Rainy Season Preparation & Storm Channel Maintenance

Size: px
Start display at page:

Download "Rainy Season Preparation & Storm Channel Maintenance"

Transcription

1 Rainy Season Preparation & Storm Channel Maintenance

2 City Efforts Thorough Review of the storm water system Documentation of system conditions Now part of selection criteria or maintenance Full public report with recommendations Mayor City Council Senior Staff

3 El Niño Preparation Citywide All Hands effort Multiple and continuing face-to-face planning Extensive communication efforts - all-media

4 City Assets 2,774 miles of streets 48,000 drainage structures 700 miles of drainage pipe 15 storm water pump stations 84 miles of drainage channels

5 Channel Maintenance Purpose: Reducing flood risk Environmental permits required Master Storm Water System Maintenance Program (MMP) Channels selected 2 years in advance

6 Channel Locations Citywide Natural and concrete Large watersheds

7

8 Channel Maintenance Council calls for a declaration of emergency Mayor requests declaration of emergency from the Governor of California United States Army Corps of Engineers issues the failure to act if unacceptable letter supporting emergency criteria

9 Master Storm System Maintenance Program Approved by the City Council in August 2013 Preferred planning approach not piecemeal Program Environmental Impact Report (PEIR) Coastal Commission issued a Coastal Development Permit Emergency efforts are clearly limited

10 Permit Requirements Special Studies: Hydrology Biological Assessment Noise Cultural Resources Water Quality Regulatory Permits Federal, State & Local

11 Emergency Criteria Imminent Threat (Army Corps Letter) Documented Risk Change in conditions Regional General Permit (RGP) 63 Minimum effort allowed and full mitigation required

12 Mitigation Requirements Sorrento Valley Wetland Creation and Enhancement offsite in Los Peñasquitos Canyon Preserve Rose Creek (Mission Bay High School) Wetland Creation and Enhancement offsite in Los Peñasquitos Canyon Preserve Murphy Canyon Creek Wetland restoration offsite at San Diego River south of Stadium San Carlos Creek Searching for appropriate mitigation Reservoir Drive Searching for appropriate mitigation Smythe Channel None required

13 Mitigation Requirements FY 16 Channel Maintenance Alvarado Creek Channel Wetland restoration offsite at San Diego River south of Qualcomm Stadium Tijuana River Valley Removal of invasive plants within and adjacent to the channel

14 Prioritization Field visits by crews Technical consultant analysis Public input Management team review Council Environment Committee review

15 Scoring Factors Flood risk management Water quality Public input Aesthetics

16 Winter Storm Preparations Non-stop continuous operation Pump station upgrades Storm drain repair and cleaning Channel cleaning

17 Before Soledad Creek After 17

18 Before Murphy Canyon Creek After 18 18

19 Alvarado Creek Transportation & Storm Water Department

20 When Storms Arrive More than 200 staff deployed Expanded after-hours staffing Portable pumps mobilized for tidal low points Road detours set as needed Hotline become primary contact point

21 Emergency CIP Beyond the capability of city crews Secure the site (isolate the area) Emergency Annual Allocation $1 million for unplanned events Public Works has authority for sole source emergency contract and manages contractor rotation list Contractor performs minimum repairs necessary to address the emergency After the fact permits

22 City Efforts Thorough Review of the storm water system Documentation of system conditions Now part of selection criteria or maintenance Full public report with recommendations Mayor City Council Senior Staff

23 Environmental Services Department Questions?

Agenda. Agenda. Agenda. What is Integrated Regional Water Management (IRWM) Planning? Benefits of IRWM Planning

Agenda. Agenda. Agenda. What is Integrated Regional Water Management (IRWM) Planning? Benefits of IRWM Planning Watershed Workshop Peñasquitos/San Diego River Innovative Solutions for Water and the Environment September 21, 2012 2 3 4 What is Integrated Regional Water Management (IRWM) Planning? Benefits of IRWM

More information

The Chollas Creek Watershed Master Plan

The Chollas Creek Watershed Master Plan The Chollas Creek Watershed Master Plan FMA Luncheon March 13, 2017 City of San Diego Rick Engineering Company Tetra Tech HELIX Environmental Planning Key Drivers and Considerations Drivers Considerations

