1 I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P Project Agency: Ministry of Water and Irrigation Dar es Salaam Water Supply and Sewerage Authority Dar es Salaam Water Supply ans Sewerage Corporation 3. Date of the Plan: April Period Covered by this Plan: First 18 Months II. Thresholds for Review, Approaches and Methods A. Goods, Works and Non-Consulting Services Category Approaches and Methods (US$ millions) Review (US$ millions) Open International Open National Request for Quotation (RfQ) Works < Goods, IT, and nonconsulting services B. Consulting Services 2 5 < Category Review Short List of National s (US$ million) (US$ millions) Consulting Services Engineering and Construction Supervision s (Firms) Individual s 0.3 NA. NA. [Overall Project Risk is SUBSTANTIAL] Notes: Terms of Reference: Terms of Reference for all contracts shall be cleared by the Bank, regardless of whether the assignment is for prior or post review. Advertisement: Consultancy Service for Contracts estimated to cost US$ 300,000 equivalent and above per contract shall be advertised in UNDB online in addition to advertising in National News Paper(s) of wide circulation and/or Regional News Paper(s). 1

2 Page 1 PROCUREMENT PLAN Tanzania : Second Tanzania Water Sector Support Project General Information Country: Tanzania Banks Approval Date of the Original Plan: Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P GPN Date: Project Name: Second Tanzania Water Sector Support Project Loan / Credit No:,, IDA / V0310 Executing Agency(ies): Dar Es Salaam Water Supply and Sewarage Authority, Ministry of Water and Irrigation, Dar es Salaam Water and Sewerage Corporation WORKS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / TZ-DAWASA-6497-CW-RFB / Construction of Mbezi Beach Waste Water Treatment Plant, Pumping Station, and SEWERAGE Network and their Operation (DBO) Component 3: Dar es Salaam Sanitation Improvement Request for Bids Open - International TZ-MOW CW-RFB / Drilling Works for Ground Water Monitoring Network in Wami- Ruvu and Internal Drainage Basins Resources Management (IWRM) TZ-MOW CW-RFB / Construction of office and water laboratory buildings for Wami- Ruvu Basin Water Board (BWB) Headquarter at Morogoro and Water Users Association (WUA) Offices at Msowero and rehabilitation and extension of office building for Wami-Ruvu BWB in Dodoma. Resources Management (IWRM) TZ-MOW CW-RFB / Civil Works Construction and Installation of Water Resources Monitoring Gauges in all the nine Basins in Tanzania Resources Management (IWRM) TZ-MOW CW-RFB / Construction of Office Block for the Proposed Water Resources Centre of Excellency (COE) in Dar es Salaam Resources Management (IWRM) TZ-DAWASCO CW-RFB / Construction of Public toilets in selected areas TZ-DAWASCO CW-RFB / Construction of transfer stations (about 30 units@usd40,000 per unit) first phase TZ-DAWASCO CW-RFB / Construction of off-grid water supply small piped schemes to serve about 100,000 USD 50 per capita (several packages-first phase) TZ-DAWASCO CW-RFB / Construction of Condominium sewerage (about 250 houses/scheme TZ-DAWASA-6487-CW-RFB / Construction of water Supply Distribution Networks Part 1 from University Reservoir to Bagamoyo Request for Bids Open - International 0.00 Canceled TZ-DAWASCO CW-RFB / Construction of water supply distribution network Part 1. (from University reservoir to Bagamoyo) Request for Bids Open - International 0.00 Canceled TZ-DAWASCO CW-RFB / Construction of Water Supply Distribution Network Part I, from University Reservoir to Bagamoyo Town Request for Bids Open - International TZ-DAWASCO CW-RFB / of Performance Based Contracts to reduce NRW in selected DMAs (multiple) Request for Bids Open - International TZ-DAWASCO CW-RFB / Construction of Decentralized Fecal Sludge Management (FSM) treatment (about 50 units@usd120,000 per unit starting with 10 units first phase) GOODS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission /

3 Page 2 TZ-MOW GO-RFB / Supply of Water Users Associations Survival Working Kits Resources Management (IWRM) TZ-MOW GO-RFB / Supply of eighteen four-wheel Drive Vehicles for the Basin Water Boards and MoWI's Division of WR. Resources Management (IWRM) TZ-MOW GO-RFB / Supply of Motorbikes and Bicycles (100 of each) to support 100 WUAs Resources Management (IWRM) TZ-MOW GO-RFB / Supply of office data management tools and equipment including ICT equipment Resources Management (IWRM) TZ-MOW GO-RFB / Supply of Communication Strategy Materials Resources Management (IWRM) TZ-MOW GO-RFP / Supply of water quality monitoring equipment and tools Resources Management (IWRM) TZ-MOW GO-RFB / Supply of surface and groundwater monitoring network gauges monitoring instruments for large dams and sediment monitoring equipment Request for Bids Open - National TZ-DAWASCO GO-RFB / Supply of Domestic Water Meters for Utility Modernization and Expansion of Water Supply Distribution System (Packages 2B & 2F) Request for Bids Open - National TZ-DAWASCO GO-RFB / Supply of domestic water meters Request for Bids Open - National 0.00 Canceled TZ-DAWASCO GO-RFB / Renewal of pipeline (pipes for network rehabilitation) 0.00 Canceled TZ-DAWASCO GO-RFB / Supply of PVC Pipes and Fittings for Network Rehabilitation TZ-DAWASCO GO-RFB / Supply of Billing equipment (this is specific to hand held meter reading/billing tools) 0.00 Canceled TZ-DAWASCO GO-RFB / Supply of Data Loggers TZ-DAWASCO GO-RFB / Supply and installation of SCADA System, i.e. Bulk meters, pressure meters, central station meters, telemetry for network management and clampon and acoustic equipment for leak detection NON CONSULTING SERVICES Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / CONSULTING FIRMS Contract Type Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Proposals / Minutes Proposal Negotiated Contract TZ-DAWASA-6490-CS-QCBS / for review of design and construction supervision of Mbezi Beach waste water treatment plant, pumping station and sewerage network Review TZ-DAWASA-6494-CS-CQS / Preparation of ESIA and RAP for the Mbezi Beach Waste Water Treatment Plant Component 3: Dar es Salaam Sanitation Improvement Post Open - National TZ-MOW CS-QCBS / Modernizing Hydrological and Meteorological Monitoring Systems

