Life Extension by Refurbishment of Transformers

Size: px
Start display at page:

Download "Life Extension by Refurbishment of Transformers"

Transcription

1 Life Extension by Refurbishment of Transformers C. JAYASENAN by and SHIRISH KANUNGO SIEMENS, India SIEMENS, India 1

2 6th International Conference on Large Power Transformers Modern Trends in CURRENT STATUS OF TRANSFORMER SERVCE Absence of governing standard Closure of some OEMs Improper root cause analysis before refurbishment Repeat of existing design Opt for nearby economic service providers Absence of detailed refurbishment evaluation Modern technological advances rarely used for performance improvement With symptom of early failure, further insights of transformer refurbishment by OEMs is beneficial. 2

3 SUCCESS STORY OF LIFE EXTENSION BY REFURBISHMENT CUSTOMER SPECIFICATION Replacement of failed winding Change voltages (100 to 110kV) Load loss gtd with penalty Many mechanical design improvements Replacement w/o foot print changes (Fans, BR, MOG, SPRR, PRV, OTI, WTI, OFI, Breather, Ladder, Safety railing,cts, Gasket sealing) Replacement of Marshalling box Shot blasting and repainting of tank Repainting of radiators and accessories Rated power Before 90/45/45 MVA After 90/45/45 MVA Ratio (kv) 100/23.1/ /23/11.5 Vector Dyn11yn11 Dyn11yn11 Cooling ODAF ONAF Freq. 50 Hz 50 Hz Phases 3 3 Tapping kV@ 2.5kV steps steps Load loss No data Guaranteed 3

4 CHALLENGES FACED ENGINEERING LL gtd in absence of test data Complicated multilayer wdg with taps at 100kV line end Rare / Complex OCTC schematics & physical connection Reuse of OCTC due to commercial impact. No clue on health of various parts Proper storage, traceability of reused items & disposal of scrap items like windings 4

5 OCTC Schematic OCTC connection 2-pole bridging type rotary switch with Multi-layer winding with taps on 100kV line inter connection end Winding type changed to interleaved disc with regulating winding at middle of 110kV without increase to dielectrics stress with due consideration of step voltage and across tap. 5

6 6th International Conference on Large Power Transformers Modern Trends in CHALLENGES FACED LOGISTICS & MANUFACTURING Transport restriction Additional accessories with minimal change to existing foot print. Tools not suitable for hardware Frequent checks leading to many unplanned action. Sludge removal w/o compromising shop floor cleanliness. DOCUMENTATION Unreadable drawings, absence of dimensions Closure of original manufacturer (YOM : 1960) Modified with minimal records (e.g. No Buchholz relay!) Absence of existing bushings, pumps, fans details 6

7 6th International Conference on Large Power Transformers Modern Trends in REFURBISHMENT ACTIVITIES Joint inspection and scope freezed Re-designed to meet customer spec (ratio, tap steps, loss) Remnant life check of GOES before re-use (though not specified) Re-design evaluated using SIEMENS global engg tool for Electromagnetics Electrostatics 100% dielectrics level - PD free Thermal performance SC withstand (Thermal & Dynamic) Creation of Engg documentation HV winding changed from layer to disc Replacement of windings, insulation, bushings, accessories Re-processing of active part 7

8 BEFORE AFTER 8

9 BEFORE AFTER 9

10 BEFORE AFTER 10

11 BEFORE AFTER 11

12 BEFORE AFTER 12

13 6th International Conference on Large Power Transformers Modern Trends in Information required with refurbishment enquiry Reference Standard (IEC/ANSI / IS) Installation (indoor/outdoor) Rated frequency (Hz) Vector group Rated power (MVA) in different cooling types Rated voltage HV/MV/LV (kv) Voltage regulation (Type, range, steps) Insulation levels on HV / LV / N (U m /AC/LI/SI) Type of insulating oil Rated short circuit duration (s) Loss evaluation (NL/LL/AL ---per/kw) Penalty and Bonus for improvement Impedance u k (%) at rated power, frequency, principal tap position Type of Termination Transport dimensions, weight and mode. Rating & Diagram plate photos Test certificates (Routine/Type tests) Details of cooler (radiator, fans, pumps) Nature of failure, investigation report, conditions before failure 13

14 Customer benefits (Tangible & Intangible) TANGIBLE: Life extended (Proved by test at 100% level PD free!) Up-graded performance (e.g. LL reduced by ~12.5%) Reduced maintenance & Reduced Cooler loss (cooling ODAF -- ONAF). INTANGIBLE: All fabricated parts re-painted after shot blasting to give brand new look Old GOES re-used after proper evaluation (sample test instead of physical examination) Ensured leak proof performance (Gasket design change!) Fresh set of Engg documents. Improved availability of spare parts. No major changes to existing foundation (faster re-installation) 14

