1 Career History Terra Erosion Control Ltd. Project Manager Nelson, British Columbia November 2009 to Present Stantec Consulting Ltd. Edmonton Alberta Environmental Consultant / Project Manager May 2003 to October 2009 o project management o contract administration o reports, studies and tender documents o raw, fire and potable water lines o sanitary sewers o pump stations o lift stations o forcemains o storm water management facilities o storage facilities o culverts o water treatment o wastewater treatment o operations manuals o public and stakeholder consultation o erosion and sedimentation control o outfalls rehabilitation o proposal preparation o scada and real time control o civil site works and grading o horizontal directional drilling o regulatory application and compliance o water system & thermal modeling o pressure pipeline and pump station modeling o small gravity sewer system modeling My career with Stantec s Environmental Infrastructure group has provided me with the opportunity to work on an extensive range of environmental infrastructure and civil projects. Including study, design and construction management of linear infrastructure, pump stations, lift stations, storm water management facilities, control systems and civil surface works. A sample set of projects is provided at the end of this resume. The City of Whitehorse Whitehorse Yukon Utilities Supervisor August 1998 to May 2003 o staff supervision & recruitment o transportation and parks technical support o pump stations o parts & materials procurement and inventory o lift stations o water treatment As the Utilities Supervisor for the City of Whitehorse`s o storage facilities Public Works Department, I was responsible for the o water lines overall operations and maintenance of the City`s water o water metering program and wastewater systems. I directly supervised up to o sanitary sewers 24 union members including recruitment, evaluation o storm sewers and career development. During my time as the o sewage treatment lagoons Utilities Supervisor we developed or formalized a o scada and control systems number of preventive maintenance programs including o solid waste collection water testing, unidirectional flushing, hydrant o landfill operation winterization, valve exercising, sewer cleaning, o operational and capital budgets reservoir cleaning, leak detection and upgraded our o preventative maintenance programs major pump stations to SCADA. o subdivision design reviews We also managed to fix a significant amount of o design and construction standards neglected infrastructure while dealing with shrinking o safety programs budgets. December 2009 Page 1 of 10

2 Engineering Technologist October 1994 to August 1998 o budgeting and planning o report preparation o surveying o water lines o sewer lines o storm sewer lines o storm water ponds o sewage lagoons o roadways o construction management o water modeling o landfill o pavement systems As an Engineering Technologist for the City of Whitehorse, I was involved in planning, budgeting, study, design and construction of transportation, solid waste, water and wastewater capital projects. Public Works & Government Services Canada Construction Inspector Edmonton Alberta June 1993 to October 1994 o project management o highway design o construction monitoring o highway construction inspection o gravel crush inspection o pavement construction o materials testing o surveying o drainage structure installation inspection o asphalt recycling and overlay As a Construction Inspector for Public Works & Government Services Canada I worked under the Alaska Highway Program on highway design and construction. Materials Technician Whitehorse Yukon Seasonal 1989 to 1992 o soils, granular materials testing o concrete & asphalt testing o geotechnical field investigation o gravel crushing o highway reconstruction inspection o drainage structure inspection o survey assistant As a Materials Technician for Public Works & Government Services Canada, I conducted in lab and field materials testing, gravel crush inspection, and highway construction inspection for the Alaska Highway Program. December 2009 Page 2 of 10

3 Education British Columbia Institute of Burnaby British Columbia Technology Civil and Structural Engineering Technology Diploma, 1991 to 1993 University of British Columbia Vancouver British Columbia Applied Science First year, 1990 to 1991 Yukon College Whitehorse Yukon Science (First Year University Transfer) 1989 to 1990 F.H. Collins Secondary School Whitehorse Yukon Grade 12 Diploma 1986 to 1989 Training Emergency Operations o Emergency Site Management Canadian Emergency Preparedness College 2001 o Emergency Operations Center Canadian Emergency Preparedness College 2000 Safety o H2S Alive Suncor, 2009 o WHMIS Stantec Consulting Ltd o Standard First Aid and Heart Saver II Canadian College of EMS 2007 o Alberta Construction Safety Alberta Construction Safety Association 2007 o Oils Sands Safety Stantec 2007 o Transportation of Dangerous Goods Stantec Consulting Ltd o Confined Space Entry and Rescue Justice Institute of British Columbia 2001 Technical o Autodesk Land / Civil Fundamentals Rand Worldwide 2004 o Water Treatment Level 1 BC Water and Wastewater Association 2002 o Cross Connection Control Tester BC Water and Wastewater Association 2001 o SLC500 & RSLOGIX500 (PLC) Rockwell Automation 2000 o Wonderware Automation (SCADA) Flint Controls and Electric 2000 o Water Distribution Level 1 BC Water and Wastewater Association 2000 Supervisory o Supervisor s Skills Level 1 & 2 Yukon College 2001 o Media Relations Yukon College 2000 o Supervisor s Safety Skills Level 1 Yukon College 1999 December 2009 Page 3 of 10

