1 Dunpar Developments Inc. Proposed Townhouse Development 2158, 2168, 2180 and 2192 Trafalgar Road Oakville, Ontario Functional Servicing and Stormwater Management Report (in Support of a Re-Zoning and Site Plan Application) Prepared by: Engineers, Planners and Landscape Architects Johnson Sustronk Weinstein + Associates 20 Mural Street, Unit 10 August 2012 Richmond Hill, Ontario L5B 1K3 Project No

2 Dunpar Developments Inc. Proposed Townhouse Development 2158, 2168, 2180 and 2192 Trafalgar Road Oakville, Ontario Functional Servicing and Stormwater Management Report (in Support of Re-Zoning and Site Plan Application) Johnson Sustronk Weinstein + Associates 20 Mural Street, Unit 10 August 2012 Richmond Hill, Ontario L5B 1K3 Project No

3 TABLE OF CONTENTS Page 1.0 Introduction Objectives Scope of Report Study Area Development Concept Development Sanitary Sewers Existing Sanitary Sewers Proposed Sanitary Design Parameters 3 a) Sanitary Population Density 3 b) Sanitary Demand Sanitary Sewer Design Summary and Conclusions Water Distribution Existing Watermains Design Parameters Layout of Proposed Watermain Summary and Conclusion Storm Drainage and Stormwater Management Existing Site Drainage and Storm Sewer System Storm Sewer Design Stormwater Management Summary and Conclusion 8

4 APPENDIES Appendix A Appendix B - Sanitary Sewer Design Sheet - Storm Sewer Design Sheet LIST OF TABLES AND CHARTS Table Year Storm Modified Rational Method LIST OF DRAWINGS DWG. NO. TITLE G-1 Grading Plan S-1 Servicing Plan GS-1 SD-1 STM-1 SAN-1 CM-1 Grading Sections and Details Servicing Details Storm Drainage Area Plan Sanitary Drainage Area Plan Construction Management and Siltation Control Plan

5 1.0 INTRODUCTION 1.1 Objectives This report has been prepared as supporting documentation for a Re-Zoning and Site Plan application for the property at 2158, 2168, 2180 and 2192 Trafalgar Road. The development consists of the construction of stacked townhouse units as indicated on the Architectural Site Plan prepared by O.P. Design Inc. 1.2 Scope of Report The servicing of the development is addressed with respect to storm and sanitary drainage. Water demand for domestic and fire flow requirements are presented. Stormwater management requirements are based on the Town of Oakville s criteria for stormwater management In more detail the Municipal Servicing sections of this report will address: anticipated domestic water consumption based on the Halton of Region s criteria anticipated fire flow demand based on the nature of the development and the requirements of the Fire Underwriter s Survey, 1999 (FUS). review of existing watermains servicing the area. pressure and flow test of existing watermain(s). determine if upgrades are required to the existing watermain infrastructure. anticipated sanitary discharge from the development. current capacity of existing sanitary sewer to which the development will connect. impact to the existing sanitary sewer as a result of the new demand will be assessed. determine if upgrades are required to the existing sanitary sewer infrastructure. storm drainage from the development will be controlled to 5 year predevelopment run-off levels for storm event up to and including the 1:100 year event as per the Town s criteria. 2158, 2168, 2180 and 2192 Trafalgar Road August 2012 Functional Servicing and Stormwater Management 1 JSW

6 the existing storm sewer capacity will be determined. impact to the existing storm sewer as a result of the new controlled flow from the development will be assessed. determine if upgrades are required to the existing storm sewer infrastructure. With regards to stormwater management the following is address: the Grading Plan enclosed with the report indicates the direction of surface drainage. emergency overland flow route is indicated on the Grading Plan. storage volumes are provided for detention storage of return period storms up to and including the 1:100 year event. water quality calculation indicating 80% TSS removal. 1.3 Study Area The ha. (4.02 ac.) site is bound by Trafalgar Road to the east, existing single family housing to the north and south, and a proposed future residential street to the west (see Figure No. 1 Key Plan). Presently on the site are no existing buildings. The grade of the site slopes gently from west to east at approximately 0.8%. The site also slopes from north to south at approximately 0.5% slope. Along Trafalgar Road approximately 7.0m to the west of the west curb line is a ditch with four (4) culverts providing access to the land to the west. Aligned with the culverts are existing curb cuts in the west curb. An asphalt sidewalk also exists just 3.0m west of the curb , 2168, 2180 and 2192 Trafalgar Road August 2012 Functional Servicing and Stormwater Management 2 JSW

