1 LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012
2 01 STONY MOUNTAIN PIPELINE Laricina will develop and follow an environmental protection plan that meets or exceeds regulatory requirements and industry standards. About Laricina Energy Stony Mountain Pipeline Environmental Stewardship, Health and Safety Laricina Energy Ltd. (Laricina) is a privately held, Calgary-based company that is creating value by developing Canada s oil sands using innovative in situ technologies. Laricina has a portfolio of targeted oil sands assets containing a variety of reservoir environments and geological character. These assets range from the familiar oil sands of the McMurray Formation to the developing Grand Rapids and Grosmont Formations, all of which offer significant resource potential. Laricina s diverse portfolio of oil sands assets are at varied stages of development. Development is underway at Saleski and Germain, Laricina s two core properties in the West Athabasca Oil Sands region. At Saleski an 1,800 barrels per day (bpd) pilot project is in operation and at Germain a 5,000 bpd commercial demonstration project is under construction. Laricina is a responsible energy company that will respond to the growing demand for crude oil through in situ oil sands development. Laricina proposes to construct a new 24-inch, 184 km blended crude bitumen pipeline to transport production from its Saleski Steam-Assisted Gravity Drainage (SAGD) development, located in the West Athabasca Oil Sands region of Alberta, to the Enbridge Pipelines Inc. (Enbridge) Cheecham Terminal, located approximately 70 km south of Fort McMurray. A second 12-inch diluent pipeline is planned for the same right of way. Diluent is a light petroleum liquid used to dilute bitumen and heavy oil so it can be shipped through a pipeline to domestic and export markets. Laricina is currently planning to install the two pipelines along with required tankage and associated facilities over two winter seasons in order to manage project timing and meet business commitments. The initial capacity of the blended crude bitumen pipeline, scheduled for completion in mid-2015, will be 200,000 bpd. The initial capacity of the diluent pipeline, scheduled for completion in 2016, will be 70,000 bpd. To mitigate the impact on environmentally sensitive areas, the proposed pipelines are routed south of both the Grand Rapids and Stony Mountain Wildland Provincial Parks commencing from Laricina s Saleski lease located at Townships 84 and 85 and in Ranges 19 and 20 W4M (approximately 70 km northeast of Wabasca, Alberta) to Enbridge s Cheecham Terminal located at W4M. (See map on page 3). Laricina has named this development the Stony Mountain Pipeline. Laricina is committed to carefully assessing and mitigating potential impacts on the environment, to considering socio-economic issues related to the pipeline and to protecting the health and safety of Aboriginal communities, the public, contractors and our employees. The commitment to stakeholders is to ensure facilities are designed, constructed and operated with these results in mind. We will seek input from those who may be affected by construction activities and will work together to address their concerns early in the process as we work through the regulatory process for the Stony Mountain Pipeline. Through studies and ongoing dialogue with Aboriginal communities, regulatory agencies and other stakeholders, we will identify the potential effects the pipeline may have on the various land, air, fish, bird, wildlife and freshwater environments along the route and will utilize existing and proven mitigation measures during construction and operations. Laricina will develop and follow an environmental protection plan that meets or exceeds regulatory requirements and industry standards. Construction work will be conducted in accordance with Laricina s environmental, health and safety standards. Prior to going into service, the pipeline will undergo a rigorous inspection process to ensure that it is safe for use. The pipeline will be operated in an environmentally safe and responsible manner.
3 Horizontal Directional Drilling (HDD) HDD is an established and extensively-used pipeline boring technique which is particularly effective for water crossings. 02 A bore hole is drilled under the water body and the pipeline is then pulled back through the bore hole to the other side. HDD rig section of pipeline direction of pipeline pull Pipeline Need Preliminary Route Selection As new in situ projects are being developed, additional pipeline capacity is required out of the West Athabasca Oil Sands region. Laricina is currently operating a pilot at Saleski which has an approved 1,800 bpd capacity. Regulatory approval for the Phase 1 10,700 bpd expansion at Saleski is being sought which will increase the proposed production capacity to 12,500 bpd. Phase 1 will be the first of six expansion phases expected to increase Saleski s production to more than 270,000 bpd over a 30-year period. While pilot production is currently being trucked to market, the increased production from the planned expansion at Saleski will require a connection to existing pipeline infrastructure. The Stony Mountain Pipeline will initially serve Saleski, however, it is expected that other neighbouring projects may also use the pipeline. To meet the full development potential of Saleski and other potential neighbouring projects, the initial pipeline capacity of 200,000 bpd will need to be expanded in the future. Expansion options will be considered in the context of balancing overall operational requirements with protecting sensitive environments and mitigating new land disturbance. Laricina s preliminary route planning and selection for the pipeline has undergone careful consideration consisting of desktop reviews of topographical maps, land use and tenure information and land disturbances in the vicinity of the region, as well as route and site inspection by helicopter. Our primary pipeline route selection is founded on our commitment to manage potential impacts to wildlife and to the local environment, through mitigation, both during and following construction activities. Route selection criteria included the environment, construction cost and timing, existing linear disturbances, river crossing feasibility and right of way reclamation. As the Athabasca River crossing is a critical control point for the overall pipeline routing, Laricina conducted a preliminary assessment of the proposed crossing location in spring A geotechnical borehole investigation was executed during June and July 2011 and through this investigation Laricina determined that a horizontal directional drill (HDD) under the Athabasca River was a viable crossing option. Using HDD for pipeline crossings of roads, rivers and other obstacles is an established and commonly used technique. Additional geotechnical investigations will be conducted at the Athabasca River, and other watercourse crossings along the proposed route, as warranted, to gather the information required to ensure the pipeline is installed in a manner that minimizes potential impacts to the environment. Development of the proposed pipeline is contingent upon receiving regulatory approvals. Laricina will consult with regulators, Aboriginal communities, stakeholders, and land users on routing.