More information

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT Goat Canyon Sedimentation and Basin Maintenance Dredging Project Public Notice/Application No.: SPL-2005-02068-RRS

More information

Engineering Department

Engineering Department Engineering Department Stormwater Mission: To provide for the efficient and effective cleaning and repair of the stormwater collection system and implement the federally mandated Stormwater Pollution Prevention

More information

CITY OF MOUNTAIN VIEW

CITY OF MOUNTAIN VIEW CITY OF MOUNTAIN VIEW Incorporate Climate Change Adaptation in Municipal Scale, Urban Watershed Planning at the City of Mountain View Raymond Wong, PhD, PE, LEED AP Lisa Au, PE Floodplain Management Association

More information

Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656

Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656 Wood Canyon Emergent Wetland Project City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656 Introduction Wood Canyon is located within Aliso and Wood Canyon Regional Park in southwest Orange County,

More information

STORM WATER ASSET MANAGEMENT PLAN & PROGRAM

STORM WATER ASSET MANAGEMENT PLAN & PROGRAM STORM WATER ASSET MANAGEMENT PLAN & PROGRAM City of Walker, MI September 2017 System Goals and Action Plan INTRODUCTION About this Document This document is our Storm Water Asset Management Plan & Program

More information

VALLECITOS WATER DISTRICT

VALLECITOS WATER DISTRICT VALLECITOS WATER DISTRICT WATER, WASTEWATER, AND RECYCLED WATER MASTER PLAN Draft Program Environmental Impact Report SCH No. 2010071073 VALLECITOS WATER DISTRICT 2008 Water, Wastewater and Recycled Water

More information

SAN DIEGO RIVER 2 LEVEE SYSTEM SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN DIEGO RIVER 2 LEVEE SYSTEM SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID # SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010007 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE FINAL RATING DATE: MARCH 7, 2016 PERIODIC INSPECTION

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Update to Chesapeake Bay Program Management Board June 14, 2018

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Update to Chesapeake Bay Program Management Board June 14, 2018 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 RESTORATION PLAN 110 135 120 252 174.59 112 92 56 62 102

More information

California Regional Water Quality Control Board Erosion And Sediment Control Field Manual

California Regional Water Quality Control Board Erosion And Sediment Control Field Manual California Regional Water Quality Control Board Erosion And Sediment Control Field Manual requirements prescribed by the Regional Water. Quality Control Board. the Erosion and Sediment Control Field Manual

More information

Francois Rodigari, Director of Water Quality and Environmental Services, SJWC Mike Ambrose, Manager of Regulatory Compliance, EBMUD

Francois Rodigari, Director of Water Quality and Environmental Services, SJWC Mike Ambrose, Manager of Regulatory Compliance, EBMUD Francois Rodigari, Director of Water Quality and Environmental Services, SJWC Mike Ambrose, Manager of Regulatory Compliance, EBMUD Potable water discharges covered by exception in storm water permits

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 RESTORATION PLAN 110 135 120 252 174.59 112 92 56 62 102

More information

Potable Water Discharges NPDES Permit Update for Regions 2, 4 and 5

Potable Water Discharges NPDES Permit Update for Regions 2, 4 and 5 Potable Water Discharges NPDES Permit Update for Regions 2, 4 and 5 Francois Rodigari, Director of Water Quality and Environmental Services SFPUC Annual Technology Transfer Workshop 11/13/2013 Originally

More information

City of San Jose Storm Sewer Master Plan

City of San Jose Storm Sewer Master Plan City of San Jose Storm Sewer Master Plan Anne Symonds, PE and Mira Chokshi, PE 2016 Pacific Water Conference AWWA Hawaii Section HWEA February 4, 2016 Agenda Introduction and Goals of the Project Background

More information

WASTEWATER ASSET MANAGEMENT PLAN

WASTEWATER ASSET MANAGEMENT PLAN Must be kept on file and available upon request until 2032 (per 2014 MDEQ/SAW grant requirements) WASTEWATER ASSET MANAGEMENT PLAN CITY OF NORTON SHORES, MI May 2017 Where we re going: System Goals INTRODUCTION

More information

The newly updated and comprehensive SWMP shall:

