1 Sellafield Box Procurement Project Nigel Goward Box Manufacturing Manager 13th March April

2 Background Legacy Intermediate Level Nuclear Waste currently being stored at Sellafield Site is to be retrieved from facilities and re-packaged into 3m 3 Boxes. One box design for encapsulated waste One box design for Raw / Un-encapsulated waste. Intermediate Level Waste (once in boxes) will be stacked 9 high in engineered shielded stores on Sellafield site followed by final storage in the Geological Deposit Facility (GDF) which will be provided by the Nuclear Decommissioning Authority s, Radioactive Waste Management Directorate (NDA-RWMD). For a container to be stored in the GDF, it must be granted a Letter of Compliance (LoC) for the container and the quality of the waste product within it by the NDA-RWMD.

3 3m 3 Generic Box Design, Prototype Manufacture and Testing ( ) 19 April

4 Box Store Vault Box Store Vault 9 High Stillage Stacks

5 Generic Box Design Underpins both new Variants PFCS Variant (Double Skin) Generic Box SDP Variant (Removable Liner) PFCS = Pile Fuel Cladding Silo SDP = Silos Direct Encapsulation Project

6 15m Drop Test of Single & Double Skin Generic Boxes

7 Top Edge & Top Corner Drop - Knock Back

8 PFCS Box 28 Lid Bolts Outer Lid Inner Lid (incl EPDM Plant Seal) AFP (Future) EPDM Inner Lid Seal

9 PFCS Double Skin Box Outer Skin Inner Skin Corner Stiffeners

10 Grout plug includes a specialised filter Interspace Grout filling points (4 off) Manufacturer will be required to fill up to ~150mm in the interspace with bespoke grout

11 Overarching Quality Expectations Demonstrable Quality Assurance is a key requirement Sellafield Ltd expects the contractor to take full accountability for product quality Ensure that quality expectations are communicated and understood by all who are involved in the supply chain

12 PFCS Waste Arisings When will PFCS use the boxes? PFCS 3m3 Box Demand Profile (Jan 2013) / / / / / / / / / / / / /25 11 Commissioning Boxes for PFCS 5 5 PFCS Boxes - PP 11 PSWP

13 PFCS Programme Waste Arisings Retrievals Duration Total number of boxes expected to remain consistent: Confidence in observed/measured waste volumes. Development supporting bulking assumptions. Demand model being updated. Profile likely to be different, but not significantly so. Updated profile will be available for the ITT. Initiatives are being developed looking at accelerating the Retrievals phase.

14 Procurement Approach

15 Tender Composition Sellafield Box Procurement Project scope is to procure the volume manufacture and supply of two variant [design] boxes to support ILW retrievals Due to the divergence in the demander plants demand requirements, two separate tenders will be undertaken one for each variant design PFCS variant box to be tendered first, to be followed by SDP variant

16 Selection Process (PFCS tender) Procurement to be undertaken through OJEU Tender to be conducted through CTM Restricted process selected (2 stage) Pre Qualification Questionnaire (PQQ) Selection stage Invitation to Tender (ITT) Award stage Enables focused assessment on capable bids Source Evaluation Board with cross functional representation

17 PFCS Procurement Timescales PQQ Issue March 2013 PQQ return date April 2013 ITT Issue May 2013 ITT return date July 2013 Period of Technical Due Diligence Contract Award (Phase 1) July 2014

18 Critical Success Factors Must ensure retrievals is never interrupted due to unavailability of boxes Must meet strict quality standards Must provide value for money Must consider socioeconomics

19 Contract Strategy (PFCS tender) Volume contract 2,200 boxes for PFCS variant, demand required until 2025 Long term contract subject to achievement of performance criteria at determined contract hold points Contract rather than framework acknowledging investment required e.g. facilities, production line, etc Additional 10% volume option for additional variant box production

20 Form of Contract Sellafield supply contract incorporating NDA flow down terms Two phased contract structure with performance linked Hold Points; Phase 1 Design for Manufacture (Contract Hold Point) Develop Tooling/ Design & Build Proving Volume Production Line Prove volume production throughput (Contract Hold Point) Produce initial buffer stock (Option under phase 1) Phase 2 Final facility/multi production lines complete Steady state volume production in line with agreed forecasts and/or minimum order quantities

21 Thank You Any Questions?

OPERATIONAL DECOMMISSIONING

OPERATIONAL DECOMMISSIONING OPERATIONAL DECOMMISSIONING UK Responsibilities & Arisings Dr. Denis Buckley 12 th September 2013 UK Liabilities Responsibility & Management HM Government: Ultimate responsible authority for decommissioning.

More information

UK Low Level Waste Repository Ltd Standardising the Design and Transport of Packages to Contain Low Activity Radioactive Wastes in the UK 11459

UK Low Level Waste Repository Ltd Standardising the Design and Transport of Packages to Contain Low Activity Radioactive Wastes in the UK 11459 UK Low Level Waste Repository Ltd Standardising the Design and Transport of Packages to Contain Low Activity Radioactive Wastes in the UK 11459 Martin Walkingshaw, LLW Repository Ltd, United Kingdom Mark

More information

OPERATIONAL DECOMMISSIONING

OPERATIONAL DECOMMISSIONING OPERATIONAL DECOMMISSIONING UK Responsibilities & Arisings Dr. Denis Buckley September 2016 UK Liabilities Responsibility & Management HM Government: Ultimate responsible authority for decommissioning.

