DAKOTA COUNTY PHYSICAL DEVELOPMENT COMMITTEE OF THE WHOLE

Size: px
Start display at page:

Download "DAKOTA COUNTY PHYSICAL DEVELOPMENT COMMITTEE OF THE WHOLE"

Transcription

1 DAKOTA COUNTY PHYSICAL DEVELOPMENT COMMITTEE OF THE WHOLE November 7, 2017

2 Agenda Study Purpose Study Process Resolution Next Steps

3 MAPO Transportation Study Purpose Plan The Need For The Study: Bridge the gap between areas of adjacent studies How do roadways fit into the broader highway system? Increase in traffic with proposed planned growth based on City Plans IGH Population: 33,880 (2010) 42,000 (2030) Rosemount Population: 21,874 (2010) 31,700 (2030) Address the disconnected north/south and east/west County roadway system in study area Is Akron the right location for a County roadway?

4

5 MAPO Transportation Akron Avenue Plan

6 MAPO Transportation Akron Avenue Plan Rosemount Map Showing Land Uses Along Akron in Rosemount Land Uses

7 MAPO Transportation Plan Acres

8 MAPO Transportation Study Purpose Plan Look at year system needs to develop a transportation system vision Proactively plan for the future Allow County and Cities to identify best approach before growth results in traffic issues Minimize impacts Minimize costs Help to ensure investments are wisely made Improvement projects happen when needed

9 Study Process Study Began Fall 2014 Project Management Team: IGH, Rosemount, MnDOT, County, Consultant (SRF) Schedule Extended due to Public Response & Council Meeting discussions Iterative Process Interim Improvement Discussions

10 Public Involvement Study Process 6 meetings with Neighborhood Groups Spring/Summer 2015 and Winter meetings with Commercial Stakeholders Open Houses Oct 2014, Jan 2015, Sept 2015 Council Workshops May 2015, Oct 2015, March 2016, Sept 2016 (IGH) Rosemount Council Adoption Aug 2016

11 Study Process MAPO Transportation Plan Developed and Reviewed 4 Main System Scenarios (A, B, C, D) Focused on Long-Term Scenarios Evaluated For: Safety/Mobility Wetland Impacts Woodland Impacts Impacts to Non-Residential Property Impacts to Residential Property Utility Impacts

12 Study Process MAPO Transportation Plan Project Management Team Recommended Scenario D - Refined Scenarios A and C Eliminated due to Safety and Operational Risks Scenario B included County 73 along Akron Avenue through residential area Scenario D was refined to move future County 73 away from existing residences, reduce tree stand impacts, and eliminate a curve

13 Study Process MAPO Transportation Plan

14 MAPO Transportation Plan Scenario D Refined Moves County 73 away from existing residences Provides direct connection of CSAH 32 to 117 th Street Addresses east/west and north/south discontinuities in one plan Property impacts to Flint Hills buffer land and Bituminous Roadways mining area Study Process

15 Study Process MAPO Transportation Plan Since November 29, 2016 PDC Meeting Met with IGH staff and mayor on April 5 to discuss study and implications for County roadway improvements within the City 117 th Street is a priority for the City Akron Avenue improvements are not a priority for the City (not in their CIP) Met with Rosemount City council on June 12 They do not support a partial realignment They support Akron Avenue improvements and have requested through the CIP process

16 MAPO LONG Transportation RANGE COUNTY Plan HIGHWAY SYSTEM PLAN County State Aid Highway 71 (Rich Valley Boulevard) Projected volumes don t change Right of way needs don t change

17

18 MAPO Transportation Resolution Plan 1. Plan for the long term improvement of County Road 73 as presented in Scenario D-Refined (not along Akron) if and when improvements are needed Supports long-term vision of Akron as a city collector street Future County Road 73 belongs in a different location Consistent with Rosemount City Council Action Future approvals would be needed by each city and County Board to move forward with implementation and project(s) Roadway construction/reconstruction Flint Hills (MOU/acquisition) Basis for potential turnback agreement with Rosemount

19 MAPO Transportation Resolution Plan 1. Plan for the long term improvement of County Road 73 as presented in Scenario D-Refined (not along Akron) if and when improvements are needed Provides for a continuous roadway system in the study area Exact alignment and project scope will be determined when needed Avoids investing in a County road twice for County 73