4 Page 3 TZ-MOW CS-QCBS / Operational Decision Support System through Enhanced Hydro- Meteorological Services TZ-MOW CS-CQS / Technical Assistance for strengthening Ground water Resources Development and Management in Tanzania Open - National TZ-MOW CS-CQS / Technical Assistance on Supporting of IWRMD at National and Basin Levels Open - National TZ-MOW CS-CQS / Technical Assistance on Preparation of Water Resources Use Charges Regulations Open - National TZ-MOW CS-CQS / Consultancy for Development and of Laboratory Information Management System Open - National TZ-MOW CS-CQS / Consultancy for Conceptualization and strategic planning for COE Open - National TZ-MOW CS-QCBS / Consultancy services for National Hydrological Aquifer Mapping TZ-MOW CS-QCBS / Operational Decision Support System Through Enhanced Hydro- Meteorological Services Open - International TZ-MOW CS-QCBS / Modernizing Hydrological and Monitoring Systems Open - International TZ-MOW CS-CQS / the study of institutional set up for water Resources Centre of Excellence Open - National TZ-MOW CS-CQS / Design and Supervision for Centre of Excellence Building Open - National TZ-MOW CS-QCBS / design review and supervision of construction of office and laboratory buildings for Wami- Ruvu Basin Water Boards Headquarter Morogoro and Water Users Associations Offices at Msowero and rehabilitation and extension at Dodoma Open - International TZ-MOW CS-QCBS / Catchment Conservation in Wami- Ruvu Basin Open - International TZ-MOW CS-QCBS / Institutional development support technical assistance COE Open - International TZ-MOW CS-CQS / preparation of future investments Open - International TZ-DAWASA-6480-CS-QCBS / Construction Supervision of Distribution Networks Part 1- from University Reservoir to Bagamoyo Open - International 0.00 Canceled TZ-DAWASCO CS-QCBS / NRW consultancy: asset management, hydraulic model, DMA installation for NRW management, NRW management Material Handbook, customer metering and billing (multiple) Open - International TZ-DAWASCO CS-QCBS / Provision of Consultancy Services for Preparation of Detailed Engineering Design, Bidding Documents and Construction Supervision of the Off-Grid Sanitation Works in Dar es Salaam Review

5 Page 4 TZ-DAWASCO CS-QCBS / Provision of Consultancy Services for Preparation of Detailed Engineering Design, Bidding Documents and Construction Supervision of the Off-Grid Water Supply Works in Dar es Salaam Post Open - National TZ-DAWASCO CS-QCBS / Consultancy for Construction supervision of distribution networks Part 1 - From University Reservoir to Bagamoyo. Open - International 0.00 Canceled TZ-DAWASCO CS-QCBS / Supervision of Construction of Water Supply Distribution Network Part 1, from University Reservoir to Bagamoyo Town INDIVIDUAL CONSULTANTS

Procurement Plan. 1. Project Information Country: Tanzania Project Name: Regional Communications Infrastructure Program Project ID: P111432

Procurement Plan. 1. Project Information Country: Tanzania Project Name: Regional Communications Infrastructure Program Project ID: P111432 I. General Plan 1. Project Information Country: Tanzania Project Name: Regional Communications Infrastructure Program Project ID: P111432 2. Project Agency: President Office Public Service Management Ministry

More information

WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months)

WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months) Public Disclosure Authorized WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months) Public Disclosure Authorized I. General The following procurement plan has

More information

MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617

MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617 Public Disclosure Authorized MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617 1 st STEP ANNUAL PROCUREMENT PLAN BASED ON THE FEBRUARY 2017

More information

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan Additional Financing for the Water Sector Capacity Building and Advisory Services

More information

Maharashtra Project on Climate Resilient Agriculture

Maharashtra Project on Climate Resilient Agriculture Public Disclosure Authorized Maharashtra Project on Climate Resilient Agriculture Country: INDIA Procurement Plan for First 18months Borrower: Government of India on behalf of Government of Maharashtra

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) Public Disclosure Authorized PROCUREMENT PLAN (Textual Part) Project information: Burkina Faso Local Government Support Project - P162742 Project agency: Unité de Coordination du Programme d Appui aux

More information

WATER UTILITIES PERFORMANCE REVIEW REPORT 2012/2013 REGIONAL WATER UTILITIES & DAWASCO

WATER UTILITIES PERFORMANCE REVIEW REPORT 2012/2013 REGIONAL WATER UTILITIES & DAWASCO WATER UTILITIES PERFORMANCE REVIEW REPORT 2012/2013 REGIONAL WATER UTILITIES & DAWASCO December 2013 TABLE OF CONTENTS FOREWORD... iii ABBREVIATIONS AND ACRONYMS...iv DEFINITIONS OF KEY PERFORMANCE INDICATORS...v