The newly updated and comprehensive SWMP shall: RFQ SCOPE OF SERVICES 2.1 Project Purpose The City of Miami, ( City ) is seeking professional engineering services from a qualified firm for the purpose of planning and developing a newly updated and comprehensive

More information

Newport Bay Watershed Executive Committee

Newport Bay Watershed Executive Committee Newport Bay Watershed Executive Committee June 21, 2017 Discussion Calendar AGENDA ITEM 1 ACTION MINUTES OF THE MARCH 15, 2017 MEETING Amanda Carr, County of Orange Recommended Action Approve the action

More information

ISO-9001:Quality Management System Progress Report

ISO-9001:Quality Management System Progress Report ISO-9001:Quality Management System Progress Report Department of Street Services May 2, 2007 Purpose Provide an overview of the Department of Street Services Provide background of ISO 9001 certification

More information

9 CEQA Alternatives. Alternatives

9 CEQA Alternatives. Alternatives 9 CEQA Alternatives 9 CEQA Alternatives CHAPTER 9 CEQA Alternatives Sections Tables 9.1 Introduction 9.2 Alternatives Analysis 9.3 Comparison of Alternatives to the Proposed WSIP 9.4 Alternatives Identification

More information

City of San Diego Asset Management: Citywide and Watershed Based Approach

City of San Diego Asset Management: Citywide and Watershed Based Approach City of San Diego Asset Management: Citywide and Watershed Based Approach Society of American Military Engineers November 13, 2013 Gene Matter, P.E. Senior Civil Engineer City of San Diego Storm Water

More information

Aberdeen Airport Drainage Study. Todd Yerdon, PE Al Erickson, PE

Aberdeen Airport Drainage Study. Todd Yerdon, PE Al Erickson, PE Aberdeen Airport Drainage Study Todd Yerdon, PE Al Erickson, PE INTRODUCTIONS Project Background In 2009, HDR was hired to provide a drainage study for the Aberdeen Airport as part of an Environmental

More information

Subject: Notice of Preparation of a Draft Environmental Impact Report

Subject: Notice of Preparation of a Draft Environmental Impact Report NOTICE OF PREPARATION From: Santa Clara Valley Water District 5750 Almaden Expressway San Jose, CA 95118 Subject: Notice of Preparation of a Draft Environmental Impact Report Project Title: Guadalupe Dam

More information

PLEASE do not reuse without permission from NYCDEP. [Please notify Pinar Balci and Alan Cohn

PLEASE do not reuse without permission from NYCDEP. [Please notify Pinar Balci and Alan Cohn PLEASE do not reuse without permission from NYCDEP. [Please notify Pinar Balci (PBalci@dep.nyc.gov) and Alan Cohn (AlanC@dep.nyc.gov) if you intend to use any of these slides, and indicate where and when

More information

Pacheco Reservoir Expansion

Pacheco Reservoir Expansion California Water Commission Pacheco Reservoir Expansion Unique Opportunity for Fisheries Recovery, Flood Risk Reduction and Emergency Water Supply December 13, 2017 1 of 33 Project Partners Pacheco Pass

More information

DRAFT ANNOTATED OUTLINE 12/4/2006

DRAFT ANNOTATED OUTLINE 12/4/2006 DRAFT ANNOTATED OUTLINE 12/4/2006 INTEGRATED WATER MANAGEMENT PLAN SAN DIEGO REGION A. INTRODUCTION AND REGIONAL WATER MANAGEMENT GROUP Summary This Integrated Regional Water Management Plan (IRWM Plan)

More information

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 NCCP PROGRAM IMPLEMENTATION: SAN DIEGO RIVER CALMAT PROPERTY PHASE 2

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 NCCP PROGRAM IMPLEMENTATION: SAN DIEGO RIVER CALMAT PROPERTY PHASE 2 COASTAL CONSERVANCY Staff Recommendation March 25, 2004 NCCP PROGRAM IMPLEMENTATION: SAN DIEGO RIVER CALMAT PROPERTY PHASE 2 File No. 03-137 Project Manager: Marc Beyeler RECOMMENDED ACTION: Authorization

More information

3.0 CUMULATIVE PROJECTS SCENARIO

3.0 CUMULATIVE PROJECTS SCENARIO 3.0 CUMULATIVE PROJECTS SCENARIO The CEQA Guidelines define cumulative impacts as two or more individual effects that, when considered together, are considerable or which compound or increase other environmental

