1 CHAPTER-1 INTRODUCTION PREAMBLE: The Ministry of Environment & Forest has recently amended its Environmental Impact Assessment Notification vide S.O. 60(E) dated , covering the following Projects: 1. Town Ships 2. Industrial Town Ships 3. Settlement Colonies 4. Commercial Complexes 5. Hotel Complexes 6. Office Complexes etc The proponents of the above projects will be required to obtain Consent for Establishment (CFE) and Environmental Clearance from Ministry of Environment and Forests (MOEF) under the following circumstances. 1. The Contributing Population of the modified Project is 3490 persons. 2. The Domestic Wastewater (Domestic Sewage) discharged from the modified project is 4, 71,150 Ltrs/day. 3. The Investment on the proposed project is 75 Crores. This amendment to the EIA Notification is effective from Therefore such projects coming under the preview Amended Notification of EIA is required to carry out. Rapid Environmental Impact Assessment studies to ascertain Environmental Impacts of the proposed establishment. It is also necessary for such projects to present before public hearing to ascertain the response of public for the project.

2 1.1 BACK GROUND OF THE PROJECT: We have been obtained Environmental Clearance for Residential Apartment, letter No. SEIAA: 176: CON: 2012 Dated 7 th March 2013 consisting of 590 flats with built up area 94,148 Sq. Mts. Now, we have applied for Modification of Residential Apartment of 698 Flats at khata no. 1531/34/12, 34/13, 34/11, 34/10, 34/9 & Sy. No. 34/9, 34/10, 34/11, 34/12, 34/13 at Junnasandra Village, Varthur Hobli, Bangalore East. The project consists of 698 Residential flats. The total plot area of the residential apartment is Sq. Mtrs with a built up area of Sq. Mtrs with plot coverage area of Sq. Mtrs (16.09%). The paved area available is Sq.mts (26.53%), green belt area is Sq. Mt. (52.38%) and Civic Amenities is Sq. Mts (5.00%). The project consists of residential units with modern facilities like, Swimming pool & Gym facility. The source of water is tertiary treated water for construction purposes. In future the source of water is from BWSSB for domestic purposes. Power from BESCOM. The project has been designed in accordance with the regulations/by law of Bangalore Development Authority (BDA).

3 Salient Features Comparison of EC Sl. No Description As per Previous EC Present/As per Modification 1. Usage For Residential For Residential 2. Built Up Area in Sq. Mt 94,148 Sq. Mts 94,148 Sq. Mts 3. No. of Flats 590 Flats 698 Flats 4. Power in KVA 500 KVA-1No, KVA KVA-2 No, 250 KVA- 1No, 200 KVA-2 No 5. Water Consumption in KLD KLD KLD 6. Waste STP in KLD KLD 450 KLD 7. No. of Cars 800 Cars 1001 Cars 8. Investment Cost 72 Crores 75 Crores

4 AREA STATEMENT: Description Area (Sq. Mts) Total Site Area Sq. Mts Permissible FAR 2.25 Permissible FAR area Sq. Mt Net FAR area Sq. Mt FAR achieved 2.24 Height of Building 44.9 m (B+G+14) Total number of units 698 Total number of floors B2+B1+G+14 Floors

5 Statement for Number of Flats Non FAR Area SL. No Floors Gross Area Sq. Mt Deduction s Ducts & Net BUA Lift/ Stair case Parking Total Net FAR area No. of Unit EWS Allocatio n cutouts s 1 Basement Basement Ground floor First Floor Second Floor Third Floor Fourth Floor Fifth Floor Sixth Floor Seventh Floor Eight Floor

6 12 Ninth Floor Tenth Floor Eleventh Floor 15 Twelfth Floor Thirteenth Floor 17 Fourteenth Floor 18 Terrace Floor Total

7 Car Parking Details: No. of Cars Provided Basement No. of Cars Provided Basement Total 1001

8 1.2 PROJECT GLANCE ESTABLISHED PROJECT LOCATION Construction of Modified Residential Apartment M/s. Klassik Landmark At Khata No. 1531/34/12, 34/13, 34/11, 34/10, 34/9 & Sy. No. 34/9, 34/10, 34/11, 34/12, 34/13 at Junnasandra Village, Varthur Hobli, Bangalore East. TOTAL PLOT AREA TOTAL BUILT UP AREA PLOT COVERAGE AREA PAVED AREA GREENBELT AREA CIVIC AMENITIES FAR (FLOOR AREA RATIO) ACHIEVED TOTAL PROJECTED PROJECT COST NUMBER OF FLATS & FLOORS CIVIC AMENITIES WATER SUPPLY SANITATION SOLID WASTE MANAGEMENT Total Site Area Sq. Mt with a Built up area of Sq.Mt 44, Sq. Mt 94,148 Sq.Mt Sq.Mt (16.09%) Sq.Mt (26.53%) Sq.Mt (52.38%) Sq.Mt (5.00%) Crores Total number of Flats : 698 Total number of floors: B2+B1+G+14 Floors Swimming pool, with Gym, Indoor game facility. BWSSB Install Sewage Treatment Plant of Capacity KLD (450 KLD) Provided organic waste converter.

9 The total quantity of the domestic sewage generated from residential apartment works out as follows. Total number of residential flats : 698 Anticipated population of the apartment considering average of 5 persons per flat : 698x5 = 3490 As per IS : domestic water demand is assumed as: 135 lpcd Total water consumption from the apartment = 698x135=4,71,150 Lts/Day Assuming that about 90% of water Quantity of sewage generated from the apartment: 4,24,035 Lts/day (flow period is about 16 hours) Total quantity of sewage generated from the apartment: KLD For design purposes we consider KLD (450 KLD capacity of STP)

10 1.3. PROJECT SETTING: The project proponents especially those who intend to residential apartment will usually identify certain basic factors while selecting the site for the project. Such factors are usually related to the titles of the property, commercial viability in terms of the marketability of the flats, which mainly depends on the location of the proposed residential apartment. In addition to this the Environmental Setting of the proposed location also is a factor while deciding the site for such project. The site selection criteria also including the selection of such a location which is close to the city of Bangalore and also the project is coming up along the road which connects Kaikondanahalli/ Junnasandra Village which connects Sarjapur road which in turn connects to Hosur road Bangalore etc. From the view point of environmental factors any site located in a residential area will be feasible with established basic infrastructure in terms of the roads, power supply, water supply and sanitation facilities being available, thereby reduces additional burden on such establishments. As far as the environmental setting is concerned the proposed location of the proposed project with mixed pattern of land use is observed with residential, commercial, industrial areas observed along the surrounding of the Junnasandra road( adjacent to the project site) Sarjapur, Varthur, Bellandur, Whitefield, Koramangala etc within the surrounding of the project site. The general topographical feature of the area reveals that the proposed project site and its surroundings is generally a plain land with residential, commercial and very few agricultural patches. The soil nature is observed is generally sandy loamy soil.