7 2.0 DEVELOPMENT CONCEPT 2.1 Development The proposed development consists of 114 townhouses in 11 Blocks. The largest block of townhouses has 12 units which are the proposed 3 block to front on to Trafalgar Road. Each Townhouse unit provides parking for two(2) vehicles. In addition to the 228 parking space noted above 27 visitor spaces are provided around the site. 2158, 2168, 2180 and 2192 Trafalgar Road August 2012 Functional Servicing and Stormwater Management 3 JSW

8 3.0 SANITARY SEWERS 3.1 Existing Sanitary Sewers No sanitary sewer exists in the Trafalgar Road right of way that fronts the development. A future sanitary sewer is proposed in the future street to the west of the site. At the time of writing this report no information has been released by the neighboring developer or their consultants. It is anticipated that the proposed future sewer will be sized to accommodate the 114 unit townhouse development. 3.2 Proposed Sanitary Sewer Design.1 Sanitary Population Density: The Town of Oakville sanitary sewers are under the jurisdiction of Halton Region. The Region does not have a population count on a per unit bases, instead the population density is based on 135 persons per hectare. The cumulative population for the 114 unit development is 147 persons. This results in an average population of 1.29 persons per unit which seems low. JSW did contact the Region for further clarification regarding population criteria but received no further information from the Region in this regard. Based on the above the above the total population for the proposed development is 147 persons..2 Sanitary Demand: The sanitary demand using 275 l/capita/day including infiltration and a peaking factor is 2.29 l/s. 3.3 Sanitary Sewer Design A 200 mm minimum sewer size is used throughout the development. Minimum slope on the first leg is 1.00%. The intent is to have one (1) outlet to the proposed new street as indicated on the Servicing Plan Drawing No. S-1. The layout of the proposed sanitary sewer system for the development is illustrated on the Servicing Plan. In Appendix A is the sanitary sewer design sheet. 2158, 2168, 2180 and 2192 Trafalgar Road August 2012 Functional Servicing and Stormwater Management 4 JSW

9 3.4 Summary and Conclusion The anticipated flow from the development is 2.29 l/s. It is anticipated that the proposed development to the west will provide a sanitary sewer sized to accommodate the proposed flow from this development. 2158, 2168, 2180 and 2192 Trafalgar Road August 2012 Functional Servicing and Stormwater Management 5 JSW

10 4.0 WATER DISTRIBUTION 4.1 Existing Watermains A 300mm watermain exists in Trafalgar Road, which is located approximately 5.0 m west of the east curb line. It is anticipated that a watermain will be constructed in the proposed future road allowance along the west side of the development and will be sized to accommodate domestic and fire demand. 4.2 Design Parameters The watermain design must accommodate the demand for two conditions, which are domestic and fire supply. The Region of Halton s standard for domestic supply is 275 l/person/day, which is the average daily demand. The maximum daily demand will be based on a factor of 2.25 times the average daily demand and the maximum hourly demand or peak hour, will be based on a factor of 4.0 times the average daily demand. Based on the above the domestic demand requirements are the following: l/min. Average Daily Maximum Daily Maximum Hourly Fire demand for the development is based on the type of building construction and the requirements of Water Supply for Public Fire Protection 1999 Fire Underwriters Survey. A review of the townhouse units and the fire separation between each unit will need to be review with the architect to determine the required fire flow. 2158, 2168, 2180 and 2192 Trafalgar Road August 2012 Functional Servicing and Stormwater Management 6 JSW

11 4.3 Layout of Proposed Watermain The watermain service connection is proposed off of the proposed street to the west (see the Servicing Plan Drawing No. S-1). 4.4 Summary and Conclusions A pressure and flow test will be carried out once the watermain is constructed in the proposed street to the west. In the interim the modeled pressure and flows for the proposed development to the west will be used which will be taken from their functional servicing report for their development. There are no existing fire hydrants along the Trafalgar Road frontage. 2158, 2168, 2180 and 2192 Trafalgar Road August 2012 Functional Servicing and Stormwater Management 7 JSW

