1 WELCOME Please sign in Representatives are available to answer questions Please complete a comment sheet Place it in the box or send it to the Consultant undertaking the study or to the Town of Wasaga Beach at the address provided on the comment sheet 1
2 This Project is being planned in accordance with the Municipal Engineers Association s (MEA) Municipal (October 2000, as amended in 2007 & 2011) document. The MEA Planning and Design Process Flow Chart is provided for public information. At the present time, the Wasaga Beach West End Water Storage Facility and Maintenance Depot Class Environmental Assessment is in Phase 3. WE ARE HERE 2
3 Phase 1 - Problem Statement In order to enhance potable water delivery in the west end of the community, the Town of Wasaga Beach is undertaking a planning process (Schedule C) to consider storage options and sites for a new water reservoir. The assessment will investigate all aspects of the water system including water pressure, fire flow volumes, adequate storage volume, existing servicing and future development. The Town intends to ensure that all areas within the current Town boundary limits are adequately serviced by the municipal water system. In addition, the Town is also considering layout options and site locations for a new (satellite) maintenance depot in the west end of Town. Given the geographic layout of the Town, the current Public Works Maintenance Facility located in the east end, does not efficiently support present operations. Projected growth in demand for services will further overload the current facility and diminish current levels of service. 3
4 Phase 1 - Map of Study Area The study area for the project is described as the Town limit west of 58 th Street. 4
5 Phase 2 - Potential West End Sites All potential site options within the study area were considered. 7 sites were identified as feasible options and were short listed for additional consideration, shown on the map. Options 2 5
6 Phase 2 - Recommended Preferred Site A comparison of site options was presented in the Public Information Centre held on July 22, Comments received were taken into consideration to confirm the recommended preferred site. Site 2 was established as the recommended preferred site Overall Site 2 presented the best alternative based on the evaluation criteria. This site is considered to have the least impact on development in Wasaga Beach with minimum impact to the surrounding area. This site is considered to provide increased water security and performance as well as increased maintenance and service to the residents located in the west end of Wasaga Beach. Studies were undertaken during Phase 3 to confirm the recommended preferred design solution. 6
7 Phase 2 - Maintenance Depot Requirements A Needs Assessment was conducted which determined the need for a satellite maintenance depot in the west end of Wasaga Beach. The Assessment identified that the depot will allow for more timely repairs and services, improved winter maintenance and is necessary to service the proposed developments in the west end. The area necessary to provide these services was identified as 3.5 hectares. To adequately serve the Wasaga Beach community, the new satellite maintenance depot requirements are as follows: Office Area For office staff and dispatch Will include meeting/training room and washrooms Utility Area For building utilities, cleaning materials and storage Staff Facilities Incudes kitchen, lunch room, locker rooms and washrooms Depot Includes storage and vehicle bays for parking, truck washing and repair Sand and Salt Shed - Storage Yard Fuel station, parking, material storage and a communication tower 7
8 Phase 2 - Water Storage Requirements The need for additional water storage was identified in a Report titled: Ultimate Water Supply and Distribution System Model Update prepared by Ainley & Associates Limited, March A total water storage requirement of 24,641 m 3 was identified for full build out of the Town (27,012 units) The additional storage requirement was derived as follows: Location of Storage Available Storage (m 3 ) East End Elevated Tank 2,841 Veterans Way (formerly Powerline Road) 3,410 In-Ground Reservoir Sunnidale Elevated Tank 9,550 Total Existing Storage 15,801 Additional Storage Required 8,840 8
