PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERSHED CONSERVATION GROWING GREENER GRANT FINAL PROJECT REPORT

Size: px
Start display at page:

Download "PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERSHED CONSERVATION GROWING GREENER GRANT FINAL PROJECT REPORT"

Transcription

1 PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERSHED CONSERVATION Date: November 30, 2002 GROWING GREENER GRANT FINAL PROJECT REPORT Project Title: VILLANOVA STORMWATER BIOINFILTRATION TRAFFIC ISLAND (Originally Bioretention) ME # Watershed: 3-G Darby River Period: 31 May November 2002 Sponsor: Villanova University, Department of Civil and Environmental Engineering Institute for Environmental Engineering Research Principal Investigator: Robert G. Traver, Ph.D., P.E., Associate Professor Department of Civil and Environmental Engineering Villanova University 800 Lancaster Ave., Villanova, PA (610) Robert.Traver@Villanova.EDU (610) (FAX) Amount of 319 Funds Awarded $ 59,112 Match Proposed $ 29,143 Match Delivered $ 50,553

2 TABLE OF CONTENTS 3 NARRATIVE 6 SUMMARY 7 DETAILED TECHNICAL REPORTS 15 ACKNOWLEDGEMENTS 16 BIBLIOGRAPHY A 1 Appendix A - BMP Power point presentation B-1 Appendix B - Accomplishment Work Sheets C-1 Appendix C- Construction Photographs D-1 Appendix D- Design Components E-1 Appendix E Final Budget Summary and Invoice 2

3 VILLANOVA STORMWATER BIOINFILTRATION TRAFFIC ISLAND NARRATIVE What was the project suppose to accomplish? Quoting from the project proposal, the purpose of the project was: To create a bioretention Best Management Practice (BMP) Traffic Island, To reduce stormwater nonpoint source pollution to the headwaters of Darby Creek, To enhance infiltration of stormwater, To verify design principles of the Pennsylvania BMP Manual, To create another permanent demonstration site on the Villanova campus, To create a BMP research site for the future. Figure 1 - Villanova Bioinfiltration Traffic Island BMP What did we actually do and how did it differ from our original plan? We set out to design, build, and study a bioretention Best Management Practice (BMP) that would benefit the Commonwealth as a demonstration and research site, and create a measurable environmental benefit for the Darby River. These goals have been accomplished. Originally termed a Bioretention BMP, due to the high infiltration of the soils, it is more accurately categorized as a Bioinfiltration BMP. Besides the title of the site, the only differences from the original plan were in the design and construction of the site, not the accomplishments. 3

4 The bioinfiltration BMP was created by retrofitting an existing traffic island on Villanova s Campus as shown above in Figure 1. The facility intercepts runoff from a highly impervious (50.2%) small drainage area (1.2 acres) that previously would be collected by inlets and delivered through culverts to a dry detention basin without any chance to cleanse or infiltrate the stormwater runoff. The BMP is designed to control smaller storms (1 1.5 inches) through capturing and infiltrating the runoff, thereby reducing downstream stormwater volumes, stream bank erosion, and nonpoint source pollution to the headwaters of the Darby Creek. The advantage of this type of facility is the capture and infiltration of more than 80% of the annual rainfall from, thus reducing stream bank erosion and maintaining baseflow. The success of this design supports the new Act 167 technical approach and the principles of the Pennsylvania BMP Manual. Figure 2 - Villanova University BMP Research and Demonstration Park The Bioinfiltration BMP has been incorporated in the Villanova University Stormwater Best Management Practice (BMP) Demonstration and Research Park (Fig.2). Developed to promote both research and public awareness of stormwater BMP s, the site has already been part of many tours. The site has been instrumented to collect data for research, and is currently the focus of a Master s Thesis. Initial funding for planning of the BMP Park was through a separate Growing Greener grant (Traver 2002). Besides a change in title, there were no changes to the scope of work. Changes did occur to the design and construction methods employed which allowed some funds to be shifted to purchase better monitoring equipment, and to student salary. In addition, salary earmarked for Faculty was redirected to the graduate students, and the University increased its match by allocating faculty time to the project. The Villanova Stormwater Bioinfiltration Traffic Island project has met or exceeded all expectations and commitments. The University exceeded its promised match by over 70%. 4

