1 DEQ Northwest Region Cleanup Program Proposed Cleanup Plan KFF Site, Sherwood Oregon Mark Pugh, Project Manager DEQ Northwest Region Cleanup Program Sept. 22, 2016 Sherwood, Oregon Mark Pugh, RG Oregon Department of Environmental Quality

2 Presentation Outline Background Information Site History Previous Investigations Remedial Action Areas Cleanup Options Proposed Plan Question and Answer Session

3

4 Site History Historical farm land covering approximately 40 acres Rolling topography with generally thin soil layer and shallow basalt bedrock Tannery waste placed on the ground surface between ; lime added to control odor; tilled into soil Tannery waste contains primarily trivalent chromium (CrIII), with relatively low concentrations of hexavalent chromium (CrVI) Farm land initially subdivided into 10 parcels and developed in the late 70s- mid-80s ; additional subdivision for single family residential use Approximately 2 acre wetland area

5

6

7 Previous Investigations DEQ (2005) Preliminary Assessment EPA (2006) Integrated Assessment Total Chromium (primarily CrIII) detected across the site CrVI not identified as a concern Referred to DEQ for additional followup DEQ (2007) DEQ Risk Assessment 2011-Change in CrVI cleanup level (130X lower)

8 Settlement 2010 DEQ begins settlement negotiations with responsible parties May 2011 Global settlement - $2,600,000 cash payment from parties in exchange for liability release from DEQ December 2013 Court Issues final decision Total settlement $2.6 million $2.3 million available for cleanup

9 DEQ Remedial Investigation-2013 Potential Human Health Risk from CrVI in soil on most tax lots Potential Ecological Risk to birds and benthic organisms from CrIII in soil/sediment

10

11

12

13 Remedial Action Objectives RAO# 1. Prevent current residents from exposure to upland soils containing Cr(VI) resulting greater than1 in 1,000,000 cancer risk RAO#2. Prevent future residents from exposure to upland soils containing Cr(VI) resulting greater than1 in 1,000,000 risk RAO#3. Reduce transport of chromium, lead, and mercury in upland surface soil to wetlands that would result in further sediment contamination

14 Cleanup Options Capping Removal Treatment Institutional Controls Presence of Contamination Maintain Protective Remedy -----Easement and Equitable Servitudes -----Deed Notice -----Other measures selected or approved by the Director

15 KFF Cleanup Alternatives Capping in Place Comprehensive Capping in Place On-Site Consolidation and Capping Excavation and Off-Site Disposal

16 Capping in Place Cost Effective Relatively easy to implement Leaves exposed contamination susceptible to contact by residents, and storm runoff Concerns of compromising cap and redistributing contamination during site development DEQ would likely require confirmation testing

17 Comprehensive Capping in Place Highly effective Reduces potential for mobilization of residual contamination No confirmation testing needed High Cost* Larger Cap Area to Maintain

18 On-Site Consolidation and Capping Highly effective Coordinated with grading plan Reduce cap maintenance area Reduces potential for mobilization of residual contamination High Cost*

19 Excavation and Off-site Disposal Reduces contaminant mass Reliable No cap maintenance Bedrock prevents complete removal May require imported fill for grading Implementation risk (truck traffic;dust) Leaves exposed contamination susceptible to contact by residents and storm runoff

20 Proposed Cleanup Plan Current Use (DEQ) -Yard Areas -Tax Lots 100,200,700,1200 Future Use (Owners/developers) -Undeveloped Properties/Areas

21 Proposed Cleanup Plan for Current Use Capping Preferred-Cost Effective $700,000 estimated cost Consolidation and capping and/or excavation and off-site disposal Maintenance/Public Communication ECSI on-line database Ongoing Coordination with City of Sherwood Real Estate Disclosure Laws DEQ Periodic Inspection NFA/Certificate of Completion recorded on deed* Off-Site Properties to south *Not in Staff Report

22

23

24

25

26 Proposed Cleanup Plan for Future Use Owner/developer implement cleanup Comprehensive capping preferred Cleanup costs defrayed through apportionment of settlement funds based on area cleaned up Apportionment amount based on relative tax lot size

27 Proposed Cleanup Plan for Future Use (cont d) $1,400,000 available for apportionment Apportionment Agreement Flexibility in cleanup method Maintenance/Public Communication ECSI on-line database Ongoing Coordination with City of Sherwood Real Estate Disclosure Laws (NFA letter) DEQ Periodic Inspection *Not in Staff Report

