Cold Weather Ammonia Removal

Size: px
Start display at page:

Download "Cold Weather Ammonia Removal"

Transcription

1 MWEA Annual Conference June 21, 2016 Cold Weather Ammonia Removal Mark Prein

2 Welcome to Charlevoix the Beautiful

3

4 Project Need NPDES Permit

5 Project Need NPDES Permit

6 Project Need MDEQ Compliance Schedule

7 MG/L City of Charlevoix INFLUENT AND EFFLUENT BOD, MG/L Influent BOD Monthly Average Day mg/l Final Effluent BOD Monthly Average Day mg/l 2011 MDEQ BOD Limits mg/l Jan-09 Apr-09 Jul-09 Oct-09 Jan-10 Apr-10 Jul-10 Oct-10 Jan-11 Apr-11 Jul-11 Oct-11 Jan-12 Apr-12 Jul-12 Oct-12 DATE

8 MG/L 45 City of Charlevoix INFLUENT AND EFFLUENT AMMONIA, MG/L Influent Ammonia Monthly Average Day mg/l Final Effluent Ammonia Monthly Average Day mg/l 2011 MDEQ Ammonia Limits mg/l /01/2015 Limits Jan-10 Mar-10 May-10 Jul-10 Sep-10 Nov-10 Jan-11 Mar-11 May-11 Jul-11 Sep-11 Nov-11 DATE

9 RATIO 1.4 City of Charlevoix ACTIVATED SLUDGE FOOD TO MICRO-ORGANISM (F/M) RATIO Activated Sludge Food to Micro-organism Ratio - F/M Ten States Maximum F/M Ratio for Nitrification Both Aeration Tanks in Operation From April 11, 2011 to October 9, 2011 and From October 21, 2011 to End of Year Jan-09 Apr-09 Jul-09 Oct-09 Jan-10 Apr-10 Jul-10 Oct-10 Jan-11 Apr-11 Jul-11 Oct-11 Jan-12 Apr-12 Jul-12 Oct-12 DATE

10 TEMPERATURE, F 75 City of Charlevoix INFLUENT TEMPERATURE, DEGREES FAHRENHEIT Influent Temperature Monthly Average Day Influent Temperature Monthly Minimum Day Primary Effluent 43 degree F 40 Jan-09 Apr-09 Jul-09 Oct-09 Jan-10 Apr-10 Jul-10 Oct-10 Jan-11 Apr-11 Jul-11 Oct-11 Jan-12 Apr-12 Jul-12 Oct-12 DATE

11 MG/L 25 City of Charlevoix INFLUENT TEMPERATURE, WATER PLANT TEMPERATURE AND EFFLUENT AMMONIA LIMITS, MG/L 2011 MDEQ Ammonia Limits mg/l Influent Temperature Monthly Average Day Water Plant Intake Temperature Monthly Average Day TEMPERATURE, F /01/2015 Limits Dec-08 Jul-09 Jan-10 Aug-10 Feb-11 Sep-11 Apr-12 Oct-12 DATE

12 MG/L 25 City of Charlevoix INFLUENT TEMPERATURE AND EFFLUENT AMMONIA LIMITS, MG/L 2011 MDEQ Ammonia Limits mg/l Influent Temperature Monthly Average Day TEMPERATURE, F Dec-08 Mar-09 Jul-09 Oct-09 Jan-10 May-10 Aug-10 Nov-10 Feb-11 Jun-11 Sep-11 Dec-11 Apr-12 Jul-12 Oct-12 DATE

13 MG/L City of Charlevoix INFLUENT AND EFFLUENT AMMONIA, MG/L Final Effluent Ammonia Monthly Average Day mg/l Influent Ammonia Monthly Average Day mg/l 2011 MDEQ Ammonia Limits mg/l Prelim. Calc. Site Specific Ammonia Limits mg/l Jan-10 Apr-10 Jul-10 Oct-10 Feb-11 May-11 Aug-11 Dec-11 DATE

14 Temperature Impact on Treatment WEF MOP11, fifth addition

15 ph Impact on Nitrification WEF MOP11, fifth addition

16 Discharge Permit Negotiations Identified four proposed modifications to Permit Reduce or Eliminate the Ammonia Multiple Discharge Points Shift the Permit Time Limits Discharge Location Specific Conditions WET Testing Methodology Impacts! Next Permit Cycle

17

18 Ammonia Challenge Issues Cold Wastewater Limited growth rate/washout Tankage Alkalinity Seasonal Flows Solutions Air Stripper Increase wastewater temperature Increase/retain biomass

19 Temperature Issue Cold Wastewater Slows Ammonia removal Solutions Prevent heat loss Increase Temperature Heat wastewater Heat recovery Work around

20 Temperature Issue Cold Wastewater Slows Ammonia removal Solutions Prevent heat loss Cover Primary Tanks Increase Temperature Heat wastewater Heat recover Work around MBR Attached Growth

21 MBR vs. Attached Growth MBR Zenon/GE Koch Evoqua Ovivo Lots of Others Attached Growth Infilco Degremont Kruger Biowater Water World Lots of Others

