6 EIA must identify, predict, evaluate and mitigate likely direct and indirect environmental effects of activities on: human beings fauna, flora, soil, water, air, climate, landscape material assets, cultural heritage, social the interaction between those factors

7 Projects with significant adverse effects to environment Projects with insignificant adverse effects to environment Mandatory EIA Screening by Competent authorities to decide if EIA is needed or not

8

9

10

11

12

13 Screening Scoping Assessment Review EIA

14 Screening Scoping Assessment Review Answers the question: is EIA required? check the policy delineation (prescribed activity list) The guiding principle: are significant environmental effects likely? If yes EIA needed If no no EIA needed EIA

15 Screening Scoping Assessment Review Criteria used include threshold, size of project, and environmental sensitivity. Preliminary study to indicate: No or insignificant adverse effects Significant but mitigable adverse effects Significant but may or may not be mitigable EIA

16 Screening Scoping Assessment Review EIA Identification of key issues to be studied & addressed in the report. Answers the question: what should be covered by the environmental information? Determined in a meeting comprising environmental authority, project proponent & consultants. Before development consent application is submitted

17 Screening Scoping Assessment Review EIA Baseline study (Existing Environment) - Project description - Collection of background info of the existing biogeographical settings for impact assessment and future monitoring purposes. Impact Assessment preliminary and detailed Assessments - Use of resources, emissions and residues (estimate)

18 Screening Scoping Assessment Review EIA Impact Assessment preliminary and detailed Assessments (cont d) - Description of the environment likely to be significantly affected - Likely significant environmental effects and forecasting methods. Mitigation and abatement measures - Recommendations of Environmental Monitoring Plan (EMP)

19 Screening Scoping Assessment Review Main alternatives and reasons for the choice taking account of the environmental effects Cumulative effects Short term and temporary effects Mitigation measures Non-technical summary EIA

20 Screening Scoping Assessment Review To determine whether the report is adequate in addressing all the issues under the TOR If revision is required, the EIA consultant needs to amend and improve the quality of the EIA report to a standard acceptable to the Panel member EIA

21 Screening Scoping Assessment Review EIA When final decision is taken, public must be informed of its contents and reasons, attached conditions and mitigation measures Upon acceptance of EIA report, the Natural Resources & Environment Board (NREB) will prepare EIA Approval document consisting Letter of Undertaking (LOU), approval conditions and guidelines. Ground truthing by NREB field officer to verify information on the ground

22 Start EIA Required? Screening yes Scoping No Environmental Assessment (EA) Receipt & Preliminary Evaluation Preliminary Report No accepted? Report accepted? yes Evaluation yes Approval Monitoring/Auditing End Procure more info by Consultant No Revision of EIA Report by Consultant Yes No Reject Report needs revision?

23 Key sections of an EIA study, 2 major parts: The treatment of unwanted chemicals (by-products) and the concentrations of liquid discharges and gaseous emissions during normal operation The handling of a major chemical accident within the plant and any subsequent reaction products, and containment and clean-up.

24 Waste chemical disposal Treatment dilution, neutralisation, purification, separation, etc. Drainage system rainwater, domestic waste, relatively pure process water, acid spills, oils, etc. Separate systems vs central collection tank Concentration must consider current limits and the possibility of these being tightened in the future Scrubbing systems, filters, etc. Emissions short term and possible long-term affects have to be addressed

25 Containment, clean-up, discharge Quantity and location of the chemicals Prevailing wind direction Location of plant personnel and general public Access to the plant and high-risk areas

26 Contains discussion of beneficial and adverse impacts considered relevant to the project, plan or policy 3 Sections: Inventory, Assessment, Evaluation These sections should include: - A brief description of the proposed development - A brief description of the local area - Potential impacts - Mitigating actions - Examination of affect on the area if existing trends were continue - Consultations and objections

27 Pre-1974 Abundance Paradigm (nature is a free and endless commodity) Pollution control paradigm (Environmental Quality Act 1974) Pollution prevention/sustainable development paradigm

28 Administered by Department of Environmental (DOE): Environmental Quality Act 1974 But under the Federal constitution, matters related to natural resources (land use, forestry, agriculture and inland water resources) are under the control of state governments. Thus Federal laws pertaining to natural resources are ineffective until it s adopted by the state legislature.