15 CONCLUSION Real benefit achieved only with use of latest technology For fair refurbishment evaluation, utilities should consider a) Cost of shot blasting for surface preparation & associated transport cost. b) Cost of sample tests: Material reuse based on sample tests. c) Cost of technology used in refurbishment d) Flexible bidding to allow design improvement during re-design. (To encourage performance improvement instead of mere repeat of existing design) a) Bonus clause for losses in addition to penalty 15

16 THANK YOU!!! 16

Pomona, CA May 24 25, 2016

Pomona, CA May 24 25, 2016 Pomona, CA May 24 25, 2016 Transformer Technology Seminar Modular approach on economic condition assessment for power transformer; data management, Fleet screening and risk ranking Siemens AG 2014 All

More information

Powertech Transformers Services

Powertech Transformers Services Powertech Transformers Services Offering our Customers Peace of Mind Powertech Transformers has over 60 years of experience in the transformer industry. Buying a transformer from Powertech Transformers

More information

Lifetime Decisions. Investments can be planned, lifetime costs of equipment made transparent and decisions based on informed fact.

Lifetime Decisions. Investments can be planned, lifetime costs of equipment made transparent and decisions based on informed fact. Lifetime Decisions Ageing assets, rising energy demand, and the need to deliver without outage are issues facing utilities and industries around the world. At the same time, financial constraints demand

More information

OIL IMMERSED TRANSFORMERS ENG

OIL IMMERSED TRANSFORMERS ENG OIL IMMERSED TRANSFORMERS ENG endless transformation POWER UP TO 50MVA VOLTAGE UP TO 145kV BIL 650kV Oil immersed transformers offer a customize and reliable solution for the customer as the typical design

More information

Featured Product. Transformer Monitoring and Diagnostic Systems

Featured Product. Transformer Monitoring and Diagnostic Systems Featured Product Transformer Monitoring and Diagnostic Systems Transformer Predictive Analysis Owners of critical transformer equipment can realize the benefits of predictive analysis on transformer health

More information

OUR VISION J & S POWER SOLUTIONS QUALITY OBJECTIVES... CORE VALUES : OUR TQM PRACTICES... VISION : Call for service 24 x 7 x

OUR VISION J & S POWER SOLUTIONS QUALITY OBJECTIVES... CORE VALUES : OUR TQM PRACTICES... VISION : Call for service 24 x 7 x OUR VISION J & S POWER SOLUTIONS QUALITY OBJECTIVES... Increased Emphasis on Reliability of Design Achieving zero failure rate Ensuring strict adherence to laid down quality system standards Employee Motivation

More information

SUPER LOW LOSS AMORPHOUS TRANSFORMERS

SUPER LOW LOSS AMORPHOUS TRANSFORMERS SUPER LOW LOSS AMORPHOUS TRANSFORMERS 0 IMPROVE THE ENERGY EFFICIENCY OF YOUR SITE A WILSON E AMORPHOUS TRANSFORMER CAN SAVE UP TO Our Wilson e amorphous transformer is the industry leading super low loss

More information

The Iraq Community Resilience Initiative (ICRI) would like to obtain a quotation for the items specified in the following table: Qty Units.

The Iraq Community Resilience Initiative (ICRI) would like to obtain a quotation for the items specified in the following table: Qty Units. September 29, 2018 Iraq Development and Sustainability LLC. 100m street, Baharka bridge intersection Erbil, Kurdistan, Iraq From: (ICRI) Subject: Request for Quotation Number RFQ-ICRI-PROG-IRU012-001 Deadline

More information

POWER TRANSFORMER INSTALLATION

POWER TRANSFORMER INSTALLATION Project Procedure POWER TRANSFORMER INSTALLATION No.: P-6.2-8-1 07/20/2011 PAGE 1 OF 6 1.0 PURPOSE The purpose of this procedure is to ensure that power transformer installations are accomplished in compliance

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 (Above 1000V and up to 38kV for Surface Mining) Key Components of Specification:

More information

MATERIAL AND EQUIPMENT STANDARD FOR POWER TRANSFORMERS

MATERIAL AND EQUIPMENT STANDARD FOR POWER TRANSFORMERS MATERIAL AND EQUIPMENT STANDARD FOR POWER TRANSFORMERS CONTENTS : PAGE No. 1. SCOPE... 3 2. REFERENCES... 3 3. DEFINITIONS... 3 4. UNITS... 4 5. SERVICE CONDITIONS... 4 6. RATINGS... 4 7. CONSTRUCTIONAL

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY NOTICE INVITING TENDER Phone:

More information

SPECIFICATIONS FOR Gas-to-Cable termination

SPECIFICATIONS FOR Gas-to-Cable termination Product GSM-145 1.0 APPLICATION: Gas-to-cable termination is a part of high voltage gas insulated indoor switchgear equipment. The component is intended for a high voltage system of 132 kv (AC), 50 Hz.