5 What were the reasons for our success? The involvement of all parties in the design and construction was the primary reason the project was so successful. The final design incorporated ideas from the Villanova Facilities Management Office, the Contractor, PaDEP representatives, and comments from the many visitors to the site. By remaining flexible and remaining open to ideas, the finished project was a great improvement over the original design. It should be noted that design details were discussed at several American Society of Civil Engineers National Conferences, and many suggestions were used from the participants in these conferences. What problems were encountered and how did we deal with them? No significant problems were encountered during the design and construction of the site due to the flexibility as mentioned previously. Problems did develop during the monitoring and study part of the project. First, a drought delayed the start of hydraulic monitoring. Second, the manufacturer shipped the wrong frequency ultrasonic depth sensor. As the error could only be determined by examining the part numbers, it was not found for several months after shipping the instruments back to the factory multiple times for repair. This wasted several months of the study. It was corrected by the manufacturer, and Villanova shifted resources to the students in order to complete the study. How does your work contributed to solution of original problems? What are your plans for disseminating results of your work? This site, as part of the Villanova Demonstration and Research BMP Park provides a showcase of how to implement this new technology, and an opportunity to conduct research. As stated in the project report, well over 500 water resource professionals, township officials, and concerned citizens have toured the site. The Environmental and Water Resources Institute (part of the American Society of Civil Engineers) has selecting the site for visitation as part of their national conference in Philadelphia during June The site will also be part of the Pennsylvania Stormwater Symposium (October 2003). Power-point presentations have been available on the web for some time for this and other projects, and Dr. Traver has made presentations to many groups. Most recently he presented this project at the AWRA national convention (Nov 2002). As promised, the site was featured during several Best Management Practice Symposiums held on campus at no cost to the project. In addition, a signboard at the project discusses its purpose, construction, and benefits. As a research site the potential is just beginning to be realized. The recent approval of a two year research partnership with PaDEP will dramatically aid the profession and the Commonwealth. This report will be made available through the Villanova Website, and will be updated as more studies are conducted on the site. 5

6 What else needs to be done? This site is intended to both demonstrate the technology and to enable long term research. While the mechanisms used by infiltration BMP s are generally understood, much needs to be learned. Research into their effectiveness from a site and watershed viewpoint, design criteria, and maintenance needs to be studied on a long term basis. The first study on the site is underway in the form of a Masters thesis. Hopefully the recently formed Villanova Stormwater Urban Partnership will provide a funding mechanism for future studies. Further, the public and the profession have to be educated as to their function and value. Both this research and education are needed to meet the Phase II National Pollutant Discharge Elimination System (EPA 1999) goals. How well did our spending align with the budget request? Construction savings due to design changes and tight contractual control enabled the university to redirect some funds to increase the capability of the monitoring equipment and extend the hydraulic study due to the recent rainfall drought. The loss of data due to the initial malfunctioning of the equipment required an extension to the study which was supported by redirecting faculty funding to student salaries, and allocating faculty workload to the project as a match. The faculty workload match is reported in the revised project budget (Annex E), but is an underestimate. SUMMARY An existing traffic Island has been converted into a stormwater Bioinfiltration best management practice. Designed to infiltrate the first inch of runoff, this translates to well over 80 % and possible 90% of the annual rainfall as measured by the Chadds Ford Pennsylvania raingage. This infiltration BMP thereby effectively treats the non point source pollution present in the watershed runoff, recharges the runoff, thereby reducing downstream channel erosion. This site would exceed the new Pennsylvania Stormwater Management Act 167 Technical Requirements for Recharge, Water Quality, and Channel Protection. Developed as both a demonstration project and a site for future research, the site excels at both. To date over 500 water resource professionals, municipal officials and concerned citizens have toured the project. This site has been incorporated into Villanova s BMP Stormwater Park, joining a stormwater wetland, and a porous concrete BMP. Current research underway shows great promise. While the basic function of bioinfiltration BMPs is understood, many questions on their design, maintenance, and how to best utilize them as part of a watershed plan remain. Many studies are expected from the site now and in the future. For more information, go to the project website at: 6

7 DETAILED TECHNICAL REPORT Design Focus Design of Bioinfiltration BMP s primarily focuses on water quality improvement, channel protection, and restoration of infiltration. While these devices do reduce the volume of runoff, they are not as effective at reducing major storms ( Year Events) by themselves. The design criterion focuses on directing the runoff into the BMP, the volume of runoff, storage volume within the BMP (both basin and made soil), and infiltration rates for the made soil and the undisturbed soil underneath. For this site, the volume of a watershed inch was chosen as the initial goal. This would be considered a large infiltration volume for the site, but as this is both a research and demonstration site it was decided to maximize the site capacity. Using a graph of the capture rainfall from the Chadds Ford rain gage (Fig.3) a capture design of one inch of rainfall equates to over 80% of the annual rainfall. Capture design means that all storms of less then one inch and the first inch of all storms greater then one inch are captured, and in this case infiltrated. As some infiltration will occur on the contributing drainage area, the capture volume is probably closer to 85 or 90 % of the yearly runoff from this site. Percent Chadds Ford Daily Rainfall Ave Yearly 40.6" Percent Capture Ave Yearly Capture Capture Rainfall Figure 3 - Chadds Ford Raingage Contributing Watershed The contributing drainage area is approximately 1.2 Acres in size and 50% impervious (Figure 4). The impervious area is made up of roads, parking and basketball courts. The pervious area is all grass. Runoff travels as overland flow, gutter flow, or through a culvert to the traffic island. See Appendix D for detailed information on the site. 7

