1 OFFICE OF LICENSING & GUIDANCE INSPECTORS REPORT ON A LICENCE APPLICATION To: Directors From: Aoife Loughnane - Licensing Unit th Date: 20 July 2006 RE: Application for an IPPC Licence Review from Huntstown Power Company Limited, Huntstown, Finglas, Dublin 11. Licence Register P (779) Application Details Class of activity: 2.1 The operation of combustion installations with a rated thermal input equal to or greater than 50 MW. Section 87(1)b notice sent: 21/02/06 Information under Section 87(1)b received: 24/03/06 Notices under Article 17 issued: 11/05/06 Information under Article 17 received: 06/06/06, 12/06/06, 26/06/06 Submissions received: None Site visits: 09/02/06 BACKGROUND IPC Licence Reg. No. P was granted to CRH Estates Limited on 27 th October 1999 for the development of a power station at Huntstown, Finglas, Dublin 11. The site is located adjacent to a working quarry operated by CRH Estates Limited. This power station was to consist of two combined cycle gas turbines (CCGTs), and the development of the site was to take place in two stages (Phase I and II), each corresponding to the installation of one of the CCGTs. Huntstown Power Company Limited subsequently acquired this installation and became the licensee. Phase I of the development was completed and the first CCGT commenced operation in However, changes to the original proposed scale, layout and ownership arrangements for the Phase II development mean that Phase II now requires a separate IPPC licence. An application for a new, separate licence for Phase II was made on 10 th January 2006 (Reg. No. P ) and is referred to as Phase II throughout this report. In 2003, Huntstown Power Company Limited applied for a review of their licence (P ) but subsequently withdrew that application for corporate reasons and in light of the sale of part of the site for the second gas turbine (Phase II) to Viridian Power Limited. The withdrawal/abandonment of the review application was the subject of detailed discussions between Agency and licensee. Page 1 of 8

2 A request for a review of licence Reg. No. P , in order to amend it to cover Phase I only, was made on 10 th January This review application (Reg. No. P ) is referred to as Phase I throughout this report. As mentioned earlier, Phase I is owned by Huntstown Power Company Limited and operated by GenSys Power Limited. Phase II is owned by Viridian Power Limited and will be operated by GenSys Power Limited. These three companies are all wholly owned subsidiaries of Viridian Group plc. Phase I commenced open cycle gas turbine operation (by-pass of the heat recovery steam generator) in July 2002 and combined cycle operation (turbine and heat recovery steam generator operation) in November Construction of Phase II commenced in August 2005 and operation is expected to commence in Autumn The licensee has submitted a revised site plan Drawing No. A0/61825B/G/002 Rev. B which shows the distinction between the Phase I and Phase II boundaries (see Appendix A). This report deals with the environmental issues arising from the operation of the Phase I power plant. REASON FOR REVIEW The review of licence Reg. No. P is necessary for the following reasons: (i) to amend the site boundary and accommodate changes arising from the separate IPPC licence application (Reg. No. P ) for a portion of the site; (ii) to take account of proposed changes in discharges to water; and (iii) to incorporate the amendments to the licensing provisions of the Environmental Protection Agency Acts 1992 and 2003, as appropriate. ENVIRONMENTAL IMPACT STATEMENT Planning permission for the development of two CCGTs with a combined output of 600 MW e was granted on 25 th March Fingal County Council granted subsequent planning permission for the increased combined output of 740 MW e on 18 th July An EIS was required in support of the original planning application, however Fingal County Council did not require a further EIS for the subsequent planning application. The EIS submitted in support of the first planning application was assessed by the Agency as part of the assessment of licence Reg. No. P and was deemed to comply with the statutory regulations. Huntstown Power Company Ltd. submitted a planning application and EIS to Fingal County Council on the 7 th July 2006 for alterations to the development and an increase in nominal power output to 765MW. The Recommended Determination (RD) does not incorporate the increased power output for which planning permission is been sought. INTERACTION BETWEEN THE TWO SITES The Phase I plant was designed and constructed with a number of plant items, services and interconnections with sufficient capacity to meet the operational requirements of two CCGTs. Items which will remain under Phase I control, but which will serve both Phase I & II, include the gas compound, switchyard area, water treatment plant (demineralisation plant), firefighting & raw water storage tanks, distillate oil unloading station, sanitary effluent treatment system, consumable stores building and administration/control building. As the majority of the shared services remain under the control of Phase I, they form part of this licence review application and are included in the attached RD. Aqueous emissions will be dealt with as follows: Process effluent from Phase I & II will be collected separately and subject to separate treatment (neutralisation) and monitoring, prior to discharge at a common emission point D1 to the adjacent quarry drainage system. Page 2 of 8

3 Surface Water Drainage from Phase I & II will not be entirely separate; therefore the monitoring point is shared and is identified as I-SW. Grab samples may be taken from any individual stream where there is a manhole for access, including locations downstream of all oil interceptors. Sanitary Effluent from Phase I & II will be treated on-site in the existing proprietary bio-aerator and discharged to ground via a raised percolation bed. Operation, control and maintenance of the proprietary bio-aerator and percolation bed are the responsibility of Huntstown Power Company Limited. PROCESS DESCRIPTION The CCGT plant operation has been described in the Inspector s report for the current licence (Reg. No. P ). The power plant is a cycling or base load plant and could operate for 24 hours per day and 365 days per annum, depending on maintenance and despatch requirements. The plant operates on natural gas with distillate oil as a standby fuel, in the event of an interruption to the gas supply. Gas is supplied to the installation by Bord Gais Eireann and electricity is supplied to the ESB National Grid. The Phase I plant consists of a MW e gas fired CCGT. The main power generating element is a Siemens gas turbine. The exhaust gases pass through a heat recovery steam generator (HRSG) which delivers steam to a separate steam turbine. The steam is condensed in an air-cooled condenser. The plant operates under three modes: (i) combined cycle (turbine and HRSG) using natural gas; (ii) combined cycle using distillate oil; (iii) open cycle (by-pass of HRSG) using natural gas. In combined cycle mode, the HRSG integral exhaust stack is the main emission point (labelled E1 in Schedule B of the RD). Open cycle mode allows the plant to produce electricity from the gas turbine alone only in instances where there is either a planned maintenance or forced outage of the HRSG and steam turbine. In open cycle mode, the bypass stack is the emission point (labelled E2 in Schedule B of the RD). Distillate oil will be used in the event that natural gas is unavailable. Operation on distillate oil is not expected to exceed 10 days per year. On-site storage is provided for up to five days provision of distillate oil (10,000m 3 ) and demineralised water. Demineralised water is required for injection into the gas turbine to control NO x emissions when operating on distillate oil. USE OF RESOURCES The average annual usage to date of fuel, energy, mains and groundwater at the installation is shown in Table 1 below. The CCGT plant operates on natural gas as a primary fuel with distillate oil as a standby fuel. Service water is supplied from two on-site wells on a duty/back-up basis, and is treated in the raw water demineralisation plant prior to use. Groundwater is also used to supply the fire protection system. Potable water for domestic use is obtained from the Local Authority mains supply. The use of an air-cooled condenser avoids the need for large quantities of cooling water associated with conventional power plants. Table 1: Use of Resources Gas Fuel 7,013,713 Sm 3 (house load) Distillate Oil Fuel 4 m 3 (used for testing purposes) Electricity 846 MWh Mains Water 3,890 m 3 Groundwater 37,447 m 3 Page 3 of 8