12 5.0 STORM DRAINAGE AND STORMWATER MANAGEMENT 5.1 Existing Site Drainage and Storm Sewer System Trafalgar Road does have an existing storm sewer however the proposed townhouse development is no proposing to make a connection to the Trafalgar Road storm sewer. The intent is to make a storm connection to the proposed storm sewer which is to be located in the proposed street to the west of the site. 5.2 Storm Sewer Design The proposed storm sewer design and layout is indicated on the Servicing Plan Drawing No. S-1. In Appendix B is the storm sewer design sheet. 5.3 Stormwater Management The stormwater management criteria used to assess and design the system provided at the site, is to the Town of Oakville s criteria. The 100 year postdevelopment flow is controlled to the 5 year post-development flow. Based on this criteria a detention stormwater management tank was sized to accommodate the required detention storage volume of m 3 (see Table 5.1 modified rational method analysis). 5.4 Summary and Conclusions The allowable outflow from the site is l/s based on the 5-year post development criteria. Under the 1:100 year event m 3 of storage is required. Storage of m 3 is provided. 2158, 2168, 2180 and 2192 Trafalgar Road August 2012 Functional Servicing and Stormwater Management 8 JSW

13 TRAFALGAR ROAD TOWNHOUSE DEVELOPMENT Table No , 2168, 2180, 2192 Trafalgar Rd. Modified Rational Method - 5 yr Post to 100 yr Post 100yr based on IDF curve defined by the following equation I = 2150/(T+5.7) mm/hr 5 yr based on IDF curve defined by the following equation I = 1170/(T+5.8) mm/hr 5 yr Post Development Condition Contributing Site Area = 1.48 ha Site runoff coefficient - C = 0.80 Time of concentration = min. Peak runoff rate for 5 year storm event = l/s Inflows = Q = A x C x I/360 THEREFORE : Design peak outflow rate for = l/s Time Intensity Inflows Inflow Volumes Outflows Outflow Volumes Storage Required (min.) (mm/hr) (cu.m/s) (cu.m.) (cu.m/s) (cu.m.) (cu.m.) THEREFORE : Required storage is = m³ ORIFICE PLATE SIZING CHECK C = 0.6 (constant) G = 9.81 m/s H = 2.86 m (based on an elevation of m and orific plate centre of m) Q = 341 l/s A = Q / 2GH x C m 2 A = m 2 r = m THEREFORE : orifice diameter = 311mm

14 Johnson Sustronk Weinstein + Associates Prepared By Reviewed By Lawrence Rutledge, C.E.T. Brent Schuknecht, P.Eng. 2158, 2168, 2180 and 2192 Trafalgar Road August 2012 Functional Servicing and Stormwater Management 9 JSW

15 APPENDIX A Sanitary Sewer Design Sheet

16 Sanitary Drainage Design Sheet Population Equivalents: Townhouse = 135 persons/hectare Pipe Comment Up Stream Down Stream Increment Cumulative M Pop./ Flow A Road A Gross Infilt. Q Total L Size Grade Cap. Vel. Act. Vel. % MH Invert MH Invert Units A Site ha P p Areas Ha. l/s (ha) (ha) l/s l/s (m) (mm) (%) (l/s) (m/s) (m/s) Full Block C,G 100A A Blocks B-A 101A A Blocks A,D 102A A Road 103A A Block K 104A A Blocks E-F 106A A Block J 105A A A A Blocks H-I 108A A A A A Ex. MH TRAFALGAR ROAD TOWNHOUSE DEVELOPMENT A= area in ha. q= 275 l / person / day (Townhouse) 2158, 2168, 2180, 2192 Trafalgar Rd. P= 135p/ha x Area in Hectares P flow = M * q * P / = Population flow (l/s) Town of Oakville, Ontario I = * A gross (l/s) Design: R.N. Job No: M= / {4+(p/1000)½} Q Total = P flow + I (l/s) Check: L.R. Date: July 2012 Sheet 1 of 1

