HARVEST PARK/ZIEGLER MIXED USE LOT 2 CITY OF FORT COLLINS, CO

Size: px
Start display at page:

Download "HARVEST PARK/ZIEGLER MIXED USE LOT 2 CITY OF FORT COLLINS, CO"

Transcription

1 EROSION CONTROL REPORT / STORMWATER MANAGEMENT PLAN FOR HARVEST PARK/ZIEGLER MIXED USE LOT 2 CITY OF FORT COLLINS, CO Prepared by: Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado Phone: Fax: Prepared for: ARCHITECTURE WEST, LLC 4710 South College Avenue Fort Collins, CO September 10, 2014

2 September 10, 2014 Mr. Jesse Schlam City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO RE: Erosion Control Report / Stormwater Management Plan for Ziegler Mixed Use Lot 2 Dear Jesse, I am pleased to submit for your review and approval, this Erosion Control Report / Stormwater Management Plan for the Harvest Park/Ziegler Mixed Use Lot 2 development. This report provides the City with an erosion control plan for the proposed development that addresses the topics outlined in the City Erosion Control Report Requirements. This plan mimics the State of Colorado General Permit and Stormwater Management Plan requirements. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Reviewed By: Skylar Brower, P.E. Robert Almirall, P.E. Colorado Professional Colorado Professional Engineer No Engineer No

3 TABLE OF CONTENTS 1. INTRODUCTION SITE DESCRIPTION BMPS FOR STORMWATER POLLUTION PREVENTION Erosion and Sediment Controls Materials Handling and Spill Prevention STORMWATER MANAGEMENT CONTROLS SWMP Administrator Identification of Potential Pollution Sources FINAL STABILIZATION AND LONG TERM STORMWATER MANAGEMENT INSPECTION AND MAINTENANCE City of Fort Collins Standard Erosion and Sediment Control Notes City of Fort Collins Erosion Control Security Calculations SWMP IMPLIMENTATION APPENDIX A BMP DETAILS... P APPENDIX B EROSION CONTROL PLAN AND SITE MAP... Q APPENDIX C CONSTRUCTION SEQUENCE... R APPENDIX D SOIL INFORMATION... S LIST OF FIGURES & TABLES Figure 1--Vicinity Map... 2 Table 6.1 Erosion Control Cost Estimate 14

4 1. INTRODUCTION The primary purpose of preparing and maintaining a stormwater management plan is to improve the health and quality of the State's urban waterways. The preparation and maintenance of the plan will contribute to this objective by facilitating an approach to stormwater management, establishing a program of actions to be used during construction activities, and describing stormwater management controls and various Best Management Practices (BMPs) necessary to reduce erosion, sediment and pollutants in stormwater discharge. Information concerning the State of Colorado General Permit and Stormwater Management Plan are not included in the appendices of this report. The site is over one acre and will require a SWMP permit, which will be the responsibility of the Contractor. 2. SITE DESCRIPTION The Ziegler Mixed Use development is located in southeast Fort Collins. It is located in the Southwest Quarter of Section 5, Township 6 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See figure 1 on the next page for the vicinity map. The property is located west of Zeigler Road and will be split down the middle by the extension of County Fair Lane. The parcel north of County Fair Lane will be Lot 1 and the parcel south of County Fair Lane will be Lot 2. Lot 1 contains 1.32 acres and Lot 2 contains 2.71 acres. The project is bounded on the north and west by Harvest Park Subdivision, on the south by McClelland s Channel, and on the east by Ziegler Road. Only Lot 2 will undergo development at this time. Lot 1 will maintain the existing single family residence and be developed in the future. The project will extend County Fair Lane to Ziegler road as well as construct a new drive access for four multi-family buildings and associated driveways and parking spots on the southern half of the site. 1

5 Figure 1--Vicinity Map All paved areas are designed with a minimum slope of 0.5% and all grassed areas are designed with a minimum slope of 2.0%. Side slopes in grassed areas are graded to a maximum of 4:1. Runoff from the undeveloped north portion of the site will follow existing flow paths until it is cut off by County Fair Lane. The runoff will be conveyed via curb and gutter to a low point just west of the Ziegler intersection where it will be collected by two Type R inlets. Runoff from the proposed development on Lot 2 will be conveyed overland across 2

6 the 24 concrete drive to the south into the proposed water quality pond. Roof drains will either discharge on grade into a rain garden facility or be piped to the water quality pond. Existing soil types on site as classified by the NRCS Soil Survey of Larimer County are classified as Nunn clay loam, Nun clay loam wet, and Stoneham loam. Please refer to Table 2.1 for additional soil characteristics. Table 2.1: On-site Soil Characteristics Soil Type Percent of Site Hydrologic Soil Group K Factor 1 Wind Group 2 Nunn Clay Loam 71% C Nunn Clay Loam, Wet 21% C Stoneham Loam 8% B K factors range from 0.02 to The higher value, the more susceptible the soil is to sheet and rill erosion by water. 2 Soils assigned to wind group 1 are the most susceptible to wind erosion, soils assigned to wind group 8 are the least susceptible. Overall, the soils on site can be classified as moderately erodible. Please refer to Appendix D for the on-site soil information from the NRCS Soil Survey of Larimer County. The City of Fort Collins has mapped a floodplain associated with McClelland s Channel which is located on the southern most portion of the site. There is no work proposed within the limits of the McClelland floodplain. The outlet to the water quality pond is tying into an existing storm system that discharges into the channel. The anticipated sequence of construction shall progress as follows: 1) Installation of perimeter erosion control measures (other measures as required for the permit will be constructed throughout) including silt fence along the western property line and the top of bank of McClelland s Channel, existing inlet protection along County Fair Lane and Ziegler Road, and the vehicle tracking control pad at Ziegler Road. 2) Clearing, stripping and grading 3

7 3) Rough grading of water quality pond to be used as a temporary sediment trap 4) Utility installation 5) Sub-grade preparation for the roadway extension, drives and parking 6) Curb, gutter and sidewalks 7) Paving 8) Building construction (this may occur simultaneously with items 5 through 7) 9) Final grading and landscaping. All disturbed ground will be impervious (concrete, asphalt, or building), seeded and mulched, sodded or xeriscaped to permanently stabilize the site. The 10-year runoff coefficient associated with this project will be No known sources of pollution currently exist on this site. Potential pollutant sources brought onto the site during construction will be discussed (along with spill prevention) in Section 3.2 below. The anticipated non-stormwater components of discharge with this project are landscape irrigation return flows. The ultimate receiving water for this area is McClelland s Channel. 4