9 Phase 2 - Water Storage General Alternatives Six water storage alternatives were considered for the additional required capacity as follows: Alternative 1 9,000 m³ elevated tank in the west end Alternative 2 9,000 m³ in-ground tank in the west end built in 2 stages Alternative 3 4,500 m³ elevated tank in the west end and 4,500 m³ inground at Veterans Way (formerly Powerline Road) site Alternative 4 4,500 m³ in-ground tank in the west end and 4,500 m³ in-ground at Veterans Way (formerly Powerline Road) site Alternative 5 Do Nothing Alternative 6 Limit Growth Recommended Preferred Alternative Alternative # 3 is the recommended water storage solution (4,500m³ elevated tank in the west end and 4,500m³ inground reservoir on Veterans Way (formerly Powerline Road)) 9
10 Phase 3 - Site Assessment Studies Desktop studies and field surveys were conducted by industry specialists for the proposed site. The following information and site studies were analyzed to confirm Site 2 as the preferred site for this project: Natural Environment Natural heritage information, amphibian survey, bird survey, bat survey, vegetation and vascular flora surveys, wildlife survey and fish survey Archaeological Stage 1 (review geomorphological conditions, government files, literature and historical maps and complete a field review), Stage 2 (field survey with test pits) Noise Sound level testing at existing maintenance depot, sound level testing at preferred site and sound level modeling Geotechnical Field work including 4 boreholes Drainage in the area of this site was examined to ensure that site development would have no negative impacts. Site Boundaries The extent and boundaries of the site were examined to minimize impacts on neighbouring properties, to comply with Highway setbacks and to retain frontage on Joan Avenue for existing property owners. 10
11 Phase 3 - Site Assessment Recommendations Natural Environment The preliminary Environmental Impact Study identified no concern of affecting Provincially Significant Wetlands, Areas of Natural and Scientific Interest, Significant Woodlands, Local Wildlife Habitat or Fish Habitat. Archaeological Stage 1 identified the need for a Stage 2 assessment. No archaeological resources were encountered during Stage 2 and no further investigation is required. Noise To meet Ministry of the Environment and Climate Change s noise criteria, a 5.5m high acoustic barrier is likely required along the north limit of the preferred site. Geotechnical The boreholes identified that the soil will be adequate for construction of the maintenance depot at any location on the site. The water tower will need to be constructed on the west side of the site to allow for sufficient geotechnical bearing resistance at serviceability limit state. Additional boreholes will be required before construction of the water tower. Drainage Develop a storm water management plan that mitigates impacts on the site and eliminates impacts on adjacent properties and addresses existing drainage issues in the area. 11
12 Maintenance Depot Site Layout Evaluation 12
13 Recommended Preferred Site Layout 13
14 Proposed Maintenance Depot Office and Garage 14
15 Storm Water Management A storm water management pond will be required on the site to properly attenuate stormwater flows. Site development will change the existing natural stormwater management. To ensure no negative effect on the downstream drainage area a stormwater management pond is needed. The storm water management pond will provide both water quality and water quantity control. Four alternative locations were considered for the stormwater management pond and evaluated to determine the preferred location. 15
16 Storm Water Management Pond Alternative Locations Alternative 1 Located in the existing unevaluated wetland Alternative 2 Located south of the existing unevaluated wetland 16
17 Storm Water Management Pond Alternative 3 Located along the north side of the maintenance depot Alternative Locations Alternative 4 Only services the maintenance depot and located on maintenance depot site 17
18 Storm Water Management Pond Location Evaluation 18
19 Recommended Stormwater Management Pond Location Alternative 3 is the recommended preferred location for the stormwater management pond. Takes into account future development in the surrounding area. Will help mitigate existing storm water management problems in the surrounding area. Provides a solution to the existing drainage problem. 19
20 Stormwater Management Pond Drainage Path Exact drainage paths and method of conveyance (pipe vs ditch) to be decided during detailed design 20