More information

Cast Resin LV Busway (IP68) Taiwan Busway Company

Cast Resin LV Busway (IP68) Taiwan Busway Company Cast Resin LV Busway (IP68) Taiwan Busway Company TBC Company Overview Taiwan Busway Company, Ltd. Est. 2002; located in Taipei Brand: TBC Busway market leader in Taiwan, presence in China, Germany/ Europe,

More information

ADDITIONAL CONTACT INFORMATION:

ADDITIONAL CONTACT INFORMATION: RENEWABLE ENERGY Experience in the industry Bringing renewable power economically to the end customer requires today s most efficient technologies. As a leader in reliable transformer design and manufacturing,

More information

ENERGY SOLUTIONS FOR THE GLOBAL POWER INDUSTRY

ENERGY SOLUTIONS FOR THE GLOBAL POWER INDUSTRY TRANSFORMERS ENERGY SOLUTIONS FOR THE GLOBAL POWER INDUSTRY BRUSH Transformers is globally renowned for the quality of its products, innovation and service. Our markets include the utility, oil, petrochemical,

More information

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the secondary unit substation(s) complete from the incoming line terminals

More information

A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS

A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS Willy LORD SwedPower AB Sweden willy.lord@swedpower.com Lennart AHNLUND Vattenfall Eldistribution AB Sweden B. WALLBING-LÖVGREN Vattenfall Eldistribution

More information

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES MANUALLY OPERATED / REMOTELY OPERATED DEAD FRONT PADMOUNTED SWITCHGEAR WITH VACUUM LOAD INTERRUPTING

More information

Capital Projects Group Liquid Filled Transformer Specification

Capital Projects Group Liquid Filled Transformer Specification Capital Projects Group Specification Specification 26 12 13 Revision 0 Date: August 2018 Specification Specification 26 12 13 Publication Date: August 2018 COPYRIGHT 2018 Metrolinx, an Agency of the Government

More information

33-SDMS-02 SPECIFICATIONS FOR

33-SDMS-02 SPECIFICATIONS FOR SPECIFICATIONS FOR MV AUTOMATIC LINE SECTIONLIZER UP TO 36 KV This specification is property of SEC and subject to change or modification without any notice TABLE OF CONTENTS SECTION T I T L E PAGE NO.

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

SERVICE AND RETROFIT ASSET MANAGEMENT SOLUTIONS. TrANSfOrMEr control

SERVICE AND RETROFIT ASSET MANAGEMENT SOLUTIONS. TrANSfOrMEr control SERVICE AND RETROFIT ASSET MANAGEMENT SOLUTIONS. TrANSfOrMEr control ASSET MANAGEMENT SOLUTIONS Maintenance of on-load tap-changers and transformers. 2 Asset management. Guaranteed reliability. Maximum

More information

TRANSFORMER SERVICE AND MAINTENACE FOR TATACHEMICALS MAGADI.

TRANSFORMER SERVICE AND MAINTENACE FOR TATACHEMICALS MAGADI. TRANSFORMER SERVICE AND MAINTENACE FOR TATACHEMICALS MAGADI. SAFETY MEASURES AND REQUIREMENTS i) A thorough site risk assessment to be done before commencement of work. ii) All personnel involved in the

More information

SECTION LOW-VOLTAGE TRANSFORMERS

SECTION LOW-VOLTAGE TRANSFORMERS PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not

More information

POLYMER HOUSED SURGE ARRESTORS

POLYMER HOUSED SURGE ARRESTORS POLYMER HOUSED SURGE ARRESTORS March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.

More information

37-SDMS-01 REV. 03 SPECIFICATIONS FOR

37-SDMS-01 REV. 03 SPECIFICATIONS FOR 37-SDMS-01 REV. 03 SPECIFICATIONS FOR LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS FOR SERVICE CONNECTIONS This specification is property of SEC and subject to change or modification without any notice CLAUSE

More information

S. C. Electric Cooperative s Specification for a Single-Phase, Two Bushing Overhead Distribution Transformer (Revised 10/2013)

S. C. Electric Cooperative s Specification for a Single-Phase, Two Bushing Overhead Distribution Transformer (Revised 10/2013) S. C. Electric Cooperative s Specification for a Single-Phase, Two Bushing Overhead Distribution Transformer (Revised 10/2013) 1.0 GENERAL 1.1 This specification covers the electrical and mechanical characteristics

More information

Justus B.C Mtolera Mtera Hydro plant Manager TANESCO TANZANIA

Justus B.C Mtolera Mtera Hydro plant Manager TANESCO TANZANIA Justus B.C Mtolera Mtera Hydro plant Manager TANESCO TANZANIA MAINTENANCE & REFURBISHMENT OF MTERA HYDRO POWER PLANT Layout: 1. Introduction 2. Technical data of Mtera Hydro Power Plant 3. Maintenance

More information

UL TEST REPORT AND PROCEDURE

UL TEST REPORT AND PROCEDURE Issue Date: 2015-12-22 Page 1 of 13 Report Reference # E182560-V4-S35 UL TEST REPORT AND PROCEDURE Standard: ANSI/AAMI ES60601-1 (2005/(R) 2012 +A1:2012, C1: 2009/(R) 2012 + A2:2010/(R) 2012) Amendment

More information

Components, Systems and Service for Transformers.