8 3. BMPS FOR STORMWATER POLLUTION PREVENTION 3.1. Erosion and Sediment Controls Structural Practices: Structural practices for the site will consist mainly of silt fence, vehicle tracking control pad, concrete washout area, inlet protection and wattles which are described in detail in the following paragraphs. Detail drawings of these BMPs are also included in Appendix A. These BMPs are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMPs are in place and/or removed at the appropriate time in the construction sequence. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. All BMPs shall be inspected and repaired or replaced as indicated in Section 6 and as required to satisfy the conditions of the Permit. Silt fence is intended to filter sediment and contaminants from non-point runoff leaving the site. Perimeter silt fence shall be in place prior to commencement of any construction activity. During clearing and grubbing necessary for perimeter silt fence installation, all cleared material shall be placed on the uphill side of the trench so that if erosion occurs from the cleared material, the sediment will be trapped in the exposed trench and not transported downstream. Vehicle tracking control pad is intended to trap mud and sediment within coarse grain material and provide clean access to public roadways. Wherever construction vehicle access routes intersect paved public roads a vehicle tracking control pad shall be installed to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Pads shall be maintained and refurbished when necessary to obtain their intended result. Concrete washout area is intended to contain washout liquids and solids that result from the cleaning of concrete trucks and pumps. Washouts should be placed near the area where the concrete is being poured. Inlet protection prevents sediment from entering storm drainage systems prior to permanent stabilization of the disturbed site area via ponding and settling of sediment. Inlet protections shall be placed at new inlets and existing inlets near the site. Storm sewer inlet protection must be inspected and maintained after every rainfall event that 5

9 produces runoff. Sediment must be removed and rocks replaced. Wattles are intended to filter concentrated runoff of sediment before entering drainage facilities. Wattles shall be implemented as gutter sediment control where necessary and as inlet protection. Wattle dikes shall be installed in swales. Wattles shall be installed immediately upon completion of over-lot grading and/or the installation of the proposed storm sewer inlets. Non-Structural Practices: All low sloped areas exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation or other permanent erosion control is installed. All exposed steep sloped areas exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall have slope protection. The contractor shall use a "tracked" vehicle, run perpendicular to slope to inhibit rill/gully erosion; the contractor may use other windrow-type methods as necessary. No soil shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (seed/mulch, landscaping, etc.) is installed. THE CONTRACTOR SHALL ADD ANY AND ALL BMP S AND DETAILS NEEDED FOR SEDIMENT/EROSION CONTROL. 6

10 3.2 Materials Handling and Spill Prevention Potential impacts from significant materials and their handling are as follows: Chemicals, cleaning substances, and petroleum products related to the construction will be stored within the construction trailer or storage shed where it will not be in contact with precipitation. No storage of these materials will be allowed outside. Fueling and maintenance of equipment shall take place at the construction staging area. Fueling will be accomplished with fueling trucks on an as needed basis. Absorbent (kitty litter) will be in the construction trailer and applied on any spill immediately and the dry material disposed of properly and legally. All construction waste shall be disposed of in the available dumpsters throughout the workday. Liquid wastes will be hauled off site and disposed of properly and legally. Any cleaning or maintenance of small equipment will be required to be done within a containment device (horse trough or small kiddy pool ) and the liquid disposed of properly and legally. In the event of any spill, the SWMP Administrator shall be immediately notified. Spills can be broken into three categories. Their definitions and the procedures required to address the spills are as follow: Minor Spill A spill generally of less than 5 gallons which is unlikely to reach adjacent waters (i.e. equipment leak). Procedure: a. Stop the source of the spill. b. Contain the spillage. c. Contact the SWMP Administrator. d. Clean up the spill with on-site absorbent material (kitty litter) e. Dispose of the dry material properly or legally. f. Document the spill and the response in the SWMP including dates and times verify that the pollutants are completely cleaned up. g. Include incident in the following training meeting. h. Provide information to the City of Fort Collins at the next regular inspection. 7

11 Significant Spill A spill of pollutants or oils of any size that will likely or has reached adjacent waters, may endanger health or the environment, or which may exceed a water quality standard. Procedure: a. Stop the source of the spill. b. Contain the spillage. c. Contact the SWMP Administrator. d. Clean up the spill with on-site absorbent material (kitty litter) e. Dispose of the dry material properly or legally. f. Document the spill and the response in the SWMP verify that the pollutants are completely cleaned up. g. Notify the City of Fort Collins (970) and the Colorado Department of Public Health and Environment spill reporting line (877) of the spill. h. Notify the same two entities above with a written submission (outlined within the permit) within 5 calendar days. i. Include incident in the following training meeting. Hazardous Spill A spill of a dangerous substance requiring expert cleanup. Procedure: a. Secure the area do not approach the spill. b. Offer first aid to any injured parties. c. Call 911 and describe the nature of the spill and any injuries. d. If possible, isolate downstream areas from the spill (for example, cover an inlet that is downstream and a safe distance from the spill with plastic and soil). e. Contact the SWMP Administrator. f. Document the spill and the response in the SWMP g. Notify the City of Fort Collins (970) and the Colorado Department of Public Health and Environment spill reporting line (877) of the spill. h. Notify the same two entities above with a written submission (outlined within the permit) within 5 calendar days. i. Include incident in the following training meeting. 8

12 4. STORMWATER MANAGEMENT CONTROLS 4.1. SWMP Administrator The Local Contact and SWMP Administrator is (INSERT CONTACT NAME, POSITION, COMPANY, AND PHONE NUMBER). (INSERT CONTACT) will be responsible for developing, implementing, maintaining, and revising the SWMP. (INSERT CONTACT) will also be responsible for required inspections and coordinating and documenting changes or repairs resulting from inspections. (INSERT CONTACT) will be responsible for the training and enforcement aspects of the SWMP and he is the first point of contact for any stormwater issues Identification of Potential Pollution Sources The permit identifies 13 potential sources that must be evaluated for their potential to contribute pollutants to stormwater discharge. These items have been evaluated below for this project: 1) Disturbed and stored soil YES The construction will require that areas be disturbed exposing soil including foundation construction, paving and repaving, slope construction, and demolition required as shown on the plans. BMPs will include silt fence on the downhill side of disturbed slopes, inlet protection on existing and proposed inlets, minimizing disturbance of existing vegetation and hard surfaces, and slope roughening and tracking of slopes after disturbance and prior to landscaping, paving, or building will be implemented. 2) Vehicle tracking of sediment YES The construction will require that subgrade be prepared for pavement and that vehicles drive on unpaved surfaces to the proposed buildings and utility improvement locations. BMPs will include a policy that vehicles be clean prior to entering the site and, if they become muddy during construction or earthwork activities, mud is removed by hand from the vehicle prior to departing the site in an area near the vehicle tracking pad. Any soil that is removed is to be disposed of in the trash dumpster by scraping or sweeping. Any muddy vehicle will use the vehicle tracking pad prior to leaving the site. 3) Management of contaminated soil NO Soil borings do not indicate any existing contamination. 4) Loading and unloading operations YES Chemicals and petroleum products will be brought to the site. Anytime these are being transported, they will be in a sealed container. 5) Outdoor storage activities YES Inert materials such as wood and stone will be stored outside and will likely be covered with tarps or plastic, but 9

