1 Unmanned Aerial Vehicle System Cloudbreak Survey Department
2 Introduction Background to the problem: The Cloudbreak Survey Department is required to survey all stockpiles on site in order to accurately report stockpile volumes Every month it takes about 5 days for the entire Survey team to physically walk, drive and scan all stockpiles on site to collect the required data There are more than 100 stockpiles at Cloudbreak. 85% of which are active with heavy machinery each day 2
3 Cloudbreak Site Surveyed Stockpiles 3
4 Context Background Risk assessment Hazards to personnel: Interacting with heavy vehicles, injury from falling over uneven/loose material, water hazards, engulfment and crushing Safety controls introduced to minimise the risk Dozer power to flatten all stockpiles in preparation for the surveyors to access them safely Heavy machinery to cease working at the stockpile or pit area where survey activities were being conducted More utilisation of the scanner data to remotely survey stockpiles, or simply estimate and project the crest or top surface of the stockpiles 4
5 Hazard Reporting Hazards identified by the team Example 1: Example 2: Stockpile crest and toe unsafe to walk, fall from height and engulfment risks identified. Surveyor could not get accurate volume of stockpile. Crest/top of stockpile consisting of oversize truck dumps, not flattened, many rocks unstable. Risk of falling and injury to surveyor. Impossible for surveyor to get accurate volume of stockpile. 5
6 Solution finding process The Controls introduced did not completely remove personnel from the hazards. These controls also created new challenges such as interrupting production demands and inaccurate data After researching numerous products, methods and technologies the team discovered Unmanned Aerial Vehicle Systems (UAV s) Initially three trials were completed on different systems to identify the most robust, suitable and safest option A business plan proposal was put forward to management on the chosen system 6
7 Challenges Initial research and trial challenges: UAV pilots require CASA UAV operator certificates where practical flying assessments were to be completed Developing a CASA approved Operations Manual, flight manual and maintenance manual Public liability insurance Job Hazard Analysis (JHA s) and Safe Working Instructions (SWI) completed to cover all parts of the Mine 7
8 Team Build Risk Assessment To operate in the OPF and workshop areas 8
9 9 UAV and Chief controller
10 Provide example of outputs Marsh pickup Insert video of north-image 10
11 Benefits Associated with the UAV System Surveyors are completely removed from traversing stockpiles and interacting with heavy vehicles The time pressures associated with end of month surveys and the physical workload on the surveyors will be reduced Reduces the use of dozer power for conditioning stockpiles Machinery no longer locked down to wait for surveyors to complete activities in the area Increased accuracy of stockpile volumes 11
12 Disclaimer Important Notice The purpose of this presentation is to provide general information about Fortescue Metals Group Limited ("Fortescue"). It is not recommended that any person makes any investment decision in relation to Fortescue based on this presentation. This presentation contains certain statements which may constitute "forward-looking statements". Such statements are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward-looking statements. No representation or warranty, express or implied, is made by Fortescue that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability which cannot be excluded, each of Fortescue, its officers, employees and advisers expressly disclaims any responsibility for the accuracy or completeness of the material contained in this presentation and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission therefrom. Fortescue accepts no responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information made available to a person nor any obligation to furnish the person with any further information. Additional Information This presentation should be read in conjunction with the Annual Financial Report as at 30 June 2013, the half year financial statements as at 31 December 2013 and together with any announcements made by Fortescue in accordance with its continuous disclosure obligations arising under the Corporations Act Any references to reserve and resource estimations should be read in conjunction with Fortescue s 2013 Annual Report which is available on the Fortescue website. Fortescue confirms that it is not aware of any new information or data that materially affects the mineral resources and ore reserves statement included in the 2013 Annual Report. All amounts within this presentation are stated in United States Dollars consistent with the Functional Currency of Fortescue Metals Group Limited. Tables contained within this presentation may contain immaterial rounding differences. 12
13 FortescueNews Sign up to alerts online: Proudly supporting:
ILUKA BRIEFING PAPER MODELLING METHODOLOGY June 2016
ILUKA BRIEFING PAPER MODELLING METHODOLOGY June 2016 Key Physical and Financial Parameters Iluka issued guidance on a range of parameters in its Key Physical and Financial Parameters of 19 February 2016).