Components, Systems and Service for Transformers. Components, Systems and Service for Transformers. HYDAC Headquarters in Germany HYDAC China Your Professional Partner for the Optimization of Transformers. With over 5,500 employees worldwide HYDAC is

More information

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained. DOC: STI//1 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF According to IS/IEC:2000 (Including Amendment no.2) 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and

More information

MR 120/2015. SUPPLY OF 2 X 2MVA 415V/11kV 3 PHASE TRANSFORMERS

MR 120/2015. SUPPLY OF 2 X 2MVA 415V/11kV 3 PHASE TRANSFORMERS MR 120/2015 SUPPLY OF 2 X 2MVA 415V/11kV 3 PHASE TRANSFORMERS TRANSFORMER DETAILS: 2 x 2MVA 3Phase 11-6.3kV/415V YNd11 Transformer Voltage ratios: 11000-6.35/415volts Off circuit tapchanger, with tappings

More information

GENERATOR STEP-UP TRANSFORMER FOR MASINGA POWER STATION

GENERATOR STEP-UP TRANSFORMER FOR MASINGA POWER STATION TENDER NO. KGN-HYD-023-2017 DATE: 26/09/2017 KENYA ELECTRICITY GENERATING COMPANY TENDER FOR DESIGN, MANUFACTURE, FACTORY TRAINING AND TESTING, DELIVERY, SUPERVISION OF ASSEMBLY, INSTALLATION, TESTING

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

TRANSFORMER and OIL-FILLED REACTOR INSTALLATION PROCEDURE SP-TRF-INST

TRANSFORMER and OIL-FILLED REACTOR INSTALLATION PROCEDURE SP-TRF-INST TRANSFORMER and OIL-FILLED REACTOR INSTALLATION PROCEDURE SP-TRF-INST Version number: 12 Approval date: 02/06/2013 Authoring department: Substation Technical Services Approved location: PolicyTech File

More information

SUPPLY AND DELIVERY OF 200KVA EARTHING TRANSFORMER TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. PLS PART I TENDER PROCEDURES

SUPPLY AND DELIVERY OF 200KVA EARTHING TRANSFORMER TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. PLS PART I TENDER PROCEDURES SUPPLY AND DELIVERY OF 200KVA EARTHING TRANSFORMER TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. PLS-160091 PART I TENDER PROCEDURES SECTION 1 INTRODUCTION This Introduction should be read in conjunction with

More information

1 29SEP03 ALL General update with miscellaneous changes in entire document.

1 29SEP03 ALL General update with miscellaneous changes in entire document. REVISION RECORD SECTION 16461 Dry-Type Transformers (600 V and Less) REV DATE PAGE PARA NO. DESCRIPTION APPROVED BY 28SEP01 ALL Initial issue. 1 29SEP03 ALL General update with miscellaneous changes in

More information

Pre-Qualification Certificate

Pre-Qualification Certificate Nordic Utility Pre-Qualification System Pre-Qualification Certificate Awarded to Registration number: 984 277 032 Sellihca Id: Sellihca Qualification hereby confirms that is now fully registered as a supplier

More information

Product-related services for switchgear, transformers, and cables

Product-related services for switchgear, transformers, and cables Product-related services for switchgear, transformers, and cables Making the most of your T&D assets Asset Services/Product-related services Switchgear Services Transformer Services Cable and Line Services

More information

ELECTRICITY SUPPLY - POWER SYSTEM MAINTENANCE Carry out routine inspection and service on oil filled distribution power transformers 11kV to 400V

ELECTRICITY SUPPLY - POWER SYSTEM MAINTENANCE Carry out routine inspection and service on oil filled distribution power transformers 11kV to 400V 1 of 8 level: 4 credit: 8 planned review date: December 2006 sub-field: purpose: entry information: Electricity Supply People credited with this unit standard are able to: prepare for routine service transformers

More information

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the primary unit substation(s) complete from the incoming line terminals to the

More information

The complete guide to transformers and packaged substations

The complete guide to transformers and packaged substations LAND LOGICAL POWER The complete guide to transformers and packaged substations Contents Land Logical Power transformers An introduction to the complete range of Land Logical Power transformers and package

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 11 16 SECONDARY UNIT SUBSTATIONS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

Federal Power Transformers LLC

Federal Power Transformers LLC www.fpt.ae Federal Power Transformers LLC based in Abu Dhabi, UAE CONTENTS The Company...03 Design Process...05 Manufacturing...07 Testing...11 Quality...13 After Sales Support & Other Services...15 Satisfied