4 03 STONY MOUNTAIN PIPELINE 89 Development of the proposed pipeline is contingent upon receiving regulatory approvals. Laricina will consult with local 88 regulators, Aboriginal communities, stakeholders and land users on routing. Grand Rapids Wildland Park 87 Athabasca River 86 MUNICIPAL DISTRICT OF OPPORTUNITY NO. 17 REGIONAL MUNICIPALITY OF WOOD BUFFALO KP 0 Saleski 18 KP KP 20 LEGEND KP 30 Kilometre Post Proposed Stony Mountain Pipeline Highway KP 40 Railway Watercourse Waterbody Bovin Creek Municipal Boundary City / Town Park or Protected Area Proposed Conservation or Recreation Area First Nations Land Athabasca River KP 50 KP 60 KP KP 80 KP 79 LAC LA BICHE COUNTY
5 Fort McMurray 04 N 89 Grand Rapids Wildland Park Clearwater River Clearwater Gipsy Lake Wildland Park 87 Gregoire/Willow Lake Expansion Gipsy - Gordon Wildland Park 86 Hangingstone Provincial Recreation Area Gregoire Lake 176 Gregoire Lake Provincial Park Maqua Lake Provincial Recreation Area Stony Mountain Wildland Park KP 184 KP 180 Cheecham 83 Engstrom Lake Provincial Recreation Area KP KP KP 100 KP KP 120 KP 130 KP 140 KP 150 Janvier 194 SCALE: 1: 500,000 km
6 NITY NO STONY MOUNTAIN PIPELINE 19 KP 0 eski 18 KP 10 KP 20 Right of Way Width K Community Involvement Given that the terrain poses challenges with respect to wetlands and access, we recognize how important it is to optimize working space and safety on the right of way. Laricina has determined that safe installation of the pipeline project will require an approximately 35 metre wide right of way (30 metre permanent and 5 metre temporary). Additional temporary workspace may be taken in areas of challenging slopes, wet terrain, road and water course crossings and other infrastructure such as existing pipelines. Laricina is committed to transparent consultation with all stakeholders and nearby communities in the areas in which we operate. Our public consultation program is designed to reflect Energy Resources Conservation Board (ERCB) Directive 56 to ensure that we: engage with Aboriginal communities in the area to learn and understand how our proposed pipeline project may impact their rights and traditional uses; build and maintain transparent, mutually beneficial and respectful relationships with Aboriginal communities and our stakeholders; listen effectively and seek to understand the Aboriginal communities and stakeholders perspectives, requests, and recommendations and give them every consideration in light of our business requirements; review our progress and learnings with potentially impacted Aboriginal communities; seek input into the design of the consultation process and practices to ensure we respect and meet the communications and consultation needs of participants in the area; provide timely, accurate information in a manner that is conducive to promoting understanding of the information we are sharing; provide Aboriginal communities and stakeholders with the opportunity to understand our plans and operations and provide feedback on how their input will be incorporated in our plans and operations; and establish and maintain open communication and a high level of inclusiveness by identifying and including those who may have an interest or potentially be impacted by our activities and proposed activities.