4 Stantec Project Management Training 2005 to 2007 o Introduction to Project Management o Mitigate Risk: Projects and Agreements o Manage Risk: Delivery Quality Cash o Project Management Framework o Risk Management o People Skills o Project Planning o Business Development o Projects, Profit Centres and Cash Flow o Client Relations Current Certificates and Licenses o Registered Engineering Technologist Association of Science and Engineering Technology (ASET) Alberta 2008 o Certified Engineering Technologist ASET 2005 o Class 5 driver's license Government of Alberta o Standard First Aid and Heart Saver II Canadian College of EMS 2007 Past Certificates and Licenses o Notary Public in and for the Yukon Expired 2007 o Applied Science Technologist (AScT) Applied Science Technologists and Technicians of B.C., Transferred in 2005 o Cross Connection Control Tester BC Water and Wastewater Association 2001 Certification o Chlorine Handler s Certification BC Water and Wastewater Association 1996 December 2009 Page 4 of 10

5 Stantec Project Highlights Rossdale Forcemain Lowering, City of Edmonton The Rossdale Forcemain Lowering project consists of providing a design, regulatory support services and construction support services to lower an exposed sanitary sewer forcemain on the bank of the North Saskatchewan River. For this project I provided project management and design services. This project is currently in the regulatory application phase. Borealis Wastewater Treatment Plant, Suncor The Borealis Wastewater Treatment Plant Expansion project consisted of upgrading the existing wastewater treatment plant by adding new bioreactor skids, digester skid, clarifier & microstrainer skid, flow equalization skid, controls and generator skid, pumping station, lift station, storage tank, and new forcemains between the expanded plant and three nearby plants. For this project I provided construction administration for civil works. The project is currently in the construction stage. Firebag Administration Complex, Suncor The Firebag Administration Complex is a design build manage project in which Stantec is providing design and construction monitoring for an oil sands administration complex including administration, control, warehouse and maintenance buildings. For this project I worked on the design and construction monitoring of potable water lines, fire water lines, sanitary sewer lines, potable water booster station, potable water storage tank, and two pre-packaged sanitary lift stations. The project is currently in the construction stage. December 2009 Page 5 of 10

6 Firebag Village, Suncor The Firebag Village is a design build manage project in which Stantec is providing the design and construction monitoring services for an oil sands camp including accommodations for four thousand people and Core facilities building. For this project I worked on the design and construction monitoring of raw water lines, potable water lines, fire water lines, fire water booster station, fire storage tanks, sanitary sewers, sanitary lift station, storm sewers, storm water management pond, storm lift stations, erosion and sedimentation control, site grading, roadways and parking lots. The project is currently in the construction stage. Elsinore Pump Station Upgrades, Canterra Developments Corp. The upgrade of the City of Edmonton s Elsinore Pump Station was required to support service area expansion. This project involved a pump station preliminary design study to establish sanitary design flows and servicing options. The detailed design for pump, standby power and control upgrades is currently underway. For this project I provided project management, report preparation and process design. This project is currently in the detailed design stage. Storm Water Management Facility Real Time Control Chambers, Private Developers Real Time Control (RTC) chambers are used to control the timing and outflow rate from storm water management facilities. I provided project management and design services for four RTC chambers for private developers in Edmonton. The RTC facilities are connected to the City s SCADA system. SCADA Phase V, City of Edmonton The SCADA Phase V project involved the design, tender and construction services for the fifth phase of the City of Edmonton s SCADA implementation. For this project I provided tender preparation and construction support services. December 2009 Page 6 of 10

7 Storm Outfalls Rehabilitation, City of Edmonton The preliminary work for this project involved the structural, geotechnical and hydrological assessment of seven storm water outfalls to the North Saskatchewan River and other fish bearing streams. Along with condition assessments, the study documentation included conceptual upgrade designs and an implementation plan. For this project I provided technical support and assisted with document preparation during the preliminary project stage. I was the Project Manager for the detailed design and rehabilitation of four of the outfalls. A key feature of the outfall upgrade designs includes biotechnical treatment of the erosion control measures. The rational for this approach is to provide improved erosion protection and an improved fish habitat that negates the need for regulator required habitat alteration compensation. Warm Water Wells Expansion Hydraulic Review and Conceptual Design, City of Whitehorse Based on recommendations provided in the Water and Sewer Study, Stantec 2003, the City decided to investigate the potential for warm water well expansion as an alternative to constructing a water treatment plant. For this project I provided project management and project delivery including, water system hydraulic modeling, water thermal modeling, assessment of alternatives, well site and transmission concept design and report preparation. Pump Station Electrical & Control Design Guidelines Revision, City of Edmonton This project involved updating the City of Edmonton s Pump Station Electrical and Control Design Guidelines. For this project I provided project management and document preparation. Rat Creek Fish Habitat Creation, City of Edmonton The Rat Creek Fish Habitat Creation project involved construction of Sturgeon habitat in the North Saskatchewan River as compensation for other outfall construction and rehabilitation activities. I was responsible for the design and tender phases of this project. December 2009 Page 7 of 10

