures to be followed by waste generators petitioning the Cumberland

More information

ENVIRONMENTAL SUMMARY OF CATALYST AREA 1

ENVIRONMENTAL SUMMARY OF CATALYST AREA 1 ENVIRONMENTAL SUMMARY OF CATALYST AREA 1 Phase I Environmental Site Assessment and Phase II Environmental Site Assessment for 55 South River Street. Environmental Response Program WDNR File Review for,

More information

Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA)

Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA) Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial National Oilheat Research Alliance (NORA) Forward Heating oil is used to heat many private homes as well as small commercial

More information

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA Residual Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA Background Information Linebach Funkhouser, Inc. (LFI) personnel performed permanent closure, assessment and corrective

More information

LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT

LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT REPORT ON LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT 2005 Greenwood Road Shreveport, Louisiana October 2012 Prepared for: Biomedical Research Foundation of Northwest Louisiana 1505 Kings Highway Shreveport,

More information

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA)

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA) DRAFT Analysis of Brownfields Cleanup Alternatives (ABCA) Preliminary Evaluation Ball Square Station Site Boston Avenue and Broadway Somerville and Medford, Massachusetts Massachusetts DEP Release Tracking

More information

Remediation Plan. for. Creek County Landfill Site. E/2 SE NW 28-18N-12E Creek County, OK

Remediation Plan. for. Creek County Landfill Site. E/2 SE NW 28-18N-12E Creek County, OK Remediation Plan for Creek County Landfill Site in E/2 SE NW 28-18N-12E Creek County, OK Draft Remediation Plan Table of Contents 1.0 GENERAL... 3 1.1 Location... 3 1.2 Site Boundaries... 3 1.3 Background...

More information

If you have any questions regarding the report, please contact me at (510) , ext. 109.

If you have any questions regarding the report, please contact me at (510) , ext. 109. March 16, 2006 Mr. Nick Thom City Of San Leandro Engineering and Transportation Department 835 East 14th Street, Suite 101 San Leandro, California 94577 RE: Soil Characterization Report 2660 Eden Road,

More information

Section 3.11: Hazardous Materials

Section 3.11: Hazardous Materials Section 3.11: Hazardous Materials Section 3.11 Hazardous Materials 3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general

More information

Oregon DEQ - Northwest Region Office. Heating Oil Tank Program NW Eastman Parkway, Suite 290 Gresham, OR

Oregon DEQ - Northwest Region Office. Heating Oil Tank Program NW Eastman Parkway, Suite 290 Gresham, OR Heating Oil Tank Program Generic Remedy Guidance Document (OAR Chapter 340 Division 177 and OAR 340-122-0252) Oregon DEQ - Northwest Region Office Heating Oil Tank Program 1550 NW Eastman Parkway, Suite

More information

Industrial Activity and Site Contamination

Industrial Activity and Site Contamination Name: Date: Figure1,Mapofcontaminatedwaterfrontsites;somedegreeofcleanuphasoccurredatallofthese sites.(figure:timesstandard,april29,1996).theballoontracksiteisatlocationnumber6 (SouthernPacificyard). IndustrialActivityandSiteContamination

More information

Restover Truck Stop Groundwater Monitoring, Results of January 2000 Sampling

Restover Truck Stop Groundwater Monitoring, Results of January 2000 Sampling A D e p a r t m e n t o f E c o l o g y R e p o r t Restover Truck Stop Groundwater Monitoring, Results of January 2000 Sampling Abstract This progress report is one in a series describing results of groundwater

More information

GUIDELINES FOR THE PERMANENT CLOSURE OF UNDERGROUND STORAGE TANK SYSTEMS

GUIDELINES FOR THE PERMANENT CLOSURE OF UNDERGROUND STORAGE TANK SYSTEMS GUIDELINES FOR THE PERMANENT CLOSURE OF UNDERGROUND STORAGE TANK SYSTEMS ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY REGULATED STORAGE TANKS PROGRAM 5301 NORTHSHORE DRIVE NORTH LITTLE ROCK, AR 72118-5317