21 Phase 3 - Elevated Water Storage Design Alternatives Based on the water storage requirements for the Town of Wasaga Beach and the analysis completed during Stage 2 a 4,500 m 3 elevated storage tank is to be constructed in the west end. Three design alternatives for elevated water storage were considered for the additional required capacity as follows: Alternative 1 Composite Elevated Water Storage (Steel Tank with Concrete Pedestal) Alternative 2 Glass Lined Composite Elevated Water Storage Alternative 3 Glass Lined Composite Partially Elevated Water Storage 21
22 Alternative 1 Composite Elevated Water Storage (Steel Tank with Concrete Pedestal) 22
23 Alternative 2 Glass Lined Composite Elevated Water Storage 23
24 Alternative 3 Glass Lined Composite Partially Elevated Water Storage
25 Comparison of Elevated Water Storage Alternatives A criteria assessment table was developed rating each of the options as best (3), moderate (2) or least preferred (1) Alternatives 1 and 2 are the recommended elevated water storage solutions Composite Elevated Water Storage Glass Lined Composite Elevated Water Storage Glass Lined Composite Partially Elevated Water Storage Land Requirement Construction Time Maintenance Aesthetics Opportunity to Create Landmark Security of Supply (Need for Standby Power) Water Quality * Access to Storage Capital Cost * Long Term Operation and Maintenance Cost Normal Operation and Maintenance Total *A weighting of 2 has been applied because this criteria is of higher importance resulting in ratings of least preferred = 2, moderate = 4 and best = 6. 25
26 Timing and Phased Construction Plan The water tower and maintenance depot project will be phased to allow for each aspect of the site to be constructed as needed. The following is the phased construction timing as indicated in the Development Charges report: Purchase Land Elevated Water Storage Construction Additional Water Storage at Veterans Way (formerly Powerline Road) Stormwater Management Pond and Joan Avenue Construction Maintenance Depot Office and Garage Construction Salt and Sand Storage Construction 26
27 Phased Construction 27
28 Next Steps Phase 3 1. Review PIC #2 comments 2. Confirm recommended preferred design option Phase 4 3. Draft ESR 4. Publish Notice of Completion of Class EA 5. Public and Agency review of DRAFT Environmental Study Report 6. Finalize Environmental Study Report based on comments received 7. Memo to Ministry of Environment Completion of Class EA 28
29 What Can you Do? Fill out a comment sheet Send your comments to: Mike Latimer, C.E.T. Project Coordinator Town of Wasaga Beach 30 Lewis Street Wasaga Beach L9Z 1A1 Tel: (705) Fax: (705) m.latimer@wasagabeach.com Gary Scott, P.Eng. Project Manager Ainley Group 280 Pretty River Parkway Collingwood, Ontario L9Y 4J5 Tel: (705) Fax: (705) scott@ainleygroup.com 29
30 The Town of Wasaga Beach West End Storage Facility and Maintenance Depot Public Information Centre August 18, :00 p.m. to 9:00 p.m. Wasaga Rec Plex, 1724 Mosley Street COMMENT SHEET NAME OF RESPONDENT: Please print all responses. REPRESENTING (Agency, Municipality, Property Owner, Tenant, etc.): ADDRESS (Including Postal Code, Telephone Number & Address): COMMENTS (Please use the back of this sheet if necessary) Do you wish to be informed of the publication of the Notice of Study Completion? Yes No Please submit this comment sheet by September 19, 2016 to: Mr. Michael Latimer, C.E.T. Project Coordinator Wasaga Beach Public Works 30 Lewis Street Wasaga Beach, ON L9Z 1A1 Tel: (705) Fax: (705) Mr. Gary Scott, P. Eng. Project Manager Ainley Group 280 Pretty River Parkway Collingwood, ON L9Y 4J5 Tel: (705) Fax: (705)
31
Public Information Centre No. 2
Public Information Centre No. 2 Wednesday April 20, 2011 4:00 pm to 7:00 pm City of Welland City Hall Area 2 Welland, Pelham, and Port Colborne Welcome to Public Information Centre No. 2 Please sign in
More informationOttawa-Trussler Area Sewage Facility Class Environmental Assessment
Welcome to the Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Public Open House May 7, 2013 September 25, 2013 Welcome The purpose of this second Public Open House is to: Present the
More informationAirport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1
Municipal Class Environmental Assessment Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Date: Thursday, June 20, 2013 Time: 6:30 p.m. 8:30 p.m.