8 Figure 4 - Contributing Watershed Figure 5 - Site and Surrounding Area Before Construction 8

9 Bioinfiltration Traffic Island Figure 6 - Bioinfiltration Traffic Island Top View Figure 7 - Bioinfiltration Traffic Island - Side View 9

10 An existing traffic island was retrofitted as shown above in Figures 6 and 7. The infiltration portion is a bed of porous made soil. A basin is left above the made soil to give the water time to infiltrate. The construction sequence was to first excavate the site. The soil was sifted and mixed with 50% sand to create a very sandy mixture (made soil), and then replaced. Appendix D contains detailed information on the soil properties of the site. To capture the runoff, the existing drainage culvert was diverted into the site. As shown in Figures 6 and 7, a hole was cut in the side of the adjacent inlet redirecting the flow into the inlet. A weir was constructed in the inlet to enable this redirection. Two curb cuts were made to capture runoff from the adjacent parking areas. One inlet was filled in with rock and sealed with asphalt during this process. During larger flows, the water in the culvert will jump the weir in the inlet, thus using the original culvert system. Overflows within the island will go over the curb and back into the original drainage path. Planting of the traffic island is required to maintain infiltration, increase evapotranspiration, to minimize erosion, and to create a good neighbor (Fig. 1). Plantings were designed by Chuck Leeds (chief horticulturist of Villanova s Facility Management Office. As the soil is either extremely wet or dry, selection of the plants was based upon their survive ability. A listing of the plants is shown in Appendix D. Initially, mulch was used to minimize erosion of the surface of the traffic island. This was a one time application, and since then small rounded river rock has been used in eroding areas. An as-built survey of the site confirmed the project did indeed meet the goal of capturing 1 inch of runoff. As shown below in Figure 8, the combination of void space in the bed, and storage above the bed resulted in a combined volume of one inch. Figure 8 - Traffic Island Properties 10

11 Construction Costs Considerable savings were realized from the original budget by the decision to make the porous soil instead of importing it, and by paying per hour for the project. The original budget incorporated the excavation and disposal of the original soil, and the cost of purchasing new soil to our specifications. By making the soil on site, this saved the purchase and disposal of the original soil, but added the cost of making the soil. The contractors estimate for the complete job was high, probably due to the experimental nature of the work. Bidding the job on a per hour basis was much more affordable. The original and actual budgets are shown below in Figure 9. It should also be noted that these costs would be lower if this project was installed at the time of construction of the parking areas. The excavation costs would be lower, curb cuts would not be included, and several inlets and pipes would not have been needed if the project had been built during the original construction. Actual Budget +/- OVERALL Supervision Excavation Dumping Make Soil Sand Emplacement Pipe installation Curb cuts Observation Well Note + is a savings Figure 9 - Actual and Original Construction Budgets. Storm Event January 2002 An early test to the system was the January 2002 snowmelt and rain event as shown by the photographs below (Fig. 10). After a snow storm, a warm front came through bringing rain, melting the snow creating a fairly significant runoff event. While at this point no instrumentation was in place, it clearly was a fairly large event. The site functioned as expected, capturing and then infiltrating the runoff into the ground. Note that within 48 hours the pooled water is no longer visible. 11

12 Figure 11 - January 2002 Snowmelt / Rain Event Depth Rain Depth (ft) Rain (in) /3/02 22:00 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22: /5/02 0:00 Figure 10 - Sample Rainfall Event (October 2002) Total Precipitation