More informationTHE NOLANS RARE EARTHS PROJECT
THE NOLANS RARE EARTHS PROJECT Gavin Lockyer Managing Director August 2015 DISCLAIMER Important Notice This presentation contains certain statements which may constitute forward-looking statements. Such
More informationStephen Ween and Jane Knipe. Drones The flight path from toy shop to research tool
Stephen Ween and Jane Knipe Drones The flight path from toy shop to research tool Outline We will outline: What a drone is Legislative requirements and responsibilities Summary of requirements and general
More informationRemotely Piloted Aircraft
Check. They re Chartered. A Guide to Remotely Piloted Aircraft Consumer Guide SCSI 2 15/09/2016 15:08 Page 4 Introduction Remotely Piloted Aircraft The purpose of this consumer guide is to raise awareness
More informationUNIVERSITY OF MASSACHUSETTS AMHERST POLICE DEPARTMENT
UNIVERSITY OF MASSACHUSETTS AMHERST POLICE DEPARTMENT Subject: Policy on the Use of Drones Number: PAT- 48 Category: Patrol Type: Policy Effective Date: February 22, 2017 Issuing Authority: Chief Tyrone
More informationMapping on a Budget. Using Drones & Digital Data. Jeff Campbell
Mapping on a Budget Using Drones & Digital Data Jeff Campbell 1 Mapping with Minimal Investment UAS Mapping suited to Incremental Approach Large Up front investment not necessary. Determine if you have
More informationZincOx Resources plc. Corporate Overview
ZincOx Resources plc Corporate Overview May 2012 Where there s Muck there s Brass Disclaimer This document is for informational purposes only and must not be used or relied upon for the purposes of making
More informationAustralia s New Nickel
Australia s New Nickel Proactive Investors Forum, Sydney David Singleton, MD & CEO 9 July 2014 Agenda The Windarra Nickel Mine Black Swan Processing Plant & Mine Nickel Market Boom developing 2 2 Windarra
More informationSTRATEGIC UPDATE 20 DECEMBER 2017
STRATEGIC UPDATE 20 DECEMBER 2017 DISCLAIMER - This presentation is intended to constitute a summary of certain information about Synlait Milk Limited ( Synlait ). It should be read in conjunction with,
More informationSafe visits to Customer Site for occasional visitors from Industrial Gas Companies
Training Package TP 20/16 Safe visits to Customer Site for occasional visitors from Industrial Gas Companies Safe visits to Customer Sites for occasional visitors from Industrial Gas Companies Disclaimer
More informationFACT SHEET COMMISSION-ONLY CONDITIONS THAT MUST BE MET
FACT SHEET - 2014 COMMISSION-ONLY CONDITIONS THAT MUST BE MET Commission-only is meant only for experienced salespersons with a proven track record. Every one of the following conditions MUST be met before
More informationOUR CUSTOMER TERMS CLOUD SERVICES TELSTRA APPS MARKETPLACE
CONTENTS Click on the section that you are interested in. 1 Applicable Terms 2 2 What is the Telstra Apps Marketplace? 2 3 Telstra Apps Marketplace General Terms 6 4 Telstra Apps Marketplace Support 12
More informationRisk management for Mining Industry
Risk management for Mining Industry Esko Juuso Engineering University of Oulu Outline Mine processes and water Process & environment, laboratory & online Water balance weather, rainfall, snow, hydrological
More informationSampling and subsequent testing of aggregate is performed for several reasons:
SAMPLING AGGREGATES Sampling and subsequent testing of aggregate is performed for several reasons: Preliminary investigation of supply source; Production quality control at supply source; Quality control
More informationTaking Off With Drones. December 4, :45 4:45 Workshop Block II Brian D Simmons, P.E., FAA 107 Principal Engineer Bolton & Menk Inc.
