UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. MSc CIVIL ENGINEERING SEMESTER TWO EXAMINATION 2015/2016 URBAN DRAINAGE SYSTEMS MODULE NO: BLT4022
|
|
- Leon Joseph
- 5 years ago
- Views:
Transcription
1 TW5 UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING MSc CIVIL ENGINEERING SEMESTER TWO EXAMINATION 015/016 URBAN DRAINAGE SYSTEMS MODULE NO: BLT40 Date: Tuesday 17 May 016 Time: INSTRUCTIONS TO CANDIDATES: There are FIVE questions. Answer FOUR questions. All questions carry equal marks. Marks for parts of questions are shown in brackets. This examination paper carries a total of 100 marks. All working must be shown. A numerical solution to a question obtained by programming an electronic calculator will not be accepted. A formula sheet and HRS tables are attached.
2 Page of 16 School of Engineering Semester Two Examination 015/016 Module No. BLT40 Question 1 a) Describe the natural purification processes taking place in a river reach and their contribution in reducing pollution in rivers. (5 marks) b) Explain your understanding of River Environmental Standards and Compliance Assessment of a river reach and who issue and oversee them (5 marks) c) The figure below shows two reaches of a river which serves as receiving water for a nearby town drainage system. The river receives final effluent from the town treatment work (FE), a combined sewer overflow (CSO), a Surface Water Outfall (SWO) and a runoff flow from rural catchment (CFB) at different locations as illustrated in Figure Q1. For a particular moment of time the values of flow and concentrations of the BOD, NH4 & DO for these inputs, as well as for the upstream end of the river reach (RBF), are given in Table 1. The percentage increase or decrease for the concentrations of BOD, NH4 & DO, due to the natural biochemical processes within the two reaches, is given in Table. i) Using the principle of mass balance and natural biochemical processes, find the concentrations of BOD, NH4 and DO in the river at locations P1, P, P3 and P4. (10 marks) ii) Carry out compliance assessment for the two reaches against the UK UPM standards for fishery (shown in Table 3) at same locations mentioned in (i). (5 marks) CFB SWO FE CSO RBF P3 P P1 P4 Reach1 3 Figure Q1 Question 1 continued over the page 1
3 Page 3 of 16 School of Engineering Semester Two Examination 015/016 Module No. BLT40 Question 1 continued Table 1: Input Data Input Name Flow C BOD C NH4 C DO m 3 /sec mg/l mg/l mg/l River Base Flow (RBF) Final Effluent (FE) Combined Sewer Overflow (CSO) Surface Water Outfall (SWO) Catchment Flow Boundary (CFB) Table : Effects of Biochemical Processes Process Reach1 Reach DO Percentage Increase by Aeration 0 15 DO Percentage Decrease by Biodegradation & Nitrification BOD Percentage Decrease by Biodegradation NH4 Percentage Decrease by Nitrification Table 3: Pollution Standards UPM Standards for Fishery Pass Fail DO >=5 <5 NH4 <=4 >4 Total 5 marks Please turn the page
4 Page 4 of 16 School of Engineering Semester Two Examination 015/016 Module No. BLT40 Question a) Explain the principles of sediment transportation. (8 marks) b) An 18m wide channel has a bed slope of The particles in the channel have a density of 50kg/m 3 and the particle size d 50 = 1.30mm. During a storm event the flow in the channel is raised to 5.8m 3 /s. Assuming uniform flow conditions, and µ: 1.14*10-3 ms/kg, determine whether sediment transportation occurs and if so whether particles are in bed-load or suspended load. (17 marks) Question 3 Total 5 marks Critically comment upon the shortcomings of conventional approaches to urban drainage design and outline the alternative sustainable techniques. Comment on the design and other issues that currently prevent their wider use. Discuss what systemic changes may be required to ensure their wider acceptance. Question 4 Total 5 marks a) Discuss the parameters that affect catchment response to rainfall in a rural area. Explain how urbanisation can impact some of these parameters and the consequence of this impact on the runoff hydrograph. (10 marks) b) Discuss the structural and non-structural mitigation measures of urbanisation impacts on a runoff hydrograph and give two examples for each of these measures. (10 marks) c) Explain your understanding for the concept of catchment modelling and differentiate between Blackbox, Conceptual and Physically-based mathematical models. (5 marks) Total 5 marks Please turn the page