20 MAPO Transportation Resolution Plan 2. Plan for the long term improvement of County State Aid Highway 32 as presented in Scenario D-Refined if and when improvements are needed If and when needed, improve County 32 to a 4-lane roadway from Trunk Highway 3 to Trunk Highway 52, and realign from Akron to 117 th Street Timing of realignment likely tied to realignment of County 73 due to Bituminous Roadway mining, and design considerations Supports functionality of 117 th Street as a future County roadway and County participation in improvements

21 MAPO Transportation Resolution Plan 2. Plan for the long term improvement of County State Aid Highway 32 as presented in Scenario D-Refined if and when improvements are needed Provides for a continuous roadway system in the study area Exact alignment and project scope will be determined when needed

22 MAPO Transportation Resolution Plan Improvements to 117 th Street (future County 32) Work with IGH to improve 117 th Street to a 4-lane facility with turn lanes and access management for safety. Include improvements at County 71. Include in eligible list for Sales and Use Tax CIP and add as a project in the Sales and Use Tax CIP

23 MAPO Transportation Resolution Plan 3. Assess the long term alignment for County State Aid Highway 71 south of 117 th Street at the time County Road 73 is fully realigned, as presented in Scenario D-Refined. Dependent upon traffic conditions and projections at the time of design Exact alignment and project scope will be determined when needed

24 Resolution And; BE IT FURTHER RESOLVED, That the Dakota County Board of Commissioners directs staff to consider future improvements in the study area, consistent with implementation of Scenario D-Refined, as mutually agreed upon between the County and the city the improvements are located in, through the County s Transportation Capital Improvement Program process.

25 PROPOSED AMENDMENT: And; Resolution BE IT FURTHER RESOLVED, That the actual location of future roadway and intersection alignments and design of improvements, consistent with Scenario D-Refined, will be based on conditions existing at the time of the improvement, as mutually agreed upon by the County and the city the improvements are located in, taking into consideration input from City Councils, residents and businesses.

26 MAPO Transportation Resolution Plan What s Been Done in the Recommended CIP Removed improvements to existing Akron in IGH Included improvements to existing Akron in Rosemount (2020 Construction) Added CSAH 32 to Recommended Eligible Project List for Transportation Sales and Use Tax (including 117 th Street) Added 117 th Street to the Recommended Transportation Sales and Use Tax CIP

27 MAPO Transportation Next Plan Steps Next Steps Recommended Transportation CIP Pending Adoption Recommended Transportation Sales & Use Tax CIP Pending Adoption Begin design for Akron in Rosemount in 2018 Work with Inver Grove Heights on a project for 117 th Street contingent on their schedule Begin discussions with Flint Hills on a Memorandum of Understanding for future R/W Acquisition

28 DAKOTA COUNTY PHYSICAL DEVELOPMENT COMMITTEE OF THE WHOLE November 7, 2017

29 Extra Slides REMAINING SLIDES ARE EXTRA SLIDES ONLY IF NEEDED

30 MAPO Transportation Plan

31

32 MAPO Transportation Recommendations Plan

33 Study Process MAPO Transportation Plan Future Traffic Assumptions/Findings Study reviewed current volumes, Transportation Plan forecasts, and relevant adopted studies

34

35 MAPO LONG Transportation RANGE COUNTY HIGHWAY Plan SYSTEM PLAN Current map defines long-term improvement needs based on 2030 traffic projections in Transportation Plan Used as part of the plat review process to minimize future right of way issues created by new development 2 Lane Divided/3 Lane Undiv. 4 Lane Divided 6 Lane Divided

36 County 73 Improvements MAPO Transportation Plan Rosemount CIP request for County 73 improvements The City of Rosemount would still pay 45% for the ½ mile segment that is not future turnback, per County policy. Build future turnback segment of CR 73 to city collector standards at 100% County cost, per County policy. No changes to Akron in IGH at this time 1 mile Rosemount improvements include ½ mile of long term CR 73 and 1 mile of future city street Long Term Alignment for CR 73 ½ mile

37 MAPO Frequently Transportation Asked Plan Questions UMORE is currently being mined, and will be for decades. Won t that preclude future development and roads? As mining is completed, development will occur. This is typical, and is currently happening in Apple Valley along County 46 and County 31. County/cities have successfully worked with mining companies and developers on roadways. U of M is exploring purchase agreements for 595 acres

38 MAPO Frequently Transportation Asked Plan Questions Will traffic control at major intersections along County 73 need to change? Questions have been raised at County 42, Bonaire Path, and County 32. These intersections will be monitored for the need for traffic control changes consistent with intersections across the County system. The need for changes is not anticipated in the short term.

