1 ENVIRONMENTAL ASSESSMENT A3-1 INTEGRA COAL OPERATIONS PTY LTD Glennies Creek Open Cut Coal Mine (No. of pages excluding this page = 15) Consultation Record
2 INTEGRA COAL OPERATIONS PTY LTD A3-2 ENVIRONMENTAL ASSESSMENT Glennies Creek Open Cut Coal Mine This page has intentionally been left blank
3 ENVIRONMENTAL ASSESSMENT A3-3 INTEGRA COAL OPERATIONS PTY LTD Glennies Creek Open Cut Coal Mine A3.1 INTRODUCTION During the preparation of the the local community was consulted in a number of ways, as follows. The Proponent initiated discussions with the local community through the Glennies Creek Colliery Consultative Committee. A newsletter was circulated in February 2005 (see attached copy), after which a community meeting was convened, on 22 March An information forum was held on 2 May 2006 to further explain the status of the Project and discuss any further issues. The Proponent maintained contact with various neighbours and welcomed telephone contact through the Colliery or R.W. Corkery & Co. Throughout the consultation program, a number of issues relating to the Project were raised and were taken into consideration during the preparation of the. Table A3.1 within this appendix records the various issues raised, their frequency and where each issue is addressed in the.
4 INTEGRA COAL OPERATIONS PTY LTD A3-4 ENVIRONMENTAL ASSESSMENT Glennies Creek Open Cut Coal Mine
5 ENVIRONMENTAL ASSESSMENT A3-5 INTEGRA COAL OPERATIONS PTY LTD Glennies Creek Open Cut Coal Mine
6 INTEGRA COAL OPERATIONS PTY LTD A3-6 ENVIRONMENTAL ASSESSMENT Glennies Creek Open Cut Coal Mine
7 ENVIRONMENTAL ASSESSMENT A3-7 INTEGRA COAL OPERATIONS PTY LTD Glennies Creek Open Cut Coal Mine
8 INTEGRA COAL OPERATIONS PTY LTD A3-8 ENVIRONMENTAL ASSESSMENT Glennies Creek Open Cut Coal Mine
9 ENVIRONMENTAL ASSESSMENT A3-9 INTEGRA COAL OPERATIONS PTY LTD Glennies Creek Open Cut Coal Mine
10 INTEGRA COAL OPERATIONS PTY LTD A3-10 ENVIRONMENTAL ASSESSMENT Glennies Creek Open Cut Coal Mine
11 ENVIRONMENTAL ASSESSMENT A3-11 INTEGRA COAL OPERATIONS PTY LTD Glennies Creek Open Cut Coal Mine
12 INTEGRA COAL OPERATIONS PTY LTD A3-12 ENVIRONMENTAL ASSESSMENT Glennies Creek Open Cut Coal Mine A3.2 ISSUES RAISED BY THE COMMUNITY Table A3.1 presents the issues raised by the community during the community consultation process, how each issue was raised and where each issue is addressed within the. Table A3.1 Issues by the and Coverage within the EA Issue Log Aspect Noise Issue How Issue 8 noise loggers is not enough Noise loggers do not appear to have been placed where potential impact will be eg: to the southeast. Why were they not placed based on topography and prevailing winds? 12 days is not enough to get a true background (anything less than 12 months is not acceptable), Noise measurements will be abnormally high due to Council roadworks on Middle Fallbrook Road on the northern ridge and trucks carting quarry material to Mt Owen along Glennies Creek and Middle Falbrook Roads. Is there a noise limit over which the government will not approve a mine? How can you do the assessment if you do not know for sure how many trucks will be operating yet? Who did Mt Owen noise study? Modelling methodology always questionable for noise. General Noise Noise from dozers & reversing alarms Noise kicks in regularly between 3.00 and 3.15pm Can here the chink chink of the bulldozer Noise from Boral trucks (3 trucks between 7.00 and 7.45am) Phone Discussions, # of Times Page 1 of 6 EA Section 1 Part D Part D3.2 1 Part D Part D Part D3.4 1 Part B9 1 Part D3 6 Part D3 1 Part D3 1 Part D3 1 Part D3 1 Part D3
13 ENVIRONMENTAL ASSESSMENT A3-13 INTEGRA COAL OPERATIONS PTY LTD Glennies Creek Open Cut Coal Mine Table A3.1 (Cont d) Issues by the and Coverage within the EA Issue Log Aspect validity and use of weather data Air Quality Government Approvals Night time operations and light Acquisition Zones Issue Want assessments to use more than 12 months weather data to ensure extreme conditions (eg strong winds) are accounted for. If the dust gauges are out now, rain would cause a lower background to be recorded. Is there an air quality limit over which the government will not approve the mine? No monitoring to the north for dust General Air Quality State government will always approve coal mines in the Hunter Valley. How come the mine can get a Bore Licence and I cannot? How can light impact be measured? The existing aura or glow of night mining operations is already too much. Cumulative impact must be addressed. Reversing Alarms heard at night. How are acquisition and management zones determined? sometimes does not seem fair or logical. Replacement value is very different to market value. Wants to be bought out by the Company. How Issue, Phone Discussion, Phone Discussions Phone Discussion # of Times Page 2 of 6 EA Section 1 Parts D1 to D3 1 Part D2.2 1 Part D2.4 1 Part D2.2 1 Part D2 1 Part D8 2 Part D8 1 Part D, Various 1 Part D3 4 Not Relevant to