Taking Off With Drones December 4, 2017 3:45 4:45 Workshop Block II Brian D Simmons, P.E., FAA 107 Principal Engineer Bolton & Menk Inc. Taking Off With Drones Regulations UAV/Drone Implementation & your
More informationWhat is Enterprise Optimisation?
What is Enterprise Optimisation? Enterprise optimisation solves the production schedule challenges of mining and processing operations with multiple pits, mining faces and underground mines, multiple metal
More informationRisk Management for Remotely Piloted Aircraft Systems
Risk Management for Remotely Piloted Aircraft Systems Dr Reece Clothier CivSec 2016, 1 st June 2016 Melbourne, Australia Overview Safety risk management The requirement for risk management What is it and
More informationFuture Matters US Disclosure
Disclaimer This presentation has been prepared by Samsung Electronics Co., Ltd. (the "Company"). It does not purport to contain all the information that a prospective investor may require in connection
More informationLF Track III: Drone Technology Application in Waste Management Facility. Presented by Mike Cobb
LF Track III: Drone Technology Application in Waste Management Facility Presented by Mike Cobb Authors Osvaldo Lucero Maria Eugenia Rey Nores Ezequiel Verdini James Law Benito Roggio Ambiental, Argentina
More informationUAV SERVICES. Consult. Trust. Innovate.
UAV SERVICES Aerial surveys and inspection for the property, rail and infrastructure markets using Unmanned Aerial Vehicles (UAVs) Consult. Trust. Innovate. www.plowmancraven.co.uk Why Walk When You Can
More informationAn Introduction to the Serial Shipping Container Code (SSCC)
An Introduction to the Serial Shipping Container Code (SSCC) Release 2.0, Sept 2017 Table of Contents 1 What is a Serial Shipping Container Code?... 4 2 What is an SSCC used for?... 4 3 Key Attributes
More informationBIG UNLIMITED FY18 Q1 4C UPDATE OCT 2017
BIG UNLIMITED FY18 Q1 4C UPDATE OCT 2017 WHAT IS BIG BIG (ASX: BIG) is the parent company of Big Review TV Ltd. Big Review TV are innovative disruptors in the online video space. They are a video driven
More informationScienceDirect. Wirtgen drives the development of surface mining
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 138 (2016 ) 30 39 SYMPHOS 2015, 3rd International Symposium on Innovation and Technology in the Phosphate Industry Wirtgen drives
More informationProductivity improvements in a changing world
Productivity improvements in a changing world Michael Gollschewski Managing director Pilbara Mines 13 July 2015 Cautionary statement General This presentation has been prepared by Rio Tinto plc and Rio
More informationENTRUST CERTIFICATE SERVICES
ENTRUST CERTIFICATE SERVICES Certification Practice Statement Version: 2.8 June 25, 2012 2012 Entrust Limited. All rights reserved. Revision History Issue Date Changes in this Revision 1.0 May 26, 1999
More informationSantacruz Silver Reports First Quarter 2017 Production and Financial Results
TSX.V: SCZ FSE: 1SZ May 31, 2017 Santacruz Silver Reports First Quarter 2017 Production and Financial Results Vancouver, B.C. Santacruz Silver Mining Ltd. (TSX.V:SCZ) (the Company or Santacruz ) reports
More informationSunrise Communications AG. Sunrise ONE versus Swisscom inone - High level comparison
unrise Communications AG unrise ONE versus wisscom inone - High level comparison unrise ONE - Everything unlimited aunch andline & obile in ONE package New fully convergent high-end product, complementing
More informationSAP Business One 8.8 PL12
SAP Business One 8.8 PL12 Activating the Cockpit (excluding dashboards) Benno Eberle Roll-Out Services, Small Business GTM June 2010 SAP Business One 8.8 Expert Empowerment Session Objectives At the end
More informationGuidance Note. Guidance on CCTV Surveillance and Use of Drones 1. Introduction CCTV
Guidance Note Guidance on CCTV Surveillance and Use of Drones Introduction The use of CCTV 1 covering public places or common areas of buildings for security reasons or for monitoring illegal acts 2 (e.g.