13 Monitoring / Research Monitoring of infiltration BMP s is much more difficult then that of stormwater wetlands or detention basins. Entering inflow through the curb cuts is difficult to measure, and so is the infiltration leaving the site. The monitoring plan thus centered on collecting data that would allow the development of a hydrologic model for the site. To accomplish this task, an ultrasonic level meter and a tipping bucket raingage were installed. In addition two wells were drilled, one to the bottom of the made soil, and one to the side four feet below the made soil. Pressure transducers were added to record depth, with all four meters collecting data on a five minute (or less) basis for use in hydrologic modeling. Due to short battery life, a connection to include a transformer was added that would recharge the batteries every night when the area lighting turns on. As shown by Figures 11 and 12 the data collection is extremely successful. The ultrasonic level monitor clearly show the build up and infiltration of storm events. The rainfall is recorded across the top for both storm events. In the first case of a light storm all of the runoff infiltrates into the basin. Figure 12 shows a heavier storm where the water level exceeds the weir. This storm was close to a 2 year storm for the area, and some runoff bypassed the BMP. By taking the downward slopes, an infiltration rate can be determined. For all depths greater than 0.71 ft, the infiltration rate was cfs. Below that level, the infiltration rate changes with respect to depth and decreases as the depth decreases. This could be attributed to either the geometry of the basin or the decrease in the head, causing a smaller driving force into the soil. These values vary from storm to storm, clearly dependent on previous storm events. In all cases to date all water has infiltrated within two days. To date no water has been observed in these wells, meaning the system has not become saturated and the water is moving through the soil as unsaturated soil moisture. In the future, we hope to add a series of soil moisture meters and lysimeters Depth of Pond measured fromlowest point (ft) Depth of Pond Elevation of top of Weir (1.22 ft) Elevation of Weir 121ft Rain (in) 0.2 Rain (in) /26/02 9/26/02 9/26/02 9/27/02 9/27/02 9/27/02 9/27/02 9/28/02 9/28/02 9/28/02 9/28/02 9/29/02 9/29/02 9/29/02 6:00 AM 12:00 6:00 PM 12:00 6:00 AM 12:00 6:00 PM 12:00 6:00 AM 12:00 6:00 PM 12:00 6:00 AM 12:00 PM AM PM AM PM AM PM Figure 12 - Sample Rainfall Event (September 2002) Total Rainfall

14 Modeling of the System Figure 13 shows an early attempt to model the infiltration basin using modified puls routing and the HEC-HMS computer model (HEC 2000). The watershed and storm data were used to develop a model for the traffic island and surrounding drainage area. Using NRCS methods (HEC 2000), runoff from the watershed was routed into a reservoir. A storage-outflow table was imputed, with the weir and infiltration acting as the outflow for various water surface elevations. Using the real precipitation data, the model was run for the storm event. The total rainfall of 3.00 in. produced 1.96 in of runoff. Initial results reflect a gain of.51 inches of infiltration during the event, meaning the volume of runoff was greatly reduced. Figure 13 shows the actual depth versus the calculated depth over time for this event Level (ft) Time (min) HMS Data Observed Figure 13 - Actual versus Calculated Depths for Storm Event While these results look impressive, the results are not as good when applied to other rainfall events. We are finding that the infiltration rate changes as a function of previous rainfall. Currently Mr. Matt Prokop is studying this topic and the site is the focus of his Masters Thesis due out in May Future Research Villanova is committed to long term research on the site. Future research questions include performance, maintenance, and effectiveness of the site. Plans include the installation of several lysimeters to aid in water quality sampling, and moisture meters to track the level of moisture in the soil. Research on this site is expected to continue for a long period of time. 14

15 Summary - A Discussion of Act 167 Requirements The role of infiltration BMP s is definitely a hot topic of the water resource community, as evidenced by many efforts to study infiltration (ASCE 1999). The Maryland approach to stormwater Management (MDE 2000) focuses on five separate criteria s to include infiltration, water quality, channel protection, and medium and large extreme events management. Infiltration The infiltration achieved greatly exceeds the preconstruction infiltration of the site. Future studies will determine how large an impervious area this one site would compensate for. Based upon the current record of events captured, we have recently increased the weir height to further increase the islands capture ability. This site exceeds any criteria for infiltration. Water Quality The advantage of this type of facility is through the capture and infiltration of more than 90% of the annual rainfall, there would be no surface runoff pollutant input to the headwaters from all the infiltrated storm events. The first flush (1 ) is generally considered the dirtiest, and this is entirely captured by this design. The research question in the future is the effectiveness of the soil in removing the pollutants from any base flow contribution. This site exceeds any criteria for water quality treatment. Channel Protection Again, as the great preponderance of the annual stormwater is infiltrated, stream channel erosion is greatly reduced. This site exceeds any criteria for channel protection for this site. Medium and Large Storm Flooding As the capture is during the initial portion of the storm, this site by itself does not protect against large extreme events though it may reduce their magnitude thus reducing the added protection needed. Study of this topic is planned in the near future. We feel that the demonstration and research value of this site is extraordinary, and will benefit the citizens of the Commonwealth of Pennsylvania for a long period of time. ACKNOWLEGMENTS Funding for the Villanova Bioinfiltration Traffic Island was provided by the Pennsylvania Department of Environmental Protection (PaDEP) through the Growing Greener Grant program. This support does not imply endorsement of this project by EPA or PaDEP. The author wishes to thank his current and former graduate students, in particular Carter Hubard, Matt Prokop and Tyler Ladd and both the Facilities Management and Arboretum Staff at Villanova for their enthusiastic and extremely gracious support. 15