More information

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE PUBLIC SERVICE RECRUITMENT SECRETARIAT

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE PUBLIC SERVICE RECRUITMENT SECRETARIAT THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE PUBLIC SERVICE RECRUITMENT SECRETARIAT Ref.No.EA.7/96/01/J/83 30 th December, 2017 VACANCIES ANNOUNCEMENT President s Office, Public Service Recruitment

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized I. General Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized 2. Bank s approval of the procurement Plan : 19 mai 2015 3. of General Procurement

More information

MOROGORO URBAN WATER SUPPLY AND SANITATION AUTHORITY

MOROGORO URBAN WATER SUPPLY AND SANITATION AUTHORITY MOROGORO URBAN WATER SUPPLY AND SANITATION AUTHORITY MONTH: DECEMBER, 2012 A: IMPLEMENTATION OF WATER SECTOR DEVELOPMENT PROGRAMME (WSDP) PROJECTS Introduction Under Water Sector Development Programme,

More information

Annex A. Templates for the Procurement Post Review Report

Annex A. Templates for the Procurement Post Review Report Annex A. Templates for the Procurement Post Review Report Country Loan / Credit / Trust Fund #: Project name*: Project ID: Name (s) of Implementing Agency (ies): TL: APS/PAS: Hub Coordinator Post Review

More information

Procurement Plan for P (BRICKS)

Procurement Plan for P (BRICKS) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan for P130888 (BRICKS) 2. Bank s approval Date of procurement Plan: March

More information

Procurement Plan dated April 20, 2016

Procurement Plan dated April 20, 2016 Procurement Plan dated April 20, I. General 1. Data of General Project information: 2. Borrower: REPUBLIC OF POLAND 3. Project Name: ODRA RIVER BASIN FLOOD PROTECTION 4. Loan No.: 7436-POL, Project ID:

More information

PROCUREMENT PLAN. Consulting Services

PROCUREMENT PLAN. Consulting Services PROCUREMENT PLAN Basic Data Project Name: North Eastern Region Capital Cities Development Investment Program - Tranche 2 Project : 35290-033 Approval : 2834 Country: India Executing Agency: Ministry of

More information

Water Sector Development Programme Phase II (2014/ /2019)

Water Sector Development Programme Phase II (2014/ /2019) THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WATER Water Sector Development Programme Phase II (2014/2015 2018/2019) JULY 2014 i TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 WSDP I 2007-2013

More information

USAID COCA-COLA COMPANY COMMUNITY WATERSHEDS PARTNERSHIP PROGRAM

USAID COCA-COLA COMPANY COMMUNITY WATERSHEDS PARTNERSHIP PROGRAM USAID COCA-COLA COMPANY COMMUNITY WATERSHEDS PARTNERSHIP PROGRAM Improving Local Community Livelihoods and Strengthening Capacity for Implementing Tanzania s Water Sector Development Strategy APPROVED

More information

Palestinian Water Sector Capacity Building

Palestinian Water Sector Capacity Building Palestinian Water Sector Capacity Building By Khairy Al-Jamal Senior Infrastructure Specialist World Bank, MNSSD International Conference -Sustainable Development and Management of Water in Palestine-

More information

II. Coods and Works and non-consulting services.

II. Coods and Works and non-consulting services. I. General Procurement Plan dated r 0, 2008. Data of General Project information: 2. Borrower: REPUBLIC OF POLAND 3. Project Name: ODRA RIVER BASIN FLOOD PROTECTION 4. Loan No.: 7436-POL, Project ID: P086768

More information

IPCC scenarios (global) A1B. Climate change scenarios on regional level. Landscape modeling (Crops, Vegetation, WaNuLCAS)

IPCC scenarios (global) A1B. Climate change scenarios on regional level. Landscape modeling (Crops, Vegetation, WaNuLCAS) Johannes Dietz J Bobert, M Büchner, U Böhm, O Dietrich, A Gebrekirstos, MC Gomani, JJ Kashaigili, KC Kersebaum, R Kindt, A Kitalyi, H Mahoo, K Mutabazi, M Ojoyi, S Sieber, K Tscherning Climate Change +

More information

BOSNIA AND HERZEGOVINA Irrigation Development Project (Loan No ) Terms of Reference

BOSNIA AND HERZEGOVINA Irrigation Development Project (Loan No ) Terms of Reference BOSNIA AND HERZEGOVINA Irrigation Development Project (Loan No. 50980) Terms of Reference Civil Works Supervision and Environmental Monitoring Goražde/Foča-Ustikolina (Consulting Firm) I. BACKGROUND The

More information

INTEGRATED WATER MANAGEMENT AND DEVELOPMENT PROJECT(IWMDP) The Project information sheet March 2018

INTEGRATED WATER MANAGEMENT AND DEVELOPMENT PROJECT(IWMDP) The Project information sheet March 2018 INTEGRATED WATER MANAGEMENT AND DEVELOPMENT PROJECT(IWMDP) The Project information sheet March 2018 OBJECTIVES Project Development Objectives and brief description of components 2 Water Sector in Uganda:

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Flows, translations and practices in IWRM in Tanzania

Flows, translations and practices in IWRM in Tanzania Flows, translations and practices in IWRM in Tanzania Andrew Tarimo, Philip Sumuni, Kulwa Shimiyu, Aurelia van Eeden, Emmanuel Manzungu, Barbara van Koppen Context 1990 Pre-1961 Local smallholder irrigation