More informationPreferred Elevated Tank Site
Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access
More informationWelcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study
Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive
More informationSTORM WATER MANAGEMENT REPORT
Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek
More informationThe rezoning application and proposed transportation facility warrants consideration.
Date: November 11, 2014 To: Re: Chair and Members Planning & Development Committee PDE File Number: REZ1400020 275 Conception Bay South Bypass Road, Ward 5 Application to Rezone Land to Industrial General
More informationComprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:
Comprehensive Study Scoping Document for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: 07-03-26302 Prepared pursuant to Subsection 21(1) of the Canadian Environmental Assessment
More informationTES Industrial Development SW ¼ SEC Lacombe County Outline Plan
TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1
More informationCOLE ENGINEERING GROUP LTD.
CITY OF MARKHAM PROJECT FILE Stormwater Management Facilities Retrofit Municipal Class EA ES12-0316 COLE ENGINEERING GROUP LTD SEPTEMBER 2015 [ Month Year ] HEAD OFFICE 70 Valleywood Drive Markham, ON
More informationFactor Potential Effects Mitigation Measures
Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table
More informationIDT Discussions on HRM Expansion Compiled on April 10, 2014
IDT Discussions on HRM Expansion Compiled on April 10, 2014 IDT identified that Alternative 4 would fully address the cross-country skiing issues that were raised. The alternative locations suggested in
More informationMunicipal Infrastructure
The Town of Hebron Section 5 2014 Plan of Conservation and Development Municipal Infrastructure C. Public Works (Draft: 5/2/13) This section of the plan will identify the services provided by the Town
More information(this cover page left intentionally blank)
4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant
More informationDEVELOPMENT AND INTERFERENCE WITH WETLANDS AND WATERCOURSES REGULATION - POLICIES AND PROCEDURES MANUAL For Planning Act Applications
DEVELOPMENT AND INTERFERENCE WITH WETLANDS AND WATERCOURSES REGULATION - POLICIES AND PROCEDURES MANUAL For Planning Act Applications REVISED JANUARY, 2017 (administrative edits) Executive Board Motions
More informationGRAND NIAGARA Proposed Secondary Plan
GRAND NIAGARA Proposed Secondary Plan Public Open House #3 January 17. 2017 scope + process BUILT Grand Niagara Secondary Plan The Grand Niagara Secondary Plan will establish a framework for the future
More informationSustainable Halton Water & Wastewater Master Plan. Public Information Centre #1
Sustainable Halton Water & Wastewater Master Plan Public Information Centre #1 Welcome to Public Information Centre #1 Please sign in on the sheet provided. Our representatives will be pleased to discuss
More informationOFFICIAL PLAN AMENDMENT AND SCHEDULE C CLASS ENVIRONMENTAL ASSESSMENT
ROBERT FERRIE DRIVE OFFICIAL PLAN AMENDMENT AND SCHEDULE C CLASS ENVIRONMENTAL ASSESSMENT Presentation to Planning and Strategic Initiatives Committee June 9 th, 2014 1 Background Official Plan requires
More informationDesign Specifications & Requirements Manual
Design Specifications & Requirements Manual 10 SEDIMENT AND EROSION CONTROL 10.1 INTRODUCTION... 1 10.2 REFERENCE... 1 10.3 GENERAL INFORMATION REQUIREMENTS... 1 10.3.1 ESC Plan... 1 10.3.2 Servicing Drawings...