39 Frequently Asked Questions MAPO Transportation Plan Won t existing Akron become a shortcut when County 73 is realigned in the future? Resolution says that roadway and intersection alignments will be determined and agreed upon by the County and City taking into consideration input from residents and businesses Cities and Dakota County will work together at the time of full realignment of 32 and CR 73 on connection details. Connection to County 32 will be determined in the future by City and County with input from residents and businesses City street when County 73 is realigned CSAH

40 MAPO Frequently Transportation Asked Plan Questions Isn t the access spacing between 118 th and Albavar a problem? Spacing is about 300 (less than guideline of ¼ mile) The offset allows for left turn lanes for both intersections. This spacing is more of an issue if turn lanes are not built Long-term plan is for Akron to become a City collector. This is also a larger issue if that is not the plan.

41 MAPO Frequently Transportation Asked Plan Questions What are the implications of the Koch Jet Fuel Pipeline? This will need to be addressed through the design process for any future improvements on County 73. It would be most prudent to avoid the portion of the pipeline currently outside of the County 73 right of way.

42 MAPO Frequently Transportation Asked Plan Questions Is Akron Avenue the right location for County 73 in the long term? Discontinuous system and implications for safety and efficiency Changing land uses along the southern portion of the corridor coupled with existing rural residential land uses that will not change Investments should fit with a long-term plan

43 Study Process MAPO Transportation Plan Scenarios B and D were refined to improve safety and to reduce costs/impacts Phasing of improvements was also assessed considering short-term and longterm needs High-level planning cost estimates for comparison (phasing element) Scenario B Refined and Scenario D Refined similar in cost with jet fuel pipeline cost risks taken into account Other alignments for Scenario D were also reviewed Resident proposal

44 Study Process MAPO Transportation Plan Additional Alignments Reviewed Greater circuity reduces functionality 50% greater than the cost of Akron in interim Skewed intersections at 117 th Street and County 32 Requires realignment of County 71

45 MAPO Transportation Study Process Plan

46

47 MAPO Study Transportation Recommendations Plan Future Jurisdictional Exchanges

ROSEMOUNT TRANSPORTATION PLAN

ROSEMOUNT TRANSPORTATION PLAN ROSEMOUNT TRANSPORTATION PLAN April 2008 (Revised April, July 2009) Prepared by: WSB & Associates, Inc. 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 (763) 541-4800 (763) 541-1700 (Fax) WSB Project

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

U S H I G H W A Y 1 4 F I N A L E N V I R O N M E N T A L I M P A C T S T A T E M E N T ( F E I S

U S H I G H W A Y 1 4 F I N A L E N V I R O N M E N T A L I M P A C T S T A T E M E N T ( F E I S U S H I G H W A Y 1 4 F I N A L E N V I R O N M E N T A L I M P A C T S T A T E M E N T ( F E I S ) N E W U L M T O N O R T H M A N K A T O, M I N N E S O T A Summary What is the US 14 Final EIS? An Environmental

More information

AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE

AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE Tuesday, April 30, 2013 4:00 p.m. County Board Room Bldg. A A. CALL TO ORDER B. ROLL CALL C. PLEDGE OF ALLEGIANCE & PRAYER D. APPROVAL OF MINUTES: March 26,

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

Appendix B. Benefit-Cost Technical Memorandum

Appendix B. Benefit-Cost Technical Memorandum Appendix B Benefit-Cost Technical Memorandum This Page Left Blank Intentionally MEMORANDUM TO: FROM: Michael Kalnbach MnDOT District 1 Project Manager Graham Johnson, PE DATE: September 2, 2014 RE: TH

More information

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES Planning Feasibility Study June 2003 INTRODUCTION AND HISTORY The SR 417 Extension Study was a yearlong effort undertaken by Florida s Turnpike Enterprise to investigate the feasibility of a new toll road

More information

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN Report No. 3 of the Transportation Services Committee Regional Council Meeting of March 24, 2011 5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN The Transportation Services Committee

More information

HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House

HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House HIGHLIGHTS OF HWY 14 PROGRESS 1960s & 70s Four-lane expansion in Rochester and Mankato areas 1993 Owatonna to Kasson EIS Completed (redone to

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

COMPREHENSIVE SANITARY SEWER SYSTEM PLAN

COMPREHENSIVE SANITARY SEWER SYSTEM PLAN COMPREHENSIVE SANITARY SEWER SYSTEM PLAN Prepared for: City of Rosemount 2875 145 th Street West Rosemount, MN 55068 December 28, 2007 Prepared by: WSB & Associates, Inc. 701 Xenia Avenue South, Suite

More information

State Highway 10A Improvements (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma)

State Highway 10A Improvements (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma) (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma) Open House January 31, 2017 Open House Purpose Explain purpose and need for SH-10A improvements

More information

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work Background MnDOT, Metro Transit, Hennepin County, and the City of Minneapolis are in the process of developing a project for Interstate 35W between 43 rd Street in Minneapolis and 15 th Street in Minneapolis.