More information

Review of Trinidad and Tobago Water and Sewerage Authority Capital Expenditure Plans and Asset Valuation

Review of Trinidad and Tobago Water and Sewerage Authority Capital Expenditure Plans and Asset Valuation T +1 (202) 466 6790 F +1 (202) 466 6797 1700 K Street NW WASHINGTON DC 20006 United States of America Review of Trinidad and Tobago Water and Sewerage Authority Capital Expenditure Plans and Asset Valuation

More information

The Reform of the Water Sector in Tanzania

The Reform of the Water Sector in Tanzania The Reform of the Water Sector in Tanzania Ernst Doering GTZ - Support to the Tanzanian Water Sector Reform Programme P.O. Box 1519, Dar es Salaam, Tanzania E-mail: mowld.gtz@africaonline.co.tz Abstract

More information

Key Design Principles for Community Water and Sanitation Services

Key Design Principles for Community Water and Sanitation Services Key Design Principles for Community Water and Sanitation Services Thematic Area Problem Definition and Key s Community Water and Sanitation (CWS) Strategy for Rural Areas and Small Towns Policy Environment

More information

Community Infrastructure Upgrading Program (CIUP) Margareth Mazwile Community Infrastructure Upgrading Programme (CIUP) Dar es Salaam, Tanzania

Community Infrastructure Upgrading Program (CIUP) Margareth Mazwile Community Infrastructure Upgrading Programme (CIUP) Dar es Salaam, Tanzania Community Infrastructure Upgrading Program (CIUP) Margareth Mazwile Community Infrastructure Upgrading Programme (CIUP) Dar es Salaam, Tanzania Dar es salaam (Tanzania) Area -1800sq Land 1350 Total number

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST Government of Karnataka Advanced Centre for Integrated Water Resources Management (AC-IWRM) 1/1, 1 st Floor, KSFC Bhavan, Thimmaiah Road, Near Cantonment Railway Station, Bangalore-560052. Karnataka No.SE/AC-IWRM/EOIs/11/2015-16

More information

Regional Experiences on Irrigation Modernization. Joop Stoutjesdijk Lead Irrigation Engineer, World Bank

Regional Experiences on Irrigation Modernization. Joop Stoutjesdijk Lead Irrigation Engineer, World Bank Regional Experiences on Irrigation Modernization Joop Stoutjesdijk Lead Irrigation Engineer, World Bank Why Modernize Few main reasons why to modernize: Rapidly increasing competing uses for water. Irrigation

More information

Summary of Project/Program. Summary - Project Approval Request. Amount (USD):USD 1 1 million Date: June 29 th, 2011

Summary of Project/Program. Summary - Project Approval Request. Amount (USD):USD 1 1 million Date: June 29 th, 2011 Summary of Project/Program PILOT PROGRAM FOR CLIMATE RESILIENCE Summary - Project Approval Request 1. Country/Region: Zambia 2. CIF Project ID#: (Trustee will assign ID) 3. Project/Program Title: Strengthening

More information

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting 19th International Congress on Modelling and Simulation, Perth, Australia, 12 16 December 2011 http://mssanz.org.au/modsim2011 UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing

More information

From Manufacturing to the End Consumer How to Meet the Working Capital Needs of the Off-Grid Solar Sector Across the Supply and Distribution Chain?

From Manufacturing to the End Consumer How to Meet the Working Capital Needs of the Off-Grid Solar Sector Across the Supply and Distribution Chain? 2 From Manufacturing to the End Consumer How to Meet the Working Capital Needs of the Off-Grid Solar Sector Across the Supply and Distribution Chain? Development Bank of Ethiopia Market Development for

More information

NZQA registered unit standard version 4 Page 1 of 5

NZQA registered unit standard version 4 Page 1 of 5 Page 1 of 5 Title Describe drinking-water supply reticulation systems Level 5 Credits 8 Purpose People credited with this unit standard are able to describe: the reticulated services found on public and

More information

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities Dhaka Environmentally Sustainable Water Supply Project (RRP BAN 42173) SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and

More information

Sample Procurement Plan

Sample Procurement Plan I. General Sample Plan 1. Bank s approval Date of the procurement Plan February 7, 2014. Revision of the Plan, February 8, 2017 2. Date of General Notice: Updated April 20, 2017 3. Period covered by this

More information

Pangani River Basin, Tanzania Building consensus on water allocation and climate change adaption

Pangani River Basin, Tanzania Building consensus on water allocation and climate change adaption Pangani River Basin, Tanzania Building consensus on water allocation and climate change adaption IUCN WATER PROGRAMME DEMONSTRATION CASE STUDY NO.2 WATER AND NATURE INITIATIVE (WANI) CASE STUDY PANGANI

More information

The United Republic of Tanzania THE STUDY ON WATER SUPPLY IMPROVEMENT IN COAST REGION AND DAR ES SALAAM PERI-URBAN IN THE UNITED REPUBLIC OF TANZANIA

The United Republic of Tanzania THE STUDY ON WATER SUPPLY IMPROVEMENT IN COAST REGION AND DAR ES SALAAM PERI-URBAN IN THE UNITED REPUBLIC OF TANZANIA No. The United Republic of Tanzania THE STUDY ON WATER SUPPLY IMPROVEMENT IN COAST REGION AND DAR ES SALAAM PERI-URBAN IN THE UNITED REPUBLIC OF TANZANIA Final Report SUMMARY REPORT December 2005 JAPAN

More information

UNITED REPUBLIC OF TANZANIA MINISTRY OF WATER AND IRRIGATION (MoWI) NATIONAL IRRIGATION COMMISSION (NIC) KILIMANJARO ZONE