More informationTOWN OF KILL DEVIL HILLS, NORTH CAROLINA ANNUAL PROGRESS REPORT ON ADOPTED HAZARD MUTIGATION PLAN COMMUNITY #
TOWN OF KILL DEVIL HILLS, NORTH CAROLINA ANNUAL PROGRESS REPORT ON ADOPTED HAZARD MUTIGATION PLAN COMMUNITY # 375353 Since the last application for continued participation in the Community Rating System
More informationOil and Gas Fast Facts and Frequently Asked Questions February 19, 2013
COMMUNITY DEVELOPMENT DEPARTMENT Oil and Gas Fast Facts and Frequently Asked Questions February 19, 2013 FACTS Property Rights and Interests Property rights: each tract of land contains a set of rights
More informationLeaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood
Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Purpose of this Public Information Centre Provide you with an update on Hydro One s infrastructure
More informationChapter 21 Stormwater Management Bylaw
Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm
More informationC&B Alberta Solar Development ULC
Decision 22447-D01-2017 Vauxhall Solar Power Plant July 4, 2017 Alberta Utilities Commission Decision 22447-D01-2017 Vauxhall Solar Power Plant Proceeding 22447 Application 22447-A001 July 4, 2017 Published
More informationInformation Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation
Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation Why is the project needed? The new Mountain Highway Interchange will provide additional Highway 1 access to better
More informationWelcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming!
Welcome to the Community Meeting for the Niagara Region Wind Project Thank you for coming! In early September we will host the first Public Open House under We are happy to share information about this
More informationSummary Statement PLANNING REPORT & AGGREGATE RESOURCES ACT. Part of Lot 3, Concessions 1 and 2, Township of Clearview, County of Simcoe OSTER PIT
PLANNING REPORT & AGGREGATE RESOURCES ACT Summary Statement OSTER PIT Part of Lot 3, Concessions 1 and 2, Township of Clearview, County of Simcoe Date: October 2016 Prepared for: Lafarge Canada Inc. Prepared
More informationMunicipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B
Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B February 13, 2013 Municipal Class EA Process We are here Purpose and Objective of
More informationState of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area
State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area Thaddeus L. Cohen, AIA Secretary November 2006 CONTENTS Part 1 - Summary
More informationWhat is a stormwater utility fee?
What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville
More informationS.O.P. No. HMD
Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT
More informationENVIRONMENTAL NOISE ASSESSMENT
ENVIRONMENTAL NOISE ASSESSMENT LAKEVIEW BOULEVARD ENVIRONMENTAL ASSESSMENT LAKEVIEW BOULEVARD BETWEEN POPLAR AVENUE AND MAPLE AVENUE TOWN OF AJAX PREPARED FOR: TMIG February 2017 Y1610 TABLE OF CONTENTS
More informationC&B Alberta Solar Development ULC
Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by
More informationSTORMWATER MANAGEMENT PROGRAM. Table of Contents
STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public
More informationDivision 8 Intensive Animal Husbandry Code
Division 8 Intensive Animal Husbry Code 12.8.1 Intensive Animal Husbry Code (1) The provisions in this division comprise the Intensive Animal Husbry Code. (2) They are compliance with the Intensive Animal
More informationKing County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds
News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District
More informationHEADQUARTERS WEST LTD. FARM, RANCH, AGRIBUSINESS REAL ESTATE SALES & SERVICES
Offered For Sale HUNT VALLEY RANCH Apache County, Arizona Exclusively Listed By: Traegen Knight Headquarters West, Ltd. P.O. Box 1980 St. Johns, Arizona 85936 Ph. 928 524-3740 Fx. 928 563-7004 Hunt Valley
More informationProvincial Policy Statement 2014
Natural Heritage Provincial Policy Statement 2014 NATURAL HERITAGE Nature is bountiful. It is also fragile and finite. Provincial Natural Heritage 0 Interest: Ontario s natural heritage resources are valuable
More informationSpencerHolmes engineers - surveyors - planners
Preliminary Stormwater Design Mary Potter Hospice 48-62 Mein Street Newtown Wellington SpencerHolmes engineers - surveyors - planners PO Box 588 Level 6, 8 Willis Street Wellington New Zealand Phone 04
More informationWelcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016
Welcome to the Boulevard Lake Dam Class Environmental Assessment Public Information Session #1 June 14, 2016 Boulevard Dam - Overview Built approximately 100 years ago Owned and operated by the City of