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

WHITNEY ROAD 10% CORRIDOR PLAN. Open House Meeting #1 November 8, 2017

WHITNEY ROAD 10% CORRIDOR PLAN. Open House Meeting #1 November 8, 2017 WHITNEY ROAD 10% CORRIDOR PLAN Open House Meeting #1 November 8, 2017 AGENDA Introductions Project Overview Limits Purpose and Goals Overall Study Process What to expect (i.e. Schedule)? Identifying the

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

Introduction. Comprehensive Plan

Introduction. Comprehensive Plan Comprehensive Plan 2010-2030 1 The City of Elwood Comprehensive Plan establishes a development strategy and policies to guide the future growth and development of the community for the next two decades.

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

KAW CONNECTS EXECUTIVE SUMMARY

KAW CONNECTS EXECUTIVE SUMMARY Executive Summary Page E-1 Introduction KAW CONNECTS EXECUTIVE SUMMARY The Kansas Department of Transportation (KDOT) and the Kansas Turnpike Authority (KTA) have both recognized the need to plan for the

More information

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment)

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment) BCWMC Capital Improvement Program 2020 2024 (approved April 19, 2018; pending minor Plan amendment) Project Name City Number 2019 2020 2021 2022 2023 2024 2025 Totals Medicine Lake Rd and Winnetka Ave

More information

Bonnie Doon Grade Separation

Bonnie Doon Grade Separation 6. 2 Bonnie Doon Grade Separation Recommendation: That the April 18, 2017, Integrated Infrastructure Services report CR_4461, be received for information. Report Summary This report provides information

More information

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501 SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP-09-04 MDX Work Program #: 87410.011 ETDM #: 11501 1 This Public

More information

City of Palo Alto (ID # 7047) City Council Staff Report

City of Palo Alto (ID # 7047) City Council Staff Report City of Palo Alto (ID # 7047) City Council Staff Report Report Type: Consent Calendar Meeting Date: 6/13/2016 Summary Title: East Palo Alto Comment Letter Title: Approval and Authorization for the City

More information

6.0 Indirect Effects and Cumulative Impacts

6.0 Indirect Effects and Cumulative Impacts 6.0 Effects and Impacts 6.1 Introduction This chapter of the Draft EIS addresses potential indirect and cumulative impacts of the Bottineau Transitway project. effects are those that are caused by the

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

Project Initiation Form

Project Initiation Form Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination

More information

Alico Road. Connector Study. Lee County Department of Transportation. Prepared by. Lee County, Florida

Alico Road. Connector Study. Lee County Department of Transportation. Prepared by. Lee County, Florida Alico Road Connector Study Lee County Department of Transportation Lee County, Florida Prepared by July 2009 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Project Description and Purpose...

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

3.0 REVIEW OF PREVIOUS STUDIES

3.0 REVIEW OF PREVIOUS STUDIES 3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the

More information

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ 1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ Executive Summary 3UHSDUHGýIRUã 3UHSDUHGýE\ã.DQVDVý'HSDUWPHQWýRI 7UDQVSRUWDWLRQ,QýDVVRFLDWLRQýZLWKã (DUWKý7HFKý,QFï EXECUTIVE SUMMARY Introduction This Northwest

More information

2.1 Summary of Existing and Future Population Estimates

2.1 Summary of Existing and Future Population Estimates SECTION 2 Demographics This technical memorandum identifies the uncertainties and describes potential future demographics that might affect wastewater facilities in the City of McCall, Idaho (the City).