28 DEQ Roles and Responsibilities Preparation of agreements and other administrative documents Oversight and technical assistance Conduct public notice and comment Provide cap specifications for incorporation into property-specific plans

29 DEQ Roles and Responsibilities (cont d) Soil Management Plan Cap Inspection Identification and Testing of Cap Material* *Not in Staff Report

30 Next Steps DEQ accept comments through September 2016 Review and respond to comments as appropriate Prepare Record of Decision with selected remedy- October 2016 Agreements with individual owners/developers (ongoing) Planning and work plan preparation fall 2016-winter 2017 DEQ implement remedy on current use property in summer 2017

31 Mark Pugh DEQ Northwest Region Office 700 NE Multnomah Street Suite 600 Portland, OR (503)

State of Oregon Department of Environmental Quality

State of Oregon Department of Environmental Quality State of Oregon Department of Environmental Quality Memorandum Date: August 7, 2017 To: From: Subject: File Bob Schwarz ECSI # 4793, former Northwest Aluminum property; review of request for a Prospective

More information

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP)

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP) ECSI Number: 1213 Responsible Party: Klamath County QTime Number: 37941 Entry Date: 9/22/04 (VCP) Proposed Remedial Action Staff Report - Addendum Chiloquin Forest Products Chiloquin, Klamath County, Oregon

More information

US Steel/Spirit Lake Sediment Cleanup Update for River Corridor Coalition

US Steel/Spirit Lake Sediment Cleanup Update for River Corridor Coalition US Steel/Spirit Lake Sediment Cleanup Update for River Corridor Coalition Erin Endsley, Project Manager Mike Bares, Technical Analyst Minnesota Pollution Control Agency August 26, 2015 Outline Site history

More information

OCTOBER 2014 UPDATE: A YEAR OF REAL PROGRESS IN ALL AREAS

OCTOBER 2014 UPDATE: A YEAR OF REAL PROGRESS IN ALL AREAS OCTOBER 2014 UPDATE: A YEAR OF REAL PROGRESS IN ALL AREAS Fort Smith City Directors Study Session Tuesday, October 14, 2014 Summary July Aug. Sept. Oct. Nov. Dec. Progress Report in Key Areas Remediation

More information

TECHNOLOGY OVERVIEW EXCAVATION AND DISPOSAL OF SOLID MINING WASTE

TECHNOLOGY OVERVIEW EXCAVATION AND DISPOSAL OF SOLID MINING WASTE TECHNOLOGY OVERVIEW EXCAVATION AND DISPOSAL OF SOLID MINING WASTE August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from

More information

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY Environmental Health Department 950 MAIDU AVENUE, SUITE 170 NEVADA CITY, CA 95959-8617 (530) 265-1222 FAX (530) 265-9853 http://mynevadacounty.com Amy Irani,

More information

VAP Introduction to the Voluntary Action Program. Division of Emergency and Remedial Response

VAP Introduction to the Voluntary Action Program. Division of Emergency and Remedial Response VAP 101 - Introduction to the Voluntary Action Program Division of Emergency and Remedial Response Ohio EPA Voluntary Action Program Created in 1994 Ohio Revised Code (ORC) 3746 Final Rules went into effect

More information

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY File No. 0506-013-07 Contaminated Media Management Plan Midland

More information

None N Columbia Boulevard Portland, OR 97203

None N Columbia Boulevard Portland, OR 97203 , DEQ SITE ASSESSMENT PROGRAM - STRATEGY RECOMMENDATION Site Name: Rivergate Auto Wrecking Division U Pull It Site CERCLIS Number: None DEQ ECSI Number: 2056 Site Address: 12104 N Columbia Boulevard Portland,

More information

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS

More information

Cost Estimate for Removal and Disposal of Contaminated Soil

Cost Estimate for Removal and Disposal of Contaminated Soil 14432 SE Eastgate Way, Suite 100 Bellevue, WA 98007 tel: 425-519-8300 Mr. Mark Menard Sound Transit 401 South Jackson Street Seattle, Washington 98104-2820 Subject: Cost Estimate for Disposal of Contaminant-Impacted

More information

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS Revised: June 4, 2014 Requirements for obtaining a site alteration permit vary depending on the type of project being proposed. This information