More informationApplication for resource consent Form B Damming and diversion of water
Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or
More informationDEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)
DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) FEBRUARY, 2005 PLANNING AND TRANSPORTATION SERVICES PLANNING AND PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS Introduction 1 Application Review 1.1
More informationPLANNING RATIONALE MACLEOD III AND V QUARRIES
PLANNING RATIONALE MACLEOD III AND V QUARRIES Project No.: OCP-16-0280 Prepared for: Cornwall Gravel Company Ltd. 390 Eleventh Street West Cornwall, Ontario K6J 3B2 Prepared by: McIntosh Perry Consulting
More informationSEVERANCE PROPOSAL FORM
SEVERANCE PROPOSAL FORM PETERBOROUGH COUNTY PLANNING DEPARTMENT Please complete this form with as much detail as possible and provide a rough sketch of what you intend. Completion of this form will help
More informationWorks, services and infrastructure code
9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the
More informationCounty of Calaveras Department of Planning
Date: July 18, 2013 To: From: Project: Advisory Agencies Amy Augustine, AICP - Planner County of Calaveras Department of Planning Rebecca L. Willis, AICP ~ Planning Director Phone (209) 754-6394 Fax (209)
More informationM O R R I S O N H E R S H F I E L D L I M I T E D 235 YORKLAND BOULEVARD,SUITE 600 TORONTO,ONTARIO, M2J 1T1 TEL: (416) FAX: (416)
SIXTH LINE FROM DUNDAS STREET TO HIGHWAY 407 ETR CLASS ENVIRONMENTAL ASSESSMENT STUDY ENVIRONMENTAL STUDY REPORT T OWN OF O AKVILLE SIXTH LINE FROM DUNDAS STREET TO HIGHWAY 407 ETR CLASS ENVIRONMENTAL
More informationContent Copy Of Original
Content Copy Of Original Ministry of the Environment Ministère de l Environnement ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 4495-9FUQDY Issue Date: February 5, 2014 Holcim (Canada) Inc. 2300 Steeles Ave
More informationSewer System Flood Reduction Measures in the Rockcliffe Area
PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward
More informationC&B Alberta Solar Development ULC
Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017
More informationNoise Assessment Report Main Street, Residential Site Cambridge, ON
Noise Assessment Report 825-875 Main Street, Residential Site Cambridge, ON Prepared for: 2536546 Ontario Inc. Prepared by: Stantec Consulting Ltd. 100-300 Hagey Boulevard Waterloo, ON N2L 0A4 Project:
More informationI-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM
I-15 South, MP 0 to MP 16 Environmental Assessment Public Hearing August 7, 2012 5:00 PM to 7:00 PM 1 PROJECT OVERVIEW The Federal Highway Administration (FHWA) and the Utah Department of Transportation
More informationErosion & Sedimentation Control Policy
Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of
More informationOFFICIAL PLAN FOR THE MUNICIPALITY OF MAGNETAWAN
OFFICIAL PLAN FOR THE MUNICIPALITY OF MAGNETAWAN Prepared by July 24, 2002 May 16, 2005 and June 14, 2005 With Jim s Notes on Modifications Modifications provided by MMAH on May 10, 2005 and June 8, 2005
More informationENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass
ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT
More informationENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009
ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,
More informationShell Quest Carbon Capture and Storage Project. Shell Canada Limited
SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries
More informationKENT BREEZE WIND FARMS
Decommissioning Plan Report MAY 2010 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. DECOMMISSIONING PROCESS DESCRIPTION... 2 3. SITE RESTORATION... 3 4. EXCESS MATERIALS AND WASTE MANAGEMENT... 4 5. MANAGING
More informationDATE: December 10, 2012 REPORT NO. PW CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION
PUBLIC WORKS COMMISSION DATE: December 10, 2012 REPORT NO. PW2012-073 TO: FROM: CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION GEOFF RAE, MBA, P.ENG. GENERAL MANAGER, PUBLIC WORKS
More informationKaipara District Plan: Proposed Plan Change 2 - Fire Safety Rules SUMMARY
Kaipara District Plan: Proposed Plan Change 2 - Fire Safety Rules SUMMARY Kaipara District Council is proposing changes to the Fire Safety Rules in the Kaipara District Plan. Research has been undertaken
More information407 TRANSITWAY. Planning & Preliminary Design
FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was
More informationTraffic Noise Introduction to Traffic Noise Analysis and Abatement
Traffic Noise Introduction to Traffic Noise Analysis and Abatement NW Bethany Blvd Improvement Project Michael Minor, President Michael Minor & Associates Inc. Introduction to Acoustics What is Noise?