UNITED REPUBLIC OF TANZANIA MINISTRY OF WATER AND IRRIGATION (MoWI) NATIONAL IRRIGATION COMMISSION (NIC) KILIMANJARO ZONE UNITED REPUBLIC OF TANZANIA MINISTRY OF WATER AND IRRIGATION (MoWI) NATIONAL IRRIGATION COMMISSION (NIC) KILIMANJARO ZONE 1 AN OVERVIEW OF IRRIGATION DEVELOPMENT IN KILIMANJARO ZONE Amana S. Mbowe Principal

More information

Water Distribution Management and reduction of NRW

Water Distribution Management and reduction of NRW Water Distribution Management and reduction of NRW Managing Director Jens Pedersen, Watertech Ltd. Denmark. The views expressed in this paper are the views of the authors and do not necessarily reflect

More information

Urban NEXUS. Integrated Resource Management in Asian Cities: The Urban Nexus Ulanbataar, 5 7 th November, 2014

Urban NEXUS. Integrated Resource Management in Asian Cities: The Urban Nexus Ulanbataar, 5 7 th November, 2014 Urban NEXUS Operationalizing the Urban NEXUS in cities and metropolitan regions for resource efficient, effective, customizable and resilient urban projects and investments Integrated Resource Management

More information

Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa

Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa SECURITY OF WATER SUPPLY It is the ability to continuously produce and supply safe drinking water to the enduser ASSURANCE RISK LEVEL

More information

The views expressed are those of the author and do not necessarily reflect the views of UNCTAD

The views expressed are those of the author and do not necessarily reflect the views of UNCTAD The views expressed are those of the author and do not necessarily reflect the views of UNCTAD The Multi-year Expert Meeting (MYEM) on Investment, Innovation and Entrepreneurship for Productive Capacity-Building

More information

Ministry of Regional Development and Infrastructure of Georgia United Water Supply Company of Georgia

Ministry of Regional Development and Infrastructure of Georgia United Water Supply Company of Georgia Ministry of Regional Development and Infrastructure of Georgia United Water Supply Company of Georgia United Water Supply Company of Georgia LLC Bucharest, ROMANIA November 7th, 2011 About the Company

More information

Statement of Capability

Statement of Capability Statement of Capability 1 Introduction to WSUP Advisory Each week a million people move into unplanned, urban settlements with no basic services. This trend is set to continue. In response, WSUP Advisory

More information

Case Study: City of Nagoya, Japan

Case Study: City of Nagoya, Japan Policies, Measures, and Collaboration for integrated implementation of SDG 6.5, 11.3 and 11.5 toward sustainable IWRM and Water-Resilient City Case Study: City of Nagoya, Japan Yumiko Asayama Manager of

More information

Emerging practices from Agricultural Water Management in Africa and the Near East. Thematic Workshop

Emerging practices from Agricultural Water Management in Africa and the Near East. Thematic Workshop Emerging practices from Agricultural Water Management in Africa and the Near East Thematic Workshop Coping with water scarcity in Egypt - the role of agriculture: Theme 7 Solar-Powered Water Lifting for

More information

Water Issues in Cyprus

Water Issues in Cyprus Water Issues in Cyprus Sofoclis Aletraris Minister of Agriculture, Natural Resources and Environment 7 July, 2012 Water scarcity and droughts in Cyprus Severe water scarcity problem in Cyprus for centuries

More information

AfDB s Activities in the Water and Sanitation Sector: Strategies and Pipeline of Projects. Water Development and Sanitation Dept.

AfDB s Activities in the Water and Sanitation Sector: Strategies and Pipeline of Projects. Water Development and Sanitation Dept. AfDB s Activities in the Water and Sanitation Sector: Strategies and Pipeline of Projects Water Development and Sanitation Dept. (AHWS) Outline 1. The Water and Sanitation Sector at a glance 2. Context

More information

Water Security Agency. Plan for saskatchewan.ca

Water Security Agency. Plan for saskatchewan.ca Water Security Agency Plan for 2016-17 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 8 Financial Summary...

More information

Integrated Urban Water Management in city of Darkhan, Mongolia

Integrated Urban Water Management in city of Darkhan, Mongolia Integrated Water Resources Management in Central Asia: Model Region Mongolia (MoMo) Integrated Urban Water Management in city of Darkhan, Mongolia Buren Scharaw Fraunhofer IOSB-AST Workshop Ulaanbaatar,

More information

REQUEST FOR QUOTATIONS (RFQ)

REQUEST FOR QUOTATIONS (RFQ) REQUEST FOR QUOTATIONS (RFQ) Transition Initiatives for Stabilization Plus (TIS+) Provision of Support for Engineering Technical Supervision and Capacity Building for Baardhere Orientation Center (JSS021)

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan 1.Name of the Project Country: The Republic of Indonesia Project: Upper Citarum Basin Flood Management Sector Loan Loan Agreement: March 28,

More information

Hydropower & Dams Services

Hydropower & Dams Services Hydropower & Dams Services We represent a world-class concentration of hydropower and dam expertise. Since 1920, we have designed hundreds of new hydropower and dams globally, producing clean reliable

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY (DC Water) REQUEST FOR INFORMATION (RFI)

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY (DC Water) REQUEST FOR INFORMATION (RFI) DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY (DC Water) REQUEST FOR INFORMATION (RFI) RFI Date Issued 18-PR-DWT-05 November 1, 2017 Information Due Date and Time For Energy Partnership SodiHyHyklklHydHydroxide