More informationAdvantages of Using Laser Scan and UAV Technology in Virtual Asset Management
Advantages of Using Laser Scan and UAV Technology in Virtual Asset Management Authors: Paul David Ramirez and George Mann Unmanned Ad-Hoc Industries, Inc. 519 E Oak Hill Dr, Spring, Texas 77386 www.globaluai.com
More informationHFM Asset Management Contractor Induction Queens Riverside Apartments
HFM Asset Management Contractor Induction Queens Riverside Apartments Contents Purpose About HFM Asset Management HFM Asset Management s Responsibilities Contractors Responsibilities Commencing Work Working
More informationValence Industries Australia s Only Graphite Producer
Valence Industries Australia s Only Graphite Producer Asia Pacific I Europe I North America December 2014 Christopher S. Darby MD & CEO SAEM Conference Adelaide Manufacturing Our Carbon Future TM Valence
More informationDrilling, metallurgical test work and a new resource model add 21% to oxide gold reserves
LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource
More informationOne trusted source of information for the mining enterprise. Trimble Connected Mine Mine Information Systems TRANSFORMING THE WAY THE WORLD WORKS
One trusted source of information for the mining enterprise Trimble Connected Mine Mine Information Systems TRANSFORMING THE WAY THE WORLD WORKS Transforming the Way Mines Work In mining and other industries
More informationHeavy Vehicle Transport Off-Farm Grain Carriers Code of Practice. Mass, Dimension, Load Restraint and Fatigue
Heavy Vehicle Off-Farm Grain Carriers Code of Practice Mass, Dimension, Load Restraint and Fatigue PREPARED BY: SARTA AUTHORISED BY: South Australian Road Association, South Australian Farmers Federation,
More informationCristal Australia Pty Ltd
ENERGY EFFICIENCY OPPORTUNITIES PUBLIC REPORT 2013 Cristal Australia Pty Ltd is a wholly owned subsidiary of The National Titanium Dioxide Company Limited (Cristal), a private company with headquarters
More informationXXXXX. Bremner Trio Small Hydro Project. Interconnection Facilities Study and Project Plan
XXXXX Bremner Trio Small Hydro Project Interconnection Facilities Study and Project Plan June 25, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2011. All rights
More informationAdditional Terms & Conditions for Use of Apple Pay to Supplement Your Interactive Brokers Debit Mastercard Cardholder Agreement
4245 10/23/2017 Additional Terms & Conditions for Use of Apple Pay to Supplement Your Interactive Brokers Debit Mastercard Cardholder Agreement These terms and conditions ("Terms and Conditions") are a
More informationThe Bank of Elk River: Digital Wallet Terms and Conditions
The Bank of Elk River: Digital Wallet Terms and Conditions These Terms of Use ("Terms") govern your use of any eligible debit card issued by The Bank of Elk River (a "Payment Card") when you add, attempt
More informationSurveying for BIM BIM IN PRACTICE
9 Surveying for BIM BIM IN PRACTICE 9 Surveying for BIM Contributors: Chris Houghton, Peddle Thorp Architects David Berry, V-Mark Design Michael Byrne, Hellier McFarland Nicholas Davies, Lester Frank Edited
More informationV.) FedEx Trade Networks shall not be liable for any delay or loss of any kind, which occurs while a shipment is in the custody or control of a Third
A.) Rates and charges in this Rate Proposal will exclusively pertain to the "Origin" and "Destination" cities named in this Rate Proposal. In addition, ocean shipment rates set forth in this Rate Proposal
More informationFIRST BAUXITE CORPORATION (FBX) ANNUAL GENERAL MEETING
FIRST BAUXITE CORPORATION (FBX) ANNUAL GENERAL MEETING May 25, 2016 TSX-V: FBX Disclaimer This document is intended to be strictly informational. The Company reserves the right, at its sole discretion,
More informationMarket Access Update 19 Tomato-potato psyllid (TPP) complex
Market Access Update 19 Tomato-potato psyllid (TPP) complex 18 August 2017 This update contains information specific to tomato-potato psyllid (TPP) and Candidatus Liberibacter solanacearum (CLso) interstate