More informationThe Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.
This document was put together following the fourth round of public consultation for the Class Environmental Assessment study for this Project. In June 2011, the Project Team consulted with stakeholders
More informationQuarry, Mobile asphalt plant, Equipment Yard and Storage Garage
Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage Trans Canada Highway, 8.5 KM west of Springdale Jct, NL. Department of Environment and Conservation File Ref No. 200.20.2475 Prepared for.
More informationDesign Guidelines. pegasus-town.co.nz
Design Guidelines pegasus-town.co.nz Welcome to Pegasus Town These guidelines have been developed to help make your home-building process as easy as possible. The contents provide you, or your designer
More informationAppendix K. Environmental Noise Assessment
Appendix K Environmental Noise Assessment ENVIRONMENTAL NOISE ASSESSMENT THORNTON ROAD NORTH TAUNTON ROAD WEST TO WINCHESTER ROAD WEST SCEDULE 'C' MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT CITY OF OSHAWA
More informationENVIRONMENTAL SCREENING REPORT
ENVIRONMENTAL SCREENING REPORT Pursuant to the Canadian Environmental Assessment Act (CEA Act) SCREENING SUMMARY TransCanada PipeLines Limited (TransCanada) is proposing to conduct a contaminant sampling
More informationEnvironmental Impact Statement for the Slave Falls Tramway Conversion Project
Environmental Impact Statement for the Slave Falls Tramway Conversion Project Prepared for Submitted by 41844.101 March 2008 ENVIRONMENTAL IMPACT STATEMENT FOR THE SLAVE FALLS TRAMWAY CONVERSION PROJECT
More informationEnvironmental Assessment Matrix
For FCC Use Only Date: Customer Name: Environmental Assessment Matrix Loan Number: Please complete each question. Some answers may require additional information. Attach additional documentation where
More informationSOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands
SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced
More informationSmall Project Proposal
Combined Scoping and Notice and Comment Document Small Project Proposal USDA Forest Service Fishlake National Forest Beaver Ranger District Sevier County, Utah The purpose of this document is to inform
More informationWELCOME. ? Meet the RUS Representatives. Connecting Rural America. Rural Utilities Service. Please Sign In. Pick up RUS handout/ comment sheet
Connecting Rural America Rural Utilities Service WELCOME Please Sign In Pick up RUS handout/ comment sheet? Meet the RUS Representatives Turn in comment sheet or provide to RUS within 30 days to Lauren
More informationMunicipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan
Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Public Meeting and Open-House March 27, 2013 Agenda The Master Plan Process History of the Area Draft Servicing Strategy
More informationAPPENDIX A. Project Scoping
APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice
More informationChanges in Assessment Report for the Labatte-Mastronardi Drain
Changes in Assessment Report for the Labatte-Mastronardi Drain Roll No. 590-06800, 590-06850 and 590-06901 Municipality of Leamington February 16, 2016 Project No. 15-012 February 16, 2016 The Municipality
More informationCivic Address (Street No. & Name):
Building Permit District of Squamish 37955 2nd Avenue, PO Box 310 Squamish, BC V8B 0A3 604.815.5011 www.squamish.ca Application Form Civic Address (Street No. & Name): OFFICE USE ONLY: Folio/Roll No.:
More informationPreliminary Decision Memo 2015 Recreation Residence Projects Odell Lake
2015 Recreation Residence Projects Odell Lake USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon Background The Crescent Ranger District maintains 66 recreation
More informationCity of Ottawa. Environmental Impact Statement Guidelines. 2 nd Edition April 2012
DOCUMENT 1 City of Ottawa Environmental Impact Statement Guidelines 2 nd Edition April 2012 Planning and Infrastructure Portfolio Planning and Growth Management Department Policy Development and Urban
More informationChapter 3 Affected Environment and Environmental Consequences
Sterling Highway MP 45 60 Draft SEIS and Draft Section 4(f) Evaluation Chapter 3 Affected Environment and Environmental Consequences Prepared for: Alaska Department of Transportation and Public Facilities
More informationCornwall Solar Project Renewable Energy Approval Modification Report