13 are not pollutant sources and are not covered by the permit. Chemicals and petroleum products will be stored within the construction trailer or storage shed. Cement and mortar bags (if not contained in a vehicle or storage shed) will be completely covered with plastic to avoid contact with precipitation. 6) Vehicle and equipment maintenance and fueling YES Vehicle maintenance and fueling will take place in the northern half of the site adjacent to Ziegler Road (a minimum of 50 away from the proposed inlets in County Fair Lane) No fuel will be stored on site; a fuel truck will deliver fuel directly to equipment as needed. The largest risk to stormwater with this operation is pollutants being spilled in the existing asphalt. Absorbent (kitty litter) will be available on site and applied on any spill immediately and the dry material disposed of properly and legally. 7) Significant dust or particulate generating processes NO The area of heavy construction is very limited and none of the operations are expected to generate significant dust. 8) Routine maintenance activities involving fertilizers, pesticides, detergents, fuels, solvents, oils, etc. YES Fertilizers and pesticides will not be used. Any cleaning or maintenance of small equipment will be required to be done within a containment device (horse trough or small kiddy pool and the liquid disposed of properly and legally. 9) On-site waste management YES The multi-family building and site construction (access drive, parking, concrete walks, underground utilities) will result in construction waste. A dumpster for trash and a dumpster for bulk recycling will be on the site. Waste will be hauled to the dumpsters by hand or in loaders. Dumpsters will be hauled off as needed. Dumpsters shall be located a minimum of 50 feet away from the proposed inlets in County Fair Lane, the proposed water quality pond, and the existing inlet along Ziegler Road. No construction waste will be left outside overnight. No construction debris (including broken concrete) may be buried on the site. 10) Concrete truck/equipment washing YES A concrete washout will be provided on site. This will be used for trucks and for any masonry / concrete tools. The concrete washout shall be located a minimum of 50 feet away from the proposed inlets in County Fair Lane, the proposed water quality pond, and the existing inlet along Ziegler Road. 11) Dedicated asphalt of concrete batch plants NO None on this project. 12) Non-structural waste sources such as worker trash and portable toilets YES Trash dumpster will be available for worker s trash and will be located near the construction trailer. Portable toilets will be on site near the construction trailer. All portable toilets and trash dumpsters shall be located a minimum of 50 feet away from the proposed inlets in County Fair Lane, the proposed water quality pond, and the existing inlet along 10

14 Ziegler Road. 13) Other areas where potential spills can occur NO The above 12 items are adequate for the anticipated construction process. CONTRACTOR TO UPDATED THE ABOVE INFORMATION WITH EXACT LOCATIONS OF THE CONSTRUCTION TRAILER, VEHICLE TRACKING PAD, CONCRETE WASHOUT, DUMPSTERS, AND PORTABLE TOILETS PRIOR TO COMMENCEMENT OF CONSTRUCTION AND UPDATED AS NECESSARY THROUGHOUT THE CONSTRUCTION SEQUENCE. 5. FINAL STABILIZATION AND LONG TERM STORMWATER MANAGEMENT Long-term erosion control for this site will be the established vegetative cover, landscaping and xeriscaping along with the completed site improvements (pavement and buildings). Final stabilization shall be considered achieved once all proposed site improvements are in place and all vegetation is established. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion (typically 70% of the original vegetative cover). Areas controlled by grass sod will be considered established upon the completion of the sod installation. 11

15 6. INSPECTION AND MAINTENANCE Site inspections will be performed to effectively address maintenance, repair, and adequacy of BMPs. The site inspections will be performed by the SWMP Administrator or his designee a minimum of once every fourteen (14) calendar days on active construction sites and within 24 hours after a significant storm event (event causing erosion). As part of the site inspections the inspector will keep documentation of all inspections and BMP maintenance, including updated Site Maps indicating new BMPs or the removal of BMPs since the previous inspection. Blank Site Maps will be utilized and will be redlined by the SWMP Administrator throughout construction to note all BMPs, pollutant sources, storage locations, etc. Any maintenance, repair, or necessary installation of BMPs that are noted during the inspection must begin immediately. The modifications shall be noted in the SWMP and the action taken as a result of the inspection shall be noted and certified on or attached to the original inspection report (date and time that the repair or change was started and finished and a certification that it was done properly) City of Fort Collins Standard Erosion and Sediment Control Notes 1) The City Stormwater Department erosion control inspector must be notified at least 24 hours prior to any construction on this site. 2) All required BMPs shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All of their required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 3) Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area required for immediate construction operations, and for the shortest practical period of time. 4) All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent 12

16 erosion control is installed. No soils in areas outside project street rights of way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the Stormwater Department. 5) The property must be watered and maintained at all times during construction activities so as to prevent wind-caused erosion. All land disturbing activities shall be immediately discontinued when fugitive dust impacts adjacent properties, as determined by the City Engineering Department. 6) All temporary (structural) erosion control measures must be inspected and repaired or reconstructed as necessary after each runoff event and every 14 days in order to assure continued performance of their intended function. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any drainage way. 7) No stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after 30 days shall be seeded and mulched. 8) City Ordinance prohibits the tracking, dropping, or depositing of soils or any other material onto city streets by or from any vehicle. Any inadvertent deposited material shall be cleaned immediately by the contractor. 13