4 IPPC DIRECTIVE This installation falls within the scope of Category 1.1 (Combustion installations with a rated thermal input exceeding 50 MW) of Annex I of Council Directive 96/61/EC concerning integrated pollution prevention and control. The Recommended Determination (RD) takes account of the requirements of the Directive. In particular, Condition 7 provides conditions dealing with energy, water and raw material use, reduction and efficiency on-site. Conditions 9 and 10 deal with accidents, emergency response, decommissioning and residuals management at the installation. BAT is taken to be represented by the guidance given in the IPPC Reference Document on BAT (BREF) for Large Combustion Plants (May 2005). LARGE COMBUSTION PLANT DIRECTIVE 2001/80/EC The Large Combustion Plant Directive 2001/80/EC applies to combustion plants with a rated thermal input of equal to or greater than 50 MW, irrespective of the fuel used (solid, liquid or gaseous). Under Article 2(7)(j) gas turbines licensed before 27 November 2002 are exempt from the requirements of the Directive. The current licence (Reg. No. P ) was issued on 27 th October 1999, therefore the Directive is not applicable to this installation (Phase I). Notwithstanding the above, the licensee has compared the maximum emission concentrations sought in the review application to the NO x emission limits for gas turbines, which are specified in Annex VI.B of the LCP Directive. The requested emissions of 50mg/Nm 3 during gas firing and 125 mg/nm 3 during distillate oil firing are generally consistent with the limits specified in the Annex, which specify 50 mg/nm 3 (or 75 mg/nm 3 under certain circumstances) for gas firing and 120 mg/nm 3 for distillate oil firing, at 15% O 2 reference conditions and above 70% load. EUROPEAN COMMUNITIES (CONTROL OF MAJOR ACCIDENT HAZARDS INVOLVING DANGEROUS SUBSTANCES) REGULATIONS, 2006 (S.I. NO. 74 OF 2006) The Seveso Regulations apply to establishments where dangerous substances are present in amounts equal to or exceeding certain thresholds. S.I. No. 74 of 2006 introduced lower thresholds for the qualifying quantities of petroleum products stored at a site. The licensee has identified that the installation now falls under the scope of the Seveso Regulations as a lower tier establishment, which requires compliance with Articles 6 & 7 of the Seveso Directive 96/62/EEC. The National Authority for Occupational Safety and Health (NAOSH) is the competent authority responsible for administration and enforcement of these regulations. RECOMMENDED DETERMINATION AIR This review essentially involves the removal of two stacks references from the original licence i.e., the proposed main and bypass stacks associated with the Phase II CCGT, and the inclusion of revised volumetric limits for the existing stacks. In addition, the licensee has requested an increased NO x limit of 125 mg/nm 3 during distillate oil firing, compared to the currently specified 120 mg/nm 3. The emissions of NO x are below 50 mg/nm 3 during natural gas firing. This is the emission limit value specified in the current licence, therefore there will be no change to the ELV when firing on gas. The current licence specifies a SO x limit of 120 mg/nm 3 during distillate oil firing. The RD reduces this limit to 80 mg/nm 3, based on information supplied by the licensee. The impact of atmospheric emissions from the power station was previously assessed as part of the application for the original licence. The licensee has submitted a revised air dispersion modelling assessment, which takes account of more accurate measured data from this installation, updated predicted emissions from the proposed Phase II and a newer version of Page 4 of 8

5 ISC-3 model. The model has been used to predict the ground level concentrations of NO x and SO x based on the cumulative emissions from Phase I and the proposed Phase II installations. Overall, the modelling assessment concludes that atmospheric emissions from the power stations do not impact significantly on local air quality and will not lead to an exceedence of Air Quality Standards. The RD maintains the continuous monitoring requirement for stack emissions, and requires monitoring of sulphur dioxide and dust on a biannual basis. Condition 6 limits operation of the installation on distillate oil to occasions when there is an interruption to the gas supply or when otherwise agreed by the Agency. Condition 11 requires the licensee to maintain records on-site of periods during which the plant operates in two shift mode and of any other start-up or shut-down of the gas turbine. Minor Atmospheric Emissions A 10.35m 3 capacity hydrochloric acid storage tank was installed in July 2004 to allow for bulk storage of acid. An associated scrubber unit was installed to abate breathing losses. The HCl tank is filled three times per annum. While the HCl tank is not being filled, a pump operates for 1 minute every 15 minutes. This ensures the packing in the scrubber contains 10% weight of water, which is sufficient to absorb up to 3kg of HCl vapours. The licensee states that during periods of non-filling of the main tank, and with the scrubber pumps set to operate four times per hour, there is negligible flow into the scrubber, therefore the emission concentration is trace. Minor emissions to atmosphere from the auxiliary boiler, emergency generator, safety creep relief valve at the gas compound and breathing losses from the distillate oil storage tank were assessed during the original licence application stage and are not considered significant. EMISSIONS TO SEWER: There are no emissions to sewer from the installation. EMISSIONS TO WATERS: Process effluent and surface water run-off is discharged from the site into the adjacent quarry dewatering network which drains from Huntstown Quarry in a northeasterly direction and joins the Ward River at Owens Bridge, c.6km from the installation. The Ward River discharges to the sea at Swords. The licensee has requested an increased volumetric limit of 200 m 3 /day for trade effluent emissions to water. The current licence authorises a discharge of 168 m 3 /day. In addition, the licensee has requested increased concentration limits for total dissolved solids (2,000 mg/l compared to 1,300mg/l) and ammonia (5mg/l compared to 0.5mg/l). The licensee has assessed the assimilative capacity of the receiving water to accept the cumulative discharge from the Phase I and II power plants. There is sufficient assimilative capacity in the Ward River for the requested emissions. The RD maintains the same monitoring requirements for emissions to water as the current licence. Due to the sensitivity of the Ward River the following conditions are also included in the RD: the licensee shall assess methods to minimise emissions to water and maximise recycling and recovery as part of the Environmental Management System; and the licensee shall assess the feasibility of connection to the Local Authority drainage system for discharge of trade effluents. Page 5 of 8

