Control, Safe Use and Operation of Plant and Equipment

Size: px
Start display at page:

Download "Control, Safe Use and Operation of Plant and Equipment"

Transcription

1 Date: DEC 93 Control, Safe Use and Operation of Plant and British Railways Board

2 British Railways Board Page 1 of 5 Part A Synopsis A procedural standard outlining the framework of managerial responsibilities for ensuring the control, safe use and operation of plant and equipment. Approval and authorisation Signatures removed from electronic version Submitted by: Approved by : Nominated responsible manager Chairman, Civil Engineering Subject Committee Approved by : Chairman, Electrification & Plant Subject Committee Authorised by : Board Member, Engineering Control, Safe Use and Operation of Plant and This document is the property of the British Railways Board, it shall not be reproduced in whole or in part, nor disclosed to a third party, without the written permission of the Director, Engineering Standards. Copyright 1993 British Railways Board Published By s Macmillan House Paddington

3 Page 2 of 5 Issue / Revision record This standard will be updated when necessary by distribution of a complete replacement. Amended or additional parts of revised pages will be marked by a vertical black line in the adjacent margin. Issue Rev Date Comments 1 A June 93 Original document Not published 1 B Dec. 93 Alteration to scope Responsibilities and distribution To all managers responsible for the operation and use of plant and equipment operating on railway operational land Contents Section Description Page No. Part A Synopsis 1 Approval & authorisation 1 Issue/Revision record 2 Responsibilities and distribution 2 Implementation 2 Supply 2 Contents 2 Part B Implementation This Group standard is mandatory and the process of implementation shall begin on its receipt. Supply 1 Purpose 3 2 Scope 3 3 Key definitions 3 4 Standard 3 5 Supporting or Related Standards 5 Controlled and uncontrolled copies of this standard may be obtained from the TDCC Manager, Document Services, Railway Technical Centre, London Road, Derby, DE24 8UP.

4 Page 3 of 5 Part B 1. Purpose To specify to managers factors that must be considered for controlling, safely using and operating plant and equipment in the railway environment. 2. Scope This standard applies to all managers responsible for the operation of plant and equipment (whether owned, hired or leased) used on railway property by railway staff, contractors, franchise holders, lease holders and private parties. 3. Key definitions 3.1 Managerially responsible In the context of this standard this refers to the delegated person responsible for the use. This is not a reference to any specific managerial grade. 3.2 Plant and In the context of this standard this means any powered or manual equipment where the correct operation is required to ensure safety. It specifically excludes domestic type equipment where the manufactures' instructions are adequate to ensure safe operation. 4. Standard Those who are managerially responsible for the operation of plant and equipment must always take the following points into consideration before plant and equipment is put into use. 4.1 Plant and Acquisition Before any plant and equipment is used, the acquiring organisation must ensure it is safe for use in the railway environment. Where the design or use of the plant and equipment could affect the safe operation of trains or the safety of the railway operation, then technical type approval must be obtained from the infrastructure owner. The requirements for type approval of some items of plant are indicated in the supporting standards as listed in section 5.

5 Page 4 of Registration All plant and equipment must be uniquely identified and registered for maintenance purposes. 4.3 Maintenance All plant and equipment must be subject to maintenance, which must be recorded and an indication of when the next maintenance is due must be apparent or available to the user. The maintenance schedules must address the minimum safety requirements for the use of the plant and equipment in a railway environment. When plant and equipment is hired and the hire company undertakes to perform maintenance, it is the hirer's (users agent) responsibility to ensure that a satisfactory maintenance programme exists and that the equipment is made available for it to be implemented. 4.4 Modifications Modifications to type approved plant and equipment, that affect the safety of the railway operation must be approved by the infrastructure owner. 4.5 Statutory Requirements Statutory registers must be kept up to date and the appropriate certificates available, whether the plant and equipment is owned, hired or leased. All relevant Statutory requirements must be identified and all necessary parties made aware of them. 4.6 Training and Authorisation Operators must have received appropriate training and/or assessment to operate the plant and equipment and carry the appropriate authorising certificate where necessary. The training, assessment and authorisation (as required) must be recorded for audit purposes. 4.7 Safe System of Work A safe system of work that takes account of a risk assessment in the local operating environment must be identified, communicated and implemented. Trained and authorised supervisor(s) must be provided for the work as appropriate. 4.8 Personal Protective Personal protective equipment for those operating the plant and equipment and those who may be affected by