5 150m Page 5 of 16 School of Engineering Semester Two Examination 015/016 Module No. BLT40 Question 5 a) For Site A in Figure 5A, provide a preliminary sketch for a storm drainage design. Assume a 75% runoff rate from grounds. Comment on all assumptions made. (9 marks) 100m 99.8m 99.6m 99.54m Building footprint and roof ridges 99.4m Site A boundary 170m Figure 5A - Site A Question 5 continued over the page
6 Page 6 of 16 School of Engineering Semester Two Examination 015/016 Module No. BLT40 Question 5 continued. b) During setting out and construction of the manholes on Site B the original drainage design was misinterpreted. The storm drains are now required to be connected into the Combined Sewer manhole MH C, see Figure 5B. i) Complete the Site B drainage scheme in Tables 5B-1 and 5B- by selecting suitable pipe diameters and gradients to accommodate a 1 in 0year storm event. (HRS tables and rainfall charts are provided). (1 marks) ii) Using Building Regulation Part H, state the bedding and surround requirements for all pipes in the storm drainage network. (3 marks) Total 5 marks Please turn the page
7 Page 7 of 10 MHC1 MHC MH MH3 1.0 MH4 Grassed area to drain through infiltration due to very permeable soil conditions MH1 MH5 Building footprint 36m 5m Site B boundary
8 School of Engineering Semester Two Examination 015/016 Module No. BLT40 Page 8 of 16 Manhole No. Cover level (m) Site B - Manhole Schedule Invert level (m) Ground catchment area (Ha) Roof catchment area (Ha) MH MH MH MH MH MTC n/a n/a MHC n/a n/a Table 5B-1 Table Q5B-1. To be handed in with answer book Candidate ID No... Please turn the page
9 School of Engineering Semester Two Examination 015/016 Module No. BLT40 Page 9 of 16 Pipe No Pipe Length (m) Pipe gradient (1 in ) Pipe fall (m) Vel (m/s) Time of flow (min) Time of Conc. (min) Rate of rainfall i (mm/hr) Imp. Area (ha) Cumulative Imp. Area (ha) Flow Q (l/s) Pipe dia. (mm) Pipe capacity (l/s) Table Q5B-. To be handed in with answer book Candidate ID No... END OF QUESTIONS Please turn the page
10 Page 10 of 16 School of Engineering Semester Two Examination 015/016 Module No. BLT40 Formula A = DWF P + E l/d DWF = PG + I + E D MIN = 0.7 Q MAX 0.4 F r = 4.06 Q 0.5 gd 5 Q O = C D x A O x ( x g x H O ) 0.5 Formula sheet H O = 1.D + 0.5D O C D = db Do u db - D o d B =.5 x D MIN, L = 7 x D MIN s = 0.8D + D O Q w = C Qw H w = C C 1 = 3 1 C d d 3 Q C 3 3/ g LH w w g L Q C 3 w 3,C gl s K 1,C 3 gl t K, C d = 0.7, K 1, K =.0 h f = S o x L n=(sinθ)d 1/6, τ o = ρgrs V = τ o ρ τ = τ O ρ(s 1)gd s Please turn the page
11 School of Engineering Semester Two Examination 015/016 Module No. BLT40 Page 11 of 16
12
13 Page 13 of 16 School of Engineering Semester Two Examination 015/016 Module No. BLT40
14
15
16
UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. MSc CIVIL ENGINEERING SEMESTER TWO EXAMINATION 2017/2018 URBAN DRAINAGE SYSTEMS MODULE NO: BLT4022
[ESS29] UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING MSc CIVIL ENGINEERING SEMESTER TWO EXAMINATION 2017/2018 URBAN DRAINAGE SYSTEMS MODULE NO: BLT4022 Date: Monday 21 st May 2018 Time: 10:00 13:00 INSTRUCTIONS
More informationUNIVERSITY OF BOLTON WESTERN INTERNATIONAL COLLEGE FZE BENG (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 2015/2016
OCD63 UNIVERSITY OF BOLTON WESTERN INTERNATIONAL COLLEGE FZE BENG (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 015/016 WATER ENGINEERING AND THE ENVIRONMENT MODULE NO: CIE601 Date: 15 January 016
More informationLearning objectives. Upon successful completion of this lecture, the participants will be able to:
Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design
More informationSanitary Sewer Design. Sanitary Sewers, Page 1
Sanitary Sewer Design Sanitary Sewers, Page 1 Sanitary Sewers, Page 2 Sanitary Sewer Design sanitary sewers collect and transport domestic and industrial wastes via gravity flow the ultimate destination
More informationCIE4491 Lecture. Quantifying stormwater flow Rational method
CIE4491 Lecture. Quantifying stormwater flow Rational method 27-5-2014 Marie-claire ten Veldhuis, Watermanagement Department Delft University of Technology Challenge the future Robust method stationary
More informationSECTION-I. b) Write a short note on pumping of savage. 4
UNIVERSITY OF PUNE [4364]-401 B. E. (Civil Engineering Semester I) Examination - 2013 ENVIRONMENTAL ENGINEERING-II (2008 Pattern) [Total No. of Questions :12] [Total No. of Printed Pages :4] [Time : 3
More informationCourse: Wastewater Management