8 Yellowhead Trail and CN Rail Yard HDD Crossing, EPCOR Transmission Services The Yellowhead Trail and CN Rail Yard HDD Crossing project involved design and construction services for a high voltage transmission line crossing of the Yellowhead Trail and CN Rail Yard by horizontal directional drilling (HDD). For this project I provided resident engineering services. Storm Outfall 44 Rehabilitation, City of Edmonton The Storm Outfall 44 Rehabilitation project consisted of rehabilitation of a 3,000 mm diameter storm outfall, including sheet piles, new concrete apron, and Class 2 rip rap erosion protection. A key feature of this project was construction of nearly a 1 km of access road within the North Saskatchewan River from Class 2 rip rap. Floating turbidity curtains were used to control sediment. The rip rap was later blended into the bank for erosion protection. I provided resident engineering services for this project. Opportunistic Sewer Separation, City of Edmonton The Opportunistic Sewer Separation project involved design and construction services for three combined sewer separation projects. Trenchless construction was required for a significant portion of the design. For this project I provided preliminary report preparation and assisted with sewer line detailed designs. Lendrum Dry Pond, City of Edmonton The Lendrum Dry Pond project was initiated after severe July 2004 storm events that caused significant flooding throughout Edmonton. The project involved design and construction services for a storm water management dry pond within an existing school playing field. The dry pond was designed to provide storm water storage and neighbourhood flood relief during large storm events. The design included improved playing fields, naturalized and specialty areas. For this project I was involved in the preliminary design and public consolation process. Malmo Relief Sewer, City of Edmonton The Malmo Relief Sewer project was initiated after severe July 2004 storm events that caused significant flooding throughout Edmonton. The project involved design and construction services for a sanitary relief sewer running through the Malmo Plains neighbourhood. Trenchless construction was required for a significant portion of the design. For this project I was involved in the preliminary design, detailed design and public consolation process. December 2009 Page 8 of 10

9 St. Albert Pump Station Feasibility Study, Alberta Capital Region Wastewater Commission The St. Albert Pump Station services the entire City of St. Albert. This project involved establishment of sanitary design flows, an assessment of pump station and force main upgrade options, and an assessment of storage options. For this project I provided pump and forcemain modeling, and assisted with system assessment, upgrades options assessment and report preparation. Water and Wastewater Facilities Operations Manuals, City of St. Albert The City of St. Albert was required to produce operation manuals as part of their approval to operate from Alberta Environment. I authored the manuals for this project. Water Treatment Facility and Wastewater Treatment Facility Operations Manuals, Aquatera Utilities Inc. Aquatera was required to produce operation manuals as part of their approval to operate Grande Prairie s water and wastewater treatment plants. I co-authored the manuals for this project. Raw Water Pump Station and Transmission Feasibility Study, Aquatera Utilities Inc. The Aquatera Raw Water Pump Station services the City of Grande Prairie and region. The pump station delivers water from the Wapiti River to the water treatment plant in Grande Prairie. This project involved establishment of design water demands, an assessment of pump station and transmission upgrade options, raw water storage options, assessment of severe river erosion conditions and intake protection measures. For this project, I provided system modeling, and assisted with assessment, upgrades options assessment and report preparation. 34 Street Sewershed Concept Study, Strathcona County This project involved the establishment of sanitary service levels and collection system upgrade options for a large industrial area within Sturgeon County. For this project I provided, existing system assessment, upgrades options assessment and report preparation. December 2009 Page 9 of 10

10 34 Street Gravity Forcemain and Flush Facility, Strathcona County This project involved design and tender of a gravity forcemain (inverted siphon) and flush facility to be installed by horizontal directional drill (HDD). For this project I provided forcemain and flush facility design and preparation of tender documents. Environmental Data Warehouse Evaluation, City of Edmonton The Environmental Data Warehouse Evaluation project involved an assessment of communications, data storage, data management and reporting options for the City of Edmonton s data logger based environmental monitoring system. For this project I provided option identification, assessment and report preparation. Whitehorse Water and Sewer Study, City of Whitehorse The Whitehorse Water and Sewer Study project involved establishment of potential water and sewer service levels and establishment of upgrade requirements to ultimately support the full build out of Whitehorse s planned urban areas. My involvement included sewer system hydraulic modeling, water system hydraulic modeling, water system thermal modeling, assessment of transmission, storage and pump station upgrade requirements, review of water treatment requirements, and report preparation. As a follow up to this project, a Water and Thermal Model User s Manual was provided. December 2009 Page 10 of 10

OPERATOR EDUCATION PROGRAM COURSE CATALOGUE

OPERATOR EDUCATION PROGRAM COURSE CATALOGUE OPERATOR EDUCATION PROGRAM COURSE CATALOGUE REGISTER TODAY bcwwa.org 604.433.4389 education@bcwwa.org TABLE OF CONTENTS 4 About the BCWWA 5 Certification Courses: Water and Wastewater Systems Water Treatment