6 Page 5 of 5 its operation must be provided and worn as required by the safe system of work. 5. Supporting or Related Standards For certain groups of plant and equipment as listed below the above points have been considered and the minimum requirements, which are mandatory, have been documented or will be documented as s. Where those standards are not yet published the existing provisions of Part 7 (Buff Pages) of the Working Manual will apply. Title Operation of:- Rail mounted cranes Forklift trucks & side loaders Excavators loaders and earth moving equipment Station and depot vehicles Chain saws and clearing saws Disc cutters, grinders and abrasive wheels. Track jacks Powered operated jacks Cartridge operated tools Self Propelled On-Track machines Road-Rail vehicles Plant in the vicinity of overhead electric supply lines Rail scooters Rail skates Loose lifting tackle Flails Safe working on electrical equipment No. GC/OG0004 GC/OG0005 GC/OG0006 GM/OG0007 GC/OG0011 GC/OG0012 GC/OG0013 GM/OG0014 GC/OG0015 GC/OG0016 GC/OG0018 GC/OG0020 GC/OG0001 GC/OG0023 GC/OG0021 GC/OG0022 GM/TT0106

Control, Safe Use and Operation of Chain Saws, Clearing Saws and Strimmers

Control, Safe Use and Operation of Chain Saws, Clearing Saws and Strimmers Control, Safe Use and Operation of Chain Saws, Clearing Saws and Strimmers Page 1 of 11 Part A Synopsis A standard detailing the requirements for control, safe use and operation of chain saws, clearing

More information

Qualification of Suppliers of Safety Critical Engineering Products and Services

Qualification of Suppliers of Safety Critical Engineering Products and Services Qualification of Suppliers of Safety Critical Engineering Products and Services Signatures removed from electronic version Submitted by George Clayton Nominated Responsible Manager Approved by Colin Boocock

More information

Working of Passenger Trains over Non- Passenger Lines

Working of Passenger Trains over Non- Passenger Lines Working of Passenger Trains over Non- Submitted by... Roger Merryweather Nominated Responsible Manager Approved by... Michael Harwood Chairman, Operations Standards Subject Committee Authorised by... Ken

More information

Qualification of Suppliers of Safety Critical Engineering Products and Services

Qualification of Suppliers of Safety Critical Engineering Products and Services Rail Industry Standard RIS-2450-RST Date December 2016 Qualification of Suppliers of Safety Critical Engineering Synopsis This document sets out requirements for the qualification of suppliers of safety

More information

Air Quality and Lighting Environment for Traincrew Inside Railway Vehicles

Air Quality and Lighting Environment for Traincrew Inside Railway Vehicles Air Quality and Lighting Environment for Traincrew Inside Railway Vehicles Signatures removed from electronic version Submitted by... D. Boocock Nominated Responsible Manager Approved by... C.P. Boocock

More information

Persons Working On or Near to AC Electrified Lines

Persons Working On or Near to AC Electrified Lines Persons Working On or Near to AC Electrified Lines Synopsis This document defines the requirements for the production of safe systems of work to prevent injury from electrical causes to persons working

More information

Safety Requirements of Signal Post Telephone Systems

Safety Requirements of Signal Post Telephone Systems GK/RT0186 Safety Requirements of Signal Post Telephone Systems Synopsis This standard describes the mandatory requirements for the provision of, or alterations to, signal post telephone systems. Signatures

More information

Verification of Electrification Systems and Interactions with Other Systems

Verification of Electrification Systems and Interactions with Other Systems Verification of Electrification Systems and Interactions with Other Systems Synopsis This document mandates the verification process for new or significant changes to electrification systems and interactions

More information

Undertrack Crossings and Pressure Pipelines

Undertrack Crossings and Pressure Pipelines Railway Group Standard Undertrack Crossings and Pressure Signatures removed from electronic version Submitted by... Frank Hardy Nominated Responsible Manager Approved by Synopsis Sets out requirements

More information

Route Knowledge Drivers

Route Knowledge Drivers Issue: 1 Revision: A Date: JAN 1993 Route Knowledge Drivers GOIOTCI 06 Issue: 1 Revision: A Page: 1 of 45 Part A - Synopsis This standard s~ecifies the requirements for the learning of routes, the certification

More information

Testing Railway Safety Critical Workers for Drugs and Alcohol

Testing Railway Safety Critical Workers for Drugs and Alcohol Document ceases to be in force and is superseded by Railway Group Standard Critical Workers for Drugs Synopsis This document mandates common requirements for drug and alcohol testing of staff carrying

More information

Reporting High Risk Defects

Reporting High Risk Defects Railway Industry Standard RIS-8250-RST Issue One Date December 2016 Reporting High Risk Defects Synopsis This document defines requirements for recording, analysing and reporting safety-related defects

More information

Environment Inside Railway Vehicles (Audibility of detonators)