Course: Wastewater Management Prof. M. M. Ghangrekar Questions 1 1. Describe advantages and disadvantages offered by the water carriage system. 2. What are the possible adverse effects when untreated or
More informationStorm Sewer Design - Introduction
Class 4 [1] Storm Sewer Design - Introduction As urban drainage can not be expected to accommodate all rainfall events, the first step in the design procedure is to select an appropriate design storm.
More informationStorm Sewers, Page 2
Storm Sewers storm sewer systems are dendritic systems used to collect and direct stormwater runoff storm sewer systems are integral components of any urban infrastructure curbs, gutters and storm inlets
More informationThe Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management
The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives
More information6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON
6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON
More informationSTORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR:
Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT Proposed Row House Complex Clare and
More informationFoul Water Drainage Strategy Monkton Road Minster CT12 4EE
66-68 Monkton Road Minster CT12 4EE RMB Consultants (Civil Engineering) Ltd May 2016 RMB Consultants (Civil Engineering) Ltd 39 Cossington Road Canterbury Kent CT1 3HU Tel 01227 472128 www.rmbconsultants.co.uk
More informationSite Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario
Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario Prepared for The C and C Group of Companies Attention: Mr. Bob Cousins
More informationModule 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains
Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7: Hydraulic Design of Sewers and Storm Water Drains 7.0 HYDRAULIC DESIGN OF SEWERS AND STORM WATER DRAINS 7.1 General Consideration
More informationSt. Boniface Industrial Park Phase 2 Municipal Servicing Report
St. Boniface Industrial Park Phase 2 Municipal Servicing Report Prepared for: City of Winnipeg Prepared by: Stantec Consulting Ltd. File: 116809351 November 5, 2015 ST. BONIFACE INDUSTRIAL PARK PHASE 2
More informationSite Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario
Site Servicing & Stormwater Management Report for Site Plan Control Application Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Prepared for: Martin Clement Attention: Mr. Martin
More informationFlood Risk Assessment. for. Proposed Residential Development at Bentletts Scrap Yard Claygate Road Collier Street Kent
Flood Risk Assessment for Proposed Residential Development at Bentletts Scrap Yard Claygate Road Collier Street Kent 1129-1008 February 2016 RCD Consultants Ltd Proposed Residential Development Bentletts
More informationHOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT. Prepared for: David Johnston Architect. Prepared By:
HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI
More informationLearning objectives. Upon successful completion of this lecture, the participants will be able to describe:
Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network
More informationEPA Waste Water Discharge Licence Application
Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update
More informationDESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.
Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to
More informationCEE 371 May 14, 2009 Final Exam
CEE 371 May 14, 2009 Final Exam Closed Book, two sheets of notes allowed Please answer questions 3, 6 and 7. In addition, answer either question 1 or 2, and answer either question 4 or 5. The total potential
More informationWASTEWATER & STORM WATER COLLECTION AND REMOVAL
CVE 471 WATER RESOURCES ENGINEERING WASTEWATER & STORM WATER COLLECTION AND REMOVAL Assist. Prof. Dr. Bertuğ Akıntuğ Civil Engineering Program Middle East Technical University Northern Cyprus Campus CVE
More informationModule 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains
1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper
More informationSummary of Detention Pond Calculation Canyon Estates American Canyon, California
July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i
More informationNew Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario
New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S
More informationVALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING Question Bank CE2354 - ENVIRONMENTAL ENGINEERING - II Prepared By: Year: 3rd year Semester: 6th Semester R.THENMOZHI / A.P.Civil J.SHANMUGAPRIYA
More informationD. B. G R A Y E N G I N E E R I N G I N C.