11 This plot is located at an elevation of about 905 m above Mean Sea Level (MSL). The climatic condition is temperate (Semiarid) with moderate annual rainfall of 800 to 1000 mm. CHAPTER-2 BASELINE ENVIRONMENTAL STUDIES 2.1. PROJECT RELATED ENVIRONMENT a) Air Environment. As a preliminary study to ascertain basic facts about the project a reconnaissance survey is carried out. Details about the general topography, nature of soil, water sources etc were observed. In addition to this information were collected by reviewing the available data and literature. To assess the base line Air Quality surrounding the project site it was decided to carry out the ambient air quality monitoring studies, Future the ambient air quality monitoring stations were identified based on various environmental and other related factors. The period for monitoring was selected based on the season of the year and the monitoring were conducted using the standard protocol with High Volume Air Sampler (Envirotech), the random samples were picked disturbed fairly uniform during the monitoring period and the duration of sampling was for 24 hours as per the guidelines of CPCB. Meteorological data for parameters like speed of wind, its Direction, Ambient temperature levels, Relative Humidity were collected for the project site. These data were used for interpretation of baseline ambient air quality and prediction of impacts due to project.

12 b) Noise Environment To ascertain the base line status of ambient air quality w.r.t Noise around the proposed project site noise level monitoring were carried out using the portable noise-measuring instrument. The spot noise levels were also monitoring at different location surrounding the project site based on the noise influencing factors like the movement of vehicular traffic, construction activities and other metrological factors the results are presented in Table. c) Water Environment As a preliminary part the reconnaissance studies included identification of available fresh water source i.e. ground or surface in study area. Analysis of raw water samples from bore well sources, surface sources (Lakes) in the study area were conducted and analyzed for physicochemical and bacteriological characteristics as per IS 10500/1991 to determine general characteristics of such sources. d) Land Environment A reconnaissance survey of the study area was carried out to ascertain the Geo & Topographical features of the study area. Since the terrestrial environment is prone to be affected due to deposition of atmosphere pollutants, contaminated runoffs. However, the proposed activity planned envisages utility of its treated wastewater for On-land irrigation for gardening within its own premises. Soil samples were also collected within the proposed project site to ascertain the soil nutrient levels, its characteristics and nature. e) Biological Environment The baseline data to ascertain the status on flora & fauna in the study area was established by collection of the relevant data; the detail was collected from the past records available and by verbal enquires within the surrounding areas of the project site.

13 2.2. ENVIRONMENTAL FEATURES Land Availability & Land use pattern: The total plot Area of the project is about 44, Sq. Mt and is close to the city of Bangalore and also project is coming up along the road which connects Sarjapur road which in turn connects to Hosur road Bangalore etc. LAND USE PATTERN: The land around the project site indicates a mixed land use pattern with residential, commercial, slightly industrial establishments and agricultural patches within the study area. Transportation: This area where the residential apartment project is well connected to Bangalore city, Whitefield, Old Airport road, Old Madras road and new air port via Whitefield. Agricultural Land: There are very few farming activities observed along the road that leads to surrounding areas such as Sarjapura, Varthur, Bellandur, Hosur road etc. Forest: No major forests blocks are observed in the surroundings of the project study area. Water Bodies: There is no major water course within the study area.

14 The Land available for the modified Residential Apartment & the land use pattern of this plot is tabulated below as Table: 2.1 SL. No Particulars Area in Sq.mts Percentage 1.0 Total Plot Area 44, Sq. mtrs Total Built up area 94,148 Sq. mtrs --- for 698 Nos 3.0 Paved area Sq.mts Greenbelt area 23, Sq.mts Plot coverage area Sq. mts Civic Amenities Sq. mts 5.00 The total area utilization is planned in such a way that recreation facilities, located at an ideal place to ensure utility of the same by the residents of the apartment.

15 Water Consumption The apartment being a residential one, water demand is for domestic purpose, public uses and fire fighting purposes. It includes the quantity of water required in the houses for drinking, bathing, cooking, washing, etc. The quantity of water required for domestic purposes depends on the habits, social status, climatic condition and customs of the people. In India on an average the domestic consumption of water under normal condition is about 135 liters/ capital/ day, as per IS , the details of the domestic consumption are as follows. Sl No Utility Consumption in Liters per capita per day 1 Drinking 5 2 Bathing 55 3 Cooking 5 4 Washing the 20 Clothes 5 Utensils Washing 10 6 Washing of floor Flushing of Toilets 30 Total 135 The anticipated water demand is worked out by taking into consideration that the apartment is fully developed and the residents have fully occupied their respective flats. The total domestic, public water demand, source of portable water for the proposed apartment is appended in the table. The proponents of the project have identified Bore Well Points (2 NoS) within premises of the plot and it also intends to avail BWSSB connection to cater its domestic water requirements.

16 Capacities of Water Storage Facilities Table : 2.2 SL.No Storage Facilities Quantity Storage Capacity Material of construction. 1.0 Over head water KL RCC storage tank 2.0 Ground level tank KL RCC 3.0 Treated water KL RCC sump 4.0 Rain water KL RCC collection Tank 5.0 Fire fighting tank KL RCC Water supply system The water supply scheme to cater to the public and domestic water requirement of the residential apartment consisted of sourcing pretreated raw water from BWSSB service mains to a common collection facility known as the underground service reservoir. The under Ground Reservoir will be constructed in RCC. The water from the UG sump will be pumped to overhead tank (capacities of UG sumps & OHTs are detailed earlier in the above table) through pipes known as the rising mains. The distribution network is split into different zones depending on the requirements of water and is provided with isolation valves and other various appurtenances to facilitate residual head in the entire distribution network.

17 Source of Water and its Availability: The most important aspect under the water supply scheme is the selection of source of water, which should be reliable and potable. Since no natural source is found near the apartment, the source of water is from BWSSB. Quality & Portability of available water source: The quality of water from BWSSB is good, treated of the same is not envisaged except chlorination. After the treatment of water, it is distributed through a network of distribution system. The distribution system consists of pipes of various sizes, valves, meters, pumps, and hydrants. The pipeline carries water to each and every household. The valves provided in the distribution network will control flow of water through the system. Water meters are provided for every house so that the quantity of water consumed by each of them can be quantified. Fire hydrants are provided to connect water to fire fighting equipments during fire. Quantification of Wastewater: Generally it has been observed that doing all the calculation the quantity of sanitary sewage will be equal to 75 to 80 percent of the total quantity of water supplied to the apartment. Therefore, the total quantity of wastewater generated from the residential apartment is worked out as below.