More informationFranconia Bluffs SNA
Franconia Bluffs SNA in te i rm tt e n am tre ts intermittent stream intermittent stream Na ve Plant Communi es* Oak - (Red Maple) Woodland Red Oak - White Oak - (Sugar Maple) Forest N45 22.291 W92 41.908
More informationRECYCLING CONSTRUCTION AND DEMOLITION MATERIAL
1st Edition January 2007 RECYCLING CONSTRUCTION AND DEMOLITION MATERIAL GUIDANCE ON COMPLYING WITH THE OCCUPATIONAL HEALTH AND SAFETY (ASBESTOS) REGULATIONS 2003 The information presented in Recycling
More informationIR-release: Q4 and FY 2015 Operational Overview
IR-release: Q4 and FY Operational Overview 28 January 2016 Disclaimer 2 The below applies to the presentation (the Presentation ) following this important notice, and you are therefore advised to read
More informationBP Energy Outlook 2016 edition
BP Energy Outlook 216 edition Spencer Dale, group chief economist Outlook to 235 bp.com/energyoutlook #BPstats Disclaimer This presentation contains forward-looking statements, particularly those regarding
More informationCAPABILITY STATEMENT 0 P a g e
CAPABILITY STATEMENT 2016 WWW.SURVEYGROUP.COM.AU 0 P a g e Contents ABOUT SURVEY GROUP... 2 About Survey Group... 2 Who We Are... 2 OUR CAPABILITY... 2 Our Commitment to Quality... 4 Our Commitment to
More informationGood 4 Global Charity Foundation Ltd Good 4 Global Limited. On behalf of all Affiliates and Software Licensees
Good 4 Global Charity Foundation Ltd Good 4 Global Limited On behalf of all Affiliates and Software Licensees Website terms and conditions relate to all online transactions, goods and services purchased
More informationENTRUST CERTIFICATE SERVICES
ENTRUST CERTIFICATE SERVICES Certification Practice Statement for Extended Validation (EV) SSL Certificates Version: 1.02 August 1, 2007 2007 Entrust Limited. All rights reserved. Revision History Issue
More informationAustralian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation
Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation Disclaimer Forward-Looking Statements This presentation contains forward looking statements concerning the projects owned by Australian
More informationFor personal use only
KEY POINTS Reserves and Resources Update For further information, please contact: Peter Bird Managing Director Heemskirk Consolidated Limited ABN 18 106 720 138 Level 5 303 Collins Street Melbourne Victoria
More informationCarbon Forged Steel Fittings
BONNEY FORGE SALES CENTER/WAREHOUSE 14496 CROGHAN PIKE P.O. BOX 330 MT. UNION, PA 17066 (814) 542-2545 (800) 345-7546 FAX (814) 542-9977 TELEX 910-240-9091 E-MAIL: bfsales@bonneyforge.com WEB SITE: http://www.bonneyforge.com
More informationContainer Transport Operator Access Terms & Conditions
ANL CONTAINER PARK Pty Ltd 11-21 Pinnacle Road Altona North VIC 3025 LAST UPDATED 28 SEPTEMBER 2016 Container Transport Operator Access Terms & Conditions 1) Overview... 2 2) Site safety requirements...
More informationDRONE-OLOGY - TO INFINTY AND BEYOND! ADSK Solutions. Chad Studer Owner/President
ADSK Solutions Chad Studer Owner/President ADSK SOLUTIONS SALES - RENTALS CONSULTING - TRAINING - SUPPORT AUTODESK 3D SCANNERS UAV aka DRONES BLUEBEAM Supported Application POINT CLOUDS LIDAR/UAV MOBILE
More informationStrengthening the experience and embracing the shift
Strengthening the experience and embracing the shift THIS PRESENTATION IS NOT AN OFFER OR SOLICITATION OF AN OFFER TO BUY OR SELL SECURITIES. IT IS SOLELY FOR USE AT A CAPITAL MARKETS EVENT AND IS PROVIDED
More informationDrone Guidance. For small unmanned aircraft weighing less than 20kg
Drone Guidance For small unmanned aircraft weighing less than 20kg Updated 16 th October 2017 Contents Contents... 2 1 Introduction... 3 2 The law... 3 3 The legislation explained... 3 3.1.1 Non-commercial
More informationStrata Energy. A Design-Build Success Story
Strata Energy A Design-Build Success Story Disclaimer This presentation is provided on the basis that the Company nor its representatives make any warranty (express or implied) as to the accuracy, reliability,
More informationQuickSpecs. Why use Platform LSF?