22 Pros Vs. Cons MBR - Pros Smaller Footprint Very high MLSS, option High quality effluent Cons Higher electric cost Higher chemical costs More complicated Attached Growth Increase biomass Media adjustable Many configurations Operator friendly Cons Settling, potential Biomass loss More tankage Clarifiers remain/add Life Cycle Costs

23 Attached Growth Process

24 MBR

25 Process Selection Pros/Cons Results Why not select MBR More aggressive Additional costs and O&M More operator intensive Accomplish goal with less equipment Have the space for the Attached Growth Process

26 Process Selection Pros/Cons Results Why not select MBR More aggressive Additional costs and O&M More operator intensive Accomplish goal with less equipment Have the space for the Attached Growth Process Note the use of Attached Growth terminology

27 Attached Growth Options Mobile Media MBBR Moving Bed Biofilm Reactor CMFF Complete Mix Fixed Film (Biowater) IFAS Integrated Fixed Film Activated Sludge CFAS Combined Fixed Film Activated Sludge (Biowater) CFIC Continuous Flow Intermittent Cleaning (Biowater)

28

29 And some more options Lagoon - EDI Brentwood Lagoon Nelson Env.

30 Process Selection Why select IFAS/CFAS vs MBBR Better settling Clarifier Needs Better control of Activated Sludge Treatment flexibility Huge swings in flows

31 Cost Estimate City of Charlevoix Wastewater Treatment Plant Plant Unit Cost Estimate 1. Basic Plant Improvements $5,695, Additional Aeration Tanks $200, Complete Advanced Treatment System $1,650, Process Requirements $350, Piping Systems $500,000 Total $8,395,000 Contingency, Legal, Engineering, and Fiscal $2,500,000 Project Total $10,895,000

32 Funding $11 Million Dollar Project State S-2 Planning Grant (90%) State: $63,900; City: $24,900* Includes 10% match and In-Eligible work. Rate Increase 24.5% for three years Outreach program Unanimous community support State S-2 Design Grant (90%) State: $812,700; City: $90,300 SRF Project Plan and Funding City of Charlevoix WWTP

33 Primary Covers

34 Bioreactor

35 Bioreactor Internals

36 Bioreactor Internals

37

38 Media Install

39 MG/L 35 City of Charlevoix MODIFIED AMMONIA PERMIT LIMIT, MG/L 2011 MDEQ Ammonia Limits, mg/l 2015 MDEQ Ammonia Limits, mg/l Note: Permit June 2011 Permit November Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DATE

40 MG/L City of Charlevoix INFLUENT AND EFFLUENT BOD, MG/L Influent BOD Monthly Average Day mg/l Final Effluent BOD Monthly Average Day mg/l MDEQ BOD Limits mg/l Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 DATE

41 ph 9 City of Charlevoix INFLUENT AND EFFLUENT ph Influent ph Monthly Average Day Effluent ph Monthly Average Day Jan-15 Mar-15 May-15 Jul-15 Sep-15 Nov-15 Jan-16 Mar-16 May-16 DATE

42 MG/L 45 City of Charlevoix INFLUENT AND EFFLUENT AMMONIA, MG/L Influent Ammonia Monthly Average Day mg/l Final Effluent Ammonia Monthly Average Day mg/l 2011 MDEQ Ammonia Limits mg/l Jan-10 Mar-10 May-10 Jul-10 Sep-10 Nov-10 Jan-11 Mar-11 May-11 Jul-11 Sep-11 Nov-11 DATE

43 MG/L 35 City of Charlevoix INFLUENT AND EFFLUENT AMMONIA AND MDEQ LIMITS, MG/L Influent Ammonia Monthly Average Day mg/l Final Effluent Ammonia Monthly Average Day mg/l MDEQ Ammonia Limits mg/l Permit 2015 Permit Media Install Jan-15 Mar-15 May-15 Jul-15 Sep-15 Nov-15 Jan-16 Mar-16 May-16 DATE

44 Operational Improvements/Savings Process Anoxic BOD reduction Oxygen credit Alkalinity recover Sludge Tank Chemical Ferric Flow paced Alkalinity addition eliminated No chlorine for disinfection Eliminate De-chlorination system

45 KWH City of Charlevoix ENERGY USAGE, KWH , Pre-Project 2016, Post-Project January February March April May MONTH

46 Monthly Energy Cost Savings Month 2015, Pre-Project 2016, Post-Project Monthly Savings January $ 9, $ 7, $ 1, February $ 8, $ 7, $ 1, March $ 9, $ 6, $ 2, April $ 8, $ 6, $ 1, May $ 7, $ 7, $ Total $ 8, Note: Costs based on $0.11/KWH

47

48 Questions? A Little History

Upgrading Lagoons to Remove Ammonia, Nitrogen, and Phosphorus *nutrient removal in cold-climate lagoon systems

Upgrading Lagoons to Remove Ammonia, Nitrogen, and Phosphorus *nutrient removal in cold-climate lagoon systems Upgrading Lagoons to Remove Ammonia, Nitrogen, and Phosphorus *nutrient removal in cold-climate lagoon systems October 7, 2015 3:15 4:00pm Session M Room Tamboti / Aloes-wood Treatment Processes Aerated

