There will be a technical and financial evaluation. Technical evaluation will be 70% and 30% for financial.

Size: px
Start display at page:

Download "There will be a technical and financial evaluation. Technical evaluation will be 70% and 30% for financial."

Transcription

1 ANNEX H (EVALUATION CRITERIA & FINANCIAL PROPOSAL TEMPLATE) There will be a technical and financial evaluation. Technical evaluation will be 70% and 30% for financial. Technical evaluation The returned Tenders shall be evaluated on the basis of experience of the Tenderers, the proven performance record of the equipment offered, and the energy efficiency (specific energy consumption) of the Plant. The technical evaluation will be based on the following structure and only those companies which pass the 49 point threshold, will have their financial offers opened. Financial offers must be separated. Any technical bids which contain financial pricing will be disqualified. Technical Evaluation Criteria CATEGORY POINTS 1. ADMISSIBILITY Vendor Registration: Ministry of Industry and Trade registration, Companies Control Department, Operation Permits Evidence of specialization as Water Treatment plants contractors/ suppliers: Classification or Company Registered Objectives C.1 Technical Submission Form 1 2. COMPANY EXPERIENCE & EXPERTISE C Bidder General Information C Details of contracts and references for works undertaken of similar medium to large scale R.O. plants for in the last 5 years 3. COMPANY FINANCIAL STATUS - C Turnover in the past 3 years - C.2.4 Value of Works in hand - C Litigation history (current or during past 3 years) 4. PROPOSED IMPLEMENTING METHODOLOGY AND APPROACH YES/NO (20) (15) (15) - Method statement for implementation of works - Proposed draft Project Management Plan and systems to be implemented - Proposed schedule demonstrating completion of works within the specified timeframe, Gantt Chart and a comprehensive Work Breakdown Structure - Proposal for O&M 5. PROPOSED TEAM (15)

2 - C Proposed Project Manager (Degree qualified and minimum of 10 years Project Management experience in similar projects) - C Proposed support team - Proposed subcontractors (proposals for subcontracting components of the Works if amounting to more than 10 percent of the total amount of the Bill of Quantities) 6. OVERALL RESPONSE (5) - Demonstrated understanding of scope, objectives and UNICEF requirements. - Overall completeness of response TOTAL MARKS (70) A1-Forms.docx (attached) Financial Proposal The financial proposal needs to be submitted against the BoQ provided by UNICEF. The contractor may add or modify items according to the final design of the unit in the technical proposal which meets final UNICEF approval. A. RO Equipment (inclusive of overhead and profit) Item Description Unit Quantity Price Aeration Tower and Raw Water Tank 1. Aeration tower for releasing of trapped gases and to act as a softener (two fans working/standby) 2. Effective volume of 100 m3 steel raw water tank with a float valve, completely covered and sealed from the top with opening access hatch fixed on hinges to allow access for cleaning and inspection with internal and external ladder and Along with electrical float valve. 3. A separate 4' washout valve for emergency emptying of the tank. LS 1 HDPE 4" Pipes and all required fittings HDPE Pipe 3" 1. to connect the wellhead to the raw water tank. 2.raw water tank drainage pipe. 3.to connect the multimedia sand filter assembly to the RO unit assembly. 4. to carry the effluent from the RO assembly to the storage tanks. For all drainage, washout, backwash processes including excavation for up to 50 cm and the backfilling. L.M 100 L.M 250

3 Containarized RO Unit Should contain at least the following: Filter feed pumps (two). Pressure Multi Grade Sand Filter. Micron Cartridge Filter. Anti-Oxidant Dosing Pump. Antiscalant Dosing System. Cartridge Filter Housing (Container). Reverse Osmosis Skids complete with membranes and pressure vessels with a minimum recovery rate of 80%. Membrane. High Pressure Pump. Pressure Vessel. ph correction system. Pre chlorination system. Post chlorination disinfection system. Cleaning in place system. Backwash System. Pressure Gauges. Flow indicators (minimum of 4). Timer for auto flush. High pressure switch and low pressure switch. Auto flushing system with solenoid valve. Electric control panel with A meter, Voltmeter indicators, on off switch. Pressure control valve. Digital conductivity or TDS meter. Fully automated protection system to control the ON/OFF of borehole pump, raw water tank, RO unit and storage tank. Influent and effluent: EC meter, flow meter, ORP, ph, Cl2 meters. Fully automated ON/OFF system between the plant and a float valve in the storage tanks. LS 1 4" Steel pipe Supply, install and test 4 steel pipe and fittings to connect the raw water tank to the Multimedia sand filter 4" Valves Before and after the following: 1. raw water tank. 2.filters assembly. 3. RO assembly. And before the T95 storage tanks. Electrical Works 1. Supply and install all works to connect the RO unit control panel to the Main Control Board of the project including provision of cable properly sized based on the load of the plant along with all electrical protection (circuit breaker). Cable installation will be installed underground with cable trench excavation and PVC sleeve. 2.All works required to connect the float valves to the system. L.M 30 Unit 7 LS 1 Phase I sub-total

4 2. Phase II Operation and Maintenance A. Staffing and transportation Description Duty Qualification Qty JD/Month (full operational month) Technician electro/mechanical Skilled Operator Pick up (transportation) TOTAL amount One shift Min 7 years in maintenance and 2 years in RO units Three shifts Min 5 years in water/ RO unit operation Total in JD B. Chemicals and Consumables Description Chlorine Cost plus (invoices) Treatment Cost plus Chemicals (invoices) Maintenance Cost plus (replacement parts (invoices) and maintenance work) TOTAL amount Provisional sum in JD for 6 months and based on actual cost invoices (Column A) Transportation (Column B) Total Cost (Column A + Column B) Total Price (Financial offer) (all costs to be inclusive of overhead and profit) Description Phase I Total cost for Phase I As per BOQ Phase II Total of Phase II As per table A (Part A Staffing and transportation) Total of Phase II As per table B (Part B - Chemicals and Consumables) Total cost for Phase II (Part A and B) Cost in JD