Overview 8 is a job management scheduler from Platform Computing Inc. Why use? A powerful workload manager for demanding, distributed and mission-critical computing environments. Includes a comprehensive
More informationHydrocarbon Management PROCEDURE
Hydrocarbon Management PROCEDURE Doc No: Approved: PRO-0380 Operations Manager Table of Contents 1. PURPOSE... 3 2. SCOPE... 3 3. REFERENCES... 3 3.1 LEGISLATION/STANDARDS... 3 4. DEFINITIONS... 3 5. HYDROCARBON
More informationBUILDING CANADA S LARGEST GOLD MINE Production Early Mining Ready Summit October 23, 2012
BUILDING CANADA S LARGEST GOLD MINE Production Early 2013 1 Mining Ready Summit October 23, 2012 Forward Looking Information This presentation contains certain forward-looking information as defined in
More informationVolunteer Health and Safety
March 2005 Information Sheet VP2 Despite the increasing importance of volunteering (22 million people volunteer each year), the legal obligations of organisations towards their volunteers with regard to
More informationBEST PRACTICE GUIDANCE THE SAFE OFF-LOADING OF REINFORCEMENT FABRIC.
BEST PRACTICE GUIDANCE THE SAFE OFF-LOADING OF REINFORCEMENT FABRIC www.uk-bar.org CONTENTS Introduction.... 3 Hazards.... 4 Accidents... 5 Working at Height... 6 Dunnage.... 7 Planning for a Safe Delivery....
More informationBONUS PAYMENT TERMS AND CONDITIONS
DEFINITIONS 1. Unless the contrary intention appears, in these terms and conditions the following words and phrases have the following meaning: 1.1 Account means the account provided by the Designated
More informationLICENSE MC B CHOICE TRANSPORT, LLC COLUMBUS, NE
U.S. Department of Transportation Federal Motor Carrier Safety Administration 400 7th Street SW Washington, DC 20590 SERVICE DATE February 08, 2007 LICENSE MC-587619-B CHOICE TRANSPORT, LLC COLUMBUS, NE
More informationV.2. REFERENCE: G:\Public\OCCUPATIONAL HEALTH & SAFETY\3. INDUCTION\General Site Induction REVIEW DATE: 5/6/2013
REFERENCE: G:\Public\OCCUPATIONAL HEALTH & SAFETY\3. INDUCTION\General Site Induction REVIEW DATE: 5/6/2013 V.2 WELCOME TO N.F. McDONNELL & SONS Before working on our site it is a requirement that all
More informationISOPA PRODUCT STEWARDSHIP PROGRAMMES. Walk the Talk. Truck Reception, Unloading and Departure. Version
ISOPA PRODUCT STEWARDSHIP PROGRAMMES Walk the Talk Truck Reception, Unloading and Departure 1 Site Responsibilities Truck Arrival Unloading of Chemicals Truck Departure Processing Maintenance Warehousing
More informationBP Energy Outlook 2018: Energy demand grows as fuel mix continues to diversify
20 February 2018 BP Energy Outlook 2018: Energy demand grows as fuel mix continues to diversify The 2018 edition of BP s Energy Outlook is published today and considers the forces shaping the global energy
More informationAuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway
AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway Toronto: April 5, 2012: AuRico Gold Inc. (TSX:AUQ) (NYSE:AUQ), ( AuRico, AuRico Gold or the Company ) is pleased to provide
More informationAVINO SILVER & GOLD MINES LTD.