7 TE CU XE ACK B T R O CO STA M E RE P Laricina s Commitments Communications Model will be adopted to promote open dialogue and integrate stakeholder feedback into our consultation program. EN T IS R OU T TE ITMEN M Laricina will seek input into the design of the consultation process and will inform Aboriginal communities and stakeholders of proposed Stony Mountain Pipeline developments. We will provide all communities with the opportunity to understand our plans and operations, as well as provide feedback. L 06 Schedule Laricina intends to file regulatory applications in mid Pending regulatory approval, construction would start in late 2013 with right of way clearing. Based on Laricina s current plan, the blended crude bitumen pipeline will be completed by mid-2015, with the diluent pipeline completed a year later Aboriginal and public consultation process Application preparation Application filing Regulatory review Engineering Blended crude bitumen pipeline Construction Start-up Diluent pipeline Construction Start-up Final clean up
8 WE HOPE TO HEAR FROM YOU PLEASE CONTACT US We will listen to you and to what matters most to your community. Your voice will be heard through direct dialogue with our team. By understanding your priorities, we can work together to minimize the impact of the Stony Mountain Pipeline. FOR MORE INFORMATION Laricina welcomes input from local communities, Aboriginal communities, land users, and stakeholders and can be contacted for questions or comments. Yvonne Walsh Manager, Community Engagement Laricina Energy Ltd. T: East Tower, 5 th Ave Place F: Suite 800, st St. SW pipeline@laricinaenergy.com Calgary, AB T2P 3L8
Cold Lake expansion project
Cold expansion project Initial project description Plain language summary March 2016 Our commitment Imperial Oil Limited s success depends on our ability to maintain an open dialogue with, and ongoing
More informationProject Summary Table BlackPearl Resources Inc Blackrod Commercial SAGD Project Proponent Name: BlackPearl Resources Inc. Date: November, 2011
Project Summary Table BlackPearl Resources Inc Blackrod Commercial SAGD Project Proponent Name: BlackPearl Resources Inc. Date: vember, 2011 Project Name: Blackrod Commercial SAGD Project Company Contact
More informationTelephone Lake project
Telephone Lake project Cenovus Energy Inc. is a Canadian oil company. We re committed to applying fresh, progressive thinking to safely and responsibly unlock energy resources the world needs. Our operations
More informationJackfish 2 Project. Public Disclosure Document. August 2005
Jackfish 2 Project Public Disclosure Document August 2005 Table of Contents Introduction...1 Company Profile...2 Preliminary Project Description...2 The Plan...2 The Process...3 Facilities...3 Physical
More informationCanada s oil sands the in situ producers perspective
Canada s oil sands the in situ producers perspective February 11, 2010 By: Chris Bloomer (Presented by: Gerald W. Bruce, IOSA member) IOSA Member Petrobank Who is IOSA? In situ Oil Sands Alliance Independent
More informationNexen Inc. and CNOOC Canada Inc.
Decision 2012-330 Long Lake Project December 6, 2012 The Alberta Utilities Commission Decision 2012-330: Long Lake Project Application No. 1608729 Proceeding ID No. 2074 December 6, 2012 Published by The
More informationShell Quest Carbon Capture and Storage Project. Shell Canada Limited
SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries
More informationImperial s Sarnia Products Pipeline Mississauga, Ontario. Credit River Valley Project
Imperial s Sarnia Products Pipeline Mississauga, Ontario Credit River Valley Project Preventative pipeline maintenance in Mississauga s Credit River Valley Imperial s Sarnia Products Pipeline (SPPL) carries
More informationIn us, you ll find a trusted resource. Oil Sands
In us, you ll find a trusted resource Oil Sands 20% increase of plant throughput at Cenovus Foster Creek in situ facility. In Canada s oil sands, you are tapping into one of the world s largest oil reserves.
More informationProgressing C-SAGD recovery of bitumen from the Grosmont D reservoir
Progressing C-SAGD recovery of bitumen from the Grosmont D reservoir LARICINA ENERGY Steve Brand P. Eng. WHOC15-280 Organized by: Outline Project overview 1D experience and knowledge gained Early cycle
More informationALBERTA ENVIRONMENT ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPLICATIONS NO AND ENVIRONMENTAL IMPACT ASSESSMENT
Notice NOTICE OF APPLICATIONS SHELL CANADA LIMITED QUEST CARBON CAPTURE AND STORAGE RADWAY FIELD ENERGY RESOURCES CONSERVATION BOARD APPLICATIONS NO. 1689376, 1670112, AND 1671615 ALBERTA ENVIRONMENT ENVIRONMENTAL
More informationWelcome to our Open House!
Welcome to our Open House! Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If
More informationSociety of Petroleum Engineers - Paper "Study and Demonstration of a Process to Extract Bitumen from Utah Tar Sands"
Servicing the Utah and Athabasca Oil Sands Industries MENU HOME ASPHALT RIDGE - STATUS ASPHALT RIDGE - HISTORY SERVICES KEY PERSONNEL CONTACT US LINKS INTRODUCTION ASPHALT RIDGE - OUR HISTORY & a TECHNOLOGY
More informationRecovery Process - Cold Heavy Oil
Recovery Process - Cold Heavy Oil CHOPS (Cold Heavy Oil Production with Sand) CHOPS is a heavy oil recovery technique where the reservoir sand is deliberately produced to improve reservoir performance.
More informationNexen Inc. OPTI Canada Inc.