16 BIBLIOGRAPHY ASCE National Stormwater Best Management Practices Database, American Society of Civil Engineers, New York, NY EPA Office of Water Report To Congress On The Phase II Stormwater Regulations, United States Environmental Protection Agency, Washington, D.C. EPA 2002, 319 Non Point Source Pollution Success Stories Volume III. EPA Washington DC HEC 2000 Hydrologic Modeling System Technical Manual, HEC Corps of Engineers, MDE 2000, 2000 Maryland Stormwater Design Manual, Baltimore, MD. Pennsylvania Association of Conservation Districts Pennsylvania Handbook of Best Management Practices for Developing Areas, Harrisburg PA Traver, R. G Development of a BMP Research and Demonstration Park, Proceedings, 9 th International Conference on Urban Drainage (ASCE). 16

Green Infrastructure BMPs. Hydrologic Performance Small Storms

Green Infrastructure BMPs. Hydrologic Performance Small Storms Green Infrastructure BMPs Hydrologic Performance Small Storms Clay Emerson, Ph.D. Princeton Hydro Robert G. Traver, Ph.D., PE Department of Civil and Environmental Engineering Villanova University Director,

More information

Modeling Infiltration BMPs

Modeling Infiltration BMPs Modeling Infiltration BMPs CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Design Goals for Calculations 1. Mitigate Peak Rates 2-Year to 100-Year 2. No Volume

More information

Design Example Residential Subdivision

Design Example Residential Subdivision Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site

More information

Appendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning

Appendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning Appendix E Appendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning E.1 Introduction It is essential to coordinate post-construction stormwater planning with the design

More information

Stormwater Management Fact Sheet: Porous Pavement

Stormwater Management Fact Sheet: Porous Pavement Stormwater Management Fact Sheet: Porous Pavement Description Porous pavement is a permeable pavement surface with an underlying stone reservoir that temporarily stores surface runoff before infiltrating

More information

VUSP ~ PaDEP - Best Management Practice National Monitoring Site Year 9

VUSP ~ PaDEP - Best Management Practice National Monitoring Site Year 9 Project Report VUSP ~ PaDEP - Best Management Practice National Monitoring Site Year 9 November 2013 Principal Investigators: Robert G. Traver Ph.D. PE, D.WRE Professor of Civil and Environmental Engineering

More information

Director, Villanova Urban Stormwater Partnership. Government Academia Industry Pennsylvania Stormwater Management Symposium

Director, Villanova Urban Stormwater Partnership. Government Academia Industry Pennsylvania Stormwater Management Symposium 2003 Pennsylvania Stormwater Management Symposium Implementing Stormwater Management Integration of Planning, Regulation, Design, and Operations Robert G. Traver, Ph.D., PE Symposium Chair Department of

More information

Calibration of Hydrologic Design Inputs for a Small Urban Watershed

Calibration of Hydrologic Design Inputs for a Small Urban Watershed Research Project Proposal for Johnson County Stormwater Management Program and City of Overland Park, Kansas Calibration of Hydrologic Design Inputs for a Small Urban Watershed Bruce M. McEnroe & C. Bryan

More information

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.

More information

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons 2011-12 and 2012-13 Project Overview San Francisco State University (SFSU) has implemented several green

More information

Pennsylvania. Pennsylvania. Villanova University Stormwater Best Management Practice Section 319 National Monitoring Program Project.

Pennsylvania. Pennsylvania. Villanova University Stormwater Best Management Practice Section 319 National Monitoring Program Project. Pennsylvania Villanova University Stormwater Best Management Practice Section 319 National Monitoring Program Project Pennsylvania Project Area Figure 44: Villanova University Stormwater Best Management

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Evening traffic plows through high water at the intersection of

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

Infiltration Trench Factsheet

Infiltration Trench Factsheet Infiltration Trench Factsheet Infiltration Trench is a practice that provides temporary storage of runoff using the void spaces within the soil/sand/gravel mixture that is used to backfill the trench for

More information

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Chapter 10 Design Examples Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Example 2: Filter Design in a commercial development

More information

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...