6 SURFACE WATER: Surface water run-off from the installation drains via oil interceptors to a surface water inspection holding pond, prior to discharge at emission point D1 into the adjacent quarry drainage network. The surface water drainage systems for Phase I and Phase II are not entirely separate, therefore the monitoring point for surface water is shared and is identified as I-SW. The RD maintains the requirement on the licensee to carry out composite sampling of the surface water discharge, with quarterly monitoring of a range of specified parameters. Firewater Retention The current licence (Reg. No. P ) does not specify requirements in relation to firewater retention at the installation. Condition 3 of the RD requires the licensee to carry out a risk assessment to determine if the activity should have a firewater retention facility and to implement a suitable risk management programme in the event that a significant risk exists for the release of contaminated firewater. EMISSIONS TO GROUND There were no proposed discharges to ground at the time of the original licence application in Sanitary effluent from the administration and workshop buildings was to be treated on site to standards of 20 mg/l BOD 5 and 30 mg/l suspended solids using a proprietary bioaerator prior to discharge to the quarry drainage system. However, the installed biodisc treatment unit experienced difficulties in achieving the effluent licence limits, resulting in effluent being tankered off-site for disposal. On 12/07/05 the Agency approved the licensee s proposal to install a raised percolation bed to provide tertiary treatment of the sewage effluent from the biodisc unit (Ref. M483/C12MG01). The percolation bed came into operation in October In the review application, the licensee has carried out an assessment of the sanitary effluent treatment system capacity. The percolation bed is based on a load of 900 litres per day (30 30 litres/person/day) and 600 grams BOD/day (20 grams BOD/person/day). Based on predicted flow, there is sufficient capacity to treat the sanitary effluent associated with both Phase I and Phase II developments. Nonetheless, Condition 6 of the RD requires the licensee to reassess the treatment system capacity when the Phase II power plant becomes operational, and to undertake upgrading works as necessary in accordance with the Agency s Wastewater Treatment Manuals. The RD requires that the sanitary effluent treatment system be included in the site s maintenance programme, as required under Condition There are three wells on the Phase I site, one is an operational supply well, a second is a backup well and the third has been decommissioned. Schedule C requires the licensee to monitor the ph and conductivity of the raw water supply to the installation on a monthly basis, and to monitor total ammonia and total and faecal coliforms on a biannual basis. WASTE No new wastes will be generated as a result of the licence review. HCl contaminated water associated with the storage tank scrubber is removed for disposal off-site by a licensed waste disposal company. Waste recovery/disposal is controlled by licence conditions, which require the waste to be transferred to authorised waste recovery/disposal facilities. NOISE Results of the 2005 noise survey show that emissions from the power station are similar by day and night and are within the 55/45 db(a) limits specified in the current licence at noise sensitive locations. The company have received occasional noise complaints from neighbouring residents and have identified the noise source as ground-working associated with the construction of the Phase II development. The RD maintains the requirement for an annual noise survey, to be carried out in accordance with the Agency s guidance note. Page 6 of 8

7 HABITATS The installation is an existing site located on former agricultural land with no designated ecological status. There will be no impact on any designated sites as a result of the licence review. DECOMMISSIONING AND ENVIRONMENTAL LIABILITIES The current licence and amendment dated 02/09/05 do not require the licensee to prepare a Residuals Management Plan (RMP) for the decommissioning or closure of the site or part thereof, or to carry out an Environmental Liabilities Risk Assessment (ELRA) to address any liabilities from past or present activities. The RD includes standard conditions which require the licensee to prepare an RMP which shall be reviewed annually (Condition 10), and to carry out an ELRA which shall be reviewed as necessary to reflect any significant changes on site and in any case, every three years (Condition 12). FIT & PROPER PERSON ASSESSMENT The licensee s experience, technical abilities, financial and legal standing would qualify them as Fit & Proper Persons. COMPLIANCE RECORD: Five site inspections and one audit of this facility have been carried out since the licence was issued in Three notifications of non-compliance have been issued to the licensee in that time, relating to the use of un-approved waste contractors, inadequate bunding, and nonnotification of a new emission point associated with the HCl tank scrubber. Overall the site maintains a good level of compliance with the current licence Reg. No. P SUBMISSIONS / COMPLAINTS: No submissions were received in relation to this review application. Since issue of licence Reg. No. P , there have been a number of noise complaints received by the company, most recently in relation to construction of the Phase II power plant. CHARGES: The financial charges invoiced for 2005 and 2006 were 7,729 and 8,888 respectively. The annual charge proposed in the RD is 10,129. This reflects the predicted enforcement effort required for the installation and is in line with the charges proposed by the Office of Environmental Enforcement for RECOMMENDATION: I recommend that the Recommended Determination be issued subject to the conditions and for the reasons as drafted. Signed Aoife Loughnane Inspector, Office of Licensing & Guidance Procedural Note In the event that no objections are received to the Proposed Determination of the application, a licence will be granted in accordance with Section 87(4) of the Environmental Protection Agency Acts 1992 and 2003 as soon as may be after the expiration of the appropriate period. Page 7 of 8

8 Appendix A Revised site boundary: The outer perimeter of the entire site is marked in red and represents the Phase I boundary, with the exclusion of areas designated as Phase II which are marked in green e.g., new turbine building, new distillate oil storage tank & associated bund, new Phase II process effluent tank, new Phase II firewater tank and new workshop & storage area. Page 8 of 8

OFFICE OF LICENSING & GUIDANCE

OFFICE OF LICENSING & GUIDANCE OFFICE OF LICENSING & GUIDANCE INSPECTORS REPORT ON A LICENCE APPLICATION To: Directors From: MARIE O CONNOR - LICENSING UNIT Date: 19 April 2007 RE: Application for a Review of IPPC Licence from Cara

More information

VIRIDIAN POWER LIMITED

VIRIDIAN POWER LIMITED VIRIDIAN POWER LIMITED HUNTSTOWN POWER STATION PHASE II IPPC LICENCE APPLICATION SUPPORT DECEMBER 2005 EPA Export 25-07-2013:17:58:17 PB Power List of Revisions LIST OF REVISIONS Current Rev. Date Page

More information

A. Non-technical Summary

A. Non-technical Summary A. Non-technical Summary A non-technical summary of the application is to be included here. The summary should identify all environmental impacts of significance associated with the carrying on of the

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

The operation of combustion installations with a rated thermal input greater than 50MW at Whitegate (Corkbeg and Glanagow Townlands), County Cork