More information

OPERATIONAL DECOMMISSIONING

OPERATIONAL DECOMMISSIONING OPERATIONAL DECOMMISSIONING UK Responsibilities & Arisings Dr. Denis Buckley September 2014 UK Liabilities Responsibility & Management HM Government: Ultimate responsible authority for decommissioning.

More information

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. The Sellafield Plan

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. The Sellafield Plan The Sellafield Plan - 12458 Mr Iain Irving, Stakeholder Relations Director, Sellafield Ltd, Cumbria, UK ABSTRACT The Sellafield Performance Plan represents the start of a new era for the Sellafield site.

More information

R&D across the NDA for waste and decommissioning. Darrell Morris Research Manager

R&D across the NDA for waste and decommissioning. Darrell Morris Research Manager R&D across the NDA for waste and decommissioning Darrell Morris Research Manager 1 Why do we do R&D? Established via Energy Act 2004 by Government to: Safely clean up the UK civil public sector nuclear

More information

Current Supply Chain Opportunities In the NDA Estate and Overseas

Current Supply Chain Opportunities In the NDA Estate and Overseas Current Supply Chain Opportunities In the NDA Estate and Overseas Supply Chain Opportunities Presentation Outline Clean Energy Overview Sellafield Magnox / RSRL Dounreay NDA Estate wide Overseas 2 3 Clean

More information

GAME CHANGER. Packaging, Transport and Disposal of VLLW & Low Category LLW. Innovative Fit for purpose Regulatory compliant

GAME CHANGER. Packaging, Transport and Disposal of VLLW & Low Category LLW. Innovative Fit for purpose Regulatory compliant GAME CHANGER Packaging, Transport and Disposal of VLLW & Low Category LLW Innovative Fit for purpose Regulatory compliant 1 Exceeding Expectations, One Customer at a time... Introduction The UK Nuclear

More information

Box Encapsulation Plant Supply Chain Opportunities. Rachel Beech

Box Encapsulation Plant Supply Chain Opportunities. Rachel Beech Box Encapsulation Plant Supply Chain Opportunities Rachel Beech Agenda Background/History of BEP Supply Chain opportunities How to pre-qualify for BEP 2 Background / History Deliver capability to treat

More information

Regulation of Sellafield and GB Decommissioning Sites

Regulation of Sellafield and GB Decommissioning Sites Regulation of Sellafield and GB Decommissioning Sites 2 nd Fukushima decommissioning Forum Iwaki- July 2017 Mina Golshan Director, Office for Nuclear Regulation, UK Contents About ONR: who we are and what

More information

Plutonium Strategy. Current Position Paper. February Nuclear Materials Doc Ref: SMS/TS/B1-PLUT/001/A

Plutonium Strategy. Current Position Paper. February Nuclear Materials Doc Ref: SMS/TS/B1-PLUT/001/A Strategy Nuclear Materials Doc Ref: SMS/TS/B1-PLUT/001/A Contents 1 Introduction 3 2 Current Baseline Plan 5 3 Credible Strategic Options 5 4 Topic Strategy Objectives and Future Scope 8 5 Topic Lifecycle

More information

WM2015 Conference, March 15 19, 2015, Phoenix, Arizona, USA

WM2015 Conference, March 15 19, 2015, Phoenix, Arizona, USA Installation and Operation of GeoMelt In Container Vitrification in NNL Central Lab Active Rig Hall at Sellafield 15328 Keith Witwer *, Eric Dysland *, Steve Woosley *, Charlie Scales **, John McGibbon

More information

Brief Guide to Public Sector EU Procurement Legislation. Despatch PIN not a call for competition (optional) allowing shortened timescale

Brief Guide to Public Sector EU Procurement Legislation. Despatch PIN not a call for competition (optional) allowing shortened timescale A summary of the Open Procedure: Brief Guide to Public Sector EU Procurement Legislation Despatch PIN not a call for competition (optional) allowing shortened timescale before the contract notice was dispatched,

More information

A S S E S S M E N T R E P O R T

A S S E S S M E N T R E P O R T ASSESSMENT REPORT Generic Design Assessment: Disposability Assessment for Wastes and Spent Fuel arising from Operation of the Westinghouse Advanced Passive Pressurised Water Reactor (AP1000) Part 1: Main

More information

WM2011 Conference, February 27 March 3, 2011, Phoenix, AZ. Decommissioning of the Beta Gamma Waste Store, Sellafield UK 11498

WM2011 Conference, February 27 March 3, 2011, Phoenix, AZ. Decommissioning of the Beta Gamma Waste Store, Sellafield UK 11498 Decommissioning of the Beta Gamma Waste Store, Sellafield UK 11498 Jeremy Gareth Hunt Sellafield Ltd, UK ABSTRACT A significant milestone was reached on 29 th July 2010 at the NDA s Sellafield Site in

More information

Enabling Innovation Framework Tranche 2

Enabling Innovation Framework Tranche 2 Enabling Innovation Framework Tranche 2 Market Engagement Day John Sidney Head of Supply Chain Strategy Date: 14 March 2014 Housekeeping Safety Arrangements No planned fire alarms for today In the event

More information

SDP Project. Development of an Effluent Treatment Process for the Silos Direct Encapsulation Plant. Thomas Jones SDP Delivery Team / Nuvia Ltd

SDP Project. Development of an Effluent Treatment Process for the Silos Direct Encapsulation Plant. Thomas Jones SDP Delivery Team / Nuvia Ltd Development of an Effluent Treatment Process for the Silos Direct Encapsulation Plant Thomas Jones SDP Delivery Team / Nuvia Ltd SDP Project Aims Explain the requirement for the Silos Direct encapsulation

More information

In total, nine bidders submitted a PQQ response and five were successfully taken forward to the Invitation to Tender stage.