More information

SCHEDULE 3.1 DETAILED CONSTRUCTION PLAN Part B: Narrative Area B

SCHEDULE 3.1 DETAILED CONSTRUCTION PLAN Part B: Narrative Area B SCHEDULE 3.1 DETAILED CONSTRUCTION PLAN Part B: Narrative Area B SCHEDULE 3-1 DETAILED CONSTRUCTION PLAN Part B Narrative: Work Area B We will carry out the excavation for Work Area B as per Company s

More information

Skim Pit Closure Report for the Hickert No. 1A Lease Washington County, Colorado COGCC Remediation # 9065

Skim Pit Closure Report for the Hickert No. 1A Lease Washington County, Colorado COGCC Remediation # 9065 Skim Pit Closure Report for the Hickert No. 1A Lease Washington County, Colorado COGCC Remediation # 9065 Prepared for: Mr. Terry Pape HRM Resources, LLC 410 17 th Street, Suite 1100 Denver, CO 80202 Nicholson

More information

Appendix 5: Environmental Considerations, Regulations, and Guidance for Soil Disturbing Activities at Lowry

Appendix 5: Environmental Considerations, Regulations, and Guidance for Soil Disturbing Activities at Lowry Appendix 5: Environmental Considerations, Regulations, and Guidance for Soil Disturbing Activities at Lowry The Lowry Community Master Association (LCMA) is conveying this notice as a courtesy to future

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland 21230-1719 1-800-633-6101 http:/www.mde.state.md.us Darlington Citgo 3940 Conowingo Road, Darlington Harford County,

More information

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program www.pca.state.mn.us Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program This document describes the requirements for excavating petroleum-contaminated soil

More information

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008 FINAL PLAN OF REMEDIAL ACTION Burns and McBride South Market and A Streets August 19, 2008 Wilmington, Delaware DNREC Project No. DE-0325 This Revised Final Plan of Remedial Action (Final Plan) presents

More information

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS DIVISION 02 EXISTING CONDITIONS 02 01 00 MAINTENANCE OF EXISTING CONDITIONS 1. Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling

More information

Cost Estimate for Removal and Disposal of Contaminated Soil

Cost Estimate for Removal and Disposal of Contaminated Soil 14432 SE Eastgate Way, Suite 100 Bellevue, WA 98007 tel: 425-519-8300 Mr. Mark Menard Sound Transit 401 South Jackson Street Seattle, Washington 98104-2820 Subject: Cost Estimate for Disposal of Contaminant-Impacted

More information

2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland

2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland 2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland Prepared for: Lockheed Martin Corporation Prepared by: Tetra Tech, Inc.

More information

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By:

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By: CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, 2016 Prepared By: SHANNON & WILSON, INC. 5430 Fairbanks Street, Suite 3 Anchorage, Alaska 99507 (907)

More information

State of Oregon Department of Environmental Quality

State of Oregon Department of Environmental Quality State of Oregon Department of Environmental Quality Memorandum To: Rich Muza, US Environmental Protection Agency, Region 10 Date: April 5, 2013 Through: From: Subject: Keith Johnson, NWR Cleanup Manager

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT

MARYLAND DEPARTMENT OF THE ENVIRONMENT MARYLA DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Suite 620 Baltimore, Maryland 21230-1719 410-537-3442 800-633-6101 x 3442 www.mde.state.md.us Land Management Administration Oil Control Program

More information

UNITED STATES FORGECRAFT

UNITED STATES FORGECRAFT UNITED STATES FORGECRAFT STATE PRIORITY LIST SITE FORT SMITH, ARKANSAS ADEQ 5301 Northshore Drive North Little Rock, Arkansas 72118 EPA RCRA ID No: ARD006341747 EPA CERCLA ID No: ARD006341747 AFIN: 66-00145

More information

Sediment control measures, including straw bales, silt fences, sediment traps and/or sediment basins

Sediment control measures, including straw bales, silt fences, sediment traps and/or sediment basins During final design, additional efforts will be taken to minimize wetland impacts, such as minimizing culvert lengths and the use of riprap for bridge abutment protection and stormwater outfalls. Wetland

More information

Treatment System Locations. Treatment System Sampling Activities and Analytical Results. June 15, 2011