More information

State of Oregon Department of Environmental Quality

State of Oregon Department of Environmental Quality State of Oregon Department of Environmental Quality Memorandum Date: July 1, 2014 To: From: Subject: File Erin McDonnell, Northwest Cleanup Section Proposed No Further Action for Building 02 Operational

More information

Mill Street Corridor Assessment/Cleanup Overview

Mill Street Corridor Assessment/Cleanup Overview Mill Street Corridor Assessment/Cleanup Overview Former S. Bent Mill Site Site History Overview Circa 1867 to 1992 - S. Bent Mill Company (furniture manufacturing) Circa early 1900s - expansion of the

More information

The Town should require the builder to save more trees even if grading endangers some trees.

The Town should require the builder to save more trees even if grading endangers some trees. Bill Lorensen 14 Hearthside Drive, Ballston Lake, NY 12019 877-5070 John Scavo Director - Planning Department One Town Hall Plaza Clifton Park, NY 12065 January 20, 2015 Subject: Kain Preserve Tree Clearing

More information

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Closure Plan Ash Disposal Area PGE Boardman Power Plant FIRST ISSUE REVISION 0 Closure Plan Ash Disposal Area PGE Boardman Power Plant Prepared for Portland General Electric September 2015 2020 SW 4th Avenue, Suite 300 Portland, Oregon 97201 This document was

More information

RECORD OF DECISION SELECTED REMEDIAL ACTION. For TEKTRONIX, INCORPORATED EVALUATION AREA 1 BEAVERTON, OREGON ECSI #167

RECORD OF DECISION SELECTED REMEDIAL ACTION. For TEKTRONIX, INCORPORATED EVALUATION AREA 1 BEAVERTON, OREGON ECSI #167 RECORD OF DECISION SELECTED REMEDIAL ACTION For TEKTRONIX, INCORPORATED EVALUATION AREA 1 BEAVERTON, OREGON ECSI #167 Prepared by OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY Northwest Region Office July

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

Closed Castner Firing Range Remedial Investigation. Technical Project Planning (TPP) Meeting #4 07 November :00 AM 11:00 AM

Closed Castner Firing Range Remedial Investigation. Technical Project Planning (TPP) Meeting #4 07 November :00 AM 11:00 AM Closed Castner Firing Range Remedial Investigation Technical Project Planning (TPP) Meeting #4 0 9:00 AM 11:00 AM Imagine result 2017 7 the November 1 Meeting Agenda Remedial Investigation (RI) Project

More information

7.0 EVALUATION OF REMEDIAL ALTERNATIVES

7.0 EVALUATION OF REMEDIAL ALTERNATIVES 7.0 EVALUATION OF REMEDIAL ALTERNATIVES This section provides a description of the developed remedial alternatives based on viable remedial technologies and process options, as identified in Section 4.0,

More information

Staff Report for Former ANG Coos Head Recommendation for Partial No Further Action for Groundwater at AOC C

Staff Report for Former ANG Coos Head Recommendation for Partial No Further Action for Groundwater at AOC C Staff Report for Former ANG Coos Head Recommendation for Partial No Further Action for Groundwater at AOC C Project Name: Former ANG Coos Head AOC C Groundwater Project Address: 63379 Coos Head Road, Coos

More information

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517) Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION

More information

Private Sewage Permit Application

Private Sewage Permit Application Kneehill County 1600-2 Street NW Three Hills, AB T0M 2A0 Phone: 403-443-5541 Fax: 403-443-5115 Private Sewage Permit Application Permit Number Permit Type: Owner Contractor Development Permit Number: Application

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

Construction Application for Permit (CAP) Instructions

Construction Application for Permit (CAP) Instructions Construction Application for Permit (CAP) Instructions A CAP is required to be completed and submitted to the Wayne Soil & Water Conservation District (SWCD) office for non-farm, earth-disturbing activities

More information

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting Modern Electroplating Site Update Dudley Vision Advisory Task Force September 2008 Meeting 1 Modern Electroplating Uncontrolled Waste Site Key elements that define a site relative to MA DEP and US EPA

More information

Overview of Pepco Benning Facility RI/FS

Overview of Pepco Benning Facility RI/FS Overview of Pepco Benning Facility RI/FS RI/FS Background Between 1985 and 2003, there have been six documented releases of PCBs into the environment at the facility. In each case, Pepco cleaned up the

