THUNDER BAY AREA DRAINAGE MASTER PLAN

Size: px
Start display at page:

Download "THUNDER BAY AREA DRAINAGE MASTER PLAN"

Transcription

1 THUNDER BAY AREA DRAINAGE MASTER PLAN

2 Overall problem Vs. local solutions There are several areas with local flooding problems A review of the situation showed that the problem is not local, but that the existing outlets are insufficient to carry the storm water load The present goal is to determine a solution which will reduce the storm water load in the ditches and carry the water to an outlet as efficiently as possible.

3 Existing Condition For a 5 year storm event Almost all water is carried through surface ditching Some rain water goes to the friendship trail Some rain runs east on Thunder Bay road to Six-Mile creek Most rain goes out the Shirley road outlet

4 Image of existing drainage pattern

5 Existing Condition Most rain travels through surface ditching Effectiveness of the system is limited by water level and storage capacity of the outlets The system s ability to drain is significantly impacted by the wind direction over the lake and the water level in Six-Mile Creek

6 Problems with existing condition Friendship trail ditch running at capacity Thunder Bay ditches overflowing Shirley outlet at capacity Provincially significant wetland Species at risk Areas which run over private property Limits any significant maintenance

7 Images of Shirley Outlet

8 Proposed Master Plan Redistribute the drainage basins Improve 3 existing outlets Friendship Trail Burleigh Thunder bay or Bernard Significantly reduce the flow going through the Shirley outlet

9 Friendship Trail New ditch on south side of trail (twinning the ditch) From Bernard to Six-Mile Creek Double the storage capacity of the outlet during heavy rain events Significantly improve the drainage for the Jewell & Hyman area Approx cost $

10 Image of proposed Friendship trail ditch outlet

11 Burleigh Road Outlet Will drain Burleigh Road and areas to the west Improve outlet into lake Erie at south end of Burleigh Road Outlet with a 1.8m x 1.2m (4 foot by 6 foot) box structure Approx cost $1.3 million

12 Image of proposed Burleigh Road outlet

13 Thunder Bay Outlet Possible outlet on Thunder Bay Road. Will drain area south of Riselay, between Burleigh & Bernard Outlet at Thunder Bay Road into Six-Mile Creek Outlet structure will be twin 1.2m (4 foot) diameter pipes Approximate cost $4.0 Million

14 Image of proposed Thunder Bay Road outlet

15 Bernard Street Outlet Possible outlet on Bernard avenue into lake Erie Will drain area south of Riselay, between Burleigh & Bernard Outlet will be a 1.8m x 1.2m (4 foot by 6 foot) box structure Approximate cost $2.0 million

16 Image of proposed Bernard Avenue outlet

17 Image of proposed Bernard Avenue outlet

18 Image of proposed Bernard Avenue outlet

19 Image of proposed Bernard Avenue outlet

20 Design Considerations Streets will retain their ditches. Ditches will be re-sloped to run towards the appropriate pipe inlet. Risk of ditch overflow should be reduced or eliminated.

21 Design Considerations Attempted design with ditches only IE: no pipes Ditch only design with outflows as proposed (Burleigh, Trail, Bernard, Thunder Bay, Shirley) would have ditches up to 1.8m deep (6 feet) Significant negative impact on these roads (deep ditches, tree removals, utility relocations)

22 Proposed 1.8m deep ditches

23 Proposed 1.8m deep ditches PICTURE

24 Bernard Vs Thunder Bay Bernard and thunder Bay outlets should be seen as alternatives to each other Thunder Bay will cost approx $4.0 Million Will outlet to Six Mile creek. Note that during heavy storm events that the creek backs-up which could back-up the system Bernard Street Will cost approx $2.0 Million Will outlet over beach (above high water mark) Town must continue and improve its regular maintenance over beach area. Especially after any storm event

25 Image of proposed overall drainage pattern

26 Expected cost Project including Bernard Outlet will cost approx $3.5 Million Project including Thunder Bay Ave outlet will cost approx $5.5 Million

27 Schedule Phase 1 (2007) Bernard outlet to Thunder Bay Road Twinning of Friendship trail ditch Phase 2 Piping on Thunder Bay and Cook Local ditch improvements Phase 3 Burleigh outlet Piping on Burleigh & Pleasant Local ditch improvements