The operation of combustion installations with a rated thermal input greater than 50MW at Whitegate (Corkbeg and Glanagow Townlands), County Cork WHITEGATE POWER STATION ANNUAL ENVIRONMENTAL REPORT 2011 1 Contents 1 INTRODUCTION... 3 1.1 Name and Location of the Site... 3 1.2 IPPC Licence Registration Number... 3 1.3 Brief Description of Activities

More information

Rhode Peaking Power Plant. Annual Environmental Report 2008

Rhode Peaking Power Plant. Annual Environmental Report 2008 Rhode Peaking Power Plant Annual Environmental Report 2008 Table of Contents Subject Page Introduction 1 Summary Information Plant Operation Data 1 Emissions to Air 1 Emissions to Water 2 Waste 2 Energy

More information

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P Clogrennane Lime Ltd Toonagh Lime Works AER 2010 Licence # P0 771-01 Section 1 Overview. 3 1.0 Introduction 1.1 Description of Activities 1.2 Responsibility for Environmental Management 1.3 Environmental

More information

ATTACHMENT N o A1: NON-TECHNICAL SUMMARY

ATTACHMENT N o A1: NON-TECHNICAL SUMMARY ATTACHMENT N o A1: NON-TECHNICAL SUMMARY A1 INTRODUCTION Dairygold AgriBusiness Ltd is making an application to the Environmental Protection Agency for an Industrial Emissions Licence which relates to

More information

EPA Guidance for Licensees on Requests for Alterations to the installation/facility

EPA Guidance for Licensees on Requests for Alterations to the installation/facility EPA Guidance for Licensees on requests for alterations to the installation/facility ISSUE NO: 1 REVISION NO: 1 DATE OF ISSUE: 08/12/2014 EPA Guidance for Licensees on Requests for Alterations to the installation/facility

More information

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Headquarters, Johnstown Castle Estate, County Wexford, Ireland INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Licence Register Number: Applicant: Location of Activity: 564 Arthur P. Dinan Limited

More information

Waste Water Discharge

Waste Water Discharge Environmental Protection Agency An Ghnfomhakacht urn Chaomhnl Comhshaoii Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland Waste Water Discharge Certificate of Authorisation Certificate

More information

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21 CONTENTS PAGE 1 INTRODUCTION 3 2. GENERAL OVERVIEW OF THE ACTIVITY 4 3 DATA 3.1 Emissions to Atmosphere 4 3.2 Surface Water Emissions 5 3.3 Ground Water Sampling 8 3.4 Noise 8 3.5 Inspection of Valves

More information

ATTACHMENT E.3 EMISSIONS TO SEWER LOCATION OF EMISSION TO SEWER (IE DR-0003) Consent of copyright owner required for any other use.

ATTACHMENT E.3 EMISSIONS TO SEWER LOCATION OF EMISSION TO SEWER (IE DR-0003) Consent of copyright owner required for any other use. ATTACHMENT E.3 EMISSIONS TO SEWER LOCATION OF EMISSION TO SEWER (IE0310818-22-DR-0003) Page 152 of 217 Attachment E.3 Emissions to Sewer It is proposed that trade and foul effluent from the facility will

More information

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

IPC Licence P AER Report Waterford Crystal Springmount Dungarvan Co. Waterford

IPC Licence P AER Report Waterford Crystal Springmount Dungarvan Co. Waterford IPC Licence P0156-01 AER Report 2008 Waterford Crystal Springmount Dungarvan Co. Waterford 31 st March 2009-1 - Table of Contents Page No. 1.0 Introduction 3 1.1 Brief Description of Site Activities 1.2

More information

The detail of the two remaining stages as outlined by the licensee are as follows:

The detail of the two remaining stages as outlined by the licensee are as follows: Company United Fish Industries (UFI) Killybegs accepts fish trimmings and whole fish from the fish industry across Ireland and recovers fish-meal and fish-oil. The installation in Killybegs was established

More information

Annual Environmental Report ANNUAL ENVIRONMENTAL REPORT 2012

Annual Environmental Report ANNUAL ENVIRONMENTAL REPORT 2012 ANNUAL ENVIRONMENTAL REPORT 2012 Contents 1.0 Introduction...3 1.1 Site Activities... 3 1.2 Company Environmental Policy... 3 1.3 Organisation chart for Environmental Management... 3 2.0 Summary Information...4

More information

This Report has been cleared for submission to the Board by

This Report has been cleared for submission to the Board by 7 This Report has been cleared for submission to the Board by.- Article 1 1 (2)(b)(ii) response rec Site notice inspected: Fees) regulations 1994 to 2004. The installation is located in a rural area of

More information

MEMORANDUM. Members of the Board Technical Committee. DATE: 20/02/03 Objection to Proposed Determination for Galco Steel Limited, IPC Reg. No.

MEMORANDUM. Members of the Board Technical Committee. DATE: 20/02/03 Objection to Proposed Determination for Galco Steel Limited, IPC Reg. No. MEMORANDUM TO: FROM: Members of the Board Technical Committee DATE: 20/02/03 RE: Objection to Proposed Determination for Galco Steel Limited, IPC Reg. No. 632 Application Details Class of activity: Location

More information

INTEGRATED POLLUTION CONTROL LICENCE

INTEGRATED POLLUTION CONTROL LICENCE This licence was amended on 17 th September 2007 under Section 96(1) of the EPA Acts 1992 and 2003. The details of Amendment A must be read in conjunction with this licence. The amendment document is entitled

More information

OFFICE OF ENVIRONMENTAL SUSTAINABILITY

OFFICE OF ENVIRONMENTAL SUSTAINABILITY This report has been cleared for submission by Patrick Byrne. Eve O'Sullivan, 21/11/2016 11:33 OFFICE OF ENVIRONMENTAL SUSTAINABILITY ENVIRONMENTAL LICENS ING PROGRAMME TO: FROM: Programme Manager Marian

More information

OFFICE OF LICENSING & GUIDANCE

OFFICE OF LICENSING & GUIDANCE OFFICE OF LICENSING & GUIDANCE TO: REPORT OF THE TECHNICAL COMMITTEE ON OBJECTIONS TO LICENCE CONDITIONS Directors FROM: Technical Committee - LICENSING UNIT DATE: 11/07/06 RE: Objection to Proposed Determination

More information

In compliance with Art October 2001 PD issued: First party objection received: Third party objections: One, An Taisce,

In compliance with Art October 2001 PD issued: First party objection received: Third party objections: One, An Taisce, M E M O R A N D U M DATE: 1 March 2002 TO: FROM: RE: The Members of the Board Technical Committee Objection to a Proposed Determination (PD) for Electricity Supply Board Shannonbridge, Co Offaly. IPC Register