More information

Advanced Lagoon Treatment

Advanced Lagoon Treatment Environmental Dynamics International Presents Advanced Lagoon Treatment Developments, Technologies & Field Experiences March 16, 2016 Marc W. Salmi, P.E. Environmental Dynamics International Agenda Overview

More information

Global Leaders in Biological Wastewater Treatment

Global Leaders in Biological Wastewater Treatment Global Leaders in Biological Wastewater Treatment OVERVIEW OF ANOXKALDNES AnoxKaldnes is a global provider of leading-edge biological processes for wastewater treatment. The head-office is in Sweden. There

More information

Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund

Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund Rip Copithorn, Jeff Sturdevant, Vince Maillard GHD Clients People

More information

Efficient Design Configurations for Biological Nutrient Removal

Efficient Design Configurations for Biological Nutrient Removal Efficient Design Configurations for Biological Nutrient Removal A Case Study: Upper Blackstone Water Pollution Abatement District Jane E. Madden, P.E., BCEE August 30, 2017 UBWPAD Wastewater Treatment

More information

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race Case Study BiOWiSH Aqua has Positive Long-Term Effects After Two Years, Sustains Improved Effluent Quality in South Korean Slaughterhouse Executive Summary BiOWiSH Aqua was implemented in a South Korean

More information

Water Resources Director: Chris Graybeal

Water Resources Director: Chris Graybeal Water Resources Director: Chris Graybeal Our Mission To promote and protect the environment, preserve natural resources, and ensure the health and safety of our customers. Granite Falls Wastewater Treatment

More information

Soggy in Snohomish - Biofilm Media Improves Wet-Weather Lagoon Nitrification

Soggy in Snohomish - Biofilm Media Improves Wet-Weather Lagoon Nitrification Soggy in Snohomish - Biofilm Media Improves Wet-Weather Lagoon Nitrification Chuck McCall 1*, Erin Gallimore 1, Tom Giese 2, Steve Schuller 3, Karen Allen 3, Duane Leach 3 1 Entex Technologies Inc., Chapel

More information

Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology

Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology OWEA Annual Conference Mason, OH June 19, 2013, Operations, 11:00-11:45AM Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology Bill Meinert, PE, O Brien & Gere Often

More information

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below: 6.1.3 Environmental Impacts A summary of the impacts of this treatment alternative are listed below: 1. The Matanuska River will receive treated effluent as it currently does. 2. Effluent quality would

More information

Dawson City Wastewater

Dawson City Wastewater Ken Johnson Planner and Engineer CRYOFRONT COOL IDEAS for management - technology - media Oxygen Concentration Dawson City Wastewater What is bad about sewage? Environment Oxygen depletion Eutrification

More information

Do You Know. Your Co$ts? Tom Stow Operations & Maintenance Division Manager Clean Water Services

Do You Know. Your Co$ts? Tom Stow Operations & Maintenance Division Manager Clean Water Services Do You Know Your Co$ts? Tom Stow Operations & Maintenance Division Manager Clean Water Services Would you like to take the stress out of budget prep? Have you calculated the annual dose for each chemical

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim

More information

An Efficient Aeration Strategy Sits on a Three-Legged Stool

An Efficient Aeration Strategy Sits on a Three-Legged Stool October 13, 2016 An Efficient Aeration Strategy Sits on a Three-Legged Stool A Case Study of Brookfield, WI by Wendy Raisbeck Outline Aeration Efficiency Stool Existing Conditions and Project Goals Aeration

More information

Tales from the Field: Troubleshooting Denitrification

Tales from the Field: Troubleshooting Denitrification Tales from the Field: Troubleshooting Denitrification OWEA Plant Operations Conference North Pointe Conference Center May 21, 2014 Jon van Dommelen Ohio EPA Compliance Assistance Unit Denitrification Denitrification

More information

2017 Annual Performance Report

2017 Annual Performance Report 2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive

More information

Feel free to contact me should you require any additional information regarding the report. I can be reached at

Feel free to contact me should you require any additional information regarding the report. I can be reached at February 28, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Glencoe Wastewater Treatment Plant The Ontario Clean Water Agency is the Operating

More information

COLD WEATHER NITRIFICATION OF LAGOON EFFLUENT USING A MOVING BED BIOFILM REACTOR (MBBR) TREATMENT PROCESS

COLD WEATHER NITRIFICATION OF LAGOON EFFLUENT USING A MOVING BED BIOFILM REACTOR (MBBR) TREATMENT PROCESS ABSTRACT COLD WEATHER NITRIFICATION OF LAGOON EFFLUENT USING A MOVING BED BIOFILM REACTOR (MBBR) TREATMENT PROCESS Mr. Flemming G. Wessman 1 and Mr. Chandler H. Johnson 1 AnoxKaldnes, Inc., 58 Weybosset

More information

AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) and Integrated Fixed-Film Activated Sludge (IFAS)

AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) and Integrated Fixed-Film Activated Sludge (IFAS) AnoxKaldnes Moving Bed Biofilm Reactor (MBBR) and Integrated Fixed-Film Activated Sludge (IFAS) AnoxKaldnes MBBR and Hybas Processes AnoxKaldnes is the global leader in MBBR and IFAS technologies. Kruger,