More information

Santa Clara River Watershed Feasibility Study. Information Meeting City of Santa Clarita August 16, 2007

Santa Clara River Watershed Feasibility Study. Information Meeting City of Santa Clarita August 16, 2007 Santa Clara River Watershed Feasibility Study Information Meeting City of Santa Clarita August 16, 2007 Darrell Buxton Los Angeles District U.S. Army Corps of Engineers Public Issues and Concerns Balance

More information

Los Angeles 3 rd Regional

Los Angeles 3 rd Regional Los Angeles 3 rd Regional Investors Conference Los Angeles, California March 31, 2016 Metropolitan Water District of Southern California 1 Metropolitan Water District of of Southern California 2 Metropolitan

More information

Calleguas Creek Watershed Wetland Restoration Plan. David L. Magney. David Magney Environmental Consulting

Calleguas Creek Watershed Wetland Restoration Plan. David L. Magney. David Magney Environmental Consulting Calleguas Creek Watershed Wetland Restoration Plan David L. Magney David Magney Environmental Consulting Calleguas Creek Watershed About the Watershed Located in southeastern Ventura County Drains 343

More information

OCSD Urban Runoff Program SCAP Collection Systems in Motion

OCSD Urban Runoff Program SCAP Collection Systems in Motion OCSD Urban Runoff Program SCAP Collection Systems in Motion Tom B. Meregillano Regulatory Specialist Orange County Sanitation District, CA OCSD Service Area Los Angeles Santa Ana San Diego Orange County,

More information

California High-Speed Train Program FEIR/EIS

California High-Speed Train Program FEIR/EIS Page 2-30 Page 2-31 Page 2-32 Page 2-33 Page 2-34 Page 2-35 Page 2-36 of Enrique Manzanilla, Director U.S. Environmental Protection Agency, August 31, 2004 (Letter AF008) AF008-1 Acknowledged. AF008-2

More information

Public Input Meeting. Proposed Central New York Wetland Mitigation Bank. March 20, 2017

Public Input Meeting. Proposed Central New York Wetland Mitigation Bank. March 20, 2017 Public Input Meeting Proposed Central New York Wetland Mitigation Bank March 20, 2017 What in the world is wetlands mitigation? What is a wetland? Hydrology (surface water or groundwater) Hydric soil Hydrophytes

More information

Funding a More Holistic Effort - Bringing In New Partners and Resources Case Study: San Mateo County Shoreline Vulnerability Assessment

Funding a More Holistic Effort - Bringing In New Partners and Resources Case Study: San Mateo County Shoreline Vulnerability Assessment Funding a More Holistic Effort - Bringing In New Partners and Resources Case Study: San Mateo County Shoreline Vulnerability Assessment Craig Conner Flood Risk Management Program Manager 3 December 2015

More information

sewers ANd storm drains Storm Drain Under Construction, 1916

sewers ANd storm drains Storm Drain Under Construction, 1916 sewers ANd storm drains Storm Drain Under Construction, 1916 A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 1 9 FY 219-223 Capital Improvement Program FY 218 FY 219

More information

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS 2018-19 THROUGH 2022-23 Project Number Stg No. Project

More information

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS 2017-18 THROUGH 2021-22 Project Number Stg No. Project

More information

Uvas Creek Levee Rehabilitation Project City of Gilroy Council Meeting June 4, 2018

Uvas Creek Levee Rehabilitation Project City of Gilroy Council Meeting June 4, 2018 Uvas Creek Levee Rehabilitation Project City of Gilroy Council Meeting June 4, 2018 Presented by Ted Ibarra, SCVWD What we do.. Mission: Provide Silicon Valley with safe, clean water for a healthy life,

More information

ADDITIONS & DELETIONS TO THE COMPREHENSIVE PLAN

ADDITIONS & DELETIONS TO THE COMPREHENSIVE PLAN LGCP/EAR-2008 Section One: Summary of SubElement Comprehensive Plan Amendments. The following table summarizes additions and deletions made to the Comprehensive Plan as a result of processing the EAR-

