Broken Hill Water Supply. Hendrik Van Rhijn

Size: px
Start display at page:

Download "Broken Hill Water Supply. Hendrik Van Rhijn"

Transcription

1 Broken Hill Water Supply Hendrik Van Rhijn

2 Public Works Advisory Who are we? We are the NSW Government s key advisor for large water infrastructure projects and complex water programs and portfolios. We have a key role in the provision of life cycle management advisory services to State and Local Government water utilities to assist them to make informed water infrastructure and natural resource management investments and be competent asset owners and operators.

3 Water infrastructure and natural resource lifecycle management assurance

4 Advisory Services Sustainable solutions maximise public value for money Early stage involvement From over 100 independently reviewed case studies: Early advice is key 9% vs 2% savings Examples of savings: Coffs Harbour East Breakwater $15M in anticipated unrequired construction costs Lawrence Hargrave Drive coastal revetment $10M in estimated unrequired construction costs

5 Our footprint supporting regional NSW

6 Broken Hill In the vast arid and semi-arid areas of Australia perhaps no greater challenge has existed than that of providing an adequate and unpolluted water supply to serve the inhabitants and industry of the City of Broken Hill ~(Water Carts to Pipelines The History of the Broken Hill Water Supply, 1968)

7 Broken Hill Water Board

8 Broken Hill Climate The Broken Hill region generally has a hot and dry climate. (Annual Temperature and S E 315m AMSL commenced in 1889)

9 Water Supply Pipeline

10 Background Broken Hill and the surrounding communities have been through two significant drought events within the past 13 years and are currently experiencing their worst drought on record. The traditional surface water storages are been significantly depleted and current alternative water supplies are of a deteriorating quality. These drought conditions have necessitated water restrictions, currently at Level 3.

11 Background The water quality being currently sourced has high salinity, which is increasing, and various other water quality issues.

12 Background DPI Water, WaterNSW and Essential Energy/Water were tasked by government to delivery a short term emergency water supply solution while the long term water supply solution was being worked through.

13 Call to Action A short term water potable water supply had to be urgently secured for Broken Hill and Menindee before the traditional sources of surface water was depleted. The modelled critical date was initially 30 November 2015.

14 Call to Action Develop and implement a strategy to be able to treat the higher salinity levels anticipated through the alternative water sources and provide potable water, to Australian drinking water guidelines, to the Broken Hill community.

15 Ministerial Direction April 2015, Funding Approval Package 1: which included the Menindee Shallow Bores supply water into the existing Menindee Broken Hill bulk raw water pipeline. Package 2: REF, returning Essential Water s 6MLD RO (BWRO (2 trains)) package plant into operation; the procurement and installation of an additional RO package plant, 4.5MLD (BWRO (1 train) and SWRO (2 trains)); completion of the existing brine pipeline to the new brine ponds as well as the detail design and construction of the brine ponds. This is under the responsibility of Essential Water. Package 4: Upgrade the Menindee WTP to be able to accept and treat water supplied from the Menindee common bore (12 weeks). Potassium permanganate and ACH dosing to treat the high levels of iron and manganese from the bore

16 Client Commissioning Essential Energy engages NSW Water Solutions in May 2015 to delivery the BHSTWS Project Package 2 and Package 4 by December 2015 (8 months)

17 Strategy Return the existing Essential Water owned 6MLD RO Plant to supplement the Mica Street WTP and procure an additional 4.4MLD RO to provide a shandied 13.5MLD to the Broken Hill community. Design and Construct the partially installed brine pipeline from the Mica Street WTP to the new Brine Pond facility Design and construct a 660ML capacity brine pond configuration Minimise disruptions to the supply of potable water over the summer months during construction activities.

18 Why would you do it Extremely tight timeframes Defined budget based on an approved business case providing funding based on assumptions Failure would result in the carting or water to the Broken Hill community Reputational and political risk

19 Highlights Dealt with extremely short timeframes to call and evaluate tenders and to appoint Contractors for the three contracts. Approvals from various private and government entities were obtained in record time during the design and tendering stages. Construction, commissioning and proving of different project components were synchronised to meet the very tight deadline despite adverse weather conditions such excessive heat, wind and would you believe rain. Ensured continued potable water supply while providing water for project construction, commissioning and testing to the community of Broken Hill.

20 Outcomes Contractors and suppliers successfully engaged: A supply and put into service contract to provide a leased 4.5MLD RO capacity to supplement the existing RO Plant. Completed, the plant is capable of treating raw water up to a salinity of 3,000 mg/l TDS (5,500µS/cm EC) and producing 10.5MLD of potable water at an EC of <1500µS/cm and supplemented by 3MLD of WTP treated water, for the total required 13.5MLD. Construction of a 10.5km brine pipeline from the Mica Street WTP to the Perilya Mine Tailing Dam site. A blended team of designers, private and public, were engaged to finalise the detailed design of the lined storage pond facility and the brine transfer pipeline.