More information

Natural and Engineered Wetlands for Stormwater Management

Natural and Engineered Wetlands for Stormwater Management Natural and Engineered Wetlands for Stormwater Management Dan Hitchcock, Ph.D., P. E. Baruch Institute of Coastal Ecology and Forest Science Clemson University Georgetown, SC Prominence and Diversity of

More information

INTRODUCTION TO STORMWATER MANAGEMENT

INTRODUCTION TO STORMWATER MANAGEMENT CHAPTER 1 INTRODUCTION TO STORMWATER MANAGEMENT 1.1 Introduction 1 1.2 Effect of Land Development 1 1.3 Stormwater Design Criteria 2 1.4 Comprehensive and Innovative Design 4 1.5 Book Organization 8 1.1

More information

Sustainable Stormwater Research

Sustainable Stormwater Research 2013 NJASLA Designing Healthy Communities Sustainable Stormwater Research Robert G. Traver, Ph.D., PE, D.WRE Professor & Director, Villanova Center for the Advancement of Sustainability in Engineering,

More information

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND BMP RAM BMP Type Definitions 1 CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND USES AND OWNERSHIP STRUCTURAL BMP TYPE OTHER NAMES

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-Y Regulation No. 1110-2-1464 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDROLOGIC ANALYSIS OF WATERSHED RUNOFF Distribution Restriction

More information

the 2001 season. Allison brought high winds and street flooding to Houston, after

the 2001 season. Allison brought high winds and street flooding to Houston, after Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Evening traffic plows through high water at the intersection of

More information

Water Resources Management Plan

Water Resources Management Plan P L Y M O U T H M I N N E S O T A Appendix D: The developed a to analyze and minimize the impact of existing and future development on the City s natural resources. It is important to the City to have

More information

Design of Stormwater Wetlands

Design of Stormwater Wetlands Hydraulic & Hydrologic Stormwater Engineering Design of Stormwater Wetlands Jon Hathaway, EI Extension Associate NCSU Bio. And Ag. Engineering 6 Step Process 1. Watershed Analysis (Runoff Volume and Peak

More information

3/25/2019. Urbanization of the Hydrologic Cycle. Codicil to Ben Franklin s Will Advances in Raingarden Design An Engineered Approach

3/25/2019. Urbanization of the Hydrologic Cycle. Codicil to Ben Franklin s Will Advances in Raingarden Design An Engineered Approach Advances in Raingarden Design An Engineered Approach With John Komlos Kristin Sample-Lord Virginia Smith Bridget Wadzuk AndreaWelker Moving to Resilient Stormwater Systems 1 Urbanization of the Hydrologic

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010. CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted March 29, 2010 Table of Contents Page Part 1 Introduction...3 4-1 Title..................3 4-2

More information

Implementing Restoration Projects Upstream from the Teaneck Creek Conservancy

Implementing Restoration Projects Upstream from the Teaneck Creek Conservancy from the Teaneck Creek Conservancy by Jeremiah D. Bergstrom 1, Peter Kallin 2, and Christopher Obropta 3 1 Water Resources, TRC Environmental Corporation, Trenton, New Jersey 08628 2 Belgrade Regional

More information

How Climate Change Impacts Urban Runoff and Water Quality Design

How Climate Change Impacts Urban Runoff and Water Quality Design How Climate Change Impacts Urban Runoff and Water Quality Design by J. C. Hayes, C. Privette, III and S. J. Klaine AWRA Conference Anchorage, AK May 4-7, 2009 Presentation Outline Introduction: Why manage

More information

Engineering Report Preliminary Floodplain Study. Executive Summary

Engineering Report Preliminary Floodplain Study. Executive Summary Executive Summary Engineering Report Preliminary Floodplain Study The Federal Emergency Management Agency (FEMA) has updated the Flood Insurance Rate Maps (FIRM) for Finney County, including the City of

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

PREDEVELOPMENT VERSUS POSTDEVELOPMENT VOLUME ANALYSIS: An Application of Continuous Simulation Modeling using PONDS Version 3 Software

PREDEVELOPMENT VERSUS POSTDEVELOPMENT VOLUME ANALYSIS: An Application of Continuous Simulation Modeling using PONDS Version 3 Software PREDEVELOPMENT VERSUS POSTDEVELOPMENT VOLUME ANALYSIS: An Application of Continuous Simulation Modeling using PONDS Version 3 Software PRESENTATION TO: SOUTH FLORIDA WATER MANAGEMENT DISTRICT RFP No. C-8501

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Infiltration Basin Description Applicability

Infiltration Basin Description Applicability Infiltration Basin Description An infiltration basin is a shallow impoundment which is designed to infiltrate storm water into the ground water. This practice is believed to have a high pollutant removal

More information

Paraprofessional Training Session 1

Paraprofessional Training Session 1 Paraprofessional Training Session 1 Part 2: Stormwater Basics November 26, 2012 Rutgers University, Cook Campus Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources Associate Professor

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

Villanova University. The Graduate School. Department of Civil and Environmental Engineering AN INFILTRATION MODEL OF AN UNDERGROUND ROCK STORAGE BED