More information

Offsite BMP Program for Sediment Reduction. February 2017

Offsite BMP Program for Sediment Reduction. February 2017 Offsite BMP Program for Sediment Reduction February 2017 Collaboration 2 Stormwater Advisory Board support Development community support KDHE support EPA support Win-Win-Win New Program 3 Cutting Edge

More information

CHROMIUM EXPOSURE AND HEALTH EFFECTS IN HUDSON COUNTY

CHROMIUM EXPOSURE AND HEALTH EFFECTS IN HUDSON COUNTY CHROMIUM EXPOSURE AND HEALTH EFFECTS IN HUDSON COUNTY Principal Investigators: Paul J. Lioy, PhD and Michael Gochfeld, MD, PhD Co-investigators: Zhi-hua (Tina) Fan, PhD, and Stuart Shalat, Ph.D Robert

More information

Distribution Restriction Statement

Distribution Restriction Statement CECW-A Engineer Regulation 1165-2-501 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 ER 1165-2-501 30 September 1999 Water Resources Policies and Authorities CIVIL WORKS

More information

HAZARDS AND HAZARDOUS MATERIALS Previous Enironmental Investigations APPENDIX F

HAZARDS AND HAZARDOUS MATERIALS Previous Enironmental Investigations APPENDIX F HAZARDS AND HAZARDOUS MATERIALS Previous Enironmental Investigations APPENDIX F This page intentionally left blank APPENDIX F PREVIOUS ENVIRONMENTAL INVESTIGATIONS 1.0 Subsurface Investigations Performed

More information

Site Map Investigative Areas (IAs) IA-3

Site Map Investigative Areas (IAs) IA-3 Hoffmann-La Roche Nutley Site Remediation Project Feasibility Study and Proposed Cleanup Plan for Soil in Investigative Areas (IAs) 3, 7, 10 (Southern Portion), 14 (Upland) and 15 (Upland) www.trcsolutions.com

More information

Characteristics of Land Resources

Characteristics of Land Resources Chapter Chapter 1 Characteristics of Land Resources The geology, soils and topography of Woodford County T he geology, soils and topography of an area are important to the community planning process for

More information

ASH AND BURN DEBRIS CLEAN UP AND REMOVAL PROCESS

ASH AND BURN DEBRIS CLEAN UP AND REMOVAL PROCESS COUNTY OF LAKE HEALTH SERVICES DEPARTMENT Division of Environmental Health 922 Bevins Court, Lakeport 95453-9739 Telephone 707-263-1164 Denise Pomeroy Interim Health Services Director Raymond Ruminski

More information

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan A. In accordance with Local Government Code Section 232.007, an Infrastructure Development Plan (IDP) is required for all manufactured home rental communities, as defined in Section A 1.0 E of these regulations,

More information

OVERVIEW CAPACITY & CONDITION

OVERVIEW CAPACITY & CONDITION OVERVIEW Over 18,000 sites and an associated 22 million acres of land are related to the primary hazardous waste programs that comprise much of the nation s hazardous waste infrastructure, and more than

More information

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007: LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates

More information

Collection #432 Butterworth Landfill Files Collection 432

Collection #432 Butterworth Landfill Files Collection 432 Collection #432 Butterworth Landfill Files Collection 432 Finding aid prepared by Robert McVay This finding aid was produced using the Archivists' Toolkit August 01, 2015 Describing Archives: A Content

More information

Local Limits Evaluation. Genet Belete Oregon DEQ Pretreatment Program

Local Limits Evaluation. Genet Belete Oregon DEQ Pretreatment Program Evaluation Genet Belete Oregon DEQ Pretreatment Program 503-229-5586 belete.etsegenet@deq.state.or.us Evaluation What does Oregon DEQ expect from technical evaluation of local limits? Report Federal and

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

INTRODUCTION. 1 Proposed Plan for the Former Lee Field Naval Air Station Landfill Area 2 Site

INTRODUCTION. 1 Proposed Plan for the Former Lee Field Naval Air Station Landfill Area 2 Site 1 Proposed Plan for the Former Lee Field Naval Air Station Landfill Area 2 Site U.S. Army Corps of Engineers, Jacksonville District Formerly Used Defense Site Program PROPOSED PLAN for the LANDFILL AREA