More information

San Luis Obispo County IRWM Region FULL PROJECT LIST - DRAFT March 30, 2017

San Luis Obispo County IRWM Region FULL PROJECT LIST - DRAFT March 30, 2017 REGION GOAL or PROJECT/PROGRAM NAME PROJECT SPONSOR STATUS NOTES REGIONAL or MULTIPLE SUB-REGIONS 2007 Project Regional Ecosystem Invasive Species Program County of San Luis Obispo 2007 Concept Regional

More information

Engineering Department Stormwater

Engineering Department Stormwater Engineering Department Stormwater Prepared by:, Director Assisted by: Mary Phelps Verle Holland Steven Tam Andy Yeung Gina De la Torre Serenity Cummings Engineering Department Stormwater Mission: To provide

More information

Because of its coastal location on the Gulf

Because of its coastal location on the Gulf CMOM: Does it Work? Clearwater s Program Performance History Robert Fahey, Tracy Mercer, Janice Nan Bennett, Donald McCullers, Dorean Modjeski, and Kelly Wehner Because of its coastal location on the Gulf

More information

Draft Environmental Impact Report

Draft Environmental Impact Report Revised Draft Environmental Impact Report San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101 This notice announces that a Draft Environmental

More information

Alluvial Fans 150 Years of Flood Control, Urbanization, and Politics in Los Angeles

Alluvial Fans 150 Years of Flood Control, Urbanization, and Politics in Los Angeles Alluvial Fans 150 Years of Flood Control, Urbanization, and Politics in Los Angeles Los Angeles County Department of Public Works Topics to be Addressed Historic Perspectives Current Practices and Constraints

More information

Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019

Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019 Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019 Introduction The Bolsa Chica Land Trust (BCLT) has applied for and been selected to receive

More information

Environmental Defense Section Telephone (202) P.O. Box 7611 Facsimile (202) Washington, DC 20044

Environmental Defense Section Telephone (202) P.O. Box 7611 Facsimile (202) Washington, DC 20044 U.S. Department of Justice Environment and Natural Resources Division Environmental Defense Section Telephone (202) 514-2640 P.O. Box 7611 Facsimile (202) 514-8865 Washington, DC 20044 Sent Via e-mail

More information

SAN LUIS REY RIVER 3 LEVEE SYSTEM SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN LUIS REY RIVER 3 LEVEE SYSTEM SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID # SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010012 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE FINAL RATING DATE: DECEMBER 15, 2017 PERIODIC INSPECTION

More information

City of Tacoma Stormwater Management Program Assessment. Attachment B3

City of Tacoma Stormwater Management Program Assessment. Attachment B3 City of Tacoma Stormwater Management Program Assessment Attachment B3 Attachment B3. City of Tacoma Stormwater Management Program Assessment The following discussion includes an assessment of the appropriateness

More information

Newport Bay Water Quality Programs and Projects

Newport Bay Water Quality Programs and Projects Newport Bay Water Quality Programs and Projects City of Newport Beach/UCI Water Quality Meeting November 9, 2017 David Webb 1 Director of Public Works Newport Beach Statistics Newport Bay Watershed Partnership

More information

LETTER G. City of San Diego

LETTER G. City of San Diego LETTER G City of San Diego G-1 The comment provides introductory statements and acknowledges collaboration between interested stakeholders and agency representatives in the development of the proposed

More information

Preferred Alternative Proposal

Preferred Alternative Proposal Preferred Alternative Proposal Advisory Committee March 27, 2007 Agenda Formation of the Preferred Alternative Proposal Description of the Preferred Alternative Proposal Preferred Alternative Proposal

More information

LOWER SWEETWATER CREEK

LOWER SWEETWATER CREEK LOWER SWEETWATER CREEK STORMWATER MANAGEMENT MASTER PLAN Prepared for the Hillsborough County Board of County Commissioners By Public Works Department/Engineering Division Stormwater Management Section

More information

WATERSHED ENGINEERING, MAPPING & FEMA SUPPORT

WATERSHED ENGINEERING, MAPPING & FEMA SUPPORT 2000 2002 2000-2002 Section Background WATERSHED MANAGEMENT DIVISION BIENNIAL REPORT WATERSHED ENGINEERING, MAPPING & FEMA SUPPORT CRAIG DAVID, Section Head This Section was formed with the creation of

More information

What s Required for Permittee- Responsible Wetlands Mitigation? Steps and permittee perspective