14 INTEGRA COAL OPERATIONS PTY LTD A3-14 ENVIRONMENTAL ASSESSMENT Glennies Creek Open Cut Coal Mine Table A3.1 (Cont d) Issues by the and Coverage within the EA Issue Log Aspect Visual Impact Flora and Fauna Reputation of Company Water Issue Stockpiles on RL100 ROM, already visible will this proposal increase the size of the stockpiles? Visual bund constructed to block view of RL100 ROM stockpiles does not work. Invitations were extended to go to residences during the visual assessment and assess their views of the Project Site. Fauna surveys done in winter and spring last year: not good enough need updated surveys. How can the Lower Hunter Ironbark and spotted Gum ecological community be endangered and the Upper Hunter Ironbark and not Spotted Gum community? How can they be different? Effect of dust & noise on native animal enclosure in back yard. Lied already: increased resource from 6Mt to 8Mt and estimated resource north of Stony Creek Road was increased. The company has made previous commitments that have not been honoured. Nobles Crossing, Bridgeman Road intersection how can we trust that you will do as you say?. Why had the change of an extra 3 million tonnes occurred between the initial meeting & the newsletter coming out typical of mines not knowing what they are doing and changing their mind. How much water will be pumped to Glennies Creek? All mines discharge and it is not acceptable. If the mine really wanted to impact on Possum Skin Dam they would just do it do not lie to us. Groundwater bore information from DIPNR Search wrong/misleading. Quality of water in final void How Issue, Phone Discussion Phone Discussion Discussion with G. MacKenzie # of Times Page 3 of 6 EA Section 1 Parts B6.2 and D8 2 Part D8 and Plates D1, D2 and D4 1 Part D4 1 Part D4 1 Parts D2 to D4 1 Part D9 1 Part D10 1 Parts D9 and D10
15 ENVIRONMENTAL ASSESSMENT A3-15 INTEGRA COAL OPERATIONS PTY LTD Glennies Creek Open Cut Coal Mine Table A3.1 (Cont d) Issues by the and Coverage within the EA Issue Log Aspect Reputation / experience of specialists Consultation Blasting Issue If only measuring noise for 12 days at 8 locations, then they are not specialists. None of the specialists are based in the Hunter - they have no local expertise/experience. How many EIS s has R W Corkery & Co done in the Hunter? How can the reports/assessments be independent if paid for by the company? Why aren t the community consultative committee meetings advertised, I want to attend. Will there be another community forum? A number of attendees did not receive newsletters in the letterbox drop consultation deficient. Can the dust monitoring be made public? What compensation will there be for the local community? Does GCCM advertise their environmental hotline? Regular community newsletters Potential traffic disruption on Stony Creek Road. Vibrational impact. Potential distance to nearest resident. Resident lives on rockshelf and house is already impacted by blasting, this proposal would mean more impact has had enough. How Issue, Phone Discussion, # of Times Page 4 of 6 EA Section 1 Part D3 1 Part D2 1 Parts A5.2.5 and A Parts B5, B9 and D11 4 Part D3 1 Part D Part D3
16 INTEGRA COAL OPERATIONS PTY LTD A3-16 ENVIRONMENTAL ASSESSMENT Glennies Creek Open Cut Coal Mine Table A3.1 (Cont d) Issues by the and Coverage within the EA Issue Log Aspect Blasting (Cont d) General Property Value Issue Cutting Stony Creek Road during blasting. Will the Company inspect house. Blasting on weekends? General Blasting Do not want the mine and if you are continuing with the environmental assessment process, then you are not listening to our concerns. Such a small coal resource why bother? Do not want a final void: Camberwell s was going to be small as well. Export coal: not needed for Australian electricity generation so no local benefit. When will it stop? (emotional) Could at least one aerial photo in the EIS depict all the regional mines (Rixs, Camberwell, Mt Owen, Ashton)? What will be the increase in infrastructure? What will be the increase in traffic eg: explosive trucks? Better access for complaints line Walls on final void too steep Kangaroos in off-set area Concerns of property value in near future. How Issue Phone Discussions Phone Discussions # of Times Page 5 of 6 EA Section 2 Parts B5, B9 and D11 1 Part B5 2 Part B5 1 Part B Part D13 1 Figure D6 1 Part B 1 Parts B9 and D11 1 Table E1 1 Part B Part D4 2 Part D13