Decision 2010-006 Nexen Inc. OPTI Canada Inc. Long Lake South Phase 1 Cogeneration Power Plant January 15, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-006: Nexen Inc. and OPTI Canada Inc. Long Lake
More informationPrince Rupert Gas Transmission Project Overview Prince Rupert
Prince Rupert Gas Transmission Project Overview Prince Rupert Gas Transmission Project ALBERTA ALBERTA Prince Rupert Gas Transmission Project 37 Pink Mountain Wonowon Fort St. John ALASKA Stewart 37 Prince
More information6 DRILLING AND COMPLETIONS
Cenovus FCCL Ltd. 6-1 Drilling and Completions 6 DRILLING AND COMPLETIONS 6.1 OVERVIEW This section contains information about the drilling and completion of wells within the CLTP. Well counts, locations
More informationOPPORTUNITY PROFILE. Fort McKay Sustainability Department (FMSD) Senior Manager, Industry & Government Relations
OPPORTUNITY PROFILE Fort McKay Sustainability Department (FMSD) ABOUT FORT MCKAY FIRST NATION Fort McKay First Nation (FMFN) is composed of over 800 band members, including those of Cree and Dane heritage,
More informationEAST-WEST TIE TRANSMISSION PROJECT
EAST-WEST TIE TRANSMISSION PROJECT Connecting Ontario s Northwest THANK YOU for attending this Open House We want to hear from you www.nextbridge.ca Purpose of the Open House We are here to provide you
More informationKeystone Projects Overview
Keystone Projects Overview TransCanada Assets Wholly Owned Natural Gas Pipeline Partially Owned Natural Gas Pipeline Natural Gas Pipeline Under Construction Natural Gas Pipeline In Development Natural
More informationEARTH ENERGY RESOURCES INC. Western U.S. Oil Sands Conference. D. Glen Snarr, President & CFO September 21, 2006
EARTH ENERGY RESOURCES INC. Western U.S. Oil Sands Conference D. Glen Snarr, President & CFO glen.snarr@earthenergyresources.com September 21, 2006 ISSUES FACING OIL SAND PRODUCTION Issues Facing Athabasca
More informationC&B Alberta Solar Development ULC
Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017
More informationPipeline Performance: Building Trust & Raising the Bar
Pipeline Performance: Building Trust & Raising the Bar Jim Donihee, OMM CD June 19 th, 2014 Outline Relevance & Background CEPA Who are we & What do we stand for? Defining Moments Catalyst for Change How
More informationSUNDANCE 7 January 2014
Artist rendering of a combined-cycle natural gas power plant. SUNDANCE 7 January 2014 Project Information Booklet Table of Contents Introduction to Sundance 7 1 TransAlta and MidAmerican 1 Project location
More informationGrizzly Oil Sands ULC
Decision 2013-124 Algar Lake Project Distribution System Exemption March 28, 2013 The Alberta Utilities Commission Decision 2013-124: Algar Lake Project Distribution System Exemption Application No. 1609370
More informationIntegrated Watershed Management Plan
mighty peace watershed alliance Integrated Plan SUMMARY What is the Plan? The Mighty Peace Alliance (MPWA) supports the three goals of Alberta s Water for Life Strategy: safe secure drinking water, healthy
More informationSHELL ONSHORE OPERATING PRINCIPLES
SHELL ONSHORE OPERATING PRINCIPLES FOR TIGHT SAND OR SHALE OIL AND GAS In 2011, Shell publicly shared five aspirational operating principles that govern the activities where we operate and where hydraulic
More informationPart 1: Project Description
Application for Approval of the AOSP Bitumen Blending Facility Project Part 1: Project Description Submitted to: Alberta Energy and Utilities Board and Alberta Environment Submitted by: Shell Canada Limited
More informationThe Peace Watershed. Current and Future Water Use and Issues, 2011
This is an Executive Summary. For full report go to: www.mightypeacewatershedalliance.org The Peace Watershed Current and Future Water Use and Issues, 2011 March 2012 EXECUTIVE SUMMARY This study was undertaken
More informationFORT McMURRAY MINEABLE OIL SANDS INTEGRATED RESOURCE MANAGEMENT PLAN DRAFT. As of October 2005
FORT McMURRAY MINEABLE OIL SANDS INTEGRATED RESOURCE MANAGEMENT PLAN 2005 DRAFT As of October 2005 This ideas presented in this discussion paper are intended to stimulate discussion. We would like to hear
More informationPengrowth Energy Corporation
Decision 2013-308 Lindberg SAGD Industrial System Designation August 20, 2013 The Alberta Utilities Commission Decision 2013-308: Lindberg SAGD Industrial System Designation Application No. 1609200 Proceeding
More informationTES Industrial Development SW ¼ SEC Lacombe County Outline Plan
TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1
More informationPROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT
PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT Approximately 70 km North of Fort McMurray, Alberta ISSUED
More informationOil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency -
Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency - Nov-29, 2017 JAPEX (Japan Petroleum Exploration Co., Ltd) Canada Oil Sands Project Dept. Tanetomo (Tom) Izumi Japan
More informationCanada s Oil Sands - A World-Scale Hydrocarbon Resource
Canada s Oil Sands - A World-Scale Hydrocarbon Resource Prepared by: R.B. (Bob) Dunbar, P. Eng. bob.dunbar@strategywest.com February 2009 www.strategywest.com PO Box 76037; Calgary, Alberta T2Y 2Z9; Phone
More informationALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta
ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta PETRO-CANADA OIL AND GAS STEAM-ASSISTED GRAVITY DRAINAGE PROJECT MACKAY RIVER PROJECT Decision 2000-50 ATHABASCA OIL SANDS AREA Applications No. 1032550
More informationProposed Heartland Cavern Lateral Pipeline and Meter Station. Public Information Document
Proposed Heartland Cavern Lateral Pipeline and Meter Station Public Information Document April 16, 2015 Proposed Heartland Cavern Lateral Pipeline and Meter Station Project 2 Contents Project Necessity...
