1 STORMWATER MANAGEMENT REPORT 22 Perkins Street Ottawa, Ontario Report No SWM February 6, 2015 D. B. G R A Y E N G I N E E R I N G I N. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers - Watermains 700 Long Point ircle Ottawa, Ontario K1T 4E9 dbgray@rogers.com 1
2 STORMWATER MANAGEMENT REPORT 22 Perkins Street Ottawa, Ontario This report addresses the stormwater management requirements of a proposed threestorey 17 unit apartment building development located on 510 sq.m. of land 22 Perkins Street in Ottawa. The site located at the foot of a rock cliff. This report forms part of the stormwater management design for the proposed development. Refer to drawings -1 to -4 prepared by D. B. Gray Engineering Inc. WATER QUALITY: omments and recommendations concerning the stormwater quality criteria for this site are required from the RVA to determine if permanent on-site quality control measures required. During construction, an erosion and sediment control plan has been developed (see notes 2.1 to 2.4 drawing -3). In summary: To filter out construction sediment: geotextile fabric will be placed between the grate and frame of all existing catch basins adjacent to the site and all new catch basins as they are installed. WATER QUANTITY: The stormwater management criteria for quantity control are to control the post development peak flows for the 5-year and 100-year storm events to peak flows during the 5-year storm event using a pre-development runoff coefficient or runoff coefficient of 0.5, whichever is less; and the calculated time of concentration, but not less than 10 minutes. It is calculated that the pre-development conditions reflect a 5-year runoff coefficient of Using the Airport Formula for sheet flow, it is calculated that the existing time of concentration is 5.7 minutes. Therefore based on runoff coefficient of 0.32 and a time of concentration of 10 minutes and using the Rational Method; the predevelopment (existing) peak flow is 3.51 l/s. The drainage area includes an adjacent off-site area between the property and the rock cliff that does not need to be controlled (Drainage Area I 22 sq.m.). Adding drainage from this area the Maximum Allowable Flowrate is 3.78 l/s for the 100-year event and 3.63 l/s for the 5-year event. alculations are based on the Rational Method. The runoff coefficients for the 100 year event were increased by 25% to maximum
3 Stormwater will be stored within the development on the roof of the proposed building and in a cistern located adjacent to the building. The runoff from the perimeter of the site primarily the front yard and between the proposed building and rock cliff (Drainage Area II 85 sq.m.) will be allowed to flow uncontrolled off the site. The flow from these areas is calculated at the five year event at 10 minutes concentration. The roof drain will be flow control type installed with a parabolic shaped slotted weir (1 slot per weir drain at l/s per mm per slot - 5 USgpm per inch per slot) causing the storm water to pond on the roof (Drainage Area III 330 sq.m.). The roof drain drains to the cistern so stormwater released from the roof drains to the cistern so is added to the stormwater runoff generated from (Drainage Area IV 117 sq.m.). An inlet control device (ID) located at the outlet pipe of the cistern will control the release of stormwater off the site. The ID will restrict the flow and cause the stormwater to back up into the upstream cistern. Stormwater released through the ID will be conveyed off the site via a 250mm storm sewer that will discharge onto the surface near the north-west corner of the property. The ID shall be a Hydrovex "VHV Vertical Vortex Flow Regulator" and shall be sized by the manufacturer for a discharge rate of 1.54 l/s at 0.92 m head. It is calculated that an orifice area of 1963 sq.mm. (50mm diameter) and a discharge coefficient of will restrict the outflow rate to 1.54 l/s at a head of 0.92 m. Based on this orifice the maximum outflow rate for the 1:5 year storm event is calculated to be 1.15 l/s at 0.51 m. Since the stormwater management facility discharges to a combined sewer it is expected that a Ministry of Environment Environmental ompliance Approval (EA) will be required. 3