17 ENVIRONMENTAL ASSESSMENT A3-17 INTEGRA COAL OPERATIONS PTY LTD Glennies Creek Open Cut Coal Mine Table A3.1 (Cont d) Issues by the and Coverage within the EA Issue Log Aspect Traffic Dust Issue Will there be temporary disruption to Middle Falbrook Rd during intersection works? Fuel & explosives trucks. Speeds on local roads Where will trucks delivering come from? School bus on poor road (Middle Falbrook Road) Trucks on haul road General Dust Lots of black dust Regular sweeping? Grey dust everywhere Dust on lucerne Dust suppression on waste dumps Hours of Operation Hours of Operation How Issue Phone Discussion Phone Discussion Phone Discussions # of Times Page 6 of 6 EA Section 1 Part B9.1 1 Part B9 1 Parts B9 and D11 1 Part B9 1 Part B9 2 Part D2 1 Part D2 1 Part D2 1 Part D2 1 Part D2 1 Part D2.5 1 Part B12
18 INTEGRA COAL OPERATIONS PTY LTD A3-18 ENVIRONMENTAL ASSESSMENT Glennies Creek Open Cut Coal Mine This page has intentionally been left blank
2.0 Description of Existing Mine Operations
2.0 2.1 Mine History Austar Coal Mine is an amalgamation of several older mines and operates within a number of mining leases under 12 separate development consents issued by Cessnock City Council between
More informationTABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment
Executive Summary TABLE OF CONTENTS ES1 BACKGROUND ES-1 ES2 EXISTING OPERATIONS ES-1 ES3 MODIFICATION OVERVIEW ES-1 ES4 CONSULTATION ES-1 ES5 COMMUNITY INITIATIVES AND INVOLVEMENT ES-3 ES6 ENVIRONMENTAL
More informationAir Quality Monitoring Program. for the. Integra North Open Cut Coal Mine
Integra Coal Operations Pty Ltd ABN: 96 118 030 998 Air Quality Monitoring Program for the Integra North Open Cut Coal Mine Including an Air Quality Monitoring Protocol Integra Coal Operations Pty Ltd
More informationBengalla Mining Company Pty Limited. Particulate Matter Control Best Practice Implementation Monitoring Programs
Bengalla Mining Company Pty Limited Particulate Matter Control Best Practice Implementation Monitoring Programs U3. Wheel Generated Dust U4. Disturbing and Handling Overburden Under Adverse Weather Conditions
More informationAppendix G Noise and Blasting Assessment
Appendix G Noise and Blasting Assessment MT ARTHUR COAL OPEN CUT MODIFICATION NOISE & BLASTING ASSESSMENT REPORT NO. 11246 REVISION D JANUARY 2013 PREPARED FOR HUNTER VALLEY ENERGY COAL PTY LTD THOMAS
More information2016 Annual Air Monitoring Results Summary
2016 Annual Air Monitoring Results Summary Teck Coal Limited Elkview Operations R.R. #1, Highway #3 Sparwood, BC Canada V0B 2G0 1. Monitoring Results Summary 1.1. Source Monitoring EVO is required to monitor
More informationMonthly Environmental Monitoring Report
\ Monthly Environmental Monitoring Report Name of Operation Name of Licensee Environmental Protection Licence Reporting Period start date Reporting Period end date Version Author Approver Moolarben Coal
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 June 2017 to 30 June 2017 Air Monitoring
More informationAnnual Review
A ABN: 45 050 224 250 Annual Review 2016-2017 for Possum Brush Quarry Prepared in conjunction with: R.W. CORKERY & CO. PTY. LIMITED September 2017 This page has intentionally been left blank ABN: 45 050
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 August 2017 to 31 August 2017 Air
More information6. Stakeholder Engagement
6. Stakeholder Engagement TNG is committed to consulting with stakeholders during the planning and development of the Mount Peake Project, to identify and understand any potential issues and concerns,
More informationAppendix J Socio-Economic Assessment
Appendix J Socio-Economic Assessment MT ARTHUR COAL OPEN CUT MODIFICATION SOCIO-ECONOMIC ASSESSMENT PREPARED BY GILLESPIE ECONOMICS October 2012 HVE-11-01 DOC. ID: 482858 TABLE OF CONTENTS Section Page
More informationActions arising from meeting on 15 November 2013 UHMD Emissions and Health Working Group Meeting Action Responsibility Status 1. Welcome and Apologies
Actions arising from meeting on 15 November 2013 UHMD Emissions and Health Working Group Meeting Action Responsibility Status 1. Welcome and Apologies 2. Confirmation of Minutes of 30 July Industry to
More informationNoise Management Plan
Boggabri Coal Operations Pty Ltd Noise Management Plan January 2016 Revision Control Chart Rev No Original 1 2 3 4 5 6 7 8 9 Revision Date Prepared by Reviewed by Approved by 25 Jan 2012 N Pennington 4
More informationBass Point Quarry. Environmental Management Strategy. Bass Point Quarry Environmental Management Strategy
Bass Point Quarry Environmental Management Strategy Bass Point Quarry Environmental Management Strategy July 2014 Table of Contents Table of Contents... 1 List of Figures... 2 List of Tables... 2 1.0 Introduction...