More information

Water and Wastewater Technician POA (2011) Subtask to Unit Comparison

Water and Wastewater Technician POA (2011) Subtask to Unit Comparison Water and Wastewater Technician POA (2011) Subtask to Unit Comparison Task 1 Monitors control 1.01 Monitors electrical A1 Trade Safety Awareness. (A & C Board Standard) A4 Trade Science And Trade Electricity

More information

City of Deerfield Beach. Environmental Services

City of Deerfield Beach. Environmental Services City of Deerfield Beach Environmental Services Areas of Responsibility Engineering and Administration Responsible for the coordination, budget, and quality control of all department functions. Review and

More information

Water and Waste Department

Water and Waste Department Water and Waste Department 2012 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association, March 7 th, 2012 Capital Budget Capital s Summary 2012 Capital Budget 2013 to

More information

Water and Waste Department

Water and Waste Department Water and Waste Department 2015 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 17, 2015 1 Capital Budget CAPITAL BUDGET 2015 Approved 2016 to 2020 2015

More information

TOWN OF FORT SMITH. Employment Opportunity. Water Plant Operator I

TOWN OF FORT SMITH. Employment Opportunity. Water Plant Operator I TOWN OF FORT SMITH Employment Opportunity Water Plant Operator I The Town of Fort Smith has an opportunity for a full-time Water Plant Operator I position to assist with the operation and regular maintenance

More information

HALIFAX WATER. Capital Budget 2015/16 Urban Core System Summary. Water - Land -- T O T A L $731,000. Water - Transmission -- T O T A L $5,297,000

HALIFAX WATER. Capital Budget 2015/16 Urban Core System Summary. Water - Land -- T O T A L $731,000. Water - Transmission -- T O T A L $5,297,000 Summary Asset Category s Water - Land -- T O T A L $731,000 Water - Transmission -- T O T A L $5,297,000 Water - Distribution -- T O T A L $4,978,000 Water - Structures -- T O T A L $608,000 Water - Treatment

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

GENERAL SERVICE WORKER

GENERAL SERVICE WORKER GENERAL SERVICE WORKER The City of Jefferson, IA (Pop. 4,323) is taking applications for a full-time General Service Worker for the Streets, Water, Sewer and Parks Departments. Duties include all aspects

More information

WATER RESOURCES COORDINATOR

WATER RESOURCES COORDINATOR File: Water Resources Coordinator Job Code: 456 FLSA: Non-exempt Unit: Public Services Operating Engineers Local 3 Revised: 2/2001 WATER RESOURCES COORDINATOR DEFINITION Under general supervision, plans,

More information

Working Partnerships with Alberta Environment and Parks/Advice and Support to Industry

Working Partnerships with Alberta Environment and Parks/Advice and Support to Industry INDUSTRY LEADERSHIP Working Partnerships with Alberta Environment and Parks/Advice and Support to Industry In 2017, EPCOR continued to provide expertise and advice to provincial government agencies and

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

Water / Wastewater Fund

Water / Wastewater Fund WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services

More information

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT Downtown Ottawa Transit Tunnel: Tunney s Pasture to Blair Station via a Downtown LRT Tunnel Prepared for: City of Ottawa 110 Laurier Avenue West Ottawa, ON

More information

SPRINGBROOK 2017 Offsite Levies

SPRINGBROOK 2017 Offsite Levies SPRINGBROOK 2017 Offsite Levies DETAILED CALCULATIONS REPORT BYLAW No. 2017/25 SCHEDULE A December 2017 RDC 2398 Final Version Table of Contents Springbrook 2017 Offsite Levies 2017 Detailed Calculations

More information

Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION

Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION 1 Contents Introduction 3 Delegation to the NEB 3 Assessments and regulatory guidance 4 Provincial requirements

More information

Public Information Centre No. 1

Public Information Centre No. 1 Public Information Centre No. 1 City of Timmins Schedule B Class Environmental Assessment for the WHITNEY TISDALE SANITARY SYSTEM UPGRADES Welcome Please Sign In Class EA Process & Public Consultation

More information

PerFormanCe Report. Town of Strathmore

PerFormanCe Report. Town of Strathmore PerFormanCe Report 2015 Town of Strathmore Our History in Strathmore EPCOR has been providing clean drinking water and wastewater service for more than one hundred years. We serve more than 1.5 million

More information

Engineering Technician or Engineering Technician II

Engineering Technician or Engineering Technician II Engineering Technician or Engineering Technician II Summerland, nestled in the heart of the Okanagan Valley, is a warm, friendly, unique, town with beautiful beaches, orchards, vineyards and mountains.