29 Requirement for EIA in Malaysia: EIA is a planning tool for preventing environmental problems or damages as a result of project development. EIA is required under Section 34A, Environmental Quality Act, Guidelines and Procedures: To guide and advise you in preparing EIA reports. Guidelines for specific activities are published by Department of Environment (DOE)

30 Nineteen categories of Activities are prescribed under the Environmental Quality Act, 1974 (Amendment 1985). These include activities related to: Agriculture, airport, drainage and irrigation, land reclamation, fisheries, forestry, housing, industry, infrastructure, ports, mining, petroleum, power generation, quarries, railways, transportation, resort and recreational development, wastewater treatment and disposal and water supply.

31 The EIA procedure adopted in Malaysia consists of three major components: Preliminary Assessment Detailed Assessment Review of EIA

32 Initial prediction of the impacts due to those activities that are prescribed should be initiated at the prefeasibility study stage of the development of an activity. Project options are identified and any significant residual environmental impacts are made known. Preliminary report is reviewed by technical committee in the DOE internally or other government and non-government agencies

33 Undertaken for those projects where significant residual environmental impacts have been predicted in the preliminary assessment. Carried out based on specific TOR issued by an ad hoc Review Panel appointed by the Director General (DG). Detailed EIA report to be submitted for approval by the Director General of Environmental Quality prior to approval by the Federal or State Gov t authority for implementation.

34 This is carried out internally by the DOE for the Preliminary Assessment and by an ad hoc Review Panel for Detailed Assessment reports. Recommendations from review are transmitted to relevant project approving authorities for consideration Normal period allocated for review of a Preliminary Assessment report is one month while that for Detailed Assessment report is two months.

35 Director General of Environmental Quality Chairman of EIA Review Panel Public Director of Prevention (DOE) Secretary of EIA Review Panel Head of EIA Section Review Panel Evaluation Section (EIA Report Processing Desk Officers)

36 Upon acceptance of EIA report, the NREB will prepare EIA Approval Document consisting Letter of Undertaking ( LOU), approval conditions and guidelines. Project proponent together with appointed EIA consultant will sign LOU to be witnessed by NREB Official.

37

38 A mechanism to : check environmental compliance especially the EIA approval conditions, mitigation measures and guidelines test impact predictions provide warning of undesirable change so that corrective measures can be implemented, provide evidence to refute or support claims for damage compensation keep record of activities that affect the environment

39 A management tool to: Determine impacts Check that conditions arising from EIA are being met Test the scientific accuracy of EIA predictions Check on environmental management practices Identify areas where the EIA could have been improved Look for improvements for future EIAs

5. ENVIRONMENTAL IMPACT ASSESSMENT

5. ENVIRONMENTAL IMPACT ASSESSMENT 5. ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION Environmental Impact Assessment (EIA) is a process that considers how a proposed development will change existing environmental conditions, and what

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL IMPACT STATEMENT (EIS) 2.0 Developments requiring preparation of an EIS

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL IMPACT STATEMENT (EIS) 2.0 Developments requiring preparation of an EIS ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL IMPACT STATEMENT (EIS) 1.0 Background 2.0 Developments requiring preparation of an EIS 3.0 The contents of an EIS 4.0 Exemption from the requirement

More information

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act: TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management Plans for

More information

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act: Interim TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management

More information

Information on the focal point for the Convention. Information on the point of contact for the Convention

Information on the focal point for the Convention. Information on the point of contact for the Convention Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

March Protected area boundary adjustments fall within one of three categories:

March Protected area boundary adjustments fall within one of three categories: PROVINCIAL PROTECTED AREA BOUNDARY ADJUSTMENT POLICY, PROCESS AND GUIDELINES March 2010 1. BACKGROUND: Provincial protected areas 1 are set aside to provide a wide range of opportunities that support tourism

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

WHICH PROJECTS REQUIRE EIA?