What s Required for Permittee- Responsible Wetlands Mitigation? Steps and permittee perspective Diane Heinze What s Required for Permittee- Responsible Wetlands Mitigation? Steps and permittee perspective FIND site How many acres? DESIGN mitigation Create or enhance wetlands MONITOR site For what

More information

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX N N.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Los Peñasquitos San Diego River Watershed Workshop Notes Attendance

Los Peñasquitos San Diego River Watershed Workshop Notes Attendance Los Peñasquitos San Diego River Watershed Workshop Notes 3:00 p.m. 4:30 p.m. Mission Valley Library 2123 Fenton Parkway, San Diego, CA 92108 Attendance Alan Grant, San Diego River Park Foundation Andrew

More information

LADWP WATER INFRASTRUCTURE PLAN

LADWP WATER INFRASTRUCTURE PLAN LADWP 2017-18 WATER INFRASTRUCTURE PLAN Introduction All major components of the Water System infrastructure are evaluated as part of the ongoing Asset Management (AM) Program. The goal of AM is to systematically

More information

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG U.S. Army Corps of Engineers Los Angeles District US Army Corps of Engineers BUILDING STRONG 1. Opening Comments; 2. Los Angeles County Drainage Area Project As-Built Condition, Current Condition, and

More information

SFPUC Flooding Workshop Tuesday, February 9, 2016

SFPUC Flooding Workshop Tuesday, February 9, 2016 Presenters: SFPUC Flooding Workshop Tuesday, February 9, 2016 Tommy Moala, Assistant General Manager, Wastewater Enterprise Stefani Harrison, Project Manager Photo: Dec 3, 2014 End of Cayuga Street 25-year

More information

Santa Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives

Santa Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives Santa Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives The purpose of the Water Supply Master Plan (Water Master Plan) is to present the District s strategy for ensuring a

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

Project Summary

Project Summary Stormwater Utility Capital Improvement Plan Project Summary 2017 2018 2019 2020 2021 2022 Backyard Drainage Problems 25,000 25,000 25,000 25,000 25,000 25,000 CIPP Lining Storm Sewer 100,000 100,000 100,000

More information

Creek Asset Management Plans. Elizabeth Mercado, Associate Civil Engineer, P.E. BAYWORK Maintenance & Asset Management Workshop May 30, 2018

Creek Asset Management Plans. Elizabeth Mercado, Associate Civil Engineer, P.E. BAYWORK Maintenance & Asset Management Workshop May 30, 2018 Creek Asset Management Plans Elizabeth Mercado, Associate Civil Engineer, P.E. BAYWORK Maintenance & Asset Management Workshop May 30, 2018 Overview District Mission Facts about SCVWD 10 Step AM Planning

More information

Tim Tucker, City Engineer Veronica Nebb, Senior Assistant City Attorney Karen Majors, Assistant City Manager Community and Economic Development

Tim Tucker, City Engineer Veronica Nebb, Senior Assistant City Attorney Karen Majors, Assistant City Manager Community and Economic Development CITY OF MARTINEZ CITY COUNCIL AGENDA October 1, 2008 TO: FROM: SUBJECT: DATE: Mayor and City Council Tim Tucker, City Engineer Veronica Nebb, Senior Assistant City Attorney Karen Majors, Assistant City

More information

Notice of Preparation

Notice of Preparation Notice of Preparation Date April 23, 2015 To: Subject: Project: Lead Agency: California Office of Planning and Research, Responsible and Trustee Agencies and Interested Parties Notice of Preparation of

More information

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California Prepared for City of Redlands 35 Cajon Street Redlands, California 92373 Prepared by 14725 Alton Parkway Irvine, CA 92618 Contact

More information

Technical Memorandum No Basis of Comparison

Technical Memorandum No Basis of Comparison Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.1 Basis of Comparison Task: Basis of Comparison To: PRWFPA Staff Working Group Prepared by: J. Schaaf Reviewed by: R. Raines

More information

WATER RESOURCES - DRAINAGE

WATER RESOURCES - DRAINAGE EXECUTIVE SUMMARY The Department of Water Resources (DWR) constructs drainage improvement projects intended to mitigate or prevent flood damage in developed areas. Projects are intended to minimize flooding