More information

ENGINEERING SPECIFICATION

ENGINEERING SPECIFICATION ENGINEERING SPECIFICATION No. Page 1 CATEGORY: TRANSFORMERS DATE: 11/16/2006 Subject: TABLE OF CONTENTS PURPOSE...2 SCOPE...2 REFERENCES...2 DEFINITIONS...2 SPECIFICATION...2 General... 2 High Voltage

More information

SECTION CONVECTORS

SECTION CONVECTORS SECTION 23 82 33 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS SINGLE-PHASE PADMOUNTED TRANSFORMERS

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS SINGLE-PHASE PADMOUNTED TRANSFORMERS CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS SINGLE-PHASE PADMOUNTED TRANSFORMERS Original Issue 1/84 Revised 1/91 Revised 6/02 Revised 11/05 Revised 11/09 Revised 1/12 Revised 11/12 Revised 5/14 Revised

More information

Measurement of Equipment Life and Life Extension, Experience from National Grid

Measurement of Equipment Life and Life Extension, Experience from National Grid Measurement of Equipment Life and Life Extension, Experience from National Grid WG A3-06 Tutorial course on Reliability of HV Equipment June 2006, Rio de Janeiro Francis Waite Asset Management National

More information

TABLE OF CONTENTS. FOREWORD... Error! Bookmark not defined. INTRODUCTION SCOPE NORMATIVE REFERENCES DRAWING...4

TABLE OF CONTENTS. FOREWORD... Error! Bookmark not defined. INTRODUCTION SCOPE NORMATIVE REFERENCES DRAWING...4 TITLE SPECIFICATION FOR FREE- STANDING 11 DATE: AUGUST 2006 PAGE: 1 OF 15 TABLE OF CONTENTS Page FOREWORD... Error! Bookmark not defined. INTRODUCTION...3 1 SCOPE...3 2 NORMATIVE S...3 3 DRAWING...4 4

More information

ABSORPTION FILTERS FAP SERIES

ABSORPTION FILTERS FAP SERIES ABSORPTION FILTERS FAP SERIES INSTRUCTION MANUAL Cod. M - 981216-01A ------ Absorption filters FAP ------ Instructions Manual ------ Pág. 1 de 6 ------ 1 INTRODUCTION Absorption filters are designed to

More information

GST001 MV/LV TRANSFORMERS LOCAL SECTION CELG D

GST001 MV/LV TRANSFORMERS LOCAL SECTION CELG D GST001 MV/LV TRANSFORMERS LOCAL SECTION CELG D In addition on what specified in the common part, the following requirements are prescribed: 3.1 LAWS Portaria INMETRO 378/2010 Requisitos de Avaliação da

More information

Supply and Maintenance of Transformers, Switchgear, Minisubs, Oil Analysis, Oil Purification & Transformer Testing

Supply and Maintenance of Transformers, Switchgear, Minisubs, Oil Analysis, Oil Purification & Transformer Testing Supply and Maintenance of Transformers, Switchgear, Minisubs, Oil Analysis, Oil Purification & Transformer Testing Content: Introduction Company Details Products Services Equipment &Facilities Health and

More information

A. This Section includes the following types of dry-type transformers rated 600 V and less, with capacities up to 1000 kva:

A. This Section includes the following types of dry-type transformers rated 600 V and less, with capacities up to 1000 kva: SECTION 16461 - LOW-VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control 1. DESCRIPTION 2. MATERIALS Furnish, install, relocate, or remove radar vehicle detection systems (RVDS) of

More information

Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Germany

Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Germany Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Frank.Herbener@Piller.com, Germany 1 Contents 1 Scope 3 2 Power Demand and Distribution in today s Mission Critical Applications

More information

JUNCTION BOX AND BAYMARSHALLING KIOSK

JUNCTION BOX AND BAYMARSHALLING KIOSK JUNCTION BOX AND BAYMARSHALLING KIOSK September 2017 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata

More information

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low-Voltage Plug-in Busway - 225 to 5000 ampere, 600 VAC 1.02 RELATED

More information

Power Transformers. Your partner in energy solutions

Power Transformers. Your partner in energy solutions Power Transformers Your partner in energy solutions - 2 - Contents CG Power Systems. Smart Solutions, Strong Relationships 5 Transformer design 6 Quality Assurance 8 Core construction 9 Windings 10 Insulation

More information

Oil Regeneration in 132kV and 33kV Transformers 6 December 2017

Oil Regeneration in 132kV and 33kV Transformers 6 December 2017 1 Oil Regeneration in 132kV and 33kV Transformers 6 December 2017 Paul Marshall Innovation Project Manager Agenda Introduction Research IFI oil regeneration project Oil regeneration results Oil regeneration