Treatment System Locations. Treatment System Sampling Activities and Analytical Results. June 15, 2011 June 15, 2011 Mr. David Anderson Oregon Department of Environmental Quality Eastern Region 475 NE Bellevue Drive, Suite 110 Bend, Oregon 97701-7415 Re: Status Report: May 2011 Keno Area Wide Groundwater

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1993 Specifications CSJ 8015-24-003 SPECIAL SPECIFICATION TO ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1. DESCRIPTION. This item shall govern all work required to remove groundwater encountered

More information

SOIL AND GROUNDWATER MANAGEMENT PLAN MAINE ENERGY RECOVERY COMPANY SITE BIDDEFORD, MAINE

SOIL AND GROUNDWATER MANAGEMENT PLAN MAINE ENERGY RECOVERY COMPANY SITE BIDDEFORD, MAINE SOIL AND GROUNDWATER MANAGEMENT PLAN MAINE ENERGY RECOVERY COMPANY SITE BIDDEFORD, MAINE MARCH 19, 2015 JN: 12-3259.1 Report Prepared by: Summit Environmental Consultants 640 Main Street Lewiston, Maine

More information

2014 Capital Improvement Project Contract Concrete Paving & Utilities Oshkosh, Wisconsin

2014 Capital Improvement Project Contract Concrete Paving & Utilities Oshkosh, Wisconsin Environment Submitted to City of Oshkosh Dept. of PW 215 Church Ave. Oshkosh, WI 54903 Submitted by AECOM 558 N. Main St. Oshkosh, WI 54901 February 14, 2014 Soil and Groundwater Management Plan 2014 Capital

More information

GAMSBY AND MANNEROW Limited CONSULTING PROFESSIONAL ENGINEERS GUELPH- OWEN SOUND- LISTOWEL

GAMSBY AND MANNEROW Limited CONSULTING PROFESSIONAL ENGINEERS GUELPH- OWEN SOUND- LISTOWEL GAMSBY AND MANNEROW Limited GUELPH- OWEN SOUND- LISTOWEL 255 WOODLAWN ROAD WEST, SUITE 210 GUELPH, ONTARIO, N1H 8)1 PHONE (519) 824-8150 FAX (519) 824-8089 email: info@gamsby.com February 22, 2005 Our

More information

Storm Water Pollution Prevention Plan (SWP3) Checklist

Storm Water Pollution Prevention Plan (SWP3) Checklist . Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:

More information

3.11 HAZARDOUS MATERIALS

3.11 HAZARDOUS MATERIALS 3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general areas of potentially contaminated properties along the proposed

More information

OAR Table 240-1

OAR Table 240-1 OAR 690-240-0005 Table 240-1 WATER RESOURCES DEPARTMENT CHAPTER 690 DIVISION 240 CONSTRUCTION, MAINTENANCE, ALTERATION, CONVERSION AND ABANDONMENT OF MONITORING WELLS, GEOTECHNICAL HOLES AND OTHER HOLES

More information

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP)

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP) ECSI Number: 1213 Responsible Party: Klamath County QTime Number: 37941 Entry Date: 9/22/04 (VCP) Proposed Remedial Action Staff Report - Addendum Chiloquin Forest Products Chiloquin, Klamath County, Oregon

More information

BELUNES CONSULTING, INC.

BELUNES CONSULTING, INC. BELUNES CONSULTING, INC. Integrating environmental strategies with business solutions. October 3, 2012 Ms. Karen Keeley, Project Manager EPA Region 10 1200 Sixth Avenue, Suite 900 ECL-111 Seattle, WA 98101

More information

Conceptual Site Mode and Phase 2 Work Plan

Conceptual Site Mode and Phase 2 Work Plan Conceptual Site Mode and Phase 2 Work Plan Pacific Property Holdings Site 1512 NE 67th Ave Portland, Oregon DEQ Site ID 6142 HydroCon Project Number: 2016-041 Prepared for: Tronghuy Pham Pacific Property

More information

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework THIS PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS C3.1 Purpose... C3-1 C3.2 Responsibility of Implementation... C3-2 C3.3