17 APPENDIX B Storm Sewer Design Sheet

18 Storm Drainage Design Sheet Cont. Total Pipe Data Street Up Stream Down Stream No. of Hectares Total AxC I-5 Flow Design Flow L Size Grade Cap. Vel. Time % Pipe MH Invert MH Invert In Area Total In Area Cum T c (mm/hr) (m³/s) (m³/s) (m) (mm) (%) (m³/s) (m/s) (min.) Full Blocks C&G CBMH Blocks C&G CBMH CBMH Block B CBMH Blocks A&D CBMH Blocks A&D CBMH CBMH Blocks A CBMH Road Court Yard Clean out Block E Block E Block K CBMH CBMH CBMH CBMH Block J CBMH Block J CBMH Block E&F CBMH Block E&F CBMH Block J CBMH Block J CBMH Block H&I CBMH CBMH CBMH CBMH TRAFALGAR ROAD TOWNHOUSE DEVELOPMENT Q = 2.78 x A x C x I/1000 A = Area (Hectares) 2158, 2168, 2180, 2192 Trafalgar Rd. C = Runoff Coefficient n = Pipe Roughness = Town of Oakville, Ontario 5 Year Rainfall Intensity =1170/(t+5.8)0.843 Designed: R.N. Job No: Checked: L.R. Date: July 2012 Sheet 1 of 1

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 346 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE PROJECT 2016-4442 JULY 2017 REVISED: APRIL 2017 C O N S U L T I N G E N G I N E E R S 64 Jardin

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016 The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

Sleepy Hollow Developments Inc. Functional Servicing and Stormwater Management Report, Town of the Blue Mountains

Sleepy Hollow Developments Inc. Functional Servicing and Stormwater Management Report, Town of the Blue Mountains Sleepy Hollow Developments Inc. Functional Servicing and Stormwater Management Report, Town of the Blue Mountains R.J. Burnside & Associates Limited 3 Ronell Crescent Collingwood ON L9Y 4J6 CANADA 300035191.0000

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

Modelling and Analysis of EES Systems Using SWMM

Modelling and Analysis of EES Systems Using SWMM Planning and Design of a Right-of-Way LID (Etobicoke Exfiltration System) July 24 th 2015 Toronto, Ontario, Canada ling and Analysis of EES Systems Using SWMM Darko Joksimovic Department of Civil Engineering,

More information

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA FUN NCTIONAL SER RVICING AN ND STO ORMWATER R MA ANAGEMENT T RE PORT 333 AN ND 351 KING STR REET EAST P PREPARED FOR: CITY O OF TORONTO F IRST GULF COR PORATION 3 751 VICTORIA PA ARK AVENUE T TORONTO,

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

Blackstone Community Phase 4-8 Functional Servicing Report

Blackstone Community Phase 4-8 Functional Servicing Report Blackstone Community Phase 4-8 Functional Servicing Report Project #160401130 Prepared for: 2129786 Ontario Inc. Prepared by: Stantec Consulting Ltd. Sign-off Sheet This document entitled Blackstone Community

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.

More information

Site Design Analysis Report 21 Willowcrest Avenue Brandon, MB R7A 7K9

Site Design Analysis Report 21 Willowcrest Avenue Brandon, MB R7A 7K9 City of Brandon Planning & Building Safety Department 638 Princess Avenue Brandon, B R7A 4A9 Site Design Analysis Report 21 Willowcrest Avenue Brandon, B R7A 7K9 Submitted by: Burns aendel Consulting Engineers

More information

FUNCTIONAL SERVICING REPORT ONTARIO STREET RESIDENTIAL TOWNHOUSE DEVELOPMENT BUCCI HOMES TOWN OF MILTON REGION OF HALTON.