More informationMt Arthur Coal. Annual Environmental Management Report FY16
Mt Arthur Coal Annual Environmental Management Report FY16 30 September 2016 Table of Contents Introduction... 8 Approvals, Leases and Licences... 11 Mine Contacts... 13 Actions Required at Previous AEMR
More informationIntegra Underground Section 96(1A) Application Statement of Environmental Effects. Delivering sustainable solutions in a more competitive world
Integra Underground Section 96(1A) Application Statement of Environmental Effects Integra Coal Operations May 2008 0082094 FINAL www.erm.com Delivering sustainable solutions in a more competitive world
More informationCMPDI. 4.6 Mine Closure Plan
4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 20850 24-November Licensee MACH ENERGY AUSTRALIA PTY LTD LEVEL 2, 179 GREY STREET SOUTH BANK QLD 4101 Premises MOUNT PLEASANT OPERATION 1100 WYBONG ROAD MUSWELLBROOK
More informationSection XXV Preconstruction Assessments and Damage Mitigation Procedures
Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding
More informationEnvironmental Noise Assessment
July to September 2014 Rev 0 (Final) Report Details - July to September 2014 Filename: Job #: J0140003 Folder #: F13130 Revision: 0 (Final) Date: Prepared For Clark Potter, Senior Environmental Advisor
More informationIndependent Environmental Audit
1. Macquarie Generation 12-Sep-2013 Independent Environmental Audit Bayswater Power Station Water Management Upgrade Bayswater Power Station Water Management Upgrade Client: Macquarie Generation ABN: 18
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 20593 20-December Licensee HI-QUALITY QUARRY (NSW) PTY LTD PO BOX 42 KEMPS CREEK NSW 2171 Premises HI QUALITY KEMPS CREEK CENTRAL 1503-1519 ELIZABETH DRIVE KEMPS
More informationThis summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions.
18. Air The Project Air quality team prepared an Air Quality Assessment Report for the Project, which is included in Volume 3 (Part 1). The Report provides an assessment of air quality effects associated
More informationPacific Highway Upgrade Frederickton to Eungai ENVIRONMENTAL MONITORING DATA EPL 20318
Pacific Highway Upgrade Frederickton to Eungai ENVIRONMENTAL MONITORING DATA EPL 20318 May 2014 1 INTRODUCTION The publishing of data refers to the compliance of the Frederickton to Eungai Project (the
More informationMINING LEASE No ANNUAL ENVIRONMENTAL MANAGEMENT REPORT APRIL 2014
MINING LEASE No. 1616 ANNUAL ENVIRONMENTAL MANAGEMENT REPORT APRIL 2014 MOP Commencement : 1 January 2008 MOP Completion : 1 January 2015 AEMR Commencement : 1 April 2013 AEMR Completion: 31 March 2014
More informationCCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona
CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona Prepared by: CB&I Environmental & Infrastructure, Inc. Pittsburgh,
More informationCOMMUNITY AND STAKEHOLDER ENGAGEMENT REPORT APPENDIX ENVIRONMENTAL IMPACT STATEMENT
COMMUNITY AND STAKEHOLDER ENGAGEMENT REPORT APPENDIX I ENVIRONMENTAL IMPACT STATEMENT COMMUNITY AND STAKEHOLDER ENGAGEMENT REPORT BORAL GOLD COAST QUARRY PROJECT EIS APRIL 2013 TABLE OF CONTENTS 1 INTRODUCTION...