Environment Inside Railway Vehicles (Audibility of detonators) Environment Inside Railway Vehicles (Audibility of detonators) Synopsis This document mandates requirements for the audibility of detonators in driving cabs. Copyright in the s is owned by Rail Safety

More information

Traincrew Access to and Egress from Railway Vehicles

Traincrew Access to and Egress from Railway Vehicles Traincrew Access to and Egress from Synopsis This document mandates requirements for traincrew access to and egress from railway vehicles. This document contains requirements that are amended under the

More information

RIS RIS-1800-ENE. Rail Industry Standard for Network and Depot Interface Management Isolation Documentation. Rail Industry Standard

RIS RIS-1800-ENE. Rail Industry Standard for Network and Depot Interface Management Isolation Documentation. Rail Industry Standard RIS This document is a voluntary standard, produced by at the request of the industry. Duty holders may choose to mandate it through internal instructions/procedures or contract conditions. Published by

More information

Axle Counters : Code of Practice for Resetting and Restoration to Service

Axle Counters : Code of Practice for Resetting and Restoration to Service Axle Counters : for Resetting and Restoration to Service Synopsis This gives the best practice requirements for the resetting and restoration to service of axle counters, in support of Railway Group Standard

More information

Reporting High Risk Defects

Reporting High Risk Defects Reporting High Risk Defects Synopsis This document defines requirements for recording, analysing and reporting safety-related defects on rail vehicles, their components, systems, subsystems and related

More information

Registration of Rail Vehicles and Mandatory Data Requirements

Registration of Rail Vehicles and Mandatory Data Requirements Registration of Rail Vehicles and Mandatory Data Requirements Synopsis This standard mandates the registration process and that up-todate records of design and operational data essential for railway safety

More information

Requirements for Rail Vehicle Maintenance

Requirements for Rail Vehicle Maintenance Requirements for Rail Vehicle Maintenance Synopsis This document defines a process by which continued conformity to standards, known as the Vehicle Maintenance Plan and Policy, is confirmed for new or

More information

Guidance on the Storage and Recommissioning of Traction and Rolling Stock

Guidance on the Storage and Recommissioning of Traction and Rolling Stock Guidance on the Storage and Recommissioning of Traction and Rolling Synopsis This document gives guidance on the storage and recommissioning of traction and rolling stock that is withdrawn from operation

More information

Loading Requirements for the Design of Bridges

Loading Requirements for the Design of Bridges May 1997 Loading Requirements for the Design of Bridges Synopsis This sets out the minimum loading requirements to be considered in the design of bridges. Signatures removed from electronic version Submitted

More information

Derogations from Railway Group Standards

Derogations from Railway Group Standards Derogations from Railway Group Standards Synopsis This Standard defines the procedure to be used when a Railway Group Member seeks to regularise a permanent non-compliance with a in circumstances where

More information

Engineering Acceptance of Rail Vehicles

Engineering Acceptance of Rail Vehicles Engineering Acceptance of Rail Vehicles Synopsis This document defines, where applicable, a process, known as the Engineering Acceptance process, to confirm that a rail vehicle conforms to the relevant

More information

Management of Shared Information Systems

Management of Shared Information Systems To be superseded by GERT8054 Iss 2 published on Railway 03/09/2011 Group Standard Management of Shared Information Systems Synopsis This document defines the requirements for managing shared information

More information

Safe Asset Management - Embankments and Cuttings

Safe Asset Management - Embankments and Cuttings Safe Asset Management - Embankments and Cuttings Synopsis This document sets out requirements for the safe management of embankments, cuttings and natural slopes. Submitted by Martin Fargher Standards

More information

Structural. requirements for windscreens and. windows on railway vehicles

Structural. requirements for windscreens and. windows on railway vehicles To be superseded by GMRT2100 Iss 4 published on Railway 04/12/2010 Group Standard Structural requirements for windscreens and windows on railway vehicles Synopsis This document prescribes the loading cases

More information

Infrastructure Based Train Detection Interface Requirements

Infrastructure Based Train Detection Interface Requirements Uncontrolled When Printed Railway Group Standard Infrastructure Based Train Detection Interface Synopsis This document specifies the interface requirements for infrastructure based train detection systems

More information

Terminal Tracks - Managing the Risk

Terminal Tracks - Managing the Risk Railway Group Standard Terminal Tracks - Managing the Risk Synopsis This standard defines the arrangements to be provided on terminal tracks to arrest a train and protect people, stations and structures

More information

RISQS Audit Protocol. Plant Operations Scheme. Document no.: RISQS-AP-004. Plant Operations Scheme