WHICH PROJECTS REQUIRE EIA? WHAT IS EIA? Environmental Impact Assessment (EIA) is a critical examination of the effects of a project on the environment. An EIA identifies both negative and positive impacts of any development activity

More information

Environmental Assessment in Canada

Environmental Assessment in Canada Environmental Assessment in Canada 1. International Building Blocks for Environmental Assessment 2. Role of the Canadian Environmental Assessment Act 3. The Ontario Environmental Assessment Act 4. Procedures

More information

Mining Environmental Impact Assessment Guidelines. May 2018

Mining Environmental Impact Assessment Guidelines. May 2018 Mining Sector Environmental and Social Impact Assessment Guidelines Mining Environmental Impact Assessment Guidelines May 2018 Background Mining EIA Guidelines Working Group established by Minister of

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

! Environmental Impact Assessment process!

! Environmental Impact Assessment process! Environmental Impacts"! Environmental Impact Assessment process! Prof. Doutora Maria do Rosário Partidário Environmental Impacts @ MRPartidário 1 EIA Started with NEPA (National Environmental Policy Act,

More information

Evaluation and future development of the EIA system in Albania

Evaluation and future development of the EIA system in Albania MEDITERRANEAN ENVIRONMENTAL TECHNICAL ASSISTANCE PROGRAM Evaluation and future development of the EIA system in Albania A report prepared under the METAP EIA Institutional Strengthening Project February

More information

Berth 9 Quay Extension Environmental Statement Non-Technical Summary

Berth 9 Quay Extension Environmental Statement Non-Technical Summary Berth 9 Quay Extension Hutchison Ports UK Ltd July 2013 Final Report 9Y0150 CONTENTS Page 1 PROJECT BACKGROUND 1 2 NEED FOR THE PROPOSED SCHEME 4 3 DESCRIPTION OF THE CONSTRUCTION PHASE 4 4 DESCRIPTION

More information

Environmental Assessment Approval

Environmental Assessment Approval Environmental Assessment Approval Approval Date: Original Dated April 20, 2012 Trimper Sand and Gravel Pit Expansion Ivan H. Trimper Construction Ltd., Proponent Annapolis County, Nova Scotia The Trimper

More information

Consultation Protocol of the Mikisew Cree First Nation

Consultation Protocol of the Mikisew Cree First Nation November 24, 2009 In our every deliberation we must consider the impact of our decisions on the next seven generations - author unknown Consultation Protocol of the Mikisew Cree First Nation ( the Protocol

More information

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and Information required by EUB Guide G-23 1.0 GENERAL INFORMATION 1.1 INTRODUCTION The application should include: a brief project summary, objectives, approvals requested, technical and economic details,

More information

Environmental Assessment Program

Environmental Assessment Program Environmental Assessment Program Frequently Asked Questions Updated February 2010 Introduction The following is a list of questions that are commonly asked by both project Proponents and the public regarding

More information

Draft Code of Construction Practice

Draft Code of Construction Practice Draft Code of Construction Practice This factsheet outlines how it is expected the nominated undertaker will manage the effects of the construction of the Proposed Scheme on communities and the environment

More information

STANDARD TECHNIQUE : EW1AB/1

STANDARD TECHNIQUE : EW1AB/1 Company Directive STANDARD TECHNIQUE : EW1AB/1 Relating to the Requirement for Environmental Impact Assessments ST:EW1AB/1 November 2011-1 of 10 - IMPLEMENTATION PLAN Introduction This document describes

More information

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section Compliance Reporting

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section Compliance Reporting Section 12.0 Compliance Reporting VE51988 TABLE OF CONTENTS 12.0... 12-1 12.1 Introduction... 12-1 12.2 Compliance Monitoring and Reporting... 12-1 12.3 Reporting Structure... 12-4 List of Tables Table

More information

Consent Steps Assessing the Application and Assessment of Environmental Effects

Consent Steps Assessing the Application and Assessment of Environmental Effects 2017 Consent Steps Assessing the Application and Assessment of Environmental Effects Assessing the Application and Assessment of Environmental Effects This guidance has been updated to include the changes

More information

2 ENVIRONMENTAL IMPACT ASSESSMENT

2 ENVIRONMENTAL IMPACT ASSESSMENT 2 ENVIRONMENTAL IMPACT ASSESSMENT Introduction 2.1 Environmental Impact Assessment (EIA) is required for certain categories of projects and involves a process of drawing together, in a systematic way,

More information

Licensing Nuclear Power Plants in Canada. Ensuring Safe and Environmentally Acceptable Operations

Licensing Nuclear Power Plants in Canada. Ensuring Safe and Environmentally Acceptable Operations Licensing Nuclear Power Plants in Canada Ensuring Safe and Environmentally Acceptable Operations Nuclear Power the ultimate Energy Source It s been around a long time Nuclear power closer to home Needs

More information

1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups.