April 13, AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com NYSE-MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES
More informationROCK CRUSHING PLANT APPLICATIONS ADVICE
ROCK CRUSHING PLANT APPLICATIONS ADVICE This guidance is intended to help applicants prepare applications and certifications with a reduced amount of effort, yielding clearer and more accurate applications.
More informationLockout/Tagout. Company Policy
Company Policy Lockout/Tagout is dedicated to the protection of its employees from occupational injuries and illnesses. is responsible for providing a safe working environment and the employees have and
More informationMATTERS RESERVED FOR THE BOARD
MATTERS RESERVED FOR THE BOARD Key: References to Board committees shall mean the Audit, Nomination & Corporate Governance and Remuneration committees. References to Audit, Nomination & Corporate Governance
More informationSte De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: Fax:
April 25, 2012 Ste. 3083 595 Burrard Street Vancouver, BC V7X 1L3 Tel: 604 566 9080 Fax: 604 566 9081 Ste. 560 999 De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: 514.289.1183 Fax: 514.289.1188 TSX Venture
More informationProtocol for Consultation with Trade Union Safety representatives.
Protocol for Consultation with Trade Union Safety representatives. Introduction The purpose of this protocol is to outline the arrangements within the School for consulting and cooperating with Trade Union
More informationTENDER AND EVALUATION PROCESS FOR CONTESTABLE AUGMENTATIONS
TENDER AND EVALUATION PROCESS FOR CONTESTABLE AUGMENTATIONS PREPARED BY: Transmission Services Department VERSION: 1 RELEASE DATE: 1 July 2010 Au1hol,an Enargy Marla! ap.rotr:w lkl A~N o,. 012 010 321
More informationEstimation of Open Cut Mining Recovery and Mining Dilution. Summary. Introduction. Estimation Techniques. AusIMM JORC Code Edition.
Estimation of Open Cut Mining Recovery and Mining Dilution By Kent Bannister, ARMIT, FAusIMM (CP), CEO Kent Bannister Pty Ltd, (KBPL) Summary Loss and dilution of Mineral Resource grade occurs during mining
More informationFIRST BAUXITE CORPORATION (FBX) FBX CORPORATE PRESENTATION
FIRST BAUXITE CORPORATION (FBX) FBX CORPORATE PRESENTATION JANUARY 2017 TSXV: FBX Disclaimer This document is intended to be strictly informational. The Company reserves the right, at its sole discretion,
More informationChinalco Mining Corporation International 中鋁礦業國際
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness
More informationSPOTLIGHT ON SPECIFIC AUDIT AREAS. charteredaccountantsanz.com
SPOTLIGHT ON SPECIFIC AUDIT AREAS charteredaccountantsanz.com ABOUT CHARTERED ACCOUNTANTS AUSTRALIA AND NEW ZEALAND Chartered Accountants Australia and New Zealand is a professional body comprised of over
More information1.3 The annulment or nullification of any provision in these General Terms and Conditions shall not affect the validity of the remaining provisions.