More information

Membrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF

Membrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF Membrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF Thor Young, GHD With Contributions from Vince Maillard, Rip Copithorn, Kristi Perri, and Jeff Sturdevant, GHD Dimitrios

More information

Technical Survey of Nitrogen Removal Alternatives for the Deer Island Treatment Plant

Technical Survey of Nitrogen Removal Alternatives for the Deer Island Treatment Plant Technical Survey of Nitrogen Removal Alternatives for the Deer Island Treatment Plant Massachusetts Water Resources Authority Environmental Quality Department ENQUAD Report ms-090 March 9, 2004 Ms. Linda

More information

We Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification

We Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification We Know Water AnoxKaldnes Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification WATER TECHNOLOGIES AnoxKaldnes MBBR and Hybas Processes AnoxKaldnes

More information

JEDDAH INDUSTRIAL CITY

JEDDAH INDUSTRIAL CITY JEDDAH INDUSTRIAL CITY WASTEWATER TREATMENT PLANT A Presentation by : Engr. Mowafaq Al-Sugeir Managing Director ICDOC SAWEA 2007 WORKSHOP, AL-KHOBER 4 December 2007 Built & Being Operated by : on Build-Operate-Transfer

More information

ONSITE TREATMENT. Amphidrome

ONSITE TREATMENT. Amphidrome ONSITE TREATMENT Amphidrome Agenda System Description Installation Locations Performance Questions Definition in Oceanography Amphidrome The position in the ocean where the tide vanishes to zero Definition

More information

Bloomingdale WWTF Private/Public Partnership Works. Bob Wilcox, PE Fleis & VandenBrink May 10, 2016

Bloomingdale WWTF Private/Public Partnership Works. Bob Wilcox, PE Fleis & VandenBrink May 10, 2016 Bloomingdale WWTF Private/Public Partnership Works Bob Wilcox, PE Fleis & VandenBrink May 10, 2016 Outline Background Need for the Project Biofilm Technologies The Project Performance Background Project

More information

Deammonification for Cost-Effective Sidestream Treatment

Deammonification for Cost-Effective Sidestream Treatment Deammonification for Cost-Effective Sidestream Treatment MWEA Process Seminar November 8, 2017 Lucy Pugh, P.E., BCEE Vice President Wastewater Technical Practice Leader Overview 1. What is deammonification?

More information

Achieving Effluent Limits While Treating an Intermittently Deficient Wastewater MWEA September 27, 2018

Achieving Effluent Limits While Treating an Intermittently Deficient Wastewater MWEA September 27, 2018 Achieving Effluent Limits While Treating an Intermittently Deficient Wastewater MWEA September 27, 2018 By: Roger Gillard DWTF Bryan Wagoner, P.E. - DTW Warren Evans Wayne County Executive Chad Newton,

More information

Upgrade of the Marathon Louisiana Refining Division s Wastewater Treatment Plant to a State-of-the-Art Nitrification-Denitrification Facility

Upgrade of the Marathon Louisiana Refining Division s Wastewater Treatment Plant to a State-of-the-Art Nitrification-Denitrification Facility Upgrade of the Marathon Louisiana Refining Division s Wastewater Treatment Plant to a State-of-the-Art Nitrification-Denitrification Facility Presented to Air & Waste Management Association Louisiana Section

More information

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March

More information

Planning for the Future Battle Creek s Approach to Upgrading its Secondary Treatment Processes

Planning for the Future Battle Creek s Approach to Upgrading its Secondary Treatment Processes Planning for the Future Battle Creek s Approach to Upgrading its Secondary Treatment Processes Michigan Water Environment Association Annual Conference June 21, 2016 Richard Beardslee, City of Battle Creek

More information

We Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification

We Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification We Know Water AnoxKaldnes Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification WATER TECHNOLOGIES AnoxKaldnes MBBR and Hybas Processes AnoxKaldnes

More information

At the Mercy of the Process Impacts of Nitrogen Removal Performance on WWTP Disinfection

At the Mercy of the Process Impacts of Nitrogen Removal Performance on WWTP Disinfection OBG PRESENTS: At the Mercy of the Process Impacts of Nitrogen Removal Performance on WWTP Disinfection Ned Talbot, PE Tri-Association Conference 2018 8/30/18 9:00-9:30AM AGENDA Overview of Plant Processes

More information

BIOSPHERE MOVING BED BIOLOGICAL SYSTEMS

BIOSPHERE MOVING BED BIOLOGICAL SYSTEMS REACTION TANKS BIOSPHERE MOVING BED BIOLOGICAL SYSTEMS PROVEN FIXED-FILM TECHNOLOGY IDEAL FOR BNR UPGRADES AND CAPACITY EXPANSIONS. SAME FOOTPRINT, BETTER TREATMENT AT NEPTUNE BEACH, FL WWTP Without adding

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

Stonecrest Estates Sewage Treatment Plant 2017 Annual Report

Stonecrest Estates Sewage Treatment Plant 2017 Annual Report 2017 Stonecrest Estates Sewage Treatment Plant 2017 Annual Report The Corporation of the City of Quinte West 0 Contents Table of Figures... 1 Executive Summary... 3 Summary and Interpretation of Monitoring