More informationTasman Extension Project Environmental Impact Statement APPENDIX N PRELIMINARY HAZARD ANALYSIS
Tasman Extension Project Environmental Impact Statement APPENDIX N PRELIMINARY HAZARD ANALYSIS TASMAN EXTENSION PROJECT PRELIMINARY HAZARD ANALYSIS FEBRUARY 2012 Project No. DCL-09-01 Document No. PHA-C
More informationDEVELOPMENT CONSENT MODIFICATION Statement of Environmental Effects
BENGALLA MINE DEVELOPMENT CONSENT MODIFICATION for Bengalla Mining Company Pty Limited August 2015 BENGALLA MINE DEVELOPMENT CONSENT MODIFICATION STATEMENT OF ENVIRONMENTAL EFFECTS Prepared by: HANSEN
More informationWerris Creek Coal Mine
Werris Creek Coal Mine Coal Mine Particulate Matter Best Pract ice Werris Creek Coal Pty Limit ed Prepared For: 1435 Werris Creek Road Werris Creek NSW 2341 PO Box 125 Werris Creek NSW 2341 Contact: Andrew
More informationNote: Niagara Region has determined that it is necessary to provide additional information relating to the above referenced Request for Tender.
Enterprise Resource Management Services 1815 Sir Isaac Brock Way, P.O. Box 1042, Thorold, ON L2V 4T7 Tel: 905-980-6000 Toll-free 1-800-263-7215 Fax: 905-682-8521 www.niagararegion.ca Page 1 of 4 Date:
More informationWhat is the Port Granby Project?
What is the Port Granby Project? The Port Granby Project is a federal initiative for the cleanup and safe long-term management of historic low-level radioactive waste situated in the southeast corner of
More informationENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA DEA Reference Number: 12/12/20/2175 BACKGROUND INFORMATION
More informationMurra Warra Wind Farm Project Environmental Management Plan
1. Introduction This (EMP) covers the pre-construction, construction, operation and decommissioning phases for the Murra Warra Wind Farm Project. RES Australia recognises the importance of reducing human
More informationAdvice to decision maker on coal mining project
. Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January
More informationSection 2 Proposal Description
Section 2 Proposal Description 2. PROPOSAL DESCRIPTION 2.1 Overview The Proposal comprises the construction, operation and closure of mining at the J5 and Bungalbin East iron ore deposits and associated
More informationAnnex F Scoping Checklist
Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve
More informationCITY OF PALM DESERT FRED WARING DRIVE PALM DESERT, CALIFORNIA TEL: (760) FAX: (760)
NOTICE TO GRADING PERMIT APPLICANTS New Dust Control Ordinance Requirements On November 13, 2003, the City Council of the City of Palm Desert unanimously passed Ordinance 1056 which revised Title 24, Chapter
More informationENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009
ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,
More informationLands & Waters Aggregate & Petroleum Resources March 15, 2006
Subject: Policy No.: New: Ministry of Natural Resources Ministère des Richesses naturelles Licence / Site Plan Notes A.R. 2.00.03 Yes Compiled by Branch: Section: Date Issued: Lands & Waters Aggregate
More informationStandard Performance Attributes for Transportation Projects
Standard s for Transportation Projects Mainline Operations Local Operations Maintainability Construction Impacts Environmental Impacts Project Schedule An assessment of traffic operations and safety on
More informationSubmission. Clarence Valley Council Proposed quarry development at Kungala (DA 2013/0508) CLARENCE ENVIRONMENT CENTRE INC
CLARENCE ENVIRONMENT CENTRE INC 31 Skinner Street South Grafton 2460 Phone/ Fax: 02 6643 1863 Web site: www.cec.org.au E-mail: admin@cec.org.au Submission to Clarence Valley Council council@clarence.nsw.gov.au
More informationFACT SHEET Land and Property
FACT SHEET Land and Property Introduction Glencore Coal Assets Australia (GCAA) is part of the broader Glencore group, one of the world s largest global diversified natural resource companies. GCAA is
More informationWILPINJONG COAL NOISE MANAGEMENT PLAN
WILPINJONG COAL NOISE MANAGEMENT PLAN WI-ENV-MNP-0011 June 2017 Document Owner Environmental Advisor Document Approver Environment and Community Manager Version Approval Date Approver Name 3 June 2017
More informationPre-Tender Meeting Notes
AECOM 201 3275 Lakeshore Road 250 762 3727 tel Kelowna, BC, Canada V1W 3S9 250 762 7789 fax www.aecom.com Pre-Tender Meeting Notes Date of Meeting December 19, 2014 Start Time 10:00 am Project Number 60303523
More informationFINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE
FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE OURAY RANGER DISTRICT OURAY COUNTY, COLORADO BACKGROUND The Owl Creek Gravel Pit, also known as the Spruce Ridge Pit,
More informationCONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK
CONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK APPENDIX D Contents 1 Introduction... 1 1.1 Purpose and Scope... 1 1.2 Status... 1 1.3 Environment and Sustainability Policy... 1 1.4 Project Description...