4 ONLUSIONS: WATER QUALITY: omments and recommendations concerning the stormwater quality criteria for this site are required from the RVA to determine if permanent on-site quality control measures required. An erosion and sediment control plan as been developed to be implemented during construction WATER QUANTITY: One Hundred Year Storm Event: The maximum allowable release rate for the one hundred year storm event for the site is 3.78 l/s. The post-development release rate for the 100-year storm event is calculated to be 3.78 l/s. Therefore the maximum post development release rate for the 100-year storm event is equal to the maximum permitted release rate. A maximum stored volume of cu.m. is required to achieve the post development release rate. Five Year Storm Event: The maximum allowable release rate for the five year storm event for the site is 3.63 l/s. The post-development release rate for the 5-year storm event is calculated to be 2.29 l/s. Therefore the maximum post development release rate for the 5-year storm event is less than the maximum permitted release rate. A maximum stored volume of 9.28 cu.m. is required to achieve the post development release rate. 4
5 Summary Tables ONE HUNDRED YEAR EVENT Drainage Area AREA II (Uncontrolled flow off site) AREA III (Roof) Maximum Maximum Maximum Maximum Allowable Release Volume Volume Release Rate Required Stored Rate l/s l/s cu.m. cu.m AREA I & IV TOTAL FIVE YEAR EVENT Drainage Area AREA II (Uncontrolled flow off site) AREA III (Roof) Maximum Maximum Maximum Maximum Allowable Release Volume Volume Release Rate Required Stored Rate l/s l/s cu.m. cu.m AREA I & IV TOTAL
6 STORMWATER MANAGEMENT ALULATIONS The orifice calculations are based on the following formula: Q = d x A o 2gh x 1000 where: Q = flowrate in litres per second d = coefficient of discharge A o = orifice area in sq.m. g = 9.81 m/s2 h = head above orifice in meters Flow control roof drain calculations are based on the following formula: Q = N x S x d x F where: Q = flowrate in litres per second N = number of roof drains S = slots per weir d = pond depth at roof drain in mm F = flowrate through each slot litres per second per mm pond depth (5 USgpm per inch) Storage calculations on the roof are based on the following formula for volume of a cone: V = (A x d)/3 where: V = volume in cu.m. A = ponding area in sq.m. d = ponding depth in meters alculations for sub-surface storage (manholes and sewer pipes) are based on the following formula for volume of a cylinder: V = L x Pi x (d/2) 2 where: V = volume in cu.m. L = depth of water in manhole or length of pipe in meters d = diameter of manhole or pipe in meters 6
7 22 PERKINS STREET Ottawa, Ontario 05-Feb-15 STORM WATER MANAGEMENT ALULATIONS Rational Method ONE HUNDRED YEAR EVENT Maximum Allowable Release Rate Pre-development onditions Roof Area: 76 sq.m Asphalt/oncrete Area: 10 sq.m Gravel Area: 4 sq.m Landscaped Areas: 420 sq.m Total atchment Area 510 sq.m Area (A): 510 sq.m. Time of oncentration: 10.0 min. (see below - use not less than 10 min.) Rainfall Intensity (i): 77 mm/hr (2 year event) Runoff oeficient (): 0.32 Flow Rate (2.78Ai): 3.51 l/s Time of oncentration: Sheet Flow Airport Formula Tc = 3.26 (1.1 - ) (L) 1/2 Sw 0.33 min Runoff oefficient (): 0.32 see above Sheet Flow Distance (L): 31 m Slope of Land (Sw): 15 % Time of oncentration (Sheet Flow): 5.7 min DRAINAGE AREA I (Off Site Area Not Required to be ontrolled): Roof Area: 0 sq.m Asphalt/oncrete Area: 0 sq.m Landscaped Areas: 22 sq.m Total atchment Area 22 sq.m Area (A): 22 sq.m. Time of oncentration: 10 min. Rainfall Intensity (i): 179 mm/hr (100 year event) Runoff oeficient (): 0.25 Flow Rate (2.78Ai): 0.27 l/s Maximum Allowable Release Rate: l/s (including flow from off-site)
8 DRAINAGE AREA II (Uncontrolled Flow Off Site): (ONE HUNDRED YEAR EVENT) Roof Area: 0 sq.m Asphalt/oncrete Area: 32 sq.m Landscaped Areas: 53 sq.m Total atchment Area 85 sq.m Area (A): 85 sq.m. Time of oncentration: 10 min. Rainfall Intensity (i): 179 mm/hr (100 year event) Runoff oeficient (): 0.53 Flow Rate (2.78Ai): 2.25 l/s 8