5 Total (Phase I and II) Payment terms Phase 1 1 st payment 25% of Phase I value upon procurement and 3 rd party validation and acceptance of all plant materials and items in contractor shop verified by UNICEF site inspection (3% of Phase I value will be deducted as retention) 2 nd payment 25% of Phase I value upon completion of plant assembly, shipping to Rukban site (3% of Phase I value will be deducted as retention) 3 rd payment 40% of Phase I value upon issuing WAJ lab tests confirming effluent water analysis as per National drinking water standards (JS 286/2008) (4% of Phase I value will be deducted as retention) Retention amount 10% of Phase I (This amount will be deducted from the above three payments and paid after 6 months of the start of operation of the system) Phase II six months Operation and Maintenance (O&M) First O&M 40% of Phase II value after the end of three months of satisfactory OM payment Second OM 40% of Phase II value after the end of three months of satisfactory OM payment Third payment 20% Development of O&M manual and guidelines and SOPs and training of local operator on O&M *OPERATION AND MAINTENANCE will start once within one week of the issuance of the certificate from the Ministry of Health. UNICEF will instruct the contractor on the proposed starting date. Instruction to bidders A. 15 calendar days mobilization period starting from signing date of the contract B. Phase I works is a maximum of 90 calendar days from the end date of the mobilization C. UNICEF will obtain the first security permit however, obtaining repeat security access permit from the Ministry of the Interior will be the responsibility of the contractor D. The contractor shall submit a monthly report to UNICEF stating work progress, water test results, daily readings of Turbidity, Flow, Chlorine, TDS (influent and effluent) E. Penalties shall be applied as outlined for delays Defect liability bank guarantee In exchange for the release of the retention amount, the contractor shall submit a defect liability bank guarantee of 5% of total contract value (Phase I) and will be released after six months upon issuing of Final completion certificate after Operation and Maintenance period by UNICEF.

6 1. REQUEST FOR PROPOSAL EVALUATION WEIGHTING CRITERIA 70% Technical 30% Financial Technical (70% weightage) 1) Admissibility - Vendor Registration: Ministry of Industry and Trade registration, Companies Control Department, Operation Permits - Evidence of specialization as Water Treatment plants contractors/ suppliers: Classification or Company Registered Objectives. 2) Company Experience and Expertise (20 points) - Bidder General Information - Details of contracts and references for works undertaken of similar R.O. plants for groundwater source in the last 5 years 3) Company Financial status (15 points) - Turnover in the past 3 years - Value of Works in hand - Litigation history (current or during past 3 years) 4) Proposed implementation methodology and approach (15 points) - Method statement for implementation of works - Proposed draft Project Management Plan and systems to be implemented - Proposed schedule demonstrating completion of works within the specified timeframe, Gantt Chart and a comprehensive Work Breakdown Structure - Proposal for O&M 5) Proposed Team (15 points) - Proposed Project Manager (Degree qualified and minimum of 10 years Project Management experience in similar projects) - Proposed support team - Proposed subcontractors (proposals for subcontracting components of the Works if amounting to more than 10 percent of the total amount of the Bill of Quantities) 6) Overall Response (5 points) - Demonstrated understanding of scope, objectives and UNICEF requirements. - Overall completeness of response Minimum technical score: 70% of 70 points = 49 points Financial (30% weightage) The contractor must submit the financial offer according to the BoQ. The price should be broken down for each component of the proposed work. The total amount of points allocated for the price component is 30. The maximum number of points will be allotted to the lowest

7 price proposal that is opened and compared among those invited firms/institutions which obtain the threshold points in the evaluation of the technical component. All other price proposals will receive points in inverse proportion to the lowest price; e.g.: Max. Score for price proposal * Price of lowest priced proposal Score for price proposal X = Price of proposal X

Nairobi Funeral Home and Forensics BOREHOLE BILLS OF QUANTITIES

Nairobi Funeral Home and Forensics BOREHOLE BILLS OF QUANTITIES Nairobi Funeral Home and Forensics BOREHOLE BILLS OF QUANTITIES 26/10/2015 Item Description Qty Unit Supply, deliver, install, test and commission the following borehole equipment including all materials

More information

WATER TREATMENT PLANT BASED ON REVERSE OSMOSIS TECHNOLOGY litres Per Hour

WATER TREATMENT PLANT BASED ON REVERSE OSMOSIS TECHNOLOGY litres Per Hour WATER TREATMENT PLANT BASED ON REVERSE OSMOSIS TECHNOLOGY Capacity: 25000 litres Per Hour 1 TECHNICAL SPECIFICATIONS Flow Rate : Feed Water : 48000 LPH Treated Water : 25000 LPH 1 RAW WATER PUMP To feed

More information

Innovative Desalination Design: Location, Pre-treament, Intake and Outfall. 7 December 2018

Innovative Desalination Design: Location, Pre-treament, Intake and Outfall. 7 December 2018 Innovative Desalination Design: Location, Pre-treament, Intake and Outfall 7 December 2018 Today Desalination Plant Evaluation Procurement FIDIC Gold Book Risk Allocation Summary Desalination Plant 1.

More information

You get more for less at FSHS!