1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups. 1.0 The Need for EIA Every anthropogenic activity has some impact on the environment. More often it is harmful to the environment than benign. However, mankind as it is developed today cannot live without

More information

September 2016 ID Competency Statement Type

September 2016 ID Competency Statement Type September 06 Ensures that the impact assessment scope, criteria and conditions (geographic, environmental, economic, social, and cultural) are defined adequately. Develops a project management plan for

More information

BASIC INFORMATION QUESTIONNAIRE

BASIC INFORMATION QUESTIONNAIRE Application No. Central Environmental Authority BASIC INFORMATION QUESTIONNAIRE Essential information to determine the environmental approval requirement of projects (Note Use separate sheets as and when

More information

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI

More information

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 Summary of LAE ONTARIO 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 2. Information (editorial, revised, new): LO G 1 (revised) LO NGS 1 (revised) LO G 2 (revised) LO SEW 2 (revised) LO G 6 (revised) LO

More information

Introduction to Environmental Impact Assessment for Masterplan Sites 25 April 2018

Introduction to Environmental Impact Assessment for Masterplan Sites 25 April 2018 Introduction to Environmental Impact Assessment for Masterplan Sites 25 April 2018 Environmental Impact Assessment Session Introduction and purpose of the presentation Key Topics for Discussion: Environmental

More information

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL COMPLIANCE IN UGANDA-A REGULATORY PERSPECTIVE/ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROCESS IN UGANDA PRESENTED AT A TRAINING WORKSHOP FOR USAID/UGANDA STAFF FROM 9 TH TO 12 TH SEPTEMBER,

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

The Halifax Harbour Solutions Project Provision of Sewage Treatment

The Halifax Harbour Solutions Project Provision of Sewage Treatment The Halifax Harbour Solutions Project Provision of Sewage Treatment ENVIRONMENTAL SCREENING PURSUANT TO THE CANADIAN ENVIRONMENTAL ASSESSMENT ACT Prepared by Halifax Regional Municipality June, 2000 Revised

More information

LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776]

LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776] LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776] 1. Notwithstanding all the other permits and clearances

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

Conditions of Approval for the MDP for the brickworks at Perth Airport

Conditions of Approval for the MDP for the brickworks at Perth Airport Conditions of Approval for the MDP for the brickworks at Perth Airport Definitions In this document, unless a contrary intention appears, the terms below have the meanings given to them: AES means Airport

More information

6 IDENTIFICATION AND PREDICTION OF IMPACTS

6 IDENTIFICATION AND PREDICTION OF IMPACTS 6 IDENTIFICATION AND PREDICTION OF IMPACTS 6.1 General The actual and potential environmental impacts due to the proposed development by Mauritius Molasses Company Limited in the setting up of an oil storage

More information

STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT for ECONOMIC DEVELOPMENT STRATEGY FOR COUNTY MEATH MEATH COUNTY COUNCIL.

STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT for ECONOMIC DEVELOPMENT STRATEGY FOR COUNTY MEATH MEATH COUNTY COUNCIL. STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT for ECONOMIC DEVELOPMENT STRATEGY FOR COUNTY MEATH 2014-2022 MEATH COUNTY COUNCIL January 2016 Brady Shipman Martin Canal House Canal Road Dublin 6 Phone:

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Insert then choose Picture select your picture. Right click your picture and Send to back. August 6-8 th, 2014 Craig A. Reid Partner,

More information

Birds and Habitats Directives Natura 2000 and Appropriate Assessments

Birds and Habitats Directives Natura 2000 and Appropriate Assessments Workshop on Exemptions under Art. 4(7) of the Water Framework Directive 14/12/2016, Brussels Birds and Habitats Directives Natura 2000 and Appropriate Assessments Fotios Papoulias European Commission,