21 Integration into an operational WTP

22 Reconfiguring an existing pump station

23 Minimizing down time

24 Future decommisioning challenges brine management Approx. equivalent tonnes of salt per day = 1 tonnes Approx. equivalent tonnes of salt per month = 75 tonnes Estimated potable water salinity produced by the upgraded Mica Street WTP (at 13.5 MLD production) as the feed water salinity increases Note: 1,000 EC = approximately 550 ppm (or mg/l depending on the type of salts present)

25 Emergency Water Trains to Broken Hill

26 Menindee Lakes Boating at Lake Menindee

27 Umberumberka Reservoir

28 Imperial Lake Imperial Lake under construction

29 Effective Capacity of Broken Hill Town Reservoirs & Balance Tanks

30 Broken Hill Area Broken Hill view from Billygoat Hill 1886 Broken Hill Admin Office Broken Hill view from Billygoat Hill 1968 Carters at Gossan Street

31 Aerial Views of Stephens Creek

32 Mica Street Water Filtration Plant

33 Menindee Pump Station at Darling River

34 Long Section Stephens Creek to Mica Street WTP 34

35 Concept for the Broken Hill Long Term Solution

36 Wentworth to Broken Hill provisional schematic

37 Potential Intakes from the Murray River Locks

38 Typical Murray River bank details

39 Typical River Crossing

40 Potential route into Broken Hill

41 Existing Raw Water Feed Pipe work at the Mica Street WTP

42 Stephens Creek Reservoir at peak capacity

43 Indicative Time line Draft Tender Documentation 28 October 2016 Design Review complete 4 November 2016 Tender Documentation 21 November 2016 Tender Estimate 21 November 2016 Start Commissioning October 2017

44 Proposed Menindee Operational Changes

45 Existing pump station bypass

46 Menindee and Sunset Strip provisional schematic

47 Proposed new water supply scheme

Don t mention the bore A transition from two water reticulation systems to one reticulation system

Don t mention the bore A transition from two water reticulation systems to one reticulation system Don t mention the bore A transition from two water reticulation systems to one reticulation system Author Details John Roworth Director of Infrastructure Services Longreach Regional Council Abstract I

More information

River Murray to Broken Hill Pipeline

River Murray to Broken Hill Pipeline ouble River Murray to Broken Hill Pipeline Final Report Number DC16095 October 2017 Prepared for WaterNSW Document Control Version Authors Reviewer Approved for Issue Name Date Final Lara Hess Kristen

More information

Water Status in the Gaza Strip and Future Plans

Water Status in the Gaza Strip and Future Plans ` Water Status in the Gaza Strip and Future Plans April 2010 1.0 Background and Introduction Gaza Strip is one of the semi-arid area where rainfall is falling in the winter season from September to April,

More information

The West East Link Main is a 125 million pipeline project that will carry water across the North West of England

The West East Link Main is a 125 million pipeline project that will carry water across the North West of England West East Link Main 55km pipeline, carrying 100 million litres, is one of the largest ever undertaken by a water company by Jon Higham The West East Link Main is a 125 million pipeline project that will

More information

Managing Operations of PPP Contracts Case Study: SingSpring Desalination Plant. Lee Mun Fong Deputy Director Water Supply (Plants) 2 Nov 2012

Managing Operations of PPP Contracts Case Study: SingSpring Desalination Plant. Lee Mun Fong Deputy Director Water Supply (Plants) 2 Nov 2012 Managing Operations of PPP Contracts Case Study: SingSpring Desalination Plant Lee Mun Fong Deputy Director Water Supply (Plants) 2 Nov 2012 Outline Introduction Project Details Desalination Processes

More information

Strategic procurement in capital expenditure the use of program management & delivery

Strategic procurement in capital expenditure the use of program management & delivery Strategic procurement in capital expenditure the use of program management & delivery Project Scope Changes Changing Client Needs Environment of Uncertainty Diverse Stakeholder Interests Community Involvement

More information

Environmental Assessment Chapter 8 Surface Water

Environmental Assessment Chapter 8 Surface Water Environmental Assessment Chapter 8 Surface Water 8.2.7 Rainfall and Evaporation Based on recorded data for the area of interest, the mean annual rainfall is about 700mm, with maximum monthly rainfalls

More information

City Of Wichita Falls Status of Water Resources. November 10, 2014

City Of Wichita Falls Status of Water Resources. November 10, 2014 City Of Wichita Falls Status of Water Resources November 10, 2014 Water Supply Summary Current Population Served ~ 150,000 Supply Reservoirs Lake Arrowhead, Lake Kickapoo (Fresh water) Lake Kemp (Brackish

More information

SeaSMART* SWRO desalination concept

SeaSMART* SWRO desalination concept Water Technologies & Solutions capability profile SeaSMART* SWRO desalination concept proven experience and sustainable solutions you expect why choose SUEZ water technologies & solutions? With over 50

More information

Tweed Shire Demand Management Strategy & Water Supply Augmentation Options Study A Brief Technical Review

Tweed Shire Demand Management Strategy & Water Supply Augmentation Options Study A Brief Technical Review Tweed Shire Demand Management Strategy & Water Supply Augmentation Options Study A Brief Technical Review quality solutions sustainable future Tweed Shire Demand Management Strategy & Water Supply Augmentation

More information

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project City of Saint John, New Brunswick Safe, Clean Drinking Water Project Canadian Consulting Engineering Awards 2017 City of Saint John, New Brunswick Safe, Clean Drinking Water Project Canadian Consulting

More information

Raw water sources, facilities, and infrastructure

Raw water sources, facilities, and infrastructure WATER AND WASTEWATER SERVICES IN STEAMBOAT SPRINGS Prepared by Jay Gallagher, General Manager Mt. Werner Water and Sanitation District (February, 2015) Raw water sources, facilities, and infrastructure