More information

Technical Impracticability Determinations

Technical Impracticability Determinations Voluntary Remediation Program (VRP) (307) 777-7752 http://deq.state.wy.us/volremedi/index.asp Technical Impracticability Determinations In its 2000 session, the Wyoming Legislature created new opportunities,

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

Martha Fritzie, Senior Planner Clackamas County Department of Transportation and Development 150 Beavercreek Road Oregon City, OR 97045

Martha Fritzie, Senior Planner Clackamas County Department of Transportation and Development 150 Beavercreek Road Oregon City, OR 97045 Oregon Kate Brown, Governor Department of Land Conservation and Development 635 Capitol Street NE, Suite 150 Salem, Oregon 97301-2540 Phone: (503) 373-0050 Fax: (503) 378-5518 www.oregon.gov/lcd Martha

More information

MANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS

MANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS Planning & Economic Development 100 Santa Rosa Ave, Rm. 3 Santa Rosa, CA 95404 Phone: (707) 543-4691 Email: planning@srcity.org MANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS To ensure safety to workers,

More information

Cass County Soil Erosion & Sedimentation Control Program

Cass County Soil Erosion & Sedimentation Control Program Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that

More information

JAXPORT Overview. JAXPORT Dealing with Legacy Contamination Issues

JAXPORT Overview. JAXPORT Dealing with Legacy Contamination Issues JAXPORT Overview JAXPORT Dealing with Legacy Contamination Issues Scott Skinner JAXPORT Manager, Environmental Compliance Planning and Properties Department November 15, 2011 1 JAXPORT Facilities Dredge

More information

January 25, 2016 VIA (HARD COPY TO FOLLOW BY U.S. MAIL)

January 25, 2016 VIA  (HARD COPY TO FOLLOW BY U.S. MAIL) January 25, 2016 VIA E-MAIL (HARD COPY TO FOLLOW BY U.S. MAIL) Virginia Department of Environmental Quality David K. Paylor James Golden 629 E. Main Street Richmond, VA 23219 Re: Dominion Dear Messrs.

More information

Site Status Report for the

Site Status Report for the Site Status Report for the Patrick Bayou Superfund Site Deer Park, TX Prepared by: Patrick Bayou Joint Defense Group and US Environmental Protection Agency Region 6 Presented by: Bob Piniewski, JDG Project

More information

Board of County Commissioners. Peter Russell, Senior Transportation Planner. DATE: October 7, 2015

Board of County Commissioners. Peter Russell, Senior Transportation Planner. DATE: October 7, 2015 TO: FROM: Board of County Commissioners Peter Russell, Senior Transportation Planner DATE: October 7, 2015 SUBJECT: Work session on amending the Deschutes County Comprehensive Plan to add an exception

More information

Appendix H: Construction Impacts H-5 Dredged Materials Management Alternatives Analysis

Appendix H: Construction Impacts H-5 Dredged Materials Management Alternatives Analysis Appendix H: Construction Impacts H-5 Dredged Materials Management Alternatives Analysis Dredged Material Management Alternatives Analysis A. INTRODUCTION The Tappan Zee Hudson River Crossing Project proposes

More information

Addendum to Feasibility Study

Addendum to Feasibility Study Addendum to Feasibility Study Former Duluth Works and Spirit Lake Sediment Site Prepared for Great Lakes Legacy Act Partnership between United States Steel Corporation, United States, Environmental Protection

More information

Kate Brown, Governor Portland, Oregon (800)

Kate Brown, Governor Portland, Oregon (800) June 15, 2017 Department of Environmental Quality Northwest Region 700 NE Multnomah St. Suite 600 Kate Brown, Governor Portland, Oregon 97232 (800)452-4100 Boni Halton Halton Company P.O. Box 3377 Portland,

More information

REVISED FEASIBILITY STUDY REPORT

REVISED FEASIBILITY STUDY REPORT REVISED FEASIBILITY STUDY REPORT Warrenton Boat Yard 101 NE Harbor Street Warrenton, OR 97146 DEQ ECSI Site #2764 Prepared for: Warrenton Boat Yard 101 NE Harbor Street Warrenton, OR 97146 Prepared by:

More information

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide Roscommon County SESC Program 500 Lake Street Roscommon, Michigan 48653 Phone: 989-275-8323 Fax: 989-275-8640 Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide INCLUDED ATTACHMENTS