More informationConsiderations. Report of the Joint Review Panel for the Enbridge Northern Gateway Project Volume 2
Considerations Report of the Joint Review Panel for the Enbridge Northern Gateway Project Volume 2 Considerations Report of the Joint Review Panel for the Enbridge Northern Gateway Project Volume 2 Permission
More informationMontney Development. in the South Peace
Montney Development in the South Peace Fort St. John Table of contents British Columbia Mapped area Dawson Creek British Columbia Pouce Coupe Alberta Beaverlodge Grande Prairie Your feedback matters! Please
More informationShell Canada Limited. Shell s Comments for Phase 4: Oral Proceeding Related to Alberta Energy Regulator Proceeding No
Shell Canada Limited Shell s Comments for Phase 4: Oral Proceeding Related to Alberta Energy Regulator Proceeding No. 1769924 January 22, 2014 Good (morning/afternoon) Panel Members, AER staff, members
More informationParsons Creek Aggregates Project. Part D: Environmental Impact Assessment (EIA) Methodology
Part D: Environmental Impact Assessment (EIA) Methodology Table of Contents D. ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY... 1 D.1 EIA TERMS OF REFERENCE... 1 D.2 SCOPE OF THE ASSESSMENT... 2 D.2.1 Scope
More informationENVIRONMENTAL SCREENING REPORT
ENVIRONMENTAL SCREENING REPORT Pursuant to the Canadian Environmental Assessment Act (CEA Act) SCREENING SUMMARY TransCanada PipeLines Limited (TransCanada) is proposing to conduct a contaminant sampling
More informationLarge-Scale CCS Demonstration Projects in Canada
Carbon capture and sequestration technology holds enormous potential to reduce our greenhouse gas emissions as we use our own energy resources to power our economy. Prime Minister Stephen Harper, February
More informationTrenchless Pipeline Crossings
Trenchless Pipeline Crossings Overview Where we started Horizontal Directional Drilling 1960 s Evolution of the process Where we are today HDD Microtunneling Direct Pipe Crossing Process Where we re going
More informationJAPAN CANADA OIL SANDS LTD. HANGINGSTONE DEMO PROJECT 2004 Presented on Monday, March 7, 2005 Presentation Outline
Thermal In-Situ Scheme Progress Report JAPAN CANADA OIL SANDS LTD. HANGINGSTONE DEMO PROJECT 2004 Presented on Monday, March 7, 2005 Presentation Outline 1. Introduction Project Background, Activity Summary
More informationtransportation BUSINESS PLAN
Transportation BUSINESS PLAN 2014-17 Accountability Statement This business plan was prepared under my direction, taking into consideration the government s policy decisions as of February 12, 2014. original
More informationSite C Clean Energy Project Agricultural Mitigation and Compensation Plan
Site C Clean Energy Project Agricultural Mitigation and Compensation Plan Revision 1: September 25, 2017 Table of Contents 1.0 Background... 4 1.1 The Site C Clean Energy Project... 4 1.2 Project Benefits...
More informationMurphy Oil Operations in the PEACE RIVER AREA
Murphy Oil Operations in the PEACE RIVER AREA April 27 th, 2015 Craig Sinclair Manager, Special Projects MURPHY OIL CORPORATION www.murphyoilcorp.com NYSE: MUR 1 Our purpose today includes: Our Purpose
More informationTransmission Pipelines: Changing context
Transmission Pipelines: Changing context CATHY HAY, DIRECTOR, RESEARCH & SPECIAL PROJECTS JANUARY 2015 Who is CEPA? The Canadian Energy Pipeline Association (CEPA) represents Canada s transmission pipeline
More informationWelcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming!