More information

OVERCOMING CHLORAMINATION OPERATIONAL PROBLEMS AT WILLOW GROVE WATER TREATMENT PLANT. Brendan Holt. Gippsland Water Authority

OVERCOMING CHLORAMINATION OPERATIONAL PROBLEMS AT WILLOW GROVE WATER TREATMENT PLANT. Brendan Holt. Gippsland Water Authority OVERCOMING CHLORAMINATION OPERATIONAL PROBLEMS AT WILLOW GROVE WATER TREATMENT PLANT Paper Presented by : Brendan Holt Author: Brendan Holt, Water Treatment Plant Operator, Gippsland Water Authority 65

More information

Water, Salinity and Irrigation in Australia s Murray-Darling Basin & Hetao Irrigation District

Water, Salinity and Irrigation in Australia s Murray-Darling Basin & Hetao Irrigation District Water, Salinity and Irrigation in Australia s Murray-Darling Basin & Hetao Irrigation District Ian White Australian National University Ian White FTSE Research Major research area is water resources with

More information

Water Solutions for the Mining Industry

Water Solutions for the Mining Industry Water Solutions for the Mining Industry Reliable Mining Expertise EXPERIENCED. From the extreme heat of remote Australia and Africa, to the cold climates of Mongolia and Kazakhstan, MAK Water has delivered

More information

OFF RIVER STORAGE (ORS) : An Alternative for Urban River Raw Water Source: Sungai Labu Water Treatment Plant Experience

OFF RIVER STORAGE (ORS) : An Alternative for Urban River Raw Water Source: Sungai Labu Water Treatment Plant Experience WATER MALAYSIA 2015 OFF RIVER STORAGE (ORS) : An Alternative for Urban River Raw Water Source: Sungai Labu Water Treatment Plant Experience Haji Abdul Karim bin Endut 23 rd April 2015 1 Content of Presentation

More information

Desalination of Sea Water

Desalination of Sea Water Desalination of Sea Water A presentation on Desalination: The Quest to Quench India s Thirst for Drinking Water was made at our Chapter by K. K. Mehrotra, Former Chairman-cum-Managing Director, MECON Limited,

More information

Development of Semenyih Dam Storage Prediction Model

Development of Semenyih Dam Storage Prediction Model Development of Semenyih Dam Storage Prediction Model Yong Siew Fang 1 & Yuhainis Kamardin 2 1, 2 G&P Water & Maritime Sdn Bhd Introduction Semenyih Dam is a regulating storage system to regulate the river

More information

Quenching the Nation s Thirst through Sweetened Seawater: Namibian Experience Presented at the Zaragoza Water Tribune, Zaragoza, Spain, Sept 2008

Quenching the Nation s Thirst through Sweetened Seawater: Namibian Experience Presented at the Zaragoza Water Tribune, Zaragoza, Spain, Sept 2008 Quenching the Nation s Thirst through Sweetened Seawater: Namibian Experience Presented at the Zaragoza Water Tribune, Zaragoza, Spain, Sept 2008 Kuiri F Tjipangandjara (D. Sci. Eng.) General Manager :

More information

Presentation for Roads Australia Miller Street, Sydney 3 April creating public Pacific Highway delivering value for money

Presentation for Roads Australia Miller Street, Sydney 3 April creating public Pacific Highway delivering value for money Presentation for Roads Australia Miller Street, Sydney 3 April 2014 Legitimacy & Support creating public Pacific Highway delivering value for money Real sustainable development solutions in practice Public

More information

City Of Wichita Falls Water Reuse Projects. August 8, 2013

City Of Wichita Falls Water Reuse Projects. August 8, 2013 City Of Wichita Falls Water Reuse Projects August 8, 2013 The Current Problem Loss of Rainfall The annual average rainfall for the Wichita Falls area is 28.5 inches. Normal 2011 2012 2013 YTD In 2011 we

More information

Ithaca Area Intermunicipal Cooperation NYAWWA Conference. Chris Bordlemay Padilla Cornell University Water Manager 4/27/17

Ithaca Area Intermunicipal Cooperation NYAWWA Conference. Chris Bordlemay Padilla Cornell University Water Manager 4/27/17 Ithaca Area Intermunicipal Cooperation NYAWWA Conference Chris Bordlemay Padilla Cornell University Water Manager 4/27/17 Three Water Purveyors in Ithaca Area Cornell University City of Ithaca Bolton Point

More information

Allwater. case study Water. Delivering value through partnerships

Allwater. case study Water. Delivering value through partnerships Allwater case study Water Delivering value through partnerships delivering sustainable water and wastewater services to residents in metropolitan Adelaide type of contract O&M (Operation & Maintenance)

More information

CLIMATE CHANGE IMPACTS ON SYDNEY S WATER SUPPLY

CLIMATE CHANGE IMPACTS ON SYDNEY S WATER SUPPLY CLIMATE CHANGE IMPACTS ON SYDNEY S WATER SUPPLY Selvaratnam Maheswaran 1, Jason Martin 1, Golam Kibria 1 1. Sydney Catchment Authority, Penrith, NSW, Australia INTRODUCTION The drinking water for Sydney

More information

5.2.2 Lower Mgeni System

5.2.2 Lower Mgeni System 5.2.2 Lower Mgeni System Description The Lower Mgeni System (Figure 5.7 and Figure 5.8) serves the greater ethekwini Municipal area from lower Pinetown/KwaDabeka in the west, to Phoenix/Inanda/Verulam