More information

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS I. POLICY STATEMENT Auburn University's (the University's) "Policy for Natural Resource Management Areas" implements the Campus Master Plan Land Use Element

More information

Board Work Plan FY

Board Work Plan FY Board Work Plan FY 2018-19 Table of Contents District Values...4 Board of Directors....5 Board Committees....6 Purpose of the Work Plan....7 Goals and FY19 Strategies....8 Water Supply....9 Natural Flood

More information

Public Scoping Meetings

Public Scoping Meetings Public Scoping Meetings GRASS VALLEY Wednesday, March 9, 2016 6:00 8:00 p.m. Holiday Inn Express 121 Bank Street Grass Valley, CA 95945 AUBURN Thursday, March 10, 2016 6:00 8:00 p.m. Forest Lake Christian

More information

Restoring an Urban River in a Historic Setting Lower Pawtuxet River, R.I.

Restoring an Urban River in a Historic Setting Lower Pawtuxet River, R.I. Restoring an Urban River in a Historic Setting Lower Pawtuxet River, R.I. Thomas Ardito Narragansett Bay Estuary Program Sam Whitin, Andy Lipsky EA Engineering, Science & Technology Rita L. Holahan, Pawtuxet

More information

INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY

INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY The Indian Creek Watershed covers a 38 square mile area in southern Lake County, Illinois that drains 24,116 acres before discharging into the Des Plaines

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Current Construction Projects

Current Construction Projects Zone 4 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2018 Current Construction Projects Sunnymead MDP Line B (aka Heacock Channel), Stages 3 and 4 (4-8-00011-03,

More information

Appendix B: Inventory of Data Sources

Appendix B: Inventory of Data Sources Appendix B: Inventory of Data Sources LIST OF DATA SOURCES AND REFERENCES TO SUPPORT WATER QUALITY IMPROVEMENT PLAN FOR THE SOUTH ORANGE COUNTY WATERSHED MANAGEMENT AREA November 4, 2015 Orange County

More information

A Case Study: Imperial Valley, California

A Case Study: Imperial Valley, California University of Colorado Law School Colorado Law Scholarly Commons Western Water: Expanding Uses/Finite Supplies (Summer Conference, June 2-4) Getches-Wilkinson Center Conferences, Workshops, and Hot Topics

More information

Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study

Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study 1 Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study Policy Recommendations and City-wide Flood Protection Strategies January 15, 2019 2 Agenda Project Overview Hazards and

More information

ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE

ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE Presented by Gary Takara City Council September 18, 2017 Agenda Item 12 Recommendations Find that

More information

Creating a Flood Forecasting System for the San Diego River Watershed

Creating a Flood Forecasting System for the San Diego River Watershed Creating a Flood Forecasting System for the San Diego River Watershed Rand Allan County of San Diego Flood Control Martin J. Teal, P.E., P.H., D.WRE WEST Consultants inc. OUTLINE San Diego River Watershed

More information

THUNDER BAY AREA DRAINAGE MASTER PLAN

THUNDER BAY AREA DRAINAGE MASTER PLAN THUNDER BAY AREA DRAINAGE MASTER PLAN Overall problem Vs. local solutions There are several areas with local flooding problems A review of the situation showed that the problem is not local, but that the

More information

SAN GABRIEL RIVER/SAN JOSE CREEK 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER/SAN JOSE CREEK 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # SAN GABRIEL RIVER/SAN JOSE CREEK 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010052 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE

More information

Roland Ottolini, P.E. Director, Natural Resources Division. Presented to the Lee County Tourist Development Council. May 11, 2017

Roland Ottolini, P.E. Director, Natural Resources Division. Presented to the Lee County Tourist Development Council. May 11, 2017 Roland Ottolini, P.E. Director, Natural Resources Division Presented to the Lee County Tourist Development Council May 11, 2017 1 Presentation Overview Regional Water Management Caloosahatchee Issues Lee

More information

STORM DRAIN PROJECTS

STORM DRAIN PROJECTS STORM DRAIN PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,

More information

BUDGET WORKSHOP

BUDGET WORKSHOP 1 2017-2019 BUDGET WORKSHOP Scott D. McGolpin Department Director Administration & Support Transportation Surveyor Water Resources Resource Recovery & Waste Management 2 Key Challenges / Emerging Issues