More information

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 DECISION DOCUMENT Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 Prepared by Division of Environmental Remediation New York State Department of Environmental

More information

Managing a MGP Site Containing 121,000 Tons of Soils Containing Highly Impacted and Multiple Contaminates Of Concern (COC) Clinton, Iowa

Managing a MGP Site Containing 121,000 Tons of Soils Containing Highly Impacted and Multiple Contaminates Of Concern (COC) Clinton, Iowa Managing a MGP Site Containing 121,000 Tons of Soils Containing Highly Impacted and Multiple Contaminates Of Concern (COC) Clinton, Iowa Dean Hargens, Alliant Energy Frank Kellogg, DCI Environmental. Inc.

More information

September 27, Scott Yonke Ramsey County Parks & Recreation Dept N. Van Dyke Street Maplewood, MN 55109

September 27, Scott Yonke Ramsey County Parks & Recreation Dept N. Van Dyke Street Maplewood, MN 55109 Ramsey County Parks & Recreation Dept. 2015 N. Van Dyke Street Maplewood, MN 55109 RE: No Further Action Determination for Soil Rice Creek Regional Trail, Arden Hills Billing ID: 199943 Dear : The Minnesota

More information

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY Environmental Health Department 950 MAIDU AVENUE, SUITE 170 NEVADA CITY, CA 95959-8617 (530) 265-1222 FAX (530) 265-9853 http://mynevadacounty.com Amy Irani,

More information

60 Year Old Construction Yard REMEDIATED AND REDEVELOPED

60 Year Old Construction Yard REMEDIATED AND REDEVELOPED 60 Year Old Construction Yard REMEDIATED AND REDEVELOPED Vladimir Agatonovic, P. Geol., Focus Environment and Geosciences Group Operations Manager/Senior Hydrogeologist Erwin Greisinger, Courtenay Real

More information

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION IPEC 13 November 2013 CLIQUEZ ET MODIFIEZ LE TITRE PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS 1. IN-SITU THERMAL REMEDIATION

More information

RCRA CLOSURE OF MATERIALS DISPOSAL AREA P, LOS ALAMOS NEW MEXICO. Criswell, C.William Roy F. Weston Inc., Albuquerque, New Mexico

RCRA CLOSURE OF MATERIALS DISPOSAL AREA P, LOS ALAMOS NEW MEXICO. Criswell, C.William Roy F. Weston Inc., Albuquerque, New Mexico RCRA CLOSURE OF MATERIALS DISPOSAL AREA P, LOS ALAMOS NEW MEXICO Criswell, C.William Roy F. Weston Inc., Albuquerque, New Mexico Bostick, Kenneth V., EES-15 Richard Romero, ESH-19, Los Alamos National

More information

Project Description and Environmental Conditions. Hennepin County. CSAH 81 Reconstruction Project Brooklyn Park, Minnesota.

Project Description and Environmental Conditions. Hennepin County. CSAH 81 Reconstruction Project Brooklyn Park, Minnesota. Project Description and Environmental Conditions CSAH 81 Reconstruction Project Brooklyn Park, Minnesota Prepared for Hennepin County Project B1511287 December 3, 2015 Braun Intertec Corporation Table

More information

REGULATED STORAGE TANK DIVISION CORRECTIVE ACTION PLAN FACILITY:

REGULATED STORAGE TANK DIVISION CORRECTIVE ACTION PLAN FACILITY: REGULATED STORAGE TANK DIVISION CORRECTIVE ACTION PLAN FACILITY: Kerr-McGee Service Station #6400 Highway 270 & Old Military Road Malvern, Arkansas ID # 30000062 LUST #30-002 AUTHORIZATION Name: Title:

More information

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures . GROUNDWATER AND SOILS 0.. Introduction.. Environmental Setting.. Applicable Regulations.. Impacts and Mitigation Measures... Project Impacts and Mitigation... Proposed Project... Construction Impacts

More information

Environmental Management Procedure (EMP) Tab 3

Environmental Management Procedure (EMP) Tab 3 Environmental Management Procedure (EMP) 4.4.6.8 Tab 3 Subject: Installation Clean Soil Program (CSP) 1. Purpose: This EMP establishes procedures for managing soil associated with JBLE-E Activities to