More information

Ballasted Activated Sludge Demonstration Study SEPTEMBER 30, 2016

Ballasted Activated Sludge Demonstration Study SEPTEMBER 30, 2016 Ballasted Activated Sludge Demonstration Study SEPTEMBER 30, 2016 Agenda Riverbend WRP Expansion Project Background Ballasted Activated Sludge Process Overview Special Equipment Overview Peninsula WRP

More information

Integrated real-time SRT and aeration control in the city of Grand Rapids

Integrated real-time SRT and aeration control in the city of Grand Rapids 2016 MWEA 92 st Annual Conference Sunday, June 18 th - Wednesday, June 21 st Boyne Mountain Resort Integrated real-time SRT and aeration control in the city of Grand Rapids M. Lunn, City of Grand Rapids

More information

ADAMSTOWN BOROUGH SEWAGE TREATMENT PLANT LANCASTER COUNTY, PENNSYLVANIA

ADAMSTOWN BOROUGH SEWAGE TREATMENT PLANT LANCASTER COUNTY, PENNSYLVANIA ADAMSTOWN BOROUGH SEWAGE TREATMENT PLANT LANCASTER COUNTY, PENNSYLVANIA NPDES# PA0021865 WASTEWATER TREATMENT EVALUATION Prepared By: Marc Neville Water Program Specialist Department of Environmental Protection

More information

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Review of WEFTEC 2016 Challenge & Overview of 2017 Event Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Agenda Review 2016 Challenge Provide overview of updates to 2017 event Frequency WEFTEC Scores

More information

NEWEA 2015 Annual Conference Session 16

NEWEA 2015 Annual Conference Session 16 NEWEA 2015 Annual Conference Session 16 Meeting North Attleborough, MA s 0.1 mg/l Phosphorus Limit with Bio-P and Cloth Media Filters January 27, 2015 Sue Guswa, P.E., Tighe & Bond Merrill Hastings, Town

More information

Emerging Issues in the Water/Wastewater Industry. Austin s Full-Scale Step-BNR Demonstration

Emerging Issues in the Water/Wastewater Industry. Austin s Full-Scale Step-BNR Demonstration Summer Seminar Emerging Issues in the Water/Wastewater Industry Austin s Full-Scale Step-BNR Demonstration Rajendra P. Bhattarai, P.E., DEE Austin Water Utility, City of Austin 625 East 10 th Street, Suite

More information

Biological Phosphorus Removal Technology. Presented by: Eugene Laschinger, P.E.

Biological Phosphorus Removal Technology. Presented by: Eugene Laschinger, P.E. Biological Phosphorus Removal Technology Presented by: Eugene Laschinger, P.E. Overview What is phosphorus and why do we care? How can you remove phosphorus? Biological phosphorus removal Biological phosphorus

More information

A Submerged Attached Growth Bioreactor (SAGB) And Membrane Filtration For Water Reuse

A Submerged Attached Growth Bioreactor (SAGB) And Membrane Filtration For Water Reuse A Submerged Attached Growth Bioreactor (SAGB) And Membrane Filtration For Water Reuse Philip B. Pedros, Ph.D., P.E. Andrew R. McBrearty, P.E. Wallace W. Bruce Agenda Introduction Description of Process

More information

Energy Savings Through Denitrification

Energy Savings Through Denitrification Energy Savings Through Denitrification If Your Plant Nitrifies, Why Not Make it Denitrify Brett Ward Utility Operations Consultant Municipal Technical Advisory Service The University of Tennessee 1 Nitrate,

More information

Decentralized Wastewater Management

Decentralized Wastewater Management Decentralized Wastewater Management Collection, Treatment, and in-ground reuse NEAR the point of generation. Minimizes wastewater: Volumes Infrastructure Costs Facilitates smart growth concepts Enhances

More information

Nutrient Removal Optimization at the Fairview WWTP

Nutrient Removal Optimization at the Fairview WWTP Alyssa Mayer, PE Principal Engineer Nutrient Removal Optimization at the Fairview WWTP Mark Strahota, PE Associate Presentation Overview Project Background Process Model Development BNR Design Considerations

More information

TWO YEAR CASE STUDY OF INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS) AT BROOMFIELD, CO WWTP West 124th Street Broomfield, CO 80020

TWO YEAR CASE STUDY OF INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS) AT BROOMFIELD, CO WWTP West 124th Street Broomfield, CO 80020 ABSTRACT TWO YEAR CASE STUDY OF INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS) AT BROOMFIELD, CO WWTP Mr. Ken Rutt 1, Jim Seda 1 and Mr. Chandler H. Johnson 2 1 City & County of Broomfield 2985 West 124th

More information

Council Meeting Post Point Wastewater Treatment Plant Improvements March 15, By Ted Carlson PW Director

Council Meeting Post Point Wastewater Treatment Plant Improvements March 15, By Ted Carlson PW Director Council Meeting Post Point Wastewater Treatment Plant Improvements March 15, 2010 By Ted Carlson PW Director tcarlson@cob.org Objectives: 1. Update/confirm peak flow management status 2. Update/confirm