More information

Stream and Watershed Restoration Design and Quantitative Benefits. Kelly Gutshall, RLA and Mike LaSala

Stream and Watershed Restoration Design and Quantitative Benefits. Kelly Gutshall, RLA and Mike LaSala Stream and Watershed Restoration Design and Quantitative Benefits Kelly Gutshall, RLA and Mike LaSala Suquehanna Greenway River Towns Workshop September 30, 2013 Benefit Stacking Single Function Multiple

More information

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR REGIONAL GENERAL PERMIT NO. 85 (RGP) Coronado Cays Home Owners Association Boat Dock Removal and Replacement

More information

ORLEANS STORM PROOFING PROJECTS THE SEWERAGE AND WATER BOARD OF NEW ORLEANS. US Army Corps of Engineers BUILDING STRONG

ORLEANS STORM PROOFING PROJECTS THE SEWERAGE AND WATER BOARD OF NEW ORLEANS. US Army Corps of Engineers BUILDING STRONG ORLEANS STORM PROOFING PROJECTS THE SEWERAGE AND WATER BOARD OF NEW ORLEANS US Army Corps of Engineers BUILDING STRONG Sewerage and Water Board of New Orleans Services Provided: Sewage Collection and Treatment

More information

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects Appendix J Existing Efforts for Identifying Multi-Benefit Projects Water Purveyor Projects Existing Efforts for Identifying Multi Benefits Projects In-lieu groundwater recharge under RWA planning efforts

More information

3F. Hydrology and Water Quality

3F. Hydrology and Water Quality This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts

More information

There is a reliable, clean water supply for current and future generations.

There is a reliable, clean water supply for current and future generations. E2 There is a reliable, clean water supply for current and future generations. E2.1. Current and future water supply for municipalities, industries, agriculture, and the environment is reliable. 2.1.1.

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE FORM GEN. 160 (Rev. 8-12) CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE DATE: June 1, 2018 TO: Honorable Nury Martinez, Chair Honorable Paul Koretz, Vice Chair Honorable Paul Krekorian, Member

More information

STORMWATER / FLOOD CONTROL TULSA CITY COUNCIL

STORMWATER / FLOOD CONTROL TULSA CITY COUNCIL STORMWATER / FLOOD CONTROL TULSA CITY COUNCIL Capital Improvement Program Task Force February 14, 2013 STORMWATER/FLOOD Prioritization Process Stormwater/Flood Control Projects are scored and ranked using

More information

VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID #

VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID # VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID # 380510086 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY 8 JUNE 2012 FINAL RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE:

More information

MILL CREEK LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

MILL CREEK LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010056 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: SEPTEMBER 23, 2013

More information

City of Edmonton Drainage Services Summary Notes of Cloverdale Flood Mitigation Meeting Held May 13, 2015 at Cloverdale Hall

City of Edmonton Drainage Services Summary Notes of Cloverdale Flood Mitigation Meeting Held May 13, 2015 at Cloverdale Hall Presenters Miressa Fola, Project Manager, Drainage Planning Maxime Belanger, Project Manager, Sameng Inc. In attendance were approximately 40 residents. River Valley Neighbourhoods Flood Risk Study Please

More information

SOAP LAKE FLOODPLAIN PRESERVATION PROJECT

SOAP LAKE FLOODPLAIN PRESERVATION PROJECT SOAP LAKE FLOODPLAIN PRESERVATION PROJECT Draft Initial Study and Negative Declaration Prepared for: Pajaro River Watershed Flood Prevention Authority A joint powers authority with representation from:

More information

Preliminary Project Assessment

Preliminary Project Assessment DISCLAIMERS: Date: March 14, 2014 Case No.: 2014.0097U Project Address: Third Street Crossing of Islais Creek Block/Lot: Public Right-of-Way Zoning: Not Applicable Area Plan: Not Applicable Project Sponsor:

More information

CAPITAL IMPROVEMENT PROGRAM WATER

CAPITAL IMPROVEMENT PROGRAM WATER CAPITAL IMPROVEMENT PROGRAM 246 247 FUNDS (711-715) Access Road Improvements c709840 Minor road repair and pipeline clearance work to gain access to water facilities and equipment. Project Cost Estimate

More information