More information

World Bank Financed Yunnan Urban Environment Project Procuremen

World Bank Financed Yunnan Urban Environment Project Procuremen losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized N o Contract N o Description Estimated Procure in RMB M. in USD M. ment Method Component I. County

More information

ABDULRAHMN ALDAKHEEL. King Saud University Riyadh, Saudi Arabia

ABDULRAHMN ALDAKHEEL. King Saud University Riyadh, Saudi Arabia ABDULRAHMN ALDAKHEEL King Saud University Riyadh, Saudi Arabia OVERVIEW OF WATER RESOURCES Groundwater : Fossil aquifers (non-renewable) Alluvial aquifers (renewable) Desalination: More than 30 plants

More information

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) 1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) The national water legislative framework in the Republic of Macedonia is comprehensive and regulates, from different perspectives,

More information

State Programme for Water Resources Management and Kazakhstan s Transition to Green Economy

State Programme for Water Resources Management and Kazakhstan s Transition to Green Economy Annual Meeting of EUWI EECCA Working Group - Geneva, 24 June 2014 - State Programme for Water Resources Management and Kazakhstan s Transition to Green Economy Август 203 г. Mukhtar Zhakenov, Deputy Director,

More information

Pasquia Area Drainage and Pumping System

Pasquia Area Drainage and Pumping System Pasquia Area Drainage and Pumping System Review of Operating Guidelines Public Open House August 22, 2017 Welcome! Manitoba Infrastructure, the Rural Municipality (RM) and The Pas and District Farmer s

More information

Honorable Deputy Minister, Madam Ambassador, Mr. Chairman PS Eng Stower, Distinguished Partners, Friends, Colleagues, Ladies and Gentlemen,

Honorable Deputy Minister, Madam Ambassador, Mr. Chairman PS Eng Stower, Distinguished Partners, Friends, Colleagues, Ladies and Gentlemen, World Bank Statement Rafik Hirji May 29, 2012 Thank you Mr. Chairman. Honorable Deputy Minister, Madam Ambassador, Mr. Chairman PS Eng Stower, Distinguished Partners, Friends, Colleagues, Ladies and Gentlemen,

More information

WEC IWRM Seminar Sana a March 2010

WEC IWRM Seminar Sana a March 2010 Components of IWRM study program at WEC and its relevance to water sector in Yemen by Prof. Dr.Abdulla Babaqi WEC IWRM Seminar Sana a 15-16 March 2010 Outline Current situation of the water sector Needs

More information

NRW - Danish technology and management solutions. David Yang

NRW - Danish technology and management solutions. David Yang NRW - Danish technology and management solutions David Yang yzy@dhigroup.com NRW (non revenue water) Apparent losses (commercial losses) inaccurate metering data handling errors theft Real losses (physical

More information

Ml/d. Ml/d. Ml/d. Ml/d

Ml/d. Ml/d. Ml/d. Ml/d Block A Raw water Line 1 Raw water abstracted from own sources The volume of raw water abstracted from Scottish Water's boreholes, rivers and impounding reservoirs in the report year. Block A Raw water

More information

Darial Energy LLC. Dariali Hydro Power Plant Construction and Operation Project. Environmental and Social Action Plan, Dariali HPP

Darial Energy LLC. Dariali Hydro Power Plant Construction and Operation Project. Environmental and Social Action Plan, Dariali HPP Darial Energy LLC Dariali Hydro Power Plant Construction and Operation Project Environmental and Social Plan, Dariali HPP Tbilisi 2014 Dariali Energy JSC, the Sponsor, is planning construction and operation

More information

NELSAP AT A GLANCE. Overview of NELSAP

NELSAP AT A GLANCE. Overview of NELSAP NELSAP AT A GLANCE Overview of NELSAP The Nile Basin Initiative (NBI) is a partnership of the riparian states effective 1999; it seeks to develop the river in a cooperative manner, share substantial socioeconomic

More information

Country Paper on Integrated Water Resources Management in Nepal

Country Paper on Integrated Water Resources Management in Nepal The First General Meeting of the Network of Asian River Basin Organization (NARBO) in Batu-Malang, Indonesia (February 24-26, 2004) Country Paper on Integrated Water Resources Management in Nepal Presented

More information

Tanzania s Second Five Year Development Plan 2016/ /21: Summary of proposed actions and financing plans for implementation 1

Tanzania s Second Five Year Development Plan 2016/ /21: Summary of proposed actions and financing plans for implementation 1 Tanzania s Second Five Year Development Plan 2016/17 2020/21: Summary of proposed actions and financing plans for implementation 1 TANZANIA S SECOND FIVE YEAR DEVELOPMENT PLAN IMPLEMENTATION STRATEGY AND

More information

CENSUS OF INDUSTRIAL PRODUCTION

CENSUS OF INDUSTRIAL PRODUCTION CENSUS OF INDUSTRIAL PRODUCTION TANZANIA MAINLAND 2013 SUMMARY REPORT Vision To become a one stop centre for official statistics in Tanzania Mission To produce quality official statistics and service that

More information

Water Account, Mauritius 2013

Water Account, Mauritius 2013 Republic of Mauritius Water Account, Mauritius 2013 Statistics Mauritius, Ministry of Finance and Economic Development June 15 Contents Foreword... III List of Symbols and Abbreviations... IV 1. Introduction...