FUNCTIONAL SERVICING REPORT ONTARIO STREET RESIDENTIAL TOWNHOUSE DEVELOPMENT BUCCI HOMES TOWN OF MILTON REGION OF HALTON. FUNCTIONAL SERVICING REPORT 405-475 ONTARIO STREET RESIDENTIAL TOWNHOUSE DEVELOPMENT BUCCI HOMES TOWN OF MILTON REGION OF HALTON Submitted to: Submitted by: AMEC Earth & Environmental, a division of AMEC

More information

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Hydrology Study For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Prepared for Daryl Priest - Priest Development Corporation 124 West Main Street,

More information

Envie Champagne Avenue

Envie Champagne Avenue Envie - 101 Champagne Avenue Site Servicing and Stormwater Management Report Type of Document Site Plan Submission Project Name Envie - 101 Champagne Avenue Project Number 00219439-A0 Prepared By: J. Fitzpatrick,

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 6401 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT

ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 6401 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 641 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT Prepared by: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 2, 24 Michael Cowpland

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031

1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031 1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report Marshall Homes Project # E15031 August 2016 Table of Contents 1.0 Introduction and Background... 1 2.0 Existing

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

Richland County Department of Public Works Engineering (Land Development) Division

Richland County Department of Public Works Engineering (Land Development) Division Richland County Department of Public Works Engineering (Land Development) Division Commercial Projects What is a Commercial Project? Projects that are not related to residential single family homes and/or

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

Appendix J: Storm Conveyance Design Parameters

Appendix J: Storm Conveyance Design Parameters Appendix J: Storm Conveyance Design Parameters Drain Commissioner 39 February 2005 STORM DRAINAGE DESIGN CRITERIA A. STORM SEWERS 1. The required discharge capacity shall be determined by the Rational

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

ROOF AND PROPERTY DRAINAGE

ROOF AND PROPERTY DRAINAGE CHAPTER 4 ROOF AND PROPERTY DRAINAGE 4.1 INTRODUCTION... 4-1 4.2 ROOF DRAINAGE SYSTEM... 4-1 4.3 ROOF DRAINAGE DESIGN PROCEDURE... 4-2 4.3.1 Catchment Area... 4-2 4.3.2 Design Average Recurrence Intervals...

More information

Appendix I OFFICE OF THE MORGAN COUNTY SURVEYOR STORMWATER DESIGN MANUAL 7/1/2008

Appendix I OFFICE OF THE MORGAN COUNTY SURVEYOR STORMWATER DESIGN MANUAL 7/1/2008 Appendix I OFFICE OF THE MORGAN COUNTY SURVEYOR This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX I PAGE 1 Appendix II OFFICE OF THE MORGAN COUNTY SURVEYOR This Page Left

More information

124 MODERN SEWER DESIGN

124 MODERN SEWER DESIGN 14 MODERN SEWER DESIGN Fabricated fittings are hydraulically superior. 5. HYDRAULIC DESIGN OF STORM SEWERS CHAPTER 5 Hydraulic Design of Storm Sewers 15 The hydraulic design of a sewer system may have

More information

SEWAGE TREATMENT AND DISPOSAL

SEWAGE TREATMENT AND DISPOSAL SEWAGE TREATMENT AND DISPOSAL QUANTITY OF SANITARY SEWAGE AND STORM WATER Zerihun Alemayehu Unpolluted cooling water Intercept or sewer Sources of Sewage Residential and commercial sewage Industrial wastewater

More information

APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING

APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING Source: TRCA/CVC LID Plannign and Design Guide (Version 1.0) Figure 4.10.5 Schematic of perforated pipe system integrated with

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit

More information

ULTRAMAR LTD 3467 Hawthorne Road Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT REPORT. Submitted to:

ULTRAMAR LTD 3467 Hawthorne Road Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT REPORT. Submitted to: ULTRAMAR LTD 3467 Hawthorne Road Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT REPORT Submitted to: Manon Renaud Architect 443 Saint-Claude, Montréal (QC) H2Y 3B6 Submitted by: Delcan Corporation

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY LOW IMPACT DEVELOPMENT HYDROLOGIC CONSIDERATIONS 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY May 18, 2011 PRESENTATION AGENDA Introduction Definitions Discuss Impacts to Hydrologic

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

ATTACHMENT 4: Design Calculations and Construction Details

ATTACHMENT 4: Design Calculations and Construction Details Pennsylvania Pipeline Project Erosion and Sediment Control Plan Southeast Region: Spread 6 November 2016 ATTACHMENT 4: Design Calculations and Construction Details Tetra Tech Pennsylvania Pipeline Project