Cornwall Solar Project Renewable Energy Approval Modification Report Algonquin Power Co 2845 Bristol Circle Oakville ON, L6H 7H7 Contents Contents... 1 Introduction... 2 Summary and Rational for Minor
More information5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN
Report No. 3 of the Transportation Services Committee Regional Council Meeting of March 24, 2011 5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN The Transportation Services Committee
More informationLIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]
LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] 1. Notwithstanding all other permits and clearances, the following clearances shall be obtained prior to
More informationWATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS
WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)
More informationAdministrative Hearing Staff Report
Administrative Hearing Staff Report CenturyLink Utility Boxes 175 N A St Conditional Use PLNPCM2013-00320 Public Right-of-Way at approximately 165-175 North A St Hearing date: July 11, 2013 Planning Division
More informationPolicy for the Assessment and Mitigation of Traffic Noise on County Roads
Lanark County Policy for the Assessment and Mitigation of Traffic Noise on County Roads d r a f t f o r d i s c u s s i o n Prepared by: AECOM Canada Ltd. 302 1150 Morrison Drive, Ottawa, ON, Canada K2H
More informationEnvironmental Information Worksheet
Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project
More informationSection XXV Preconstruction Assessments and Damage Mitigation Procedures
Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding
More informationViridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton
Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management
More informationTORONTO GREEN STANDARD VERSION 2.0
For New Mid to High Rise Residential and all New Non-Residential The Toronto Green Standard (TGS) is a two-tier set of performance measures, with supporting guidelines for new development. Its purpose
More informationSunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies
CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights
More informationDESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION
DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada
More informationSITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS
SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS Revised: June 4, 2014 Requirements for obtaining a site alteration permit vary depending on the type of project being proposed. This information
More information9.3.9 Industry uses code
9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of
More information7 Mineral and Energy Resources
7 Mineral and Energy Resources This chapter examines Humboldt County s mineral (including sand and gravel extraction) and energy (oil, gas, and geothermal) resources. Existing General Plan policies and
More informationWATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS
WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)
More informationProvincial. Statement
Provincial Statement This publication was produced by the Ministry of Municipal Affairs and Housing. For more copies of this document, in either English or French, please contact: Publications Ontario
More informationSECTION 25 - GENERAL INDUSTRIAL ZONE (M2)
SECTION 25 - GENERAL INDUSTRIAL ZONE (M2) No person shall within any M2 Zone use any land or erect, alter, or use any building or structure for any purpose except in accordance with the following provisions:
More information(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.
13. 6C-21.208 CONSERVATION ELEMENT Information Sources George F. Young, Interview notes, June 2002 Sasaki Associates, Inc., interview notes, April, 2000 Interviews between DRMP Staff and USF Staff, May,
More informationLandscaping and Fencing
Landscaping and Fencing Fences, driveways, paving, retaining walls, landscaping & other garden features To be read in conjunction with General Requirements: A guide to building on properties containing
More informationA homeowners/applicants guide to understanding and making application for a building permit.
Building Standards Department Administration Centre 10 Wellington St. E. Alliston, ON L9R 1A1 Web Address: www.newtecumseth.ca Email: building@newtecumseth.ca Phone: 705-435-3900 or 905-729-0057 Fax: 705-435-1689
More information