Welcome to the Community Meeting for the Niagara Region Wind Project Thank you for coming! In early September we will host the first Public Open House under We are happy to share information about this
More informationSAGD Water Disposal Options, Associated Impacts, and Strategies to Improve Environmental Footprint. Basil Perdicakis, January 27, 2011
SAGD Water Disposal Options, Associated Impacts, and Strategies to Improve Environmental Footprint Basil Perdicakis, January 27, 2011 Statoil Canada Kai Kos Dehseh (KKD) Lease Leismer site currently producing
More informationThe Role of Oil Sands Cogeneration in the 2030 Alberta Generation Mixture. Ariane Ouellette, Dr. Andrew Rowe and Dr. Peter Wild April
The Role of Oil Sands Cogeneration in the 2030 Alberta Generation Mixture Ariane Ouellette, Dr. Andrew Rowe and Dr. Peter Wild April 13 2013 Motivation Province of Alberta targets a 2050 GHG emissions
More informationWelcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study
Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive
More informationPROPOSED PIPELINES TO SERVE THE COMMUNITY OF FENELON FALLS: ENVIRONMENTAL REPORT
1.0 INTRODUCTION 1.1 PROJECT DESCRIPTION Enbridge Gas Distribution Inc. ("Enbridge") is proposing to construct up to a total of approximately 37 kilometres (km) of natural gas pipelines at different nominal
More informationSHALE FACTS. Production cycle. Ensuring safe and responsible operations
SHALE FACTS Production cycle Ensuring safe and responsible operations Statoil is committed to developing our shale projects in a safe, responsible and open manner. Statoil takes a long term perspective
More informationWELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet
WELCOME Please sign in Representatives are available to answer questions Please complete a comment sheet Place it in the box or send it to the Consultant undertaking the study or to the Town of Wasaga
More informationUrban Pipeline. Replacement Program A NATURAL GAS PIPELINE INITIATIVE. Southwest Calgary Connector & South Glenmore Lateral. Safety First. Always.
Urban Pipeline Replacement Program A NATURAL GAS PIPELINE INITIATIVE Southwest Calgary Connector & South Glenmore Lateral Safety First. Always. ATCO s Urban Pipeline Replacement Program In January 2014,
More informationOil Sands Performance. Muskeg River Mine & Scotford Upgrader
Oil Sands Performance Report Muskeg River Mine & Scotford Upgrader ABOUT THIS REPORT 01 This document is a report to our stakeholders and is an important part of Shell s continuing dialogue with governments,
More informationorporate responsibility 2009 performance measures
orporate responsibility performance measures about cenovus 2 3 4 economic 5 environment 2 4 workforce 6 community 6 governance our approach to CR reporting health and safety energy efficiency and R&D measurement
More informationTABLE OF CONTENTS PART 1 PROJECT UPDATE... 1 PROPOSED PLANT SITE EXPANSION...1
Canadian Natural Resources Limited - i - Table of Contents TABLE OF CONTENTS SECTION PAGE PART 1 PROJECT UPDATE... 1 PROPOSED PLANT SITE EXPANSION...1 PART 2 SUPPLEMENTAL INFORMATION REQUEST RESPONSES...
More informationSustainable Water Management in the Athabasca River Basin Initiative (ARB Initiative) DRAFT Working Group Terms of Reference
Sustainable Water Management in the River Basin Initiative (ARB Initiative) DRAFT Working Group Terms of Reference December 2016 Contents 1.0 Background...3 2.0 Vision...4 3.0 Project Principles...4 4.0
More informationC&B Alberta Solar Development ULC
Decision 22447-D01-2017 Vauxhall Solar Power Plant July 4, 2017 Alberta Utilities Commission Decision 22447-D01-2017 Vauxhall Solar Power Plant Proceeding 22447 Application 22447-A001 July 4, 2017 Published
More informationBiomass supply and diesel requirements for cofeeding a bitumen upgrader in Alberta
Engineering Conferences International ECI Digital Archives BioEnergy IV: Innovations in Biomass Conversion for Heat, Power, Fuels and Chemicals Proceedings Spring 6-12-2013 Biomass supply and diesel requirements
More informationWater Conservation, Efficiency and Productivity Plan Progress Report Upstream Oil and Gas Sector
Guide Water Conservation, Efficiency and Productivity Plan Progress Report Upstream Oil and Gas Sector January 2016 2016-0037 The Canadian Association of Petroleum Producers (CAPP) represents companies,
More informationTHE NORTHERN GATEWAY PIPELINE: A POSSIBLE CORRIDOR TO SEED RENEWABLE ENERGY IN BRITISH COLUMBIA, CANADA. McGill University, Montreal, Quebec, H3A 2A7
World Mining Congress 2013 THE NORTHERN GATEWAY PIPELINE: A POSSIBLE CORRIDOR TO SEED RENEWABLE ENERGY IN BRITISH COLUMBIA, CANADA Mory Ghomshei 1,2,*, Ferri Hassani 1, John Meech 2, and Nima Mousavi 3
More informationEXCELLENCE * INTEGRITY * STEWARDSHIP * COMMITMENT * EFFICIENCY * VISION
1 TOPICS September 8 & 22, 2011 The Challenge The Solution (Part of it) The Grand Park The Results 2 The North Georgia Water Challenge High dependency on Lake Lanier and Chattahoochee River (>70%). 11
More informationOPPORTUNITY PROFILE Director, Communications & Stakeholder Relations
OPPORTUNITY PROFILE Director, Communications & Stakeholder Relations 1 THE ORGANIZATION REGIONAL MUNICIPALITY OF WOOD BUFFALO Stretching from north central Alberta to the borders of Saskatchewan and the
More informationPXP Point Arguello / Gaviota
PXP Point Arguello / Gaviota An ongoing project consisting of three offshore platforms (Hermosa, Harvest and Hidalgo) that produce and process oil and gas from the Point Arguello Offshore field and an
More informationProposed Northern Gateway Pipeline
Fall 2014 Proposed Northern Gateway Pipeline RISK MITIGATION STRATEGY REPORT JEFFREY KENT YORK UNIVERSITY Disaster Risk Management Course Table of Contents Introduction... 1 Description of Mitigation Strategies...