More information

State of Oregon Department of Environmental Quality

State of Oregon Department of Environmental Quality State of Oregon Department of Environmental Quality Memorandum To: Rich Muza, US Environmental Protection Agency, Region 10 Date: April 5, 2013 Through: From: Subject: Keith Johnson, NWR Cleanup Manager

More information

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT Revised August 2005 I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT Before the applicant submits improvement plans and reports for Engineering plan checking, the applicant shall contact

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

Drainage By-law. WM-4 Consolidated as of April 18, 2011

Drainage By-law. WM-4 Consolidated as of April 18, 2011 Drainage By-law WM-4 Consolidated as of April 18, 2011 As Amended by By-law No. Date Passed at Council WM-4 September 20, 1993 WM-4-95001 September 18, 1995 WM-4-96002 August 6, 1996 WM-4-97003 May 5,

More information

FACT PATTERN THE RESERVATION

FACT PATTERN THE RESERVATION FACT PATTERN THE RESERVATION Great Lakes Tribal Reservation Surrounded by Big River National Forest Big River flows through Reservation and into Big Lake General Environmental Concerns Wild rice areas

More information

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators Page 1 of 5 STREAMLINES A Newsletter for North Carolina Water Supply Watershed Administrators Volume 2, Number 2 May 1997 Non-Point Source (NPS) Pollution This issue of Streamlines provides basic information

More information

Human Health and Ecological Risks Associated with Surface Impoundments

Human Health and Ecological Risks Associated with Surface Impoundments Copyright Gradient 2012 Human Health and Ecological Risks Associated with Surface Impoundments Ari Lewis Flyash Ponds and Power Plant Wastewater Treatment Issues McIlvaine Webinar May 4, 2012 Gradient

More information

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1 City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June 2010... Chapter 1 i CITY OF AZLE iswm CRITERIA MANUAL FOR SITE DEVELOPMENT AND CONSTRUCTION Incorporating the Regional NCTCOG Integrated

More information

Report AQUA METROLOGY SYSTEMS. SafeGuard H2O Pilot Report. Online Cr(VI) Remediation System

Report AQUA METROLOGY SYSTEMS. SafeGuard H2O Pilot Report. Online Cr(VI) Remediation System Report AQUA METROLOGY SYSTEMS SafeGuard H2O Pilot Report Online Cr(VI) Remediation System AQUA METROLOGY SYS TEMS SafeGuard H2O Pilot Report 24 January 2018 This report summarizes results of the Aqua Metrology

More information

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields 4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater

More information

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Draft Reformulation Public Information October 2016 US Army Corps of Engineers Presentation Outline Project Overview

More information

Stormwater Quality Trades: Virginia Farms and Highways

Stormwater Quality Trades: Virginia Farms and Highways Natural Resources & Environment (NRE) Mission Area Stormwater Quality Trades: Virginia Farms and Highways Valerie Frances Office of Strategic Natural Resource Initiatives Natural Resource Conservation

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

PROPOSED DECISION DOCUMENT. CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017

PROPOSED DECISION DOCUMENT. CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017 PROPOSED DECISION DOCUMENT CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017 Prepared by Division of Environmental Remediation New York State Department

More information

San Jacinto River Waste Pits Superfund Site

San Jacinto River Waste Pits Superfund Site San Jacinto River Waste Pits Superfund Site Channelview Highlands Northern Waste Pits Before Cap North Waste Pits After Cap Approximate Limit of Armored Cap Cap Construction Completed July 12, 2011 Old

More information

BMP #: Water Quality Inserts

BMP #: Water Quality Inserts Structural BMP Criteria BMP #: Water Quality Inserts Catch basin inserts are commercially available (manufactured) devices and are generally configured to remove one or more of the following contaminants:

More information

Sidewalk Repair Program. Charter Township of Canton Engineering Services

Sidewalk Repair Program. Charter Township of Canton Engineering Services Sidewalk Repair Program Charter Township of Canton Engineering Services Sidewalk Repair Program History Canton lost a landmark case at the Michigan Supreme Court level in 1997. The Supreme Court has determined

More information

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced

More information

FOR THE ADOPTED BY: APPROVED BY: PREPARED BY: CHATFIELD ENGINEERS, P.C DEWEY AVENUE ROCHESTER, NY (585)