More information

UPGRADING FOR TOTAL NITROGEN REMOVAL WITH A POROUS MEDIA IFAS SYSTEM

UPGRADING FOR TOTAL NITROGEN REMOVAL WITH A POROUS MEDIA IFAS SYSTEM UPGRADING FOR TOTAL NITROGEN REMOVAL WITH A POROUS MEDIA IFAS SYSTEM T. Masterson, J. Federico, G. Hedman, S. Duerr BETA Group, Inc. 6 Blackstone Valley Place Lincoln, Rhode Island 02865 ABSTRACT The Westerly,

More information

21 st Century Biofilm Reactors TREATING FOR TROUT. Northport/Leelanau Township Wastewater Treatment Facility. Presented by: Rich Grant, PE

21 st Century Biofilm Reactors TREATING FOR TROUT. Northport/Leelanau Township Wastewater Treatment Facility. Presented by: Rich Grant, PE 21 st Century Biofilm Reactors Presented by: Rich Grant, PE TREATING FOR TROUT Northport/Leelanau Township Wastewater Treatment Facility Concepts A Revitalizing Story: importance of collection The Technology;

More information

WWTP Side Stream Treatment of Nutrients Considerations for City of Raleigh s Bioenergy Recovery Project. Erika L. Bailey, PE, City of Raleigh

WWTP Side Stream Treatment of Nutrients Considerations for City of Raleigh s Bioenergy Recovery Project. Erika L. Bailey, PE, City of Raleigh WWTP Side Stream Treatment of Nutrients Considerations for City of Raleigh s Bioenergy Recovery Project Erika L. Bailey, PE, City of Raleigh LNBA / NRCA 2017 Wastewater Treatment Plant Operators Training

More information

ECO Smart Aerobic Waste Water Treatment System. Optimising the re-use and recycling of waste water

ECO Smart Aerobic Waste Water Treatment System. Optimising the re-use and recycling of waste water Optimising the re-use and recycling of waste water The ECO Smart aerobic wastewater treatment system is a selfcontained wastewater treatment system that utilizes a combination of anaerobic as well as aerobic

More information

Electric Forward Market Report

Electric Forward Market Report Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08

More information

Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility"

Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility" Presented by: Mark J. Halm, P.E. - Yokhana Alkass, LEED AP EEC, PC Darrin B. Boyer - City of Plano- Illinois

More information

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing - 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants by Glenn Thesing Through retrofitting IFAS systems, communities can upgrade and expand wastewater treatment without the expense and complication

More information

Advanced Oxidation Ditch Process and Screw Press Dewatering

Advanced Oxidation Ditch Process and Screw Press Dewatering Advanced Oxidation Ditch Process and Screw Press Dewatering 24 th Aug. 2012 Takashi Ishida Director of the Resources Recycling Research Division Japan Institute of Wastewater Engineering and Technology

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

orld water works Clean Water and Energy from Wastewater IDEAL MBBR IDEAL IFAS

orld water works Clean Water and Energy from Wastewater IDEAL MBBR IDEAL IFAS orld water works Clean Water and Energy from Wastewater IDEAL MBBR IDEAL IFAS orld water works.com - Making a World of Difference Our Name reflects our Passion... WORLD = Our Living Planet WATER = Life

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

Director of Operations and Compliance Report. October 17, Biochemical Oxygen Demand, 5-Day (Avg lbs/day)

Director of Operations and Compliance Report. October 17, Biochemical Oxygen Demand, 5-Day (Avg lbs/day) Director of Operations and Compliance Report October 17, 218 Plant Loading, CSO Report, and Director s Notes Plant Loading Biochemical Oxygen Demand, 5-Day (Avg. 16475 lbs/day) Total Suspended Solids (Avg.

More information

Andrea Nifong, World Water Works (formerly HRSD) Stephanie Klaus, VT & HRSD

Andrea Nifong, World Water Works (formerly HRSD) Stephanie Klaus, VT & HRSD Recommendations and Lessons Learned from the Startup of the First Two Full-Scale Sidestream Deammonification Processes in North America: DEMON and ANITA Mox Andrea Nifong, World Water Works (formerly HRSD)

More information

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System 14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency

More information

Overview of Supplemental Carbon Sources for Denitrification and Enhanced Biological Phosphorus Removal

Overview of Supplemental Carbon Sources for Denitrification and Enhanced Biological Phosphorus Removal JANUARY 19, 2017 Overview of Supplemental Carbon Sources for Denitrification and Enhanced Biological Phosphorus Removal Maahedi Savvy & Brad Hice, EOSi, Massachusetts Speakers Brad Hice, P.E., Business

More information

SECTION 8.0 NEWPCC SECOND PRIORITY CONTROL ALTERNATIVES

SECTION 8.0 NEWPCC SECOND PRIORITY CONTROL ALTERNATIVES SECTION 8.0 NEWPCC SECOND PRIORITY CONTROL ALTERNATIVES 8.1 PREAMBLE Table 8.1 below indicates the target ammonia concentrations for the Best Practicable and the Second Priority Levels of Control for the

More information

TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP

TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP ABSTRACT TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP Tim Baldwin, PE, Senior Vice President McKim & Creed, Inc. Pender County s Commerce Park was created as a vehicle to attract

More information

Protecting the environment. Preserving the coast.