17 6.2. City of Fort Collins Erosion Control Security Calculations The cost of erosion control for the site was compared to the cost to reseed the entire site and the greater cost was used to establish the erosion control escrow amount. The cost to reseed the site is estimated at $4, Using a multiplier of 1.5 the erosion control escrow amount would be $6, The site erosion control cost is estimated at $5, Using a multiplier of 1.5 the erosion control escrow amount would be $8, The larger sum of the Erosion Control cost and the Reseeding cost shall be used for the escrow account. Therefore, the Erosion Control Escrow amount is $8, See Table 6.1 for a break-down of the costs associated with seeding and erosion control. Table 6.1: Erosion Control Cost Estimate ITEM QUANTITY UNIT COST/UNIT TOTAL COST Silt Fence 932 LF $ 2.00 $ Wattle 20 LF $ 7.00 $ Inlet Protection (IP) 7 EA $ $ Concrete Washout 1 EA $ $ Construction Entrance 1 EA $ 1, $ 1, Sedimentation Basin 2 EA $ $ CITY RESEEDING COST Subtotal $ 5, Contingency (50%) $ 2, Total $ 8, Reseed/Mulch 2.71 ACRE $ 1, $ 4, Subtotal $ 4, Contingency (50%) $ 2, Total $ 6, CALCULATED EROSION CONTROL ESCROW AMOUNT $8, Note: Minimum Escrow Amount is $3,000 14

18 7. SWMP IMPLIMENTATION It is the responsibility of the contractor to operate and maintain all facilities and systems of treatment and control which are installed to achieve compliance with the conditions of the permit. This includes effective performance, adequate funding, adequate staffing and training, etc. (see permit). All personnel on the construction site who will be in a position to affect or be affected by the SWMP shall be trained prior to beginning work. These individuals will be given general orientation information regarding the project and SWMP, shown where the SWMP is physically located, the SWMP will be explained to them and available for their review, and the enforcement policy will be reviewed. After this training, a certification that the employee or subcontractor s employee is familiar with the document and its procedures will be signed. Copies of these certifications shall be included in the SWMP notebook Appendix. Throughout the construction, as a part of a weekly safety meeting, the SWMP will be reviewed with all attendees and any incidents discussed. All attendees shall be logged. 15

19 APPENDIX A BMP DETAILS

20

21

22 APPENDIX B EROSION CONTROL PLAN AND SITE MAP Q

23

24 APPENDIX C CONSTRUCTION SEQUENCE R

25 Construction Sequence Chart Location: Ziegler Mixed Use - Lot 2 Date: Septemeber 2014 (Construction Phases) Best Management Practices (BMPs) Structural "Installation" Silt Fence Barriers* Contour Furrows (Ripping / Disking) Sediment Trap / Filter **Vehicle Tracking Pad* Concrete Washout* Flow Barriers (Wattles)* Stream Flow Diversion* Rip Rap *All BMPs to be Removed once Construction is Complete. Mobilization Clear, Strip, Grade Utility Installation Subgrade Curb, Gutter and Sidewalk Paving Building Construction Landscape Demobilization **BMPs installed and maintained by others Vegetative Temporary Seeding Planting Mulching/Sealant Permanent Seeding Planting Rolled Products : Netting/Blankets/Mats Other: Any time the site will sit dorment longer than 30 Days. Any time the site will sit dorment longer than 30 Days. Any time the site will sit dorment longer than 30 Days.

26 APPENDIX D SOIL INFORMATION S

27 105 1' 17'' W Soil Map Larimer County Area, Colorado (Ziegler Mixed Use) 105 1' 9'' W ' 47'' N 40 30' 47'' N 40 30' 39'' N ' 39'' N ' 17'' W N Map Scale: 1:1,260 if printed on A portrait (8.5" x 11") sheet. Meters Feet Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS ' 9'' W Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 1 of 3

28 Soil Map Larimer County Area, Colorado (Ziegler Mixed Use) MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 8, Dec 23, 2013 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011 Nov 18, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 2 of 3

29 Soil Map Larimer County Area, Colorado Ziegler Mixed Use Map Unit Legend Larimer County Area, Colorado (CO644) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 74 Nunn clay loam, 1 to 3 percent slopes 76 Nunn clay loam, wet, 1 to 3 percent slopes 103 Stoneham loam, 5 to 9 percent slopes % % % Totals for Area of Interest % Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 3 of 3

30 105 1' 17'' W Hydrologic Soil Group Larimer County Area, Colorado (Ziegler Mixed Use) 105 1' 9'' W ' 47'' N 40 30' 47'' N 40 30' 39'' N ' 39'' N ' 17'' W N Map Scale: 1:1,260 if printed on A portrait (8.5" x 11") sheet. Meters Feet Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS ' 9'' W Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 1 of 4

31 Hydrologic Soil Group Larimer County Area, Colorado (Ziegler Mixed Use) MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 8, Dec 23, 2013 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011 Nov 18, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 2 of 4

32 Hydrologic Soil Group Larimer County Area, Colorado Ziegler Mixed Use Hydrologic Soil Group Hydrologic Soil Group Summary by Map Unit Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 74 Nunn clay loam, 1 to 3 percent slopes 76 Nunn clay loam, wet, 1 to 3 percent slopes 103 Stoneham loam, 5 to 9 percent slopes C % C % B % Totals for Area of Interest % Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 3 of 4

33 Hydrologic Soil Group Larimer County Area, Colorado Ziegler Mixed Use Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 4 of 4

34 105 1' 17'' W K Factor, Whole Soil Larimer County Area, Colorado (Ziegler Mixed Use) 105 1' 9'' W ' 47'' N 40 30' 47'' N 40 30' 39'' N ' 39'' N ' 17'' W N Map Scale: 1:1,260 if printed on A portrait (8.5" x 11") sheet. Meters Feet Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS ' 9'' W Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 1 of 3

35 K Factor, Whole Soil Larimer County Area, Colorado (Ziegler Mixed Use) MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons Not rated or not available Soil Rating Lines Not rated or not available Soil Rating Points Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 8, Dec 23, 2013 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: 18, 2011 Apr 22, 2011 Nov The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 2 of 3

36 K Factor, Whole Soil Larimer County Area, Colorado Ziegler Mixed Use K Factor, Whole Soil K Factor, Whole Soil Summary by Map Unit Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 74 Nunn clay loam, 1 to 3 percent slopes 76 Nunn clay loam, wet, 1 to 3 percent slopes 103 Stoneham loam, 5 to 9 percent slopes % % % Totals for Area of Interest % Description Erosion factor K indicates the susceptibility of a soil to sheet and rill erosion by water. Factor K is one of six factors used in the Universal Soil Loss Equation (USLE) and the Revised Universal Soil Loss Equation (RUSLE) to predict the average annual rate of soil loss by sheet and rill erosion in tons per acre per year. The estimates are based primarily on percentage of silt, sand, and organic matter and on soil structure and saturated hydraulic conductivity (Ksat). Values of K range from 0.02 to Other factors being equal, the higher the value, the more susceptible the soil is to sheet and rill erosion by water. "Erosion factor Kw (whole soil)" indicates the erodibility of the whole soil. The estimates are modified by the presence of rock fragments. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Layer Options (Horizon Aggregation Method): Surface Layer (Not applicable) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 3 of 3