More information

OPTIMISING FILTRATION AT DUNGOG WTP. David Turner. Hunter Water Australia

OPTIMISING FILTRATION AT DUNGOG WTP. David Turner. Hunter Water Australia OPTIMISING FILTRATION AT DUNGOG WTP Paper Presented by: David Turner Author: David Turner, Operations Support Manager, Darren Bailey, Treatment Operations Manager, Hunter Water Australia 7 th Annual WIOA

More information

A1 Australian and South Australian Government Guidelines 813. A2 South Australian Government Guidelines 871

A1 Australian and South Australian Government Guidelines 813. A2 South Australian Government Guidelines 871 Appendix A EIS Guidelines CONTENTS A1 Australian and South Australian Government Guidelines 813 A2 South Australian Government Guidelines 871 A3 Northern Territory Government Guidelines 929 Olympic Dam

More information

DRAFT July 26, Engineer s Report Water Softening Alternatives for Boyack Road Water Treatment Plant. Town of Clifton Park, New York

DRAFT July 26, Engineer s Report Water Softening Alternatives for Boyack Road Water Treatment Plant. Town of Clifton Park, New York DRAFT July 26, 2010 Engineer s Report Water Softening Alternatives for Boyack Road Water Treatment Plant Town of Clifton Park, New York Prepared for: CLIFTON PARK WATER AUTHORITY 661 Clifton Park Center

More information

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County The Carlsbad Desalination Plant is capable of delivering more than 50 million gallons of fresh, desalinated drinking water per day enough to serve approximately 400,000 people in San Diego County. Commercial

More information

ALL ABOUT WATER IN HOT SPRINGS VILLAGE

ALL ABOUT WATER IN HOT SPRINGS VILLAGE ALL ABOUT WATER IN HOT SPRINGS VILLAGE Lake & Water Management Committee - 2006 Revised January 2009 #1 Water Overview #2 Water Issues 2009 #3 Water in the Future #4 Water Conservation Measures #1- Hot

More information

YOUR WATER PARTNERS. Innovations in Desalination. Mark Lambert February, 2015

YOUR WATER PARTNERS. Innovations in Desalination. Mark Lambert February, 2015 YOUR WATER PARTNERS Innovations in Desalination Mark Lambert February, 2015 1 Overall Agenda IDE Technologies Overview Carlsbad Desalination Plant Overview Common Objections to Desalination and How They

More information

John Anderson. Afton Water Solutions Australia

John Anderson. Afton Water Solutions Australia John Anderson Australia 1 The Growth in Water Recycling Worldwide The Drivers Climate Change and the Environment Adaptation Case Study 2006 Metropolitan Water Plan The Growth in Water Recycling Overseas

More information

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study Welcome to the Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study September 23, 2009 Please Sign In and take an Information Brief

More information

Volume 1 Executive Summary

Volume 1 Executive Summary 2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth

More information

SA Water Strategic Plan Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways

SA Water Strategic Plan Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways SA Water Strategic Plan 2012-16 Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways Contents 3 From the Chairman and Chief Executive 4 Our Business Context

More information

NOVEL APPROACHES TO TRIHALOMETHANE MANAGEMENT. Dr Rino Trolio. Water Corporation (WA)

NOVEL APPROACHES TO TRIHALOMETHANE MANAGEMENT. Dr Rino Trolio. Water Corporation (WA) NOVEL APPROACHES TO TRIHALOMETHANE MANAGEMENT Paper Presented by : Dr Rino Trolio Authors: Rino Trolio, Manager Operations Suppor, Richard Walker, Manager Drinking Water Quality, Sharon McNeil, Chemistry

More information

Caofeidian 50,000m 3 /day SWRO Desalination Plant

Caofeidian 50,000m 3 /day SWRO Desalination Plant Caofeidian 50,000m 3 /day SWRO Desalination Plant AQUALYNG Aqualyng A Leading Player in the International Desalination Market With over 15 years experience in the desalination industry, Aqualyng has developed

More information

OPERATION OF AN STP FOR RECYCLED WATER PRODUCTION PLANT. Iain Fairbairn. Iain Fairbairn, Plant Manager, Sydney Water

OPERATION OF AN STP FOR RECYCLED WATER PRODUCTION PLANT. Iain Fairbairn. Iain Fairbairn, Plant Manager, Sydney Water Winner of the Actizyme Prize for Best Paper at the NSW Operators Conference held in October 2005 OPERATION OF AN STP FOR RECYCLED WATER PRODUCTION PLANT Paper Presented by : Iain Fairbairn Author: Iain

More information

UNDERGROUND MINING. Cementation

UNDERGROUND MINING. Cementation Cementation North Bay Salt Lake City Santiago Johannesburg Kalgoorlie Perth UNDERGROUND M OVERVIEW THE MURRAY & ROBERTS GROUP The Underground Mining platform provides specialist engineering, construction

More information

Table 7.25 Project information: South Coast Augmentation Booster Pump Station. New in-line booster pump station. 120 Ml/day.