More information

INTERSTATE CORRIDOR PLANNING

INTERSTATE CORRIDOR PLANNING INTERSTATE CORRIDOR PLANNING Prioritization of Corridor Studies July 29, 2015 Importance of the Interstate System Texas is an integral part of the national interstate system. The interstate system provides

More information

Chapter 8. Transportation Element

Chapter 8. Transportation Element Chapter 8. Transportation Element Introduction/Overview Element Requirements Transportation is a key issue and priority in Longview. State highways, local roads, transit, railroads, and the port are lifelines

More information

State Route 8 Bridge Replacement Project

State Route 8 Bridge Replacement Project OPEN HOUSE PUBLIC INVOLVEMENT MEETING Celebration Church 688 Dan Street, Akron, Ohio Tuesday, July 14, 2015 5:00 PM to 7:00 PM State Route 8 Bridge Replacement Project Existing Bridge Future Bridges: Steel

More information

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to

More information

Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison

Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison Prepared by: Department of Planning and Community and Economic Development Economic Development Division Office

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

PUBLIC HEARING LOOP 9

PUBLIC HEARING LOOP 9 PUBLIC HEARING LOOP 9 From Interstate (I)-35E to I-45 Dallas and Ellis Counties, Texas CSJ: Loop 2964-10-005 9: I-35E to I-45 Tuesday, June 20, 20, 2017 2017 Public Hearing Introductions ELECTED & PUBLIC

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison

Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison Prepared by: Department of Planning and Community and Economic Development Economic Development Division Office

More information

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY PUBLIC INFORMATION MEETING # October, 0 LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY AGENDA :00 to :0pm: Open House :0 to :pm: Presentation : to :00pm: Individual paced workshop with the Study Team PUBLIC

More information

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014 SR 29 Project Development & Environment Study Presentation to SR 29 Stakeholders Advisory Committee January 23, 2014 Purpose and Need Enhancing Economic Competitiveness Improving Emergency Evacuation Capabilities

More information

Fairfax County Countywide Transit Network Study

Fairfax County Countywide Transit Network Study Fairfax County Countywide Transit Network Study Proposed High Quality Transit Network Concept Metropolitan Washington Council of Governments Travel Forecasting Subcommittee September 20, 2013 1 Presentation

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

Traffic Study Guidelines

Traffic Study Guidelines Traffic Study Guidelines March 2015 Manatee County Public Works Transportation Planning Division 1022 26 th Avenue East Bradenton, FL 34208 Phone: (941) 708-7450 Fax: (941) 708-7503 TABLE OF CONTENTS

More information

CITY OF ASHLAND REDEVELOPMENT PLAN FOR THE ASHLAND INVESTMENT CO., LLC HOUSING DEVELOPMENT

CITY OF ASHLAND REDEVELOPMENT PLAN FOR THE ASHLAND INVESTMENT CO., LLC HOUSING DEVELOPMENT CITY OF ASHLAND REDEVELOPMENT PLAN FOR THE ASHLAND INVESTMENT CO., LLC HOUSING DEVELOPMENT I. INTRODUCTION. The City of Ashland, Nebraska, recognizes that blight is a threat to the continued stability

More information

Project Need and Evaluation

Project Need and Evaluation City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

INVER GROVE HEIGHTS CITY COUNCIL MEETING MONDAY, NOVEMBER 22, BARBARA AVENUE CALL TO ORDER/ROLL CALL

INVER GROVE HEIGHTS CITY COUNCIL MEETING MONDAY, NOVEMBER 22, BARBARA AVENUE CALL TO ORDER/ROLL CALL INVER GROVE HEIGHTS CITY COUNCIL MEETING MONDAY, NOVEMBER 22, 2010-8150 BARBARA AVENUE CALL TO ORDER/ROLL CALL The City Council of Inver Grove Heights met in regular session on Monday, November 22, 2010,

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

I. Project Overview and Limits. Project Goal

I. Project Overview and Limits. Project Goal Scope of Work and Deliverables for Subsurface Utility Engineering (SUE) for both Underground and Overhead Utilities on T.H. 10, and its Connecting Roads under S.P. 8001-40 I. Project Overview and Limits

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

TRANSPORTATION TRANSPORTATION 9-1

TRANSPORTATION TRANSPORTATION 9-1 TRANSPORTATION Community Vision 2028 Because we place such high value on our natural surroundings, we responsibly plan for, manage, and mitigate the impacts of growth on those surroundings. Kezziah Watkins

More information

Driveway Permits Following Guidelines PLANNING REQUIREMENTS CAPABILITIES ASSISTANCE ACCESS MANAGEMENT LAND USE CONTROLS ECONOMIC DEVELOPMENT

Driveway Permits Following Guidelines PLANNING REQUIREMENTS CAPABILITIES ASSISTANCE ACCESS MANAGEMENT LAND USE CONTROLS ECONOMIC DEVELOPMENT CHAPTER 5 Access Management PASSIVE Driveway Permits Following Guidelines Comprehensive Access Management PLANNING REQUIREMENTS Access Restrictions CAPABILITIES Process ASSISTANCE ACCESS MANAGEMENT LAND