You get more for less at FSHS! You get more for less at FSHS! www.puromax.com Phone (941)625 4550 Fax (941)625-6635 4210 Whidden Blvd. Port Charlotte, FL 33980 Phone (941)625-4550 Fax (941)625-6635 www.puromax.com Contacts President

More information

Need-to-Know Criteria Water Treatment Operator Class I

Need-to-Know Criteria Water Treatment Operator Class I 2017 Need-to-Know Criteria Water Treatment Operator Class I A Need-to-Know Guide when preparing for the ABC Water Treatment Operator Class I Certification Exam Before You Dive In What is ABC s Need-to-Know

More information

ATTACHMENT A TO THE AGREEMENT FOR ENGINEERING SERVICES. Project: Chloramine Replacement Alternative Evaluation

ATTACHMENT A TO THE AGREEMENT FOR ENGINEERING SERVICES. Project: Chloramine Replacement Alternative Evaluation ATTACHMENT A TO THE AGREEMENT FOR ENGINEERING SERVICES Owner: Board of Public Works, City of Hannibal, Missouri Project: Chloramine Replacement Alternative Evaluation DESCRIPTION OF SCOPE OF SERVICES On

More information

R.O water vending machine (USER MANUAL)

R.O water vending machine (USER MANUAL) R.O water vending machine (USER MANUAL) (ATTENTION) Before the installation and operation of the system, check the manual carefully for the best system condition, CONTENTS 1. PRODUCT APPEARANCE & SPECIFICATION

More information

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE...

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE... ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL... 3 2. DESCRIPTION OF ITEMS... 5 3. PRICES TO BE FULLY INCLUSIVE... 5 4. COVERAGE... 6 5. BIDDER TO PRICE EACH ITEM... 6 6.

More information

TENDER DOCUMENT FOR OVERHAULING OF IRON REMOVAL PRESSURE FILTERATION PLANT AND ANNUAL MAINTENANCE CONTRACT 9B, QUEEN S PARK, KOLKATA

TENDER DOCUMENT FOR OVERHAULING OF IRON REMOVAL PRESSURE FILTERATION PLANT AND ANNUAL MAINTENANCE CONTRACT 9B, QUEEN S PARK, KOLKATA TENDER DOCUMENT FOR OVERHAULING OF IRON REMOVAL PRESSURE FILTERATION PLANT AND ANNUAL MAINTENANCE CONTRACT AT 9B, QUEEN S PARK, KOLKATA-700 09 RESIDENTIAL COMPLEX OF BALMER LAWRIE &CO. LTD. Tender No.

More information

The Culligan Hi-Flo 50 Series Industrial Water Filter System

The Culligan Hi-Flo 50 Series Industrial Water Filter System The Culligan Hi-Flo 50 Series Industrial Water Filter System Durable High-Volume Water Filtration for Industrial Applications The Culligan Hi-Flo 50 Filter reduces contaminants* and solids that affect

More information

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems CITY OF CHINO HILLS Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems February 18, 2016 Department: Public Works Proposal Due Date: March 17, 2016

More information

Spot Zero Mobile Wash Down System SZMWD SZMWDWH 110v SZ MWDZ SZ MWDZ WH 220v

Spot Zero Mobile Wash Down System SZMWD SZMWDWH 110v SZ MWDZ SZ MWDZ WH 220v md Dometic SPBT ZERO Spot Zero Mobile Wash Down System 0111212015 SZMWD SZMWDWH 110v SZ MWDZ SZ MWDZ WH 220v 2000 N Andrews Ext. Pompano Beach, FL 33069 Phone 954-973-2477 Fax 954-979-4414 Email: info@spotzerowater.com

More information

Oman LNG LLC. Pre-Qualification Questionnaire. QEN EPC to Construct Car Parking Sheds with Solar Photovoltaic Panels

Oman LNG LLC. Pre-Qualification Questionnaire. QEN EPC to Construct Car Parking Sheds with Solar Photovoltaic Panels Oman LNG LLC Pre-Qualification Questionnaire QEN-18-930 EPC to Construct Car Parking Sheds with Solar Photovoltaic Panels Pre-Qualification Questionnaire Page 1 of 6 1. GUIDELINES Response to this questionnaire

More information

institutions and Public Sector Undertakings for similar works.

institutions and Public Sector Undertakings for similar works. Limited Cuffe Parade, Mumbai 400 005 Ph: (022) 6655 3355; Fax: (022) 2218 0411 Notice inviting tender for Architects / Consultants for Electrical, HVAC and Allied Works at IDBI Office building at CBD Belapur,

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA This section is used for projects under $1,000,000 use other section if more than $1M SECTION 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 SCOPE A. Preliminary Contract Schedule, Contract

More information

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System. January 2012 Version

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System.  January 2012 Version MASTER Water Conditioning Corp. www.masterwater.com OPERATION MANUAL PURO PRO 1200 SCP Series Modular Reverse Osmosis System January 2012 Version Table of Contents Model Number... 1 Shipping Description

More information

Preparation of Bidding Document. Health System Strengthening Round Nine Project United Nation Development Programme Juba South Sudan

Preparation of Bidding Document. Health System Strengthening Round Nine Project United Nation Development Programme Juba South Sudan Preparation of Bidding Document Health System Strengthening Round Nine Project United Nation Development Programme Juba South Sudan Mandatory Documents to be Submitted to get Eligibility in Bid Opening

More information

POREX Tubular Membrane Filter Modules For Metal Contaminated Wastewater Treatment & Reclamation

POREX Tubular Membrane Filter Modules For Metal Contaminated Wastewater Treatment & Reclamation POREX Tubular Membrane Filter Modules For Metal Contaminated Wastewater Treatment & Reclamation Background Industrial processes can often result in waste water contaminated with heavy metals (Hg, Pb, Zn,