28 Questions

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011 Village of Winnetka Flood Risk Reduction Assessment October 11, 2011 Christopher B. Burke Engineering, Ltd. (CBBEL) Thomas T. Burke, Jr., PhD, PE David Buckley, PE, CFM Introduction The September 2008

More information

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel Mobility Solutions, Infrastructure & Sustainability Committee January 22, 2018 Sarah Standifer, Director Trinity Watershed Management Overview

More information

Malcolm Tweddle & Edith Rogers Dry Pond & Sewer Improvements Millbourne Flood Mitigation Public Information Session

Malcolm Tweddle & Edith Rogers Dry Pond & Sewer Improvements Millbourne Flood Mitigation Public Information Session Malcolm Tweddle & Edith Rogers Dry Pond & Sewer Improvements Millbourne Flood Mitigation Public Information Session November 19, 2015 Presentation Outline Millbourne Flooding Proposed Upgrades Properties

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

Clean water. From nature.

Clean water. From nature. Clean water. From nature. Natural Treatment System Save water. Do your part. Did you know that over watering or a broken sprinkler on your property can contribute to ocean pollution? Excess watering creates

More information

What We Are Hoping For: Learning Goals. Runoff Human Impact o A, B, C. Learning Goals:

What We Are Hoping For: Learning Goals. Runoff Human Impact o A, B, C. Learning Goals: LESSON Exploring: Water in Our Lives Introduce how salt moves into waterways by looking at where our water comes from and how runoff impacts the environment. What We Are Hoping For: Learning Goals Runoff

More information

CITY OF MOUNTAIN VIEW

CITY OF MOUNTAIN VIEW CITY OF MOUNTAIN VIEW Incorporate Climate Change Adaptation in Municipal Scale, Urban Watershed Planning at the City of Mountain View Raymond Wong, PhD, PE, LEED AP Lisa Au, PE Floodplain Management Association

More information

Project Need and Evaluation

Project Need and Evaluation City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007: LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices

Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices WATERSHED PROTECTION DIVISION DEPARTMENT OF PUBLIC WORKS BUREAU OF SANITATION CITY OF LOS ANGELES Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices Catch Basin Inserts: Method

More information

4.1 Browns Canal Introduction Sub-basin Information

4.1 Browns Canal Introduction Sub-basin Information Section 4 Withlacoochee Basin 4.1 Browns Canal 4.1.1 Introduction The information presented in this sub-basin plan for Browns Canal is intended to provide the reader with information necessary to understand

More information

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS UTAH COUNTY HEALTH DEPARTMENT Div. of Environmental Health 151 South University Avenue, Provo 84601 (801) 851-7525 FAX 851-7521 GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS This is intended to

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

Appendix B. Storm Drain System Data

Appendix B. Storm Drain System Data MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance TECHNICAL BULLETIN Synthetic Turf Athletic Field Drainage Design Assistance The SportsEdge HQ geocomposite strip drain products are engineered specifically for use in synthetic turf athletic field base

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

Engineering Department

Engineering Department Engineering Department Stormwater Mission: To provide for the efficient and effective cleaning and repair of the stormwater collection system and implement the federally mandated Stormwater Pollution Prevention

More information

Nutrient Management in. A presentation to the West Metro Water Alliance

Nutrient Management in. A presentation to the West Metro Water Alliance Nutrient Management in Developing and Agricultural Areas A presentation to the West Metro Water Alliance Chris Meehan, P.E. May 25, 2011 Agenda Physical Improvements Planning Improvements How to get it

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517) Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION

More information

Mud Lake Lakeshed Assessment

Mud Lake Lakeshed Assessment Mud Lake Lakeshed Assessment The lakeshed vitals table identifies where to focus organizational and management efforts for each lake. Criteria were developed using limnological concepts to determine the

More information

At least 2 feet above the seasonal high water table Overflow path or structure provided

At least 2 feet above the seasonal high water table Overflow path or structure provided General Conditions Map of proposed subwatershed to each subbasin, including total area and CN Design Flow or Design Volume to each STF, as appropriate Operation and Maintenance instructions for each STF