In total, nine bidders submitted a PQQ response and five were successfully taken forward to the Invitation to Tender stage. Report to Cabinet 12 th January 2017 By the Cabinet Member for Leisure and Culture & By the Cabinet Member for Finance and Assets DECISION REQUIRED Main report not exempt Appendix 1 Exempt under Paragraph

More information

An Overview of the Development of IP-2 ISO Freight Containers. in the UK

An Overview of the Development of IP-2 ISO Freight Containers. in the UK An Overview of the Development of IP-2 ISO Freight s in the UK Bob Vaughan Croft Associates Ltd Building F4 Culham Science Centre Culham, Abingdon Oxfordshire OX14 3DB, GB www.croftltd.com Ron Hows Croft

More information

Nuclear Decommissioning Authority

Nuclear Decommissioning Authority Nuclear Decommissioning Authority Ten Years of the NDA, 2005-2015 Decommissioning of Nuclear Installations: Strategies, Practices and Challenges Moscow, Russian Federation 9-11 November 2015 John Mathieson

More information

Geological Disposal Feasibility studies exploring options for storage, transport and disposal of spent fuel from potential new nuclear power stations

Geological Disposal Feasibility studies exploring options for storage, transport and disposal of spent fuel from potential new nuclear power stations NDA Report no. NDA/RWMD/060 Geological Disposal Feasibility studies exploring options for storage, transport and disposal of spent fuel from potential new nuclear power stations November 2010 NDA Report

More information

Innovative Waste Packaging and Associated Venting/Hydrogen Management

Innovative Waste Packaging and Associated Venting/Hydrogen Management ABSTRACT Innovative Waste Packaging and Associated Venting/Hydrogen Management - 16594 Conrad Izatt*, Daniel Fisher** and Chris Chadwick***, * Arup ** Croft Associates *** Porvair Filtration Group The

More information

RSRL Update. IMechE Nuclear. Conference 27 June Tony Wratten RSRL Managing Director

RSRL Update. IMechE Nuclear. Conference 27 June Tony Wratten RSRL Managing Director RSRL Update IMechE Nuclear Decommissioning Conference 27 June 2012 Tony Wratten RSRL Managing Director RSRL - WHO ARE WE? 2 sites Harwell (Oxfordshire) and Winfrith (Dorset) 100 miles apart Turnover ~

More information

Geological Disposal Generic Design Assessment: Summary of Disposability Assessment for Wastes and Spent Fuel arising from Operation of the UK EPR

Geological Disposal Generic Design Assessment: Summary of Disposability Assessment for Wastes and Spent Fuel arising from Operation of the UK EPR NDA Technical Note no. 11261814 Geological Disposal Generic Design Assessment: Summary of Disposability Assessment for Wastes and Spent Fuel arising from Operation of the UK EPR October 2009 NDA Technical

More information

Sellafield Ltd R&D and the future. Mike James Head of Technical

Sellafield Ltd R&D and the future. Mike James Head of Technical Sellafield Ltd R&D and the future Mike James Head of Technical The Sellafield site has more than 60 years of history 1940s/50s 1960s/70s 1980s 1990s 2000s/10s Nuclear build begins Initially a military

More information

TREATMENT AND STORAGE OF WASTE FROM THE DECOMMISSIONING OF THE WINDSCALE PILE REACTOR. D H Norton, Project Manager British Nuclear Fuels plc

TREATMENT AND STORAGE OF WASTE FROM THE DECOMMISSIONING OF THE WINDSCALE PILE REACTOR. D H Norton, Project Manager British Nuclear Fuels plc TREATMENT AND STORAGE OF WASTE FROM THE DECOMMISSIONING OF THE WINDSCALE PILE REACTOR ABSTRACT D H Norton, Project Manager British Nuclear Fuels plc W Botzem Nukem Nuklear A Dale Rolls Royce Nuclear Engineering

More information

On-Site, Near Surface Disposal of Graphite Wastes in the UK

On-Site, Near Surface Disposal of Graphite Wastes in the UK On-Site, Near Surface Disposal of Graphite Wastes in the UK - 11271 Adam Meehan*, Peter Sibley*, Al Johnson*, Jeremy Lightfoot**, Duncan Jackson*** * EnergySolutions EU Ltd, First Floor, Stella Building,

More information

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona, USA. Geological Disposal Concept Selection Aligned with a Voluntarism Process 13538

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona, USA. Geological Disposal Concept Selection Aligned with a Voluntarism Process 13538 Geological Disposal Concept Selection Aligned with a Voluntarism Process 13538 Glenda Crockett and Samantha King Nuclear Decommissioning Authority, Building 587, Curie Avenue, Harwell Oxford, Didcot, Oxfordshire,

More information

Chief Nuclear Inspector s Summary Programme Plan

Chief Nuclear Inspector s Summary Programme Plan Chief Nuclear Inspector s Summary Programme Plan 2016/17 Office for Nuclear Regulation page 1 of 8 The Chief Nuclear Inspector s Summary Programme Plan 2016/17 sets out our high level regulatory milestones

More information

Packaging Supplier Day May 2015

Packaging Supplier Day May 2015 Objective: To engage with suppliers who may be interested in and have the capability and capacity to manufacture various forms of packaging required, and the associated services. Date: 18 th June 2015

More information

Mini-project report. Life Cycle Analysis of the Nuclear Fuel Cycle. Sellafield High Level Waste Plants 2010/11