Table 7.25 Project information: South Coast Augmentation Booster Pump Station. New in-line booster pump station. 120 Ml/day. 7. 6 S O U T H 7. 6. 1 S O U T H O U T H C O A S T S Y S T E M O U T H C O A S T A U G M E N T A T I O N B O O S T E R P U M P S T A T I O N Planning No. 305.6 Project No. Project Status Construction (as

More information

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting 19th International Congress on Modelling and Simulation, Perth, Australia, 12 16 December 2011 http://mssanz.org.au/modsim2011 UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing

More information

Your recycled water guide

Your recycled water guide Your recycled water guide Introducing Class A Recycled Water... Westernport Water will now be supplying Class A recycled water to new residential properties and developments on Phillip Island. The Phillip

More information

For information on water pollution, see our Fact Sheet on Pollution.

For information on water pollution, see our Fact Sheet on Pollution. 1 Water Management Water Management Last updated: 2010 These Fact Sheets are a guide only and are no substitute for legal advice. To request free initial legal advice on an environmental or planning law

More information

WESTDALE WWTP AUGMENTATION AND REUSE FARM. Stephen Sullivan and Jamie Hunt. Tamworth Regional Council

WESTDALE WWTP AUGMENTATION AND REUSE FARM. Stephen Sullivan and Jamie Hunt. Tamworth Regional Council WESTDALE WWTP AUGMENTATION AND REUSE FARM Paper Presented by: Stephen Sullivan and Jamie Hunt Authors: Stephen Sullivan, Team Leader, Jamie Hunt, Wastewater Headworks Operator, Tamworth Regional Council

More information

POTABLE WATER COAGULANT TRIALS UTILIZING POLYALUMINIUM CHLORHYDRATE. Michael Dalton. Toowoomba City Council

POTABLE WATER COAGULANT TRIALS UTILIZING POLYALUMINIUM CHLORHYDRATE. Michael Dalton. Toowoomba City Council POTABLE WATER COAGULANT TRIALS UTILIZING POLYALUMINIUM CHLORHYDRATE Paper Presented by: Michael Dalton Author: Michael Dalton, Rockhampton City Council, Toowoomba City Council 33rd Annual Qld Water Industry

More information

SCARCE RAW WATER RESOURCES

SCARCE RAW WATER RESOURCES 24 WATER RECLAMATION The Goreangab Water Reclamation Plant in Windhoek is internationally renowned as the first and only plant in the world to reclaim domestic sewage for potable use as a supplement to

More information

Petro-Canada Re-Uses Treated Edmonton Waste Water. Coking.com Safety Seminar Calgary September 2008

Petro-Canada Re-Uses Treated Edmonton Waste Water. Coking.com Safety Seminar Calgary September 2008 Petro-Canada Re-Uses Treated Edmonton Waste Water Coking.com Safety Seminar Calgary September 2008 1 Membrane-Treated Waste Water Project Petro-Canada has completed modifications at its Edmonton refinery

More information

Two Case Studies of Stormwater Harvesting: The Coburg and Merrifield Projects, Victoria, Australia

Two Case Studies of Stormwater Harvesting: The Coburg and Merrifield Projects, Victoria, Australia Two Case Studies of Stormwater Harvesting: The Coburg and Merrifield Projects, Victoria, Australia J. McGrath*, G. Wilson**, D. Elliott**, J. Baumann*, H. Wahjudi* * Dalton Consulting Engineers, 255 Whitehorse

More information

Annual Water Outlook Western Water December 2017

Annual Water Outlook Western Water December 2017 Annual Water Outlook Western Water December 217 Summary Western Water s strategic intent is Engaging with our community on the provision of water services to enable regional economic growth and resilience

More information

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,

More information

"Significant Cost Savings Obtained Using Advanced Membrane Systems for Cooling Tower Water Treatment and in ZLD plants

Significant Cost Savings Obtained Using Advanced Membrane Systems for Cooling Tower Water Treatment and in ZLD plants Better Lives. Better Planet.SM "Significant Cost Savings Obtained Using Advanced Membrane Systems for Cooling Tower Water Treatment and in ZLD plants Webcast December 2012 Bernhard Doll Pall GmbH Disclaimer

More information

Breckenridge Second Water Treatment Plant. Public Open House. April 11, HDR, all rights reserved.

Breckenridge Second Water Treatment Plant. Public Open House. April 11, HDR, all rights reserved. Breckenridge Second Water Treatment Plant Public Open House April 11, 2018 2015 HDR, all rights reserved. Why Build a Second Water Treatment Plant? Future Tarn WTP Refurbishment: o Allows existing Tarn

More information

Notice of Preparation of an Environmental Impact Report and Scoping Meeting

Notice of Preparation of an Environmental Impact Report and Scoping Meeting Notice of Preparation of an Environmental Impact Report and Scoping Meeting Date: August 15, 2017 To: Project Sponsor and Lead Agency: Staff Contact: Project Title: Location: General Plan Designation:

More information

pwc.com.au PwC Infrastructure Advisory (Brisbane) Darren Black November 2013

pwc.com.au PwC Infrastructure Advisory (Brisbane) Darren Black November 2013 pwc.com.au Infrastructure Advisory (Brisbane) Darren Black November 2013 Discussion Points Commercial Feasibility Objectives o What is the Point of the Business Case? o Risk Development o Updated Business

More information

Water Solutions for Tourism and Leisure

Water Solutions for Tourism and Leisure Water Solutions for Tourism and Leisure Smart Water Solutions MAK Water s experience in the tourism and leisure industry is as diverse as the sector itself, with an emphasis on achieving successful and

More information

David Delasanta Executive Vice-President. Superior Distillation Performance on High TDS Water Using Flash Vacuum Distillation