More information

Recommended Resources: The following resources may be useful in teaching this lesson:

Recommended Resources: The following resources may be useful in teaching this lesson: Unit E: Basic Principles of Soil Science Lesson 7: Understanding Soil Erosion and Management Practices Student Learning Objectives: Instruction in this lesson should result in students achieving the following

More information

Forks Hill Rd SUSQUEHANNA LACKAWANNA. Woodlands

Forks Hill Rd SUSQUEHANNA LACKAWANNA. Woodlands 2011 WORKSHOP Day 2 field sites BRADFORD Carizo Tour Salt Spring SP Forks Hill Rd SUSQUEHANNA Marcellus Trip It is difficult to create an effective field trip for both gas patch and non-gas patch attendees.

More information

Cass County Soil Erosion & Sedimentation Control Program

Cass County Soil Erosion & Sedimentation Control Program Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

Installation and Maintenance of Erosion Control BMPs

Installation and Maintenance of Erosion Control BMPs Installation and Maintenance of Erosion Control BMPs Or Common BMPs Applications Specifications Installation Problems Maintenance Utility Design Professionals Clarifications, proactive problem solving

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

Adopted Projects at Priority List Meeting August 9, 2017

Adopted Projects at Priority List Meeting August 9, 2017 Adopted Projects at Priority List Meeting August 9, 2017 Drinking Water State Revolving Fund Recipient Amount Project Big Bend Water $30,000 Planning for a water distribution system replacement project.

More information

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities Standards for SWMF s (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities August 2017 PREAMBLE Development results in a great amount of impervious area,

More information

Saturated Buffer. Subsurface Drainage PURPOSE N REDUCTION LOCATION COST BARRIERS

Saturated Buffer. Subsurface Drainage PURPOSE N REDUCTION LOCATION COST BARRIERS Saturated Buffer To intercept tile drainage prior to discharging to surface waters and redistribute the water laterally in the soil profile of the streamside buffer. Subsurface drainage, also known as

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Scope of work (To be completed previously, shown here as reference.) DIVISION 2- SITEWORK: Site work (Scheduled to start September 18 th, 2017)

Scope of work (To be completed previously, shown here as reference.) DIVISION 2- SITEWORK: Site work (Scheduled to start September 18 th, 2017) Divisions Not Sent To Bid Construction of the Hygienic Art Inc., Frank Loomis Palmer Amphitheater, Art Park Covering. 79 Bank Street, New London, CT. 06320 Scope of work (To be completed previously, shown

More information

Training on Roads for Water and Resilience

Training on Roads for Water and Resilience Training on Roads for Water and Resilience 1 DRAINAGE FROM UNPAVED ROADS Outline 3 1. 2. 3. 4. 5. 6. 7. Introduction Important considerations Drainage management Surface drainage features Subsurface drainage

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

Monitoring. Floating Islands. Low Impact Development Infrastructure Performance and Risk Assessment May Plan. Public Lands

Monitoring. Floating Islands. Low Impact Development Infrastructure Performance and Risk Assessment May Plan. Public Lands Low Impact Development Infrastructure Performance and Risk Assessment May 2016 Monitoring Plan Floating Islands Public Lands 1 2012 Floating Treatment Wetland Monitoring Plan - Summary (Pond 10 & Jannock

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Master Plan of Storm Drainage for East Garden Grove Wintersburg Channel Tributary Area

Master Plan of Storm Drainage for East Garden Grove Wintersburg Channel Tributary Area CITY OF ANAHEIM Master Plan of Storm Drainage for East Garden Grove Wintersburg Channel Tributary Area JANUARY 2006 VOLUME 1 Table of Contents VOLUME 1 1. Executive Summary... 1 1.1 General... 1 1.2

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

Stormwater Sediment Sampling Project Report Project ID: SUNTREE_SED_001

Stormwater Sediment Sampling Project Report Project ID: SUNTREE_SED_001 11341 Distribution Avenue East Suite #6 Jacksonville, Florida 32256 904-880-1817 Fax904-880-1339 Stormwater Sediment Sampling Project Report Project ID: SUNTREE_SED_001 Prepared for Mr. Henry Happel Suntree