37 105 1' 17'' W Wind Erodibility Group Larimer County Area, Colorado (Ziegler Mixed Use) 105 1' 9'' W ' 47'' N 40 30' 47'' N 40 30' 39'' N ' 39'' N ' 17'' W N Map Scale: 1:1,260 if printed on A portrait (8.5" x 11") sheet. Meters Feet Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS ' 9'' W Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 1 of 3

38 Wind Erodibility Group Larimer County Area, Colorado (Ziegler Mixed Use) MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons L Not rated or not available Soil Rating Lines L Not rated or not available Soil Rating Points L Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 8, Dec 23, 2013 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011 Nov 18, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 2 of 3

39 Wind Erodibility Group Larimer County Area, Colorado Ziegler Mixed Use Wind Erodibility Group Wind Erodibility Group Summary by Map Unit Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 74 Nunn clay loam, 1 to 3 percent slopes 76 Nunn clay loam, wet, 1 to 3 percent slopes 103 Stoneham loam, 5 to 9 percent slopes % % % Totals for Area of Interest % Description A wind erodibility group (WEG) consists of soils that have similar properties affecting their susceptibility to wind erosion in cultivated areas. The soils assigned to group 1 are the most susceptible to wind erosion, and those assigned to group 8 are the least susceptible. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Lower Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/21/2014 Page 3 of 3

Re: Erosion Control Report and Drawings Requirements Accompanying Document

Re: Erosion Control Report and Drawings Requirements Accompanying Document Re: Erosion Control Report and Drawings Requirements Accompanying Document This document was created to help engineers and other design staff to better understand, meet and exceed the erosion control requirements

More information

City of Glendale Stormwater Management Plan Checklist

City of Glendale Stormwater Management Plan Checklist City of Glendale Stormwater Management Plan Checklist Project: Title of Plan: Date: Date of Plan: Reviewer: Most Recent Revision: Criteria Yes No Identify a SWMP Administrator and an alternate - The SWMP

More information

THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES

THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES Revised August 18, 2016, August 10, 2016, September 19,2016 Prepared By: Isch and Associates, Inc. 14848 Bristol Park

More information

Soil Map Lewis County, Kentucky (Denham Farm, Sand Hill/Trinity, Lewis Co., KY) Web Soil Survey National Cooperative Soil Survey

Soil Map Lewis County, Kentucky (Denham Farm, Sand Hill/Trinity, Lewis Co., KY) Web Soil Survey National Cooperative Soil Survey 83 37' 43'' W (Denham Farm, Sand Hill/Trinity, Lewis Co., KY) 83 36' 18'' W 38 40' 37'' N 271500 271700 271900 272100 272300 272500 272700 272900 273100 273300 38 40' 37'' N 38 39' 54'' N 4282900 4283100

More information

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone

More information

Drainage Letter for Falcon High School Building Expansion

Drainage Letter for Falcon High School Building Expansion August 11, 2017 El Paso County Planning and Community Development Department 2880 International Circle, Suite 110 Colorado Springs, CO 80910 ATTN: RE: Mr. Jeff Rice Drainage Letter for Falcon High School

More information

Soil Map Lowndes County, Alabama (McEvoy_Gordonsville)

Soil Map Lowndes County, Alabama (McEvoy_Gordonsville) 524700 525000 525300 525600 525900 526200 3568000 3568000 3567700 3567700 3567400 3567400 3567100 3567100 3566800 3566800 3566500 3566500 3566200 3566200 3565900 3565900 524700 525000 525300 525600 Map

More information

A. PROJECT LOCATION. B. PERMITTEE (Responsible party for day to day supervision and control of the MANAGMENT PLAN)

A. PROJECT LOCATION. B. PERMITTEE (Responsible party for day to day supervision and control of the MANAGMENT PLAN) Narrative Report Information Worksheet City and County of Denver, Demolition and Construction Activities Stormwater Management Plan (SWMP) Revised 2/12/2013 as entry form A. PROJECT LOCATION Name of Project

More information

REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP

REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP Hydrologic Soil Group-Hillsborough County, Florida (Independence Parkway) 27' 58' 56" 27" 58' 57" 2r 58' 32" 27" 58' 33" Map Scale: 1:5,290 if printed on A size

More information

STORMWATER MANAGEMENT REPORT FOR THE BORGATA OUTDOOR EVENT AREA POOL ADDITION

STORMWATER MANAGEMENT REPORT FOR THE BORGATA OUTDOOR EVENT AREA POOL ADDITION STORMWATER MANAGEMENT REPORT FOR THE BORGATA OUTDOOR EVENT AREA POOL ADDITION City of Atlantic City, Atlantic County, New Jersey Prepared For: Marina District Development Company, LLC One Borgata Way Atlantic

More information

PHYSICAL SOIL PROPERTIES

PHYSICAL SOIL PROPERTIES PHYSICAL SOIL PROPERTIES Physical Soil Properties Santa Cruz County, California Scotts Valley Target Physical Soil Properties This table shows estimates of some physical characteristics and features that

More information

A. Each Contractor shall comply with the requirements outlined in these documents.

A. Each Contractor shall comply with the requirements outlined in these documents. Section 000700 Stormwater Management Plan for Aurora Public Schools PART 1 GENERAL 1.0 DESCRIPTION A. Each Contractor shall comply with the requirements outlined in these documents. PART 2 PRODUCTS Not

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

Stormwater Analysis Report

Stormwater Analysis Report Stormwater Analysis Report Solar Panel Array Temple Street (Rt. 14) West Boylston, MA February 24, 216 SITE Prepared for: West Boylston Municipal Lighting Plant 4 Crescent Street West Boylston, MA 1583

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 99 52' 37'' W Yields of Irrigated Crops (Component): Cotton lint (Lbs) Haskell County, Texas 99 51' 40'' W 33 21' 4'' N 418500 418600 418700 418800 418900 419000 419100 419200 419300 419400 419500 419600

More information

Arvada Plaza Redevelopment. Walmart Store # (Lot 1) Industrial Realty Group, LLC (Lot 2)

Arvada Plaza Redevelopment. Walmart Store # (Lot 1) Industrial Realty Group, LLC (Lot 2) Drainage Analysis Arvada, CO Arvada Plaza Redevelopment Including: Walmart Store #4734-00 (Lot 1) & Industrial Realty Group, LLC (Lot 2) (W 58 th Ave & Independence Street) Arvada, Colorado Preliminary

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction

More information

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406) Public Works Department 201 1 st Ave East Kalispell, Montana 59901 (406) 758-7720 Note: This permit is separate from any permits required by the Montana Department of Environmental Quality. A State Stormwater