18 WASTE WATER GENERATION FROM APARTMENT: Total number of residential flats : 698 Anticipated population of the apartment considering average of 5 persons per flat : 698x5 = 3490 As per IS : domestic water demand is assumed as: 135 lpcd Total water consumption from the apartment = 3490x135=4,71,150 Lts/Day Assuming that about 90% of water Quantity of sewage generated from the apartment: 4,24,035 Lts/day (flow period is about 16 hours) Total quantity of sewage generated from the apartment: KLD For design purposes we consider KLD (450 KLD capacity of STP)

19 WATER BALANCE BWSSB First Time Water Requirement 4,71,150 Lts/day Regular Fresh Water Consumption 2,97, Lts/day Total Water Requirement 4,71,150 Lts/day Waste Water Generated 4,24,035 Lts/day 90 % after diversity Recycled Water 1,73, Lts/day 93, Lts/day KLD STP (450 KLD) Available STP water is 4,24,035 Lts/day UGD of BWSSB 1,14, Lts/day (27.0%) Gardening/ Landscaping 1,01,768.4 Lts/day (24.0%) Floor washing of entire surface area of Premises 16,961.4 Lts/day (4.0%) Vehicle Washing 16,961.4 Lts/day (4.0%) Toilet Flushing 1,73, Lts/day (41.0%)

20 Total Water Required: 4,71,150 Lts/day Total waste water generated is 4,24,035 Lts/day Total STP water available is UGD of BWSSB Gardening/ Landscaping Floor Washing Vehicle Washing 4,24,035 Lts/day 1,14, Lts/day 1,01,768.4 Lts/day 16,961.4 Lts/day 16,961.4 Lts/day Toilet Flushing 1,73, Lts/day

21 Typical Sources of Wastewater from Apartments, Its collection & Conveyance System: The Domestic Sewage generated from the individual dwelling units of the apartment (about 698 in number) is conveyed to a full- fledged Sewage Treatment Plant (STP) for its treatment. The STP is designed based on Conventional Extended Aeration Activated Sludge (EAASP) process with preliminary screening, followed by filtration & disinfection. The sufficient land suitable for accommodating the various treatment units has been earmarked at a place where the different domestic sewage is not able to be conveyed by gravity to the sewage treatment plant and the same will be collected and pumped to the treatment plant for treatment. A detailed Technical proposal of the proposed Sewage Treatment plant with Design details and Flow Chart is provided separately. Wastes of different types such as spent water from bath rooms, kitchen, water/ pans, houses and street washings, semi liquid waste of human and animal excreta, dry refuse of house and street sweeping, broken furniture, crockery etc are produced daily. If proper arrangement for collection treatment and disposal of all the wastes produced are not made, unsanitary condition will be developed and it will become impossible for the public to live. Therefore, it is most essential to collect, treat and dispose of all the waste products in such a way that it may not cause any havoc to the people residing in the area.

22 For the disposal of waste products two works are required. 1. Collection works 2. Disposal woks Of the above two methods, the waste carriage system is adopted in the proposed apartment. As in the system water is the main substance for carrying the wastes the system is termed as water carriage system. In this system excremental matters are mixed in large quantity of water and are taken out from the city through a properly designed sewage system. In the end they are disposed off after necessary treatment. The sewage so formed in water carriages system consists of 99.9% of water and the remaining 0.1% of solid matters. The only disadvantages of the system of its high initial cost. The sewerage system are classified as follows 1. Combined 2. Separate 3. Partially separate When only one set of sewers are laid carrying, both sanitary sewage and storm water, it is called combined system. This system is most suited to areas having rain fall in scanty. So that self-cleaning velocity will be available in every season. As only one sewer is laid in this system it can be used in crowed areas also. High degree of sanitation is achieved because of all these advantages. However in areas where there is moderate to heavy rain fall separate system are adopted to carry storm water and domestic sewage. Therefore, this system is adopted in the layout. Any typical residential apartment will be provided with separate system designed to convey

23 sanitary waste from individual flats of the apartment and Rain Water is separately conveyed from roof tops. For conveying foul discharge from water closets and public and domestic buildings, closed conduits are required and these closed conduits are called sewers, and are laid underground. Connections from public, domestic buildings are made to these sewers, which carry foul matter. Sewers should have such cross-section that self-cleaning velocity should be developed even during dry weather flow. PVC pipes of circular section are used in the construction of sewer lines. These pipes are rigid, are resistant to corrosion and abrasion is smooth and durable. Sewer system requires various types of appurtenances for their functioning and maintenance, because if simply sewers are laid straight sewage cannot flow in it continuously for longer time. Therefore for the operation and proper maintenance of sewerages system, various devices such as manholes, lamp holes, street inlets etc are essential. As far as possible sewers are laid straight. At very change of alignment, gradient or diameter of sewer, manholes are constructed for giving access into the sewer for inspection, cleaning, repairs and maintenance. Manholes are masonry chambers, which are constructed on the top sewer. These are fitted with suitable cast iron covers at their top. ISI have recommended that the maximum distance between manholes should be 30 meter and distance between manholes and gully chambers should not exceed 6 meters. After conveying the sewage through sewers the next step is it s disposed of without treatment or after suitable treatment. Since the sewage produced in the residential apartment is mainly domestic sewage, the treatment needed is only preliminary. Preliminary treatment involves

24 racks and screens, floatation tanks, grit chambers and sedimentation tank. After treating the sewage to a satisfactory level, which causes no harm to residents and the surrounding environment, it is disposed to natural nala. For conveying rain water from courts yards, roads, roofs, open grounds etc. Open drain is used and it discharge into public storm water Drains. It is laid on either side of the streets along the boundary walls of apartment. Air pollution: The primary source of air pollution from the establishment are Diesel Generator sets, which are used as an alternative source of power supply during the emergencies of power failure from KPTCL/BESCOM. Noise Generation Sources: Major noise producing sources of the apartment are expected to be DG sets, vehicular movement from and to the apartment. The DG sets are planned to locate in the basement floor of the apartment and it is provided with acoustic enclosures to control the noise levels in such a way that the noise levels are within the permissible limits specified for ambient noise levels. More over the DG sets are operated only during the emergencies when there is power failure. The noise caused due to the vehicle movement can be controlled at individual levels by proper and periodic maintenances and strictly maintaining the calmness of the apartment. ACOUSTICS: The acoustic enclosures are planned to provide for DG sets to control the noise levels dissipating to the surrounding areas. The noise levels while operating the DG sets are expected to be less than 55 db and there by confirms to the standards of ambient noise levels.