More information

REQUEST FOR QUOTATION (RFQ) Issue Date: 30 Nov, Closing Date: 10 Dec, :00 AM

REQUEST FOR QUOTATION (RFQ) Issue Date: 30 Nov, Closing Date: 10 Dec, :00 AM REQUEST FOR QUOTATION (RFQ) Reference No: AUAF-RFQ-16-046 Issue Date: 30 Nov, 2016 Closing Date: 10 Dec, 2016 10:00 AM PROJECT: Provision of Steel Material for installation of razor Wire The American University

More information

PURCHASE ENQUIRY. 7 Server 2 Windows NT with SQL Database. 8 Server 2 Novel Server Scope of Work

PURCHASE ENQUIRY. 7 Server 2 Windows NT with SQL Database. 8 Server 2 Novel Server Scope of Work PURCHASE ENQUIRY ENQUIRY NO: EU/AMC/COMPUTER/TNG/51 Dated: 03/10/2013 Last date of submission: 24/10/2013, 4 Pm Opening Date of Techno-Comm.bid: 25/10/2013, 11am Sealed two part offers are invited for

More information

Sulaibiya world s largest membrane water reuse project

Sulaibiya world s largest membrane water reuse project Water Technologies & Solutions technical paper Sulaibiya world s largest membrane water reuse project background In May 2001, a consortium including Mohammed Abdulmohsin Al-Kharafi and Sons (The Kharafi

More information

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017 Exterior Alterations and New Office/ Warehouse for All Weather Shelters Northwest Business Park, Building 5, Bay 3 13459-149 Street Edmonton, AB Issued for Tender: Site Visit: Available upon request. Closing

More information

St. John the Baptist Parish

St. John the Baptist Parish St. John the Baptist Parish Conceptual Engineering of Mississippi River Water Source for LaPlace March 26, 2015 digital engineering 1 Major Water System Components Conceputalized Laplace Water System New

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION

REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM The Carroll County Public Service Authority requests bids from properly licensed well drilling firms, hereafter referred to as

More information

PSP Series Water Purification Systems

PSP Series Water Purification Systems Operations and Maintenance Manual for PSP Series Water Purification Systems PSP-1000 PSP-1600 PSP-2700 Rev. 2 / 08/26/14 Compact Design, Self-Contained Water Processing Unit for Point-Of-Use or Point-Of-Entry

More information

BID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient...

BID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient... BID PROPOSAL For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES Page Article 1 Bid Recipient... 1 Article 2 Bidder s Acknowledgements... 1 Article 3 Bidder s Representations...

More information

PROJECT: INCREASE DEMAND FOR UNIVERSITY OF FIJI- KULA STREET SAMABULA SCHEME: G115-15

PROJECT: INCREASE DEMAND FOR UNIVERSITY OF FIJI- KULA STREET SAMABULA SCHEME: G115-15 TENDER NO MR 151/2016 PROJECT: INCREASE DEMAND FOR UNIVERSITY OF FIJI- KULA STREET SAMABULA SCHEME: G115-15 Notes : 1. Bidders to provide 2 hardcopies of tender bid. 2. Safety Plan to be incuded in tender

More information

ANNEX III - BID FORMS

ANNEX III - BID FORMS ANNEX III - BID FORMS The forms below must be completed and returned with your Bid: III (A): III (B): III (C): III (D): III (E): III (F): III (G) Bid Submission Form Bill of Quantity (BoQ) (financial bid,

More information

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SC Series Modular Reverse Osmosis System. January 2012 Version

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SC Series Modular Reverse Osmosis System.  January 2012 Version MASTER Water Conditioning Corp. www.masterwater.com OPERATION MANUAL PURO PRO 1200 SC Series Modular Reverse Osmosis System January 2012 Version Table of Contents Model Number... 1 Shipping Description

More information

VNIT campus, Nagpur-10

VNIT campus, Nagpur-10 Invitation to Offer Name: Procurement of FRP security cabins for IIM Nagpur at MIHAN Campus. Name of bidder & Address: Inquiry Ref. No. IIMN/Estate./01/2017-18 dated 19/02/18 Submission of quotation: on

More information

MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction

MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Joseph R. Elarde CH2M HILL 5801 Pelican Bay Blvd., Suite 505 Naples, FL 34108 joe.elarde@ch2m.com 239-431-9225 Jeff Poteet,

More information

PROJECT: NASRUP SECTION 1B UNDERGROUND RELOCATION STAGE 4 FROM CH SCHEME: C (FROM WAQADRA SUB TO NATALY JUNCTION)

PROJECT: NASRUP SECTION 1B UNDERGROUND RELOCATION STAGE 4 FROM CH SCHEME: C (FROM WAQADRA SUB TO NATALY JUNCTION) TENDER MR 05/2016.. PROJECT: NASRUP SECTION 1B UNDERGROUND RELOCATION STAGE 4 FROM CH 2900-2300 SCHEME: C 31-14 (FROM WAQADRA SUB TO NATALY JUNCTION) Notes: 1. Bidders to provide 2 hardcopies of tender

More information

NJWA 2014 Management & Technical Conference

NJWA 2014 Management & Technical Conference NEW JERSEY WATER ASSOCIATION CONFERENCE Wednesday, October 21, 2015 MYTHBUSTERS PRESENTERS Andrew S. Holt, PE, PP, CME Vice President Eleni Giannikopoulos Senior Designer PRESENTATION OUTLINE NEW JERSEY

More information

1000 GPD Marlin Reverse Osmosis Instruction & Owner s Manual

1000 GPD Marlin Reverse Osmosis Instruction & Owner s Manual 1000 GPD Marlin Reverse Osmosis Instruction & Owner s Manual AQUAFX INSTALLATION INSTRUCTIONS Congratulations on your new AquaFX water treatment system from Aqua Engineering & Equipment, Inc. We hope your