RISQS Audit Protocol. Plant Operations Scheme. Document no.: RISQS-AP-004. Plant Operations Scheme RISQS Audit Protocol Plant Operations Scheme Document no.: RISQS-AP-004 Revision Author Checked by Approved by Date Reason for revision approved 01 Carl Rulton Alan Thomas Richard Sharp 27-02-18 Initial

More information

ATOC. Approved Code of Practice Train Driving Traction Knowledge. Contents. Withdrawn Document. Association of Train Operating Companies

ATOC. Approved Code of Practice Train Driving Traction Knowledge. Contents. Withdrawn Document. Association of Train Operating Companies Uncontrolled When ATOC PrintedApproved Code of Practice ATOC Association of Train Operating Companies Approved Code of Practice Train Submitted by Signatures removed from electronic version Steve Bence

More information

Engineering Acceptance of Rail Vehicles

Engineering Acceptance of Rail Vehicles Engineering Acceptance of Rail Vehicles Synopsis This document defines the Engineering Acceptance process by which conformance to Railway Group Standards is confirmed for rail vehicles which are required

More information

Guidance on Assessment by Railway Safety of Train and Station Operators Railway Safety Cases

Guidance on Assessment by Railway Safety of Train and Station Operators Railway Safety Cases Guidance on Assessment by Railway Safety of Train and Station Operators Railway Safety Cases Synopsis This document provides both potential and existing train and station operators with practical advice

More information

Communication of Urgent Operating Advice

Communication of Urgent Operating Advice Railway Group Standard with effect from 04/03/2017 Communication of Urgent Operating Advice Synopsis This document defines the requirements for reporting and disseminating urgent operating safety information

More information

Basic ALO knowledge Briefing. RRV Safety Improvement Programme

Basic ALO knowledge Briefing. RRV Safety Improvement Programme Basic ALO knowledge Briefing RRV Safety Improvement Programme 1 Disclaimer In issuing this document for its stated purpose, the RRV Safety Improvement Programme & Network Rail makes no warranties, express

More information

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site.

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site. CONTRACTOR EHS REQUIREMENTS FOR ON-SITE WORK Issued by:: EHS Page No: Issue No: Issue Date: Authorised By: Review date: 1 of 8 3 July 2016 N Cook July 2020 1. INTRODUCTION This document sets out the rules

More information

Guidance on Railway Safety Cases for Acceptance by Railtrack

Guidance on Railway Safety Cases for Acceptance by Railtrack Guidance on Railway Safety Cases for Acceptance by Railtrack This Guidance Note has been produced by Synopsis This Guidance Note provides potential Operators with practical advice to assist in the preparation

More information

Steam Locomotive Operation

Steam Locomotive Operation Rail Industry Standard RIS-3440-TOM Issue One Date December 2016 Steam Locomotive Operation Synopsis This document sets out risk control measures to manage the operation of steam locomotives on GB mainline

More information

Supervision Guideline for Electrician to Lineworker Apprentices

Supervision Guideline for Electrician to Lineworker Apprentices Supervision Guideline for Electrician to Lineworker Apprentices This Guideline has been developed by the Victorian Electricity Supply Industry (VESI) Skills and Training Reference Committee to provide

More information

RISQS Audit Protocol. Safe Work planning. Document no.: RISQS-AP-003. Safe Work Planning

RISQS Audit Protocol. Safe Work planning. Document no.: RISQS-AP-003. Safe Work Planning RISQS Audit Protocol Safe Work planning Document no.: RISQS-AP-003 Revision Author Checked by Approved by Date Reason for approved revision 01 Carl Rulton Alan Thomas Richard Sharp 27-02-18 Initial Issue

More information

Positioning and Labelling of Lineside Telephones

Positioning and Labelling of Lineside Telephones To be superseded by GERT8048 Iss 2 published on Railway 07/09/2013 Group Standard Positioning and Labelling of Lineside Synopsis This document defines the requirements for positioning lineside telephones,

More information

Railway Interface Planning Scheme Rules (RIPS Rules)

Railway Interface Planning Scheme Rules (RIPS Rules) Contents 1. Purpose.. 1 2. Scope... 2 3. Scheme Rules.... 3 4. Roles and Responsibilities... 4 5. Management System Requirements... 7 6. Investigating Breaches of the Railway Interface Planning Scheme

More information

Defective On-Train Equipment. Defective On-Train Equipment. Railway Group Standard. GO/RT3437 Issue. Eight Date December 2015

Defective On-Train Equipment. Defective On-Train Equipment. Railway Group Standard. GO/RT3437 Issue. Eight Date December 2015 Railway Group Standard RIS-3437-TOM Iss 1 with effect from 04/03/2017 Synopsis This document mandates the requirements relating to the production of contingency plans, which have to be applied when on-train