More information

THE NEXT GENERATION OF VACUUM INTERRUPTERS; USING A DESIGN FOR THE ENVIRONMENT APPROACH

THE NEXT GENERATION OF VACUUM INTERRUPTERS; USING A DESIGN FOR THE ENVIRONMENT APPROACH THE NEXT GENERATION OF VACUUM INTERRUPTERS; USING A DESIGN FOR THE ENVIRONMENT APPROACH Leslie T. Falkingham Alstom T&D UK leslie.falkingham@tde.alstom.com Martin Schlaug Alstom T&D - France martin.schlaug@tde.alstom.com

More information

B. Pumps are to be manufactured by Flygt Pumps. No substitutes will be considered.

B. Pumps are to be manufactured by Flygt Pumps. No substitutes will be considered. I. General Requirements A. This bid is for furnishing and delivering pumps for use at the Southeast Pollution Control Treatment Plant, Cesar Chavez Pump Station, Channel Pump Station, Bruce Flynn Pump

More information

TECHNICAL SPECIFICATION OF HORIZONTAL MILLING MACHINE

TECHNICAL SPECIFICATION OF HORIZONTAL MILLING MACHINE SCOPE: SUPPLY, ERECTION & COMMISSIONING OF HORIZONTAL MILLING MACHINE WITH SPECIFICATIONS AS BELOW : SL. NO. DESCRIPTION OF BHEL REQUIREMENT REQUIRED OFFERED DEVIATION REMARKS 1.0 PURPOSE & WORKPIECE MATERIAL

More information

Practical Experience Gained from Dissolved Gas Analysis at an Aluminium Smelter. Ian.A.R. Gray

Practical Experience Gained from Dissolved Gas Analysis at an Aluminium Smelter. Ian.A.R. Gray Practical Experience Gained from Dissolved Gas Analysis at an Aluminium Smelter Ian.A.R. Gray Largest aluminium smelter in the Southern hemisphere South Africa's major producer of primary aluminium It

More information

PART- A ROTARY TABLE : 3000 X 4000 MM

PART- A ROTARY TABLE : 3000 X 4000 MM ROTARY TABLE : SIZE - 3000 X 4000 The BIDDER has to compulsorily meet the following requirements to get qualified for considering the technical offer for the ROTARY TABLE - 3000 X 4000 MM SL NO 1.0 REQUIREMENTS

More information

NPS/003/001 Technical Specification for 33kV, 66kV and 132kV Voltage Transformers

NPS/003/001 Technical Specification for 33kV, 66kV and 132kV Voltage Transformers Version:- 5.0 Date of Issue:- February 2015 Page 1 of 25 NPS/003/001 Technical Specification for 33kV, 66kV and 132kV Voltage Transformers 1. Purpose This purpose of this document is to specify the technical

More information

30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH

30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH SPECIFICATIONS FOR LOAD BREAK SWITCH This specification is property of SEC and subject to change or modification without any notice TABLE OF CONTENTS 1.0 SCOPE 3 2.0 CROSS REFERENCES 3 3.0 APPLICABLE CODES

More information

It is standard practice and all manufacturers to abide by this. It is standard practice and all manufacturers to abide by this.

It is standard practice and all manufacturers to abide by this. It is standard practice and all manufacturers to abide by this. 1 162 General 2 162 General We recommend to specify door handle to singe shot latch type, bolted construction of Door shall not be acceptable. Closing and Tripping Coils shall be rated for continuous supply,

More information

NZQA registered unit standard version 4 Page 1 of 6. Carry out acceptance, commissioning and maintenance tests on power transformers

NZQA registered unit standard version 4 Page 1 of 6. Carry out acceptance, commissioning and maintenance tests on power transformers Page 1 of 6 Title Carry out acceptance, commissioning and maintenance tests on power transformers Level 4 Credits 6 Purpose People credited with this unit standard are able to: prepare to test power transformers

More information

Distributor Bulletin Major Equipment Refurbishment

Distributor Bulletin Major Equipment Refurbishment DISTRIBUTION COMPANY AWARENESS ESA received a request to review an LDC generated refurbishment agreement for major equipment (equipment approval) and make comment with respect to its compliance to Regulation

More information

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMPING UNITS

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMPING UNITS DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: The work specified in this Section consists of providing an Environmental One grinder pump(s) unit with tank, internal piping and

More information

JOB SPECIFICATION FOR ROTARY PUMP (SCREW TYPE)

JOB SPECIFICATION FOR ROTARY PUMP (SCREW TYPE) ENGINEERS tg,e.g tale% W INDIA LIMITED Goo e/ kw UndelOom JOB SPECIFICATION FOR A223-041-16-45-SP-5050, Rev.A Page 1 of 6 JOB SPECIFICATION FOR ROTARY PUMP PROJECT : UNIT : CLIENT : CONSULTANT : PDA REVAMP

More information

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER PART 1 - GENERAL 1.1 SUMMARY SECTION 26 13 16 MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER A. The scope of this section includes providing and assembling materials and equipment for the dead-front, medium voltage