STORMWATER MANAGEMENT REPORT 22 Perkins Street Ottawa, Ontario Report No. 13030-SWM February 6, 2015 D. B. G R A Y E N G I N E E R I N G I N. Stormwater Management - Grading & Drainage - Storm & Sanitary
More informationStormwater Management Report Bachman Terrace Residential Development
Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document
More informationSTORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario
STORMWATER DRAINAGE ASSESSMENT 479 Line 1 Road, Niagara-on-the-Lake, Ontario November, 2015 1. Site Description Size: Location: Existing Land Use: Proposed Land Use: Soils: Stormwater Outlet: 1.38 hectares
More informationOdense & VCS Denmark 3rd largest city in Denmark 200,000 Inhabitants Birthplace of H.C. Andersen VCS Denmark est Reputation for innovation
Integreret modellering i Odense. En ny tilgang til udvikling af langsigtede og integrerede spildevands- og regnvandsløsninger Dansk Vand Konference November 2016 Odense & VCS Denmark 3rd largest city in
More informationLevel 6 Graduate Diploma in Engineering Hydraulics and hydrology
910-103 Level 6 Graduate Diploma in Engineering Hydraulics and hydrology Sample Paper You should have the following for this examination one answer book ordinary graph paper pen, pencil, ruler Work sheet
More informationIntegrated Catchment Modelling
Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration
More informationBridge Planning Updates. Bridge Planning Practitioners Workshop April 2012
Bridge Planning Updates Bridge Planning Practitioners Workshop April 2012 Bridge Website Bridge Website Bridge Website Bridge Website BPG 11 Stormwater Management at Rural Bridges Released July 2010 Documents
More informationHamidreza Kazemi, PhD Candidate Thomas Rockaway, Ph.D., P.E. Josh Rivard, MUP Center for Infrastructure Research Civil and Environmental Engineering
Hamidreza Kazemi, PhD Candidate Thomas Rockaway, Ph.D., P.E. Josh Rivard, MUP Center for Infrastructure Research Civil and Environmental Engineering Department University of Louisville 1 MSD s Consent
More informationQuantity of sewage. Dry weather flow: Domestic and industrial wastewater (Base flow) including inflow, infiltration and exfiltration
Quantity of sewage Quantity of sewage depends on Dry weather flow and storm water Dry weather flow: Domestic and industrial wastewater (Base flow) including inflow, infiltration and exfiltration Infiltration
More informationSCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE
FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 346 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE PROJECT 2016-4442 JULY 2017 REVISED: APRIL 2017 C O N S U L T I N G E N G I N E E R S 64 Jardin
More informationModule 8 (L31 L34): Storm Water & Flood Management : Storm water management, design of drainage system, flood
Module 8 (L31 L34): Storm Water & Flood Management : Storm water management, design of drainage system, flood routing through channels and reservoir, flood control and reservoir operation, case studies.
More informationKildare County Council. Proposed Development of 74 no. Residential Units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare.
Job No. : 16027 SHB1-CRA-CS-MOR Date: April 2017 Kildare County Council Proposed Development of 74 no. Residential Units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare. 2B Richview Office
More informationIntroduction to Urban Drainage. Scott Arthur. Civil Engineering at the School of the Built Environment. [Class 1 - Into+ 1]
Introduction to Urban Drainage Scott Arthur s.arthur@hw.ac.uk Civil Engineering at the School of the Built Environment [Class 1 - Into+ 1] Do we even need a drainage system? [Class 1 - Into+ 2] Greenfield
More informationWaste Water treatment by Multi Soil Layering Method
Waste Water treatment by Multi Soil Layering Method 1 Background The use of soil for water treatment has a long history in the world. Conventional method Land treatment Sand filter Septic systems (EPA)
More informationWhole of Water Cycle Modelling Pilot Study
Whole of Water Cycle Modelling Pilot Study Presentation Outline Background Model development Water and Sewer Stormwater Advantages of Integrated Modelling Challenges and Limitations Project Aims To investigate
More informationWater supply components
Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution
More informationFUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE
FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...