25 CHAPTER-3 ENVIRONMENTAL IMPACT STATEMENT 3.1. INTRODUCTION The Environmental Impact Statement (EIS) enumerates the likely environmental impacts due to the implementation of the proposed project on the five basic environmental parameters, which are as below: 1. Air Environment 2. Water Environment 3. Land Environment 4. Noise Environment 5. Biological Environment The impacts on the above parameters have been identified, analyzed and classified as adverse, beneficial impacts in this chapter and the impact matrix is presented later in the report. ACTIONS LIKELY TO AFFECT THE ENVIRONMENT The table presented later enumerates the various activities of the proposed residential apartment which may have certain impacts on the various environmental parameters. The impact matrix appended later identifies all such impacts.

26 AIR ENVIRONMENT The establishment of the project may impose certain impacts on the air environment, which is initially due to the construction activities that are undertaken while implementing the project. This will have marginal impacts on the air environment, which will affect the air quality due to the generation of fugitive dusts on account of movement of the construction materials, actual construction activity and its related works. The generation of fugitive dusts and its effect on the air quality will be temporary phenomena which has to be managed in such a way that the fugitive dusts are not carried for off to farther places. The carryover of Fugitive Dusts will be controlled by resorting to closed construction operations and spraying of water wherever & whenever it is required till the completion of civil work. The movement of trucks and Lorries carrying construction materials may also cause fugitive dusts all along its movement. This will be controlled by conveying sand & jelly sprayed with water, cement covered with polythene bags. Once the construction of the project is completed the operation of DG sets invariably generates gaseous emissions. Such impacts are mitigated by providing suitable stack heights for the diesel generator sets. In addition to this the use of Low sulphur content Ultra pure diesel will reduce the impacts due to emission of oxides of sulphur.

27 WATER ENVIRONMENT The Raw Water requirement for the project is met by the BWSSB. The total water requirement is estimated for the project is estimated at 4,71,150 litres/day. As stated earlier this domestic water requirement is to be met by BWSSB. The water required for construction is mainly for the purpose of curing the masonry and concrete structures of the project. The total water required for the above purpose is expected to be around 25,000 liters per capita per day on an average. The required quantity of water for the purpose is either drawn from BWSSB Grey (STP) Water. There will be discharge of domestic effluents in to public sewer. It will be not any impact of the same on surrounding water quality by Domestic Sewage generated from the residential apartment is ensured. LAND & BIOLOGICAL ENVIRONMENT The residential apartment is being developed in such a way that there will not be any major/ significant changes in land use pattern after establishment of the residential apartment. The proponents of the project are adhering to by law of the BBMP and stipulated setbacks and Floor Area Ratio (FAR) is maintained. The increase in air emission such as PM, SO2 & NOX due to operation of DG sets have a very either no or negligible impact on the surrounding area.

28 SOCIO- ECONOMIC ENVIRONMENT Observation from the demographic description of the study area it is inferred that chief occupation of the residents of the surrounding areas of the project site is dependent on the employment opportunities in Bangalore City and commercial establishments in the surrounding areas. The project would result in creating a few additional direct and in-direct job opportunities and will thereby result in direct employment potential, thus benefiting the local populace in the study area and there will not be any impact on demography/ occupation pattern due to the project. IMPACT MATRIX: Table -B presents the impact matrix for the action identified in Table-A along with various environmental parameters. A rating scale has been devised to give severity of impacts in the following manner. A: Strongly beneficial (positive) impact. B: Low beneficial impact C: Strong adverse (negative) impact D: Low adverse impact (localized in nature) (-): Indicates no conceivable impacts on environment.

29 TABLE-A Actions likely to affect Environment Sl. Actions No I. Construction Phase Envisaged for the following 1 Land Excavation Building Construction 2 Civil Works Construction of Plant, associated building 3 Fabrication and Erection Plant, utilities II. Occupancy Phase 1 When the residential apartment is occupied

30 Table B: Impact Matrix Sl No Environmental Parameters 1.0 Air Environment Ambient Air Quality Suspended Particulars Proposed Actions Excavation Civil Works Fabrication / Erection D D - D Sulphur dioxide D Nitrogen oxides D Carbon Monoxides D 2.0 Water Environment Ground water - Quality/ Availability - - D Surface water - Availability Receiving water - body quality Drainage system Solid waste Land disposal - D - D 4.0 Noise 5.0 Ambient noise - levels - D D Ecological parameters Flora Fauna Aquatic Ecology Human Settlement -Economic Output B B B B -Employment B B B B Opportunity -Occupational Health D - - D - Infrastructure - D D B 7.0 Aesthetics Topography/ skyline D -Visual Air Quality D Visual water - Quality Occupancy Phases Note: A- Strong Beneficial impact, B- Low Beneficial Impact C- Strong Adverse Impact, D- Low Adverse Impact

31 CHAPTER-4 ENVIRONMENTAL MANAGEMENT PLAN (EMP) M/s. Klassik Enterprises Pvt Ltd proposes to develop modified residential apartment M/s. Klassik Landmark at Khata No. 1531/34/12, 34/13, 34/11, 34/10, 34/9 & Sy. No. 34/9, 34/10, 34/11, 34/12, 34/13 at Junnasandra Village, Varthur Hobli, Bangalore East. The proponents of the project have applied for Consent for Modification to Karnataka State Pollution Control Board. An Environmental Management Plan Report has been prepared to assess the possible impacts of the proposed project on the different environmental parameters during the inception and the occupancy phase of the project by developing an Environmental Impact Matrix. Once the impacts are ascertained it is imperative on the part of the establishment to develop and evolve strategies for safe occupancy of the residential apartment from Environmental angle, which necessitates preparation of Environmental Management Plan (EMP). The Environmental Management Plan (EMP) is the road map for implementing mitigation measures to prevent the impact arising from a particular project. The environmental management plan is required to ensure sustainable development in the area of the proposed project. Hence, it needs to be an all encompassive plan for which the industries, government, regulating agencies like pollution control board working in the region and more importantly the population of the area need to extend their co-operation and contribution. It has been evaluated that, the project area will not be affected significantly with proposed project.