More information

This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/ :27

This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/ :27 This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/2014 16:27 OFFICE OF CLIMATE, LICENSING & RESOURCE USE. INSPECTORS REPORT ON A WASTE WATER DISCHARGE

More information

OFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH

OFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH This report has been cleared for submission to Director/Board by Breen Higgins. Grainne Power, 03/11/2015 14:44 OFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH INSPECTORS REPORT ON A WASTE WATER DISCHARGE

More information

Review Register Number: 565 Notice under Section 85(1)(b) issued: 12 June 2000

Review Register Number: 565 Notice under Section 85(1)(b) issued: 12 June 2000 M E M O R A N D U M DATE: 29 January 2001 TO: FROM: RE: Each Board Member Patrick Geoghegan Application from National By-Products, Casatleblake, Rosegreen, Cashel, Co. Tipperary for Review of IPC Licence

More information

The following documentation was tabled:

The following documentation was tabled: Extract from the 564th meeting of the Agency held on 21 November 2008, in Headquarters, Johnstown Castle Estate, CO Wexford. 3. Report on the Oral Hearing of the Objections to a Proposed Decision on a

More information

Mayo Renewable Power IPPC Licence Application. ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS

Mayo Renewable Power IPPC Licence Application. ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS Mayo Renewable Power IPPC Licence Application Attachment No. A ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS A.1. Installation and its Activities... 2 A.2. Raw and Auxilliary Materials... 2

More information

The Board of Directors Gerard Kelly Waterford Crystal Limited (Dungarvan) - Application for an IPCL.

The Board of Directors Gerard Kelly Waterford Crystal Limited (Dungarvan) - Application for an IPCL. M E M O R A N D U M DATE: 7 th May 1998 TO: FROM: RE: CC: The Board of Directors Gerard Kelly Waterford Crystal Limited (Dungarvan) - Application for an IPCL. Application Details: Waterford Crystal Limited

More information

DATE: 27 th March, 2002

DATE: 27 th March, 2002 MEMO TO: CC: Board of Directors FROM: Dara Lynott DATE: 27 th March, 2002 SUBJECT : Waste Recovery Services (Fermoy) Ltd. Application details Application Details Applicant: Waste Recovery Services (Fermoy)

More information

PLATIN PEAKER PLANT PROPOSAL

PLATIN PEAKER PLANT PROPOSAL PLATIN PEAKER PLANT PROPOSAL PUBLIC INFORMATION EVENT - 25 SEPTEMBER 2018 Thank you for coming to our information evening for SSE s proposed new peaker power generation plant at Platin, Carranstown, Duleek,

More information

ECO2 LINCS LTD SLEAFORD RENEWABLE ENERGY PLANT IPPC APPLICATION - NON TECHNICAL SUMMARY

ECO2 LINCS LTD SLEAFORD RENEWABLE ENERGY PLANT IPPC APPLICATION - NON TECHNICAL SUMMARY SLEAFORD RENEWABLE ENERGY PLANT IPPC APPLICATION - NON TECHNICAL SUMMARY ISSUE NUMBER 1 DATE 16/11/07 AUTHOR CHECKED SMO TME Title Page ISSUE NUMBER 1 DATE 16/11/07 AUTHOR CHECKED SMO TME Title Page TABLE

More information

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021)

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021) ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE0310818-30-DR-0021) SITE SERVICES LAYOUT SHEET 2 OF 2 (IE0310818-30-DR-0022) LOCATION OF EMISSION TO SURFACE WATER (IE0310818-22-DR-

More information

Doherty Brothers Timber Company Limited

Doherty Brothers Timber Company Limited Annual Environmental Report 2008 Doherty Brothers Timber Company Limited Licence Number: P0354-01 Report Date: 14 th September 2009 Report Number: 1010-09-01 Version 0 40 Coolraine Heights, Old Cratloe

More information

ESB Lough Ree Power IPPCL Review - Clarifications

ESB Lough Ree Power IPPCL Review - Clarifications ESB Lough Ree Power IPPCL Review - Clarifications For the purposes of EC Environmental Objectives (Landfill Directive) Regulations 1999/31/EC CONTENTS 1.ADDRESS...2 2.MAPS...3 3.TABLE B1(II).3 4.AL-SW1-ADF...5

More information

Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS

Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Lagan Cement Ltd. IPPC Licence Application Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Air Contents F.2.0 Air Emissions.3 Water

More information

ANNUAL ENVIRONMENTAL MANAGEMENT REPORT

ANNUAL ENVIRONMENTAL MANAGEMENT REPORT ORICA KOORAGANG ISLAND ANNUAL ENVIRONMENTAL MANAGEMENT REPORT NOVEMBER 2010 Revision Date Description Author Reviewer Approver 0 30/11/2010 2010 Annual Environmental Report S Woodroffe Sustainability Manager

More information

For inspection purposes only. Consent of copyright owner required for any other use. EPA Export :00:52:48

For inspection purposes only. Consent of copyright owner required for any other use. EPA Export :00:52:48 EPA Export 26-07-2013:00:52:48 Premier Proteins (2000) Ltd. White Young Green 1.0 Non-Technical Summary of IPPC Licence Application (Site Code: 004097) and NHA (Site Code 000222). Premier (2000) Proteins

More information

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21 CONTENTS PAGE 1 INTRODUCTION 3 2. GENERAL OVERVIEW OF THE ACTIVITY 4 3 DATA 3.1 Emissions to Atmosphere 5 3.2 Surface Water Emissions 6 3.3 Ground Water Sampling 8 3.4 Noise 10 3.5 Inspection of Valves

More information

Essidev SA Trading as Organic Lens Manufacturing IPPC License P Annual Environmental Report 2008

Essidev SA Trading as Organic Lens Manufacturing IPPC License P Annual Environmental Report 2008 ESSIDEV SA T/A ORGANIC LENS MANUFACTURING IPPC Licence P-0061-03 Essidev SA Trading as Organic Lens Manufacturing IPPC License P0061-03 Annual Environmental Report 2008 2 Contents Section 1 INTRODUCTION

More information

ANNUAL ENVIRONMENTAL REPORT

ANNUAL ENVIRONMENTAL REPORT ANNUAL ENVIRONMENTAL REPORT JANUARY 2017 TO DECEMBER 2017 Licence Registration Number: PO357-01 Licensee: Cross Vetpharm Group Ltd Location of Activity: Attention: Airton Close, Tallaght Dublin 24. Office