More information

VEHICLES MILES TRAVELED (VMT) TRAFFIC IMPACT METRIC

VEHICLES MILES TRAVELED (VMT) TRAFFIC IMPACT METRIC VEHICLES MILES TRAVELED (VMT) TRAFFIC IMPACT METRIC A project-specific quantified analysis of the MGA Campus has been undertaken to compare BAU to the project including the project s VMT reduction program

More information

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL SCOTT CHARNEY DIRECTOR OF COMMUNITY DEVELOPMENT SUBJECT: PUBLIC HEARING

More information

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing Project Reston Avenue to Jarrett Valley Drive Public Hearing Nicholas J. Roper, P.E. District Project Development Engineer Email: nicholas.roper@vdot.virginia.gov Phone: (703)259-1953 Agenda 7:00-7:15

More information

Why does MnDOT build noise barriers? What is a Type I project? What is an impacted location?

Why does MnDOT build noise barriers? What is a Type I project? What is an impacted location? Why does MnDOT build noise barriers? Noise barriers generally prove to be quite effective in providing noise reduction at receptors near transportation facilities. In 1972, the U.S. Congress passed legislation

More information

LARKSPUR SMART STATION AREA PLAN. Public Workshop December 3, 2013

LARKSPUR SMART STATION AREA PLAN. Public Workshop December 3, 2013 LARKSPUR SMART STATION AREA PLAN Public Workshop December 3, 2013 0 PURPOSE OF Provide information about the regional planning context for the Larkspur Station Area, including Plan Bay Area, SMART, and

More information

DECISION REGARDING NEED FOR ENVIRONMENTAL IMPACT STATEMENT

DECISION REGARDING NEED FOR ENVIRONMENTAL IMPACT STATEMENT IV. DECISION REGARDING NEED FOR ENVIRONMENTAL IMPACT STATEMENT A. Type, Extent, and Reversibility of Impacts Traffic Noise Analysis Traffic Noise Analysis Summary Construction of the Interstate 123 (I-123)

More information

Phase 2 Exposition Metro Line Project

Phase 2 Exposition Metro Line Project Phase 2 Exposition Metro Line Project Monthly Project Status Report February through April 2012 TABLE OF CONTENTS PHASE 2 EXPO LINE PROJECT STATUS TABLE OF CONTENTS... 2 Phase 2 Exposition Metro Line Construction

More information

Sunrise Project South I-205 Corridor Improvement Project

Sunrise Project South I-205 Corridor Improvement Project Sunrise Project South I-205 Corridor Improvement Project January 24, 2007 Sunrise and I-205 Project Summary Conclusions Sunrise Scoping Study Key Results South I-205 Scoping Study Key Results South I-205

More information

FAQ Sheet. Proposed Southside St. Petersburg Community Redevelopment Area

FAQ Sheet. Proposed Southside St. Petersburg Community Redevelopment Area The City of St. Petersburg is proposing to designate Southside St. Petersburg as a community redevelopment area (CRA), an effort that will last throughout the remainder of 2013 and carry into 2014. The

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

CITY OF CLOVIS Traffic Impact Study Guidelines

CITY OF CLOVIS Traffic Impact Study Guidelines CITY OF CLOVIS Traffic Impact Study Guidelines CLOVIS, A WAY OF LIFE Approved August 25, 2014 City Council Resolution 2014-79 Prepared by City of Clovis Engineering Division Steve White, City Engineer

More information

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION SECTION 2B 1 - GROUND SURVEYS Survey Authorization... 2B-1 Interstate... 2B-1 Principal / Minor Arterial... 2B-1 Urban...

More information

OVERVIEW ORDINANCE: ORD # APPLICATION: 2014C-002

OVERVIEW ORDINANCE: ORD # APPLICATION: 2014C-002 PROPOSED SMALL-SCALE FUTURE LAND USE MAP (FLUM) AMENDMENT OVERVIEW ORDINANCE: ORD # 2014-191 APPLICATION: 2014C-002 APPLICANT: PAUL M. HARDEN PROPERTY LOCATION: 8101 Southside Boulevard Acreage: 1.76 Acres

More information

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN Prepared for: City of Colorado Springs Prepared by: Felsburg Holt & Ullevig 508 South Tejon Street Colorado Springs, CO 80903

More information

Provincial Policy Statement 2014

Provincial Policy Statement 2014 Natural Heritage Provincial Policy Statement 2014 NATURAL HERITAGE Nature is bountiful. It is also fragile and finite. Provincial Natural Heritage 0 Interest: Ontario s natural heritage resources are valuable