32 Mitigation measures at the source level and an overall management plan at the site level are elicited so as to improve the surrounding environment. The following mitigation measures are recommended in order to synchronize the economic development of the project area with the environmental protection of the region. The construction phase impacts are mostly short term, restricted to the plot area and not envisaged on the larger scale. In the operational phase the environmental impacts are due to continuous operation of the project, hence, the emphasis in the Environmental Management plan (EMP) is to minimize such impacts. The emphasis on the EMP development is on the following: 1. Mitigation measures for each of the activities causing the environmental impact; 2. Monitoring plans for checking activities and environmental parameters and monitoring responsibilities; and 3. Role responsibilities and resources allocation for monitoring. OBJECTIVES OF ENVIRONMENTAL MANAGEMENT PLAN Any establishment industrial, Residential or otherwise invariably has certain impacts on the surrounding environment, which may be either beneficial or adverse. Therefore, such establishment will have to develop strategies to tackle adverse impacts of the establishment on the surrounding environment and it becomes imperative on the part of the projects proponents to equip themselves with plans to combat such impacts. A detailed environmental management plan in support of identified environmental impacts has been prepared so as to foresee the environmental problems in the before or at planning stage itself. The advantage of preparation of such a plan at this stage is that the

33 identification of problems at the stage of inception will equip the establishment with alternatives and solution to combat, such problems at the stage of inception only which would be substantially cost effective than evolving such strategies at a later stage. Therefore, this environmental management plan is prepared as a part of REIA and is submitted before the project is started. The secondary objective of preparation of Environmental Management Plan is also to keep the establishment prepared with techniques in tackling the adverse impact on the Environment. SCOPE OF EMP: 1. Collection of data on the baseline environmental quality around the proposed establishment including air, water, noise and land environments. 2. Identification and assessment of potential adverse and beneficial environmental impacts due to the proposed project. 3. Preparation of an EMP to minimize the adverse impacts. 4. Preparation of post project monitoring plan to ensure that the EMP achieves its desired objectives.

34 ENVIRONMENTAL ASPECTS AND MANAGEMENT PLAN DURING THE COURSE OF SETTING UP OF THE PROPOSED RESIDENTIAL APPARTMENT. Environmental Management Plan for the residential apartment and the Environmental Quality Control measures to be adopted during the phase of setting up of the facility and after its occupancy. The following factors will be given due consideration during the course of setting up of the proposed facility to maintain good environmental quality during this phase. AIR ENVIRONMENT The residential apartment project involves construction activities in the initial stages followed by Fabrication, Carpentry, Interior decoration etc during later stages. The construction activity involved obviously results in generation of fugitive dusts. These fugitive dusts are controlled by carrying out construction by covering the boundary of the project site by zinc sheets & polythene covers to a particular height and also by intermittent spraying of water, which reduces controls and prevents fugitive dusts. NOISE ENVIRONMENT As construction is an imperative part of the project there will be some noise generation due to Movement of Vehicles Carrying construction materials. This is a only a temporary phenomena, this shall be managed by properly planning the Movement of Vehicular Traffic so that the ambient air quality with respect to noise is not adversely affected.

35 WATER ENVIRONMENT During the construction of the project and later, the services required like water supply, sewage facilities will be arranged on a temporary basis (By supply through Tankers, BWSSB) and the same will be maintained without any adverse impact on the environment. SOCIO- ECONOMIC ENVIRONMENT The construction of residential apartment will immensely benefit the local populace due to the direct employment opportunities it creates during its implementation and also by way of indirect employment opportunities provided by other associated activities of the project. MANAGEMENT MEASURES FOR FLORA AND FAUNA FLORA: The residential apartment is being developed in an area which is converted land which was earlier vacant land. The project proponents intend to develop good vegetations in the vacant land of the project. The proponents of the project intend to plant saplings along the boundary of the project to provide lung space for the commercial complex. FAUNA: The establishment is coming up in an area which is infrastructurally developed and as the proposed project has not resulted in displacement of native fauna. There is no scope of the management measures for protection of fauna.

36 EMP WHICH HAS TO BE UNDERTAKEN DURING CONSTRUCTION PHASE CAN ALSO BE DESCRIBED AS: In the impact assessment following four activities has been identified as causing impact of different degrees on the environment during construction phase. 1. Leveling and Site clearance 2. Transportation of construction materials 3. Construction activity and 4. Labour camps of construction workers. MITIGATION MEASURES: Each of the above activities during construction phases are critically reviewed for suggestion of mitigation measures. Based on this the following table s gives the mitigation measures for the activities considered to be causing significant environmental impacts during construction phase. In general the best housekeeping practices are incorporated in the design as well as construction phase to reduce the short terms impacts due to construction activities.

37 ENVIRONMENTAL MANAGEMENT DURING LEVELING AND SITE CLEARANCE: As the project location is a vacant land without any habitation and prominent vegetation, there is no rehabilitation and tree felling is envisaged. The superstructures are planned in such a way as not to involve too much earth work for leveling. ENVIRONMENTAL IMPACTS Soil erosion Noise generation: Caused due to excavators and bulldozers. MITIGATION Extent of vegetation removal shall be minimized to prevent extent of soil erosion. Vegetative cover shall be reprojected / rehabilitated at the earliest practicable time to minimize duration and extent of soil erosion. Most optimum no. of operation by the heavy equipment. Selection of equipment with less noise generation to be used. The earth moving equipment shall be periodically checked and maintained for noise levels. Since the site is more or less even use of these earth moving equipments may not be necessary. REMARKS Implementation responsibility; project consultant and during preconstruction and industry during construction phase. To reduce noise level, equipment provided with noise control devices will be used. Implementation responsibility: contractor

38 Dust generation: Leveling operations results in the emission of the dust. The workers shall be provided with adequate PPE such as ear plugs to reduce impact of height noise levels. The site cleared shall be periodically watered to reduce emission of dust particles. The workers shall be provided with PPE such as nose masks and goggles to reduce impact on health. Tertiary treated sewage from BWSSB STP will be used. Implementation responsibility: contractor

39 EMP FOR CONSTRUCTION PHASE IMPACTS TRANSPORTATION OF CONSTRUCTION MATERIALS During the transportation of construction materials, minimum no. of vehicles is used. Most optimum route is planned to reduce the impact of transportation activity on the environment. It is estimated that around 15 vehicle trips will run per day for the transportation of raw materials. As the existing traffic in the approach road is not significant, this additional traffic would not create any hassles. Also the raw materials will be transported during less traffic hours.