More information

Concrete Waste Management

Concrete Waste Management Objectives EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Objective

More information

Vapor Extraction / Groundwater Extraction (VE/GE) System Initial Report

Vapor Extraction / Groundwater Extraction (VE/GE) System Initial Report Vapor Extraction / Groundwater Extraction (VE/GE) System Initial Report Gasoline Fueling Station Royal Farms #96 500 Mechanics Valley Road North East, MD 21901 MDE OCP Case No. 2011-0729-CE Facility ID

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

gauging of site monitoring wells MW-1, MW-2 and MW-3 was completed on October 25, 2018 (tank field observation pipes were gauged as dry this day);

gauging of site monitoring wells MW-1, MW-2 and MW-3 was completed on October 25, 2018 (tank field observation pipes were gauged as dry this day); November 28, 2018 Ms. Susan Bull Oil Control Program Maryland Department of the Environment 1800 Washington Blvd, Suite 620 Baltimore, Maryland 212 RE: SECOND SEMI-ANNUAL 2018 MONITORING REPORT MDE Case

More information

SUBSURFACE INVESTIGATION REPORT. Industrial Building rd Street San Francisco, California

SUBSURFACE INVESTIGATION REPORT. Industrial Building rd Street San Francisco, California SUBSURFACE INVESTIGATION REPORT Industrial Building 5800 3 rd Street San Francisco, California PREPARED BY: James S. Koniuto, Project Manager REVIEWED BY: Michael L. Siembieda Senior Project Manager RG

More information

Environmental Best Management Practices Guide for Construction Projects

Environmental Best Management Practices Guide for Construction Projects Environmental Best Management Practices Guide for Construction Projects In this Package: The City of Dallas Environmental Policy Environmental Responsibilities Information for Contractors working with

More information

Fill Material and Soil Management

Fill Material and Soil Management Fill Material and Soil Management What You Need to Know The purpose of this fact sheet is to describe how fill material and excess soil can be reused properly during the cleanup and redevelopment of properties

More information

GENERATOR INFORMATION

GENERATOR INFORMATION Page 1 Office Use Only Waste Permit No. Date: GENERATOR INFORMATION One West Main Suite 401 Medford, OR 97501 Jenifer Stuber 541-494-5455 jstuber@drycreeklandfill.com Steve DeBerry 541-494-5460 sdeberry@drycreeklandfill.com

More information

EXECUTIVE SUMMARY. The following is our conclusions of the environmental issues at the Site based on our investigations:

EXECUTIVE SUMMARY. The following is our conclusions of the environmental issues at the Site based on our investigations: EXECUTIVE SUMMARY Engineers, Inc. (), on behalf of the Town of East Lyme, Connecticut performed a Phase II Environmental Site Assessment (Phase II ESA) on the property located at 224 Main Street (the Site

More information

IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B

IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B SITE: CHAMPAIGN FORMER MGP SITE CHAMPAIGN, ILLINOIS JULY 24, 2013 PREPARED FOR: PSC INDUSTRIAL OUTSOURCING, LP 210 WEST SAND BANK

More information

WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES

WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES 1. Introduction This guidance document applies to soil recovery facilities which exceed the operational

More information

SECTION X. Northwest Tennessee Regional Harbor

SECTION X. Northwest Tennessee Regional Harbor Memphis District SECTION X Northwest Tennessee Regional Harbor HAZARDOUS, TOXIC, RADIOACTIVE WASTE SURVEY April 2004 TABLE OF CONTENTS Introduction 1 Historical File Review 2 Federal Databases 3 Inquiry

More information

Single Family Residential Construction Erosion/Sediment Control Standards

Single Family Residential Construction Erosion/Sediment Control Standards Single Family Residential Construction Erosion/Sediment Control Standards Introduction: This booklet contains standard plans and procedures sufficient for typical building construction. It is not intended