More information

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017 CITY OF SANjOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR, CITY COUNCIL SUBJECT: TRANSPORTATION POLICY UPDATE REQUIRED BY STATE LAW - LOS TO VMT Memorandum FROM: Jim Ortbal Rosalynn Hughey Barry Ng

More information

S-09: Auburn Station Access Improvements

S-09: Auburn Station Access Improvements Project Number S-09 Subarea South King Primary Mode Commuter Rail Facility Type Infrastructure Improvements Length Version Number ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

Functional Classification Comprehensive Guide. Prepared by

Functional Classification Comprehensive Guide. Prepared by Functional Classification Comprehensive Guide Prepared by June 6, 2014 INTRODUCTION PURPOSE OF DOCUMENT The intent of this document is to provide a comprehensive guide to Virginia Department of Transportation

More information

Northwestern Transportation Corridor Study

Northwestern Transportation Corridor Study Northwestern Transportation Corridor Study Fiscal Year 2007 Funding Request Polk County, IA Dallas County, IA Audubon Co, IA !""#$ PROJECT SUPPORTERS: Audubon County Dallas County Guthrie County Polk County

More information

IX. STRATEGIC PLAN ELEMENT

IX. STRATEGIC PLAN ELEMENT IX. STRATEGIC PLAN ELEMENT The Strategic Plan Element provides the action and implementation plan for the New Brunswick Master Plan. New Brunswick is a fully developed, older urban area in central New

More information

CONSENT ITEM LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT FOR MEETING OF: SEPTEMBER 11, 2017

CONSENT ITEM LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT FOR MEETING OF: SEPTEMBER 11, 2017 CONSENT ITEM 7 LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT FOR MEETING OF: SEPTEMBER 11, 2017 Proposal Phillips Street Reorganization (City of Vista) (RO17-06) Proponent City of Vista,

More information

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI) 2013 ITE Western District Annual Meeting COCEPT DEVELOPMET, AALYSIS, AD DESIG OF A EW PARKWAY AT GRADE ITERSECTIO (PAGI) Lead Author: James M. Witkowski, PhD Supporting Author: Darrell Truitt, PE The Pima

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

CUY-90-Innerbelt ODOT PID No 77510

CUY-90-Innerbelt ODOT PID No 77510 CUY-90-Innerbelt ODOT PID No 77510 Chapter 1: Project History and Background Figure 1-1: Innerbelt Study Area Points of Interest 1.0 Introduction Planned in the 1940s and built during the 1950s and early

More information

US-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015

US-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015 US-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015 1 DELIVERY RECOMMENDATION GOALS Project Readiness: Enhance Funding pursuits Corridor Related Projects Coordination Develop Information to: Resolve Questions

More information

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4 Division of Land / Environmental Review City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012 FINAL ENVIRONMENTAL IMPACT REPORT Volume 1 ENV-2007-0254-EIR STATE CLEARINGHOUSE NO. 2007071036 Council

More information

PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B

PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B April 2008 Prepared by: Curtis Lueck & Associates 5460 West Four Barrel Court Tucson, AZ

More information

3.0 CUMULATIVE PROJECTS SCENARIO

3.0 CUMULATIVE PROJECTS SCENARIO 3.0 CUMULATIVE PROJECTS SCENARIO The CEQA Guidelines define cumulative impacts as two or more individual effects that, when considered together, are considerable or which compound or increase other environmental

More information

Chapter 4: Transportation and Land Use

Chapter 4: Transportation and Land Use Chapter 4: Transportation and Land Use Transportation and land use together make possible the wide range of destination opportunities in the region. Transportation provides the connections, and, in turn,

More information

Converting to LED Street Lights: Getting Started

Converting to LED Street Lights: Getting Started Chapter 6 Converting to LED Street Lights: Getting Started While the benefits of LED street lighting are substantial from a financial, environmental, and community perspective, communities whose lights

More information

Coulter Transportation Consulting, LLC 1524 Paula Avenue Wheaton, IL Ph:

Coulter Transportation Consulting, LLC 1524 Paula Avenue Wheaton, IL Ph: MEMO To: Tri-Cities Impact Fee Review Group From: Brent Coulter, PE, PTOE Date: November 8, 2006 Subject: General Review of the Preliminary Kane County CRIP Kane County requested in recent (late October

More information

UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT CONSTRUCTION, INC. PG. 6

UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT CONSTRUCTION, INC. PG. 6 UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN CONSTRUCTION, INC. PG. 6 TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT TRAUTWEIN CONSTRUCTION, INC. TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT

More information

An Introduction to the. Safety Manual

An Introduction to the. Safety Manual An Introduction to the Highway Safety Manual An Introduction to the HIGHWAY SAFETY MANUAL Table of Contents Section 1: HSM Overview... 1 What is the Highway Safety Manual?... 1 How is the HSM Applied?...