40 ENVIRONMENTAL MITIGATION IMPACTS Noise generation Quality fuel is used. Periodic maintenance of vehicle is required Dust generation Quality packaging of the construction materials Construction materials shall be covered with tarpaulin sheets to prevent the material from being air borne The vehicle speed shall be regulated The workers transporting material shall be provided with PPE such as nose masks to reduce impact of air borne dust on their health. Vehicular Periodic emission check for emissions vehicles is required Clean fuel shall be used for vehicles REMARKS Implementation responsibility : Contractor Implementation responsibility : Contractor Implementation responsibility: contractor

41 EMP FOR CONSTRUCTION PHASE IMPACTS CONSTRUCTION ACTIVITIES During the construction work, the following impacts are identified to monitor and mitigate the level of impact. Environmental impacts Noise generation Mitigation Selection of less noise generating equipment. Personal protective equipment(ppe) such as ear plugs and helmets shall be provided for construction workers Remarks Implementation responsibility: Contractor Dust generation The working hours shall be imposed on construction workers PPE in the form of nose masks shall be provided for construction workers Implementation responsibility: Contractor Air Emissions from construction machinery Use of water sprays to prevent the dust from being air borne Periodic check and regular maintenance of construction machinery for emissions. Clean fuel shall be used in equipments Implementation responsibility : Contractor

42 EMP FOR CONSTRUCTION PHASE IMPACTS LABOUR CAMPS The sewage generated from the labour camps during construction is estimated to be about 10.0 Lt/Capita/Day. This will be treated in septic tank and soak pit in the proposed project. Environmental impacts Domestic Wastewater generation Usage of water Solid waste generation Mitigation Provision of adequate sanitary facilities Sewage will be treated in septic tank and soak pit. Water for labour camps shall be supplied in required quantities and from BWSSB supply. Segregation of dry waste and wet waste Adequate facilities to handle solid wastes shall be provided and the biodegradable portion will be sent for proposed composting unit. Remarks Implementation responsibility : Project authority Implementation responsibility : Project authority Implementation responsibility : Project authority Recycling of recyclable wastes such as plastics, metals etc.

43 DISPOSAL OF EXCAVATED EARTH: The excavated earth which is generated during construction will be used for backfilling and development of landscape and the surplus quantity would be transported to the designated sites for land filling. Personnel safety system: It is planned to adopt the safe working practices which shall govern all construction works undertaken throughout the project. Following safety aids to all laborers will be provided. Safety helmets Safety belts Safety shoes Hand gloves Gumboots while concreting Safety goggles while welding/ stone dressing etc. Face masks and full body kit while pest control. Implementation of safety procedures such as: Using proper lifting techniques Using safe scaffolds Hot work permits for fabrication and welding

44 ENVIRONMENTAL ASPECTS AND MANAGEMENT PLAN DURING OPERATIONAL OR OCCUPATIONAL PHASE: Air Environment. The occupational or operational phase of the apartment will result in marginal impact on the air quality due to operation of DG sets. DG sets of capacities 1640 KVA of one number are planned to install as alternative or back up source of power supply. These DG sets are operational whenever there is break down in power supply form BESCOM and therefore will result in gaseous emissions such as NOX, SOX and also particulate emissions (PM), which is controlled by using ultra pure low sulfur content diesel. The DG exhausts is net out through a stack of height above the building Terrace Level. The stack will be provided with portholes, access ladder common chimney of 10 feet above roof level and platform to enable monitoring of emissions if required. Noise Environment The main source of noise generation in the plant during occupational phase is DG sets. DG sets are housed in an isolated, acoustically enclosed area so that the noise is dissipated before it is propagated to the surrounding areas. The DG operator will be provided with earplugs to prevent direct exposure to noise.

45 Water Environment The total water requirement to meet the domestic consumption of this project is about 4,71,150 litres/day., which will be derived from the BWSSB. Adequate water storage facilities shall be provided to store the water within the premises so that the portable water supply is ensured to the individual residential units. Domestic Sewage & its Disposal Details The domestic sewage generated from the residential apartment is conveyed to the Sewage Treatment Plant designed based on Extended Aeration Activated Sludge Process (EAASP) with primary, secondary and tertiary treatment units. The detailed proposal for the treatment of the domestic waste and disposal options is presented in a separate section. SOLID WASTE: A. Secondary Sludge from STP The solid waste generated from the apartment is in the form of stabilized secondary sludge from the plate & frame filter press of the sewage treatment plant, the solids obtained as semi slid cakes are used as organic manure for the development of plantations within the premises of the residential project. The quantity of secondary sludge from the secondary settling units of the treatment plant is calculated as below. Basic Assumptions: Assumed type of sludge :Secondary Biological Concentration of Solids:1% Specific Gravity:1.2 Minimum Dry solids Allowable in the sludge solid cake: 25-30%.

46 Sludge cake characteristics: Cake thickness :32mm Wet cake density:1280 Kgs/m3 Cycle time Feed:20 minutes Compression:15 minutes Cake Discharge:25 minutes Total :60 minutes Daily Sludge Solid generation = 70 Kgs/day.

47 B. Refuse or Garbage The residential apartment generates refuse or garbage from individual units, which are mostly organic or biodegradable in nature and to some extent also inorganic in nature. The quantity of refuse or garbage expected from the residential apartment will about 1396 Kgs/Day. The organic refuse about Kgs/Day (60%) of the total Solid Wastes generated mainly consists of the vegetable cuttings; peel off, paper cutting and other waste. The inorganic refuse about Kgs/Day(40%) of the total solid generated consists of non biodegradable waste such as plastics, rubber and any other solid waste such as aluminum foils, plastic cans etc. The above wastes are separately segregated during its generation itself and the waste is collected in separate color-coded bins. We proposed to provide organic waste convertor to treat the organic waste in our own premises. The manure produced from the organic waste convertor will be utilized for lawn and gardening purposes in our own premises, and the remaining manure will give it to nearby farmers. The inorganic waste will be sent to authorize reprocessors. A committee of the residents of the apartment will be formed to monitor and look after the collection and disposal of the solids wastes from the apartment in such a way that it is scientifically disposed without causing the eyesore or adverse effect to the surrounding environment. A nominal charge will be collected from the individual households to wards to management & disposal of solid wastes by the committee.