Mini-project report. Life Cycle Analysis of the Nuclear Fuel Cycle. Sellafield High Level Waste Plants 2010/11 Mini-project report Life Cycle Analysis of the Nuclear Fuel Cycle Sellafield High Level Waste Plants 2010/11 Donald Edward Willey d.e.willey@sheffield.ac.uk 10 th February 2012 1 1 Introduction 1.1 Aim

More information

Waste Container Integrated Innovation Team (IIT) IGD-TP 7 th Exchange Forum Córdoba, Spain October 2016

Waste Container Integrated Innovation Team (IIT) IGD-TP 7 th Exchange Forum Córdoba, Spain October 2016 Waste Container Integrated Innovation Team (IIT) IGD-TP 7 th Exchange Forum Córdoba, Spain 25-26 October 2016 Agenda 1. Background 2. The Challenge 3. The Plan 4. Case Study 5. Next Steps 1. Background

More information

An Introduction to Milton Keynes Council Procurement

An Introduction to Milton Keynes Council Procurement An Introduction to Milton Keynes Council Procurement An Introduction to Milton Keynes Council Procurement v1 October 2014 1 Milton Keynes Council Procurement Introduction Milton Keynes Council (the Council)

More information

NDA Technical Note no

NDA Technical Note no NDA Technical Note no. 11339711 Geological Disposal Generic Design Assessment: Summary of Disposability Assessment for Wastes and Spent Fuel arising from Operation of the Westinghouse AP1000 October 2009

More information

NDA Report no. NDA/RWMD/067. Geological Disposal Generic Waste Package Specification

NDA Report no. NDA/RWMD/067. Geological Disposal Generic Waste Package Specification NDA Report no. NDA/RWMD/067 Geological Disposal Generic Waste Package Specification March 2012 NDA Report no. NDA/RWMD/067 Geological Disposal Generic Waste Package Specification March 2012 Conditions

More information

Role of contracts & procurement

Role of contracts & procurement Role of contracts & procurement Many bring sites and/or containers are provided and serviced without any formal arrangement between the different parties (i.e. the local authority and the service provider)

More information

Technical Report. Overview of Knowledge Coverage for Geological Disposal. Bill Miller. AMEC Report Reference: Client Reference:

Technical Report. Overview of Knowledge Coverage for Geological Disposal. Bill Miller. AMEC Report Reference: Client Reference: Technical Report Overview of Knowledge Coverage for Geological Disposal Bill Miller AMEC Report Reference: 200094 Client Reference: ONR158 Issue Number: 1.1 Date of Report: 13th January 2015 DOCUMENT ISSUE

More information

The Importance of Interim Storage in the Management of Higher Activity Radioactive Waste

The Importance of Interim Storage in the Management of Higher Activity Radioactive Waste in the Management of Higher Activity Radioactive Waste February 2017 Contents 1. Purpose of the document 1 2. The lifecycle of HAW 1 3. Storage of HAW implementing Government policies 1 4. Storage of HAW

More information

The UK s National Policy & Programme for the Management of Spent Fuel and Radioactive Waste 16574

The UK s National Policy & Programme for the Management of Spent Fuel and Radioactive Waste 16574 The UK s National Policy & Programme for the Management of Spent Fuel and Radioactive Waste 16574 Robert Middleton Head of Radioactive Waste Management and Decommissioning René McTaggart Head of International

More information

The Regulation of Decommissioning and Associated Waste Management

The Regulation of Decommissioning and Associated Waste Management FIRST INTERNATIONAL FORUM ON THE DECOMMISSIONING OF THE FUKUSHIMA DAIICHI NUCLEAR POWER PLANT April 2016, Fukushima Japan The Regulation of Decommissioning and Associated Waste Management By M W Weightman

More information

WM2011 Conference, February 27 March 3, 2011, Phoenix, AZ. Recent Decommissioning Achievements at Sellafield, UK 11132

WM2011 Conference, February 27 March 3, 2011, Phoenix, AZ. Recent Decommissioning Achievements at Sellafield, UK 11132 ABSTRACT Recent Decommissioning Achievements at Sellafield, UK 11132 Russ Mellor, Decommissioning Director, Sellafield Ltd. The decommissioning programme at Sellafield is extremely complex and challenging.

More information

Pile Fuel Cladding Silo Deflector Plate Removal Project Using Long Reach Tooling and Suspended Abrasive Water Jet Cutting System

Pile Fuel Cladding Silo Deflector Plate Removal Project Using Long Reach Tooling and Suspended Abrasive Water Jet Cutting System Pile Fuel Cladding Silo Deflector Plate Removal Project Using Long Reach Tooling and Suspended Abrasive Water Jet Cutting System -17541 John Reekie*, Shannon Callahan ** * James Fisher Nuclear Ltd, Unit

More information

Research Sites Restoration Ltd is owned by Babcock International Group and operates on behalf of the Nuclear Decommissioning Authority

Research Sites Restoration Ltd is owned by Babcock International Group and operates on behalf of the Nuclear Decommissioning Authority Not protectively marked Research Sites Restoration Ltd is owned by Babcock International Group and operates on behalf of the Nuclear Decommissioning Authority Agenda Part One Is about Harwell, Delicensing,

More information

Nuclear Decommissioning Authority

Nuclear Decommissioning Authority Nuclear Decommissioning Authority Progress with Waste Management and Decommissioning in the UK GREAT Energy Summit, Bucharest 4 th October 2017 John Mathieson Head of International Relations Nuclear Decommissioning

More information

Invitation to Tender (ITT) for the supply of. Catering Contract at Avenue Junior School, Norwich, NR2 3HP

Invitation to Tender (ITT) for the supply of. Catering Contract at Avenue Junior School, Norwich, NR2 3HP Invitation to Tender (ITT) for the supply of Catering Contract at Avenue Junior School, Norwich, NR2 3HP Contents 1 Introduction... 3 1.1 ITT document... 3 1.1.1 Contract Requirement... 3 1.1.2 Timetable...