More informationType of Area Density (persons/ha) Large lots 5-7 Small lots, single family 75 Small lots, two family 125 Multistory apartments min.
Design of Sanitary Sewer System Key components Service connections, Manholes and pump stations Design Flows 1. Infiltration and interflow (71 to 14 m 3 /d/km). Flow from the service connections Type of
More informationStormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications
Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage
More informationAppendix H. Storm Water Management
Appendix H Storm Water Management R.J. Burnside & Associates Limited 292 Speedvale Avenue West Unit 20 Guelph ON N1H 1C4 CANADA telephone (519) 823-4995 fax (519) 836-5477 web www.rjburnside.com Technical
More informationInternational Journal of Advance Research in Engineering, Science & Technology
Impact Factor (SJIF): 3.632 International Journal of Advance Research in Engineering, Science & Technology e-issn: 2393-9877, p-issn: 2394-2444 Volume 3, Issue 5, May-2016 ANALYSIS OF RAINFALL DATA AND
More informationStorm water Catchment Analysis
Storm water Catchment Analysis Analysis index 1. Storm water attenuation tank sizing method 2. Consent notices for storm water attenuation tanks 3. Summary of sub catchments 4. Hydrological Analysis for
More informationDESIGN OF SEWER SYSTEMS
Wastewater Engineering (MSc program) DESIGN OF SEWER SYSTEMS Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University 1. Sewer Materials
More informationNewtown Creek Superfund Site Point Sources Sampling CAG Meeting March 22, 2016
Newtown Creek Superfund Site Point Sources Sampling CAG Meeting March 22, 2016 CSTAG Meeting May 19-20, 2014 May 19, 2015 1 Objectives Define point source discharge for the study area Discuss the purpose
More informationThe Drainage Basin System
The Drainage Basin System These icons indicate that teacher s notes or useful web addresses are available in the Notes Page. This icon indicates that the slide contains activities created in Flash. These
More informationWhat is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream
What is runoff? Runoff Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream 1 COMPONENTS OF Runoff or STREAM FLOW 2 Cont. The types of runoff
More informationUsing SWMM 5 in the continuous modelling of stormwater hydraulics and quality
Using SWMM 5 in the continuous modelling of stormwater hydraulics and quality M.J. Cambez 1, J. Pinho 1, L.M. David 2 * 1 Trainee at Laboratório Nacional de Engenharia Civil (LNEC) 2 Research Officer at
More informationOHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By:
Prepared By: OHM Groups FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph 114169 August 5, 2015 Guelph Owen Sound Listowel Kitchener Exeter Hamilton GTA 650 Woodlawn Rd. W., Block C, Unit 2, Guelph
More informationAPPENDIX E Drainage and Stormwater Management Report
APPENDIX E Drainage and Stormwater Management Report Drainage and Stormwater Management Report Courtneypark Drive East Class EA & Preliminary Design Prepared for: City of Mississauga Prepared by: Stantec
More informationEXECUTIVE SUMMARY 1 INTRODUCTION 2 METHODOLOGY 4
EXECUTIVE SUMMARY 1 INTRODUCTION 2 Objective 2 Background 2 METHODOLOGY 4 Site Selection 4 Testing Procedure 4 Methods 4 Rainfall 4 Discharge Recording. 5 Water sampling 5 Stormwater Analysis 5 Maintenance
More informationFROM ROOFTOP TO DRAIN NON-TRADITIONAL APPLICATIONS OF HEC-RAS 2D FROM ROOFTOP. Calibration: A Hands-On Approach to Making a Model Reflect Reality
FROM ROOFTOP TO DRAIN NON-TRADITIONAL APPLICATIONS OF HEC-RAS 2D Andrew C. Yung, PE, CFM Andres A. Salazar, PhD, PE April 26, 2017 1 FROM ROOFTOP 2 Amphitheater: 97,000 SF flexible engineered fabric roof
More informationWater Resources Management Plan
P L Y M O U T H M I N N E S O T A Appendix D: The developed a to analyze and minimize the impact of existing and future development on the City s natural resources. It is important to the City to have
More informationTHE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT
THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL
More informationSewer Capacity Assessment
Sewer Capacity Assessment Wainlode Lane, Norton, Gloucestershire DE-1607-722 Version 2 Date: 10 th February 2017 Black & Veatch Ltd. 60 High Street Redhill Surrey RH1 1SH Sewer Capacity Assessment Summary