More information

ABERDEEN CITY SUSTAINABLE DRAINAGE SYSTEMS (SUDS) AND FLOOD DEFENCES

ABERDEEN CITY SUSTAINABLE DRAINAGE SYSTEMS (SUDS) AND FLOOD DEFENCES ABERDEEN CITY SUSTAINABLE DRAINAGE SYSTEMS (SUDS) AND FLOOD DEFENCES Countesswells Avenue, Retention Pond A retention ponds function is for water attenuation (storing and slow release) and treatment. The

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan TR-20 is a computer program for the simulation of runoff occurring from a single storm event. The program develops flood hydrographs from runoff and routes

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017 SPONSOR: Gary Pestorious Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017 REFER TO: 2012-01634-DAS SECTION:404 - Clean Water Act 1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL: Pickerel Lake

More information

BIG ROCHE A CRI LAKE CHARACTERISTICS

BIG ROCHE A CRI LAKE CHARACTERISTICS BIG ROCHE A CRI LAKE CHARACTERISTICS Lake Description Big Roche Cri Lake is located in north central Adams County and has a surface area of 205 acres, a shoreline length of 6.1 mile, a volume of 6,993

More information

When it Rains it Pours

When it Rains it Pours Lesson Summary: Students will understand how water is absorbed into the ground. They will also be able to explain the difference between pervious and impervious surfaces. Students will also learn about

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Androscoggin Lake's Outlet Delta System, Maine

Androscoggin Lake's Outlet Delta System, Maine Maine Geologic Facts and Localities April, 2005 Androscoggin Lake's Outlet Delta System, Maine 44 19 27.86 N, 70 5 3.15 W Text by Daniel B. Locke, Department of Agriculture, Conservation & Forestry 1 Introduction

More information

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS

More information

OUR MISSION: To preserve, protect, and restore Delaware s Inland Bays the water that flows into them and the watershed around them.

OUR MISSION: To preserve, protect, and restore Delaware s Inland Bays the water that flows into them and the watershed around them. OUR MISSION: To preserve, protect, and restore Delaware s Inland Bays the water that flows into them and the watershed around them. OUR In 1988, the Delaware Inland Bays were declared an estuary of national

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

HOMELAND / ROMOLAND AREA DRAINAGE PLAN

HOMELAND / ROMOLAND AREA DRAINAGE PLAN RIVERSIDE COUNTY CALIFORNIA HOMELAND / ROMOLAND AREA DRAINAGE PLAN Amendment No. 3 JULY 2014 By the Riverside County Board of Supervisors Prepared and Adopted Pursuant to Government Code Section 66483,

More information

IDT Discussions on HRM Expansion Compiled on April 10, 2014

IDT Discussions on HRM Expansion Compiled on April 10, 2014 IDT Discussions on HRM Expansion Compiled on April 10, 2014 IDT identified that Alternative 4 would fully address the cross-country skiing issues that were raised. The alternative locations suggested in

More information

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Storm Sewer Design Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Major floods are dramatic and water flow routes must be recognized when minor drainage systems fail. These types

More information

Integrated. Management

Integrated. Management Integrated Rainwater Management Fort Langley: Birthplace of Sustainability? Fort Langley: Birthplace of Sustainability? Water supply from a local well On-site wastewater treatment Nearly 100 per cent infiltration

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

Challenge 2: Community Resilience in Dania Beach

Challenge 2: Community Resilience in Dania Beach University of New Orleans ScholarWorks@UNO Coastal Resilience Workshop Coastal Resilience Workshop 2015 Oct 27th, 1:00 PM - 1:15 PM Challenge 2: Community Resilience in Dania Beach Samantha Danchuk Environmental

More information

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF) Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

Clean Water is Everyone s Business. A commercial & industrial property owner s guide to improving Lake Tahoe s clarity

Clean Water is Everyone s Business. A commercial & industrial property owner s guide to improving Lake Tahoe s clarity Clean Water is Everyone s Business A commercial & industrial property owner s guide to improving Lake Tahoe s clarity this informational guide will help you understand the tahoe regional planning agency

More information

Richland County Department of Public Works Engineering (Land Development) Division

Richland County Department of Public Works Engineering (Land Development) Division Richland County Department of Public Works Engineering (Land Development) Division Commercial Projects What is a Commercial Project? Projects that are not related to residential single family homes and/or

More information

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit

More information

SECTION 11: REGULATORY FLOODWAYS

SECTION 11: REGULATORY FLOODWAYS SECTION 11: REGULATORY FLOODWAYS Contents 11.1. The Floodway... 11-2 11.1.1. The floodway concept... 11-2 11.1.2. Floodway map... 11-2 11.1.3. Floodway permitting... 11-3 11.1.4. Changing the floodway...