More information

London South Bank University Faculty of Engineering, Science and The Built Environment Explosion and Fire Research Group. With Sellafield Ltd

London South Bank University Faculty of Engineering, Science and The Built Environment Explosion and Fire Research Group. With Sellafield Ltd London South Bank University Faculty of Engineering, Science and The Built Environment With Sellafield Ltd Reference: SL2 PhD industrial CASE studentship in engineering Maintaining the resilience of hydrogen

More information

Decommissioning Waste Handling and Storage Challenges

Decommissioning Waste Handling and Storage Challenges Decommissioning Waste Handling and Storage Challenges Part of the Sellafield Ltd Game Changers Series How to use this document This document introduces the challenges associated with the dismantling, size

More information

Post Operational Clean Out Operations Division

Post Operational Clean Out Operations Division Post Operational Clean Out Operations Division February 2016 1 POCO Post Operational Clean Out ONR and NDA requirements are that Sellafield plants are subject to POCO directly after operations cease: Primary

More information

Decommissioning and Remediation after a Nuclear Accident, 3 Case Studies

Decommissioning and Remediation after a Nuclear Accident, 3 Case Studies Decommissioning and Remediation after a Nuclear Accident, 3 Case Studies Sellafield Ltd and INES Site has been operational for 67 years. The site covers an area of 6Km 2. There are over 1300 buildings

More information

PLEASURES AND PI OF PROCUREMENT

PLEASURES AND PI OF PROCUREMENT Brick Workshop 28 29/06/2017 Brymbo Ironworks PLEASURES AND PI OF PROCUREMENT PROCUREMENT The purchase of work, services, goods and assets PROCUREMENT PROCESS The actions taken in purchasing work, services,

More information

Geological disposal of higher-activity radioactive waste. June 2010

Geological disposal of higher-activity radioactive waste. June 2010 Geological disposal of higher-activity radioactive waste June 2010 1 Nuclear Decommissioning Authority Delivering the largest environmental clean-up programme in Europe at 19 existing nuclear facilities

More information

Hunterston A ILW Store. Request for agreement to active commissioning. Project Assessment Report: ONR-DFW-PAR Revision 0 November 2013

Hunterston A ILW Store. Request for agreement to active commissioning. Project Assessment Report: ONR-DFW-PAR Revision 0 November 2013 Hunterston A ILW Store Request for agreement to active commissioning Project Assessment Report: ONR-DFW-PAR-13-001 Revision 0 November 2013 Template Ref: ONR-DOC-TEMP-005 Revision 8 Page 1 of 13 Crown

More information

Radiochemistry In Nuclear Clean Up - Fundamental Science Underpinning A National Imperative Neil Smart.

Radiochemistry In Nuclear Clean Up - Fundamental Science Underpinning A National Imperative Neil Smart. Radiochemistry In Nuclear Clean Up - Fundamental Science Underpinning A National Imperative Neil Smart www.nda.gov.uk Contents NDA Strategy issues NDA underpinning R&D Activities Radiochemistry Activities

More information

Box Encapsulation Plant Delivery Team

Box Encapsulation Plant Delivery Team Box Encapsulation Plant Delivery Team Supply Chain Day C01003 OFFICE INDUCTION B O X E N C A P S U L A T I O N P L A N T ( B E P ) P R O J E C T Jun 29 th 2017 Housekeeping No fire alarms due today. If

More information

Dounreay Planning Summary Phase 3 ( Interim End State)

Dounreay Planning Summary Phase 3 ( Interim End State) Planning Summary Introduction Phase 3 development Demolitions Waste Environmental protection Environmental impacts Interim End State Socio economics Your views This document summarises the activities required

More information

UNDERSTANDING THERMAL CONSTRAINTS FOR HIGH-HEAT-GENERATING WASTES IN THE UK. Ann McCall, Martin Cairns

UNDERSTANDING THERMAL CONSTRAINTS FOR HIGH-HEAT-GENERATING WASTES IN THE UK. Ann McCall, Martin Cairns UNDERSTANDING THERMAL CONSTRAINTS FOR HIGH-HEAT-GENERATING WASTES IN THE UK Ann McCall, Martin Cairns Radioactive Waste Management Limited, Building B587, Curie Avenue, Harwell Oxford, Didcot Oxfordshire,

More information

West of England Waste Management Strategy Phase 2 Contract Award

West of England Waste Management Strategy Phase 2 Contract Award West of England Partnership Joint Waste Management Committee 27 May 2009 Agenda item 5 ii) Report of the Chief Executive West of England Waste Management Strategy Phase 2 Contract Award Recommendation:

More information

E 4 ISSUE/REVISION LAST MODIFIED 26 November 2012 DATE PRINTED

E 4 ISSUE/REVISION LAST MODIFIED 26 November 2012 DATE PRINTED THE UNIVERSITY of EDINBURGH Estates & Buildings ESTATE DEVELOPMENT E 4 ISSUE/REVISION LAST MODIFIED 26 November 2012 DATE PRINTED RIBA stage E E4 PREPARE PQQ FOR CONTRACT WORKS (OJEU & NON OJEU) 1. DEFINITION

More information

Office for Nuclear Regulation (ONR) Six Monthly Site Report for

Office for Nuclear Regulation (ONR) Six Monthly Site Report for Title of document Office for Nuclear Regulation (ONR) Six Monthly Site Report for Covering the period 01 April to 30 September 2017 Foreword This report is issued as part of ONR's commitment to make information

More information

CHALLENGE: Decommissioning Waste Handling and Storage

CHALLENGE: Decommissioning Waste Handling and Storage CHALLENGE: Decommissioning Waste Handling and Storage CONTENTS 3. Overview 4. Vision 5. Waste Packages/Containers 8. Waste Treatment 11. Long Term Monitoring of Waste Containers 13. Waste Assessment 15.