More information

Mechanic - Hydraulics

Mechanic - Hydraulics Model Curriculum Mechanic - Hydraulics Mechanic Course - Hydraulics SECTOR: SUB-SECTOR: Infrastructure Equipment Equipment Service and Spares OCCUPATION: REFERENCE ID: NSQF LEVEL: Equipment Maintenance

More information

ELECTRICAL INSPECTION BULLETIN (Effective )

ELECTRICAL INSPECTION BULLETIN (Effective ) ELECTRICAL INSPECTION BULLETIN (Effective 2009-02-01) Rule 36-000 Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which

More information

CCC Services for oil-filled- and XLPE-Cable Systems

CCC Services for oil-filled- and XLPE-Cable Systems sc CCC Services for oil-filled- and XLPE-Cable Systems Service Programme for Cable Systems As a supplier of MV- and HV-cable systems with several decades of experience, CCC GmbH Berlin offers the full

More information

INVITATION FOR QUOTATION. TEQIP II/2012/WB2G02/Shopping/41

INVITATION FOR QUOTATION. TEQIP II/2012/WB2G02/Shopping/41 INVITATION FOR QUOTATION TEQIP II/2012/WB2G02/Shopping/41 25 Sep 2012 To, Science India 232 B,Acharya Prafulla Chandra Road Kolkata 700 004 Sub: Invitation for Quotations for supply of Goods Package Code:

More information

How to Improve Grid Reliability and Asset Utilization as increasing energy demand and an aging infrastructure drives grid investment.

How to Improve Grid Reliability and Asset Utilization as increasing energy demand and an aging infrastructure drives grid investment. SMART INSULATION - The Next Major Breakthrough How to Improve Grid Reliability and Asset Utilization as increasing energy demand and an aging infrastructure drives grid investment. WICOR AMERICAS INC.

More information

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE METAL-ENCLOSED BUS MEDIUM VOLTAGE PART 1 GENERAL 1.01 1.02 1.03 1.04 1.05 SCOPE The Contractor shall furnish and install the equipment as specified herein and as shown on the contract drawings. The medium

More information

Transforming know-how into reliable energy. TUMETIC and TUNORMA Oil-Immersed Distribution Transformers. Answers for energy.

Transforming know-how into reliable energy. TUMETIC and TUNORMA Oil-Immersed Distribution Transformers. Answers for energy. Transforming know-how into reliable energy. TUMETIC and TUNORMA Oil-Immersed Distribution Transformers Answers for energy. TUMETIC distribution transformer with hermetically sealed tank TUNORMA distribution

More information

2 3 4 Distance from centre of reactor (m)

2 3 4 Distance from centre of reactor (m) ONE OPTIMISED NETWORK EQUIPMENT 12 January 2016 c 0MPRMF-4 Magnetic fields and air core reactors 1 Introduction Air core reactors are commonly used as shunt reactors, fault current limiting reactors, tuning

More information

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS 669.7403.001 West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS Page C-111 Advertisement for Bids 1-2 C-200 Instruction to Bidders 1-10 C-410 Bid Form for Construction Projects

More information

UL TEST REPORT AND PROCEDURE

UL TEST REPORT AND PROCEDURE Issue Date: 2015-09-28 Page 1 of 10 Report Reference # E182560-V4-19 UL TEST REPORT AND PROCEDURE Standard: ANSI/AAMI ES60601-1 (2005/(R) 2012 +A1:2012, C1: 2009/(R) 2012 + A2:2010/(R) 2012) Amendment

More information

TECHNICAL SPECIFICATION FOR NON SEALED TYPE 11 KV CLASS DISTRIBUTION TRANSFORMERS OF 200,400,630 & 990 KVA CAPACITIES

TECHNICAL SPECIFICATION FOR NON SEALED TYPE 11 KV CLASS DISTRIBUTION TRANSFORMERS OF 200,400,630 & 990 KVA CAPACITIES DAKSHIN HARYANA BIJLI VITRAN NIGAM TECHNICAL Specification No. S-84/DD-161 TECHNICAL SPECIFICATION FOR NON SEALED TYPE 11 KV CLASS DISTRIBUTION TRANSFORMERS OF 200,400,630 & 990 KVA CAPACITIES VOLUME-

More information

Guideline. Guide for the Procurement of Steam Turbine Plants. VGB-R 145Ae Part A: General Part. First Edition 2008

Guideline. Guide for the Procurement of Steam Turbine Plants. VGB-R 145Ae Part A: General Part. First Edition 2008 Guideline Guide for the Procurement of Steam Turbine Plants VGB-R 145Ae Part A: General Part First Edition 2008 Part A: General Part Part B: Technical Part Offer, Scope of Supply Part C: Specification

More information

DOC // SINGLE LINE DIAGRAM OF HYDRO POWER STATION DOWNLOAD

DOC // SINGLE LINE DIAGRAM OF HYDRO POWER STATION DOWNLOAD 25 March, 2018 DOC // SINGLE LINE DIAGRAM OF HYDRO POWER STATION DOWNLOAD Document Filetype: PDF 410.7 KB 0 DOC // SINGLE LINE DIAGRAM OF HYDRO POWER STATION DOWNLOAD Hydro power plant Diagrams Parts of

More information

Renovation of Substation 2 including Replacement of Oil Type transformers with Dry type Transformers at South Yard, MDL, Mumbai.