More information

University North Park TIF Project. City of Norman, Oklahoma TIF District No. 2

University North Park TIF Project. City of Norman, Oklahoma TIF District No. 2 University North Park TIF Project City of Norman, Oklahoma TIF District No. 2 WHAT IS A TIF? TIF is short for tax increment finance districts. These are development tools authorized by state law for cities

More information

City of Tacoma Regional Stormwater Facility Plan: ATTACHMENT 1: FLETT CREEK WATERSHED

City of Tacoma Regional Stormwater Facility Plan: ATTACHMENT 1: FLETT CREEK WATERSHED City of Tacoma Regional Stormwater Facility Plan: ATTACHMENT 1: FLETT CREEK WATERSHED Aerial Photo of Flett Holding Ponds and Flett Wetlands Gravel Pit Stormwater Regional Facility and Outlet Structure

More information

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

PRINCESS ANNE DISTRICT STORMWATER PROJECTS PRINCESS ANNE DISTRICT STORMWATER PROJECTS Topics o o o o o Sea Level Rise and the Southern Watersheds Ashville Park Sherwood Lakes Kingston Estates Drainage Operations & Maintenance in the Southern Watersheds

More information

Structural Stormwater Pollution Reduction Targeting Floatables, Gross-Pollutants, and Trash in Myrtle Beach

Structural Stormwater Pollution Reduction Targeting Floatables, Gross-Pollutants, and Trash in Myrtle Beach Structural Stormwater Pollution Reduction Targeting Floatables, Gross-Pollutants, and Trash in Myrtle Beach T. J. Mullen, President, Best Management Products, Inc., Lyme, CT Eric Sanford, PE. Principal/Director

More information

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS Revised: June 4, 2014 Requirements for obtaining a site alteration permit vary depending on the type of project being proposed. This information

More information

2014 WORKSHOP Field Trip 3

2014 WORKSHOP Field Trip 3 2014 WORKSHOP Field Trip 3 This trip visits a RoaDrain geosynthetic drainage material demo, GRS-IBS bridge project, and a completed project from 2011. Site 1 - Laurel Run Road: Recently completed project

More information

Acres within Planning Area. Total Acres Burned

Acres within Planning Area. Total Acres Burned Calf-Copeland Project Description Figure 1: Dead sugar pine in the Calf-Copeland planning area. Sugar pine grow best in open conditions. In the absence of fire disturbance, high densities of Douglas-fir

More information

Hydrology of the West Campus, SUNY Stony Brook

Hydrology of the West Campus, SUNY Stony Brook Hydrology of the West Campus, SUNY Stony Brook Andrew Tuomey and Steven Gessler Summer 1998 Link here to get a printable double sided brochure of this walk on 8.5 x 14 inch paper. Some of the images are

More information

Bijou Area Erosion Control Project

Bijou Area Erosion Control Project Join the City of South Lake Tahoe for a Ribbon Cutting Ceremony for the Bijou Area Erosion Control Project Thursday, October 30th at 3:30pm Ceremony will be held at the cul-de-sac at the end of Bal Bijou

More information

3.1 Problem Statements, Goals, Objectives and Action Items

3.1 Problem Statements, Goals, Objectives and Action Items 3.0 Mitigation Plan Hazard mitigation planning is the coordination of actions taken to reduce injuries, deaths, property damage, economic losses, and degradation of natural resources due to natural or

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

Agriculture and the Environment

Agriculture and the Environment Agriculture and the Environment Gabrielle Ferguson Environmental Management Branch Ontario Ministry of Agriculture and Food And Ministry of Rural Affairs Lake Erie Binational Public Forum September 20,