More information

Implementing Geological Disposal

Implementing Geological Disposal Implementing Geological Disposal A Framework for the long-term management of higher activity radioactive waste July 2014 Crown copyright 2014 URN 14D/235 You may re-use this information (not including

More information

ECMWF Copernicus procurement process

ECMWF Copernicus procurement process ECMWF Copernicus procurement process Sylvia Baylis ECMWF Head of Procurement Funded by the European Union Implemented by ECMWF s procurement process Procurements for CAMS and C3S Copernicus services will

More information

EC Contractual and Legal Framework Hans Schneider, HoS Support to Decommissioning Programme (MSU)

EC Contractual and Legal Framework Hans Schneider, HoS Support to Decommissioning Programme (MSU) Information Session for the Industry 1 Joint Research Centre (JRC) EC Contractual and Legal Framework Hans Schneider, HoS Support to Decommissioning Programme (MSU) Ispra, 3 March 2011 http://www.jrc.ec.europa.eu/

More information

Constantly Learning from Experience - Nuclear Reactor Decommissioning in the UK

Constantly Learning from Experience - Nuclear Reactor Decommissioning in the UK Constantly Learning from Experience - Nuclear Reactor Decommissioning in the UK Dr Adrian Simper, OBE NDA Director of Strategy & Technology NDA 2017 Agenda The Nuclear Decommissioning Authority The Decommissioning

More information

ABSTRACT FOR PATRAM Ben ACKER International Nuclear Services, Hinton House, Risley, Warrington, UK WA3 6GR. Abstract

ABSTRACT FOR PATRAM Ben ACKER International Nuclear Services, Hinton House, Risley, Warrington, UK WA3 6GR. Abstract ABSTRACT FOR PATRAM 2013 Title: - Impact of a double containment boundary requirement on small type B (U) package safety case Ben ACKER International Nuclear Services, Hinton House, Risley, Warrington,

More information

The Provision of North West Non-Emergency Patient Transport Services

The Provision of North West Non-Emergency Patient Transport Services The Provision of North West Non-Emergency Patient Transport Services NHS Blackpool Clinical Commissioning Group on behalf of the 33 North West Clinical Commissioning Groups Final Evaluation Report for

More information

Estates, Facilities & Professional Services. Transactional Finance, Accountancy & Transactional Procurement Services Framework User Guide

Estates, Facilities & Professional Services. Transactional Finance, Accountancy & Transactional Procurement Services Framework User Guide . Estates, Facilities & Professional Services Transactional Finance, Accountancy & Transactional Procurement Services Framework Framework Reference Number: LPP/2013/00002 April 2015 2 Version Control Contributor(s)

More information

MANAGING RADIOACTIVE WASTE SAFELY 2005 PROGRESS REPORT TO THE HOUSE OF COMMONS ENVIRONMENT, FOOD AND RURAL AFFAIRS COMMITTEE

MANAGING RADIOACTIVE WASTE SAFELY 2005 PROGRESS REPORT TO THE HOUSE OF COMMONS ENVIRONMENT, FOOD AND RURAL AFFAIRS COMMITTEE MANAGING RADIOACTIVE WASTE SAFELY 2005 PROGRESS REPORT TO THE HOUSE OF COMMONS ENVIRONMENT, FOOD AND RURAL AFFAIRS COMMITTEE Introduction 1. This is the fourth progress report to the Environment, Food

More information

RADIOACTIVE GRAPHITE MANAGEMENT AT UK MAGNOX NUCLEAR POWER STATIONS. G. HOLT British Nuclear Fuels plc, Berkeley, United Kingdom 1.

RADIOACTIVE GRAPHITE MANAGEMENT AT UK MAGNOX NUCLEAR POWER STATIONS. G. HOLT British Nuclear Fuels plc, Berkeley, United Kingdom 1. RADIOACTIVE GRAPHITE MANAGEMENT AT UK MAGNOX NUCLEAR POWER STATIONS G. HOLT British Nuclear Fuels plc, Berkeley, United Kingdom Abstract. The UK nuclear power industry is predominantly based on gas-cooled,

More information

Provision of ICT Managed Service for Aspirations Academies Trust

Provision of ICT Managed Service for Aspirations Academies Trust Provision of ICT Managed Service for Aspirations Academies Trust This document should be read in conjunction with the Pre-Qualification Questionnaire. 1 Contents 1. Glossary and Definitions... 4 2. Introduction...