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

MT. VIEW SANITARY DISTRICT POLICY & PROCEDURE MANUAL

MT. VIEW SANITARY DISTRICT POLICY & PROCEDURE MANUAL POLICY TITLE: JOB DESCRIPTION WASTEWATER OPERATOR SERIES Wastewater Operator-in-Training I POLICY NUMBER: 2435 Definition This job series description includes the entry level through journey level wastewater

More information

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections:

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections: Schedule H to Bylaw 7452, Subdivision Bylaw Page 1 1. INTRODUCTION 1.1 Contents of Engineering Specifications 1.1.1 The Engineering Specifications contains the following sections: 1. Introduction 2. General

More information

City of Logan Sanitary Sewer Design Standards

City of Logan Sanitary Sewer Design Standards City of Logan Sanitary Sewer Design Standards 2011 http://www.loganutah.org/public_works/engineering/stdsspecsdesign.cfm Table of Contents PART 1. CITY OF LOGAN SANITARY SEWER SYSTEM DESIGN STANDARDS FOR

More information

Wilmette - Background

Wilmette - Background Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square

More information

Engineering Excellence 2016

Engineering Excellence 2016 A first in the world, a small infinity loop is being constructed at the Port of Vancouver in British Columbia. ODOT s new Transportation System Plan Guidelines represents one of the first digital online

More information

Environmental Setting

Environmental Setting Trans Mountain is seeking approval for a Certificate of Public Convenience and Necessity (CPCN) from the National Energy Board (NEB) for a $5.4 billion expansion of its oil pipeline system from Strathcona

More information

Controlled Corporations

Controlled Corporations Controlled Corporations This technical document is part of a series of draft discussion papers created by Municipal Affairs staff and stakeholders to prepare for the Municipal Government Act Review. It

More information

West Clayton NCP Stage 1

West Clayton NCP Stage 1 West Clayton NCP Stage 1 Citizens Advisory Committee Meeting #7 Preliminary Utility Servicing Summary Agenda Water Distribution Sanitary Sewer Stormwater Infrastructure West Clayton NCP Water Distribution

More information

RECOMMENDATION. the financing for the project BE APPROVED in accordance with the Sources of Financing Report attached hereto as Appendix A ;

RECOMMENDATION. the financing for the project BE APPROVED in accordance with the Sources of Financing Report attached hereto as Appendix A ; TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 9, 2018 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER APPOINTMENT

More information

Water / Wastewater Fund

Water / Wastewater Fund WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services

More information

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

Page 1 of 5 CITY OF SANTA CRUZ invites applications for the position of: Superintendent of Water Distribution *Open & Promotional SALARY: $41.15 - $55.68 Hourly $7,132.00 - $9,652.00 Monthly OPENING DATE:

More information

Y EA E R A S R O F F EXCE C LL L EN E C N E

Y EA E R A S R O F F EXCE C LL L EN E C N E Infrastructure Dams & Hydropower WATER Levees Kleinfelder understands the importance of water to our clients, communities, and families. We deliver solutions to sustainably manage this vital resource.

More information

CAPITAL IMPROVEMENT PROGRAM WATER

CAPITAL IMPROVEMENT PROGRAM WATER CAPITAL IMPROVEMENT PROGRAM 246 247 FUNDS (711-715) Access Road Improvements c709840 Minor road repair and pipeline clearance work to gain access to water facilities and equipment. Project Cost Estimate

More information

ENGINEERING MANAGER Salary Range: $9,021 - $12,088

ENGINEERING MANAGER Salary Range: $9,021 - $12,088 ENGINEERING MANAGER Salary Range: $9,021 - $12,088 San Lorenzo Valley Water District is looking for applicants for the position of Engineering Manager. Please read the details of the position and how to

More information

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11 A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards 11 1. General 11 a. Future Extensions 11 b. Design Calculations 11 c. Easements and Property 12

More information

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY

More information

WATERWORKS SERVICES WORKER I WATERWORKS SERVICES WORKER II WATERWORKS SERVICES WORKER III

WATERWORKS SERVICES WORKER I WATERWORKS SERVICES WORKER II WATERWORKS SERVICES WORKER III WATERWORKS SERVICES WORKER I WATERWORKS SERVICES WORKER II WATERWORKS SERVICES WORKER III Class specifications are intended to present a descriptive list of the range of duties performed by employees in

More information

City of Enderby Water Treatment Plant

City of Enderby Water Treatment Plant City of Enderby Water Treatment Plant The City of Enderby is located in the beautiful NorthOkanagan with a population of 3200 residents. The central location between Vernon and Salmon Arm allows easy access

More information

Healthy Environment. Expenditure and Funding Source Summary Solid Waste Disposal:

Healthy Environment. Expenditure and Funding Source Summary Solid Waste Disposal: Healthy Environment Expenditure and Funding Source Summary... 53 Solid Waste Disposal: Hanes Mill Road Landfill Development and Upgrades... 54 Hanes Mill Road Landfill EVO Property Development... 55 Hanes

More information

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project City of Saint John, New Brunswick Safe, Clean Drinking Water Project Canadian Consulting Engineering Awards 2017 City of Saint John, New Brunswick Safe, Clean Drinking Water Project Canadian Consulting

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

Tri-Municipal Industrial Partnership

Tri-Municipal Industrial Partnership Tri-Municipal Industrial Partnership Industrial Area Structure Plan Public Open House October 24 & 25, 2018 Outline 1. Introduction 2. Review Project Aims & Objectives 3. Planning Context 4. Constraints