More information

TERMS OF REFERENCE (TOR)

TERMS OF REFERENCE (TOR) TERMS OF REFERENCE (TOR) PROJECT MANAGEMENT,ENGINEERING CONSULTANCY, AND SUPERVISION SERVICES FOR THE DESIGN & BUILD FOR THE SECOND CENTRAL EFFLUENT TREATMENT & RECYCLING PLANT (CETRP II) FOR PTA/PET/PIA

More information

REQUEST FOR QUOTATION (RFQ) Issue Date: December 12, 2017

REQUEST FOR QUOTATION (RFQ) Issue Date: December 12, 2017 REQUEST FOR QUOTATION (RFQ) Reference No: AUAF-RFQ-17-083 Issue Date: December 12, 2017 Closing Date: December 21, 2017 - from 01:30 to 02:30 PM PROJECT: Procurement and Supply of DL 380 G9 Server or equal

More information

Quotation Notice for installation of 20 Street Lights in Kaloor JLN Stadium premises

Quotation Notice for installation of 20 Street Lights in Kaloor JLN Stadium premises Quotation Notice for installation of 20 Street Lights in Kaloor JLN Stadium premises Kochi Metro Rail Ltd (KMRL), Invites quotation for Supply, Installation, Testing and Commissioning of decorative cast

More information

RO400 USER'S MANUAL. Memo PURE-PRO REVERSE OSMOSIS SYSTEM RO400. Type of product. Date of purchase. Address

RO400 USER'S MANUAL. Memo PURE-PRO REVERSE OSMOSIS SYSTEM RO400. Type of product. Date of purchase. Address Type of product RO400 Memo Date of purchase Name Address Tel REVERSE OSMOSIS SYSTEM 19 RO400 USER'S MANUAL 01 Introduction of RO400 02 What is Reverse Osmosis 03 Components& Selections 04 Cartridge filters

More information

(To be published in the Gazette of India, Part I, Section 1) RESOLUTION. Tariff based Competitive-bidding Guidelines for Transmission Service

(To be published in the Gazette of India, Part I, Section 1) RESOLUTION. Tariff based Competitive-bidding Guidelines for Transmission Service (To be published in the Gazette of India, Part I, Section 1) No. 11/5/2005-PG(i) GOVERNMENT OF INDIA Ministry of Power. RESOLUTION New Delhi, Date: 17th April, 2006 Tariff based Competitive-bidding Guidelines

More information

A NEW MEMBRANE FILTRATION PLANT FOR GIRGARRE. Geoffrey Frost. Geoffrey Frost, Principal Water Engineer, Parsons Brinckerhoff Australia P/L

A NEW MEMBRANE FILTRATION PLANT FOR GIRGARRE. Geoffrey Frost. Geoffrey Frost, Principal Water Engineer, Parsons Brinckerhoff Australia P/L A NEW MEMBRANE FILTRATION PLANT FOR GIRGARRE Paper Presented by: Geoffrey Frost Authors: Geoffrey Frost, Principal Water Engineer, Parsons Brinckerhoff Australia P/L Rick Maffescioni, Water Systems Manager,

More information

PROflex* 60 Hz Reverse Osmosis Machines from 50 to 360 gpm

PROflex* 60 Hz Reverse Osmosis Machines from 50 to 360 gpm Fact Sheet PROflex* 60 Hz Reverse Osmosis Machines from 50 to 60 gpm Flexible Design PROflex has 0 base configurations using 8 to 7 elements that allows user to choose various pumps and membrane element

More information

Managing Operations of PPP Contracts Case Study: SingSpring Desalination Plant. Lee Mun Fong Deputy Director Water Supply (Plants) 2 Nov 2012

Managing Operations of PPP Contracts Case Study: SingSpring Desalination Plant. Lee Mun Fong Deputy Director Water Supply (Plants) 2 Nov 2012 Managing Operations of PPP Contracts Case Study: SingSpring Desalination Plant Lee Mun Fong Deputy Director Water Supply (Plants) 2 Nov 2012 Outline Introduction Project Details Desalination Processes

More information

GRAY WATER RECYCLING SYSTEMS

GRAY WATER RECYCLING SYSTEMS GRAY WATER RECYCLING SYSTEMS Note: Section P2601.2 of the International Residential Code requires all plumbing fixtures that receive water or waste to discharge to the sanitary drainage system of the structure.

More information

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment Village of Bolivar, NY Fe/Mn Removal/Village of Bolivar, NY Presentation Outline Fe/Mn Overview Treatment Options Village of Bolivar Challenge

More information

PRO. Safe, clean drinking water on tap anywhere, anytime with UF-PRO Ultrafiltration Units...

PRO. Safe, clean drinking water on tap anywhere, anytime with UF-PRO Ultrafiltration Units... UF PRO ULTRAFILTRATION UNIT Safe, clean drinking water on tap anywhere, anytime with UF-PRO Ultrafiltration Units... LONG TERM, HIGH PERFORMANCE FILTERS SIMPLIFIED CLEANING PROCESS Low cost, safe potable

More information

Virginia Department of Health Office of Drinking Water

Virginia Department of Health Office of Drinking Water Source Water Type: City/County: Waterworks Type: Community Population Served: Nontransient Noncommunity Seasonal Transient Noncommunity Seasonal Operator in Responsible Charge: Phone: Compliance Monitoring

More information

Need-to-Know Criteria Water Distribution Operator Class I

Need-to-Know Criteria Water Distribution Operator Class I 2017 Need-to-Know Criteria Water Distribution Operator Class I A Need-to-Know Guide when preparing for the ABC Water Distribution Operator Class I Certification Exam Before You Dive In What is ABC s Need-to-Know