9 DRAINAGE AREA III (Roof): (ONE HUNDRED YEAR EVENT) Roof Area: 330 sq.m Paved Area: 0 sq.m Landscaped Areas: 0 sq.m Total atchment Area 330 Ave No. of Roof Drains: 1 Slots per Wier: l/s/mm/slot (5 USgpm/in/slot) Depth at Roof Drain: 143 mm Maximum Release Rate 1.77 l/s Pond Area: 259 sq.m. Achieved Vol: cu.m. Max. Vol. Required: cu.m. Release Stored Stored Time i 2.78Ai Rate Rate Volume min. mm/hr l/s l/s l/s cu.m
10 DRAINAGE AREA IV (ONE HUNDRED YEAR EVENT) Roof Area: 0 sq.m Asphalt/oncrete Area: 32 sq.m Landscaped Areas: 85 sq.m Total atchment Area 117 sq.m Water Elevation: m ID Invert: m (Outlet Pipe of istern): istern Head: 0.92 m Area Depth sq.m. m Orifice Diameter 50 mm cu.m. Orifice Area: 1963 sq.mm. oefficient of Discharge: Achieved Vol: 7.00 cu.m. Maximum Release Rate: 1.54 l/s Max. Vol. Required: 7.00 cu.m. Flow From Total Release Stored Stored Time i 2.78Ai Roof Inflow Rate Rate Volume min. mm/hr l/s l/s l/s l/s l/s cu.m
11 FIVE YEAR EVENT Maximum Allowable Release Rate Pre-development onditions Roof Area: 76 sq.m Asphalt/oncrete Area: 10 sq.m Gravel Area: 4 sq.m Landscaped Areas: 420 sq.m Total atchment Area 510 sq.m Area (A): 510 sq.m. Time of oncentration: 10.0 min. (see below - use not less than 10 min.) Rainfall Intensity (i): 77 mm/hr (2 year event) Runoff oeficient (): 0.32 Flow Rate (2.78Ai): 3.51 l/s Time of oncentration: Sheet Flow Airport Formula Tc = 3.26 (1.1 - ) (L) 1/2 Sw 0.33 min Runoff oefficient (): 0.32 see above Sheet Flow Distance (L): 31 m Slope of Land (Sw): 15 % Time of oncentration (Sheet Flow): 5.7 min DRAINAGE AREA I (Off Site Area Not Required to be ontrolled): Roof Area: 0 sq.m Asphalt/oncrete Area: 0 sq.m Landscaped Areas: 22 sq.m Total atchment Area 22 sq.m Area (A): 22 sq.m. Time of oncentration: 10 min. Rainfall Intensity (i): 104 mm/hr (5 year event) Runoff oeficient (): 0.20 Flow Rate (2.78Ai): 0.13 l/s Maximum Allowable Release Rate: 3.63 l/s (including flow from off-site) 11
12 DRAINAGE AREA II (Uncontrolled Flow Off Site): (FIVE YEAR EVENT) Roof Area: 0 sq.m Asphalt/oncrete Area: 32 sq.m Landscaped Areas: 53 sq.m Total atchment Area 85 sq.m Area (A): 85 sq.m. Time of oncentration: 10 min. Rainfall Intensity (i): 104 mm/hr (5 year event) Runoff oeficient (): 0.46 Flow Rate (2.78Ai): 1.14 l/s 12
13 DRAINAGE AREA III (Roof): (FIVE YEAR EVENT) Roof Area: 330 sq.m Paved Area: 0 sq.m Landscaped Areas: 0 sq.m Total atchment Area 330 Ave No. of Roof Drains: 1 Slots per Wier: l/s/mm/slot (5 USgpm/in/slot) Depth at Roof Drain: 109 mm Maximum Release Rate 1.36 l/s Pond Area: 153 sq.m. Achieved Vol: 5.57 cu.m. Max. Vol. Required: 5.57 cu.m. Release Stored Stored Time i 2.78Ai Rate Rate Volume min. mm/hr l/s l/s l/s cu.m
14 DRAINAGE AREA IV (FIVE YEAR EVENT) Roof Area: 0 sq.m Asphalt/oncrete Area: 32 sq.m Landscaped Areas: 85 sq.m Total atchment Area 117 sq.m Water Elevation: m ID Invert: m (Outlet Pipe of istern): istern Head: 0.51 m Area Depth sq.m. m Orifice Diameter 50 mm cu.m. Orifice Area: 1963 sq.mm. oefficient of Discharge: Achieved Vol: 3.71 cu.m. Maximum Release Rate: 1.15 l/s Max. Vol. Required: 3.71 cu.m. Flow From Total Release Stored Stored Time i 2.78Ai Roof Inflow Rate Rate Volume min. mm/hr l/s l/s l/s l/s l/s cu.m
STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR:
Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT Proposed Row House Complex Clare and
More informationHOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT. Prepared for: David Johnston Architect. Prepared By:
HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI
More informationPROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT
PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN 149 1162 ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT No. R-815-41 T. L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2015
More informationFUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE
FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...