More information

Services for professional procurement. Be better informed, make better decisions. RISQS Audit Questions Network Rail On-Track Plant Operations

Services for professional procurement. Be better informed, make better decisions. RISQS Audit Questions Network Rail On-Track Plant Operations Services for professional procurement. Be better informed, make better decisions. RISQS Audit Questions Network Rail On-Track Plant Operations Contents Contents... 2 Preface... 3 Issue Record... 3 Assessment

More information

SYDNEY TRAMWAY MUSEUM MAINTAINING CERTIFICATES OF COMPETENCIES

SYDNEY TRAMWAY MUSEUM MAINTAINING CERTIFICATES OF COMPETENCIES SYDNEY TRAMWAY MUSEUM MAINTAINING CERTIFICATES OF COMPETENCIES MARCH 2010 1. Document Details: SYDNEY TRAMWAY MUSEUM Document Control Record Name: Maintaining Certificates of Competencies Number STM 6164

More information

Supervision Guideline for Apprentice Lineworkers (Distribution)

Supervision Guideline for Apprentice Lineworkers (Distribution) Supervision Guideline for Apprentice Lineworkers (Distribution) This Guideline has been developed by the Victorian Electricity Supply Industry (VESI) Skills and Training Reference Committee to provide

More information

The following is Copyright 2009 The Queen s Printer, Saskatchewan

The following is Copyright 2009 The Queen s Printer, Saskatchewan Saskatchewan Elevated Work Platform This material has been extracted from the Regulations and Acts of the Province as an aid to help students better understand the subject. This is not an official source

More information

Contaminated Land - Managing the Risk

Contaminated Land - Managing the Risk Contaminated Land - Managing the Risk Signatures removed from electronic version Submitted by... Peter Wigley Nominated Responsible Manager Approved by... Tom Stevenson Chairman, Civil Engineering Subject

More information

Principles of the Railway Industry Supplier Qualification Scheme

Principles of the Railway Industry Supplier Qualification Scheme RISQS/001 Issue 1.2 Date: December 2015 Principles of the Railway Industry Supplier Qualification Scheme Copyright 2013 Rail Safety and Standards Board Limited. This document is subject to copyright protection.

More information

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock 1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles

More information

LOADING UNLOADING OPERATIONS

LOADING UNLOADING OPERATIONS CONTRACTOR WHS HAZARD STANDARD LOADING UNLOADING OPERATIONS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION

More information

JJ Training (UK) Limited. Training House, 58 Surrey Street, Glossop, SK13 7AJ.

JJ Training (UK) Limited. Training House, 58 Surrey Street, Glossop, SK13 7AJ. pride ourselves in being one of the largest training providers of Workplace Safety, Plant, Warehouse, First Aid, CPC and much more. We are a professional and highly experienced training provider with a

More information

Rail Vehicle Maintenance

Rail Vehicle Maintenance Rail Vehicle Maintenance Synopsis This document sets out the arrangements by which continued conformity to standards, known as the Maintenance Plan, is achieved together with the requirements for the provision

More information

Rail Industry Standard for High Visibility Clothing

Rail Industry Standard for High Visibility Clothing Rail Industry Standard RIS-3279-TOM Issue One Date December 2016 Rail Industry Standard for High Visibility Clothing Synopsis This document sets out the minimum requirements for high visibility clothing.

More information

ALO (Any line open) Knowledge Briefing OTPS LNE&EM

ALO (Any line open) Knowledge Briefing OTPS LNE&EM ALO (Any line open) Knowledge Briefing OTPS LNE&EM Revised by M Harrison / 1 Disclaimer In issuing this document for its stated purpose, the RRV Safety Improvement Programme & Network Rail makes no warranties,

More information

Leasing of Railway Land

Leasing of Railway Land Discipline: Engineering (Track & Civil) Category: Standard Leasing of Railway Land ETD-17-01 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard EGS 08 Document Status Version

More information

ATOC. Approved Code of Practice Transfer of Safety Performance Information Train Driving. Withdrawn Document. Association of Train Operating Companies

ATOC. Approved Code of Practice Transfer of Safety Performance Information Train Driving. Withdrawn Document. Association of Train Operating Companies Uncontrolled When Printed Approved Code of Practice /APCOP001 Date: 18 th January 2000 Association of Train Operating Companies Approved Code of Practice Transfer of Safety Performance Information Train

More information

Load Handling (Hoisting) Policy

Load Handling (Hoisting) Policy 1.0 PURPOSE This policy is to promote safe load handling (hoisting) practices and reduce the frequency and severity of incidents. The purpose is to protect personnel from injury, the environment from harm,