More information

Trans Mountain Expansion Project Overview

Trans Mountain Expansion Project Overview Trans Mountain Expansion Project Overview 1 Proposed Expansion Project $6.8-billion capital cost Expand capacity to 890,000 bpd Project scope 980 kms new pipe 12 new pump stations 19 new tanks 3 new tanker

More information

Charlotte County Utilities 2007 Review/2008 Outlook

Charlotte County Utilities 2007 Review/2008 Outlook Charlotte County Utilities 2007 Review/2008 Outlook Presented to the Board of County Commissioners January 22, 2008 1 Utilities Mission Statement To provide products and services of uncompromising value

More information

Sun Valley General Improvement District Service Technician (Water/Wastewater)

Sun Valley General Improvement District Service Technician (Water/Wastewater) Sun Valley General Improvement District Service Technician (Water/Wastewater) Sun Valley General Improvement District is now accepting applications for Certified Grade I/II Water Distribution Service Technician

More information

Municipal LGDE Help Manual. Issued by: Local Government Infrastructure and Finance Branch

Municipal LGDE Help Manual. Issued by: Local Government Infrastructure and Finance Branch Municipal LGDE Help Manual Issued by: Local Government Infrastructure and Finance Branch December, 2016 Table of Contents 7. STATISTICS SCHEDULES... 72 7(A) GENERAL STATISTICS (SCHEDULE C1)... 72 A. Area...

More information

Revision - 10/19/2016 Page 1 of 6 Employee s Initials

Revision - 10/19/2016 Page 1 of 6 Employee s Initials VILLAGE OF LA GRANGE JOB DESCRIPTION POSITION TITLE: DEPARTMENT: REPORTS TO: Crew Leader (Including Forester and Mechanic) Public Works Director of Public Works Appointment Appointment of this position

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable

More information

Information for File # RJH

Information for File # RJH Information for File #2011-01629-RJH Applicant: Matthew Ternes Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil;

More information

Appendix P. CNR Crossing Application

Appendix P. CNR Crossing Application Appendix P CNR Crossing Application AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com May 17, 2017 British Columbia Railway Company 600-221

More information

County of Grande Prairie No.1 Growth and Economic Development Strategy Executive Summary

County of Grande Prairie No.1 Growth and Economic Development Strategy Executive Summary County of Grande Prairie No.1 Growth and Economic Development Strategy Executive Summary 2016-2066 EXECUTIVE SUMMARY What is a Growth and Economic Development Strategy? A Growth and Economic Development

More information

Joshua H. Reynolds, P.E.

Joshua H. Reynolds, P.E. Joshua H. Reynolds, P.E. Education B.S., Civil Engineering, California Polytechnic University, San Luis Obispo, CA Professional Registrations Professional Engineer - Civil, California, No. C65400 Professional

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT NORTH PRIMARY SANITARY GRAVITY MAIN UPGRADE

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT NORTH PRIMARY SANITARY GRAVITY MAIN UPGRADE June 7, 2017 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT ON NORTH PRIMARY SANITARY GRAVITY MAIN UPGRADE PURPOSE To seek Council s authorization to utilize

More information

ALBEMARLE COUNTY SERVICE AUTHORITY

ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA TITLE: Rivanna Water & Sewer Authority (RWSA) Monthly Update STAFF CONTACT(S)/PREPARER: Gary O Connell, Executive Director AGENDA DATE: February 16, 2017 CONSENT AGENDA: Informational ATTACHMENTS:

More information

ASSOCIATED ENGINEERING CONSULTANTS, INC. Corporate Philosophy

ASSOCIATED ENGINEERING CONSULTANTS, INC. Corporate Philosophy Across the Nation Associated Engineering Consultants, Inc. (AEC) is a diverse civil engineering consulting firm specializing in urban and municipal site development, pavement engineering, pavement management

More information

Town of Petrolia PRELIMINARY ASSET MANAGEMENT PLAN. Prepared by: Julie Fortier, ing. Marie-Élaine Desbiens, ing.

Town of Petrolia PRELIMINARY ASSET MANAGEMENT PLAN. Prepared by: Julie Fortier, ing. Marie-Élaine Desbiens, ing. PRELIMINARY ASSET MANAGEMENT PLAN Prepared by: Julie Fortier, ing. Marie-Élaine Desbiens, ing. Verified by: Stuart Winchester, P.Eng. 236 Victoria Street North, Suite 301 Kitchener, Ontario N2H 5C8 Canada

More information

River Valley Neighbourhoods Flood Risk Study. Cloverdale Public Consultation - May 13, 2015

River Valley Neighbourhoods Flood Risk Study. Cloverdale Public Consultation - May 13, 2015 River Valley Neighbourhoods Flood Risk Study Cloverdale Public Consultation - May 13, 2015 Today s Meeting 1. Provide results of the studies done regarding drainage issues in your neighbourhood. 2. Discuss

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

EXECUTIVE SUMMARY - REVISED

EXECUTIVE SUMMARY - REVISED EXECUTIVE SUMMARY REVISED INTRODUCTION The purpose of the Town of Salem Storm Water Management Plan is to develop recommendations and implementation strategies for addressing drainage problems and minimizing

More information

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017 Site C Clean Energy Project Monthly Environmental Monitoring Summary Report - February 2017 Prepared by BC Hydro Submitted May 8, 2017 Page 1 of 17 Table of Contents Introduction... 4 Project Progress...