More information

Case Studies in Risk Management Methods as a Component of the Remedial Process

Case Studies in Risk Management Methods as a Component of the Remedial Process Case Studies in Risk Management Methods as a Component of the Remedial Process Cecile Willert, P.Eng., QP RA January/February 2013 Agenda Issues Summary Case Study # 1 RA of DNAPL site (combined with remediation)

More information

Working Together. Ministry of the Environment. Toronto Public Health. Coal Tar Remediation Case Study

Working Together. Ministry of the Environment. Toronto Public Health. Coal Tar Remediation Case Study Working Together Ministry of the Environment and Toronto Public Health Coal Tar Remediation Case Study Barbara Lachapelle Toronto Public Health Rod Adams Ministry of the Environment September 16, 2013

More information

SOIL INVESTIGATION McLAREN BIKE SKILLS PARK SAN FRANCISCO, CALIFORNIA

SOIL INVESTIGATION McLAREN BIKE SKILLS PARK SAN FRANCISCO, CALIFORNIA FUGRO CONSULTANTS, INC. SOIL INVESTIGATION McLAREN BIKE SKILLS PARK SAN FRANCISCO, CALIFORNIA Prepared for: CITY OF SAN FRANCISCO RECREATION AND PARKS DEPARTMENT JUNE 2013 Fugro Project No. 04.72130038

More information

Risk-Based Cleanup Actions for Closure of a Brownfield Site

Risk-Based Cleanup Actions for Closure of a Brownfield Site Risk-Based Cleanup Actions for Closure of a Brownfield Site H.W. Rice, J.F. Feild, L.C. Farr Jr. AMEC Earth and Environmental, Inc. 7376 SW Durham Road, Portland, Oregon 97224 USA ABSTRACT Operating as

More information

5.10 HAZARDOUS/REGULATED MATERIALS

5.10 HAZARDOUS/REGULATED MATERIALS 5.10 HAZARDOUS/REGULATED ATERIALS 5.10.1 ESA Report Summary A Phase I Environmental Site Assessment (ESA) was performed by LOPEZGARCIA GROUP (LGGROUP) in order to identify significant environmental concerns

More information

Pennsylvania Clean-up Standards for Hydrocarbon Contaminated Groundwater

Pennsylvania Clean-up Standards for Hydrocarbon Contaminated Groundwater Pennsylvania Clean-up Standards for Hydrocarbon Contaminated Groundwater Product Parameter/ Constituent Lab Test Protocol & Number Water Standard / Action Level Leaded Gasoline, Aviation Gasoline, Jet

More information

Tribal LUST Site Case Studies Pine Ridge Reservation, EPA Region Tribal Lands Forum Koos Bay, OR

Tribal LUST Site Case Studies Pine Ridge Reservation, EPA Region Tribal Lands Forum Koos Bay, OR Tribal LUST Site Case Studies Pine Ridge Reservation, EPA Region 8 2012 Tribal Lands Forum Koos Bay, OR Janice Pearson, USEPA, Region 8 Underground Storage Tank Unit Chief LUST Sites Pine Ridge Indian

More information

Introduction. Remedial Action Objectives. In This Guide

Introduction. Remedial Action Objectives. In This Guide Addendum to Citizens Guide Proposed soil cleanup plans for additional Tax Blocks for Lockheed Martin s Middle River Complex Winter 2013-2014 Lockheed Martin Would Like to Invite the Community to a Public

More information

OVERVIEW SCOPE OF WORK (SOW)

OVERVIEW SCOPE OF WORK (SOW) Site Description The subject property is occupied by the former Parker Service Station, which contained a former Service Garage (now called Former Garage) and Filling Station Store (now called Storage

More information

Summary of Investigations & Remedial Activities

Summary of Investigations & Remedial Activities Summary of Investigations & Remedial Activities Former Farmland Industries Nitrogen Manufacturing Plant Lawrence, Kansas November 9, 2009 Topics of Discussion Previous Investigations/Remedial Actions (Pre-2000s)

More information

LOWER DUNGENESS RIVER SECTION 544 ECOSYSTEM RESTORATION

LOWER DUNGENESS RIVER SECTION 544 ECOSYSTEM RESTORATION LOWER DUNGENESS RIVER SECTION 544 ECOSYSTEM RESTORATION APPENDIX F HAZARDOUS, TOXIC AND RADIOACTIVE WASTE DRAFT Detailed Project Report and Environmental Assessment DUNGENESS RIVER ECOSYSTEM RESTORATION

More information

Facts About. LMA Fill Material and Soil Management Guidance. Introduction. What Soils and Fill Material are Subject to the Policy?