More information7. Community Consultation
7. Community Consultation This section provides a summary of the public consultation process implemented for the Project, incorporating the Mine and Rail aspects. The consultation process has been undertaken
More informationStage 2 Non-Aboriginal Heritage Management Plan
Environmental Management System Integra Coal Operations Pty Ltd Stage 2 Non-Aboriginal Heritage Management Plan Doc No: Doc Owner: EMP_60 - Stage 2 Non-Aboriginal Heritage Management Plan Integra Coal
More informationVolume 2. Dundonnell Wind Farm EES. April Annex A - Annex Z DELWP Exhibition. This pages is intentionally blank
Trustpower Australia (NZ) Ltd Volume 2 Annex A - Annex Z Dundonnell Wind Farm EES April 2015 0107773 DELWP Exhibition This pages is intentionally blank Annex Annex A - Annex B - Annex C - Annex D - Annex
More informationMINING LEASE No ANNUAL ENVIRONMENTAL MANAGEMENT REPORT APRIL 2012
MINING LEASE No. 1616 ANNUAL ENVIRONMENTAL MANAGEMENT REPORT APRIL 2012 MOP Commencement : 1 January 2008 MOP Completion : 1 January 2015 AEMR Commencement : 1 April 2011 AEMR Completion: 31 March 2012
More informationDISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS
DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS Construction Impact Mitigation Strategy Guidelines for Major Developments The District of North Vancouver
More information6. Socio-Economic Environment
6. Socio-Economic Environment The functions of this section are to describe the existing socio-economic environmental values of the area which may be affected by the proposed project, to assess the potential
More informationConstruction Environmental Management Plan
Document Control Title: General Description: Document Path: Construction Environmental Management Plan Document No/Ref: NCX-LLB-07-0001-NN-PL-0001 Revision History Revision Date Description Section/Page
More informationYour Checklist Guide for Effortless Crane Hire
Your Checklist Guide for Effortless Crane Hire (Plus Frequently Asked Questions) There are 6 key Processes that can make your Crane Hire experience effortless if we work together to manage them efficiently:
More informationDistrict of North Vancouver Construction Traffic Management Plan Guidelines
District of North Vancouver Construction Traffic Management Plan Guidelines The District of North Vancouver is committed to ensuring that the disruptions to the community and traffic associated with construction
More informationAgenda. PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014
Agenda Welcome FTA Full Funding Grant Agreement Update GLX Phase 1 Construction Update GLX Phases 2/2A, 3 & 4 Construction Contracts Upcoming Early Construction Work Construction Mitigation Night & Weekend
More informationCompliance Audit Report. Woodlawn Wind Farm
Compliance Audit Report Woodlawn Wind Farm February 2013 Cover Photograph: Turbines at Woodlawn Wind Farm Crown copyright 2013 Published February 2013 NSW Department of Planning & Infrastructure www.planning.nsw.gov.au
More informationFUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York
FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK PREPARED FOR: Huntley Power, LLC Tonawanda, New York PREPARED BY: GZA GeoEnvironmental of New York Buffalo, New
More informationENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass
ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT
More informationCoal Mine Particulate Matter Control Best Practice Site-specific determination guideline. November 2011
Coal Mine Particulate Matter Control Best Practice Site-specific determination guideline November 2011 2011 State of NSW and Office of Environment and Heritage With the exception of photographs, the State
More informationWarkworth Continuation Project Review Report
Review Report Mr Paul Forward (Chair) Ms Lynelle Briggs AO Mr Gordon Kirkby 04 March 2015 COMMISSION SECRETARIAT Level 13, 301 George Street SYDNEY, NSW 2000 GPO BOX 3415, SYDNEY, NSW 2001 TELEPHONE (02)
More informationENVIRONMENT INDUCTION. Section 5
ENVIRONMENT INDUCTION Section 5 1 Overview Environmental Legal Obligations Environment Policy Environmental Commitment InSitu Recovery (ISR) Mining Low Environmental Impact Monitoring and Reporting Environmental
More informationSydney Port Botany Terminal 3 Project Out of Hours Works Protocol