Villanova University. The Graduate School. Department of Civil and Environmental Engineering AN INFILTRATION MODEL OF AN UNDERGROUND ROCK STORAGE BED Villanova University The Graduate School Department of Civil and Environmental Engineering AN INFILTRATION MODEL OF AN UNDERGROUND ROCK STORAGE BED INFILTRATION BMP A Thesis in Civil Engineering By Megan

More information

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated

More information

Project Priority List scoring worksheet - stormwater Guidance document

Project Priority List scoring worksheet - stormwater Guidance document www.pca.state.mn.us Project Priority List scoring worksheet - stormwater Guidance document PLEASE NOTE: THE MINNESOTA STATE FISCAL YEAR IS FROM JULY 1 JUNE 30 The first step towards receiving either a

More information

Appendix F. Flow Duration Basin Design Guidance

Appendix F. Flow Duration Basin Design Guidance Appendix F Flow Duration Basin Design Guidance Appendix F FINAL REPORT F:\SC46\SC46.31\HMP Mar 05\Appendices\Appendix F FLY_HMP.doc MARCH 2005 Appendix F Flow Duration Basin Design Guidance Prepared by

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

Drainage Analysis. Appendix E

Drainage Analysis. Appendix E Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for

More information

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil. Chapter 5: Acceptable Stormwater Management Practices (SMPs) This section presents a list of practices that are acceptable for water quality treatment. The practices on this list are selected based on

More information

Managed Release Concept December 13, 2018

Managed Release Concept December 13, 2018 Bureau of Clean Water Managed Release Concept Description Managed Release Concept (MRC) is a post-construction stormwater management (PCSM) strategy that involves the collection, storage, and filtration

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

CRWP NERRS Science Collaborative Site Selection Criteria & Scoring System CHAGRIN RIVER WATERSHED PARTNERS, INC.

CRWP NERRS Science Collaborative Site Selection Criteria & Scoring System CHAGRIN RIVER WATERSHED PARTNERS, INC. CHAGRIN RIVER WATERSHED PARTNERS, INC. NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM SCIENCE COLLABORATIVE GRANT Implementing Credits and Incentives for Innovative Stormwater Management REQUEST FOR PROPOSALS

More information

Permeable Pavement Hydrologic Modeling

Permeable Pavement Hydrologic Modeling Permeable Pavement Hydrologic Modeling Robin Kirschbaum, PE, LEED AP Alice Lancaster, PE April 24, 2013 Presentation Overview Overview of Hydrologic Modeling Performance Standards Modeling Guidelines,

More information

Appendix A. Compliance Calculator Guidance

Appendix A. Compliance Calculator Guidance Compliance Calculator Guidance Appendix A Appendix A. Compliance Calculator Guidance A.1 Introduction The Center for Watershed Protection created the compliance calculator spreadsheet to allow a designer

More information

Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E.

Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E. Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1 Geoffrey A. Cerrelli 1, P.E. 1 Hydraulic Engineer USDA/NRCS, One Credit Union Place,

More information

Water Resources Management Plan Appendix B

Water Resources Management Plan Appendix B B u r n s v i l l e M i n n e s o t a Water Resources Management Plan Appendix B Appendix B Page B-1 Burnsville, Minnesota STORM WATER LOW-IMPACT DEVELOPMENT GUIDE MANUAL SHORT ELLIOTT HENDRICKSON INC.

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Hydrology for Drainage Design. Design Considerations Use appropriate design tools for the job at hand:

Hydrology for Drainage Design. Design Considerations Use appropriate design tools for the job at hand: Hydrology for Drainage Design Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL Objectives for Urban Drainage Systems are Varied Ensure personal safety

More information

3F. Hydrology and Water Quality

3F. Hydrology and Water Quality This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Module 8 (L31 L34): Storm Water & Flood Management : Storm water management, design of drainage system, flood

Module 8 (L31 L34): Storm Water & Flood Management : Storm water management, design of drainage system, flood Module 8 (L31 L34): Storm Water & Flood Management : Storm water management, design of drainage system, flood routing through channels and reservoir, flood control and reservoir operation, case studies.