David Delasanta Executive Vice-President. Superior Distillation Performance on High TDS Water Using Flash Vacuum Distillation David Delasanta Executive Vice-President Superior Distillation Performance on High TDS Water Using Flash Vacuum Distillation For Hydrofracking Produced and Flowback Water Symbol: TMEN www.thermoenergy.com

More information

S A W At e r r e g u l Ato r y b u S i n e S S p r o p o S A l executive Summary regulatory business proposal 2013

S A W At e r r e g u l Ato r y b u S i n e S S p r o p o S A l executive Summary regulatory business proposal 2013 1 S A W at e r r e g u l ato r y b u s i n e ss p r o p o s a l Executive Summary SA Water Regulatory Business Proposal 213 e x e c u t i v e s u m m a r y 2 Context SA Water is part of the fabric of the

More information

DESALINATION AS AN ALTERATIVE WATER SUPPLY

DESALINATION AS AN ALTERATIVE WATER SUPPLY DESALINATION AS AN ALTERATIVE WATER SUPPLY 7 th Annual Georgia Environmental Conference, Water Management Practices and Georgia s Adopted Regional Water Plans, Session 5, Course 41 August 22-24, 2012 Chandra

More information

Dissolved Salts, Drainage, Desalting, and Discharge

Dissolved Salts, Drainage, Desalting, and Discharge Dissolved Salts, Drainage, Desalting, and Discharge Chuck Moody, Eric Holler, and Angela Adams Bureau of Reclamation presented at Spring Ag Outlook Forum Arizona Chapter of American Society of Farm Managers

More information

LEARNINGS FROM SEVERAL HIGH CHLORINE EVENTS. Raj Mahendrarajah. Coliban Water

LEARNINGS FROM SEVERAL HIGH CHLORINE EVENTS. Raj Mahendrarajah. Coliban Water LEARNINGS FROM SEVERAL HIGH CHLORINE EVENTS Paper Presented by: Raj Mahendrarajah Author: Raj Mahendrarajah, Manager Water Quality Performance, Coliban Water 79 th Annual WIOA Victorian Water Industry

More information

South East Queensland Water Grid

South East Queensland Water Grid Department of South East Queensland Water Grid IPLOCA International Pipeline and Offshore Contractors Association South East Queensland Water Grid Department of Background About the SEQ Water Grid Progress

More information

Water Conservation Report

Water Conservation Report Water Conservation Report 2016-2017 Table of contents Executive summary... 3 Introduction and regulatory context... 13 1.1 Approval of the ELWC Methodology... 14 Our five-year plan... 15 2.1 The value

More information

Final Report: Inquiry on the Cost of Supplying Bulk Potable Water to Kalgoorlie-Boulder

Final Report: Inquiry on the Cost of Supplying Bulk Potable Water to Kalgoorlie-Boulder Final Report: Inquiry on the Cost of Supplying Bulk Potable Water to Kalgoorlie-Boulder 14 October 2005 Final Report on the Inquiry into the Cost of Supplying Economic Regulation Authority CONTENTS Executive

More information

UTILITY SYSTEM OVERVIEW. Water Source Water Distribution Wastewater Collection Wastewater Treatment

UTILITY SYSTEM OVERVIEW. Water Source Water Distribution Wastewater Collection Wastewater Treatment 1 UTILITY SYSTEM OVERVIEW Water Source Water Distribution Wastewater Collection Wastewater Treatment 2 AGENDA Overview of the Utility System (building on the Council tours) ARWA Petersburg SCWWA Infrastructure

More information

Vision 2030: The resilience of water supply and sanitation in the face of climate change Chee-Keong CHEW 28 October 2009

Vision 2030: The resilience of water supply and sanitation in the face of climate change Chee-Keong CHEW 28 October 2009 Vision 2030: The resilience of water supply and sanitation in the face of climate change Chee-Keong CHEW 28 October 2009 1 Scope Why climate resilience is important? Overview of Vision 2030 Summary of

More information

Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa

Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa SECURITY OF WATER SUPPLY It is the ability to continuously produce and supply safe drinking water to the enduser ASSURANCE RISK LEVEL

More information

CAPABILITY STATEMENT OCTOBER 2017 WT CAPABILITY STATEMENT

CAPABILITY STATEMENT OCTOBER 2017 WT CAPABILITY STATEMENT CAPABILITY STATEMENT OCTOBER 2017 WT CAPABILITY STATEMENT CONTENTS OUR EXPERTISE 1 OUR SERVICES SCOPE 2 QUANTITY SURVEYING & CONSTRUCTION COST MANAGEMENT 3 THE DETAIL 6 INFRASTRUCTURE COST ENGINEERING

More information

Autumn Water Outlook 2017 for South East Queensland. Getting drought ready

Autumn Water Outlook 2017 for South East Queensland. Getting drought ready Autumn Water Outlook 2017 for South East Queensland Getting drought ready Summer recap Summer in South East Queensland is the peak season for extreme weather - bushfires, storms, floods and cyclones. It

More information

CHLORINE DEMAND ANALYSIS IN DISTRIBUTION NETWORKS USING HYDRAULIC MODELS AND LABORATORY TESTS. Raj Mahendrarajah. Coliban Water