More information

Audit services procurement strategy

Audit services procurement strategy Audit services procurement strategy December 2016 High quality independent audit is one of the cornerstones of public accountability. It gives assurance that taxpayers money has been well managed and properly

More information

Business Services Marketplace Update. Presented By: Jonathan Evans

Business Services Marketplace Update. Presented By: Jonathan Evans Business Services Marketplace Update Presented By: Jonathan Evans Business Services Marketplace Dynamic Purchasing System for 13 categories: Portfolio, Programme and Project Management Programme Controls

More information

MANAGING THE NUCLEAR LEGACY IN THE UNITED KINGDOM: STRATEGIES AND PROGRESS IN THE FORMATION OF A LIABILITIES MANAGEMENT AUTHORITY

MANAGING THE NUCLEAR LEGACY IN THE UNITED KINGDOM: STRATEGIES AND PROGRESS IN THE FORMATION OF A LIABILITIES MANAGEMENT AUTHORITY MANAGING THE NUCLEAR LEGACY IN THE UNITED KINGDOM: STRATEGIES AND PROGRESS IN THE FORMATION OF A LIABILITIES MANAGEMENT AUTHORITY Alan Edwards, Dr. Bernie L. Meyers Liabilities Management Unit Department

More information

INDUSTRIAL RESPONSE TO RF POWER REQUIREMENTS

INDUSTRIAL RESPONSE TO RF POWER REQUIREMENTS INDUSTRIAL RESPONSE TO RF POWER REQUIREMENTS David M Wilcox High Power RF Engineering Faraday Partnership UK EPAC 5 to 9 July, 2004 Lucerne Overview RF hardware Industry s contribution so far Technology

More information

OFFICIAL. Magnox Swarf Storage Silo (MSSS) Risk and Hazard Reduction Programme

OFFICIAL. Magnox Swarf Storage Silo (MSSS) Risk and Hazard Reduction Programme Title of document Magnox Swarf Storage Silo (MSSS) Risk and Hazard Reduction Programme Application for Agreement to Commence Installation and Inactive Commissioning of SEP2 and 1 Mobile Caves in MSSS Project

More information

FRAMEWORK AGREEMENT GUIDE

FRAMEWORK AGREEMENT GUIDE FRAMEWORK AGREEMENT GUIDE For external doorsets Trusted procurement for better buildings and homes 03 WHY WORK WITH LHC? About this framework agreement These are the key reasons to work with LHC whether

More information

MSP 50 CONTROL OF CONTRACTORS

MSP 50 CONTROL OF CONTRACTORS CONTROL OF CONTRACTORS AUTHORISED BY: PURCHASING MANAGER DATE: 14/03/2011 THIS DOCUMENT WILL FORM PART OF THE PRE-TENDER, TENDER AND CONTRACT PROCESSES FOR EACH CONTRACT AND AS SUCH SHALL BE REQUIRED TO

More information

Market Engagement/Soft Market Event

Market Engagement/Soft Market Event Market Engagement/Soft Market Event Lifestyle Services Procurement September 28 th 2016 Public Health Procurement Leads Steve Curtis, Senior Procurement Officer Jayne Smith, Procurement Officer Aims Robust

More information

Business Opportunity. Title: United Kingdom-Seascale: Fabrication work - glove box systems. Document Type: Contract Notice

Business Opportunity. Title: United Kingdom-Seascale: Fabrication work - glove box systems. Document Type: Contract Notice Business Opportunity Title: United Kingdom-Seascale: Fabrication work - glove box systems Document Type: Contract Notice Published By: Sellafield Ltd Date Published: 12 May 2017 Deadline Date: 29 June

More information

Development of an Integrated Waste Plan for Chalk River Laboratories L. Jones Atomic Energy of Canada Limited Chalk River, Ontario, Canada

Development of an Integrated Waste Plan for Chalk River Laboratories L. Jones Atomic Energy of Canada Limited Chalk River, Ontario, Canada Development of an Integrated Waste Plan for Chalk River Laboratories 13376 L. Jones Atomic Energy of Canada Limited Chalk River, Ontario, Canada ABSTRACT To further its Strategic Planning, the Atomic Energy

More information

Procurement Evaluation Report. For The Provision of CCTV Services

Procurement Evaluation Report. For The Provision of CCTV Services Procurement Evaluation Report For The Provision of CCTV Services Ref: 5000004944 Document Status: FINAL Date: 29/11/13 Author: Vanessa Amissah Owner: Kevin Bates Document Location Version Control Description/Reason

More information

Economic and Environmental Aspects of Long-term Spent Fuel Storage (UK Perspective)

Economic and Environmental Aspects of Long-term Spent Fuel Storage (UK Perspective) Economic and Environmental Aspects of Long-term Spent Fuel Storage (UK Perspective) Presentation to the Contact Expert Group workshop on isolation and Disposal of Radioactive Waste, 28-30 June 2006, Olkiluoto,

More information

Public Contracts Regulations A Constructionline guide

Public Contracts Regulations A Constructionline guide Public Contracts Regulations 2015 A Constructionline guide Introduction The construction industry has a high risk and complicated procurement process. This has been recognised in a Cabinet Office guidance

More information

// SAFE AND INNOVATIVE SOLUTIONS FOR THE TRANSPORT, STORAGE AND DISPOSAL OF RADIOACTIVE MATERIALS

// SAFE AND INNOVATIVE SOLUTIONS FOR THE TRANSPORT, STORAGE AND DISPOSAL OF RADIOACTIVE MATERIALS // SAFE AND INNOVATIVE SOLUTIONS FOR THE TRANSPORT, STORAGE AND DISPOSAL OF RADIOACTIVE MATERIALS // WELCOME At Croft we develop solutions for the safe transportation of radioactive materials, and for

More information

TOPIC GUIDE: TEMPLATE FOR TENDER DOCUMENTATION

TOPIC GUIDE: TEMPLATE FOR TENDER DOCUMENTATION TOPIC GUIDE: TEMPLATE FOR TENDER DOCUMENTATION Attached is a template which can be used when competitively tendering. It consists of: Covering Letter - You may wish to make slight amendments. Terms and

More information

UKEPR Issue 04

UKEPR Issue 04 Title: PCER Sub-Chapter 6.5 Interim storage facilities and disposability for UK EPR Total number of pages: 32 Page No.: I / III Chapter Pilot: C. CAHUZAC Name/Initials Date 18.06.2012 Approved for EDF

More information

Waste Acceptance Procedure. Waste Forecasting Guide

Waste Acceptance Procedure. Waste Forecasting Guide Waste Acceptance Procedure September 2013 Page 2 of 12 Contents 1. Introduction... 3 1.1. Waste Acceptance Procedure... 3 1.2. Process Guide... 4 1.3. Help and Support... 4 2. Waste Forecasting Process...