1/11 Terms and Definitions The following terms, abbreviations and definitions are used in this plan: Terms Explanation SPBT3 Sydney Port Botany Terminal 3 CEMP EM EPA ERAP OEH PAH OOHWP EIS MCoA Distribution
More informationAnnual Environmental Management Report
DONALDSON COAL PTY LTD ABN: 87 073 088 945 Annual Environmental Management Report for the 1 June 2009 to 31 May 2010 Compiled by: R.W. CORKERY & CO. PTY. LIMITED This page has intentionally been left blank
More informationIntroduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and
Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that
More informationAUSTAR COAL MINE AIR QUALITY MANAGEMENT AND MONITORING PLAN
AUSTAR COAL MINE AIR QUALITY MANAGEMENT AND MONITORING PLAN Issue 1: January 2007 Final Austar Coal Mine Carbon Based Environmental Pty Limited 2006. This document was prepared solely for the original
More informationBalranald Mineral Sands Project
Balranald Mineral Sands Project NSW Environmental Impact Statement Prepared for Iluka Resources Limited May 2015 Volume 2 Appendix A - Secretary's Environmental Impact Assessment Requirements Appendix
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 767 01-January Licensee METROPOLITAN COLLIERIES PTY. LTD. PO BOX 402 HELENSBURGH NSW 2508 Premises METROPOLITAN COLLIERY PARKES STREET HELENSBURGH NSW 2508 Scheduled
More informationAppendix H Mitigation Monitoring Plan
Appendix H Mitigation Monitoring Plan Appendix H No. Impact/Mitigation Measure Implementation & Monitoring 1. Traffic and Transportation Impacts All traffic control plans and mitigation measures, prepared
More informationaemc Wambo Coal Mine Independent Environmental Audit - June August 2011 Prepared for: Wambo Coal Pty Limited PMB 1 Singleton NSW 2330
Wambo Coal Mine Independent Environmental Audit - June 2011 18 August 2011 Prepared for: Wambo Coal Pty Limited PMB 1 Singleton NSW 2330 Report by: Trevor Brown & Associates ABN: 23 084 906 963 3 Forwood
More informationItem Discussion Action By
MEETING NOTES (APPROVED 13/03/2014) Thursday, 12 December 2013 at 6:30pm Lucas Heights RRP New Illawarra Rd, Lucas Heights Chair Gareth Jones Note Taker Gareth Jones ATTENDEES SITA Australia (AK) Sydney
More informationASSESSMENT OF PROCESS POLLUTION FOR THE PROPOSED EXTENSION TO YENNADON QUARRY, IRON MINE LANE, DOUSLAND, DEVON, PL20 6NA
ASSESSMENT OF PROCESS POLLUTION FOR THE PROPOSED EXTENSION TO YENNADON QUARRY, IRON MINE LANE, DOUSLAND, DEVON, PL20 6NA 16 th April 2013 7397/PP QUALITY CONTROL This report has been prepared in accordance
More informationReducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto
Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview
More informationPreliminary Environmental Assessment
Rix's Creek Pty Ltd Preliminary Environmental Assessment Rix's Creek Rix's Creek Client: Rix's Creek Pty Ltd ABN: 25 003 824 244 Prepared by AECOM Australia Pty Ltd 17 Warabrook Boulevard, Warabrook NSW
More information2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:
2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING
More informationSite EMP Kit- Guidance Notes
Site EMP Kit- Guidance Notes Introduction This Guide has been designed to assist applicants to understand council s requirements for Site Environmental Management Plans (Site EMP s) for subdivisions. The
More informationSEDIMENT AND EROSION CONTROL PROGRAM APPENDIX ENVIRONMENTAL IMPACT STATEMENT
SEDIMENT AND EROSION CONTROL PROGRAM APPENDIX W ENVIRONMENTAL IMPACT STATEMENT Erosion and Sediment Control Program BORAL Gold Coast Quarry, Reedy Creek B12119CR001 April 2013 TABLE OF CONTENTS GLOSSARY
More informationDust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation
Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission
More informationAPPENDIX 8. Surface Water Management
APPENDIX 8 Surface Water Management Readymix Holdings Pty Limited Surface Water Assessment Proposed Lynwood Quarry, Marulan May 2005 Surface Water Assessment Proposed Lynwood Quarry, Marulan Table of Contents
More informationODOR MANAGEMENT PLAN. Bridgeton Landfill St. Charles Rock Road Bridgeton, Missouri
ODOR MANAGEMENT PLAN Bridgeton Landfill 13570 St. Charles Rock Road Bridgeton, Missouri Date: 6-20-2014 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Background 1.2 Purpose of the 2.0 ODOR MONITORING 2.1 Identifying
More informationConstruction Environment Management Plan