More information

TUAM WASTE WATER DISCHARGE LICENCE APPLICATION

TUAM WASTE WATER DISCHARGE LICENCE APPLICATION GALWAY COUNTY COUNCIL TUAM WASTE WATER DISCHARGE LICENCE APPLICATION NOTICE RESPONSE REGULATION 18(3)(B) July 2009 Report Conlrol Sheet FORM 214 Rev 000 Ryan Hanley conruhing engineers IS0 9001 2000 Quality

More information

Cory Riverside Energy. Riverside Resource Recovery Facility

Cory Riverside Energy. Riverside Resource Recovery Facility Cory Riverside Energy Riverside Resource Recovery Facility Annual Performance Report: 2016 Environmental Permit: BK0825IU Riverside Resource Recovery Ltd Norman Road Belvedere DA17 6JY 1 1. Introduction

More information

EPA Application Form

EPA Application Form EPA Application Form 9.1 - Environmental Management Techniques - Attachment Organisation Name: Glanway Ltd Application I.D.: LA 001486 Page 1 of 17 Amendments to this Application Form Attachment Version

More information

Loy Yang B Environment Improvement Plan

Loy Yang B Environment Improvement Plan Loy Yang B Environment Improvement Plan 2017 Table of Contents 1 Endorsement 1 2 Environment Policy 2 3 Operating Arrangements 3 4 Site Management and Business Systems 4 5 Environmental Impacts and Risks

More information

INTEGRATED POLLUTION CONTROL LICENCE

INTEGRATED POLLUTION CONTROL LICENCE Headquarters, Johnstown Castle Estate, County Wexford, Ireland INTEGRATED POLLUTION CONTROL LICENCE Licence Register Number: 607 Licensee: Location of Activity: Electricity Supply Board Tarbert Generating

More information

Form PPC1 Part B : Application for a permit. B1 About the installation

Form PPC1 Part B : Application for a permit. B1 About the installation Form PPC1 Part B : Application for a permit FOR SEPA USE ONLY Name Assigned to Installation Application Reference Use this part of the form if you are applying for a new permit. When completing the form

More information

Notice of variation with introductory note

Notice of variation with introductory note Notice of variation with introductory note Environmental Permitting (England & Wales) Regulations 2010 Cleansing Service Group Limited CSG Sealand Treatment Plant Tamar View Industrial Estate Saltash Cornwall

More information

Attachment A.1 Non Technical Summary

Attachment A.1 Non Technical Summary Attachment A.1 Non Technical Summary Waste Licence Application - Dublin WtE 060706 Page 1 of 232 ATTACHMENT A1 NON TECHNICAL SUMMARY A.1.1 Nature of Facility Dublin City Council (the Authority) acting

More information

Hazardous Substances. 9. Hazardous Substances. Explanatory Statement

Hazardous Substances. 9. Hazardous Substances. Explanatory Statement Hazardous Substances 9. Hazardous Substances Explanatory Statement The Western Bay of Plenty District is predominantly rural land in farming and horticulture and has a number of small urban centres containing

More information

A proposed new gas-fired power station on the Wilton International site

A proposed new gas-fired power station on the Wilton International site TEES CCPP PROJECT A proposed new gas-fired power station on the Wilton International site Welcome This event is intended to provide you with information about the proposed Tees Combined Cycle Power Plant

More information

(Consolidated Version) 1 of COUNCIL DIRECTIVE ON WASTE

(Consolidated Version) 1 of COUNCIL DIRECTIVE ON WASTE (Consolidated Version) 1 of COUNCIL DIRECTIVE ON WASTE THE COUNCIL OF THE EUROPEAN COMMUNITIES,... HAS ADOPTED THIS DIRECTIVE: For the purposes of this Directive: Article 1 (a) "waste" shall mean any substance

More information

OFFICE OF CLIMATE, 11 LICENSING & RESOURCE USE

OFFICE OF CLIMATE, 11 LICENSING & RESOURCE USE h bh Mrn&t m c8mnh c&ml This report has 5 been cleared for submission to the Board by Frank CII ton, P ogramme Manager Signed Date db 1 I I,&Q OFFICE OF CLIMATE, 11 LICENSING & RESOURCE USE FROM: Caroline

More information

The applicant has estimated a total of vehicle movements per day.

The applicant has estimated a total of vehicle movements per day. INSPECTORS REPORT WASTE LICENCE REGISTER NUMBER 147-1 Ashgrove Plant Limited (trading as Ashgrove Recycling) Churchfield Industrial Estate, Cork Recommendation: That a Licence subject to condition be granted

More information

CARLOW COUNTY COUNCIL GUIDANCE NOTE FOR APPLICANT AIR LICENCE

CARLOW COUNTY COUNCIL GUIDANCE NOTE FOR APPLICANT AIR LICENCE CARLOW COUNTY COUNCIL GUIDANCE NOTE FOR APPLICANT AIR LICENCE AIR POLLUTION ACT, 1987 1. GENERAL Under the Air Pollution Act, 1987, certain industrial processes have been identified as having a potential

More information

Non-Technical Summary

Non-Technical Summary Construction of a 410 MW Combined Cycle Gas Turbine Power Unit at the existing Combined Heat and Power Plant in Krasnodar (Subsidiary of OAO UGK TGK-8 ), Russian Federation Non-Technical Summary February

More information

26 th October 2016 IPPC Licence No: W Company. Re: Request for Technical Amendment

26 th October 2016 IPPC Licence No: W Company. Re: Request for Technical Amendment RILTA Environmental Ref: ENV3716.epa E-Mail: conor_wall@clearcircle.com 26 th October 2016 IPPC Licence No: W0192-03 Company RILTA Environmental Limited Subject Re: Request for Technical Amendment Dear

More information

Low Emission Water/Steam Cycle A Contribution to Environment and Economics. Peter Mürau Dr. Michael Schöttler Siemens Power Generation, (PG) Germany

Low Emission Water/Steam Cycle A Contribution to Environment and Economics. Peter Mürau Dr. Michael Schöttler Siemens Power Generation, (PG) Germany Low Emission Water/Steam Cycle A Contribution to Environment and Economics Peter Mürau Dr. Michael Schöttler Siemens Power Generation, (PG) Germany Page 1 of 17 Abstract Avoiding emissions is a general

More information

WESTPORT, CO. MAYO, IRELAND.

WESTPORT, CO. MAYO, IRELAND. - c. ALLERCAN GEE PHARMACEUTICALS IRELAND TELEPHONE: +353-98-25222 TELEFAX: +353-98-25791 WEB SITE: www.allergan.com WESTPORT, CO. MAYO, IRELAND. Office of Climate, Licensing & Resource Use, EPA Headquarters,

More information

Cory Environmental. Riverside Resource Recovery Facility

Cory Environmental. Riverside Resource Recovery Facility Cory Environmental Riverside Resource Recovery Facility Annual Performance Report: 2015 Environmental Permit: BK0825IU Riverside Resource Recovery Ltd Norman Road Belvedere DA17 6JY 1 1. Introduction The

More information

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY S1481-0320-0004IRT Levenseat Waste Management - Non-Technical Summary Page 1 LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY Document Production &

More information

For inspection purposes only.