More information

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects Stormwater Program Department of Public Works City of Rancho Santa Margarita 22112 El Paseo Rancho Santa Margarita, CA

More information

Construction Site Runoff Inspections and Enforcement

Construction Site Runoff Inspections and Enforcement Construction Site Runoff Inspections and Enforcement Stormwater Program 12/01/11 Table of Contents Introduction... 1 Purpose of Document... 1 Definition of Terms... 1 Compliance and Inspections... 3 Site

More information

Single Family Residential Construction Erosion/Sediment Control Standards

Single Family Residential Construction Erosion/Sediment Control Standards Single Family Residential Construction Erosion/Sediment Control Standards Introduction: This booklet contains standard plans and procedures sufficient for typical building construction. It is not intended

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

New Administration Building

New Administration Building New Administration Building Stormwater Pollution Prevention Plan Hudson Valley Community College Troy, New York Prepared for: Hudson Valley Community College 80 Vandenburgh Avenue Troy, New York 12180

More information

Construction Site Runoff (CSR) Permit Application Permit Fee $150.00

Construction Site Runoff (CSR) Permit Application Permit Fee $150.00 Construction Site Runoff (CSR) Permit Application Permit Fee $150.00 Site Address or Lot and Subdivision: Applicant Name: Applicant s E-Mail: Applicant s Address: Telephone: (office) City, State, ZIP (cell)

More information

STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SIEMENS INDUSTRY, INC. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) COLUMBIA UNIVERSITY/SUN EDISON REMOTE METERING SOLAR ENERGY PROJECT JOHNSON FARM, 121 JOHNSON ROAD CHESTER, NEW YORK 10918 TAX LOT SECTION

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

Appendix B Construction SWPPP Short Form

Appendix B Construction SWPPP Short Form Appendix B Construction SWPPP Short Form Projects falling within the thresholds listed below may use this short form instead of preparing a formal Construction Stormwater Pollution Prevention Plan (SWPPP).

More information

STORMWATER POLLUTION PREVENTION PLAN

STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION PREVENTION PLAN PART I GENERAL PROJECT INFORMATION - To be completed by Owner or Consultant PROJECT NAME: PROPERTY OWNER S NAME: ADDRESS: CITY: STATE: ZIP: PHONE #: FAX #: MOBILE #:

More information

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.) Module 2: Selection of Controls and Site Planning for Construction Site Erosion Prevention Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa,

More information

LAND DISTURBANCE PERMIT

LAND DISTURBANCE PERMIT SPRINGVILLE CITY Application Date: 110 South Main Springville, UT 84663 Permit Number: (801) 491-2780 Caselle #2208 Project Name: Project Address: LAND DISTURBANCE PERMIT Priority Site Owner s Name Phone

More information

Site Description. CCR Rule Initial Inflow Design Flood Control System Plan (cont.) 2

Site Description. CCR Rule Initial Inflow Design Flood Control System Plan (cont.) 2 Site Description Kentucky Utilities Company (KU) owns and operates Ghent Gypsum Stack, a CCR surface impoundment, at the Ghent Generating Station in Carroll County, Kentucky. The impoundment is permitted

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water Storm Water Permitting Requirements for Construction Activities John Mathews Storm Water Program Manager Division of Surface Water Why Permit Storm Water? Impacts During Construction Not an issue until

More information

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Project Name: Page intentionally left blank. - 2 - What is this document for? The City s Phase II MS4 NPDES General Permit

More information

Storm Water Pollution Prevention Plan (SWP3) Checklist

Storm Water Pollution Prevention Plan (SWP3) Checklist . Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:

More information

Erosion Control Inspection Form

Erosion Control Inspection Form Project Name Address Inspection Date Time Name of Certified Erosion Sediment Lead (CESCL) or qualified inspector if less than one acre Print Name: Approximate rainfall amount since the last inspection

More information

Division of Water Quality (701)

Division of Water Quality (701) Division of Water Quality (701) 328-5210 stormwater@nd.gov March April 2018 1 Construction Permit Permit #: NDR10-0000 Reissued April 1, 2015 Expires March 31, 2020 2 Discharges Covered Stormwater Discharges

More information

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number: CITY OF CHICO Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Project Address: Building Permit Number: What is this document for? The City s Phase II MS4 NPDES General

More information

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total

More information

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS 2. Section 2 TW O SECTIONTWO 2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS Unless specifically exempted, all Development Construction Projects will be required

More information

McColl Fence Addition GEOTECHNICAL ASSESSMENT

McColl Fence Addition GEOTECHNICAL ASSESSMENT McColl Fence Addition GEOTECHNICAL ASSESSMENT Prepared For: Stuart McColl 1038 Hooker Road Sequim, WA 98382 SEPTEMBER 2012 Prepared By: Trent T. Adams, EIT Justin C. Wilson, PE NTI ENGINEERING & LAND SURVEYING

More information

Small Site Stormwater Quality Permit Application

Small Site Stormwater Quality Permit Application Small Site Stormwater Quality Permit Application PUBLIC WORKS ADMINISTRATION BUILDING (PWA) STORMWATER DIVISION 2525 WEST FIRST STREET LOVELAND, CO 80537 GENERAL INFORMATION (970) 962-2772 www.cityofloveland.org/stormwater

More information

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE STORM WATER POLLUTION PREVENTION PLAN TEMPLATE Cover Page Certifications Project, Owner, Operator, SWPPP Preparer, Date, Project Dates Signed by RIDOT (Owner) and CONTRACTOR (as Operator) of Contents Introduction

More information

WATER POLLUTION AND EROSION CONTROL NOTES:

WATER POLLUTION AND EROSION CONTROL NOTES: WATER POLLUTION AND EROSION CONTROL NOTES: A. GENERAL: 1. The Contractor is reminded of the requirements of Section 209 Water Pollution and Erosion Control, in the Special Provisions. Section 209 describes

More information

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 Project Address: (305) 593-6700 Permit Number: National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control

More information

Performance Standards Compliance Checklist

Performance Standards Compliance Checklist Truckee Meadows Regional Stormwater Quality Management Program Performance Standards Compliance Checklist The checklist that follows identifies the BMPs that can be used at construction sites to meet each

More information

City of Fort Collins. Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report

City of Fort Collins. Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report City of Fort Collins Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report OCTOBER 2016 VERSION 3 Prepared By: 4582 South Ulster Street, Suite 1500 Denver, CO 80237 Daniel L. Skeehan,