Facts About. LMA Fill Material and Soil Management Guidance. Introduction. What Soils and Fill Material are Subject to the Policy? Facts About LMA Fill Material and Soil Management Guidance The purpose of this guidance is to describe how fill material and excess soil can be reused properly during the cleanup and redevelopment of properties

More information

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities Development Services 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 issaquahwa.gov Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction

More information

SUBSURFACE INVESTIGATION REPORT

SUBSURFACE INVESTIGATION REPORT Prepared for: Atlanta, Georgia Prepared By: Ramboll Environ US Corporation Vancouver, Washington Date July 2015 Project Number 03-35786A SUBSURFACE INVESTIGATION REPORT GRAPHIC PACKAGING INTERNATIONAL,

More information

On March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to

On March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to LAKE EWAUNA TRAIL LEVEL 2 FIELD SAMPLING ASSESSMENT the proposed alignment (Figure 1). The trail will also include the installation of a geothermal snow melt system, allowing for year round use of the

More information

Table of Contents. Appendices

Table of Contents. Appendices Table of Contents 1.0 Introduction... 1 1.1 Site Description... 1 2.0 Waste Management Plan... 1 2.1 Waste Generation... 1 2.2 Pit Design and Storage... 2 2.3 Transportation and Disposal of Waste... 3

More information

Appendix D POINT LOMA HIGH SCHOOL WHOLE SITE MODERNIZATION AND ATHLETIC FACILITIES UPGRADE PROJECT. Environmental Issues Letter

Appendix D POINT LOMA HIGH SCHOOL WHOLE SITE MODERNIZATION AND ATHLETIC FACILITIES UPGRADE PROJECT. Environmental Issues Letter POINT LOMA HIGH SCHOOL WHOLE SITE MODERNIZATION AND ATHLETIC FACILITIES UPGRADE PROJECT Appendix D Environmental Issues Letter Prepared by Ninyo & Moore October 26, 2015 1(1R90 &/ft:oo~e~~, Js; Ge orechnrcal,1nt1

More information

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total

More information

Chapter 11: Hazardous Materials A. INTRODUCTION

Chapter 11: Hazardous Materials A. INTRODUCTION Chapter 11: Hazardous Materials A. INTRODUCTION This chapter relies on the analysis from the Fresh Kills Park Final Generic Environmental Impact Statement (FGEIS) and summarizes the conclusions drawn from

More information

REQUIREMENTS FOR PERMANENT CLOSURE OF UNDERGROUND HAZARDOUS SUBSTANCE STORAGE TANKS

REQUIREMENTS FOR PERMANENT CLOSURE OF UNDERGROUND HAZARDOUS SUBSTANCE STORAGE TANKS UT-30 HANDBOOK REQUIREMENTS FOR PERMANENT CLOSURE OF UNDERGROUND HAZARDOUS SUBSTANCE STORAGE TANKS County of Kern Public Health Services Department Environmental Health Division Hazardous Materials Management

More information

Concrete Waste Management

Concrete Waste Management Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

Delaware Cleanup Standards for Hydrocarbon Contaminated Groundwater

Delaware Cleanup Standards for Hydrocarbon Contaminated Groundwater Delaware Cleanup Standards for Hydrocarbon Contaminated Groundwater Note: The State of Delaware has adopted a Risk Based Corrective Action (RBCA) Program Product Parameter/ Constituent Lab Test Protocol

More information

Recent Field Applications of Activated Persulfate Including Petroleum Sites

Recent Field Applications of Activated Persulfate Including Petroleum Sites Recent Field Applications of Activated Persulfate Including Petroleum Sites Philip Block, PhD FMC Corporation Presentation Outline Brief Introduction to Persulfate Chemistry Activated Persulfate Treatment