Protecting the environment. Preserving the coast. Protecting the environment. Preserving the coast. SAN ELIJO JOINT POWERS AUTHORITY Recycled Water Program Advanced Water Treatment Michael T. Thornton, P.E. General Manager 2 Who We Are Wastewater Service

More information

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors Short Course on Membrane Bioreactors 3/22/06 R. Shane Trussell, Ph.D., P.E. shane@trusselltech.com Outline Introduction Process

More information

Making Your Plant Denitrify

Making Your Plant Denitrify Making Your Plant Denitrify Control the Process and Reap the Benefits Brett Ward Utility Operations Consultant Municipal Technical Advisory Service The University of Tennessee 1 Why Denitrify? Required

More information

We Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification

We Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification APPENDIX C.2 IFAS We Know Water AnoxKaldnes Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification WATER TECHNOLOGIES AnoxKaldnes MBBR and Hybas

More information

No-Holds-Barred Match: RBC vs. MBR

No-Holds-Barred Match: RBC vs. MBR No-Holds-Barred Match: RBC vs. MBR Northeast Onsite Wastewater Short Course & Exhibition April 6 th, 2016 Erin K. Moore, PE Services provided in NY as T&B Engineering, PC Overview Evaluation target Historic

More information

Increasing Biological Phosphorus Removal: Texas Case Study

Increasing Biological Phosphorus Removal: Texas Case Study Increasing Biological Phosphorus Removal: Texas Case Study Leon Downing, Ph.D. Theodore W. Chan, P.E. David R. Jackson, P.E., BCEE Leonard E. Ripley, Ph.D., P.E. Freese and Nichols, Inc. Tod K. Maurina

More information

NUTRIENT REMOVAL PROCESSES IN WASTEWATER TREATMENT. We re Glad You re Here!

NUTRIENT REMOVAL PROCESSES IN WASTEWATER TREATMENT. We re Glad You re Here! NUTRIENT REMOVAL PROCESSES IN WASTEWATER TREATMENT We re Glad You re Here! Please, put your cell phones on vibrate during sessions and, take calls to the hallway NUTRIENT REMOVAL PROCESSES IN WASTEWATER

More information

Demonstration of IFAS Technology for Cold Temperature Nitrification in Lagoon WWTFs at Clare and Ludington, Michigan

Demonstration of IFAS Technology for Cold Temperature Nitrification in Lagoon WWTFs at Clare and Ludington, Michigan Demonstration of IFAS Technology for Cold Temperature Nitrification in Lagoon WWTFs at Clare and Ludington, Michigan Jason Borchert 1, Sarah Hubbell 2*, Heidi Rupp 2 1 Gourdie Fraser, Inc., Traverse City,

More information

Treatment Optimization: What s

Treatment Optimization: What s Treatment Optimization: What s Possible Glen T. Daigger, Ph.D., P.E., BCEE, NAE Professor of Engineering Practice President and Founder, One Water Solutions Presented at Michigan Water Environment Association

More information

The NEORSD Demonstration of a Cost-Effective Solution

The NEORSD Demonstration of a Cost-Effective Solution 2015 OWEA Technical Conference Advancing Wet Weather Treatment The NEORSD Demonstration of a Cost-Effective Solution June 24, 2015 Advancing Wet Weather Treatment The NEORSD Demonstration of a Cost-Effective

More information

Presentation Outline

Presentation Outline Presentation Outline Nitrification/denitrification refresher Treatment technologies available for nitrification and BNR/ENR What is the problem? BNR/ENR VPDES permitting Causes of reduced BNR performance

More information

Decentralized Wastewater Management

Decentralized Wastewater Management Decentralized Wastewater Management An Overview of Experiences in Mobile, AL Kevin D. White, Ph.D., P.E. University of South Alabama Department of Civil Engineering Mobile, AL, 36609 kwhite@usouthal.edu

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

SLUDGE SETTLEABILITY CONTROL AT ELANORA WWTP RAS CHLORINATION TRIAL. Martin Hindmarsh. Allconnex Water

SLUDGE SETTLEABILITY CONTROL AT ELANORA WWTP RAS CHLORINATION TRIAL. Martin Hindmarsh. Allconnex Water SLUDGE SETTLEABILITY CONTROL AT ELANORA WWTP RAS CHLORINATION TRIAL Paper Presented by: Martin Hindmarsh Authors: Mark Wilson, Process Engineer, Martin Hindmarsh, Treatment Plant Operator, Allconnex Water

More information

UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP

UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP Acknowledgements 2 Northern Rockies Regional Municipality Northern Rockies Engineering

More information

ENHANCING THE PERFORMANCE OF OXIDATION DITCHES. Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis

ENHANCING THE PERFORMANCE OF OXIDATION DITCHES. Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis ENHANCING THE PERFORMANCE OF OXIDATION DITCHES Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis ABSTRACT Oxidation ditches are very popular wastewater treatment

More information

TABLE OF CONTENTS Page No. or Following HERITAGE SPRINGS WASTEWATER TREATMENT PLANT REVIEW Background... 1 Physical Condition... 2 Operating Condition