More information

Public Facilities Report October 2014

Public Facilities Report October 2014 Public Facilities Report October 2014 Dunes Community Development District 5000 Palm Coast Parkway, SE Palm Coast, FL 32137 Developed in Accordance with Florida Statutes 189.415 Prepared by: Timothy B.

More information

Advanced Wastewater Treatment Plant Plant Profile

Advanced Wastewater Treatment Plant Plant Profile Advanced Wastewater Treatment Plant Plant Profile 2008 Brief History Wastewater treatment started in Penticton in 1948 with a Package Primary / Secondary plant at what is now the Alberni Lift Station.

More information

Branch Transportation Operations

Branch Transportation Operations Introduction Transportation Operations enables the smooth operation of the existing transportation network. Branch activities include a wide range of services that affect all citizens, including operating

More information

General Departmental Summary

General Departmental Summary Summer Gravel Road Maintenance General Departmental Summary This quarter has been fairly routine. We have had no water main breaks in the past three months, however we have performed routine maintenance

More information

DIVISION VI INDIVIDUAL GRINDER PUMP INSTALLATIONS

DIVISION VI INDIVIDUAL GRINDER PUMP INSTALLATIONS DIVISION VI INDIVIDUAL GRINDER PUMP INSTALLATIONS VI-1.000 DESCRIPTION 1.010 General A. Any extension of the Kitsap County sanitary sewer extension shall be completed in accordance with the applicable

More information

Tiered NEPA Document for Categorically Permitted Alterations to Existing U.S. Army Corps of Engineer Civil Works Projects Proposed Categorically Permitted Alterations (Check all that apply) Utilities under

More information

6. INFRASTRUCTURE CHARGES

6. INFRASTRUCTURE CHARGES 6.1 Overview 6. INFRASTRUCTURE CHARGES Aquatera currently uses infrastructure charges to recover the capital cost of construction related to Water and Wastewater services. The Infrastructure Charge is

More information

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012 Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012 Prepared By: Mike Squire, AScT AWS / ERWS Program Manager Program

More information

WATER SUPPLY SERVICES

WATER SUPPLY SERVICES PRACTICE MANUAL FOR WATER SUPPLY SERVICES IN KENYA PART A WATER SUPPLY A 1 LIST OF CONTENTS PART A - WATER SUPPLY Page: A1 1. INTRODUCTION A16 1.1 Background A16 1.2 Purpose A17 1.3 Water Supply Administration

More information

Appendix B Example of the Tiered NEPA Document to be used for Categorically Permitted Alterations PROGRAMMATIC ENVIRONMENTAL ASSESSMENT CATEGORICAL PERMISSIONS SECTION 408 ALTERATIONS TO EXISTING U.S.

More information

GRAND NIAGARA Proposed Secondary Plan

GRAND NIAGARA Proposed Secondary Plan GRAND NIAGARA Proposed Secondary Plan Public Open House #3 January 17. 2017 scope + process BUILT Grand Niagara Secondary Plan The Grand Niagara Secondary Plan will establish a framework for the future

More information

2012 ANNUAL WATER REPORT

2012 ANNUAL WATER REPORT 2012 ANNUAL WATER REPORT May 2013 TABLE OF CONTENTS Page 2 1.0 INTRODUCTION... 3 2.0 PARKSVILLE WATER SYSTEM... 3 3.0 DISTRIBUTION SYSTEM... 6 4.0 SCADA... 9 5.0 WATER SAMPLING AND TESTING... 10 6.0 WATER

More information

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Regional District LGDE Help Manual

Regional District LGDE Help Manual [Type text] Regional District LGDE Help Manual Issued by: Local Government Infrastructure and Finance Branch December, 2016 Table of Contents 7. STATISTICS SCHEDULES... 49 7(A) SCHEDULE C1 GENERAL STATISTICS

More information

CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 490 NOVEMBER 2018 (Formerly OPSS 490, April 2016) Note: The MUNI implemented in November 2018 replaces OPSS 490 COMMON, April 2016 with no technical

More information

STANLEY FARM SUBDIVISION

STANLEY FARM SUBDIVISION STANLEY FARM SUBDIVISION SERVICING OPTIONS AND STORMWATER MANAGEMENT REPORT BRIEF CITY OF OTTAWA PREPARED FOR: STANLEY FARM DEVELOPMENTS PREPARED BY: (November 2014 - Revision 0) LOT 9, CONCESSION 5 WATER

More information

5 Asset Management Strategy

5 Asset Management Strategy 5 Asset Management Strategy 5.1 Non-infrastructure Solutions The LOS ensure that adequate system capacity is provided and that the infrastructure is maintained in a state of good repair. A number of non-infrastructure

More information

PROCEDURE F-6-1 (formerly referenced by 08-02) Procedures to Govern Separation of Sewers and Watermains