More information

NOTICE INVITING TENDER FOR AMC CCTV SURVEILLANCE SYSTEM AND SECURITY ACCESS CONTROL

NOTICE INVITING TENDER FOR AMC CCTV SURVEILLANCE SYSTEM AND SECURITY ACCESS CONTROL INDRAPRASTHA INSTITUTE OF INFORMATION TECHNOLOGY, DELHI (IIIT-DELHI) Okhla Industrial Estate, Phase III New Delhi 110020 (Tel No 011-26907400, Website: www.iiitd.ac.in) NOTICE INVITING TENDER FOR AMC CCTV

More information

NIPPON PAPER RO SYSTEM + 2 Others

NIPPON PAPER RO SYSTEM + 2 Others NIPPON PAPER RO SYSTEM + 2 Others 1 March 2014 Greg Wyrick District Account Manager John Zora District Account Manager 2 Purpose: Review the design, function, layout, and operation of the RO system. Process:

More information

Tender Document - Request for Quotation

Tender Document - Request for Quotation Tender Document - Request for Quotation Subject of the Tender: Tender Number: Quantity: Fabrication and Supply of Solar Drying Units JOBS/ GIZ-001 350 Kits Tender Announcement date: April 3 rd, 2014 Tender

More information

Consultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III

Consultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III Terms of Reference Consultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III UNICEF Cambodia 1. Background The Capacity Development Partnership

More information

Casework Technical Support (Social Welfare - Project Management)

Casework Technical Support (Social Welfare - Project Management) Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend

More information

ElectroChemTM Advanced EDR

ElectroChemTM Advanced EDR barium 56 Ba 137.33 calcium 20 Ca TM 40.078 zinc 30 Zn 65.39 arsenic 33 As 74.922 selenium 34 Se 78.96 chlorine 17 CI 35.453 Next generation electrodialysis reversal (EDR) and IonFlux TM membranes Desalinate

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY Frank A. Brinson, P.E., DEE, CDM, Fort Lauderdale, FL

More information

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment.

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment. STATE OF ARKANSAS REVENUE LEGAL COUNSEL Department of Finance Post Office Box 1272, Room 2380 Little Rock, Arkansas 72203-1272 and Administration Phone: (501) 682-7030 Fax: (501) 682-7599 http://dfa.arkansas.gov

More information

Design, Fabrication, Supply, Installation & Commissioning of Scissor Lift for ITMT Building at. CREST, Hosakote. Indian Institute of Astrophysics

Design, Fabrication, Supply, Installation & Commissioning of Scissor Lift for ITMT Building at. CREST, Hosakote. Indian Institute of Astrophysics Design, Fabrication, Supply, Installation & Commissioning of Scissor Lift for ITMT Building at CREST, Hosakote Indian Institute of Astrophysics Bangalore October 2017 1. Introduction The required scissor

More information

REACTION TANKS ADVANCED MEMBRANE FILTRATION

REACTION TANKS ADVANCED MEMBRANE FILTRATION REACTION TANKS ADVANCED MEMBRANE FILTRATION Memtek EFC-Series Microfiltration System A MAJOR ADVANTAGE FOR RELIABLE WASTEWATER TREATMENT OR PROCESS FILTRATION SYSTEMS THAT GIVE YOU GREATER FLEXIBILITY

More information

F.No.5-409/ /P&S/IISS Dated:

F.No.5-409/ /P&S/IISS Dated: BY SPEED POST/FAX Hkkjrh; e`nk fokku lalfkku ¼Hkk0d`0vuq0i0½ uchckx] csjfl;k jksm] Hkksiky & 462038 Indian Institute of Soil Science(ICAR) Nabibagh, Berasia Road, Bhopal 462038 (M.P.) Tel. No. (0755)2747375

More information

Project phases II. Tendering-constructionoperation

Project phases II. Tendering-constructionoperation Project phases II. -constructionoperation Construction management 2. Lepel BME Department of Construction Technology and Management 04.03.2015 Project phases time Inception initiation Preliminary analysis

More information

Request For Proposal Of Printing and Design Services. Marketing Department

Request For Proposal Of Printing and Design Services. Marketing Department Request For Proposal Of Printing and Design Services Marketing Department Released on June 3, 2016 Mosaic Youth Theatre of Detroit Printing and Design Services REQUEST FOR PROPOSAL (RFP) BACKGROUND Mosaic

More information

MINUTES OF PRE-BID MEETING

MINUTES OF PRE-BID MEETING MINUTES OF PRE-BID MEETING INVITATION TO BID ITB 2018/1 Street Lighting Through on-grid hybrid Solar Power System Al Ekaider Landfill in Irbid Governorate, Jordan Date: 1 st February 2018 Time: Venue:

More information

TENDER CONDITIONS FOR SUBMISSION OF TECHNICAL BID & PRICE BID

TENDER CONDITIONS FOR SUBMISSION OF TECHNICAL BID & PRICE BID REQUEST FOR PROPOSAL (RFP) DOCUMENT FOR Supply, Installation and Commissioning of Solar Power Pack & Solar Street Light TENDER CONDITIONS FOR SUBMISSION OF TECHNICAL BID & PRICE BID 1 KARNATAKA STATE ELECTRONICS

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax:

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax: ADDENDUM NO. 1 GOODWYN, MILLS AND CAWOOD, INC. 2701 1 st Avenue South Suite 100 Birmingham, Alabama Ph: 205-879-4462 Fax: 205-879-4493 To: ALL PLAN HOLDERS Date: March 24, 2017 Fax #: Pages: 10, including