More informationNew Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario
New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S
More informationPROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R
PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN 348 351 CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 817 21 T.L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2017 REFERENCE
More informationSite Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario
Site Servicing & Stormwater Management Report for Site Plan Control Application Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Prepared for: Martin Clement Attention: Mr. Martin
More informationPROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT
PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 2 7 BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 81 41 (REV. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD. JULY
More informationSITE SERVICING PRELIMINARY DESIGN BRIEF
855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855
More informationStormwater Management Report Bachman Terrace Residential Development
Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document
More informationNew Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario
New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S
More informationRETENTION BASIN EXAMPLE
-7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary
More informationD. B. G R A Y E N G I N E E R I N G I N C.
SERVICING BRIEF 2200 Prince of Wales Drive Ottawa, Ontario Report No. 11068-SB February 3, 2012 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary
More informationFinal Drainage Report
Thornton Electric Substation Project Final Drainage Report December 14, 2016 DRAFT Prepared for: Xcel Energy, 1800 Larimer Street, Suite 400, Denver, Colorado 80202 Prepared by: 350 Indiana Street, Suite
More informationDunpar Developments Inc.
Dunpar Developments Inc. Proposed Townhouse Development 2158, 2168, 2180 and 2192 Trafalgar Road Oakville, Ontario Functional Servicing and Stormwater Management Report (in Support of a Re-Zoning and Site
More informationSite Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario
Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario Prepared for The C and C Group of Companies Attention: Mr. Bob Cousins
More informationSITE SERVICING & STORMWATER MANAGEMENT STUDY
SITE SERVICING & STORMWATER MANAGEMENT STUDY IN SUPPORT OF MAJOR ZONING BY-LAW AMENDMENT AND SITE PLAN CONTROL APPLICAITON Location: 190 Richmond Road, Ottawa, Ontario CPE Project #: 16032 City of Ottawa
More informationP: (905) F: (905) PROPOSED BANK. Prepared For: ENT INC. JUNE Rev 0.docx
The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED BANK PLACE D ORLEANS MALL OTTAWA, ONTARIO SERVICING
More informationD. B. G R A Y E N G I N E E R I N G I N C.
SERVICING BRIEF 406-408 Bank Street Ottawa, Ontario Report No. 10015-SB December 13, 2011 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers
More informationD. B. G R A Y E N G I N E E R I N G I N C.
SERVICING BRIEF 280-282 Crichton Street Ottawa, Ontario Report No. 09069-SB July 28, 2010 Revised November 3, 2010 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage
More information968 St. Laurent Bulevard, Ottawa. Stormwater Management Report. Prepared for: Eric Haar Architect Inc.
968 St. Laurent Bulevard, Ottawa Stormwater Management Report Prepared for: Eric Haar Architect Inc. March 2012 968 St. Laurent Blvd. Ottawa Storm Water Management Report Table of Contents 1. Introduction...