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016 April 12, 2016 Mr. Craig Perl, P.E. Senior Engineer City of Aurora Public Works Department 15151 E. Alameda Parkway Aurora, CO 80012 RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

TxDOT Houston District Permit Requirements (Information contained herein is subject to change) Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three

More information

LEVAC ROBICHAUD LECLERC Consulting Engineers/Ingénieurs conseils Rockland Hawkesbury Gatineau

LEVAC ROBICHAUD LECLERC Consulting Engineers/Ingénieurs conseils Rockland Hawkesbury Gatineau LEVAC ROBICHAUD LECLERC Consulting Engineers/Ingénieurs conseils Rockland Hawkesbury Gatineau Site Servicing Brief Proposed Oakwood Designers & Builders Inc. Headquarters 865 Taylor Creek Drive, Orleans,

More information

Sleepy Hollow Developments Inc. Functional Servicing and Stormwater Management Report, Town of the Blue Mountains

Sleepy Hollow Developments Inc. Functional Servicing and Stormwater Management Report, Town of the Blue Mountains Sleepy Hollow Developments Inc. Functional Servicing and Stormwater Management Report, Town of the Blue Mountains R.J. Burnside & Associates Limited 3 Ronell Crescent Collingwood ON L9Y 4J6 CANADA June

More information

Attachment 1. Updated Infrastructure Assessment Report

Attachment 1. Updated Infrastructure Assessment Report Attachment 1 Updated Infrastructure Assessment Report Infrastructure Assessment Report Prepared for Bloom St Georges Limited 21 Swanson Road, Henderson,, Auckland Prepared by Terra Group NZ Ltd. June 2016

More information

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED Mark Pennington, Engineer, Pattle Delamore Partners Ltd, Tauranga ABSTRACT The Rational Method has been in use in some form or another at least since

More information

255 NORTHFIELD DRIVE EAST

255 NORTHFIELD DRIVE EAST 255 NORTHFIELD DRIVE EAST Fire Flow/Water Demand Analysis Project Location: 255 Northfield Drive East Waterloo, Ontario Prepared for: Abbey Ridge Developments Inc. 22 King Street South, Suite 300 Waterloo,

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 18 DRAFTING AND DESIGN REQUIREMENTS FOR NEW SUBDIVISIONS 18.1 DRAWING REQUIREMENTS FOR NEW SUBDIVISIONS... 1 18.1.1 Basic Drawing Requirements... 1 18.1.2 Transportation Drawing Requirements... 1 a) Road

More information

Permeable Pavement for Stormwater Management Porous Pavement

Permeable Pavement for Stormwater Management Porous Pavement Permeable Pavement for Stormwater Management Porous Pavement Advanced Permeable Pavement for Stormwater Management Water Quality Design Using WinSLAMM Presented by John Voorhees Water Resources Engineer

More information

ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT

ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT ENGINEERING INFRASTRUCTURE ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT Job No 37240R#C Date May 17 Level 1, 12 14 Como Street, PO Box 33 426, Takapuna,

More information

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) 525 Golden Gate Avenue, 11th Floor San Francisco, CA 94102 EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) The following example Stormwater Management Plans (SMPs) are provided

More information

GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR:

GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR: APPENDIX H GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR: NORTHERN NEW ENGLAND PASSENGER RAIL AUTHORITY (NNEPRA) 75 WEST COMMERCIAL STREET, SUITE 104

More information

SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017

SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017 SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017 I. CONSTRUCTION PREREQUISITES 1.0 Pre-construction Survey A pre-construction survey of all existing infrastructure within

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development

Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development Project # 160401232 Prepared for: Urbandale Corporation Prepared by: Stantec Consulting Ltd. Submission 3: Oct. 20,

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability

More information

PART VII - WATER SYSTEM DESIGN CRITERIA

PART VII - WATER SYSTEM DESIGN CRITERIA PART VII - WATER SYSTEM DESIGN CRITERIA A. Water Distribution, General 1. The water system layout shall be approved by the City Engineer. The fire hydrant layout shall be approved by the Redwood City Fire

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation Stormwater Engineering Bioretention Design Bill Hunt, PE, Ph.D. Extension Specialist & Assistant Professor NCSU-BAE www.bae.ncsu.edu/stormwater Bioretention Design Six Step Process 1 Determine Volume to