For inspection purposes only. Inf o-la b a. huberom group I Info-Lab Ltd. - Unit 14 * Annacotty Industrial Estate * Annacotty * Co. Limerick * Ireland 10/11/09 Info-Lab Ltd. Unit 14, Annacotty Industrial Estate, Annacotty, Co. Limerick,

More information

Integrated Pollution Prevention and Control (IPPC) Licensing

Integrated Pollution Prevention and Control (IPPC) Licensing Integrated Pollution Prevention and Control (IPPC) Licensing Application Form EPA Reg. N o : (Office use only) Environmental Protection Agency P.O. Box 3000, Johnstown Castle Estate, Co. Wexford Lo Call:

More information

Delvin Wastewater Treatment Plant

Delvin Wastewater Treatment Plant Delvin Wastewater Treatment Plant WWDL No. D0267-01 ANNUAL ENVIRONMENTAL REPORT 2011 County Buildings Mullingar Co. Westmeath Phone: 04493-32000 Fax: 04493-42330 Delvin Waste Water Discharge Licence (EPA

More information

ANNUAL ENVIRONMENTAL REPORT THE HAMMOND LANE METAL COMPANY LTD. IED Licence P

ANNUAL ENVIRONMENTAL REPORT THE HAMMOND LANE METAL COMPANY LTD. IED Licence P ANNUAL ENVIRONMENTAL REPORT for THE HAMMOND LANE METAL COMPANY LTD IED Licence P0997-01 2016 Table of Contents 1. INTRODUCTION... 4 1.1 Facility Details... 4 1.2 Licenced Waste Activities... 4 1.3 Waste

More information

Integrated Pollution Prevention & Control Licence Review

Integrated Pollution Prevention & Control Licence Review Integrated Pollution Prevention & Control Licence Review Johnson & Johnson Vision Care Ireland Attachment A1 Non Technical Summary This is a summary, in non-technical language, of the information provided

More information

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 (formerly referenced by 08-01) Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 DETERMINATION OF TREATMENT

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Bantry Licence Register No. D0168-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.

More information

Cory Environmental. Riverside Resource Recovery Facility

Cory Environmental. Riverside Resource Recovery Facility Cory Environmental Riverside Resource Recovery Facility Annual Performance Report: 2014 Environmental Permit: BK0825IU Riverside Resource Recovery Ltd Norman Road Belvedere DA17 6JY 1 1. Introduction The

More information

Irish Distillers - For inspection purposes only.

Irish Distillers - For inspection purposes only. Irish Distillers - Noeleen Roche Licensing Unit Environmental Protection Agency PO Box 3000 Johnstown Castle Estate Co. Wexford 07 December 2006 Your Ref.: Reg No: 442 Dear Ms Roche, Submission on IPPC

More information

1 Environmental Protection Agency An Ghoiornhoireacht urn Chaoinhnii Cornhrhooil

1 Environmental Protection Agency An Ghoiornhoireacht urn Chaoinhnii Cornhrhooil 1 Environmental Protection Agency An Ghoiornhoireacht urn Chaoinhnii Cornhrhooil County Secretary Limerick County Council County Hall Dooradoyle County Limerick Attention: Director of Services (with responsibility

More information

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3 DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3 This chapter provides details regarding the scope of the proposed Gourikwa Power Station and Transmission Integration

More information

Annual Environmental Report 2015

Annual Environmental Report 2015 Annual Environmental Report 2015 Agglomeration Name: Licence Register. D0063-01 Blessington Table of Contents Section 1. Executive Summary and Introduction to the 2015 AER 1 1.1 Summary report on 1 Section

More information

Mr Pat Waters Manager Cooksgrove Limited trading as Euro Farm Foods Cooksgrove Duleek County Meath

Mr Pat Waters Manager Cooksgrove Limited trading as Euro Farm Foods Cooksgrove Duleek County Meath I Environmental Protection Agency An Ghniomhorreocht om Chaomhnu Comhrhaorl Mr Pat Waters Manager Cooksgrove Limited trading as Euro Farm Foods Cooksgrove Duleek County Meath Regional Inspectorate McCumiskey

More information

Guidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences

Guidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences Guidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences Environmental Protection Agency An Ghníomhaireacht um Chaomhnú Comhshaoil P.O. Box 3000, Johnstown

More information

Questionnaire (Conventional Energy)

Questionnaire (Conventional Energy) Questionnaire (Conventional Energy) QUESTIONNAIRE FOR CONVENTIONAL ENERGY (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions as completely

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Licence Register No. D0302-01 Dromahane and Environs Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on

More information

Hazardous Substances Hazardous Substances Explanatory Statement Significant Issues Objective and Policies...

Hazardous Substances Hazardous Substances Explanatory Statement Significant Issues Objective and Policies... Section Contents Hazardous Substances... 2 9. Hazardous Substances... 2 Explanatory Statement... 2 9.1 Significant Issues... 3 9.2 Objective and Policies... 3 9.3 Activity Lists... 4 9.4 Quantity thresholds

More information

RE: Application from Monery By-Products (2000) Limited, Crosssdoney, Co. Cavan for Review of IPC Licence Reg. No. 365

RE: Application from Monery By-Products (2000) Limited, Crosssdoney, Co. Cavan for Review of IPC Licence Reg. No. 365 M E M O R A N D U M DATE: 11 January 2001 TO: FROM: Each Board Member Leo Sweeney RE: Application from Monery By-Products (2000) Limited, Crosssdoney, Co. Cavan for Review of IPC Licence Reg. No. 365 Application

More information

EPA Report on the investigation of the Lime spill incident which occurred at the Dublin Waste to Energy Facility, Poolbeg on 7 th June 2017.