More informationPUBLIC NOTICE Section 404 of the Clean Water Act - Permit Review ENVIRONMENTAL IMPACT STATEMENT U.S. ARMY CORPS OF ENGINEERS REGULATORY BRANCH
US Army Corps of Engineers Omaha District PUBLIC NOTICE Corps ID No: NWO-2007-1337-DEN Project: Regional Watershed Supply Project Applicant: Million Conservation Resource Group Issue Date: May 8, 2009
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 450 NOVEMBER 2007 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING
More informationEvaluation of Western Kentucky s Heavy Oil and Bitumen Resources
2014 Eastern Unconventional Oil and Gas Symposium - November 5-7, 2014 in Lexington, Kentucky, USA http://www.euogs.org Evaluation of Western Kentucky s Heavy Oil and Bitumen Resources 2014 Eastern Unconventional
More informationPART 1: ROUTING UPDATE
PART 1: ROUTING UPDATE TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PIPELINE CORRIDOR... 2 Page 2.1 Overview of Pipeline Corridor Selection and Optimization Process... 2 2.2 Environmental, Socio-Economic
More informationYeo Substation Project
Yeo Substation Project Application to the Alberta Utilities Commission October 2014 10035 105 Street, Edmonton AB, Canada T5J 2V6 Tel: 1-866-600-0022 Fax: 780-420-5030 www.atcoelectric.com Application
More informationTar Sands: Why Should I Care?
Tar Sands: Why Should I Care? Tar sands (bitumen) is extracted in Canada and is transported by pipeline through Minnesota and Wisconsin and points further south. Tar sands and tar sands pipelines can have
More informationC&B Alberta Solar Development ULC
Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by
More informationDead Horse Creek Project. Community Open House Minnewasta Golf & Country Club Morden, Manitoba June 15, 2017
Dead Horse Creek Project Community Open House Minnewasta Golf & Country Club Morden, Manitoba June 15, 2017 Dead Horse Creek Project Overview Enbridge operates seven pipelines that cross Dead Horse Creek
More informationCases for QAES's and QWAES's and QWSP s and QAP s
Cases for QAES's and QWAES's and QWSP s and QAP s ARHCA Environment Session, Red Deer, AB November 6, 2014 Jay S. White, M.Sc., P. Biol, QWAES, QAES Aquality Environmental Consulting Ltd. Water Act (1999)
More informationENFORCEMENT OF THE ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT WATER ACT
ENFORCEMENT OF THE ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT And TER ACT 1 Apr 2010-30 Jun 2010 July 2010 Environmental Management Division Alberta Environment Administrative Penalties Ritchie & Sons
More informationEnvironmental Impact Statement for the Slave Falls Tramway Conversion Project
Environmental Impact Statement for the Slave Falls Tramway Conversion Project Prepared for Submitted by 41844.101 March 2008 ENVIRONMENTAL IMPACT STATEMENT FOR THE SLAVE FALLS TRAMWAY CONVERSION PROJECT
More informationGENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION
GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA March 25, 2006 INTRODUCTION This document is intended to provide general guidance for use in conducting
More informationDepartment of the Army Permit Application
Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers
More information6.0 ENVIRONMENTAL AND SOCIO-ECONOMIC EFFECTS ASSESSMENT
6.0 ENVIRONMENTAL AND SOCIO-ECONOMIC EFFECTS ASSESSMENT The description of the environmental and socio-economic setting, and current state of the environment within the Project area (Section 5.0), are
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 450 NOVEMBER 2O12 CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING TABLE OF CONTENTS 450.01
More informationOperations Mine Site, Tote Road and Railway
Operations Mine Site, Tote Road and Railway 2 Panel Members Michael Anderson Richard Cook John Binns Fernand Beaulac Steve Walker Mike Lepage Michael Sheahan 3 The Panel will address: FEIS Volumes 3, 5,
More informationGeophysical Guidelines for the Muskwa-Kechika Management Area