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

Appendix F HYDROLOGY/WATER QUALITY REPORT TIESLAU CIVIL ENGINEERING

Appendix F HYDROLOGY/WATER QUALITY REPORT TIESLAU CIVIL ENGINEERING Appendix F HYDROLOGY/WATER QUALITY REPORT TIESLAU CIVIL ENGINEERING T IE S L A U C I V IL E N G I NE E R IN G, IN C. P.O. B o x 2 2 9 7, K i n g s B ea c h, C A 9 6 1 4 3 p h : (5 3 0 )5 4 6-0 8 6 1 8

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Stormwater Treatment Practice (STP) Calculator Instructions

Stormwater Treatment Practice (STP) Calculator Instructions Stormwater Treatment Practice (STP) Calculator Instructions The STP Calculator is a tool developed by the Department of Environmental Conservation (DEC) to estimate total phosphorus load reductions achieved

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Shirley E. Clark, Ph.D., P.E. October 5, /30/2012

Shirley E. Clark, Ph.D., P.E. October 5, /30/2012 Shirley E. Clark, Ph.D., P.E. October 5, 2012 Prior development decisions have led to directly connected impervious areas and pervious areas with heavily-compacted soils. Prince Georges Cty, MD photo 1

More information

Sizing Calculations and Design Considerations for LID Treatment Measures

Sizing Calculations and Design Considerations for LID Treatment Measures SCVURPPP C.3 Workshop December 18, 2012 Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program

More information

LID PLANTER BOX MODELING

LID PLANTER BOX MODELING LID PLANTER BOX MODELING Clear Creek Solutions, Inc., 2010 Low Impact Development (LID) planter boxes are small, urban stormwater mitigation facilities. They are rain gardens in a box. WWHM4 provides the

More information

Mill Creek Restoration in Lower Merion Township. PH (610) ; FAX (610) ;

Mill Creek Restoration in Lower Merion Township. PH (610) ; FAX (610) ; Mill Creek Restoration in Lower Merion Township Vincent L. Sortman 1 and Robert M. Lambert 2 1 Biohabitats, Inc., 15 W. Aylesbury Road, Timonium, MD 21093; PH (410) 337-3659; FAX (410) 583-5678; email:

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

Impact of Rainfall Calculation on Capture Volume

Impact of Rainfall Calculation on Capture Volume Impact of Rainfall Calculation on Capture Volume Ruth Ayn Hocker, P.E. Chesapeake Bay Foundation Shirley E. Clark, Ph.D., P.E., D. WRE Penn State Harrisburg Challenge: What Should The Water Quality Treatment

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

Application of the SWAT Hydrologic Model for Urban Stormwater Management

Application of the SWAT Hydrologic Model for Urban Stormwater Management UT Arlington, June 5 th, 2015 Application of the SWAT Hydrologic Model for Urban Stormwater Management Jaehak Jeong, PhD, PE Assistant Professor Texas A&M AgriLife Research Texas A&M University Roger Glick,

More information

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water Storm Water Permitting Requirements for Construction Activities John Mathews Storm Water Program Manager Division of Surface Water Why Permit Storm Water? Impacts During Construction Not an issue until

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES 1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0H.0 STORMWATER REQUIREMENTS: COASTAL COUNTIES (a) The following definitions are applicable to this rule: (1) Built upon area as defined in Session Law 00- means that portion

More information

BUREAU OF CLEAN WATER

BUREAU OF CLEAN WATER COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER DISCHARGES FROM SMALL MUNICIPAL SEPARATE STORM

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method

More information

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228 Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:

More information

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY Project #08223 CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY PREPARED FOR: City of Crystal Lake 100 West Woodstock Street Crystal Lake, Illinois 60014 FEBRUARY 11, 2009 26575 W. COMMERCE DRIVE, SUITE 601,

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

State-of-the-Practice Porous Asphalt Pavements. Kent R. Hansen, P.E. Director of Engineering National Asphalt Pavement Association

State-of-the-Practice Porous Asphalt Pavements. Kent R. Hansen, P.E. Director of Engineering National Asphalt Pavement Association State-of-the-Practice Porous Asphalt Pavements Kent R. Hansen, P.E. Director of Engineering National Asphalt Pavement Association Porous Pavements don t follow the rules Conventional Pavements Do every

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description Greenville County Technical Specification for: WQ-06 SAND FILTER 1.0 Sand Filter 1.1 Description Sand Filters remove pollutants through sedimentation and filtration within the sand. The primary components

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

SECTION III: WATERSHED TECHNICAL ANALYSIS

SECTION III: WATERSHED TECHNICAL ANALYSIS Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater

More information

KEYWORDS Detention basin retrofit, Hydromodification, Stormwater Management, Erosive flows, Streams

KEYWORDS Detention basin retrofit, Hydromodification, Stormwater Management, Erosive flows, Streams Change the Game with Green Infrastructure - Retrofits of Existing Detention Basin may be Orders of Magnitude More Cost-Effective than New BMP Construction: A Preliminary Report James A. Goodrich 1 *, Robert

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges Detention Pond Design Considering Varying Design Storms Land Development Results in Increased Peak Flow Rates and Runoff Volumes Developed area Robert Pitt Department of Civil, Construction and Environmental

More information