More information

CHALLENGE: Surveillance and Maintenance

CHALLENGE: Surveillance and Maintenance CHALLENGE: Surveillance and Maintenance CONTENTS 3. 1. Glovebox Laboratories 7. Cost Table 10. 2. Chemical Processing Plants 14. Cost Table 2 1. GLOVEBOX LABORATORIES 3 This Challenge Statement seeks innovative

More information

FRAMEWORK AGREEMENT GUIDE

FRAMEWORK AGREEMENT GUIDE FRAMEWORK AGREEMENT GUIDE For timber window and door products Trusted procurement for better buildings and homes 03 WHY WORK WITH LHC? About this framework agreement These are the key reasons to work with

More information

FRAMEWORK OVERVIEW. Standardisation and rationalisation. Reduction of effort and resources. Cost avoidance/strategic cost allocation

FRAMEWORK OVERVIEW. Standardisation and rationalisation. Reduction of effort and resources. Cost avoidance/strategic cost allocation FRAMEWORK OVERVIEW HealthTrust Europe s (HTE) Document Storage, Scanning and Related Services framework agreement offers a simple and compliant route to market for the procurement of a range of documents

More information

National Civil Engineering & Infrastructure Framework. London 8 th December 2017

National Civil Engineering & Infrastructure Framework. London 8 th December 2017 National Civil Engineering & Infrastructure Framework London 8 th December 2017 Matt Carrington-Moore Chief Marketing Officer Adrian Hill Head of Frameworks John Simons Head of Procurement & Audit Agenda

More information

CERTIFICATE OF APPROVAL OF PACKAGE DESIGN FOR THE CARRIAGE OF RADIOACTIVE MATERIAL

CERTIFICATE OF APPROVAL OF PACKAGE DESIGN FOR THE CARRIAGE OF RADIOACTIVE MATERIAL Page 1 of 8 CERTIFICATE OF APPROVAL OF PACKAGE DESIGN FOR THE CARRIAGE OF RADIOACTIVE MATERIAL This is to certify that for the purposes of the Regulations of the International Atomic Energy Agency The

More information

Aligning equality and procurement goals

Aligning equality and procurement goals Aligning equality and procurement goals Guide for the learning and skills sector Equality and diversity Aligning equality and procurement goals Contents Who this Guide is for 3 Overview 3 Equality legislation

More information

Geological Disposal of Radioactive Waste

Geological Disposal of Radioactive Waste OFFICIAL Geological Disposal of Radioactive Waste Institute of Physics Nuclear Industry Group, in collaboration with Radioactive Waste Management Ltd (RWM) 13 th July 2016, Birchwood, Warrington *Only

More information

Long Reach Tooling Solutions

Long Reach Tooling Solutions Long Reach Tooling Solutions Supporting Decommissioning of the PFSP at Sellafield A framework contract, with JFN as the primary interface, was established in July 2013, with the aim of developing a long

More information

Transition & Consolidation Phase Implementation to achieve the Interim End State at the Dounreay Site

Transition & Consolidation Phase Implementation to achieve the Interim End State at the Dounreay Site Transition & Consolidation Phase Implementation to achieve the Interim End State at the Dounreay Site Craig Brown, Prime Contract & Risk Manager Dounreay Site Restoration Limited (DSRL) Dounreay, Scotland

More information

Dounreay Parent Body Organisation Competition: Invitation to Participate in Dialogue

Dounreay Parent Body Organisation Competition: Invitation to Participate in Dialogue Dounreay Parent Body Organisation Competition: Invitation to Participate in Dialogue Section 3, Appendix 5:. Written by Claire Maxwell-Smith Page 1 of 64 1. Introduction The will form the basis of the

More information

Sellafield Limited Annual Review of Safety (AROS)

Sellafield Limited Annual Review of Safety (AROS) Sellafield Limited Annual Review of Safety (AROS) Minutes from the Annual Review of Safety held 13 December 2012 at 9.00am in Scafell Pike Core Attendance: Sellafield Ltd Representatives Sellafield Managing

More information

DESIGN AND LICENSING OF THE UKAEA IP 2m BOX

DESIGN AND LICENSING OF THE UKAEA IP 2m BOX DESIGN AND LICENSING OF THE UKAEA IP 2m BOX R P Hows, S Marshall and R A Vaughan Croft Associates Ltd, F4 Culham Science Centre Abingdon, Oxfordshire, United kingdom, OX14 3DB Tel 01865 407740 Email sales@croftltd.com

More information

IAEA Safety Standards Regarding Disposal

IAEA Safety Standards Regarding Disposal IAEA Safety Standards Regarding Disposal Dr. Japie van Blerk AquiSim Consulting (Pty) Ltd IAEA International Workshop on Sustainable Management of Disused Sealed Radioactive Sources Lisbon, Portugal, 11-15

More information