Geophysical Guidelines for the Muskwa-Kechika Management Area May 18, 2004 TABLE OF CONTENTS TABLE OF CONTENTS...i OIL AND GAS COMMISSION...1 1.0 PURPOSE OF THE GUIDELINE...3 2.0 ADAPTIVE MANAGEMENT /
More informationAccompanying this letter are three documents with further information about the project and BowArk s public involvement:
BowArk Energy Ltd. Suite 0 Devon Tower 00 Ave SW Calgary, Alberta, TP H (0 - www.bowark.com March 0, 0 RE: Lanfine Wind Power Project Dear neighbour, My name is Keith Knudsen, and I am the lead developer
More informationCHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section
More informationENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass
ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT
More informationEnergy. on this world and elsewhere. Instructor: Gordon D. Cates Office: Physics 106a, Phone: (434)
Energy on this world and elsewhere Instructor: Gordon D. Cates Office: Physics 106a, Phone: (434) 924-4792 email: cates@virginia.edu Course web site available at www.phys.virginia.edu, click on classes
More informationINDUSTRIAL FORT SASKATCHEWAN S. fortsask.ca/business LOCATION CONNECTIONS GROWTH
INDUSTRIAL FORT SASKATCHEWAN S L E A D I N Gedge LOCATION CONNECTIONS GROWTH fortsask.ca/business Fort Saskatchewan is a major industrial and commercial centre in northern Alberta. We are the largest urban
More informationOldman 2 Wind Farm Limited
Decision 2010-461 Oldman 2 Wind Farm Project September 24, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-461: Oldman 2 Wind Farm Project Application No. 1605398 Proceeding ID. 293 September 24, 2010
More informationWetlands in Alberta: Challenges and Opportunities. David Locky, PhD, PWS, PBiol Grant MacEwan University
Wetlands in Alberta: Challenges and Opportunities David Locky, PhD, PWS, PBiol Grant MacEwan University Overview What & Where Function & Value Alberta s Keystone Ecosystem Losses & Impacts Restoration
More informationPROVINCE OF BRITISH COLUMBIA REGULATION OF THE MINISTER OF ENVIRONMENT AND CLIMATE CHANGE STRATEGY. Environmental Management Act M328
PROVINCE OF BRITISH COLUMBIA REGULATION OF THE MINISTER OF ENVIRONMENT AND CLIMATE CHANGE STRATEGY Environmental Management Act Ministerial Order No. M328 I, George Heyman, Minister of Environment and
More informationPIPELINE SAFETY MUNICIPAL CONCERNS AND EXPECTATIONS
PIPELINE SAFETY MUNICIPAL CONCERNS AND EXPECTATIONS Scott Pearce, Reeve, MRC of Argenteuil and Mayor, Township of Gore Frédérick Jones, GIS Geographer, MRC of Argenteuil 2 June 2015 Introduction Consultations
More informationEffective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER).
Directive 055 Addendum Directive 055 Addendum: Interim Requirements for Aboveground Synthetically- Lined Wall Storage Systems, Updates to Liner Requirements, and Optional Diking Requirements for Single-Walled
More informationCAPROCK INTEGRITY FOCUS Analyzing How To Utilize Technical Testing Methodologies To Ensure Caprock Integrity. Tuesday, May 24 th, 2011
CAPROCK INTEGRITY FOCUS Analyzing How To Utilize Technical Testing Methodologies To Ensure Caprock Integrity Tuesday, May 24 th, 2011 Forward-Looking Information and Advisories This presentation contains
More informationE.L. SMITH SOLAR FARM PROJECT UPDATE
E.L. SMITH SOLAR FARM PROJECT UPDATE Artist rendering: Looking northeast from Anthony Henday Drive (located southwest of project site) In June 2017, we sent you information about the E.L. Smith Solar Farm
More informationALBERTA S ENERGY STORY
ALBERTA S ENERGY STORY TABLE OF CONTENTS INTRODUCING ENERGY IQ 2 OVERVIEW OF ALBERTA 3 OIL SANDS 4 NATURAL GAS 8 COAL 12 RENEWABLE ENERGY 16 QUESTION & ANSWER Joe Dion on First Nations in the energy sector
More informationDecision Syncrude Canada Ltd. Mildred Lake Power Plant. July 17, 2014
Decision 2014-212 Syncrude Canada Ltd. Mildred Lake Power Plant July 17, 2014 Decision 2014-212: Syncrude Canada Ltd. Mildred Lake Power Plant Application No. 1610311 Proceeding No. 3068 July 17, 2014