More information

OVERVIEW OF PANGANI BASIN

OVERVIEW OF PANGANI BASIN OVERVIEW OF PANGANI BASIN During Spate Irrigation Leadership Course Old Moshi Road P.O. Box 7617 Moshi, Tanzania Email: basins.pangani@maji.go.tz pbwo@panganibasin.com Website: www.panganibasin.com Protea

More information

(To be published in the Gazette of India, Part I, Section 1) RESOLUTION. Tariff based Competitive-bidding Guidelines for Transmission Service

(To be published in the Gazette of India, Part I, Section 1) RESOLUTION. Tariff based Competitive-bidding Guidelines for Transmission Service (To be published in the Gazette of India, Part I, Section 1) No. 11/5/2005-PG(i) GOVERNMENT OF INDIA Ministry of Power. RESOLUTION New Delhi, Date: 17th April, 2006 Tariff based Competitive-bidding Guidelines

More information

Integrated Catchment Modelling

Integrated Catchment Modelling Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration

More information

LIBERIA TELECOMMUNICATIONS CORPORATION

LIBERIA TELECOMMUNICATIONS CORPORATION LIBERIA TELECOMMUNICATIONS CORPORATION DEPARTMENT : ADMINISTRATION JOB TITLE : DIRECTOR OF ADMINISTRATION Shall be responsible to organize, plan, coordinate and effectively monitor activities relating

More information

Water Pricing in South Africa incorporating social and environmental elements Sacramento Water Pricing Workshop, February 2016 Barbara Schreiner

Water Pricing in South Africa incorporating social and environmental elements Sacramento Water Pricing Workshop, February 2016 Barbara Schreiner Water Pricing in South Africa incorporating social and environmental elements Sacramento Water Pricing Workshop, February 2016 Barbara Schreiner Background Middle income country Extremely high Gini co-efficient

More information

Partnership for Safe Water Distribution System Optimization Program. Barbara Martin, AWWA

Partnership for Safe Water Distribution System Optimization Program. Barbara Martin, AWWA Partnership for Safe Water Distribution System Optimization Program Barbara Martin, AWWA Why Optimize? Assessment benefits: System-specific learning opportunity Prepare for future regulations Water quality

More information

Solutions Across Disciplines STOP WATER LOSSES. Reduce NRW to less than 10 % through integrated NRW management. By Klavs Høgh & Kristian Rokkjær

Solutions Across Disciplines STOP WATER LOSSES. Reduce NRW to less than 10 % through integrated NRW management. By Klavs Høgh & Kristian Rokkjær STO WATER LOSSES Reduce NRW to less than 10 % through integrated NRW management By Klavs Høgh & Kristian Rokkjær NRW in South Africa at 40 % A burning platform RSA is divided into 9 Water Management Areas,

More information

Life-Cycle Costs Approach

Life-Cycle Costs Approach Briefing Note 1 Life-Cycle Costs Approach Glossary and cost components Catarina Fonseca, Richard Franceys, Charles Batchelor, Peter McIntyre, Amah Klutse, Kristin Komives, Patrick Moriarty, Arjen Naafs,

More information

BY PLANNER J.K.BARREH, DEPUTY DIRECTOR CITY PLANNING DEPARTMENT:

BY PLANNER J.K.BARREH, DEPUTY DIRECTOR CITY PLANNING DEPARTMENT: INTEGRATING CLIMATE CHANGE RESPONSES IN THE MASTER PLAN RENEWABLE WATER RESOURCE PLANNING & MANAGEMENT- PRESENTATION TO ICLEI CONFERENCE HELD AT DAR-ES-SALAAM ON 30 TH OCTOBER, 2013. BY PLANNER J.K.BARREH,

More information

COWI TANZANIA LTD WELCOME TO OUR WORLD OF CONSULTANCY WITHIN ENGINEERING, ENVIRONMENT AND ECONOMICS

COWI TANZANIA LTD WELCOME TO OUR WORLD OF CONSULTANCY WITHIN ENGINEERING, ENVIRONMENT AND ECONOMICS COWI TANZANIA LTD WELCOME TO OUR WORLD OF CONSULTANCY WITHIN ENGINEERING, ENVIRONMENT AND ECONOMICS COWI TANZANIA CORE SERVICE LINES Development assistance Urban and regional development Environmental

More information

SET Mission Philippines 2013

SET Mission Philippines 2013 Humanitarian Aid SDC/ HA Emergency Operation SET Mission Philippines 2013 WES assessment in Daanbantayan and Bantayan 23.11.2013 05.12.2013 (Short and mid term) 1.1 ERAL SUMMARY After the typhoon destroyed

More information

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION

More information

Zambezi River Basin Challenges and Issues

Zambezi River Basin Challenges and Issues Zambezi River Basin Challenges and Issues GEO-UNESCO Joint Workshop on Earth Observation and Capacity Development for IWRM at River Basins in Africa : 12-14 January 2012, Nairobi, Kenya. Zvikomborero MANYANGADZE

More information

ELECTRICITY PRICING IN TANZANIA

ELECTRICITY PRICING IN TANZANIA ELECTRICITY PRICING IN TANZANIA Felix Ngamlagosi Director of Regulatory Economics EWURA 10 13 SEPT. 2012 ELECTRICITY PRICING IN TANZANIA BACKGROUND TARIFF APPLICATION GUIDELINES 2009 CURRENT TARIFF SETTING

More information

National Water Demand Management Policy

National Water Demand Management Policy National Water Demand Management Policy Introduction In 1997, the Ministry of Water and Irrigation developed Jordan s Water Strategy and the following four policies, which include: Water Utility Policy;

More information

A regional public water supply scheme for the Mekong Delta Design in phases of a transmission-distribution network