FOR THE ADOPTED BY: APPROVED BY: PREPARED BY: CHATFIELD ENGINEERS, P.C DEWEY AVENUE ROCHESTER, NY (585) DEVELOPMENT REGULATIONS FOR THE TOWN OF PARMA MONROE COUNTY, NEW YORK ADOPTED BY: THE TOWN OF PARMA PLANNING BOARD AUGUST 19, 2013 APPROVED BY: THE TOWN OF PARMA TOWN BOARD OCTOBER 1, 2013 PREPARED BY:

More information

City of Anacortes Utility Rates & Information January 2016

City of Anacortes Utility Rates & Information January 2016 The City of Anacortes provides water, storm drain, sewer, and solid waste services. City of Anacortes Utility rates are established by ordinance. The City of Anacortes bills monthly minimum charges (base

More information

RESIDENTIAL BUILDING PERMIT

RESIDENTIAL BUILDING PERMIT A APPLICATION FOR A RESIDENTIAL BUILDING PERMIT JACKSON CO. MS. PLAN CASE NUMBER: PERMIT NUMBER: ACCEPTED BY: APPROVED BY: Application is hereby made for a permit under the provisions of the Comprehensive

More information

PERMANENT SOLUTION STATEMENT. Hydraulic Oil Release 68 Hopkinton Road Westborough, Massachusetts

PERMANENT SOLUTION STATEMENT. Hydraulic Oil Release 68 Hopkinton Road Westborough, Massachusetts PERMANENT SOLUTION STATEMENT Hydraulic Oil Release 68 Hopkinton Road Westborough, Massachusetts Release Tracking Number: 2-19324 CHES Job No.: 1402479917 TABLE OF CONTENTS INTRODUCTION... 1 SITE SETTING...

More information

Measurement Team Assignment Environmental Economics

Measurement Team Assignment Environmental Economics Measurement Team Assignment Environmental Economics Professor A. Ronald Gallant Term 6, 2011 1 Assignment Submit your presentation by November 29, 2011, 11:59 p.m. using the link on the platform. In this

More information

On March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to

On March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to LAKE EWAUNA TRAIL LEVEL 2 FIELD SAMPLING ASSESSMENT the proposed alignment (Figure 1). The trail will also include the installation of a geothermal snow melt system, allowing for year round use of the

More information

Hudson River PCBs Superfund Site

Hudson River PCBs Superfund Site PCBs Superfund Site Intermediate Design Report (IDR) Community Advisory Group Meeting August 31, 2005 1 Introduction Prepared by GE pursuant to the Administrative Order on Consent for Design (RD AOC) Design

More information

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING # 7 ) UN-53-16 MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: September 14, 2016 Item: UN-53-16 Prepared by: Marc Jordan GENERAL INFORMATION: Applicant:

More information

Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup

Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup A. THIS FORM IS BEING USED TO: (check one) 1. Log Date: 10/24/2017 Log Time: 11:18 AM PM 2. Assign a (RTN) to a Release or TOR Report. a. Reportable Release or TOR. b. Release that is Less Than the Reporting

More information

Closure Plan Brame Fly Ash Pond

Closure Plan Brame Fly Ash Pond Brame Fly Ash Pond CLECO Corporation Rodemacher Unit 2 Project No. 90965 Revision 0 10/14/2016 Brame Fly Ash Pond prepared for CLECO Corporation Rodemacher Unit 2 Rapides Parish, Louisiana Project No.

More information

ENVIRONMENTAL RESTORATION SERVICES FORT DETRICK, FREDERICK MD

ENVIRONMENTAL RESTORATION SERVICES FORT DETRICK, FREDERICK MD ENVIRONMENTAL RESTORATION SERVICES FORT DETRICK, FREDERICK MD Progress Report for the RAB August 10, 2016 John Cherry Arcadis Overview of Topics Site Inspections (SI) Status Area A / Area B Area B Groundwater

More information

Interstate-Callahan Upper and Lower Rock Dumps RA Construction Project. East Fork Ninemile Creek, Idaho May 3, 2016

Interstate-Callahan Upper and Lower Rock Dumps RA Construction Project. East Fork Ninemile Creek, Idaho May 3, 2016 Interstate-Callahan Upper and Lower Rock Dumps RA Construction Project East Fork Ninemile Creek, Idaho May 3, 2016 Tony Wesche, P.E. Pioneer Technical Services, Inc. and North Wind Group Presentation Topics