TABLE OF CONTENTS Page No. or Following HERITAGE SPRINGS WASTEWATER TREATMENT PLANT REVIEW Background... 1 Physical Condition... 2 Operating Condition TABLE OF CONTENTS Page No. or Following HERITAGE SPRINGS WASTEWATER TREATMENT PLANT REVIEW Background... 1 Physical Condition... 2 Operating Condition... 2 Permit Review... 3 Unit Process Sizing... 4 DMR

More information

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County

More information

Technical Survey of Nitrogen Removal Alternatives for the Deer Island Treatment Plant

Technical Survey of Nitrogen Removal Alternatives for the Deer Island Treatment Plant Technical Survey of Nitrogen Removal Alternatives for the Deer Island Treatment Plant Massachusetts Water Resources Authority Environmental Quality Department ENQUAD Report 2010-23 Bigornia-Vitale, G,

More information

Rational IPP Permitting

Rational IPP Permitting Rational IPP Permitting Protect POTW/Environment and Promote Local Economy FISHBECK, THOMPSON, CARR, & HUBER INC. Jerald O. Thaler, PE MWEA IPP Seminar October 6, 2016 Rational IPP Permitting? Accurate/Up-to-Date

More information

Water Technologies. The AGAR Process: Make Your Plant Bigger Without Making it Bigger

Water Technologies. The AGAR Process: Make Your Plant Bigger Without Making it Bigger Water Technologies The AGAR Process: Make Your Plant Bigger Without Making it Bigger Enhanced Wastewater Treatment The unique, patented AGAR (Attached Growth Airlift Reactor) process from Siemens is the

More information

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories Learning Objectives At the end of the class the student will be able to: 1. Describe the production budget process

More information

Combined Sewer Overflows July 2012-December 2013

Combined Sewer Overflows July 2012-December 2013 CSO Facilities Summary Report 213 Combined Sewer Overflows July 212-December 213 Overview MWRA monitored four CSO facilities in the North System during the period covered in this report (July 212 December

More information

Hillsdale Wastewater Treatment Plant

Hillsdale Wastewater Treatment Plant Hillsdale Wastewater Treatment Plant SRF Project Plan Public Hearing sdgfdgdf June 10, 2014 Presented by: Jeff Pugh, PE and Elaine Venema, PE Synopsis/Agenda Purpose of Presentation Project Background

More information

COMPARISON STUDY BETWEEN INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS), MEMBRANE BIOREACTOR (MBR) AND CONVENTIONAL ACTIVATED SLUDGE (AS) PROCESSES

COMPARISON STUDY BETWEEN INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS), MEMBRANE BIOREACTOR (MBR) AND CONVENTIONAL ACTIVATED SLUDGE (AS) PROCESSES Sixteenth International Water Technology Conference, IWTC 16 2012, Istanbul, Turkey 1 COMPARISON STUDY BETWEEN INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS), MEMBRANE BIOREACTOR (MBR) AND CONVENTIONAL

More information

Operation and Control of Multiple BNR Processes in One WWTP

Operation and Control of Multiple BNR Processes in One WWTP Operation and Control of Multiple BNR Processes in One WWTP CENTRAL PLANT Williamsport Sanitary Authority s Chesapeake Bay and CSO Compliance Program Presented by: Phil Anderson 1 June 24, 2015 Purpose

More information

Secondary Treatment Process Control

Secondary Treatment Process Control SARBS One-Day Training Seminar Phoenix Club, Anaheim Secondary Treatment Process Control Graham Juby June 5, 2013 Objectives Provide an understanding of nitrogen removal process interactions to support

More information

WASTEWATER PLANT PERFORMANCE EVALUATION. Elkland Borough Authority STP

WASTEWATER PLANT PERFORMANCE EVALUATION. Elkland Borough Authority STP WASTEWATER PLANT PERFORMANCE EVALUATION August 10, 2010 October 13, 2010 Elkland Borough Authority STP Water Pollution Control Facility NPDES #PA0113298 Bureau of Water Standards & Facility Regulation

More information

SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES

SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES Oxidation ditches are very popular wastewater treatment processes for small to medium sized municipalities that

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

PERFORMANCE AND RESIDUAL MANAGEMENT ASSESSMENT OF 5 MGD MEMBRANE WATER PLANT. Presented by: Stephen P. Dorman, P.E.

PERFORMANCE AND RESIDUAL MANAGEMENT ASSESSMENT OF 5 MGD MEMBRANE WATER PLANT. Presented by: Stephen P. Dorman, P.E. PERFORMANCE AND RESIDUAL MANAGEMENT ASSESSMENT OF 5 MGD MEMBRANE WATER PLANT Presented by: Stephen P. Dorman, P.E. sdorman@ksaeng.com 1 Outline Background Assessment of: Clarification Filtration Residuals

More information

Wastewater Facility Plan City of Marshall, Minnesota

Wastewater Facility Plan City of Marshall, Minnesota Wastewater Facility Plan City of Marshall, Minnesota Public Hearing March 14, 2017 Bolton & Menk, Inc. Project No. T22.108560 Glossary of General Terms & Abbreviations MPCA - Minnesota Pollution Control

More information

QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE

QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE INFLUENT MONTHLY AVERAGE Month Flow MGD CBOD mg/l TSS mg/l July 26.7 350 320 August 29.1 370 340 September 27.3 380

More information