More information

Using work breakdown structure models to develop unit treatment costs

Using work breakdown structure models to develop unit treatment costs E628 Using work breakdown structure models to develop unit treatment costs Rajiv Khera, 1 Pat Ransom, 2 and Thomas F. Speth 3 1 US Environmental Protection Agency (USEPA), Washington, D.C. 2 Leidos (formerly

More information

Owners Manual Models: 200-USCRO-600FR. US Water 600 GPD Floor-Mount Light Commercial Economy RO System. Visit us online at

Owners Manual Models: 200-USCRO-600FR. US Water 600 GPD Floor-Mount Light Commercial Economy RO System. Visit us online at Visit us online at www.uswatersystems.com US Water 600 GPD Floor-Mount Light Commercial Economy RO System Owners Manual Models: 200-USCRO-600FR REVISION # 1.2 REVISION DATE June 27 2017 US Water Systems

More information

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal Technical Bulletin 2004-02 rev0707 Q: What is the AdEdge AD26 System? A: The AD26 system is a pre-engineered, packaged treatment system specifically

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 01310 - Project Control Schedule C O N T E N T S PART 1 - SCHEDULE REQUIREMENTS PROGRESS SCHEDULE... 1 PART 2 - SUBMITTAL PROCEDURES... 2 PART 3 - DEFINITIONS...

More information

photo: Ameriwater.com Dialysis Water Treatment Equipment Monitoring December 2017 Developed by the BCPRA Hemodialysis Committee

photo: Ameriwater.com Dialysis Water Treatment Equipment Monitoring December 2017 Developed by the BCPRA Hemodialysis Committee photo: Ameriwater.com Dialysis Water Treatment Equipment Monitoring December 2017 Developed by the BCPRA Hemodialysis Committee Table of Contents 1.0 Scope of Guideline... 1 2.0 Summary of the Literature

More information

URGENTLY REQUIRED FOR SUDAN Oil Exploration - Operation & Maintenance (O&M) JOBS

URGENTLY REQUIRED FOR SUDAN Oil Exploration - Operation & Maintenance (O&M) JOBS URGENTLY REQUIRED FOR SUDAN Oil Exploration - Operation & Maintenance (O&M) JOBS SCOPE OF WORK. Introduction The SCOPE OF WORK as minimum will be carried out within the client oil exploration and development

More information

Hong Kong Science & Technology Parks Corporation Request for Quotation on Cisco IP Phones (Ref: RFQ-IT )

Hong Kong Science & Technology Parks Corporation Request for Quotation on Cisco IP Phones (Ref: RFQ-IT ) Hong Kong Science & Technology Parks Corporation Request for Quotation on Cisco IP Phones (Ref: RFQ-IT-201711004) Hong Kong Science & Technology Parks Corporation (HKSTP) would like to invite vendor to

More information

Schedule Guidance Document

Schedule Guidance Document Schedule Guidance Document Version: 1.2 Effective Date: August 20, 2013 Contents 1. Purpose... 1 2. Applicability and Basic Requirements... 2 3. Baseline Schedule... 3 3.1. General... 3 3.2. Schedule Work

More information

BAIF DEVELOPMENT RESEARCH FOUNDATION BAIF BHAVAN, DR MANIBHAI DESAI NAGAR, WARJE, PUNE Tel.: INVITATION FOR QUOTATION

BAIF DEVELOPMENT RESEARCH FOUNDATION BAIF BHAVAN, DR MANIBHAI DESAI NAGAR, WARJE, PUNE Tel.: INVITATION FOR QUOTATION BAIF DEVELOPMENT RESEARCH FOUNDATION BAIF BHAVAN, DR MANIBHAI DESAI NAGAR, WARJE, PUNE 411058 Tel.: 020 25231661 INVITATION FOR QUOTATION To Date: 15/09/2015 Dear Sir/Madam, Sub: Invitation for quotation

More information

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL DATE: January 5, 2018 UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL 32170-010 ITB# 04-18 REPLACE 12 WATER MAIN AT TURNBULL BAY (DAMAGED DURING

More information

Terms of Reference. UNICEF Iraq Country Office. ( for Institutional Consultant)

Terms of Reference. UNICEF Iraq Country Office. ( for Institutional Consultant) Page 1 of 10 UNICEF Iraq Country Office Terms of Reference ( for Institutional Consultant) Section Content Background The Multiple Indicator Cluster Survey (MICS) is an international household survey programme

More information

Project phases II. Tendering-constructionoperation

Project phases II. Tendering-constructionoperation Project phases II. -constructionoperation Construction management 2. Lepel BME Department of Construction Technology and Management 09.03.2016 Project phases time Inception initiation Preliminary analysis

More information

REPUBLIC OF KENYA COUNTY GOVERNMENT OF TURKANA PROPOSED CONSTRUCTION OF 3 BEDROOMED STAFF HOUSE BLOCKS

REPUBLIC OF KENYA COUNTY GOVERNMENT OF TURKANA PROPOSED CONSTRUCTION OF 3 BEDROOMED STAFF HOUSE BLOCKS REPUBLIC OF KENYA COUNTY GOVERNMENT OF TURKANA PROPOSED CONSTRUCTION OF 3 BEDROOMED STAFF HOUSE BLOCKS AT ELELEA SUBCOUNTY HOSPITAL IN ELELEA WARD, TURKANA COUNTY BILLS OF QUANTITIES Tender No... County

More information

INTEGRITY AND PERFORMANCE EVALUATION OF NEW GENERATION DESALTING MEMBRANES DURING MUNICIPAL WASTEWATER RECLAMATION

INTEGRITY AND PERFORMANCE EVALUATION OF NEW GENERATION DESALTING MEMBRANES DURING MUNICIPAL WASTEWATER RECLAMATION INTEGRITY AND PERFORMANCE EVALUATION OF NEW GENERATION DESALTING MEMBRANES DURING MUNICIPAL WASTEWATER RECLAMATION ABSTRACT James DeCarolis*, Samer Adham, Manish Kumar, Bill Pearce, Larry Wasserman *MWH

More information

The Contract Documents may be examined at the following locations:

The Contract Documents may be examined at the following locations: ADVERTISMENT FOR BIDS Separate sealed Bids for the replacement of Municipal Production Well will be received by the Department of Public Services at 301 W. Main Street, Owosso, MI 48867 until 2:00 p.m.