More information

CERCLA & Clean Water Act Overlapping Authorities & Cross-Program Implementation

CERCLA & Clean Water Act Overlapping Authorities & Cross-Program Implementation CERCLA & Clean Water Act Overlapping Authorities & Cross-Program Implementation Joan Snyder Stoel Rives LLP 900 SW Fifth Avenue, Suite 2600 Portland, OR 97204-1268 (503) 294-9657 jpsnyder@stoel.com Potential

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management

The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management Tax Increment Financing Policy and Project Submission Requirements January 23, 2012 PART I: TAX INCREMENT FINANCING

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Order of Magnitude Guidance (Updated August 10, 2009 * )

Order of Magnitude Guidance (Updated August 10, 2009 * ) Order of Magnitude Guidance (Updated August 10, 2009 * ) Introduction Order of magnitude provisions are established by the Brownfield Act, N.J.S.A. 58:10B-12j and 13e (See Appendix 1) and are implemented

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION DELAWARE CAR COMPANY Second and Lombard Streets Wilmington, Delaware DNREC Project No. DE-1059 October 2000 Department of Natural Resources and Environmental Control Division

More information

Environmental Management Certificate Program

Environmental Management Certificate Program Environmental Management Certificate Program Intro to Hazardous Materials Management (AM) 10/01/18 Dr. Michael Thayer This professional development-training seminar is an introductory overview of the fundamentals

More information

LAND USE POLICIES BY COMMUNITY DESIGNATION

LAND USE POLICIES BY COMMUNITY DESIGNATION 137 2040 138 Land Use Policies by Community Designation As discussed earlier in Thrive MSP 2040, the Council assigns a community designation to each city and township. This designation indicates the overall

More information

Contaminated Media Management Plan. DEQ UST Site # Del Oeste Veterinary Clinic Prairie Road Eugene, Oregon

Contaminated Media Management Plan. DEQ UST Site # Del Oeste Veterinary Clinic Prairie Road Eugene, Oregon Contaminated Media Management Plan DEQ UST Site #20-97-7034 Del Oeste Veterinary Clinic 90238 Prairie Road Eugene, Oregon March 2014 This page left intentionally blank. 2 Overview This Contaminated Media

More information

Soil Erosion Control Soil Erosion Control

Soil Erosion Control Soil Erosion Control Ordinance 1 FILLMORE COUNTY SOIL EROSION CONTROL ORDINANCE ADOPTED 1982 AMENDED 1990 AMENDED 1994 AMENDED 1996 2 FILLMORE COUNTY SOIL EROSION CONTROL ORDINANCE AN ORDINANCE REQUIRING THAT FARMING PRACTICES

More information

Guidance on RCRA Post Closure Care Period: Long-Term Management for Hazardous Waste Disposal Facilities

Guidance on RCRA Post Closure Care Period: Long-Term Management for Hazardous Waste Disposal Facilities Guidance on RCRA Post Closure Care Period: Long-Term Management for Hazardous Waste Disposal Facilities 1 ASTSWMO Mid-Year Meeting Virginia Beach, VA Plenary Session April 23, 2014 ~~~~~ Sonya Sasseville,

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Bioremediation Using DARAMEND for Treatment of POPs in Soils and Sediments

Bioremediation Using DARAMEND for Treatment of POPs in Soils and Sediments POPS - WASTES APPLICABILITY (REFS. 1, 6, AND 10): DARAMEND is a bioremediation technology that has been used to treat soils and sediments containing low concentrations of pesticides such as toxaphene and

More information

City of Sugar Hill Planning Staff Report VAR

City of Sugar Hill Planning Staff Report VAR City of Sugar Hill Planning Staff Report VAR 17-004 DATE: May 25, 2017 TO: Mayor and City Council FROM: Planning Director SUBJECT: Variance Request VAR 17-004 Stream Buffer Variance RECOMMENDED ACTION

More information

CITY OF ASHLAND REDEVELOPMENT PLAN FOR THE ASHLAND INVESTMENT CO., LLC HOUSING DEVELOPMENT

CITY OF ASHLAND REDEVELOPMENT PLAN FOR THE ASHLAND INVESTMENT CO., LLC HOUSING DEVELOPMENT CITY OF ASHLAND REDEVELOPMENT PLAN FOR THE ASHLAND INVESTMENT CO., LLC HOUSING DEVELOPMENT I. INTRODUCTION. The City of Ashland, Nebraska, recognizes that blight is a threat to the continued stability

More information