CHLORINE DEMAND ANALYSIS IN DISTRIBUTION NETWORKS USING HYDRAULIC MODELS AND LABORATORY TESTS. Raj Mahendrarajah. Coliban Water CHLORINE DEMAND ANALYSIS IN DISTRIBUTION NETWORKS USING HYDRAULIC MODELS AND LABORATORY TESTS Paper Presented by: Raj Mahendrarajah Author: Raj Mahendrarajah, Research & Development Scientist, Coliban

More information

CHANGING THE GAME FOR DESAL

CHANGING THE GAME FOR DESAL CHANGING THE GAME FOR DESAL Texas Desal 2016 Extracting Minerals From Waste Water ZERO LIQUID DISCHARGE DESALINATION EWM s clean technology desalinates salty water, producing drinking water and extracting

More information

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment Village of Bolivar, NY Fe/Mn Removal/Village of Bolivar, NY Presentation Outline Fe/Mn Overview Treatment Options Village of Bolivar Challenge

More information

Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison

Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison OBG PRESENTS: OBG PRESENTS: Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison LORI W. REID, P.E. New York State AWWA Spring Meeting, April 26, 2017 Outline Background Project

More information

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation Disclaimer Forward-Looking Statements This presentation contains forward looking statements concerning the projects owned by Australian

More information

Summary of Issues Strategies Benefits & Costs Key Uncertainties Additional Resources

Summary of Issues Strategies Benefits & Costs Key Uncertainties Additional Resources Summary of Issues Strategies Benefits & Costs Key Uncertainties Additional Resources KEY POINT: Although the use of an open intake is conceptually very straightforward, the construction of new infrastructure

More information

Pipeline Condition Assessment Technology

Pipeline Condition Assessment Technology Pipeline Condition Assessment Technology Presented by: Paul Schumi Collection Systems Fall Seminar December 1, 2016 water Asset Management Pipeline Assessment Hydrant Assessment Valve Assessment Leak Detection

More information

CIRCULAR GENERAL PROVISIONS

CIRCULAR GENERAL PROVISIONS MINISTRY OF CONSTRUCTION -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 10/2013/TT-BXD Hanoi, July 25, 2013 CIRCULAR ON CONSTRUCTION QUALITY MANAGEMENT Pursuant

More information

Drinking Water Supply by Reverse Osmosis Plants: Three Years of Experience at El Prat de Llobregat Municipality

Drinking Water Supply by Reverse Osmosis Plants: Three Years of Experience at El Prat de Llobregat Municipality Drinking Water Supply by Reverse Osmosis Plants: Three Years of Experience at El Prat de Llobregat Municipality Joan Sanz*, Aureliano García**, Jordi Miró**, Carlos Miguel*** *Veolia Water Solutions and

More information

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3 DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3 This chapter provides details regarding the scope of the proposed Gourikwa Power Station and Transmission Integration

More information

Incorporating Economic Cost Data in Water Resources Modelling

Incorporating Economic Cost Data in Water Resources Modelling 22nd International Congress on Modelling and Simulation, Hobart, Tasmania, Australia, 3 to 8 December 2017 mssanz.org.au/modsim2017 Incorporating Economic Cost Data in Water Resources Modelling W.R. Godoy

More information

ENERGY RECOVERY IN DESALINATION: RETURNING ALTERNATIVE WATER SUPPLIES TO CONSIDERATION. Introduction

ENERGY RECOVERY IN DESALINATION: RETURNING ALTERNATIVE WATER SUPPLIES TO CONSIDERATION. Introduction ENERGY RECOVERY IN DESALINATION: RETURNING ALTERNATIVE WATER SUPPLIES TO CONSIDERATION Lance R. Littrell, P.E., Reiss Engineering, Inc., 1016 Spring Villas Pt., Winter Springs, FL 32708, lrlittrell@reisseng.com,

More information

Desalination plant operating regime September 2010

Desalination plant operating regime September 2010 Desalination plant operating regime September 2010 Sydney s desalination plant will operate at full production capacity when the total dam storage level is below 70%, and will continue until the level

More information

TERMS OF REFERENCE (TOR)

TERMS OF REFERENCE (TOR) TERMS OF REFERENCE (TOR) PROJECT MANAGEMENT,ENGINEERING CONSULTANCY, AND SUPERVISION SERVICES FOR THE DESIGN & BUILD FOR THE SECOND CENTRAL EFFLUENT TREATMENT & RECYCLING PLANT (CETRP II) FOR PTA/PET/PIA

More information

Hamilton City Water Distribution System Strategic Planning

Hamilton City Water Distribution System Strategic Planning Hamilton City Water Distribution System Strategic Planning Weijun Zhang Hamilton City Council, Private Bay 3010, Hamilton, New Zealand zhangw@dhicn.com, www.hcc.govt.nz ABSTRACT Hamilton s present water

More information

MANAGEMENT OF THE MOUNT MORGAN MINE SITE, QUEENSLAND

MANAGEMENT OF THE MOUNT MORGAN MINE SITE, QUEENSLAND MANAGEMENT OF THE MOUNT MORGAN MINE SITE, QUEENSLAND December 2016 Derelict Mines Summit Singleton NSW Authors Oskar Kadletz and John Frankish Site History Mining operations began in 1882 and ceased in

More information

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge Integrated Water Resources Plan Option 11 Divert Water from Miocene and Hendricks Canal to Supply the Ridge This option would use water from the Miocene Canal and/or Hendricks Canal for municipal supplies

More information

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal Technical Bulletin 2004-02 rev0707 Q: What is the AdEdge AD26 System? A: The AD26 system is a pre-engineered, packaged treatment system specifically

More information

Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand

Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand 1. Background Information Nakhon Sawan is located about 250 km north of Bangkok and marks the point of confluence of two of major Thai rivers,

More information

final report Water quality improvement strategy for a processing site

final report Water quality improvement strategy for a processing site final report Project title: Water Quality Improvement Strategy Project code: P.PSH.0449 Prepared by: GHD Date published: July 2010 PUBLISHED BY Meat & Livestock Australia Limited Locked Bag 991 NORTH SYDNEY

More information

United Utilities Water Ltd Water Resources Review April 2016 to March Summary of water resources in 2016/ Headroom...