More informationReport. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationAPPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS
APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method
More informationIntegrating Triple Bottom Line
WATER WASTE ENERGY Shifting Decision Making Integrating Triple Bottom Line Social Environmental Financial Background Project Basis: The likely future direction of the management of urban drainage Design
More informationDesign of Sewerage System for Jaffarpur area in Southwest New Delhi
International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for
More informationAPPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS
ESTIMATING RUNOFF FROM SMALL WATERSHEDS June 2011 THIS PAGE LEFT BLANK INTENTIONALLY. June 2011 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method Values June 2011
More informationLandfill design General principles
Landfill design General principles Average height of a landfill should be at least 15 m Each section (cell) should accommodate waste to be landfilled during 5 years period Sections/cells should be hydraulically
More informationMODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation
Watershed MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1 A watershed is an area of land thaaptures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed
More informationAttachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS
Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Lagan Cement Ltd. IPPC Licence Application Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Air Contents F.2.0 Air Emissions.3 Water
More informationKildare County Council. Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare.
Job No. : 16027 SHB2-CLA-CS-MOR Date: Feb 2018 Kildare County Council Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare. Engineering Report 2B
More informationWinSLAMM v Program Modifications Final, 3/16/19
WinSLAMM v 10.4.1 Program Modifications Final, 3/16/19 1. Printing Set up a printing option for.pdf files for input data and output summary data. 2. Added the Pipe input data to the printing input data
More informationThe Membrane Wastewater Treatment Plant in Ihn Layman s report
The Membrane Wastewater Treatment Plant in Ihn Layman s report 1 Entsorgungsverband Saar, Tel. +49 6 81/ 60 00-0, P.O.Box 10 01 22, D-66001 Saarbrücken, www.entsorgungsverband.de The Wastewater Treatment
More informationRespond! Housing Association. Residential Development at Flinters Field, Athy, Co. Kildare. Engineering Report. Job No. : Date: April 2017
Job No. : 16036 Date: April 2017 Respond! Housing Association Residential Development at Flinters Field, Athy, Co. Kildare Engineering Report 2B Richview Office Park Clonskeagh Dublin 14 Contents Amendment
More informationGLOBAL SENSITIVITY ANALYSIS FOR URBAN WATER QUALITY MODELLING: COMPARISON OF DIFFERENT METHODS
Uncertainty assessment of sewer sediment erosion modelling 9th International Conference on Urban Drainage Modelling Belgrade 2012 GLOBAL SENSITIVITY ANALYSIS FOR URBAN WATER QUALITY MODELLING: COMPARISON
More informationCHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN
CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth
More informationUMLALAZI-NKANDLA SMART GROWTH DEVELOPMENT CENTRE PROVISION OF CIVIL ENGINEERING SERVICES
UMLALAZI-NKANDLA SMART GROWTH DEVELOPMENT CENTRE PROVISION OF CIVIL ENGINEERING SERVICES PROPOSED STORMWATER RETICULATION DESIGN AND MANAGEMENT DATE: OCTOBER 2011 PREPARED FOR: PREPARED BY: DEPARTMENT
More informationDesign criteria, Flooding of sewer systems in flat areas.
Design criteria, Flooding of sewer systems in flat areas. Ir Harry. Van Luijtelaar Tauw bv, P.O. box 830, 7400 AV Deventer, The Netherlands, Telephone +31570699304, Fax +31570699666, E-mail hlj@tauw.nl.
More informationReport. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationDunpar Developments Inc.
Dunpar Developments Inc. Proposed Townhouse Development 2158, 2168, 2180 and 2192 Trafalgar Road Oakville, Ontario Functional Servicing and Stormwater Management Report (in Support of a Re-Zoning and Site
More informationSITE SERVICING PRELIMINARY DESIGN BRIEF
855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855
More informationENV 4001: ENVIRONMENTAL SYSTEMS ENGINEERING. University of South Florida Civil & Environmental Eng.