48 GREEN BELT DEVELOPMENT The residential apartment will be located in total plot area 44, Sq. Mt. Built up area is 94,148 Sq.Mt. Available Greenbelt area is Sq.Mt. The proponent of the project is proposed to utilize this land development of greenery and vegetation. The hydraulic load computation is worked out and the same is appended later in the report. Vegetation is the natural extension of the soil ecosystem on a site. It can provide summer shade, wind protection and a low-maintenance landscape that is adapted to the local environment. Unfortunately, the common practice is to remove the existing landscape cover and replace with a generic, water and maintenance intensive lawn. Following approach will be adopted for vegetation and ground management. It is planned to include an ecologically knowledgeable landscape architect as an integral member of the design team. Preservation of existing vegetation, especially native plants. Avoid fencing off property where possible to make landscape available to community increasing project integration. Decrease paving and monoculture lawns. Avoid replacing mature trees with young seedlings. Protect existing plants during construction. Delineate the drip line around trees and demark or fence off areas to avoid damage. Contain heavy equipment and stockpiling areas to predefined areas. Design new plantings as diverse communities of species well adapted to the site. Plant native species of varying ages. Planting of medicinal plants and local fruit bearing species such as Neem, Honge, Maavu, Jackfruit should be preferred. Avoid invasive species and monocultures (same species, same age)

49 EMP WHICH HAS TO BE UNDERTAKEN DURING OPERATION PHASE CAN ALSO BE DESCRIBED AS: Following are the identified operational phase activities in the impact assessment chapter that may have impact on the environment. 1. Air quality; 2. Water quality; 3. Noise quality; 4. Solid waste disposal; 5. Green belt development. 6. Storm water management, and 7. Vegetation and ground management. The pollutants envisaged from the proposed project are PM10, PM2.5, SO2, NOX, HC and CO mainly due to burning of liquid fuel (HSD) in DG. Exhaust from DG set will be emitted from stack of adequate height for dispersion of gaseous pollutants. The green belt development is also proposed covering about more than 33% of the plot area. Following table presents the EMP for air quality management during operation phase.

50 MANAGEMENT OF AIR QUALITY DURING OPERATIONAL PHASE Environmental impacts DG set Mitigation Equipment selected will ensure the exhaust emission standard prescribed as per the latest amendments from the MOEF. DG will be used as stand-by unit periodic check and maintenance Ambient air quality Ambient air quality monitoring as per the prescribed norms at regular interval.

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following; ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following; ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE

ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following; ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

Municipal solid / hazardous waste

Municipal solid / hazardous waste (10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Conceptual plan Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Area of plot= 5293SQM, Sanctioned FAR = 10586SQM as per earlier sanctioned.(2) Sanctioned Built up Area=19480.63

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

BRIGADE MIXED USE DEVELOPMENT

BRIGADE MIXED USE DEVELOPMENT BRIGADE MIXED USE DEVELOPMENT Terms of Reference (TOR) At Sy. No. 171/1, 171/2, 171/3, 171/4, 172, 173/1, 173/2, 173/3, 183/2, 183/3, 183/6A, 183/6B, 183/7, 183/8, 183/9, 183/11 and 184/1(P) Varthur Village,

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the construction and

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan 10.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality.

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Thus, EIA is not applicable for proposed project. We have derived project

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN For SOWPARNIKA SAMETHANA M/s SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT LTD Sy No.57/1,57/2 & 277 of Anugondanahalli hobli, Samethanahalli village,hoskote Taluk, Bangalore

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan Of Dr. Mittal Laboratories Pvt. Ltd. Plot No. C-10/2, SARA Industrial Estate Ltd., Village Rampur, Dehradun - Chakrata Road, Selaqui, Dehradun, Uttrakhand For Manufacturing

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5

More information

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated 10.08.2009 Period : January 2018 to June 2018 Sl.No. CONDITIONS STIPULATED BY MoEF COMPLIENCE Specific Conditions

More information

Indicative Checklist for construction projects of EC [Category 8(a)]:

Indicative Checklist for construction projects of EC [Category 8(a)]: Indicative Checklist for construction projects of EC [Category 8(a)]: Sr. Checklist point Remark Yes/No Pg. no./ annexure 1. Covering letter signed by the applicant Yes Form-1 Page 1 page 13 2. Completed

More information

No construction activity started

No construction activity started Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) [Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017 COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER - 2016 TO MARCH-2017 F.No. SEIAA 281/2014/EC/110 SUBMITTED BY- M/S. TERON CONSTRUCTION PVT. LTD MAA PADMA COMMERCIAL COMPLEX, H/N-

More information

GENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005.

GENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005. GENERAL CONDITIONS 1. The Project Proponent shall comply with all the conditions stipulated in the building approval letter. 2. The applicant (Project proponent) will take necessary measures for preventions,

More information

Application of Low and Non Waste Technology in the production process;

Application of Low and Non Waste Technology in the production process; 9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management

More information

Environmental Management Plan during Construction Phase

Environmental Management Plan during Construction Phase Management Plan during Phase Sr 1 Ambient Air Quity Negative inside site premises outside site 2 ise Negative near noise generation sources inside premises on ambient noise levels in the Surrounding area

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003) Proposed Revision To: Standard Specifications For Public Works Construction Standard Plans For Public Works Construction Public Works Standards, Inc. AGC Southern California Regional Office 1906 West Garvey

More information

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016 CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified

More information

BRIGADE RESIDENTIAL DEVELOPMENT

BRIGADE RESIDENTIAL DEVELOPMENT BRIGADE RESIDENTIAL DEVELOPMENT Terms of Reference (TOR) At Plot No. R5 and Plot No. R8, Hi Tech, Defense and Aerospace park (Hardware Sector), KIADB Industrial Area, Jala Hobli, Yelahanka Bengaluru North

More information

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Design of Sewerage System for Jaffarpur area in Southwest New Delhi International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for

More information

TATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018)

TATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018) TATA STEEL LIMITED Construction of Residential Complex For Tata Steel Plant located at Kalinganagar Industrial Complex, at Environment Compliance Report (Oct 2017 to Mar 2018) Environment Department Tata

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect

More information

COMPREHENSIVE PROJECT REPORT FOR PROPOSED Training Center - TVS Institute for Quality and Leadership

COMPREHENSIVE PROJECT REPORT FOR PROPOSED Training Center - TVS Institute for Quality and Leadership COMPREHENSIVE PROJECT REPORT FOR PROPOSED Training Center - TVS Institute for Quality and Leadership At Survey Nos. 63, 64/1, 64/2, 64/3, 65/1, 65/2, 66, 67, 68, 69/1, 69/2, 69/3, 69/4, 70/1,70/2, 71/3,75,

More information

Sewage Treatment - overview

Sewage Treatment - overview Foundation for Water Research 2005 Information Note FWR - WFD15 Sewage - overview Introduction Mains water supplied to households is used for many purposes, other than drinking and food preparation, notably

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information

FEASIBILITY REPORT ON SEWAGE TREATMENT PLANT ARCHITECTS PHE CONSULTANTS

FEASIBILITY REPORT ON SEWAGE TREATMENT PLANT ARCHITECTS PHE CONSULTANTS Uttarahalli village, FEASIBILITY REPORT ON SEWAGE TREATMENT PLANT FOR M/s. PRESTIGE ESTATES PROJECTS LTD, BENGALURU PROJECT : DEVELOPMENT OF RESIDENTIAL APARTMENT BEARING SY. Nos. 115,116 & 117 AT UTTARAHALLI

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In earlier project planning the total plot area

More information

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra.