More informationSubmittal Requirements. Post Construction Verification Document Plan Requirements
Submittal Requirements Post Construction Verification Document survey plan in accordance with the items of this Checklist Supporting calculations in accordance with the items of this Checklist A copy of
More informationPART A4 STORM DRAINAGE SYSTEM
PART A4 STORM DRAINAGE SYSTEM DECEMBER 2015 PART A4 - STORM DRAINAGE SYSTEM Page 1 1 GENERAL... 2 2 DEFINITIONS... 2 3 SUBMISSIONS AND APPROVALS... 2 MASTER DRAINAGE PLAN... 2 SITE DRAINAGE PLAN... 3 4
More informationTABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1
TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method
More informationSTORMWATER MANAGEMENT REPORT. Dundas Square Gardens Inc. High Rise Residential/Commercial Development
STORMWATER MANAGEMENT REPORT Dundas Square Gardens Inc. Revised: April 6, 2016 Revised: January 12, 2016 Revised: July 10, 2015 OUR FILE: 14-RE-352 June 16, 2014 TABLE OF CONTENTS PAGE 1.0 Scope of work
More informationTable Storm Drain Inlet Protection. Applicable for Paved/ Earthen Surfaces
BMP C220: Storm Drain Inlet Protection Purpose Conditions of Use Storm drain inlet protection prevents coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area.
More informationBowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)
Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) SMP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage
More informationPROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:
PROPOSED FOOD STORE 150 TORONTO STREET SOUTH Job No. 16227 ENGINEERING REPORT Prepared For: MAVERICK DEVELOPMENT CORPORATION 150 Woodbine Avenue Suite 3005 Toronto, Ontario Prepared By: The Odan/Detech
More informationCHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationSTORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:
Civil Geotechnical Structural Environmental Industrial Health & Safety (613) 860-0923 210 Prescott Street P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE
More informationOHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By:
Prepared By: OHM Groups FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph 114169 August 5, 2015 Guelph Owen Sound Listowel Kitchener Exeter Hamilton GTA 650 Woodlawn Rd. W., Block C, Unit 2, Guelph
More informationA Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.
Engineering Page 3-1 3.0 STORM DRAINAGE 3.1 GENERAL Good drainage is vital to flat urban areas such as Lulu Island. It is essential that every storm sewer must be designed accurately minimizing conflicts
More informationSTORM DRAINS AND IRRIGATION
TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.
More informationOrleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief
Report File #: 34197-5.2.2 Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief Prepared for North American Development Group by IBI Group June 2015 IBI GROUP REPORT
More information1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031
1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report Marshall Homes Project # E15031 August 2016 Table of Contents 1.0 Introduction and Background... 1 2.0 Existing
More informationMunicipal Stormwater Ordinances Summary Table
APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which
More information6.5 Extended Detention Basin
6.5 Extended Detention Basin Figure 6-22: Extended Detention Basin. Photograph courtesy of Bill Southard (DES Architects and Engineers) Best uses Detain low flows Can be expanded to detain peak flows Sedimentation
More informationENGINEERING REVIEW CHECKLIST City of Mount Clemens
(To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact
More information4.8. Subsurface Infiltration
4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration
More informationOrleans Family Health Hub
Orleans Family Health Hub Stormwater Management & Servicing Report Type of Document: Site Plan Application Project Name: Orleans Family Health Hub (OFHH) Project Number OTT-00240132-A0 Prepared By: exp
More informationDetailed Stormwater Management Report David Manchester Road
Detailed Stormwater Management Report David Manchester Road Prepared for: Nortrax Canada Inc. 189 Cardevco Road Carp, Ontario K0A 1L0 Prepared by: McIntosh Perry Consulting Engineers Ltd. 115 Walgreen
More information215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)
Civil Geotechnical Structural Environmental 215 Sanders Street, Unit 1 (613) 860-0923 210 Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 March 29, 2016 2343065 Ontario
More informationStorm Sewers, Page 2
Storm Sewers storm sewer systems are dendritic systems used to collect and direct stormwater runoff storm sewer systems are integral components of any urban infrastructure curbs, gutters and storm inlets
More informationSTORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:
Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON
More informationSection H - Site Plan Guidelines