More information

Woodhills Bay Colony Stormwater Master Plan

Woodhills Bay Colony Stormwater Master Plan Woodhills Bay Colony Stormwater Master Plan FREP Noon Network Fox Lake February 18, 2015 Michael E. Novotney, PE Water Resources Professional Stormwater Master Plan Presents an overall stormwater management

More information

Performance Assessment of an Iron-Enhanced Sand Filtration Trench for Capturing Dissolved Phosphorus

Performance Assessment of an Iron-Enhanced Sand Filtration Trench for Capturing Dissolved Phosphorus ST. ANTHONY FALLS LABORATORY Engineering, Environmental and Geophysical Fluid Dynamics Project Report No. 549 Performance Assessment of an Iron-Enhanced Sand Filtration Trench for Capturing Dissolved Phosphorus

More information

TOWN OF PARKER, COUNTY OF DOUGLAS, STATE OF COLORADO N.T.S.

TOWN OF PARKER, COUNTY OF DOUGLAS, STATE OF COLORADO N.T.S. 8" W 8" SAN 8" SAN STM E E E PROPOSED WATER LINE EXISTING WATER LINE PROPOSED FIRE HYDRANT PROPOSED VALVE EXISTING WATER WELL PROPOSED WATER METER EXISTING WATER METER EXISTING CLEANOUT PROPOSED SANITARY

More information

Cochise Hall Water Harvesting / Storm water Management - Class Project

Cochise Hall Water Harvesting / Storm water Management - Class Project 1 The modern water harvesting movement is part of a broader change, or paradigm shift, in how water is treated on sites. And that is the shift from viewing water as a problem to seeing it as a resource.

More information

U.S. Army Corps of Engineers Permit Application Tips

U.S. Army Corps of Engineers Permit Application Tips U.S. Army Corps of Engineers Permit Application Tips MnDOT Environmental Conference Ben Orne and Sarah Wingert, USACE 4-29-2015 US Army Corps of Engineers BUILDING STRONG Outline Introduction to Corps

More information

Newport Bay Watershed Executive Committee

Newport Bay Watershed Executive Committee Newport Bay Watershed Executive Committee June 21, 2017 Discussion Calendar AGENDA ITEM 1 ACTION MINUTES OF THE MARCH 15, 2017 MEETING Amanda Carr, County of Orange Recommended Action Approve the action

More information

North Country Stormwater Conference - Porous Pavement Section

North Country Stormwater Conference - Porous Pavement Section North Country Stormwater Conference - Porous Pavement Section Sponsored by Champlain Watershed Improvement Coalition of NY (CWICNY) October 14, 2010 Presentor Daniel R. Hershberg, P.E. & L.S. Managing

More information

Grand River Monitoring

Grand River Monitoring City of Grand Rapids Environmental Services Grand River Monitoring by Mike Lunn Environmental Services Department Manager Grand River Monitoring History 1968 Grand River Monitoring Network Since 1988 Data

More information

3.0 CUMULATIVE PROJECTS SCENARIO

3.0 CUMULATIVE PROJECTS SCENARIO 3.0 CUMULATIVE PROJECTS SCENARIO The CEQA Guidelines define cumulative impacts as two or more individual effects that, when considered together, are considerable or which compound or increase other environmental

More information

Paradise and Watson Creek Headcut Treatment Project (see map on next page)

Paradise and Watson Creek Headcut Treatment Project (see map on next page) Paradise and Watson Creek Headcut Treatment Project (see map on next page) T 34 S, R 15 E, Sections 11, 13 and 14 The purpose of the project would be to stabilize the stream channel by treating headcuts

More information

Constructed Wetland Pond T-8

Constructed Wetland Pond T-8 Constructed Wetland Pond T-8 Description A constructed wetlands pond is a shallow retention pond designed to permit the growth of wetland plants such as rushes, willows, and cattails. Constructed wetlands

More information

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group Best Practices for Building High-Performance Resource Roads Road Drainage Developed by: The Roads and Infrastructure Group THIS GUIDE IS INTENDED FOR EQUIPMENT OPERATORS CONSTRUCTION CONTRACTORS FIELD

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2

More information