More information

Water Based Critical Utilities. RO, WFI, and Steam

Water Based Critical Utilities. RO, WFI, and Steam Water Based Critical Utilities RO, WFI, and Steam The bottom of the iceberg that makes a plant run! Brian Hagopian, CPIP Chemist and President Clear Water Consulting, Inc brian@clear-water-consulting.com

More information

Puroxi Pure Water Global Inc. Shield 500/1000 Drinking Water System (DWS)

Puroxi Pure Water Global Inc. Shield 500/1000 Drinking Water System (DWS) Puroxi Pure Water Global Inc. Shield 500/1000 Drinking Water System (DWS) Contents: 1. Shield vs. RO System Comparison 2. DWS Equipment Configuration 3. Incoming Water Specification 4. Incoming Water Test

More information

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of

More information

Status of Palmachim Desalination Project

Status of Palmachim Desalination Project Introduction Status of Palmachim Desalination Project Yigal Hanegbi 1, Yaacov Mansdorf 2 1 Via Maris Desalination, 2 G.E.S Ltd Palmachim desalination project is a seawater RO desalination plant of 30 million

More information

Forward Osmosis Applied to Desalination and Evaporative Cooling Make-up Water

Forward Osmosis Applied to Desalination and Evaporative Cooling Make-up Water Forward Osmosis Applied to Desalination and Evaporative Cooling Make-up Water 3 rd Osmosis Summit 26/27 April 2012 Bringing new technology to the water industry Outline What use is Forward Osmosis? Forward

More information

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM) SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM) 11/3/2008 Page 1 of 12 PURPOSE The purpose of this manual is to provide Suppliers with the DeltaTech Control (DTC) requirements for various items related to the

More information

Best Practices for Chemical Facility Design in Water Treatment. Sara N. Gibson, P.E.

Best Practices for Chemical Facility Design in Water Treatment. Sara N. Gibson, P.E. Best Practices for Chemical Facility Design in Water Treatment Sara N. Gibson, P.E. Overview Introduction Design Considerations Storage Tanks Recirculation / Transfer Pumps Metering Pumps Piping and Valves

More information

Need-to-Know Criteria Wastewater Treatment Operator Class II

Need-to-Know Criteria Wastewater Treatment Operator Class II 2017 Need-to-Know Criteria Wastewater Treatment Operator Class II A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class II Certification Exam Before You Dive In What is ABC

More information

Connoisseur Solutions Project Procurement Management

Connoisseur Solutions Project Procurement Management Project Procurement Management Project Procurement Management Processes necessary to purchase or acquire products, services or results needed from outside the project team. Procurement Management Processes

More information

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series (Single, Twin, Triple or Quadruple Demand Systems) 1 P age filtration equipment can be engineered to solve complex commercial and industrial water treatment

More information

- Turn-Key Project & Service

- Turn-Key Project & Service ROTEK Product Categories: - Water Treatment t Systems (industrial & commercials System Equipment) - Turn-Key Project & Service - ATLAS Housings & Cartridges - Domestic products Distribution ib ti & shops

More information

BUREAU OF INDIAN STANDARDS CENTRAL TESTING & CALIBRATION CENTRE PLOT NO. 20/9, SAHIBABAD INDUSTRIAL AREA, SAHIBABAD DISTRICT GHAZIABAD (UP)

BUREAU OF INDIAN STANDARDS CENTRAL TESTING & CALIBRATION CENTRE PLOT NO. 20/9, SAHIBABAD INDUSTRIAL AREA, SAHIBABAD DISTRICT GHAZIABAD (UP) BUREAU OF INDIAN STANDARDS CENTRAL TESTING & CALIBRATION CENTRE PLOT NO. 20/9, SAHIBABAD INDUSTRIAL AREA, SAHIBABAD 201010 DISTRICT GHAZIABAD (UP) Tender document No. CL/Admn/77 (2014-15) Subject : Tender

More information

b) General instructions and documents to be submitted by an interested company:

b) General instructions and documents to be submitted by an interested company: REFERENCE: EOI/675/2015 Date: July 23, 2015 Dear Sir / Madam, United Nations Development Programme in Belarus (UNDP) invites companies to submit Expressions of Interest in participating in the subsequent

More information

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m.

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m. ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP ADDENDUM DATE: February 10, 2017 BID DATE: February 15, 2017, 11:30 a.m. This ADDENDUM is issued to institute the included changes and/or

More information

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 1.0 SCOPE This document establishes the quality program requirements for an organization providing engineering

More information

Residential Sewer Backup Prevention Program

Residential Sewer Backup Prevention Program City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety

More information

ANNEX I - TERMS OF REFERENCE

ANNEX I - TERMS OF REFERENCE ANNEX I - TERMS OF REFERENCE Review and Development of End User Monitoring (EUM) Standards and tools for Ready to Use Therapeutic Foods (RUTF) Supply Chain 1.0 Background The 2016 joint child malnutrition

More information

Chapter 6 Cost Estimation

Chapter 6 Cost Estimation Developing a budget for a rainwater harvesting system may be as simple as adding up the prices for each of the components and deciding what one can afford. For households without access to reliable groundwater

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information