ENV 4001: ENVIRONMENTAL SYSTEMS ENGINEERING Fall 2016 Quiz #2 Wednesday, October 26 University of South Florida Civil & Environmental Eng. Prof. J.A. Cunningham Instructions: 1. You may read these instructions,
More informationDrainage Servicing Report - Terms of Reference
Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage
More informationBMP 6.4.4: Infiltration Trench
BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a
More informationIntroduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*
The Effect of Land Changes Towards in Sg. Pandan Perwira Bin Khusairi Rahman 1,a* and Kamarul Azlan bin Mohd Nasir 1,b 1 Faculty of Civil Engineering, Universiti Teknologi Malaysia, Malaysia a * wirakhusairirahman@gmail.com,
More informationPROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:
PROPOSED FOOD STORE 150 TORONTO STREET SOUTH Job No. 16227 ENGINEERING REPORT Prepared For: MAVERICK DEVELOPMENT CORPORATION 150 Woodbine Avenue Suite 3005 Toronto, Ontario Prepared By: The Odan/Detech
More informationLandbase Systems Draft 5/2/2014 Page: 1
Study of the potential Green Stormwater Infrastructure (GSI) strategies and options to reduce localized flooding and combined sewer overflows in conjunction with combined network adjustments along and
More informationWASTEWATER PLANNING USERS GROUP GUIDE TO THE QUALITY MODELLING OF SEWER SYSTEMS
WASTEWATER PLANNING USERS GROUP WASTEWATER PLANNING USERS GROUP GUIDE TO THE QUALITY MODELLING OF SEWER SYSTEMS Version 1.0 November 2006 WASTEWATER PLANNING USERS GROUP GUIDE TO THE QUALITY MODELLING
More informationManaged Aquifer Recharge (MAR) Practical Techniques for the Caribbean
Managed Aquifer Recharge (MAR) Practical Techniques for the Caribbean Scope of Presentation What is MAR? Antigua and Barbuda water resources issues Why promote MAR? MAR: Techniques MAR: Design criteria
More informationCarlow County Council
Carlow County Council WASTEWATER DISCHARGE LICENCE APPLICATION FOR THE AGGLOMERATIO OF CARLOW TOWN AND ENVIRONS AND SECTIONS OF GRAIGUECULLEN IN COUNTY LAOIS WASTEWATER DISCHARGE LICENCE APPLICATION NON-TECHNICIAL
More informationSixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination
CAB/2KTF/EET 1221/1413 Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination Course Code : CV 312 / CV 507 Course Name : Engineering Hydrology Time : 3 Hours ] [ Max. Marks
More informationSewer system- Design Criteria
The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Sanitary Engineering (ECIV 4325) Instructor: Dr. Abdelmajid Nassar Lect. 05-07 Sewer system- Design Criteria according
More information2. DEFINITIONS. American Association of State Highway and Transportation Officials.
2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO:
More informationThe Source Loading and Management Model (SLAMM)
The Source Loading and Management Model (SLAMM) A Water Quality Management Planning Model for Urban Stormwater Runoff Robert Pitt, P.E., Ph.D., DEE Department of Civil and Environmental Engineering, The
More informationSanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River
Sanitation District No. 1 of Northern Kentucky Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Ohio WEA Collection Systems Workshop May 5, 2011 Sanitation District No. 1
More informationModelling and Analysis of EES Systems Using SWMM
Planning and Design of a Right-of-Way LID (Etobicoke Exfiltration System) July 24 th 2015 Toronto, Ontario, Canada ling and Analysis of EES Systems Using SWMM Darko Joksimovic Department of Civil Engineering,
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or
More informationTECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance
TECHNICAL BULLETIN Synthetic Turf Athletic Field Drainage Design Assistance The SportsEdge HQ geocomposite strip drain products are engineered specifically for use in synthetic turf athletic field base
More informationSTORM DRAINS AND IRRIGATION
TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.
More informationWinSLAMM v Program Modifications Final, 12/12/17
WinSLAMM v 10.3.4 Program Modifications Final, 12/12/17 1. Corrected an error in the Biofilter caused by an improperly defined variable that caused an overflow during very long model runs. 2. Corrected
More information