More information

Noise Impact Study for UMore Park Sand and Gravel Resources

Noise Impact Study for UMore Park Sand and Gravel Resources Noise Impact Study for UMore Park Sand and Gravel Resources University of Minnesota Rosemount and Empire Township, Minnesota SEH No. UOFMN 103496 October 2010 Table of Contents Title Page Table of Contents

More information

FERRY COUNTY COUNTY-WIDE PLANNING POLICIES

FERRY COUNTY COUNTY-WIDE PLANNING POLICIES FERRY COUNTY COUNTY-WIDE PLANNING POLICIES This memorandum of understanding lays out the framework upon which the comprehensive planning process for Ferry County and the City of Republic will be built.

More information

Executive Summary October 2017

Executive Summary October 2017 Executive Summary The King of Prussia Rail Draft Environmental Impact Statement/Draft Section 4(f) Evaluation (DEIS) describes and summarizes the transportation and environmental benefits and impacts of

More information

TRAFFIC STUDY GUIDELINES

TRAFFIC STUDY GUIDELINES TRAFFIC STUDY GUIDELINES December 2013 The scope of the traffic impact analysis (TIA) should follow these guidelines and the requirements of VMC 11.80.130 and VMC 11.70, transportation concurrency (attached

More information

Utilizing Transportation Data for Low Cost Safety Improvements

Utilizing Transportation Data for Low Cost Safety Improvements Utilizing Transportation Data for Low Cost Safety Improvements Samuel Sturtz Transportation Planner Iowa Department of Transportation samuel.sturtz@dot.iowa.gov Photo Credits: Ken West- Kenneth G. West

More information

VDOT Land Use Overview. Brad Shelton, AICP Transportation and Mobility Planning Division June 2015

VDOT Land Use Overview. Brad Shelton, AICP Transportation and Mobility Planning Division June 2015 VDOT Land Use Overview Brad Shelton, AICP Transportation and Mobility Planning Division June 2015 VDOT Land Development Programs Local/State Plan and Program Consistency Review local comp plan transportation

More information

Welcome to the Public Information Centre. Red Hill Business Park South Transportation Master Plan Addendum. June 25, :00 p.m. to 8:00 p.m.

Welcome to the Public Information Centre. Red Hill Business Park South Transportation Master Plan Addendum. June 25, :00 p.m. to 8:00 p.m. Welcome Welcome to the Transportation Master Plan Addendum June 25, 2012 6:00 p.m. to 8:00 p.m. Please sign-in Background In 2006 the City of Hamilton completed the North Glanbrook Industrial Business

More information

NOISE STUDY REPORT. for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY. Orange, Lake, and Seminole Counties, Florida

NOISE STUDY REPORT. for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY. Orange, Lake, and Seminole Counties, Florida UPDATED FINAL REPORT NOISE STUDY REPORT for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY Orange, Lake, and Seminole Counties, Florida Financial Project ID: 238275 1 22 01 and 240200 1 22 01

More information

TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT

TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM #4 T/T MTG: 092616 DATE: SEPTEMBER 26, 2016 TO: TRAFFIC & TRANSPORTATION COMMISSION FROM: BENJAMIN CHAN, P.E, T.E., DEPUTY PUBLIC WORKS DIRECTOR

More information

Safety, And Quality Of Life Needs

Safety, And Quality Of Life Needs The Ivey Wellpad Demands Adams County Mitigation Measures Required To Protect Critical Urban Area Health, Safety, And Quality Of Life Needs Overview Health Safety Quality of Live Citizens Support For Mitigation

More information

HORIZON 2030: Plan Projects November 2005

HORIZON 2030: Plan Projects November 2005 Horizon PROJECTS 2030 Projects 10-1 10-2 The Horizon 2030 Project Information section is comprised of individual project information in alphabetical order by project name. The information provided for

More information

3. STATION SPACING AND SITING GUIDELINES

3. STATION SPACING AND SITING GUIDELINES 3. STATION SPACING AND SITING GUIDELINES The station spacing and siting guidelines are summarized in Table 3-1. Table 3-1 also includes benchmark information for local transit service and express bus as