Renovation of Substation 2 including Replacement of Oil Type transformers with Dry type Transformers at South Yard, MDL, Mumbai. MAZAGON DOCK SHIPBUILDERS LIMITED (Formerly known as Mazagon Dock Ltd.) CIN : U35100MH1934GOI002079 (A Government of India Undertaking) Shipbuilders to the Nation Dockyard Road, Mazagon, Mumbai 400 010.

More information

Motor Control Center Obsolescence

Motor Control Center Obsolescence International Conference Nuclear Energy for New Europe 2003 Portorož, Slovenia, September 8-11, 2003 http://www.drustvo-js.si/port2003 Motor Control Center Obsolescence Craig S. Irish Vice President, Sales

More information

LOGO.

LOGO. LOGO www.ercolemarelligroup.eu Divisions www.ercolemarelligroup.eu 1 ERCOLE MARELLI HYDRO 2 ERCOLE MARELLI POWER 3 ERCOLE MARELLI ELECTRO 4 ERCOLE MARELLI TRAFO 1. ERCOLE MARELLI HYDRO Contents a. Introduction

More information

UL TEST REPORT AND PROCEDURE

UL TEST REPORT AND PROCEDURE Issue Date: 2010-03-30 Page 1 of 12 Report Reference # E186249-A59-UL UL TEST REPORT AND PROCEDURE Standard: Certification Type: CCN: UL 60950-1, 2nd Edition, 2011-12-19 (Information Technology Equipment

More information

TECHNICAL SPECIFICATION FOR 8 MVA POWER TRANSFORMERS 1.0 Scope:

TECHNICAL SPECIFICATION FOR 8 MVA POWER TRANSFORMERS 1.0 Scope: 10.09.2013/20.01.2014 TECHNICAL SPECIFICATION FOR 8 MVA POWER TRANSFORMERS 1.0 Scope: This specification covers the design manufacture, testing, supply, delivery at site according to the following specifications

More information

CCC-Serv-8oil_ eng* :39 Uhr Seite 9. CCC Services for oil-filled- and XLPE-cable systems

CCC-Serv-8oil_ eng* :39 Uhr Seite 9. CCC Services for oil-filled- and XLPE-cable systems CCC-Serv-8oil_533-09-2003-eng* 28.02.2005 16:39 Uhr Seite 9 sc CCC Services for oil-filled- and XLPE-cable systems CCC-Serv-8oil_533-09-2003-eng* 28.02.2005 16:39 Uhr Seite 2 Contact: CCC GmbH Berlin Cable

More information

Your Reliable Service Partner in Scotland for Rotating Equipment

Your Reliable Service Partner in Scotland for Rotating Equipment Your Reliable Service Partner in Scotland for Rotating Equipment The Sulzer Advantage Capabilities HV (high voltage) and LV (low voltage) rewinds Electrical supply Field services Condition monitoring

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

SCOPE OF WORK SUBSTATIONS

SCOPE OF WORK SUBSTATIONS Page 2 of 11 REVISION CONTROL Issued for Internal Review Issued for Client Review Issued for DFS REVISION HISTORY Revision Date Pages Revised Remarks 00 29/08/2017 Multiple Comments incorporated 01 05/04/2018

More information

Systems Commissioning Table of Contents

Systems Commissioning Table of Contents Systems Commissioning Table of Contents C NC NA I. General II. Commissioning III. Mechanical Systems A. Testing, Adjusting, and Balancing B. Piping IV. Electrical Systems A. Load Balancing B. Electrical

More information

Low SCR Wind Identification and Mitigation. Will Lovelace MIPSYCON 2015 November 11 th, 2015

Low SCR Wind Identification and Mitigation. Will Lovelace MIPSYCON 2015 November 11 th, 2015 Low SCR Wind Identification and Mitigation Will Lovelace MIPSYCON 2015 November 11 th, 2015 System Background - Diagram System Background - Diagram System Background - Description 199.5 MW wind farm on

More information

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained. DOC: STI//1 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ACCORDING TO IS/IEC:2003 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and staffed, where different tests

More information

METAL ENCLOSED BUS SOLUTIONS

METAL ENCLOSED BUS SOLUTIONS METAL ENCLOSED BUS SOLUTIONS ABOUT TECHNIBUS Technibus, Inc is a global leader in the supply of metal enclosed bus systems operating for more than 50 years. Our products include Isolated Phase, Non-Segregated,

More information