More information

SECTION STORMWATER POLLUTION PREVENTION

SECTION STORMWATER POLLUTION PREVENTION PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02133 STORMWATER POLLUTION PREVENTION A. Prohibit illicit discharge (non-rainwater) into the storm drain system. B. Construct any and all necessary systems to

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES SECTION 11 PART I STORMWATER QUALITY PROTECTION CONTENTS Page 11-1 Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES 11-2 Stormwater Pollution Prevention Plan (SWPPP) 11-3 11-3 Erosion and Sediment

More information

AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA Fax Paradox Seed Mother Orchard Red Bluff, CA

AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA Fax Paradox Seed Mother Orchard Red Bluff, CA AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA 96080 530-529-4400 Fax 530-527-5042 Paradox Seed Mother Orchard Red Bluff, CA AG-LAND INVESTMENT BROKERS 275 Sale Lane / P. O. Box 896 Red Bluff,

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

WAKULLA SITE PLANNING

WAKULLA SITE PLANNING WAKULLA CIVIL SURVEYING SITE PLANNING TRAFFIC CONTROL PLAN WAKULLA ARRAN ROAD WIDENING & RESURFACING UTILITY CONTACT LIST NO. DATE: APPR. REVISION: DATE: CIVIL SURVEYING SITE PLANNING GENERAL NOTES WAKULLA

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

Watershed Delineation Techniques

Watershed Delineation Techniques Watershed Delineation Techniques Stacy D. Dehne DATCP Engineer February 2008 1 What Is a Watershed? An Area of Land that Drains to a given location February 2008 2 Contour Map Features Contour Maps: Represent

More information

D EROSION AND SEDIMENT CONTROL. Table of Contents

D EROSION AND SEDIMENT CONTROL. Table of Contents Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2

More information

DIVISION of WATER QUALITY NDPDES PROGRAM

DIVISION of WATER QUALITY NDPDES PROGRAM DIVISION of WATER QUALITY NDPDES PROGRAM THIS PAGE IS NOT PART OF ANY SWPPP CONSTRUCTION Storm Water Pollution Prevention Plan * SWPPP Template (2016-01) A SWPPP must be prepared and implemented for all

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

EROSION CONTROL AND GRADING PERMIT APPLICATION

EROSION CONTROL AND GRADING PERMIT APPLICATION EROSION CONTROL AND GRADING PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT 1735 MONTGOMERY STREET OROVILLE, CA 95965 530-538-2420 FAX (530) 5382426 www.cityoforoville.org APPLICATION DATE PERMIT FEE

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

Home Remodeling Projects

Home Remodeling Projects Should your project require a Standard Urban Stormwater Mitigation Plan (SUSMP), please see the City of Pomona s Standard Urban Stormwater Mitigation Plan (SUSMP) Pamphlet Best Management Practices For

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows: DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION 00 91 11.02 ADDENDUM NUMBER TWO June 22, 2016 TO: PLANHOLDERS SUBJECT: PCT TRUCK STAGING PROJECT PROJECT NO. 091606 CONTRACT NO. 070287 This

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY

CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY Activities Information: Project Site Name: Location & Address: City, State,

More information

Planning & Building Department. Requirements for Erosion and Sediment Control

Planning & Building Department. Requirements for Erosion and Sediment Control Planning & Building Department 455 County Center, 2nd Floor Redwood City, California 94063 Tel: 540/863-4161/Fax: 650/363-4849 Mail Drop PLN122 plngbldg@smcgov.org http://planning.smcgov.org Requirements

More information

IN T R A / M IN T R A M

IN T R A / M IN T R A M SPRING MESA SUBDIVISION CONSTRUCTION PLANS A PART OF SECTION 35, TOWNSHIP 2 SOUTH, RANGELINE 70 WEST, 6th. PRINCIPAL MERIDIAN. CITY OF ARVADA, COUNTY OF JEFFERSON, STATE OF COLORADO COVER SHEET MARTIN

More information

Appendix A: SWPPP Template Instructions

Appendix A: SWPPP Template Instructions Appendix A: SWPPP Template Instructions To help you develop the narrative section of your construction site SWPPP, EPA has created this electronic SWPPP template. The template is designed to help guide

More information

APPENDIX I. Plan Reviewer Checklist

APPENDIX I. Plan Reviewer Checklist APPENDIX I Plan Reviewer Checklist PLAN REVIEW CHECKLIST Annual Standards and Specifications The ESC/SWM Plan clearly indicates the version of Virginia Tech Annual Standards and Specifications applicable.

More information

APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS

APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS City of Bradenton January 2017 1 INTRODUCTION This appendix to the City of Bradenton Department of Public Works and Utilities Utility Specifications

More information

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER FOR SPECIAL CONDITIONS AND PERMIT NUMBERING GENERAL NOTES: HOUSE GREEN HOUSE 1900 S. NORFOLK ST. SUITE 350 GARAGE GRADING

More information

Rock Sock (RS) Rock Sock height.

Rock Sock (RS) Rock Sock height. Rock Sock (RS) SC-5 Description A rock sock is constructed of gravel that has been wrapped by wire mesh or a geotextile to form an elongated cylindrical filter. Rock socks are typically used either as

More information

Construction Site Inspections

Construction Site Inspections Construction Site Inspections Keep The Mud Out of The Creek Barry Tonning, Tetra Tech Inspections help to identify and correct problems! Inspection requirements Must inspect site every 14 days (LA) Some

More information

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018 STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -

More information

2010 California Green Building Standards Code. Residential and Non-Residential Development

2010 California Green Building Standards Code. Residential and Non-Residential Development 2010 California Green Building Standards Code Residential and Non-Residential Development Stormwater Management (Site Development) Requirements Engineering, Surveying & Permit Services Department 2700

More information

Module 3 and Module 4 Watershed Analysis and RUSLE Calculation. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Module 3 and Module 4 Watershed Analysis and RUSLE Calculation. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control Module 3 and Module 4 Watershed Analysis and RUSLE Calculation by Presented to: Dr. Pitt Construction Site Erosion Control Department of Civil, Construction, and Environmental Engineering The University

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

City of Daphne Standard Operating Guidance (SOGs) For Storm Drain System Management

City of Daphne Standard Operating Guidance (SOGs) For Storm Drain System Management Standard Operating Guidance (SOGs) For Storm Drain System Management Phase II MS4 Creating a Clean Water Future. Standard Operating Guidance (SOGs) For Storm Drain System Management The City of Daphne

More information

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY 1. PURPOSE: SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY The purpose of this policy is to establish procedures to facilitate compliance with federal, state and local stormwater regulations