More information

Impact Assessment for Changes to Railway Group Standards

Impact Assessment for Changes to Railway Group Standards Impact Assessment for Changes to Railway Group Standards Version: Final Date: 27 January 2011 Relevant Railway Group Standard Title: Rail Vehicle Maintenance Number: GM/RT2004 Issue: Four Synopsis: This

More information

MTM REQUIREMENTS METROPOLITAN TRAIN MAINTENANCE DEPOT

MTM REQUIREMENTS METROPOLITAN TRAIN MAINTENANCE DEPOT Approval Amendment Records Approval Date Version Description 14/11/2011 1 Initial Version Disclaimer Metro Trains Melbourne makes no warranties, express or implied, that compliance with the contents of

More information

1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY

1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY 1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY Purpose and Applicability The purpose of this Program is to ensure that Imhoff Custom Services Inc. employees who operate aerial or scissor lifts have the

More information

CONTRACTOR WHS HAZARD STANDARD MOBILE POWERED PLANT EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD MOBILE POWERED PLANT EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD MOBILE POWERED PLANT EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Delivery, Unloading and Loading of Materials and Plant

Delivery, Unloading and Loading of Materials and Plant Delivery, Unloading and Loading of TAKE THE STEPS TO SHE Form 67 - July 06 - Pg of 6.0 Scope This policy applies to all delivery drivers attending Barratt Developments PLC ( the Group ) developments and

More information

BOOM-SUPPORTED ELEVATING WORK PLATFORM PROGRAM

BOOM-SUPPORTED ELEVATING WORK PLATFORM PROGRAM Page: 1 of 7 1.0 PURPOSE and APPLICABILITY 1.1 It is the policy of the University of Pennsylvania in coordination with the Office of Environmental Health and Radiation Safety to provide the University

More information

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION. -Unit title- MACHINE WOODWORKING: PROFILE GRINDING

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION. -Unit title- MACHINE WOODWORKING: PROFILE GRINDING -SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- D2VW 04 -Unit title- MACHINE WOODWORKING: PROFILE GRINDING -Superclass category- -Date of publication-

More information

Assessment of Compatibility of Rolling Stock and Infrastructure Gauging and Stepping Distances

Assessment of Compatibility of Rolling Stock and Infrastructure Gauging and Stepping Distances Uncontrolled When Printed Railway Group Standard Assessment of Compatibility of Rolling Stock and Infrastructure Gauging and Stepping Distances Synopsis This document mandates specific requirements and

More information

SHORT COURSES. Industry Training New Zealand

SHORT COURSES. Industry Training New Zealand SHORT COURSES Industry Training New Zealand 2 CONTENTS About Tai Poutini Polytechnic About Training for Industry Short Courses Cranes Truck Mounted Crane Pendant Crane Lifting Loads Telehandler Scaffolding

More information

Data Recorders on Trains Design Requirements

Data Recorders on Trains Design Requirements To be superseded by GMRT2472 Iss 2 published on Railway 07/06/2014 Group Standard Data Recorders on Trains Design Synopsis This document defines the design requirements for the provision and function of

More information

Health Safety, & Environment

Health Safety, & Environment GROUP SAFETY HEALTH AND ENVIRONMENT MANUAL R.G. Carter Construction Ltd Integrated Management System Section 7 Health Safety, & Environment Issue Manual No. Holders Name: Issue Date: GROUP HEALTH AND SAFETY

More information

CO-OPERATIVE UNIVERSITY OF KENYA P.O. BOX NAIROBI

CO-OPERATIVE UNIVERSITY OF KENYA P.O. BOX NAIROBI CO-OPERATIVE UNIVERSITY OF KENYA P.O. BOX 24814 00502 NAIROBI EMAIL: www@cuk.ac.ke REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR CONSTRUCTION OF THE PROPOSED LEARNING RESOURCE CENTRE (LIBRARY PHASE IA)

More information

Level 2 Certificate in Warehousing and Storage Skills ( )

Level 2 Certificate in Warehousing and Storage Skills ( ) Level 2 Certificate in Warehousing and Storage Skills (1016-02) Candidate logbook 501/1082/2 www.cityandguilds.com August 2011 Version 1.1 (Sep 2011) Version 2.0 (March 2012) About City & Guilds As the

More information

LOSS PREVENTION STANDARD

LOSS PREVENTION STANDARD LOSS PREVENTION STANDARD LPS 1271: Issue 2.3 Companies installing fire and security doors, doorsets, shutters and active smoke/fire barriers This Loss Prevention Standard is the property of BRE Global

More information

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION MACHINE WOODWORKING: PROFILE GRINDING

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION MACHINE WOODWORKING: PROFILE GRINDING -SQA- SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit Number- 4570565 -Superclass- -Title- WK MACHINE WOODWORKING: PROFILE GRINDING -------------------------------

More information

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs)

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs) Safe planning and operation for Mobile Elevated Working Platforms (MEWPs) This document sets out the Morgan Sindall standards for the control of Mobile Elevated Work Platforms (MEWP) on its projects. It

More information

Incident Response Planning & Management

Incident Response Planning & Management Incident Response Planning & Synopsis This standard identifies interface requirements for enabling a consistent, comprehensive and structured process for rail incident response planning and management.