United Utilities Water Ltd Water Resources Review April 2016 to March Summary of water resources in 2016/ Headroom... Contents 1. Summary of water resources in 2016/17... 3 2. Introduction... 4 3. General... 7 4. Supply... 13 5. Demand... 23 6. Headroom... 37 7. Options and other measures... 38 8. Supply-demand balance...

More information

Brackish Desalination Water Supply Planning for Resiliency and Growth

Brackish Desalination Water Supply Planning for Resiliency and Growth Brackish Desalination Water Supply Planning for Resiliency and Growth Paul D. Jones II February 2, 2017 1 emwd.org EMWD Agency Overview Established in 1950 Unique agency, serving: Water/wastewater/recycled

More information

Water management in Sweden an introduction

Water management in Sweden an introduction Water management in Sweden an introduction Andreas Aronsson Inland Water Management Coordinator Five Water Scientifically based borders Five Marine Basins Main Drainage Areas Five out of 21 County Administrations

More information

Water, Wastewater and Refuse

Water, Wastewater and Refuse Water, Wastewater and Refuse - 116 - Wastewater KEY FACTS Council operates and maintains: 17 wastewater systems 16 wastewater treatment plants (11 ponds, 4 activated sludge plants) 333 kilometres of sewer

More information

Table of Contents. 0.0 Executive Summary Potable Water Demand Projection Introduction... 35

Table of Contents. 0.0 Executive Summary Potable Water Demand Projection Introduction... 35 Table of Contents 0.0 Executive Summary... 1 1.0 Potable Water Demand Projection... 6 1.1 Introduction... 6 1.2 Service Area... 7 1.2.1 Service Area Development... 7 1.2.2 Service Area Population... 7

More information

OPTIMISATION OF A WATER TREATMENT PLANT FOR FLOOD CONDITIONS. John Granzien Gene Heffernan. John Granzien, Team Leader, Gene Heffernan, Operator

OPTIMISATION OF A WATER TREATMENT PLANT FOR FLOOD CONDITIONS. John Granzien Gene Heffernan. John Granzien, Team Leader, Gene Heffernan, Operator OPTIMISATION OF A WATER TREATMENT PLANT FOR FLOOD CONDITIONS Paper Presented by: John Granzien Gene Heffernan Authors: John Granzien, Team Leader, Gene Heffernan, Operator Seqwater 38th Annual WIOA Qld

More information

WATER REQUIREMENTS IN SOUTH AFRICA AND THE ROLE OF WATER BOARDS

WATER REQUIREMENTS IN SOUTH AFRICA AND THE ROLE OF WATER BOARDS WATER REQUIREMENTS IN SOUTH AFRICA AND THE ROLE OF WATER BOARDS The Case for Rand Water and its Supply Area DKP Sechemane Chief Executive of Rand Water Presentation to the Water Summit 25 February 2016

More information

RESOURCE GOLD PTY. LTD.

RESOURCE GOLD PTY. LTD. Copyright RESOURCE GOLD PTY. LTD. Gold Recovery From Processing Of - Mill Site Materials - Alluvial Gold Deposits - Hard Rock Resources NOVEMBER, 2009 REVISION 3 1 Disclaimer! This presentation contains

More information

Shale Gas (D: unkonventionelles Erdgas )

Shale Gas (D: unkonventionelles Erdgas ) 1 Shale Gas (D: unkonventionelles Erdgas ) Aus: W. Zittel (ASPO) Kurzstudie Unkonventionelles Erdgas, 2010 Shale + Tight Gas (worldwide resources) In total: shale gas volume convential gas tight gas 50%

More information

For personal use only

For personal use only ASX Release 13 January 2017 Agrimin Limited ABN 15 122 162 396 ASX Code: AMN Level 9, 190 St Georges Terrace Perth, Western Australia 6000 T: +61 8 6141 6304 E: admin@agrimin.com.au W: www.agrimin.com.au

More information

WASTEWATER RE-USE AND DESALINATION. A SUMMARY OF THE DRIVERS FOR, AND TECHNOLOGY EVOLUTION TO SATISFY THE GLOBAL PUSH FOR SUSTAINABLE WATER USE.

WASTEWATER RE-USE AND DESALINATION. A SUMMARY OF THE DRIVERS FOR, AND TECHNOLOGY EVOLUTION TO SATISFY THE GLOBAL PUSH FOR SUSTAINABLE WATER USE. WASTEWATER RE-USE AND DESALINATION. A SUMMARY OF THE DRIVERS FOR, AND TECHNOLOGY EVOLUTION TO SATISFY THE GLOBAL PUSH FOR SUSTAINABLE WATER USE. Paper Presented by : Mark Samblebe Author: Mark Samblebe,

More information