More information

Guidance Document for Storm Water Pollution Prevention Plan (SWPPP) Submittal. A2 Plat showing building lot numbers/boundaries and road layout/names:

Guidance Document for Storm Water Pollution Prevention Plan (SWPPP) Submittal. A2 Plat showing building lot numbers/boundaries and road layout/names: Exhibit SW12-3 Page 1 of 10 Guidance Document for Storm Water Pollution Prevention Plan SECTION A CONSTRUCTION PLAN ELEMENTS A1 Plan Index showing locations of required items: The plan index should include

More information

Alapaha Tract. Alapaha Tract. Berrien County GA Acres Par LL 320 LD 5. Date: 6/6/2017. TractName

Alapaha Tract. Alapaha Tract. Berrien County GA Acres Par LL 320 LD 5. Date: 6/6/2017. TractName The 996 Planted Slash was st thinned in 0 TractName Alapaha inch equals 74 miles in = 44,786 ft 0 0 60 Miles :,77,40 The 996 Planted Slash was st thinned in 0 TractName Alapaha inch equals miles in = 6,7

More information

Common Plan SWPPP for

Common Plan SWPPP for Stormwater Pollution Prevention Plan Template (SWPPP) (This SWPPP Template is for the Only, and does NOT address SWPPP requirements found in the CGP.) Common Plan SWPPP for Date 1. Project Information

More information

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering) Compliance Assistance Program Checklist 1 Start of Construction Stormwater Self-Certification Checklist Note: This checklist must be completed and submitted to the DEM no later than 30 days after initiating

More information

STORM WATER MANAGEMENT PLAN FOR LOT 2 BECKETT AT WOODMEN HILLS FILING NO. 3 SHOPS AT MCLAUGHLIN II 7368 MCLAUGHLIN ROAD PEYTON, CO 80831

STORM WATER MANAGEMENT PLAN FOR LOT 2 BECKETT AT WOODMEN HILLS FILING NO. 3 SHOPS AT MCLAUGHLIN II 7368 MCLAUGHLIN ROAD PEYTON, CO 80831 STORM WATER MANAGEMENT PLAN FOR LOT 2 BECKETT AT WOODMEN HILLS FILING NO. 3 SHOPS AT MCLAUGHLIN II 7368 MCLAUGHLIN ROAD PEYTON, CO 80831 OCTOBER 2017 Revised July 2018 PREPARED FOR: TBONE CONSTRUCTION

More information

Regulatory Requirements

Regulatory Requirements 7B-1 Design Manual Chapter 7 - Erosion and Sediment Control 7B - Regulatory Requirements Regulatory Requirements A. National Pollutant Discharge Elimination System (NPDES) The Clean Water Act established

More information

SITE DESIGN ENGINEER'S STATEMENT:

SITE DESIGN ENGINEER'S STATEMENT: SITE DESIGN ENGINEER'S STATEMENT: THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO THE CRITERIA ESTABLISHED

More information

Stormwater Management Plan For Lemay Avenue Craft Brewery & Self-Storage Facility

Stormwater Management Plan For Lemay Avenue Craft Brewery & Self-Storage Facility For Lemay Avenue Craft Brewery & Self-Storage Facility March 2016 Prepared for: Fort Collins Self-Storage, LLC 5013 Bluestem Court Fort Collins, CO 80525 Prepared by: JR Engineering, LLC 2900 South College

More information

FORT COLLINS STORMWATER CRITERIA MANUAL Construction Control Measures (Ch. 4) 1.0 Introduction

FORT COLLINS STORMWATER CRITERIA MANUAL Construction Control Measures (Ch. 4) 1.0 Introduction Chapter 4: Construction Control Measures Contents 1.0 Introduction... 1 2.0 Scope of Applicability... 1 2.1 Exemptions to the Scope of Erosion Control Requirements... 2 3.0 Erosion and Sediment Control...

More information

Guidance on each of the 23 basic elements follows: Plan Index showing locations of required items: The plan index should include a list of the

Guidance on each of the 23 basic elements follows: Plan Index showing locations of required items: The plan index should include a list of the Guidance on each of the 23 basic elements follows: A1 Plan Index showing locations of required items: The plan index should include a list of the required items in the rule and where they occur in the

More information

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION CITY OF JENKS EARTH CHANGE PERMIT APPLICATION Any applicable State or Federal permits must be attached to this application or must be applied for with copies attached to this application if this permit

More information

Storm Water Pollution Prevention Plan for CES Gravel #3800

Storm Water Pollution Prevention Plan for CES Gravel #3800 David Lewis Cell: (870) 310-2757 Rickey Vaughn Cell: (870) 310-9602 Buddy McAdams Cell: (870) 310-8733 Local (870) 881-8830 Fax: (870) 881-8809 LICENSED, BONDED & INSURED Howard Cupp, Jr. Cell: (870) 314-2877

More information

City of Tacoma Surface Water Management Manual

City of Tacoma Surface Water Management Manual City of Tacoma Surface Water Management Manual Volume IV Source Control BMPs Prepared by: Tacoma Public Works Environmental Services January 2003 Table of Contents Chapter 1 Introduction to Volume IV...

More information

Escondido Best Management Practices (BMP s)

Escondido Best Management Practices (BMP s) Escondido Best Management Practices (BMP s) GROUNDS MAINTENANCE & GOOD HOUSEKEEPING Regularly dry sweep paved areas including parking lots, outdoor areas and dumpster areas. Do NOT use a hose. Collect

More information

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ *THE BELOW NOTES ARE COMMONLY USED IN SE&SC PLAN APPLICATIONS THE NOTES MAY BE EDITED AS APPROPRIATE FOR PROJECT BEING DEVELOPED

More information

Civil Engineering Land Surveying Wetland Science

Civil Engineering Land Surveying Wetland Science Civil Engineering Land Surveying Wetland Science July 5, 2017 Town of Littleton Conservation Commission c/o Amy Green, Conservation Coordinator Shattuck Street Municipal Building 37 Shattuck Street Littleton,

More information

ATTACHMENT C RISK LEVEL 1 REQUIREMENTS

ATTACHMENT C RISK LEVEL 1 REQUIREMENTS ATTACHMENT C RISK LEVEL 1 REQUIREMENTS A. Effluent Standards [These requirements are the same as those in the General Permit order.] 1. Narrative Risk Level 1 dischargers shall comply with the narrative

More information

CHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN

CHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN CHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN Chapter Organization 9.1 Purpose... 9-1 9.2 Applicability... 9-1 9.2.1 Exemptions... 9-2 9.3 Design Criteria... 9-3 9.4 Erosion and Sediment Control (ESC)

More information