Construction Environment Management Plan Guidance Material July 2013 ABSTRACT This CEMP guidance material has been prepared by MAC to assist the identification and management of environmental risks associated
More informationWAMBO COAL MINE MINING OPERATIONS PLAN
WAMBO COAL MINE MINING OPERATIONS PLAN 2015 2020 PREPARED BY WAMBO COAL PTY LTD March 2015 MOP Amendment B Wambo Coal Mine Mining Plan Introduction Wambo Coal Pty Limited Mining Plan Name of Mine: Wambo
More informationMoolarben Coal Complex Open Cut Optimisation Modification. Environmental Assessment ATTACHMENT 3. Stage 2 Project Approval (08_0135)
Moolarben Coal Complex Open Cut Optimisation Modification Environmental Assessment ATTACHMENT 3 Stage 2 Project Approval (08_0135) Project Approval Section 75J of the Environmental Planning & Assessment
More informationSection 75J of the Environmental Planning & Assessment Act 1979
Project Approval Section 75J of the Environmental Planning & Assessment Act 1979 I approve the project application referred to in schedule 1, subject to the conditions in schedule 2. These conditions are
More informationPUBLIC SERVICE COMPANY OF OKLAHOMA (PSO)
PUBLIC SERVICE COMPANY OF OKLAHOMA (PSO) NORTHEASTERN POWER STATION ANNUAL CCR FUGITIVE DUST CONTROL REPORT Prepared By: Public Service Co. of Oklahoma 7300 East Highway 88 Oologah, OK 74053 and American
More informationEXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary
More informationThe true cost of groundwater
The true cost of groundwater Todd Hamilton SRK Consulting (Canada) Ltd. thamilton@srk.com March 8, 2016 Groundwater in mining How groundwater affects economics Managing groundwater 2 of 23 Contents Groundwater
More informationNORTH AMERICAN Precast Concrete Sustainable Plant Program
NORTH AMERICAN Precast Concrete Sustainable Plant Program The North American Precast Concrete Sustainable Plant Program is a joint initiative from the members of the Canadian Precast/ Prestressed Concrete
More informationLake Elsinore Advanced Pumped Storage
Lake Elsinore Advanced Pumped Storage Project Update October 11, 2017 Introducing LEAPS The most advanced, large-scale pumped hydro storage project in the USA will Provide 500 megawatts of clean energy
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 12425 08-February Licensee WILPINJONG COAL PTY LTD LOCKED BAG 2005 MUDGEE NSW 2850 Premises WILPINJONG COAL MINE 1434 ULAN-WOLLAR ROAD WILPINJONG NSW 2850 Scheduled
More informationEMM. Mount Pleasant Project Construction Water Management Plan. Planning + Environment + Acoustics
EMM EMGA Mitchell McLennan Mount Pleasant Project Construction Water Management Plan Prepared for Coal & Allied Operations Pty Limited 23 July 2012 Planning + Environment + Acoustics This page has been
More informationOttawa-Trussler Area Sewage Facility Class Environmental Assessment
Welcome to the Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Public Open House May 7, 2013 September 25, 2013 Welcome The purpose of this second Public Open House is to: Present the
More informationFUGITIVE DUST CONTROL PLAN DUNKIRK GENERATION STATION 106 POINT DRIVE NORTH DUNKIRK, NEW YORK. PREPARED FOR: Dunkirk Power, LLC Dunkirk, New York
FUGITIVE DUST CONTROL PLAN DUNKIRK GENERATION STATION 106 POINT DRIVE NORTH DUNKIRK, NEW YORK PREPARED FOR: Dunkirk Power, LLC Dunkirk, New York PREPARED BY: GZA GeoEnvironmental of New York Buffalo, New
More informationOperate a dozer (wheeled and tracked)
Operate a dozer (wheeled and tracked) Code OHSCER209A Workplace Health and Safety Queensland is moving to a new learning and assessment system for certificates to work in prescribed occupations. Learning
More informationV.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN
V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite
More informationATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS
ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS [This page has been left blank intentionally] Assessment of Program Effectiveness 1. Assessment of your agency's compliance with permit requirements, based
More informationURANIUM MINING IN MALAWI BY PATRICK MEDIUS NYIRENDA ENVIRONMENTAL AFFAIRS DEPARTMENT, MINISTRY OF NATURAL RESOURCES, ENERGY AND MINING, MALAWI
URANIUM MINING IN MALAWI BY PATRICK MEDIUS NYIRENDA ENVIRONMENTAL AFFAIRS DEPARTMENT, MINISTRY OF NATURAL RESOURCES, ENERGY AND MINING, MALAWI OUTLINE Introduction History of Mining in Malawi Operations
More information