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group Environmental Management System Integrated Pollution Control Document No. 5.2.1 Version no. 1 Origination Date 1 st February 2017 Area: The Group Approval: Group Services & Facilities Last Revision Date

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Environmental Impact Assessments and Geological Repositories for Radioactive Waste

Environmental Impact Assessments and Geological Repositories for Radioactive Waste SE0000112 Environmental Impact Assessments and Geological Repositories for Radioactive Waste P. O'Sullivan, B. McKirdy, M. Askarieh A. Bond, S. Russell 1 United Kingdom Nirex Limited Environmental Impact

More information

Combined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius

Combined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius Combined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius CONTENTS Chapter Description Page 1 NON-TECHNICAL SUMMARY 17 1 INTRODUCTION 18 2 PROPOSED PROJECT IN FORT GEORGE 18 3 METHODOLOGY

More information

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT 1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT This Environmental Impact Assessment Report (EIA Report) has been prepared by Environmental Resources Management Ltd

More information

Wastewater Management Procedure Environment

Wastewater Management Procedure Environment 1 Purpose and Scope This procedure specifies the operational environmental requirements relating to the management of wastewater and the operation and maintenance of Roy Hill wastewater treatment plants

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India Review: Definition of EIA Environmental Impact Assessment

More information

7. Environmental Impact Mitigating measures

7. Environmental Impact Mitigating measures ENVS402 Environmental Impact Assessment 7. Environmental Impact Mitigating measures I. Benefit enhancing measures (selection and implementation) II. Adverse Impact mitigating measures (selection and implementation)

More information

MINING EIA REVIEW CHECKLIST

MINING EIA REVIEW CHECKLIST EIA Review Checklist Mining and the Environment Mining is a sustainable activity MINING EIA REVIEW CHECKLIST Reviewing the Content General aspects Does the environmental assessment conform to national

More information

Technical Guidance Document for Operational Environmental Management Plan (OEMP)

Technical Guidance Document for Operational Environmental Management Plan (OEMP) Technical Guidance Document for Operational Environmental Management Plan (OEMP) EAD-EQ-PCE-TG-06 Signature on Original Environment Quality Sector * Corporate Management Representative Secretary General

More information

IEMA ES Review Criteria

IEMA ES Review Criteria IEMA ES Review Criteria Structure of the Criteria The criteria are split into three sections and a review report is structured accordingly: Section 1 addresses all of the information contained within an

More information

Integrated Water Management Developer Guidance

Integrated Water Management Developer Guidance WESTERN WATER Western Water Whole-of-water-cycle Strategy Integrated Water Management Developer Guidance Edition 1, 2018 For more information call 1300 650 422 or visit us at WesternWater.com.au Development

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

Consultation with the Council and Environmental Impact Assessment Process

Consultation with the Council and Environmental Impact Assessment Process Consultation with the Council and Environmental Impact Assessment Process The following details the consultation with the Council and the environmental impact assessment process envisioned under the (draft)

More information

Key words: Marine pollution, oil and gas activities, Environmental Impact Assessment, environmental aw. INTRODUCTION

Key words: Marine pollution, oil and gas activities, Environmental Impact Assessment, environmental aw. INTRODUCTION Australian Journal of Basic and Applied Sciences, 6(11): 273-280, 2012 ISSN 1991-8178 Mitigating the Implication of Offshore Oil and Gas Activities on the Marine Environment in Malaysia: Some Measures

More information

PART 1. To: Scottish Consultation Authorities: PART 2

PART 1. To: Scottish Consultation Authorities: PART 2 PART 1 To: Scottish Consultation Authorities: SEA.gateway@scotland.gsi.gov.uk PART 2 An SEA Screening Report is attached for the plan, programme or strategy (PPS) entitled: Scotland River Basin Management

More information

Note: This is a draft document and does not represent a position or decision by government. Part 2: Policy for Cumulative Effects Management

Note: This is a draft document and does not represent a position or decision by government. Part 2: Policy for Cumulative Effects Management Cumulative CEF DRAFT Effects Policy (April, 2016) Framework Part 2: Policy for Cumulative Effects Management Preamble This is a draft natural resource sector policy being shared for the purpose of gaining

More information

In-combination and Cumulative Effects Assessment

In-combination and Cumulative Effects Assessment P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 18 In-combination and Cumulative Effects Assessment Table