A regional public water supply scheme for the Mekong Delta Design in phases of a transmission-distribution network A regional public water supply scheme for the Mekong Delta Design in phases of a transmission-distribution network Picture: Bao Moi, 2014 Rik Dierx Vitens Evides International (VEI) 1 st Water and Sanitation

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/17/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

INDICATIVE ANNUAL WORK PROGRAMME FOR PROVISION OF GRANTS UNDER THE PROGRAMMES CO-FINANCED BY THE ERDF, ESF, CF AND EMF

INDICATIVE ANNUAL WORK PROGRAMME FOR PROVISION OF GRANTS UNDER THE PROGRAMMES CO-FINANCED BY THE ERDF, ESF, CF AND EMF INDICATIVE ANNUAL WORK PROGRAMME FOR PROVISION OF GRANTS UNDER THE PROGRAMMES CO-FINANCED BY THE ERDF, ESF, CF AND EMF OPERATIONAL PROGRAMME ENVIRONMENT 204-2020 INDICATIVE ANNUAL WORK PROGRAMME FOR Name

More information

Experience and Strategy of the City of Yokohama Capabilities & Achievements of Yokohama Waterworks Bureau

Experience and Strategy of the City of Yokohama Capabilities & Achievements of Yokohama Waterworks Bureau Experience and Strategy of the City of Yokohama Capabilities & Achievements of Yokohama Waterworks Bureau CHIAKI SUZUKI JICA Expert Project for Improving the Capacity of WASAs in Punjab Province 1 Overview

More information

Added Value to MM operation processes by means of new technologies

Added Value to MM operation processes by means of new technologies Added Value to MM operation processes by means of new technologies Fabio Marelli Water Utility Director Direzione Acquedotto MM Milano Water Utility WaterIDEAS 2016 Conference H20 XIII Mostra Internazionale

More information

The newly updated and comprehensive SWMP shall:

The newly updated and comprehensive SWMP shall: RFQ SCOPE OF SERVICES 2.1 Project Purpose The City of Miami, ( City ) is seeking professional engineering services from a qualified firm for the purpose of planning and developing a newly updated and comprehensive

More information

Accounting Separation Methodology Statement. Upstream Services YW 2014/15

Accounting Separation Methodology Statement. Upstream Services YW 2014/15 Accounting Separation Methodology Statement Upstream Services YW 2014/15 Upstream Services YW 2014/15 Accounting Separation Methodology Statement Upstream Services Split - Yorkshire Water 2014/15 Yorkshire

More information

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

DETAILED TERMS OF REFERENCE. 1.0 Terms Of Reference: I.1 The scope of services of a consultant shall include the following categories:

DETAILED TERMS OF REFERENCE. 1.0 Terms Of Reference: I.1 The scope of services of a consultant shall include the following categories: DETAILED TERMS OF REFERENCE 1.0 Terms Of Reference: I.1 The scope of services of a consultant shall include the following categories: 1. To study existing SWM practice and Drainage system in the city.

More information

Power Purchase Agreements

Power Purchase Agreements Foro de Eficiencia Energética y Energía Renovable: Herramientas de Análisis Económico para Aumentar la Competitividad Empresarial Mayaguez, PR Octubre 2012 Renewable Energy Power Purchase Agreement (PPA)

More information

Iran (

Iran ( An Investigation of Structural Design Effect on Sewer System Defects Using Sewer Inspection Robot N. Mehrdadi 1, S. M. Tafazoli 2, S. M. Ghaneeizad 3 1 Faculty of Environment, University of Tehran, Tehran,

More information

TABORA INVESTMENT FORUM 19 th JULY 2013 AT SERENA HOTEL DAR ES SALAAM

TABORA INVESTMENT FORUM 19 th JULY 2013 AT SERENA HOTEL DAR ES SALAAM TABORA INVESTMENT FORUM 19 th JULY 2013 AT SERENA HOTEL DAR ES SALAAM Presentation on Tabora and Government initiative on improving infrastructures for investments attraction in Tabora region By Longino

More information

Benefits of investing in water and sanitation

Benefits of investing in water and sanitation Benefits of investing in water and sanitation OECD Expert Meeting on Water Economics and Financing Paris, 17 th March 2010 Sophie Trémolet sophie@tremolet.com 1 Introduction Report objectives Synthesise

More information

NATIONAL RURAL LIVELIHOODS PROJECT MINISTRY OF RURAL DEVELOPMENT, GOVERNMENT OF INDIA

NATIONAL RURAL LIVELIHOODS PROJECT MINISTRY OF RURAL DEVELOPMENT, GOVERNMENT OF INDIA PROCUREMENT MANUAL NATIONAL RURAL LIVELIHOODS PROJECT MINISTRY OF RURAL DEVELOPMENT, GOVERNMENT OF INDIA 1 Table of Contents Section 1 : Introduction Section 2 : Procurement of Goods, Civil Works and Non-Consulting

More information

SDG 6 (Water and Sanitation) in Republic of Korea

SDG 6 (Water and Sanitation) in Republic of Korea SDG 6 (Water and Sanitation) in Republic of Korea Roles of youth community in ensuring the availability and sustainable management of water and sanitation for all Hyun Jung Park, Ph.D. Institute for Climate

More information

Jason McDiarmid, R.E.T. Terra Erosion Control Ltd.

Jason McDiarmid, R.E.T. Terra Erosion Control Ltd. Career History Terra Erosion Control Ltd. Project Manager Nelson, British Columbia November 2009 to Present Stantec Consulting Ltd. Edmonton Alberta Environmental Consultant / Project Manager May 2003

More information