H1 GENERAL REQUIREMENTS The following is an outline of procedures and requirements for preparation and submission of Grading Plans, Site Alteration Plans (Erosion and Sediment Control Plans), Site Servicing
More information6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON
6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON
More informationDrainage Servicing Report - Terms of Reference
Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage
More informationAppendix J: Storm Conveyance Design Parameters
Appendix J: Storm Conveyance Design Parameters Drain Commissioner 39 February 2005 STORM DRAINAGE DESIGN CRITERIA A. STORM SEWERS 1. The required discharge capacity shall be determined by the Rational
More informationSanitary Sewer Design. Sanitary Sewers, Page 1
Sanitary Sewer Design Sanitary Sewers, Page 1 Sanitary Sewers, Page 2 Sanitary Sewer Design sanitary sewers collect and transport domestic and industrial wastes via gravity flow the ultimate destination
More informationSTORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario
STORMWATER DRAINAGE ASSESSMENT 479 Line 1 Road, Niagara-on-the-Lake, Ontario November, 2015 1. Site Description Size: Location: Existing Land Use: Proposed Land Use: Soils: Stormwater Outlet: 1.38 hectares
More informationRETAIL UNITS GUELPH. November Prepared For: File No Engineering Report.docx F: (905) P: (905) BURLINGTON, ONTARIO
The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED COMMERCIAL RETAIL UNITS GUELPH LINE AND UPPER MIDDLE
More information4.8. Subsurface Infiltration
4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration
More informationDESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO
CLARIDGE HOMES (PRESTON) INC. DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO PROJECT: 31637-5.2.2 OCTOBER 2014 IBI GROUP PROJECT: 31637-5.2.2 TABLE OF CONTENTS 1. INTRODUCTION...
More informationPART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS
PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm
More informationPRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS
PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS 39 AUGUST 2005 TABLE OF CONTENTS PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS PAGE SECTION 1 DESIGN CRITERIA 41 SECTION 2 SUBMITTAL 44 SECTION 3 STRUCTURES
More informationEXTENDED DETENTION BASIN EXAMPLE
EXTENDED DETENTION BASIN EXAMPLE 1117 6 July 2015 REFERENCE SECTION 1117 Given: TotalTributaryArea=7.5 o TributaryAreawithinExistingR/W=7.2 o TributaryArea,Impervious,OutsideofR/W=0.3 o TributaryArea,Pervious,OutsideofR/W=0.0
More informationNovember 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report
November 21, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report
More informationExtended Detention Basin Design
Extended Detention Basin Design 1 Extended Detention 2 Ohio Department of Transportation 1 Extended Detention Basin L&D Vol. 2 Section 1117.3 Provides quality and quantity treatment 3 Extended Detention
More informationDawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228
Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationINITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257
INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals
More informationHYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR
HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed
More informationCapital Hall Champagne Avenue
Capital Hall - 105 Champagne Avenue Site Servicing and Stormwater Management Report Type of Document Site Plan Submission Project Name Capital Hall - 105 Champagne Avenue Project Number OTT-00229902-A0
More informationCE 585 Construction Site Erosion Control The University of Alabama Tuscaloosa, AL. New Chevrolet and Cadillac Dealership Jasper, AL
CE 585 Construction Site Erosion Control The University of Alabama Tuscaloosa, AL New Chevrolet and Cadillac Dealership Jasper, AL Andrew Kennedy Homework #6 July 24, 2007 0 Table of Contents Table of
More informationDivision 33. Utilities
See Section 32 for requirements on Utility Plan Preparation. 33 10 00. Water Utilities 33 11 00. Water Utility Distribution Piping 1. All underground pipe material, 4 inch diameter and larger shall be
More informationSan Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and
San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons 2011-12 and 2012-13 Project Overview San Francisco State University (SFSU) has implemented several green
More informationBMP 6.4.4: Infiltration Trench
BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a
More informationPART V - STORM DRAIN DESIGN CRITERIA
PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement
More informationPART V - STORM DRAIN DESIGN CRITERIA
PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement
More informationLandfill design General principles
Landfill design General principles Average height of a landfill should be at least 15 m Each section (cell) should accommodate waste to be landfilled during 5 years period Sections/cells should be hydraulically
More informationD. B. G R A Y E N G I N E E R I N G I N C.
SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage
More informationStormwater Management Criteria
FOR OFFICE USE ONLY Stormwater Management Criteria Form #PWU005 (rev. 11/16) Approving Agency Performance Standards Applicability for Control of Stormwater Pollution Applicability for Control of Peak Runoff
More informationAPPENDIX E Drainage and Stormwater Management Report
APPENDIX E Drainage and Stormwater Management Report Drainage and Stormwater Management Report Courtneypark Drive East Class EA & Preliminary Design Prepared for: City of Mississauga Prepared by: Stantec
More informationPROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016
The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG
More informationFunctional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1
Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...
More informationSECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1
CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1
More informationDesign Specifications & Requirements Manual
9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital
More informationReport. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More information4.4.6 Underground Detention
4.4.6 Underground Detention Limited Application Water Quality BMP Description: Detention storage located in underground pipe systems or vaults designed to provide water quantity control through detention
More informationSTORM DRAINAGE DESIGN MANUAL
Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated
More informationCUYAHOGA COUNTY ENGINEER
CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted
More informationCHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN
CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth
More informationOrleans Family Health Hub
Orleans Family Health Hub Stormwater Management & Servicing Report Type of Document: Site Plan Application Project Name: Orleans Family Health Hub (OFHH) Project Number OTT-00240132-A0 Prepared By: exp
More informationGCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887
GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 November 17, 2017 Ms. Sheila Page, Town Planner 101 Main
More informationStormwater Management & Servicing Report KMA Mosque and Community Centre 351 Sandhill Road, Ottawa, Ontario
Stormwater Management & Servicing Report KMA Mosque and Community Centre 351 Sandhill Road, Ottawa, Ontario Client: Kanata Muslim Association 351 Sandhill Road Ottawa, Ontario K2K 1X7 Project Number: OTT-00238564-A0
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or
More informationDescription. Installation and Implementation Requirements
Earth Dike SC-6 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description Structure that prevents erosion by intercepting, diverting, and conveying surface run-on (storm water
More informationPART 3 STORM WATER TECHNICAL MANUAL
PART 3 STORM WATER TECHNICAL MANUAL A. INTRODUCTION The Storm Water Technical Manual contains requirements for land development and construction activities, as well as design criteria and guidelines for
More informationDesign Specifications & Requirements Manual
9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital
More informationModelling and Analysis of EES Systems Using SWMM
Planning and Design of a Right-of-Way LID (Etobicoke Exfiltration System) July 24 th 2015 Toronto, Ontario, Canada ling and Analysis of EES Systems Using SWMM Darko Joksimovic Department of Civil Engineering,
More informationDIVISION 5 STORM DRAINAGE CRITERIA
DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the
More informationFigure Inlet protection (Source: Minnesota DOT)
3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.
More informationDecember 6, Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229
December 6, 2016 Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229 RE: Drainage Conformance Letter Hilton Garden Inn @ The Grove The Grove Filing No 1, lot 5E Thornton,
More informationPROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT
PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A T. L. MAK ENGINEERING CONSULTANTS LTD.
More informationSilver Seven Corporate Centre Phase 1
SERVICING BRIEF Silver Seven Corporate Centre Phase 1 15 & 19 Frank Nighbor Place and 737 & 777 Silver Seven Road Kanata, Ontario Report No. 12022-SB May 31, 2012 Revised October 23, 2012 D. B. G R A Y
More informationReport. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationGRASS-LINED CHANNEL (acre) CODE 840
NATURAL RESOURCES CONSERVATION SERVICE ILLINOIS URBAN MANUAL PRACTICE STANDARD GRASS-LINED CHANNEL (acre) CODE 840 (Source: NC Erosion and Sediment Control Field Manual) DEFINITION A natural or constructed
More informationEAGLE DRAINAGE DESIGN STANDARDS
EAGLE DRAINAGE DESIGN STANDARDS November 17, 2015 City of Eagle Planning & Zoning Department P.O. Box 1520 Eagle, ID 83616 EAGLE DRAINAGE DESIGN STANDARDS A. PURPOSE 1. These standards amend the Design
More informationEROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY
31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed
More information2. DEFINITIONS. American Association of State Highway and Transportation Officials.
2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO: