1 Safety Rsk Identfcaton and Assessment for Bejng Olympc Venues Constructon Yu Sun 1 ; Dongpng Fang 2 ; Shouqng Wang 3 ; Mengdong Da 4 ; and Xaoquan Lv 5 Abstract: New technologes, new materals, and nnovatve desgns have been extensvely adopted n Bejng Olympc venues constructon. The extreme requrements for tme deadlne and competton functon expose the venues constructon to hgh rsks. These rsks would potentally brng negatve mpacts on the ste safety performance. Meanwhle, there s a lack of systematc management for safety rsks n Chna s constructon ndustry, especally for large projects such as the Bejng Olympc venues constructon. Ths paper dentfes and assesses safety rsk factors nherent n Bejng Olympc venues constructon wth the nvolvement of 27 experenced and hghly respected experts from government agences, the constructon ndustry, and academe through branstormng, workshop dscussons, and questonnare surveys. The fndng reveals that more than half of the crtcal safety rsk factors are from contractors and subcontractors such as: lack of emergency response plan and measures; workers unsafe operaton, and contractors gnorng safety under schedule pressure. Based on these crtcal safety rsks, a rsk regster s composed and a model s developed n applcaton of the analytc herarchy process to assess the status of rsks on ste safety. The model has been attempted n two Olympc venue projects under constructon and the valdty has been approved. The rsk checklst, regster, and assessment model developed n the paper were ntegrated nto the rsk management system that has been used for Bejng Olympc venues constructon. DOI: / ASCE X :1 40 CE Database subject headngs: Constructon management; Safety; Rsk management; Assessments; Chna. Introducton 1 Ph.D. Canddate, Dept. of Constructon Management, Tsnghua- Gammon Constructon Safety Research Center, School of Cvl Engneerng, Tsnghua Unv., Bejng , Chna. 2 Professor, Dept. of Constructon Management, Tsnghua-Gammon Constructon Safety Research Center, School of Cvl Engneerng, Tsnghua Unv., Bejng , Chna correspondng author. E-mal: fangdp@tsnghua.edu.cn 3 Professor, Dept. of Constructon Management, School of Cvl Engneerng, Tsnghua Unv., Bejng , Chna. 4 Deputy Drector, Bejng 2008 Project Constructon Headquarters Offce, Bejng, Chna. 5 Dvson Chef, Bejng Organzng Commttee for the Games of the XXIX Olympad, Bejng, Chna. Note. Dscusson open untl June 1, Separate dscussons must be submtted for ndvdual papers. To extend the closng date by one month, a wrtten request must be fled wth the ASCE Managng Edtor. The manuscrpt for ths paper was submtted for revew and possble publcaton on May 26, 2006; approved on May 11, Ths paper s part of the Journal of Management n Engneerng, Vol. 24, No. 1, January 1, ASCE, ISSN X/2008/ /$ The constructon of competton venues for the Bejng Olympc games, n whch new technologes, new materals, and nnovatve desgn are extensvely adopted, s a vast and complex program. Precse tme deadlne and competton functon are requred n ths complex program and consequently expose the venues constructon to hgh rsks. These rsks would potentally brng a negatve mpact on the ste safety performance whch s the hghest prorty of the Olympc venues constructon objectves. Moreover, rsk assessment on venue constructon projects has been offcally requested by the Internatonal Olympc Commttee IOC for the frst tme n the Olympc hstory. The Bejng Organzng Commttee for the 29th Olympc Games BOCOG s requred to report the rsk level hgh/medum/low of each venue constructon project every 3 months to the IOC. A rsk assessment model s therefore demanded by BOCOG, whch would also be a tool to montor and control the rsks. Wth applcaton of the model to the 30 competton venue constructon projects for the Bejng Olympc games, BOCOG should be able to dentfy not only whch venue projects are more rsky but also whch rsk factors are crtcal for all the competton venue constructon projects. A team was then set up to develop the tools for BOCOG, whch comprses professors and Ph.D. students on project management and constructon safety management from Tsnghua Unversty, senor offcals and engneers from the Constructon Department of BOCOG, the authorty n charge of the Bejng Olympc venues constructon, respectvely, and the Chef Desgners and General Managers of several venue constructon projects. Rsks are those that wll negatvely affect objectves of a project or a program n every aspect, such as cost overrun, schedule delay, and poor safety performance. Mller and Lessard 2001 nvestgated 60 large nternatonal engneerng projects and found that the methodology of rsk management s wdely used n a creatve way n project management. Kangar 1995 revealed that safety problems toward personnel are the most crtcal rsk factor when executng contracts n the Amercan constructon market. In prevous safety studes, rsk management s usually used as a three-stage process from a techncal perspectve Holmes et al. 1999; Trethewy et al : dentfyng hazards n the work envronment, assessng the rsks posed by these hazards, and selectng approprate controls for the rsks. However, many rsk factors from a manageral perspectve have been pad less attenton both n safety rsk research and practce, especally n the constructon ndustry. At the same tme, much research has dentfed a number of causes nfluencng project safety performance n the constructon ndustry from a manageral perspectve, such as workers 40 / JOURNAL OF MANAGEMENT IN ENGINEERING ASCE / JANUARY 2008

2 Table 1. Objectve on Ste Safety of Bejng Olympc Venues Constructon Objectve Defnton Crteron Safe constructon To be concerned about lves and take any means to reduce the negatve nfluence on the ste safety durng the executon of Bejng Olympc venues constructon Workng condton and lvng crcumstance must be mantaned at or above a certan level n accordance wth the related law and regulaton of P.R. Chna. Rate of casualty must be lower than the former Olympc venues constructon. Note: The statstcs of Labor Councl of NSW reveals that the rate of casualty n Sydney Olympc venues constructon s only half the average rate of constructon enterprses n New South Wales n Australa between 1991 and 2000, and there was only one lfe lost n Sydney Olympc venues constructon. atttudes, safety polcy, project coordnaton, economc pressure Hnze and Raboud 1988, and management tranng Gun 1993; Jaselsks and Suazo These researchers have lad a foundaton for further research on safety rsks from a manageral perspectve and ther conclusons have been appled n the safety management of many ndvdual constructon projects and acheved excellent performance Hnze and Wlson Focusng on safety rsks ncludng both techncal and manageral ssues for a large constructon program, ths study s used to dentfy and assess safety rsk factors nherent n Bejng Olympc venues constructon projects and develop a systematc method and tools for safety rsk management for Olympc venues constructon through a structured questonnare survey, workshops, and ntervews. The challenges of ths study are to defne the objectve for safety rsk management; dentfy safety rsks nherent n Bejng Olympc venues constructon and rank ther prortes, develop a safety rsk assessment model, and test and valdate the model. Defnng Safety Objectve for Bejng Olympc Venues Constructon Rsks are those that wll negatvely affect a task s objectves. A clearly defned objectve s crucal for rsk dentfcaton and assessment. Ths paper studes the safety rsks from the perspectve of the venue constructon program, whch focuses on the common rsk factors faced by all 30 competton venue constructon projects for the Bejng Olympc games. The objectve should therefore reflect the characterstcs of the whole venues constructon program and the expectaton of the authorty n charge of Bejng Olympc venues constructon and other stakeholders such as clents, contractors, and desgners nvolved n the process of the venue constructon plannng and executon. Accordngly, the objectve of ste safety of venues constructon should be establshed on the bass of consultaton wth each stakeholder nvolved n the venues constructon. Through documentaton, lterature revews Jaselsks 1988; Shenhar et al. 2001, and n-depth ntervews wth experts from BOCOG and the authorty n charge of Bejng Olympc venues constructon, a draft of the objectves on ste safety s presented ncludng ts defnton and crteron. Then t s revsed by a round of consultatons wth related departments of BOCOG such as the project management department, sports department, venue plannng and constructon departments and envronmental department, the authorty n charge of the Bejng Olympc venues constructon, and related departments of the metropoltan government such as Muncpal Commsson of Develop and Reform, Muncpal Commsson of Urban Plannng, and Muncpal Commsson of Constructon. Consequently, the objectve of ste safety of the Bejng Olympc venues constructon s defned as shown n Table 1. Identfyng and Prortzng Safety Rsks Identfyng Safety Rsks The rsk dentfcaton s the foundaton for settng up a rsk regster and rsk assessment model. The rsk checklst s a smple but vald method to dentfy rsks n foregong studes Fang et al. 2004b, and t has been selected as the method for rsk dentfcaton n ths study and the establshment of the checklst s through four steps shown as follows: 1. A framework for the checklst was developed accordng to sources of rsk factors on ste safety. The rsk factors were dvded nto external and nternal ones. The external rsks refer to the factors that are beyond the drect control of project manageral personnel and organzaton such as government nspecton and terror attack. The nternal rsks refer to those that wll produce a drect nfluence on the ste safety of a specfc project. They are further classfed as safety rsks caused by the authorty n charge of Bejng Olympc venues constructon, clents, desgners, contractors, subcontractors, supervsors, and workers. 2. Through comprehensve and rgorous lterature revews Fang et al. 2004a,b; 2001; L 2002; Lee and Halpn 2003; Tam et al. 2004; Trethewy et al. 2003; Wang et al and branstormng wthn the research team, 113 safety rsks were dentfed n accordance wth the objectve Table 1 and categorzed nto the framework. The descrpton of these rsks s refned one by one through several rounds of dscussons wthn the research team to ensure explct and concse statements. On the bass of the above work, a draft safety rsk checklst was establshed. 3. In-depth ntervews wth ndustry experts, whch consst of senor managers from the owner of the Natonal Grand Theater, desgners and project managers of competton venues under constructon, senor offcals from departments of BOCOG relatve to venue constructon, and top manageral personnel from the authorty n charge of the Bejng Olympc venues constructon, are carred out n order to make necessary revsons to the draft checklst. By consultng these experts, several new safety rsks are dentfed whle the number of rsks on the checklst s reduced as some smlar rsks were merged and some rsks of whch the probablty and mpact are both low were removed wth the suggestons of the experts ntervewed. 4. Three rounds of nvestgatons on the Bejng Shootng Range Hall Project, one of the 30 competton venue constructon projects for the Bejng Olympc games, are also mplemented so the checklst corresponds to the framework of safety management n the executon of venue constructon. Durng the nvestgatons, the rsks n the checklst are dscussed n detal one by one wth the top manageral team of each stakeholder, such as the clent, contractor, sub- JOURNAL OF MANAGEMENT IN ENGINEERING ASCE / JANUARY 2008 / 41

3 Table 2. Lkert Scales for Rsk Occurrence Possblty Number symbol Occurrence probablty level Defnton Probablty reference % 1 Impossble It may occur only n very exceptonal crcumstances. 1 2 Hardly It s unlkely to occur n most crcumstances Possble It may occur sometmes Very possble It may occur n most crcumstances Almost defnte It s almost certan and expected to occur n most crcumstances. 85 contractor, and supervsor, nvolved n the executon of the Bejng Shootng Range Hall Project. Ther valuable suggestons are ntegrated nto the checklst and fnally t s confrmed that the checklst conssts of 57 safety rsk factors dentfed. Prortzng Safety Rsks The rsk mportance evaluaton ndex Shen et al. 2001; Fang et al. 2004b has been used to prortze the rsks and extract the crtcal rsks from the 57 rsks dentfed on the checklst. Formulas 1 and 2 show how an mportance ndex of a rsk factor s calculated S j = j j 1 n S j R j=1 = 2 n where n=number of people surveyed; S j =evaluaton of rsk mportance by the jth person surveyed; j =evaluaton of rsk occurrence probablty by the jth person surveyed; j =evaluaton of rsk mpact resultng from the th rsk factor by the jth person surveyed; and R =mportance ndex of the th rsk factor. The questonnare survey, a research method wdely used n socal scence, s now beng adopted n other research felds. Specfcally for constructon safety and project rsk management, t s also wdely used n the foregong studes Shen et al. 2001; Tam et al. 2004; Fang et al. 2004b. Consequently, the data for prortzng the safety rsks n ths study are gathered through a questonnare survey. The questonnare was desgned for collectng the percepton of experts on the rsks n the checklst. It s based on the 57 rsk factors n the rsk checklst and the respondents need to gve ther judgments on the rsk occurrence probablty and rsk mpact n accordance wth ther knowledge and experence. The Lkert scales of rsk occurrence probablty and rsk mpact are both dvded nto fve levels and the defnton of each level s presented through several rounds of dscussons wthn the research team Tables 2 and 3 Kangar and Rggs 1989; Zhu A workshop was held to promote the questonnare and conduct the questonnare survey wth the attendance of 27 experts from the authorty n charge of the Bejng Olympc venues constructon, BOCOG, Olympc venue projects under constructon, and the constructon ndustry. The experts are all experenced and well respected. Moreover, they are all famlar wth Olympc venue constructon projects under constructon. Durng the workshop, more rsk factors had been added to the questonnare and revsons on the rsk factors n the questonnare had been conducted by a round of dscussons wth the experts. The experts were requested to make ther choces concernng the occurrence probablty and mpact of safety rsks at the end of the workshop. Statstcs are then carred out accordng to formulas 1 and 2, and the prorty rankng of rsks n accordance wth the mportance ndex value s obtaned. Based on the followng reasons, the mportance ndex value 3 3=9 s selected as the crteron for extractng crtcal safety rsk factors: 1. The rsks, wth mportance ndex value at or above 9, could cover almost 40% of rsk factors on the checklst, whch are all at or above the medum level n the qualtatve rsk analyss matrx L 2002; Zhu 2007 Table 4 ; 2. Through n-depth ntervews wth constructon experts on safety management, senor managers from venue constructon projects and manageral personnel from BOCOG and the authorty n charge of Bejng Olympc venues constructon, t s confrmed that the rsks wth an mportance ndex value at or above 9 could reasonably represent the safety related characterstcs of venue constructon projects; and 3. The order of prorty rankng n accordance wth the mportance ndex value remans unchanged even f the scales n Tables 2 and 3 are changed for example, changng the scales from 1 5 to , and ths proves that the statstc results Table 3. Lkert Scales for Rsk Impact Number symbol Impact level Defnton 1 Very small The occurrence of rsk has neglgble nfluence on ste safety. Very lttle njury results from the occurrence of rsk. The occurrence of rsk has a slght nfluence on ste safety. 2 Small On-ste frst ad s necessary for the njures resultng from the occurrence of rsk. The occurrence of rsk has some nfluences on ste safety. 3 Medum The njures resultng from the occurrence of rsk need to be sent to the hosptal for necessary treatment. The occurrence of rsk has a sgnfcant nfluence on ste safety. 4 Large The njures resultng from the occurrence of rsk would lead workers to lose ther ablty of work. 5 Severe The occurrence of rsk has an extreme nfluence on ste safety. Serous accdent and death would result from the occurrence of rsk. 42 / JOURNAL OF MANAGEMENT IN ENGINEERING ASCE / JANUARY 2008

4 Table 4. Qualtatve Rsk Analyss Matrx Probablty P R= P I 5 M M H H H 4 L M M H H 3 L M M H H 2 L L M M H 1 L L L L M Impact level I Note: M=medum; L=low; H=hgh. are stable. Besdes, because the occurrence of rsk wth low probablty and severe mpact would have an extremely negatve nfluence on ste safety of the Olympc venues constructon Wllams 1996; Ward 1999, the mpact level 3 s also chosen as another crteron for extractng crtcal safety rsk factors. On the bass of the above work, 25 crtcal safety rsks are extracted from the rsk checklst, from whch a rsk regster s set up Table 5. The fndng reveals that more than half of the crtcal safety rsk factors are from contractors and subcontractors, such as lack of emergency response plan and measures, workers unsafe operaton, contractors gnorng safety under schedule pressure, and so on. Developng Safety Rsk Assessment Model An assessment model has been developed, on the bass of crtcal safety rsk factors n the rsk regster Table 5, as a tool to montor and control safety rsks and to dentfy whch venue constructon project s more rsky on ste safety and whch rsk factors are crtcal for all the 30 competton venue constructon projects for the Bejng Olympc games. The analytc herarchy process AHP s a multcrtera decson-makng technque suggested by Saaty n It assumes a undrectonal herarchcal relatonshp among decson levels. The top element of the herarchy s the overall goal, whch decomposes to more specfc attrbutes untl a level of manageable decson crtera s met. It s a dscrete measurement theory that derves scales of values from parwse comparsons and from ratngs Saaty AHP combnes the advantage of both subjectve and objectve evaluaton methods and s easy to use. A ratng method of AHP s adopted to buld the model n three steps: establshment of the evaluaton herarchy, desgn of questons for measurng the attrbutes at the lowest level n each category, and calculaton of the attrbutes weghts. The frst step s to establsh the evaluaton herarchy. Through a rgorous lterature revew and n-depth ntervew wth experts on constructon safety management, a draft of herarchy wth two levels s establshed. The 25 rsk factors n the rsk regster are then categorzed nto Level 2 as the lowest level wth several rounds of dscussons wthn the research team. Durng the process, necessary revsons are made to both the herarchy and rsk factors. For example, f a rsk factor doesn t belong to any category n the drafted herarchy, a new category should be created, such as the category of Problem resultng from desgn, and f a rsk factor could not be evaluated by manageral personnel, t would not be categorzed nto the herarchy of the model. In the fnal evaluaton herarchy Fg. 1, there are n total 16 attrbutes Table 5. Rsk Regster Number Rsk factors 1 Lack of emergency response plan and measures of authorty n charge of Bejng Olympc venues constructon 2 Lack of emergency response plan and measures of contractor 3 Workers unsafe operaton 4 Contractor gnorng safety under schedule pressure 5 Contractor s nadequate mplementaton of measures on ste safety 6 Contractor s lackng experence on safety management when new technologes, new materals, and nnovatve structure s adopted n desgn scheme 7 Insuffcent money nput on safety by clent, contractor, or subcontractor 8 Schedule pressure from clent 9 Unqualfed personal protecton equpment provded by subcontractor 10 Bad safety and relablty performance of equpment and facltes on ste 11 Foregn desgner beng unfamlar wth local standard and constructon technque level 12 Dffculty n safety management resultng from the large scale of project 13 Contractor s poor safety management system 14 Lack of contractors safety manageral personnel 15 Subcontractor s gnorng safety when recevng schedule pressure from contractor 16 Contractor s nsuffcent supervson toward subcontractor 17 Project manager s gnorng safety 18 Subcontractor s poor safety management 19 Unforeseeable underground condton 20 Hdden safety troubles resultng from desgn scheme nconvenent for executon of constructon 21 Problem n contractors plan of safety management 22 Inexperenced safety manageral personnel of contractors 23 Desgner s gnorng safety when applyng new technologes, new materals, and nnovatve structure n desgn scheme 24 Problem n clent s organzaton such as mproper decson makng 25 Insuffcent communcaton between contractor and other stakeholders n the project at the lowest level n each category. Ffteen attrbutes are located at Level 3 and one s at Level 2. Because the attrbute Techncal measures on ste safety could not be further broken down to attrbutes at the lower level, t becomes the only attrbute of the lowest level located n Level 2. The second step s to desgn questons for measurng the attrbutes at the lowest level and the questons produced are shown n Table 6. Generally, a standardzed ratng system s adopted n the answers to these questons so that the same evaluaton standards could be kept when makng comparsons between dfferent Olympc venue constructon projects. In ths ratng system, the scores of the answers to a queston are n fve or three scales, n whch 100 stands for the hghest rsk crtcalty whle 0 for the lowest rsk crtcalty Zhu Besdes, all questons are desgned to be dynamc so as to reflect the varaton n rsk crtcalty along wth the executon of constructon. JOURNAL OF MANAGEMENT IN ENGINEERING ASCE / JANUARY 2008 / 43

5 Fg. 1. Herarchy of safety rsk assessment model The thrd step s to determne the weghts of attrbutes. The weghts of the herarchy s attrbutes are determned through ndepth ntervews wth 13 experenced experts, who are from BOCOG, the authorty n charge of Bejng Olympc venues constructon, Olympc venue projects under constructon, and the constructon ndustry n Bejng and Hong Kong. Durng the ntervews, these experts dd parwse comparsons between the attrbutes under the same node n the herarchy. It s hard to keep the respondents concentrated all the tme f the parwse comparsons are n such a number. Ths would negatvely nfluence the accuracy of comparson results. To resolve ths problem, the research team desgned a fgure-based method to do parwse comparsons. The herarchy was drawn as a fgure, and the questons and Lkert scales for parwse comparsons were prnted n addton to the attrbutes that need to be compared n the fgure Fg. 2. In ths way, the respondents could have an overvew of the herarchy and a better understandng of the meanng of attrbutes and steps for parwse comparson. It could help the respondents make ther judgments more accurately. Based on the result of parwse comparson, the weghts were calculated wth the comparson matrx accordng to AHP theory. The weghts of attrbutes of the lowest levels are also shown n Table 6. The weghted summaton of all the attrbutes at the lowest level s the overall rsk score for the objectve of safe constructon, whch reflects the general rsk crtcalty on ste safety. It ranges between 0 and 100, where 100 stands for the hghest rsk crtcalty on ste safety for an ndvdual project and 0 shows the lowest. In accordance wth ths score, the authorty n charge of venue constructon could montor the rsk status on ste safety for the 30 competton venue constructon projects. The formula of the model for calculatng the overall rsk score of a project s shown as follows R = w V 3 where R = overall rsk score of a venue constructon project; w =weght of a lowest-level attrbute n a herarchy for a sngle objectve; and V =value of a lowest-level attrbute of a venue constructon project. Dscusson Two Olympc venue constructon projects, whch have both been under constructon snce 2003,.e., the Bejng Shootng Range Hall BSRH and Natonal Swmmng Center H 2 O 3, are selected to test the assessment model. The rsk assessment forms were handed out to both project teams and explaned face to face, and have been returned n tme as requred. The rsk scores of the attrbutes at the top two levels are shown n Table 7. Through n-depth ntervews wth experts from the authorty n charge of the Bejng Olympc venues constructon and a round of nvestgatons on the two selected venue constructon projects, the results and ther reasons are summarzed as follows: 1. The overall rsk sores of BSHR and H 2 O 3 are and 18.26, respectvely. They are farly low n a ratng system wth 100 as the hghest rsk score. For ndvdual attrbutes, most of the weghted rsk scores are also very low and at the lowest level n the ratng scale. These rsk scores, both for overall objectve and ndvdual attrbutes, llustrate that the constructon safety of the BSHR and H 2 O 3 projects has been well managed and the safety rsks have been under control; 2. H 2 O 3 s one of masterpeces of the Bejng Olympc venues 44 / JOURNAL OF MANAGEMENT IN ENGINEERING ASCE / JANUARY 2008

6 Table 6. Weghts of Attrbutes of Lowest Levels Number Attrbute Weght Questons for measurng attrbutes T.1 Techncal measures on ste safety Whether there are safety protecton measures n constructon technque and organzaton plan; T.2.1 Utlzaton of equpments for ste safety Whether contractor are safety equpment; whether the safety equpment s utlzed effectvely. T.2.2 Safety and relablty performance of equpment and facltes on ste Safety accessores of equpment; safety tranng of operators and equpment mantenance. T.3.1 T.3.2 M.1.1 M.1.2 M.1.3 New technologes, new materals and nnovatve structure n desgn scheme Hdden safety troubles resultng from desgn scheme nconvenent for executon of constructon Safety manageral personnel and organzaton of clent Safety manageral personnel and organzaton of contractor The atttude of contractor project manager towards safety Quantty of new technology, materal and nnovatve desgn; whether safety measures are provded by desgner to elmnate these ssues Quantty of hdden safety troubles n desgn scheme; whether safety measures are provded by desgner to elmnate these ssues Quantty, qualfcaton, experence, and responsblty of safety manageral personnel and organzaton of clent Quantty, qualfcaton, experence, and responsblty of safety manageral personnel and organzaton of contractor Safety responsblty and communcaton system set up by project manager; whether the project manager takes charge safety meetng; whether the project manager attends safety nspecton. M.1.4 Workers unsafe operaton Rato of unsafe operaton found durng daly safety nspecton. M.2.1 Plan of contractor on safety management Whether there s a safety plan; whether there are nsurance systems and measures to execute the plan; whether there s a feedback system n safety plan; M.2.2 Implementaton of measures on ste safety.e. tranng towards workers Whether there s effectve safety tranng; whether there are enough and qualfed PPE; whether the safety nstruments are enough and clear. M.2.3 Safety Supervson toward subcontractor Whether there are clear clauses on safety responsblty n the subcontract agreement; whether the general contractor nspects the safety work of subcontractor regularly. M.3.1 M.3.2 Emergency response plan and measures of admnstratve department Emergency response plan and measures of contractor Whether the admnstratve departments establsh emergency response plan and measures; whether the functon, responsblty, and leadershp are clearly defned n the emergency response plan; whether an nformaton report system s establshed; Whether the contractor establshes emergency response plan and measures; whether enough personnel, equpment and facltes are prepared for emergency response; whether there s practce n daly work; whether the equpment and facltes used for emergency response are n good mantenance. M.4.1 Money nput on safety by clent Whether there are clear clauses on safety fee from clent n the contract agreement; whether the money nput on safety by clent could meet the project safety requrement; whether the safety fee from clent could be transferred to contractor n tme. M.4.2 Money nput on safety by contractor Whether the contractor could nsure money nput on safety accordng to laws, regulatons and contract; whether enough safety equpment and facltes are purchased by contractor; whether the contractor could nsure enough money nput on mantenance of safety equpment and facltes. wth nnovatve desgn and hgh techncal complexty, whle BSRH s only a normal venue constructon project desgned n renforced concrete structure and much smaller than H 2 O 3 n sze and nvestment. As a result, the rsk score of the H 2 O 3 project on techncal ssues s hgher than BSRH; 3. The executon of H 2 O 3 constructon s managed by the Chna Three Gorges Project Corporaton wth a hgh level of project management sklls and experenced manageral personnel. In addton, through an nvestgaton of the two projects durng model valdaton, t s found that the clent of H 2 O 3 gave more management commtments to ste safety than BSRH s. Therefore, as a result, H 2 O 3 s rsk score of manageral ssues s lower than BSRH. On the bass of the above dscussons, the results of the assessment model are consstent wth the actual condtons and could reflect the dfference and characterstcs of the two venue constructon projects. Ths study was conducted from the whole Olympc venue constructon program s perspectve, whch focuses on the common safety rsk factors faced by all 30 competton venue constructon projects, not those partcular n ndvdual projects. The tools developed n ths study are also desgned to manage the common JOURNAL OF MANAGEMENT IN ENGINEERING ASCE / JANUARY 2008 / 45

7 Table 7. Rsk Scores of BSRH and H 2 O 3 Items Level Weghted scores of attrbutes on H 2 O 3 Weghted scores of attrbutes on BSRH T.1 Level T.2.1 Level T.2.2 Level T.3.1 Level T.3.2 Level Techncal ssues Level M.1.1 Level M.1.2 Level M.1.3 Level M.1.4 Level M.2.1 Level M.2.2 Level M.2.3 Level M.3.1 Level M.3.2 Level M.4.1 Level M.4.2 Level Manageral ssues Level Safe constructon Overall objectve safety rsk factors as well. To construct a systematc methodology of safety rsk management for both programs and ndvdual projects, we are now helpng wth ndvdual projects to manage ther safety rsk as the extenson of ths study Conclusons Fg. 2. Demonstraton for parwse comparson Wth the nvolvement of 27 experenced and hghly respected experts from government agences, the constructon ndustry, and academe, ths paper has developed a framework and systematc tools to manage the common safety rsk factors nherent n the program of Bejng Olympc venues constructon, whch s composed of all 30 competton venue constructon projects. The tools have been ntegrated nto the management nformaton system for BOCOG to meet the demand of Olympc venues constructon. The procedures and outcome of ths paper could be used n managng safety rsks nherent n constructon programs. The detaled outcome of ths paper s summarzed as follows: 1. Through branstormng, workshop dscussons, and questonnare surveys, the objectve of on ste safety of the Olympc venues constructon has been defned. In accordance wth the objectve, the safety rsk factors nherent n the Bejng Olympc venues constructon program are dentfed based on lterature revews, ntervews and nvestgatons of several man competton venue constructon projects for the Bejng Olympc games. As a result, 57 rsk factors are dentfed from whch a rsk checklst s establshed; 2. The probablty and mpact of the dentfed rsk factors are assessed to prortze the rsk factors and extract crtcal rsk factors through a workshop wth the partcpaton of 27 experenced experts. The fndng reveals that more than half of crtcal safety rsk factors are from contractors and subcontractors, such as lack of an emergency response plan and measures, workers unsafe operaton, contractors gnorng safety under schedule pressure, and so on; 3. Wth the crtcal safety rsk factors a rsk regster Table 5 has been set up, whch could provde the program management wth a profound understandng of the common safety rsks faced by all 30 competton venue constructon projects for the Bejng Olympc games; and 4. On the bass of the above work, a rsk assessment model has been developed to evaluate the status of rsks on ste safety through a ratngs method of the AHP. It was tested n two Olympc venue projects under constructon and the results are proved acceptable. Acknowledgments Apprecaton s gven to the Program for Key Internatonal S&T Cooperaton Projects of Mnstry of Scence and Technology, Chna Project No. 2003DFB The wrters also gratefully acknowledge the Bejng Organzng Commttee for the 29th Olympc Games and the Natural Scence Foundaton of Chna Grant Nos , , and for provdng fundng for ths research project. Notaton The followng symbols are used n ths paper: n number of people nvestgated; R overall rsk score of venue constructon project; R mportance ndex of th rsk factor; 46 / JOURNAL OF MANAGEMENT IN ENGINEERING ASCE / JANUARY 2008

8 S j V w j j evaluaton of rsk mportance by jth person nvestgated; value of lowest-level attrbute of venue constructon project; weght of lowest-level attrbute of herarchy for sngle objectve; evaluaton of rsk occurrence probablty by jth person nvestgated; and evaluaton of rsk mpact resultng from th rsk factor by jth person nvestgated. References Fang, D. P., Huang, X. Y., and Hnze, J Constructon safety management, Chna Water Publshng Company, Bejng n Chnese. Fang, D. P., Huang, X. Y., and Hnze, J. 2004a. Benchmarkng studes on constructon safety management n Chna. J. Constr. Eng. Manage., 130 3, Fang, D. P., L, M. E., Fong, P. S., and Shen, L. Y. 2004b. Rsks n Chnese constructon market Contractors perspectve. J. Constr. Eng. Manage., 130 6, Gun, R. T The role of regulatons n the preventon of occupatonal njury. Safety Sc., 16, Hnze, J., and Raboud, P Safety on large buldng constructon projects. J. Constr. Eng. Manage., 114 2, Hnze, J., and Wlson, G Movng toward a zero njury objectve. J. Constr. Eng. Manage., 126 5, Holmes, N., Lngard, H., Yeslyurt, Z., and Munk, F. D An exploratory study of meanngs of rsk control for long term and acute effect occupatonal health and safety rsks n small busness constructon frms. J. Safety Res., 30 4, Jaselsks, E. J Achevng constructon project success through predctve dscrete choce models. Ph.D. dssertaton, Unv. of Texas at Austn, Austn, Tex. Jaselsks, E. J., and Suazo, G. A. R A survey of constructon ste safety n Honduras. Constr. Manage. Econom., 12, Kangar, R., and Rggs, L. S Constructon rsk assessment by lngustcs. IEEE Trans. Eng. Manage., 36 2, Kangar, R Rsk management perceptons and trends of U.S. constructon. J. Constr. Eng. Manage., 121 4, Lee, S., and Halpn, D. W Predctve tool for estmatng accdent rsk. J. Constr. Eng. Manage., 129 4, L, M. E Rsk dentfcaton and assessment n constructon contractng Contractors perspectve. MSc thess, Tsnghua- Gammon Constructon Safety Research Center, School of Cvl Engneerng, Tsnghua Unv., Bejng, n Chnese. Mller, R., and Lessard, D Understandng and managng rsks n large engneerng projects. Int. J. Proj. Manage., 19, Saaty, T. L Fundamentals of decson makng and prorty theory wth the analytc herarchy process, RWS Publcatons, Pttsburgh. Shen, L. Y., Wu, G. W. C., and Ng, C., S. K Rsk assessment for constructon jont ventures n Chna. J. Constr. Eng. Manage., 127 1, Shenhar, A. J., Dvr, D., Levy, O., and Maltz, A. C Project success: A multdmensonal strategc concept. Long Range Plann., 34 6, Tam, C. M., Zeng, S. X., and Deng, Z. M Identfyng elements of poor constructon safety management n Chna. Safety Sc., 42 7, Trethewy, R. W., Atknson, M., and Falls, B Improved hazard dentfcaton for contractors n the constructon ndustry. J. Constr. Res., 4 1, Wang, S. Q., Dulam, M. F., and Agura, M. Y Rsk management framework for constructon project n developng countres. Constr. Manage. Econom., 22 3, Ward, S. C Assessng and managng mportant rsks. Int. J. Proj. Manage., 17 6, Wllams, T. M The two-dmensonalty of project rsk. Int. J. Proj. Manage., 14 3, Zhu, D. F Rsk measurement for constructon program: A case study on the Olympc venue constructon. Ph.D. dssertaton, Tsnghua Unv., Bejng n Chnese. JOURNAL OF MANAGEMENT IN ENGINEERING ASCE / JANUARY 2008 / 47

LIFE CYCLE ENVIRONMENTAL IMPACTS ASSESSMENT FOR RESIDENTIAL BUILDINGS IN CHINA

LIFE CYCLE ENVIRONMENTAL IMPACTS ASSESSMENT FOR RESIDENTIAL BUILDINGS IN CHINA Proceedngs: Indoor Ar 2005 LIFE CYCLE ENVIRONMENTAL IMPACTS ASSESSMENT FOR RESIDENTIAL BUILDINGS IN CHINA DJ Gu 1,*, JJ Lu 1, LJ Gu 1 1 Department of Buldng Scence, School of Archtecture, Tsnghua Unversty,

More information

Product Innovation Risk Management based on Bayesian Decision Theory

Product Innovation Risk Management based on Bayesian Decision Theory Advances n Management & Appled Economcs, vol., no., 0, - ISS: 79-7 (prnt verson), 79-7 (onlne) Internatonal Scentfc Press, 0 Product Innovaton Rsk Management based on Bayesan Decson Theory Yngchun Guo

More information

Evaluation Method for Enterprises EPR Project Risks

Evaluation Method for Enterprises EPR Project Risks , pp.350-354 http://dx.do.org/10.14257/astl.2016. Evaluaton Method for Enterprses EPR Project Rsks L-Yongmng 1,2 1 College of Economcs and Management, Nanjng Unversty of Aeronautcs and Astronautcs, Nanjng,

More information

Risk Assessment Using AHP in South Indian Construction Companies: A Case Study

Risk Assessment Using AHP in South Indian Construction Companies: A Case Study Internatonal Journal of Engneerng, Management & Scences (IJEMS) ISSN-2348 3733, Volume-2, Issue-5, May 2015 Rsk Assessment Usng AHP n South Indan Constructon Companes: A Case Study Parvathy.P, ShvaprasadH.C,

More information

1 Basic concepts for quantitative policy analysis

1 Basic concepts for quantitative policy analysis 1 Basc concepts for quanttatve polcy analyss 1.1. Introducton The purpose of ths Chapter s the ntroducton of basc concepts of quanttatve polcy analyss. They represent the components of the framework adopted

More information

Sources of information

Sources of information MARKETING RESEARCH FACULTY OF ENGINEERING MANAGEMENT Ph.D., Eng. Joanna Majchrzak Department of Marketng and Economc Engneerng Mal: joanna.majchrzak@put.poznan.pl Meetngs: Monday 9:45 11:15 Thursday 15:10

More information

EVALUATION METHODOLOGY OF BUS RAPID TRANSIT (BRT) OPERATION

EVALUATION METHODOLOGY OF BUS RAPID TRANSIT (BRT) OPERATION 200-203 JATIT & LL. All rghts reserved. IN: 992-864 www.att.org E-IN: 87-39 EVALUATION METHODOLOGY OF BU RAPID TRANIT (BRT) OPERATION WU HONGYANG A a Chna Urban ustanable Transport Research Center (CUTReC),

More information

A Group Decision Making Method for Determining the Importance of Customer Needs Based on Customer- Oriented Approach

A Group Decision Making Method for Determining the Importance of Customer Needs Based on Customer- Oriented Approach Proceedngs of the 010 Internatonal Conference on Industral Engneerng and Operatons Management Dhaka, Bangladesh, January 9 10, 010 A Group Decson Makng Method for Determnng the Importance of Customer Needs

More information

Consumption capability analysis for Micro-blog users based on data mining

Consumption capability analysis for Micro-blog users based on data mining Consumpton capablty analyss for Mcro-blog users based on data mnng ABSTRACT Yue Sun Bejng Unversty of Posts and Telecommuncaton Bejng, Chna Emal: sunmoon5723@gmal.com Data mnng s an effectve method of

More information

Analysis of the Critical Success Factors of SOA Implementation in China Tobacco Company Based on DEMATEL Approach Yong Cen

Analysis of the Critical Success Factors of SOA Implementation in China Tobacco Company Based on DEMATEL Approach Yong Cen Internatonal Conference on Automaton, Mechancal Control and Computatonal Engneerng (AMCCE 2015) Analyss of the Crtcal Success Factors of SOA Implementaton n Chna Tobacco Company Based on DEMATEL Approach

More information

The Credit Risk Assessment Model of Internet Supply Chain Finance: Multi-Criteria Decision-Making Model with the Principle of Variable Weight

The Credit Risk Assessment Model of Internet Supply Chain Finance: Multi-Criteria Decision-Making Model with the Principle of Variable Weight Journal of Computer and Communcatons, 2016, 4, 1-11 http://www.scrp.org/journal/jcc ISSN Onlne: 2327-5227 ISSN Prnt: 2327-5219 The Credt Rsk Assessment Model of Internet Supply Chan Fnance: Mult-Crtera

More information

Research on the Evaluation of Corporate Social Responsibility under the Background of Low Carbon Economy

Research on the Evaluation of Corporate Social Responsibility under the Background of Low Carbon Economy http://jba.scedupress.com Internatonal Journal of Busness Admnstraton Vol. 7, No. 5; 2016 Research on the Evaluaton of Corporate Socal Responsblty under the Background of Low Carbon Economy Xaofang Zhang

More information

The Critical Success Factors of Sourcing Production for Small and Medium-sized Clothing Firms in Hong Kong

The Critical Success Factors of Sourcing Production for Small and Medium-sized Clothing Firms in Hong Kong Volume 4, Issue 3, Sprng2005 The Crtcal Success Factors of Sourcng Producton for Small and Medum-szed Clothng Frms n Hong Kong Fung-y Tam, Ka-leung Moon, Sau-fun Ng, Ch-leung Hu Insttute of Textles and

More information

Supplier selection and evaluation using multicriteria decision analysis

Supplier selection and evaluation using multicriteria decision analysis Suppler selecton and evaluaton usng multcrtera decson analyss Stratos Kartsonaks 1, Evangelos Grgorouds 2, Mchals Neofytou 3 1 School of Producton Engneerng and Management, Techncal Unversty of Crete,

More information

Guidelines on Disclosure of CO 2 Emissions from Transportation & Distribution

Guidelines on Disclosure of CO 2 Emissions from Transportation & Distribution Gudelnes on Dsclosure of CO 2 Emssons from Transportaton & Dstrbuton Polcy Research Insttute for Land, Infrastructure and Transport June 2012 Contents 1. Introducton...- 3-1.1 Purpose and concept...- 3-1.2

More information

A Distance-Based Multi-Criteria Decision Making Approach to Problem of Supplier Involvement in New Product Development

A Distance-Based Multi-Criteria Decision Making Approach to Problem of Supplier Involvement in New Product Development Iowa State Unversty From the SelectedWorks of Gül Okudan-Kremer August, 2010 A Dstance-Based Mult-Crtera Decson Makng Approach to Problem of Suppler Involvement n New Product Development Gulsen Akman,

More information

The Credit Risk Assessment Model of Internet Supply Chain Finance: Multi-Criteria Decision-Making Model with the Principle of Variable Weight

The Credit Risk Assessment Model of Internet Supply Chain Finance: Multi-Criteria Decision-Making Model with the Principle of Variable Weight Journal of Computer and Communcatons, 2017, 5, 20-30 http://www.scrp.org/journal/jcc ISSN Onlne: 2327-5227 ISSN Prnt: 2327-5219 The Credt Rsk Assessment Model of Internet Supply Chan Fnance: Mult-Crtera

More information

A Two-Echelon Inventory Model for Single-Vender and Multi-Buyer System Through Common Replenishment Epochs

A Two-Echelon Inventory Model for Single-Vender and Multi-Buyer System Through Common Replenishment Epochs A Two-Echelon Inventory Model for Sngle-Vender and Mult-Buyer System Through Common Replenshment Epochs Wen-Jen Chang and Chh-Hung Tsa Instructor Assocate Professor Department of Industral Engneerng and

More information

To manage leave, meeting institutional requirements and treating individual staff members fairly and consistently.

To manage leave, meeting institutional requirements and treating individual staff members fairly and consistently. Corporate Polces & Procedures People and Development - Document CPP216 Leave Management Frst Produced: Current Verson: Past Revsons: Revew Cycle: Apples From: 09/09/09 07/02/17 09/09/09, 26/10/12 3 years

More information

Supplier Quality Performance Measurement System*

Supplier Quality Performance Measurement System* Suppler Qualty Performance Measurement System* LIU Yumn School of Busness, Zhengzhou Unversty, P.R.Chna, 45000 Abstract Qualty performance s excellent performance that organzatons reach to hgh qualty at

More information

Experiments with Protocols for Service Negotiation

Experiments with Protocols for Service Negotiation PROCEEDINGS OF THE WORKSHOP ON APPLICATIONS OF SOFTWARE AGENTS ISBN 978-86-7031-188-6, pp. 25-31, 2011 Experments wth Protocols for Servce Negotaton Costn Bădcă and Mhnea Scafeş Unversty of Craova, Software

More information

Logistics Management. Where We Are Now CHAPTER ELEVEN. Measurement. Organizational. Sustainability. Management. Globalization. Culture/Ethics Change

Logistics Management. Where We Are Now CHAPTER ELEVEN. Measurement. Organizational. Sustainability. Management. Globalization. Culture/Ethics Change CHAPTER ELEVEN Logstcs Management McGraw-Hll/Irwn Copyrght 2011 by the McGraw-Hll Companes, Inc. All rghts reserved. Where We Are Now Relatonshps Sustanablty Globalzaton Organzatonal Culture/Ethcs Change

More information

Research on Evaluation Index System for Automobile Enterprise Brand Value

Research on Evaluation Index System for Automobile Enterprise Brand Value 1234 Proceedngs of the 8th Internatonal Conference on Innovaton & Management Research on Evaluaton Index System for Automoble Enterprse Brand Value Chen Zhaohu, L Jng School of Management, Guangx Unversty

More information

Driving Factors of SO 2 Emissions in 13 Cities, Jiangsu, China

Driving Factors of SO 2 Emissions in 13 Cities, Jiangsu, China Avalable onlne at www.scencedrect.com ScenceDrect Energy Proceda 88 (2016 ) 182 186 CUE2015-Appled Energy Symposum and Summt 2015: Low carbon ctes and urban energy systems Drvng Factors of SO 2 Emssons

More information

A SIMULATION STUDY OF QUALITY INDEX IN MACHINE-COMPONF~T GROUPING

A SIMULATION STUDY OF QUALITY INDEX IN MACHINE-COMPONF~T GROUPING A SMULATON STUDY OF QUALTY NDEX N MACHNE-COMPONF~T GROUPNG By Hamd Sefoddn Assocate Professor ndustral and Manufacturng Engneerng Department Unversty of Wsconsn-Mlwaukee Manocher Djassem Assstant Professor

More information

A QUANTITATIVE APPROACH FOR CUSTOMER SATISFACTION MEASUREMENT OF REAL ESTATE DEVELOPMENT ENTERPRISE

A QUANTITATIVE APPROACH FOR CUSTOMER SATISFACTION MEASUREMENT OF REAL ESTATE DEVELOPMENT ENTERPRISE A QUANTITATIVE APPROACH FOR CUSTOMER SATISFACTION MEASUREMENT OF REAL ESTATE DEVELOPMENT ENTERPRISE Jn ZHANG, Dong Mng XU 2. X an Unversty of Archtecture & Technology, School of Cvl Engneerng, X an, Chna,

More information

An Analysis on Stability of Competitive Contractual Strategic Alliance Based on the Modified Lotka-Voterra Model

An Analysis on Stability of Competitive Contractual Strategic Alliance Based on the Modified Lotka-Voterra Model Advanced Scence and Technology Letters, pp.60-65 http://dx.do.org/10.14257/astl.2014.75.15 An Analyss on Stablty of Compettve Contractual Strategc Allance Based on the Modfed Lotka-Voterra Model Qng Xueme

More information

CONSUMER PRICE INDEX METHODOLOGY (Updated February 2018)

CONSUMER PRICE INDEX METHODOLOGY (Updated February 2018) CONSUMER PRCE NDEX METHODOLOGY (Updated February 208). Purpose, nature and use The purpose s to obtan country representatve data for the prces of goods and servces and to compute overall and group ndces

More information

RELATIONSHIP BETWEEN BUSINESS STRATEGIES FOLLOWED BY SERVICE ORGANIZATIONS AND THEIR PERFORMANCE MEASUREMENT APPROACH

RELATIONSHIP BETWEEN BUSINESS STRATEGIES FOLLOWED BY SERVICE ORGANIZATIONS AND THEIR PERFORMANCE MEASUREMENT APPROACH RELATIONSHIP BETWEEN BUSINESS STRATEGIES FOLLOWED BY SERVICE ORGANIZATIONS AND THEIR PERFORMANCE MEASUREMENT APPROACH Carlos F. Gomes, School of Economcs, ISR- Insttute of Systems and Robotcs, Unversty

More information

Using Balance Score Card to Evaluate Performance of High-Tech Companies

Using Balance Score Card to Evaluate Performance of High-Tech Companies , pp.373-388 http://dx.do.org/0.4257/junesst.206.9.4.37 Usng Balance Score Card to Evaluate Performance of Hgh-Tech Companes Lu Kebn, Wang qang 2 and Zhu Benxao 3 Anhu Xnhua Unversty, Commercal College,

More information

The ranks of Indonesian and Japanese industrial sectors: A further study

The ranks of Indonesian and Japanese industrial sectors: A further study Journal of Physcs: Conference Seres PAPER OPEN ACCESS The ranks of Indonesan and Japanese ndustral sectors: A further study To cte ths artcle: Ubadllah Zuhd 2017 J. Phys.: Conf. Ser. 820 012029 Vew the

More information

Job Description. Department/School: Faculty of Humanities & Social Sciences Grade: 6 Department/Placements Office

Job Description. Department/School: Faculty of Humanities & Social Sciences Grade: 6 Department/Placements Office Job Descrpton Job ttle: Faculty Placements Offcer Department/School: Faculty of Humantes & Socal Scences Grade: 6 Locaton: Department/Placements Offce Purpose of the job: The postholder wll form part of

More information

Customer segmentation, return and risk management: An emprical analysis based on BP neural network

Customer segmentation, return and risk management: An emprical analysis based on BP neural network Avalable onlne www.jocpr.com Journal of Chemcal and Pharmaceutcal Research, 204, 6(6):698-703 Research Artcle ISSN : 0975-7384 CODEN(USA) : JCPRC5 Customer segmentaton, return and rsk management: An emprcal

More information

Process Approach and Modelling in Organisation Competitiveness Management System

Process Approach and Modelling in Organisation Competitiveness Management System Management 205, 5(4): 07-6 DOI: 0.5923/j.mm.2050504.0 Process Approach and Modellng n Organsaton Compettveness Management System Marna A. Ivankova Project and Producton Department, JSC Atomenergoproekt,

More information

Economia Aziendale online 2000 Web

Economia Aziendale online 2000 Web Economa Azendale onlne 2000 Web Ban O. Synthetc Measure of the Qualty of Servce Takng nto Account the Clent s Perspectve n the Hotel Industry Internatonal Busness and Management Revew N. /2008 Specal Issue

More information

An Indian Journal FULL PAPER ABSTRACT KEYWORDS. Trade Science Inc.

An Indian Journal FULL PAPER ABSTRACT KEYWORDS. Trade Science Inc. [Type text] [Type text] [Type text] ISSN : 094-435 Volume 0 Issue BoTechnology 204 An Indan Journal FULL PAPER BTAIJ, 0(), 204 [554-562] Based on the brd's nest, cloud patterns method after the operaton

More information

Influencing Factors and Evaluation Index of Farmers Financial Needs based on Analytic Hierarchy Process

Influencing Factors and Evaluation Index of Farmers Financial Needs based on Analytic Hierarchy Process Influencng Factors and Evaluaton Index of Farmers Fnancal Needs based on Analytc Herarchy Process Yuqu Ca, Zhan Yang, Mo Zhang * School of Economcs and Management, Northeast Agrcultural Unversty, Harbn

More information

Management of innovation processes at the enterprises of the construction materials industry

Management of innovation processes at the enterprises of the construction materials industry https://do.org/10.1051/matecconf/201817001099 Management of nnovaton processes at the enterprses of the constructon materals ndustry Nkolay Voytolovsky 1,*, Ekaterna Maslyukova 2, Margarta Aleksandrova

More information

The Study on Evaluation Module Architecture of ERP for Chemical Enterprises Yongbin Qin 1, 2, a, Jiayin Wei 1, b

The Study on Evaluation Module Architecture of ERP for Chemical Enterprises Yongbin Qin 1, 2, a, Jiayin Wei 1, b Internatonal Conference on Educaton Technology and Informaton System (ICETIS 2013) The Study on Evaluaton Module Archtecture of ERP for Chemcal Enterprses Yongbn Qn 1, 2, a, Jayn We 1, b 1 College of Computer

More information

Innovation in Portugal:

Innovation in Portugal: Innovaton n Portugal: What can we learn from the CIS III? Innovaton and Productvty Pedro Moras Martns de Fara pedro.fara@dem.st.utl.pt Globelcs Academy 2005 25 May 2005 Introducton The study of the relatonshp

More information

RULEBOOK on the manner of determining environmental flow of surface water

RULEBOOK on the manner of determining environmental flow of surface water Pursuant to Artcle 54 paragraph 2 of the Law on Waters (Offcal Gazette of the Republc of Montenegro 27/07 and Offcal Gazette of Montenegro 32/11 and 48/15), the Mnstry of Agrculture and Rural Development

More information

Volume 30, Issue 4. Who likes circus animals?

Volume 30, Issue 4. Who likes circus animals? Volume 30, Issue 4 Who lkes crcus anmals? Roberto Zanola Unversty of Eastern Pedmont Abstract Usng a sample based on 268 questonnares submtted to people attendng the Acquatco Bellucc crcus, Italy, ths

More information

On Countermeasures of Promoting Agricultural Products E Commerce in China

On Countermeasures of Promoting Agricultural Products E Commerce in China On Countermeasures of Promotng Agrcultural Products E Commerce n Chna Wehua Gan, Tngtng Zhang, and Yuwe Zhu School of Mechancal and Electroncal Engneerng, East Chna Jaotong Unversty, 330013, Nanchang,

More information

Dwelling Selection by Applying VIKOR and Fuzzy AHP Method

Dwelling Selection by Applying VIKOR and Fuzzy AHP Method DOI: 0.7763/IPEDR. 203. V63. 6 Dwellng Selecton by Applyng VIKOR and Fuzzy AHP Method Thoedtda Thpparat and Thongpoon Thaseepetch 2 Department o Constructon Management, Faculty o Engneerng and Archtecture,

More information

Analysis Online Shopping Behavior of Consumer Using Decision Tree Leiyue Yao 1, a, Jianying Xiong 2,b

Analysis Online Shopping Behavior of Consumer Using Decision Tree Leiyue Yao 1, a, Jianying Xiong 2,b Advanced Materals Research Onlne: 2011-07-04 ISSN: 1662-8985, Vols. 271-273, pp 891-894 do:10.4028/www.scentfc.net/amr.271-273.891 2011 Trans Tech Publcatons, Swtzerland Analyss Onlne Shoppng Behavor of

More information

The Impact of Information Quality of Job Descriptions on an Applicant s Decision to Pursue a Job

The Impact of Information Quality of Job Descriptions on an Applicant s Decision to Pursue a Job The Impact of Informaton Qualty of Job Descrptons on an Applcant s Decson to Pursue a Job by Harry Leung A thess presented to the Unversty of Waterloo n fulfllment of the thess requrement for the degree

More information

Investigation on Evaluation of Core Competitiveness of Airlines Based on Gray Theory

Investigation on Evaluation of Core Competitiveness of Airlines Based on Gray Theory 660 Proceedngs of the 7th Internatonal Conference on Innovaton & Management Investgaton on Evaluaton of Core Compettveness of Arlnes Based on Gray Theory Ma Luyan, Wang Xaoy, Zhao Xng, Chao Hu School of

More information

Evaluation on external economies of renewable energy resource utilization: Taken wind power engineering project as example

Evaluation on external economies of renewable energy resource utilization: Taken wind power engineering project as example Scence Journal of Energy Engneerng 2015; 3(41: 15 Publshed onlne December 26, 2014 (http://www.scencepublshnggroup.com/j/sjee do: 10.11648/j.sjee.s.2015030401.11 Evaluaton on external economes of renewable

More information

Development of an Asphalt Pavement Distress Evaluation Method for Freeways in China

Development of an Asphalt Pavement Distress Evaluation Method for Freeways in China Techncal Paper ISSN 1997-1400 Int. J. Pavement Res. Technol. 7(2):159-167 Copyrght @ Chnese Socety of Pavement Engneerng Development of an Asphalt Pavement Dstress Evaluaton Method for Freeways n Chna

More information

Power Distribution System Planning Evaluation by a Fuzzy Multi-Criteria Group Decision Support System

Power Distribution System Planning Evaluation by a Fuzzy Multi-Criteria Group Decision Support System Internatonal Journal of Computatonal Intellgence Systems, Vol.3, No. 4 (October, 2010), 474-485 Power Dstrbuton System Plannng Evaluaton by a Fuzzy Mult-Crtera Group Decson Support System Tefeng ZHANG

More information

An Empirical Study on the Impact of the Low-Carbon Economy- Based Enterprise Financial Environment on Financial Accounting

An Empirical Study on the Impact of the Low-Carbon Economy- Based Enterprise Financial Environment on Financial Accounting An Emprcal Study on the Impact of the Low-Caron Economy- Based Enterprse Fnancal Envronment on Fnancal Accountng Astract Xaoyu Lu, Desheng Zhao Langfang Polytechnc Insttute, Langfang065000,Chna. Snce reform

More information

Prediction algorithm for users Retweet Times

Prediction algorithm for users Retweet Times , pp.9-3 http://dx.do.org/0.457/astl.05.83.03 Predcton algorthm for users Retweet Tmes Hahao Yu, Xu Feng Ba,ChengZhe Huang, Haolang Q Helongang Insttute of Technology, Harbn, Chna Abstract. In vew of the

More information

Available online at ScienceDirect. Procedia Engineering 178 (2017 )

Available online at  ScienceDirect. Procedia Engineering 178 (2017 ) Avalable onlne at www.scencedrect.com ScenceDrect Proceda Engneerng 178 (2017 ) 278 288 16 th Conference on Relablty and Statstcs n Transportaton and Communcaton, RelStat 2016, 19-22 October, 2016, Rga,

More information

LIFE CYCLE GREEN COST ASSESSMENT METHOD FOR GREEN BUILDING DESIGN. Lijing Gu1, Daojin Gu1, Borong Lin1, Mingxing Huang2, Jiazi Gai3, Yingxin Zhu1

LIFE CYCLE GREEN COST ASSESSMENT METHOD FOR GREEN BUILDING DESIGN. Lijing Gu1, Daojin Gu1, Borong Lin1, Mingxing Huang2, Jiazi Gai3, Yingxin Zhu1 LIFE CYCLE GREEN COST ASSESSMENT METHOD FOR GREEN BUILDING DESIGN Ljng Gu1, Daojn Gu1, Borong Ln1, Mngxng Huang2, Jaz Ga3, Yngxn Zhu1 1Department of Buldng Scence, Tsnghua Unversty, Bejng 100084, Chna

More information

Journal of Chemical and Pharmaceutical Research, 2013, 5(11): Research Article

Journal of Chemical and Pharmaceutical Research, 2013, 5(11): Research Article Avalable onlne www.jocpr.com Journal of Chemcal and Pharmaceutcal Research, 2013, 5(11):138-142 Research Artcle ISSN : 0975-7384 CODEN(USA) : JCPRC5 Compettve actons and performance of technologcal nnovatng

More information

On Measuring the Criticality of Various Variables and Processes in Organization Information Systems: Proposed Methodological Procedure

On Measuring the Criticality of Various Variables and Processes in Organization Information Systems: Proposed Methodological Procedure Informatca Economcă vol. 14, no. /010 5 On Measurng the Crtcalty of Varous Varables and Processes n Organzaton Informaton Systems: Proposed Methodologcal Procedure Jagdsh PATHAK 1, Abdulkadr HUSSEIN, Ram

More information

DEVELOPMENT OF DECISION SUPPORT SYSTEM FOR SELECTING QUALITY MANAGEMENT SYSTEMS AND MANAGEMENT TOOLS

DEVELOPMENT OF DECISION SUPPORT SYSTEM FOR SELECTING QUALITY MANAGEMENT SYSTEMS AND MANAGEMENT TOOLS Proceedng 7 th Internatonal Semnar on Industral Engneerng and Management DEVELOPMENT OF DECISION SUPPORT SYSTEM FOR SELECTING QUALITY MANAGEMENT SYSTEMS AND MANAGEMENT TOOLS Saranya Sukkarn 1, Natcha Thawesaengskultha

More information

ROOT CAUSE ANALYSIS FOR MEDICAL EQUIPMENT CALIBRATION LABORATORY NONCONFORMITIES

ROOT CAUSE ANALYSIS FOR MEDICAL EQUIPMENT CALIBRATION LABORATORY NONCONFORMITIES ROOT CAUSE ANALYSIS FOR MEDICAL EQUIPMENT CALIBRATION LABORATORY NONCONFORMITIES M. Abdel Wahed 1, M. Montaser 2, S. A. Sam 1 1 Systems and Bomedcal Engneerng Department, Faculty of Engneerng, Caro Unversty,

More information

Construction of Control Chart Based on Six Sigma Initiatives for Regression

Construction of Control Chart Based on Six Sigma Initiatives for Regression 2018 IJSRST Volume 4 Issue 2 Prnt ISSN: 2395-6011 Onlne ISSN: 2395-602X Themed Secton: Scence and Technology Constructon of Control Chart Based on Sx Sgma Intatves for Regresson ABSTRACT R. Radhakrshnan

More information

DEVELOPMENT OF A MODEL FOR EVALUATING THE EFFECTIVENESS OF ACCOUNTING INFORMATION SYSTEMS

DEVELOPMENT OF A MODEL FOR EVALUATING THE EFFECTIVENESS OF ACCOUNTING INFORMATION SYSTEMS DEVELOPMENT OF A MODEL FOR EVALUATING THE EFFECTIVENESS OF ACCOUNTING INFORMATION SYSTEMS Asta Raupelene, asta@eko.lzuu.lt - Lnas Stabngs, lnas@nfo.lzuu.lt Lthuanan Unversty of Agrculture The mplementaton

More information

North Wales Social Care and Community Health Workforce Strategy A summary

North Wales Social Care and Community Health Workforce Strategy A summary Our workforce North Wales Socal Care and Communty Health Workforce Strategy 2018-2021 A summary Hello Socal care and communty health servces are a bg part of communty lfe. They help people who need care

More information

Field Burning of Crop Residues

Field Burning of Crop Residues SMED Report No 62 2004 Feld Burnng of Crop Resdues Heléne Wkström, Rolf Adolfsson, Statstcs Sweden 2004-06-30 Commssoned by the Swedsh Envronmental Protecton Agency Publshed at: www.smed.se Publsher: Swedsh

More information

Finding a Probabilistic Approach to Develop a Fuzzy Expert System for the Assessment of Research Projects using ANP Approach

Finding a Probabilistic Approach to Develop a Fuzzy Expert System for the Assessment of Research Projects using ANP Approach Internatonal Journal of Industral Engneerng & Producton Research June 2012, Volume 23, Number 2 pp. 143-153 ISSN: 2008-4889 http://ijiepr.ust.ac.r/ Fndng a Probablstc Approach to Develop a Fuzzy Expert

More information

A Dynamic Model for Valuing Customers: A Case Study

A Dynamic Model for Valuing Customers: A Case Study , pp.56-61 http://dx.do.org/10.14257/astl.2015. A Dynamc Model for Valung Customers: A Case Study Hyun-Seok Hwang 1 1 Dvson of Busness, Hallym Unversty 1 Hallymdaehak-gl, Chuncheon, Gangwon-do, 24252 Korea

More information

Risk Assessment of Business Process Re-engineering Projects

Risk Assessment of Business Process Re-engineering Projects Open Access Open Journal of Socal Scences, 2014, *, ** Publshed Onlne **** 2014 n ScRes. http://www.scrp.org/journal/jss http://dx.do.org/10.4236/jss.2014.***** Rsk Assessment of Busness Process Re-engneerng

More information

Experimental Validation of a Suspension Rig for Analyzing Road-induced Noise

Experimental Validation of a Suspension Rig for Analyzing Road-induced Noise Expermental Valdaton of a Suspenson Rg for Analyzng Road-nduced Nose Dongwoo Mn 1, Jun-Gu Km 2, Davd P Song 3, Yunchang Lee 4, Yeon June Kang 5, Kang Duc Ih 6 1,2,3,4,5 Seoul Natonal Unversty, Republc

More information

Development and production of an Aggregated SPPI. Final Technical Implementation Report

Development and production of an Aggregated SPPI. Final Technical Implementation Report Development and producton of an Aggregated SPP Fnal Techncal mplementaton Report Marcus Frdén, Ulf Johansson, Thomas Olsson Servces Producer Prce ndces, Prce Statstcs Unt, Statstcs Sweden 2010 ntroducton

More information

Application of fuzzy TOPSIS method in analyzing a construction company

Application of fuzzy TOPSIS method in analyzing a construction company Extensve Journal of Appled Scences Avalable onlne at www.ejasj.com 2017 EJAS Journal-2017-5-2 49-56 ISSN 2409-9511 Applcaton of fuzzy TOPSIS method n analyzng a constructon company E. Najaf 1 M.A Amr Bandeh

More information

ITEM 4.4.b. OF THE AGENDA TYPOLOGY OF SAMPLING STRATEGIES UPDATED METHODOLOGICAL INFORMATION. Doc. ESTAT/F5/ES/201 (available in EN) Orig.

ITEM 4.4.b. OF THE AGENDA TYPOLOGY OF SAMPLING STRATEGIES UPDATED METHODOLOGICAL INFORMATION. Doc. ESTAT/F5/ES/201 (available in EN) Orig. Luxembourg, May 2010 AC/RDR/AMP ----------------------------------------------------- Drectorate F: Socal Statstcs and Informaton Socety Unt F5: Health and food safety; Crme Doc. (avalable n EN) Org. :

More information

RANKING OF VENDORS BASED ON CRITERIA BY MCDM-MATRIX METHOD-A CASE STUDY FOR COMMERCIAL VEHICLES IN AN AUTOMOBILE INDUSTRY

RANKING OF VENDORS BASED ON CRITERIA BY MCDM-MATRIX METHOD-A CASE STUDY FOR COMMERCIAL VEHICLES IN AN AUTOMOBILE INDUSTRY Internatonal Journal of Latest Research n Scence and Technology Vol.1,Issue 4 :Page No.337-341,November-December (2012) http://www.mnkjournals.com/jlrst.htm ISSN (Onlne):2278-5299 RANKING OF VENDORS BASED

More information

Planning of work schedules for toll booth collectors

Planning of work schedules for toll booth collectors Lecture Notes n Management Scence (0) Vol 4: 6 4 4 th Internatonal Conference on Appled Operatonal Research, Proceedngs Tadbr Operatonal Research Group Ltd All rghts reserved wwwtadbrca ISSN 00-0050 (Prnt),

More information

Evaluation and Selection Model of Strategic Emerging Industries in Guangdong Province of China Based on AHP-TOPSIS

Evaluation and Selection Model of Strategic Emerging Industries in Guangdong Province of China Based on AHP-TOPSIS Internatonal Journal of Busness and Management; Vol. 0, No. ; 05 ISSN 8-850 E-ISSN 8-89 Publshed by Canadan Center of Scence and Educaton Evaluaton and Selecton Model of Strategc Emergng Industres n Guangdong

More information

EXPERIMENTAL DETERMINATION OF THERMAL CHARACTERISTICS OF MUNICIPAL SOLID WASTE

EXPERIMENTAL DETERMINATION OF THERMAL CHARACTERISTICS OF MUNICIPAL SOLID WASTE EXPERIMENTAL DETERMINATION OF THERMAL CHARACTERISTICS OF MUNICIPAL SOLID WASTE Vyacheslav Bukhmrov 1, *, Olga Kolbaba 1, and Raml Gabtov 1 1 Ivanovo State Power Engneerng Unversty, 153003 Ivanovo, Russa

More information

Managing Investigations Guidance Notes for Managers

Managing Investigations Guidance Notes for Managers Managng Investgatons Gudance Notes for Managers Managng Investgatons Gudance Notes for Managers Contents Page 1.0 Introducton. 3 2.0 Scope. 3 3.0 Benefts. 3 4.0 The Use of Internal Investgatons wthn the

More information

ON LINKAGE-BASED CLUSTERING APPROACH AND AIR TRAFFIC PATTERN RECOGNITION

ON LINKAGE-BASED CLUSTERING APPROACH AND AIR TRAFFIC PATTERN RECOGNITION ON LINKAGE-BASED CLUSTERING APPROACH AND AIR TRAFFIC PATTERN RECOGNITION Leïla ZERROUKI, INEOVA for EUROCONTROL, France Serge MANCHON, Marc DALICHAMPT, EUROCONTROL, France Abstract: The paper ntroduces

More information

Extended Abstract for WISE 2005: Workshop on Information Systems and Economics

Extended Abstract for WISE 2005: Workshop on Information Systems and Economics Extended Abstract for WISE 5: Workshop on Informaton Systems and Economcs How Many Bundles?:An Analyss on Customzed Bundlng of Informaton Goods wth Multple Consumer Types Wendy HUI Ph.D. Canddate Department

More information

Journals Evaluation and the Application Based on Entropy-TOPSIS

Journals Evaluation and the Application Based on Entropy-TOPSIS Engneerng Management Research; Vol. 4, No. 1; 2015 ISSN 1927-7318 E-ISSN 1927-7326 Publshed by Canadan Center of Scence and Educaton Journals Evaluaton and the Applcaton Based on Entropy-TOPSIS Wen-Tao

More information

emissions in the Indonesian manufacturing sector Rislima F. Sitompul and Anthony D. Owen

emissions in the Indonesian manufacturing sector Rislima F. Sitompul and Anthony D. Owen Mtgaton optons for energy-related CO 2 emssons n the Indonesan manufacturng sector Rslma F. Stompul and Anthony D. Owen School of Economcs, The Unversty of New South Wales, Sydney, Australa Why mtgaton

More information

INTEGRATED ENERGY DISTRIBUTION SYSTEM PLANNING: A MULTI-CRITERIA APPROACH

INTEGRATED ENERGY DISTRIBUTION SYSTEM PLANNING: A MULTI-CRITERIA APPROACH INTEGRATED ENERGY DISTRIBUTION SYSTEM PLANNING: A MULTI-CRITERIA APPROACH Audun Botterud 1,3, Mara Catrnu 1, Ove Wolfgang 2, Arne T. Holen 1 1 Dept. of Electrcal Power Engneerng, Norwegan Unversty of Scence

More information

Spatial difference of regional carbon emissions in China

Spatial difference of regional carbon emissions in China Avalable onlne www.jocpr.com Journal of Chemcal and Pharmaceutcal Research, 2014, 6(7): 2741-2745 Research Artcle ISSN : 0975-7384 CODEN(USA) : JCPRC5 Spatal dfference of regonal carbon emssons n Chna

More information

Numerical Analysis about Urban Climate Change by Urbanization in Shanghai

Numerical Analysis about Urban Climate Change by Urbanization in Shanghai Numercal Analyss about Urban Clmate Change by Urbanzaton n Shangha Hafeng L 1, Wejun Gao 2 and Tosho Ojma 3 1 Research Assocate, School of Scence and Engneerng, Waseda Unversty, Japan 2 Assocate Professor,

More information

EHJO/V AOVGE 3.33P/0. A/BttGE 33.33% SCBA

EHJO/V AOVGE 3.33P/0. A/BttGE 33.33% SCBA APPENDIX 4: SURVEY STATISTICAL ANALYSIS METHODOLOGY Percentage Scores Percentage scores lsted n Fgure 1 are calculated from the answers of 35 respondents. It s calculated as a smple percentage to show

More information

Supplier Selection in the International Environment: A Comparative Case of a Turkish and an Australian Company 1

Supplier Selection in the International Environment: A Comparative Case of a Turkish and an Australian Company 1 IBIMA Publshng IBIMA Busness Revew http://www.bmapublshng.com/journals/ibimabr/bmabr.html Vol. 2011 (2011), Artcle ID 598845, 14 pages DOI: 10.5171/2011.598845 Suppler Selecton n the Internatonal Envronment:

More information

A New Methodology for Prioritizing Mining Strategies

A New Methodology for Prioritizing Mining Strategies A New Methodology for Prortzng Mnng Strateges Mohammad Mad Fouladgar, Abdolreza Yazdan-Chamzn, and Samak Ha Yakhchal Abstract Mnng plays one crtcal role n most countres and t acts as a foundaton for growth

More information

Honorable Kim Dunning Presiding Judge of the Superior Court 700 Civic Center Drive West Santa Ana, CA 92701

Honorable Kim Dunning Presiding Judge of the Superior Court 700 Civic Center Drive West Santa Ana, CA 92701 Mayor Gary Thompson Mayor Pro Tempore Jerry Holloway Councl Members L. Anthony Beall * -* - Nel C. Blas - James M. Thor Cty Manager Steven E. Hayman f September 10, 2009 Honorable Km Dunnng Presdng Judge

More information

MODELLING AND SIMULATION OF TEAM EFFECTIVENESS EMERGED FROM MEMBER-TASK INTERACTION. Shengping Dong Bin Hu Jiang Wu

MODELLING AND SIMULATION OF TEAM EFFECTIVENESS EMERGED FROM MEMBER-TASK INTERACTION. Shengping Dong Bin Hu Jiang Wu Proceedngs of the 2008 Wnter Smulaton Conference S. J. Mason, R. R. Hll, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. MODELLING AND SIMULATION OF TEAM EFFECTIVENESS EMERGED FROM MEMBER-TASK INTERACTION

More information

SATISFACTION MAXIMIZING MODEL FOR MANAGING PROJECT STAKEHOLDERS

SATISFACTION MAXIMIZING MODEL FOR MANAGING PROJECT STAKEHOLDERS Research Journal of Busness and Management (RJBM ISSN: 2148-6689 SATISFACTION MAXIMIZING MODEL FOR MANAGING PROJECT STAKEHOLDERS DOI: 10.17261/Pressacadema.2016.55 Chu-Ch We 1, Chung-Cheng Fu 2, Chou-Shue

More information

Optimal Issuing Policies for Substitutable Fresh Agricultural Products under Equal Ordering Policy

Optimal Issuing Policies for Substitutable Fresh Agricultural Products under Equal Ordering Policy 06 Internatonal Academc Conference on Human Socety and Culture (HSC 06) ISBN: 978--60595-38-6 Optmal Issung Polces for Substtutable Fresh Agrcultural Products under Eual Orderng Polcy Qao- TENG,a, and

More information

Available online at ScienceDirect. Procedia Engineering 134 (2016 )

Available online at   ScienceDirect. Procedia Engineering 134 (2016 ) Avalable onlne at www.scencedrect.com ScenceDrect Proceda Engneerng 34 (206 ) 377 385 9th Internatonal Scentfc Conference Transbaltca 205 Suppler Evaluaton Methodology n the Logstcs Company Lena Černá*,

More information

Identifying Factors that Affect the Downtime of a Production Process

Identifying Factors that Affect the Downtime of a Production Process Identfyng Factors that Affect the Downtme of a Producton Process W. Nallaperuma 1 *, U. Ekanayake 1, Ruwan Punch-Manage 2 1 Department of Physcal scences, Rajarata Unversty, Sr Lanka 2 Department of Statstcs

More information

Journal of Project Management

Journal of Project Management Journal of Project Management 1 (2016) 7 20 Contents lsts avalable at GrowngScence Journal of Project Management homepage: www.growngscence.com Project manager selecton based on project manager competency

More information

LECTURE 9 The Benefits and Challenges of Intercultural Communication

LECTURE 9 The Benefits and Challenges of Intercultural Communication Internatonal Extenson Currculum: Strengthenng Extenson s Capacty for Internatonal Engagement http://www2.ces.purdue.edu/ec/default.htm UNIT 7 LECTURE 9 The Benefts and Challenges of Intercultural Communcaton

More information

MEASURING USER S PERCEPTION AND OPINION OF SOFTWARE QUALITY

MEASURING USER S PERCEPTION AND OPINION OF SOFTWARE QUALITY MEASURING USER S PERCEPTION AND OPINION OF SOFTWARE QUALITY Dmtrs Stavrnouds, Computer Technology Insttute, Greece Mchals Xenos, Patras Unversty, Greece Pavlos Peppas, Macquare Unversty, Australa Dmtrs

More information

Management Science Letters

Management Science Letters Management Scence Letters 2 (2012) 655 664 Contents lsts avalable at GrowngScence Management Scence Letters homepage: www.growngscence.com/msl A hybrd algorthm of BSC and QFD to determne the crtera affectng

More information

Port Customer Credit Risk Prediction Based on Internal and External Information Fusion

Port Customer Credit Risk Prediction Based on Internal and External Information Fusion Send Orders for Reprnts to reprnts@benthamscence.ae The Open Cybernetcs & Systemcs Journal, 2015, 9, 1323-1328 1323 Open Access Port Customer Credt Rsk Predcton Based on Internal and External Informaton

More information

Multi-Modular Coordination Control of HTR-PM600 Plant

Multi-Modular Coordination Control of HTR-PM600 Plant Mult-Modular Coordnaton Control of HTR-PM600 Plant Maoxuan Song, Zhe Dong, Xaojn Huang, Zuoy Zhang, Zongxn Wu Insttute of Nuclear and New Energy Technology (INET), Collaboratve Innovaton Center of Advanced

More information

AHP and Value Engineering Application in Electrical Equipment Procurement Hong-qing ZHANG

AHP and Value Engineering Application in Electrical Equipment Procurement Hong-qing ZHANG 2016 2 nd Internatonal Conference on Socal Educaton and Management Engneerng (SEME 2016) ISBN: 978-1-60595-336-6 AHP and Value Engneerng Applcaton n Electrcal Equpment Procurement Hong-qng ZHANG School

More information

Appendix 6.1 The least-cost theorem and pollution control

Appendix 6.1 The least-cost theorem and pollution control Appendx 6.1 The least-cost theorem and polluton control nstruments Ths appendx s structured as follows. In Part 1, we defne the notaton used and set the scene for what follows. Then n Part 2 we derve a

More information

MULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE. Dileep R. Sule and Anuj A. Davalbhakta Louisiana Tech University

MULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE. Dileep R. Sule and Anuj A. Davalbhakta Louisiana Tech University MULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE Dleep R. Sule and Anuj A. Davalbhakta Lousana Tech Unversty ABSTRACT Ths paper presents a new graphcal technque for cluster

More information

A Study on the Types of Managerial Behaviors, Styles and Practices that Lead to Project Success

A Study on the Types of Managerial Behaviors, Styles and Practices that Lead to Project Success A Study on the Types of Manageral Behavors, Styles and Practces that Lead to Project Success by Valere Kuo SUBMITTED TO THE DEPARTMENT OF MECHANICAL ENGINEERING IN PARTIAL FULFILLMENT OF THE REQUIREMENTS

More information