EPA Report on the investigation of the Lime spill incident which occurred at the Dublin Waste to Energy Facility, Poolbeg on 7 th June 2017. EPA Report on the investigation of the Lime spill incident which occurred at the Dublin Waste to Energy Facility, Poolbeg on 7 th June 2017. Summary Dublin Waste to Energy Limited (hereafter referred to

More information

Table 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006

Table 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006 Table 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006 With respect to the Conclusions on BAT for this horizontal BREF, the details of applicability and status

More information

ATTACHMENT No. E EMISSIONS TABLE OF CONTENTS

ATTACHMENT No. E EMISSIONS TABLE OF CONTENTS ATTACHMENT No. E EMISSIONS TABLE OF CONTENTS E.1. Emissions to Atmosphere...2 E.2. Emissions to Surface Waters...6 E.3. Emissions to Sewer...8 E.4. Emissions to Ground...8 E.5. Noise Emissions...8 E -

More information

DRINKING WATER WORKS PERMIT

DRINKING WATER WORKS PERMIT DRINKING WATER WORKS PERMIT Permit Number: 076-201 Issue Number: 3 Pursuant to the Safe Drinking Water Act, 2002, S.O. 2002, c. 32, and the regulations made thereunder and subject to the limitations thereof,

More information

Poolbeg Generating Station

Poolbeg Generating Station Poolbeg Generating Station Annual Environmental Report For the period of 1 st January to 31 st December 2011 Table of Contents 1. Introduction 3 1.1 IPPC licence number 3 1.2 Name and Location of site

More information

DIRECTIVE 2006/12/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 5 April 2006 on waste

DIRECTIVE 2006/12/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 5 April 2006 on waste 27.4.2006 EN Official Journal of the European Union L 114/9 DIRECTIVE 2006/12/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 5 April 2006 on waste (Text with EEA relevance) THE EUROPEAN PARLIAMENT

More information

Licence application received: 26/2/99 Notices under article 11(2)(b)(ii) issued: 22/4/99, 19/5/99

Licence application received: 26/2/99 Notices under article 11(2)(b)(ii) issued: 22/4/99, 19/5/99 M E M O R A N D U M DATE: 11 June 1999 TO: Each Board Member FROM: Dr. Ken Macken RE: Submission on application for IPC licence from Edenderry Power Ltd., Ballykilleen, Edenderry, Co. Offaly. Reg. No.

More information

DREHID MECHANICAL BIOLOGICAL TREATMENT FACILITY WASTE LICENCE APPLICATION ATTACHMENTS JUNE 2012

DREHID MECHANICAL BIOLOGICAL TREATMENT FACILITY WASTE LICENCE APPLICATION ATTACHMENTS JUNE 2012 DREHID MECHANICAL BIOLOGICAL TREATMENT FACILITY WASTE LICENCE APPLICATION ATTACHMENTS JUNE 2012 TOBIN CONSULTING ENGINEERS ATTACHMENTS TO WASTE LICENCE APPLICATION Prepared on behalf of: Bord na Móna Plc.

More information

OFFICE OF LICENSING & GUIDANCE

OFFICE OF LICENSING & GUIDANCE OFFICE OF LICENSING & GUIDANCE TO: REPORT OF THE TECHNICAL COMMITTEE ON OBJECTIONS TO LICENCE CONDITIONS Directors FROM: Technical Committee - LICENSING UNIT DATE: 02 November 2004 RE: Objection to Proposed

More information

Environmental Assessment Report

Environmental Assessment Report TE-TO AD SKOPJE Combined Cycle Co-Generation Power Plant Project Skopje Environmental Assessment Report ENVIRONMENTAL MANAGEMENT PLAN Thermal Energy Plants Department Combined Cycle Co-Generation Power

More information

Facility Information Summary AER Reporting Year

Facility Information Summary AER Reporting Year 1 Facility Information Summary AER Reporting Year 2016 Licence Register Number P0690-02 Name of site C&F Automotive Ltd T/A Iralco Site Location Collinstown, Mullingar, Co Westmeath NACE Code 2561 Class/Classes

More information

INSPECTORS REPORT DRAFT PD REGISTER NUMBER

INSPECTORS REPORT DRAFT PD REGISTER NUMBER INSPECTORS REPORT DRAFT PD REGISTER NUMBER 156-1 Applicant: KTK Sand and Gravel Ltd. Facility: Kimmeens, Ballymore Eustace, Co. Kildare Inspector s Recommendation: The licence be granted subject to conditions.

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Ballybay Licence Register. D0207-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.

More information

Environmental. Environmental Permits (EP) are required to operate an energy from waste facility within England and Wales. Guide page 32.

Environmental. Environmental Permits (EP) are required to operate an energy from waste facility within England and Wales. Guide page 32. Environmental Permitting Environmental Permits (EP) are required to operate an energy from waste facility within England and Wales. 1.0 Environmental Permitting 2.0 Waste inputs 3.0 Process control 4.0

More information

Annual Environmental Report 2013

Annual Environmental Report 2013 Annual Environmental Report 2013 For Woodland Products Ltd., Drumully, Emyvale, Co. Monaghan IPPC Reg. No. P0198-01 By QED Engineering Ltd., M-TEK Building 1 Armagh Road Monaghan July 2014 Table of Contents

More information

APPENDIX H AIR DISPERSION MODELLING REPORT BY PROJECT MANAGEMENT LTD. (REF. CHAPTER 11 AIR QUALITY AND CLIMATIC FACTORS)

APPENDIX H AIR DISPERSION MODELLING REPORT BY PROJECT MANAGEMENT LTD. (REF. CHAPTER 11 AIR QUALITY AND CLIMATIC FACTORS) 101050.22.RP.0001 A Environmental Impact Statement 15 th April 2005 APPENDIX H AIR DISPERSION MODELLING REPORT BY PROJECT MANAGEMENT LTD. (REF. CHAPTER 11 AIR QUALITY AND CLIMATIC FACTORS) S:\Projects\190900\101050

More information

Proposed Power Plant at Derrygreenagh, Co. Offaly Environmental Impact Statement N

Proposed Power Plant at Derrygreenagh, Co. Offaly Environmental Impact Statement N 1 Introduction 1.1 Introduction Bord Na Móna Energy Ltd () commissioned Limited (MMP) to prepare an (EIS) and planning application for the proposed construction of a power plant development at Derrygreenagh,

More information

Carton Bros Ltd Darkely, Shercock, Co Cavan. For inspection purposes only.

Carton Bros Ltd Darkely, Shercock, Co Cavan. For inspection purposes only. emion Bro$. Lilllilccl, Shcrcock. Co, Ctv,lII, Ild,lnd. 'fi:i: 042 %6 'J171 0-12%91100 Ell(: u12 'J{lll 9698 12.01OTE 31" July 2012 Ms Sonja Smith Administration Officer Office of Climate, Licensing &

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK for the Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT May 2011 INTRODUCTION The World Bank, through IDA funding, is proposing

More information

Risk Management Measures

Risk Management Measures Risk Management Measures Legal Entity: Site: ISD Kokszoló Kft ISD Kokszoló Kft Substance: (coal), coke-oven / 65996-78-3 Registration number: 01-2119519215-46-0039 Date: 15 December 2012 Information on