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Pre- feasibility Report For Shiv Kailasha At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Proposed By M/S Om Shivam Buildcon Private

More information

ENGINEERING STANDARD FOR DRAIN AND SEWER SYSTEMS OUTSIDE BUILDINGS FIRST EDITION NOVEMBER 2013

ENGINEERING STANDARD FOR DRAIN AND SEWER SYSTEMS OUTSIDE BUILDINGS FIRST EDITION NOVEMBER 2013 ENGINEERING STANDARD FOR DRAIN AND SEWER SYSTEMS OUTSIDE BUILDINGS FIRST EDITION NOVEMBER 2013 This Standard is the property of Iranian Ministry of Petroleum. All rights are reserved to the owner. Neither

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

PRE-FEASIBILITY REPORT OF A RESENTIAL APARTMENT PROJECT

PRE-FEASIBILITY REPORT OF A RESENTIAL APARTMENT PROJECT PRE-FEASIBILITY REPORT OF A RESENTIAL APARTMENT PROJECT AT Survey No 3, Sampigehalli Main Road Yelahanka Hobli Bangalore North PREPARED BY: M/S Seamak Hi-tech Products #797, 1 st cross, 12 th Main, HAL

More information

ANNEXURE-II CONSENT TO OPERATE AND ITS COMPLIANCE

ANNEXURE-II CONSENT TO OPERATE AND ITS COMPLIANCE AII-1 AII-2 AII-3 AII-4 FERRO MANGANESE PLANT, JODA CONSENT FOR EXISTING/NEW OPERATION OF THE PLANT (Under Sec.21 of the Air (Prevention and Control of Pollution) Act, 1981 Consent Details of the Consent

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report. The proposal under consideration, Regularization of Existing Resort at Sidheshwarwadi, Village Ubhadanda, Taluka Vengurla, Dist. Sindhudurg is located in CRZ III area having total plot area of 4000 m 2,

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION 1.1 PREAMBLE Environmental Protection and Sustainable development have been the cornerstones of the policies and procedures governing the residential, commercial, industrial and

More information

Details of Project. Underground source

Details of Project. Underground source Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126,

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT Office Complex at Plot No. 5A & 5B, Shopping Mall, Vasant Kunj Phase - II, New Delhi Developed by M/s Oil and Natural Gas Corporation Limited BRIEF DESCRIPTION OF THE PROJECT

More information

Department of Ecology and Environment Room No.709, 7 th Floor, IV-Gate, M.S. Building, Bangalore ,

Department of Ecology and Environment Room No.709, 7 th Floor, IV-Gate, M.S. Building, Bangalore , No. SEIAA: 7 : KAR: 2007 STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, KARNATAKA (Constituted by Ministry of Environment & Forests, Government of India) Department of Ecology and Environment Room

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

ENVIRONMENTAL GUIDELINES FOR PREVENTION AND CONTROL OF FUGITIVE EMISSIONS FROM CEMENT PLANTS

ENVIRONMENTAL GUIDELINES FOR PREVENTION AND CONTROL OF FUGITIVE EMISSIONS FROM CEMENT PLANTS ENVIRONMENTAL GUIDELINES FOR PREVENTION AND CONTROL OF FUGITIVE EMISSIONS FROM CEMENT PLANTS For achieving effective prevention and control of potential fugitive emission sources in cement manufacturing

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (66460.23 SQ. M) BY GUJARAT HOUSING BOARD AFFORDABLE RESIDENTIAL BUILDING & COMMERCIAL PROJECT PACKAGE 23, PLOT NO. 61/1, 63/1 & 64, TARSAMIYA,

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

Environmental Management Plan for Small Scale Composting Plant at Baridhara, Dhaka

Environmental Management Plan for Small Scale Composting Plant at Baridhara, Dhaka Environmental Management Plan for Small Scale Composting Plant at Baridhara, Dhaka December, 2013 Prepared by: Practical Action, Bangladesh House 12/B, Road # 4 Dhanmondi R/A, Dhaka-1205 On Behalf of Swisscontact

More information

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM)

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) TAILINGS DISPOSAL Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) Tailings must be disposed of in a manner that optimizes protection of human

More information

DESIGN OF SEWER SYSTEMS

DESIGN OF SEWER SYSTEMS Wastewater Engineering (MSc program) DESIGN OF SEWER SYSTEMS Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University 1. Sewer Materials

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

This unofficial translation of. Ministerial Decision No 421/1998. was downloaded from METS is not the copyright owner.

This unofficial translation of. Ministerial Decision No 421/1998. was downloaded from  METS is not the copyright owner. Disclaimer This unofficial translation of Ministerial Decision No 421/1998 was downloaded from www.mets-oman.com. METS is not the copyright owner. METS is not responsible for the content of this document.

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

Revised 1/20/2014 ARTICLE 9 CONSTRUCTION REQUIREMENTS PART A: GENERAL 9A-1 SERVICE LINES:

Revised 1/20/2014 ARTICLE 9 CONSTRUCTION REQUIREMENTS PART A: GENERAL 9A-1 SERVICE LINES: ARTICLE 9 CONSTRUCTION REQUIREMENTS 9A-1 SERVICE LINES: PART A: GENERAL 9A-1-1 Construction. Separate and independent service lines shall be designed, installed and constructed by the Property Owner at

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 PART A : SPECIFIC CONDITIONS 1. CONSTRUCTION PHASE S. 1

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

Sonoma Valley County Sanitation District Residential Recycled Water Fill Station Program

Sonoma Valley County Sanitation District Residential Recycled Water Fill Station Program . SVCSD Residential Recycled Water Fill Station Application Sonoma Valley County Sanitation District Residential Recycled Water Fill Station Program Introduction The Sonoma Valley County Sanitation District

More information

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,

More information

M/s. Salarpuria Properties Private Limited Page 1 of 105

M/s. Salarpuria Properties Private Limited Page 1 of 105 Environmental Impact Assessment Report Proposed Residential & Commercial Development M/s. Salarpuria Properties Private Limited Page 1 of 105 Environmental Impact Assessment Report Proposed Residential

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7: Hydraulic Design of Sewers and Storm Water Drains 7.0 HYDRAULIC DESIGN OF SEWERS AND STORM WATER DRAINS 7.1 General Consideration

More information