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

IBS Site Drainage: Senior Design Project

IBS Site Drainage: Senior Design Project IBS Site Drainage: Senior Design Project Len Wright, Ph.D., PE Lecturer, CEAE Wright.Len@gmail.com September 11, 2008 mwsw204i1.ppt/1 OUTLINE Motivation for Stormwater Management Quantity (both onsite,

More information

Whole of Water Cycle Modelling Pilot Study

Whole of Water Cycle Modelling Pilot Study Whole of Water Cycle Modelling Pilot Study Presentation Outline Background Model development Water and Sewer Stormwater Advantages of Integrated Modelling Challenges and Limitations Project Aims To investigate

More information

CRITERIA FOR STORMWATER DESIGN

CRITERIA FOR STORMWATER DESIGN ..CHAPTER.. CRITERIA FOR STORMWATER DESIGN 2.1 Integrated Site Design Approach 2.1.1 Introduction This chapter represents the requirements, policies and other guidance for stormwater management design

More information

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Storm Sewer Design Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Major floods are dramatic and water flow routes must be recognized when minor drainage systems fail. These types

More information

A Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock

A Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock A Case for the Design and Modeling of BMP Infiltration and LID Techniques 2009 IAFSM Annual Conference 2009 IAFSM Annual Conference By: Bob Murdock Presentation Outline 1. Runoff Reduction (RR) and Low

More information

Changes in Assessment Report for the Labatte-Mastronardi Drain

Changes in Assessment Report for the Labatte-Mastronardi Drain Changes in Assessment Report for the Labatte-Mastronardi Drain Roll No. 590-06800, 590-06850 and 590-06901 Municipality of Leamington February 16, 2016 Project No. 15-012 February 16, 2016 The Municipality

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

STORM DRAINAGE DESIGN CRITERIA

STORM DRAINAGE DESIGN CRITERIA BWM Orig. 01/01/05 Revised 01/01/10 LUCAS COUNTY ENGINEERS OFFICE STORM DRAINAGE DESIGN CRITERIA Drainage The design of storm sewer systems will be based upon the Rational Method using the equation Q=CiA

More information

Gwinnett County Stormwater System Assessment Program

Gwinnett County Stormwater System Assessment Program Gwinnett County Stormwater System Assessment Program Jonathan Semerjian, PE Dept. of Water Resources Stormwater Management Sam Fleming, PE Dewberry Presentation Overview Project Background Drivers Enhanced

More information

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) FEBRUARY, 2005 PLANNING AND TRANSPORTATION SERVICES PLANNING AND PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS Introduction 1 Application Review 1.1

More information

4.1 General Methodology and Data Base Development

4.1 General Methodology and Data Base Development Chapter 4 METHODOLOGY 4.1 General and Data Base Development This report project utilized several computer software models and analysis techniques to create the numeric data on which decisions for this

More information

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist If this is a re-submittal, please provide a point-by-point response to previous review comments, identifying how each comment has been addressed, location in the plan set of the changes made to address

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

Facilities Development Manual

Facilities Development Manual State of Wisconsin Department of Transportation Facilities Development Manual ORIGINATOR Director, Bureau of Highway Development PROCEDURE 13-25-35 CHAPTER 13 Drainage SECTION 25 Storm Sewer Design SUBJECT

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS Page 4-1 INTRODUCTION 4-3 4-1.01 Applicability of VMCs 14.24, 14.25, 14.26 4-4 4-1.02 Minimum Requirements - Projects Below Threshold

More information

City of Saint John. Storm Drainage Design Criteria Manual

City of Saint John. Storm Drainage Design Criteria Manual Storm Drainage Design Criteria Manual March 7, 2016 LIST OF 2016 REVISIONS PAGES SECTION TITLE iii, iv, v, vi All Table of Contents 31-35 3 SUBMISSION REQUIREMENTS March 7, 2016 Page i DISCLAIMER The material

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 SUBDIVISION NAME DEVELOPMENT NAME LOCATION Northside LTD/Joint Venture Subdivision, Resubdivision of and Addition to Lot 3A Northside

More information