More information

Environmental Impact Assessment (EIA) in Nepal

Environmental Impact Assessment (EIA) in Nepal Environmental Impact Assessment (EIA) in Nepal Presented by Government of Nepal Environmental Impact Assessment Section Ministry of Population and Environment History Started in 1960 s with the formulation

More information

FRAMEWORK FOR ENVIRONMENTAL GUIDELINES FOR SUSTAINABLE TOURISM Prepared by the Institute of Natural Resources 1 8 September 2001

FRAMEWORK FOR ENVIRONMENTAL GUIDELINES FOR SUSTAINABLE TOURISM Prepared by the Institute of Natural Resources 1 8 September 2001 FRAMEWORK FOR ENVIRONMENTAL GUIDELINES FOR SUSTAINABLE TOURISM Prepared by the Institute of Natural Resources 1 8 September 2001 1 POLICY AND LEGISLATIVE FRAMEWORK A review of policy, legislation and relevant

More information

Global Sustainable Tourism Criteria for Destinations (GSTC-D) version November Preamble

Global Sustainable Tourism Criteria for Destinations (GSTC-D) version November Preamble (GSTC-D) version 1.0 1 November 2013 Preamble Sustainable tourism is on the rise: consumer demand is growing, travel industry suppliers are developing new green programs, governments and international

More information

NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT

NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT Intended for Bugesera Airport Company Limited Date January 2018 Project Number UK11-24483 NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT

More information

Chapter 9 SUMMARY AND CONCLUSION

Chapter 9 SUMMARY AND CONCLUSION Chapter 9 SUMMARY AND CONCLUSION The potential environmental impacts and socio-economic issues associated with the construction and operation of the dye house at La Tour Koenig have been assessed in this

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

Environmental Assessment Approval

Environmental Assessment Approval Environmental Assessment Approval Approval Date: Original Dated October 1, 2010 Hants County Aggregate Quarry Extension Project Municipal Enterprises Ltd., Proponent Hants County, Nova Scotia The Hants

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT SECOND CYCLE DEGREE PROGRAMME (MSC LEVEL) IN ENVIRONMENTAL ENGINEERING ENVIRONMENTAL IMPACT ASSESSMENT A.A. 2014-2015 Environmental Impact The 'environmental impact' can be defined as the effect of an

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or 14. Waste Management 14.1. Waste Management Regulations The regulatory requirements governing waste management are provided within the EP Act, the EPR and associated Environmental Protection (Waste Management)

More information

1 Environmental and Social Action Plan

1 Environmental and Social Action Plan 1 and Social Plan The table below constitutes the ESAP. It identifies the required actions during pre-construction, construction and operation of the project. of the actions is the responsibility of Koridori

More information

ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO

ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO Review Paper (SS-3) ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO S.N. Ranshur*, P.H. Sawant and R.A. Hegde Civil (Env. Engg. Subjects), S.P. College of Engineering, Mumbai (INDIA) *E-mail : sandeepranshur@yahoo.com

More information

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction 9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of

More information

How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy

How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy for the Environmental Services Association of Nova Scotia By Krista Hilchey Wetland Specialist, Nova Scotia Environment To

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

E5. On-site and small scale wastewater treatment and disposal

E5. On-site and small scale wastewater treatment and disposal E5. On-site and small scale wastewater treatment and disposal E5.1. Background On-site wastewater systems are utilised for residential dwellings, commercial and industrial activities and facilities not

More information

SUMMARY LOUISIANA-PACIFIC CANADA LTD. - TEN YEAR FOREST MANAGEMENT PLAN (CLIENT FILE NO.: )

SUMMARY LOUISIANA-PACIFIC CANADA LTD. - TEN YEAR FOREST MANAGEMENT PLAN (CLIENT FILE NO.: ) SUMMARY LOUISIANA-PACIFIC CANADA LTD. - TEN YEAR FOREST MANAGEMENT PLAN - 1996-2005 (CLIENT FILE NO.: 3893.00) Louisiana-Pacific Canada Ltd. had applied for a Environment Act Licence of a Ten Year Forest

More information

8. Greenhouse Gas Emissions

8. Greenhouse Gas Emissions 8. Greenhouse Gas Emissions This section provides a summary of the greenhouse gas assessment undertaken, and the potential impacts identified, in regards to the Project (Mine) during construction and operation.

More information

Safeguard Requirements And the Framework Process

Safeguard Requirements And the Framework Process Safeguard Requirements And the Framework Process The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 1 Role of Bank and Borrower Bank Screens and Sets EA Category Advises Borrower

More information

Facilitating Implementation of the Canada-Ontario Agreement on Environmental Assessment Cooperation

Facilitating Implementation of the Canada-Ontario Agreement on Environmental Assessment Cooperation Federal/Provincial Environmental Assessment Coordination in Ontario A Guide for Proponents and the Public Facilitating Implementation of the Canada-Ontario Agreement on Environmental Assessment Cooperation

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

Appendix 3 The World Bank s New Operational Manual

Appendix 3 The World Bank s New Operational Manual Appendix 3 The World Bank s New Operational Manual Appendix 4 Environmental Consideration in JICA Outline of Environmental Consideration in JICA 1Introduction Various studies

More information

SgurrEnergy Ltd Linfairn Wind Farm Environmental Statement: Chapter 4

SgurrEnergy Ltd Linfairn Wind Farm Environmental Statement: Chapter 4 4 THE EIA PROCESS 4.1 OVERVIEW The purpose of an EIA is to provide a systematic analysis of the impacts of a project in relation to the existing (baseline) environment. The findings of an EIA are presented

More information

Sources of Federal Government and Employee Information

Sources of Federal Government and Employee Information INFO SOURCE Sources of Federal Government and Employee Information Prince Rupert Port Authority 1. GENERAL INFORMATION Background The Prince Rupert Port Authority was established pursuant to the Canada

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA).

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). Guidance Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). March 2008 Table of Contents Page INTRODUCTION... 2 DEFINITIONS...

More information

REPORT 2015/030 INTERNAL AUDIT DIVISION. Audit of the recruitment process at the United Nations Framework Convention on Climate Change

REPORT 2015/030 INTERNAL AUDIT DIVISION. Audit of the recruitment process at the United Nations Framework Convention on Climate Change INTERNAL AUDIT DIVISION REPORT 2015/030 Audit of the recruitment process at the United Nations Framework Convention on Climate Change Overall results relating to recruitment process were initially assessed

More information

TABLE OF CONTENTS. 3.1 Project Justification Project Description 21

TABLE OF CONTENTS. 3.1 Project Justification Project Description 21 TABLE OF CONTENTS Title Page Table of Contents (ii) List of Tables (iv) List of Plates (v) List of Annexes (vi) Executive Summary (vii) Chapter 1. Introduction & Methods of Assessment of Impact 1 1.1 The

More information

A Citizen s Guide to Environmental Assessment

A Citizen s Guide to Environmental Assessment A Citizen s Guide to Environmental Assessment February 2001 Revised September 2009 Revised September 2017 Policy Division TABLE OF CONTENTS INTRODUCTION 1 ENVIRONMENTAL ASSESSMENT 3 Definition and Purpose

More information

9 OBJECTIVES/POLICIES: Hazardous Substances and Contaminated Land. 9. Hazardous Substances and Contaminated Land

9 OBJECTIVES/POLICIES: Hazardous Substances and Contaminated Land. 9. Hazardous Substances and Contaminated Land 9. Hazardous Substances and Many activities in the District involve the use, storage, transportation and disposal of hazardous substances which are critical to manufacturing, construction, primary production

More information

N O N - T E C H N I C A L S U M M A R Y

N O N - T E C H N I C A L S U M M A R Y PROPOSED LUBE OIL BLENDING PLANT AT MAURITIUS FREEPORT DEVELOPMENT ZONE, MER ROUGE, PORT LOUIS N O N - T E C H N I C A L S U M M A R Y Project Promoter The project proponent, Sivoko Lubes Ltd, is a private

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

EIA Regulations Cara Davidson

EIA Regulations Cara Davidson EIA Regulations 2017 Cara Davidson EIA Directives EC Public Consultation EC proposals for revising EIA Directive EIA Directive amendment 2014/52/EU 2010 2012 2014 2009 2011 2013 2017 EU EIA Effectiveness

More information