PROCEDURE F-6-1 (formerly referenced by 08-02) Procedures to Govern Separation of Sewers and Watermains PROCEDURE F-6-1 (formerly referenced by 08-02) Procedures to Govern Separation of Sewers and Watermains PROCEDURE F-6-1 PROCEDURES TO GOVERN THE SEPARATION OF SEWERS AND WATERMAINS 1. Sewers/sewage works

More information

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Public Meeting and Open-House March 27, 2013 Agenda The Master Plan Process History of the Area Draft Servicing Strategy

More information

Water / Wastewater Fund

Water / Wastewater Fund WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services

More information

behind every great accomplishment...

behind every great accomplishment... behind every great accomplishment... is an even greater team ydrotech Engineering, Inc. Who We Are JEA HydroTech Engineering, Inc. is a diverse and experienced group of Licensed Professional Engineers

More information

Open Positions Spring 2019

Open Positions Spring 2019 Open Positions Spring 2019 KTM Design Solutions, Inc. KTM Design Solutions, Inc., is a full service, multi-disciplinary firm specializing in civil engineering, land planning, land surveying, project management,

More information

City of Edmonton Drainage Services Summary Notes of Riverdale Flood Mitigation Meeting Held May 14, 2015 at Riverdale School

City of Edmonton Drainage Services Summary Notes of Riverdale Flood Mitigation Meeting Held May 14, 2015 at Riverdale School Presenters City of Edmonton Drainage Services Summary Notes of Riverdale Flood Mitigation Meeting Held May 14, 2015 at Riverdale School Miressa Fola, Project Manager, Drainage Planning Maxime Belanger,

More information

BWSE-PA10 (08/18) Page 1 of 5 Project No. WCP

BWSE-PA10 (08/18) Page 1 of 5 Project No. WCP BWSE-PA10 (08/18) Page 1 of 5 Project No. WCP NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER SYSTEM ENGINEERING TECHNICAL REVIEW FORM DISTRIBUTION SYSTEMS (N.J.A.C. 7:10-11.10) Water

More information

Strathcona County Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830 A P P E N D I X G BRIDGE ASSESSMENT E00311A

Strathcona County Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830 A P P E N D I X G BRIDGE ASSESSMENT E00311A Strathcona County Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830 A P P E N D I X G BRIDGE ASSESSMENT E00311A BF 73649 E/W Bridge Culverts Highway 15 Crossing Astotin Creek Bridge

More information

WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY

WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY WESTRIDGE MARINE TERMINAL IN WATER EXCAVATION REPORT WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY Trans Mountain Pipeline ULC Kinder Morgan Canada

More information

Revised: August 29, 2018 Last Reviewed: Union: AFSCME Status: Full-time

Revised: August 29, 2018 Last Reviewed: Union: AFSCME Status: Full-time POSITION DESCRIPTION Position: General Maintenance Department: Department of Public Works Reports to: Manager Public Utilities, Roads & Facilities, Grounds FLSA Status: Non-Exempt Location: DPW Facility

More information

ONTARIO MUNICIPAL BOARD

ONTARIO MUNICIPAL BOARD PL150128 ONTARIO MUNICIPAL BOARD Eden Oak (Creditview Heights) Inc. has appealed to the Ontario Municipal Board under subsection 34(11) of the Planning Act, R.S.O. 1990, c. P.13, from the neglect or refusal

More information

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1 Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...

More information

City of Grass Valley JOB DESCRIPTION ASSISTANT ENGINEER

City of Grass Valley JOB DESCRIPTION ASSISTANT ENGINEER Department: Public Works Department Reports To: Public Works Director/City Engineer FLSA Status: Exempt Unit: 1, Full-time Position SUMMARY OF JOB PURPOSE This is the entry-level class in the Engineer

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

Transportation Contributed Assets Review January 28, 2015

Transportation Contributed Assets Review January 28, 2015 Transportation Contributed Assets Review January 28, 2015 Office of the City Auditor The Office of the City Auditor conducted this project in accordance with the International Standards for the Professional

More information

DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP)

DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP) DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP) District of Columbia Water and Sewer Authority of Maryland Thursday, April 7, 2016 George S. Hawkins, General Manager Presented by: Liliana Maldonado, Director,

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

Rural Servicing Guidelines

Rural Servicing Guidelines Rural Servicing Guidelines for Low-Pressure Sanitary Sewer System and Trickle Feed Water Distribution System FOREWORD This manual is intended to provide information to Developers, Engineering and Geotechnical

More information

Modified FY ,100, ,329,791

Modified FY ,100, ,329,791 Retail/North Andrews Gardens Neighborhood Improvement Program Expenses Through FY 4 Modified FY 5 Budget FY 26-21 North Andrews Gardens Neighborhood Improvement Project 21,524,34 22,75,757 --- 6,1, 6 ---

More information

Water Conveyance. Capability Statement

Water Conveyance. Capability Statement Water Conveyance Capability Statement Introduction The Advisory Group Water Conveyance offers engineering advisory services for water transport systems. These services include master planning, feasibility

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director