More information

ENERGY QUEENSLAND LIMITED INTERNAL AUDIT CHARTER. [April 2017]

ENERGY QUEENSLAND LIMITED INTERNAL AUDIT CHARTER. [April 2017] ENERGY QUEENSLAND LIMITED INTERNAL AUDIT CHARTER [April 2017] 1. SCOPE AND PURPOSE ENERGY QUEENSLAND LIMITED INTERNAL AUDIT CHARTER s ( Energy Queensland ) Internal Auditing (IA) function provides assurance

More information

GUIDELINES ON SAFETY REQUIREMENTS FOR PURCHASE, RECEIPT, DONATION AND SUPPLY OF WORK EQUIPMENT

GUIDELINES ON SAFETY REQUIREMENTS FOR PURCHASE, RECEIPT, DONATION AND SUPPLY OF WORK EQUIPMENT GUIDELINES ON SAFETY REQUIREMENTS FOR PURCHASE, RECEIPT, DONATION AND SUPPLY OF WORK EQUIPMENT HEALTH & SAFETY UNIT AUTUMN 2006 CONTENTS INTRODUCTION...2 WORK EQUIPMENT SAFETY CHECKLIST...3 EQUIPMENT SAFETY

More information

Plant within the Rail Corridor

Plant within the Rail Corridor Policy Principle Standard Task Instruction General Task Instruction Managing Vehicles and Purpose Plant within the Rail Corridor This Task Instruction covers the requirement for managing Vehicles and Plant

More information

To act as the nominated competent Health and Safety Manager and provide leadership for the Energy Services Directorate.

To act as the nominated competent Health and Safety Manager and provide leadership for the Energy Services Directorate. Job description Job title: CDM / Health and Safety Manager Department: Commercial & Operations Service: Highway and Energy Infrastructure Grade: GLCP-J Post reference number: JE1000004705 1. Job purpose

More information

Level 2 NVQ Certificate and Diploma in Plant Operations (Construction) (6561)

Level 2 NVQ Certificate and Diploma in Plant Operations (Construction) (6561) QUALIFICATION LOGBOOK Level 2 NVQ Certificate and Diploma in Plant Operations (Construction) (6561) June 2015 Version 3.1 Candidate Logbook / Work-Based Evidence Record Mandatory units Level 2 NVQ Certificate

More information

Switches and Crossings

Switches and Crossings Switches and Crossings Synopsis This document sets out general requirements for the design, inspection and maintenance of switches and crossings (S&C). It also defines particular requirements for fixed

More information

Revision: 1. Author: V McCarthy Department: Company. Category: Human Resources CONTENTS

Revision: 1. Author: V McCarthy Department: Company. Category: Human Resources CONTENTS PROCEDURE Title: Training Procedure No: P703.018 Issue: 6 Revision: 1 Operative Date: 19/01/2015 Author: V McCarthy Department: Company Sect./Classification: Company Category: Human Resources Owner Role:

More information

Technical Requirements for Axle Counters

Technical Requirements for Axle Counters Technical Requirements for Axle Counters Synopsis This document mandates the technical requirements for the design of train detection systems using axle counters. Signatures removed from electronic version

More information

Cskills Awards L6 NVQ Diploma in Controlling Lifting Operations - Planning Lifts (Construction) QUA893

Cskills Awards L6 NVQ Diploma in Controlling Lifting Operations - Planning Lifts (Construction) QUA893 Cskills Awards L6 NVQ Diploma in Controlling Lifting Operations - Planning Lifts (Construction) QUA893 Version QUA893/20100901/1 Published by Cskills Awards, Bircham Newton, King s Lynn, Norfolk PE31 6RH

More information

SAFETY FACT SHEETS. Working with and around High Risk Plant Safety Non Negotiable. G-HS-ST Working with and around High Risk Plant

SAFETY FACT SHEETS. Working with and around High Risk Plant Safety Non Negotiable. G-HS-ST Working with and around High Risk Plant SAFETY FACT SHEETS Working with and around High Risk Plant Safety Non Negotiable G-HS-ST-00741 Working with and around High Risk Plant Safety Non-Negotiables (SNN) Zinfra Group is committed to providing