EU GLOBAL FORWARDING GENERAL TERMS & CONDITIONS Clause 1 General provisions 1.1 These Global Forwarding Services General Terms and Conditions ("General Terms and Conditions") shall apply to all offers
More informationLegacy Revenue Recognition
September 27, 2017 2017.2 Copyright 2005, 2017, Oracle and/or its affiliates. All rights reserved. This software and related documentation are provided under a license agreement containing restrictions
More informationIPWEA/WALGA Specification for the supply of recycled road base
IPWEA/WALGA Specification for the supply of recycled road base Version 1 May 2016 IPWEA/WALGA Specification for the supply of recycled road base FOREWORD These Specifications have been developed by the
More informationCOST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED TRANSMISSION SERVICES
COST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED PREPARED BY: Network Development VERSION: 2.0 RELEASE DATE: 30 May 2012 Version Release History Version Date By Changes 1.0 6 Oct 11 Transmission
More informationMANAGING MAINTENANCE OPERATIONS IN THE OFFSHORE INDUSTRY
WÄRTSILÄ SERVICES BUSINESS WHITE PAPER MANAGING MAINTENANCE OPERATIONS IN THE OFFSHORE INDUSTRY The global offshore industry operates under an umbrella of regulatory requirements that are focused on operational
More informationContainer Transport Operator Access Terms & Conditions
Updated 15 August 2017 Container Transport Operator Access Terms & Conditions Address: Telephone: 465-467 Somerville Road Brooklyn Vic 3012 +61 3 9314 5589 After Hours: 0417 261 544 Fax: 9314 1412 Email:
More informationThe customer s attention is drawn to the following provisions of these terms and conditions:
FEDEX EXPRESS SOUTH AFRICA (PTY) LTD Registration number 2013/082888/07 FSP Number 45088 TERMS OF CARRIAGE The customer s attention is drawn to the following provisions of these terms and conditions: Clause
More informationIR-release: Q3 and 9M 2017 Operational Overview. 23 October 2017
IR-release: and Operational Overview 23 October Disclaimer 2 The below applies to the presentation (the Presentation ) following this important notice, and you are therefore advised to read this important
More informationForklift-Free: Driving Safety and Profitability
Forklift-Free: Driving Safety and Profitability Safety is driving momentum for forklift-free environments. Although training and legislation are instrumental in managing some degree of risks associated
More informationRCR Investor Presentation. Managing Director & CEO: Dr Paul Dalgleish
RCR Investor Presentation ASX Conference: New York & London Managing Director & CEO: Dr Paul Dalgleish 27 February 2014 1 Agenda Company Overview Highlights Delivering Returns to Shareholders RCR Business
More informationAGM Presentation 10 NOVEMBER 2017
AGM Presentation 10 NOVEMBER 2017 Disclaimer The information in this presentation does not constitute personal investment advice. The presentation is not intended to be comprehensive or provide all information
More informationBMW ConnectedDrive Services Information
BMW ConnectedDrive Services Information 1. General information BMW Australia Limited (ABN 11 004 675 129) of 783 Springvale Road, Mulgrave VIC 3170 (hereafter referred to as BMW ) provides the customer
More informationAerospace Engineering Solutions
Aerospace Engineering Solutions AIRCRAFT DESIGN AND CERTIFICATION SPECIALISTS AIRCRAFT WEIGHING AND LOADING SYSTEM MANAGEMENT FLEET TECHNICAL MANAGEMENT SERVICES PROUDLY SUPPORTING THE ASIA PACIFIC AVIATION
More informationCASUAL EMPLOYEE TERMS & CONDITIONS OF EMPLOYMENT
CASUAL EMPLOYEE TERMS & CONDITIONS OF EMPLOYMENT Belljax Pty Ltd as Trustee for Jeden Trust T/A Midwest Labour Pool 1. The Terms and Conditions in this document form the basis for casual employment with
More informationSection 2 Proposal Description
Section 2 Proposal Description 2. PROPOSAL DESCRIPTION 2.1 Overview The Proposal comprises the construction, operation and closure of mining at the J5 and Bungalbin East iron ore deposits and associated
More informationIssue #1-6: Identifying the Unit of Account in Design, Development, and Production Contracts
March 1, 2017 Financial Reporting Center Revenue Recognition Working Draft: Aerospace and Defense Revenue Recognition Implementation Issue Issue #1-6: Identifying the Unit of Account in Design, Development,
More informationDECKING INSTALLATION GUIDE
DECKING INSTALLATION GUIDE WWW.LUNAWOOD.COM Decking Installation Guide Please check and read carefully legal disclaimer and written instructions after the picture guidelines. 1. 2. 3. 2 Copyright Lunawood
More informationMaterial Model Validation of a High Efficient Energy Absorbing Foam
5 th LS-DYNA Forum, Ulm 2006 Material Model Validation of a High Efficient Energy Absorbing Foam Authors: Gerhard Slik, Gavin Vogel and Virendra Chawda Dow Automotive Materials Engineering Centre Am Kronberger
More information