More information

Solutions to your needs

Solutions to your needs Solutions to your needs Introduction Integrated Holding Company (IHC) was established in June 2005 to develop business in the field of Logistics, Heavy Equipment Rental, Stevedoring and Port Operations,

More information

Roy Hill Inductions and Orientation Procedure Health & Safety

Roy Hill Inductions and Orientation Procedure Health & Safety 1 Purpose and scope The purpose of this procedure is to ensure all employees, contractors and visitors requiring access to Roy Hill sites are informed of relevant health, safety and environmental risks

More information

Load Handling (Hoisting) Policy

Load Handling (Hoisting) Policy 1.0 PURPOSE This policy is to promote safe load handling (hoisting) practices and reduce the frequency and severity of incidents. The purpose is to protect personnel from injury, the environment from harm,

More information

ACT Scaffolding Services LTD METHOD STATEMENT Scaffold erection

ACT Scaffolding Services LTD METHOD STATEMENT Scaffold erection Address: 20 Bole Close, Wombwell, Barnsley, South Yorkshire. S73 8AZ Tel: 07883 780704 Email: enquiries@actscaffold.co.uk Web: www.actscaffold.co.uk Project/Contract Boiler Scaffolding Client Example Comp

More information

Bridge Strikes from Road Vehicles or Waterborne Vessels

Bridge Strikes from Road Vehicles or Waterborne Vessels Railway Group Standard Bridge Strikes from Road Vehicles or Waterborne Vessels Synopsis This document mandates requirements for the management of the risks to the operational railway from road vehicles

More information

TRANSPORT TRAILER TECHNICIAN

TRANSPORT TRAILER TECHNICIAN To qualify to challenge certification in this trade or be granted authority to supervise and sign-off on apprentices in this trade, individuals must have: worked a minimum of 4,500 hours performing the

More information

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Version 3 June 2014 Authorised by Arrium Safety Council TOOL75.WHS.COP.001 Critical Elements from the Code

More information

DELIVERY. Management Plan Volume 2 Central Section Delivery. Document Number: CR-XRL-O4-GPG-CR

DELIVERY. Management Plan Volume 2 Central Section Delivery. Document Number: CR-XRL-O4-GPG-CR DELIVERY Management Plan Volume 2 Central Section Delivery Document Number: Supersedes PDP Project Execution Plan (CRL1-PDP-N2-TPL-CR001-00002 V2.0) and Current Document History: Revision: CRL Implementation

More information

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition CEN Keymark Scheme Rules for Thermostatic Radiator Valves 2 nd Edition Content Foreword... 3 Introduction... 3 1 Scope... 4 2 References... 4 3 Terms and Definitions... 4 4 Application... 5 4.1 Product

More information

Certification Processes for NDT Operatives, Equipment & Facilities Used for Inspecting Rail Vehicles

Certification Processes for NDT Operatives, Equipment & Facilities Used for Inspecting Rail Vehicles Page 1 of 37 Certification Processes for NDT Operatives, Equipment & Facilities Used for Inspecting Rail Vehicles Signatures removed from electronic version Submitted by... G A Clayton Nominated Responsible

More information

Preparing for the Farm-Ranch Audit

Preparing for the Farm-Ranch Audit Preparing for the Farm-Ranch Audit RANCH DOCUMENTS Ranch History - Does the land selected for growing have a clean history free of any significant food safety risks? Is the land history documented? Policies,

More information

Appointed Person Lifting Operations

Appointed Person Lifting Operations Background New S/NVQ: The S/NVQ Level 3 in Controlling Lifting Operations will become the scheme requirement for demonstration of competence for the categories of Appointed Person and A62 Crane/Lifting

More information

MCS 025. Installer Certification Scheme Competency Criteria Guidance. Issue 1.1

MCS 025. Installer Certification Scheme Competency Criteria Guidance. Issue 1.1 MCS 025 Installer Certification Scheme Competency Criteria Guidance Issue 1.1 This guidance is the property of Department of Energy and Climate Change (DECC), 3 Whitehall Place, London, SW1A 2AW. DECC

More information

WORK IN THE VICINITY OF UNDERGROUND ASSETS

WORK IN THE VICINITY OF UNDERGROUND ASSETS CONTRACTOR WHS HAZARD STANDARD WORK IN THE VICINITY OF UNDERGROUND ASSETS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD

More information

1 AIM 2 4 REASON FOR INCLUSION 2 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

1 AIM 2 4 REASON FOR INCLUSION 2 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASON FOR INCLUSION 2 5 REQUIREMENTS 2 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 APPENDIX

More information