1.2 This Instruction outlines the procedures to be adopted by Subcontractors to RA when applying for a concession.

Size: px
Start display at page:

Download "1.2 This Instruction outlines the procedures to be adopted by Subcontractors to RA when applying for a concession."

Transcription

1 QAIS NO: SUBJECT: Q5B-010A CONCESSIONS 1 PURPOSE 1.1 Raytheon Aircraft (referred to as RA throughout this document), will not accept deliveries of products that do not conform to the requirements of the order, specification, drawing, etc., unless non-conformance has been authorised by an appropriate Concession/MRB Tag. 1.2 This Instruction outlines the procedures to be adopted by Subcontractors to RA when applying for a concession. 1.3 All Subcontractors holding Approval Category 18b, (MRB delegation) are subject to special requirements as annotated in paragraph 12 of this QAIS. 2 SCOPE 2.1 All non-conforming raw materials and/or manufactured goods (except propriety products) supplied or used in fulfilment of RA orders. 2.2 Requirements which are additional to or at variance with the basic procedure of this instruction are defined in the appendices of this instruction. 2.3 This instruction now defines the corrective action reporting procedure undertaken as part of the Concession application procedure. 3 REFERENCES Concession Application Form and Continuation Sheet (QSDC Nos and -2 respectively, see Appendices B1 and B2) pdf & pdf QAIS No.Q5B-010D Compilation, Approval and Amendment of a Material Review Board Plan for the Supply of Product to Raytheon Aircraft Company. Sect10d.pdf RAC Quality Assurance Instruction No Material Review Board Delegation Hawker Suppliers Concession Corrective Action Report (QSDC No. Q7B-557) Appendix C Q7B-557.pdf 4 DEFINITIONS 4.1 A Concession is defined as authority to accept a limited quantity of materials/parts already manufactured but which do not comply strictly with contract requirements (i.e., drawings, specifications, repair schemes or other design requirements). 4.2 A Concession can also request a deviation from the requirements of the contract/drwg/specification etc., before manufacturing is commenced. Such requests are strictly limited to the quantity/period quoted therein and any extension that may be required must be the subject of a further application. QSDC NO:Q5B-000 Section 10a Page 1 of 13

2 4.3 A Concession Corrective Action Report is a form completed and submitted by the Subcontractors quality authority as part of the Concession application identifying the root cause of the non-conformance and the corrective action taken to prevent recurrence. 5 APPLICATION PROCEDURE 5.1 Unless otherwise directed by the Quality Manager, Raytheon Aircraft Quality Support Company (known hereafter as RAQSC throughout this document), and an application for a concession shall be made by completing the following forms; ref RA Form QSDC Nos and -2, see APPENDICES B1/B These Concessions forms are available in electronic format using a Microsoft Word so were possible they can be created in this format. A template of the form is available on request via to scm_qa_uk@rac.ray.com 5.3 Each Concession Application shall be identified by the Subcontractors using their own Supplier Works Inspection Department (WID) Number. A register shall be maintained by the Subcontractor listing each concession raised and submitted, together with Raytheon Aircraft allocated Concession Serial Number of answered applications. The RAC Concession Serial Numbers of any previously answered concessions relevant to the item(s) in question, shall also be quoted where applicable. 5.4 A Continuation sheet (Form No ) can also form part of the Concession and can be used by either party to add additional details to the Front sheet. All Continuation Sheets used in the application for a Concession must refer to the Supplier WID Number. This Number must be clearly annotated on all Continuation Sheets used. Where sketches, rubbings, photographs are to be appended, the Applicant may scan the images and paste them on to the Continuation Sheets in order they can be transmitted. 5.5 Each Concession Application must relate to one drawing and part number only (handed parts excepted), although several items of the same drawing and part number may be included on the same form providing the discrepancies involved are of similar character (e.g., machining errors) and are separately identified against the specific items(s) involved. 5.6 Each Concession Application must be signed by the Subcontractor s approved Delegate this is normally the Subcontractor s Quality Manager or Chief Inspector. The approved Delegate will be identified by RAQSC once the individual has undergone the appropriate training (Refer to Basic Requirements Awareness Training Module X5 Non Conformance Management and Corrective Action ). 5.7 The Concession Application may be transmitted in its entirety to the RAQSC Design Manager (steve_boden@rac.ray.com). 5.8 Where a Subcontractor uses another RAQSC approved Subcontractor (subtier) to manufacture items, any concession applications from the second QSDC NO:Q5B-000 Section 10a Page 2 of 13

3 Subcontractor shall be referred to the primary Subcontractor s Quality Manager or his deputy, who is responsible for ensuring compliance with this instruction, before submission to RAQSC. 6 CONCESSION CORRECTIVE ACTION REPORTING AND CLOSE-OUT 6.1 Unless previously agreed to the contrary, the Subcontractor shall supply a Concession Corrective Action Report (Form QSDC No.Q7B- 557; see Appendix C) with every Concession application. This Report forms part of the Concession Application. 6.2 Each Concession Corrective Action Report shall be completed, in full, and approved by the Subcontractors quality authority as follows:- Box A1 Root Cause of Non Conformance For each non-conformance identified on the Concession application, enter the root cause of the discrepancy this must have been thoroughly investigated by the Subcontractor. Box A2 Owner Enter the name and title of the individual assigned the responsibility for implementing the corrective action. Box A3 Corrective Actions Enter details of the action taken to eliminate a recurrence of the discrepancy. Include details of any associated documentation e.g. Engineering Query Note, Tool Suspense Note numbers etc.. Box A4 EDC Enter the Estimated Date for Completion of the corrective action this is the time for the Corrective Action to be fully embodied. Box A5 Close Out Date Enter the date in which the corrective action has been successfully implemented and verified as effective. IMPORTANT NOTE: It is the responsibility of the Subcontractor to ensure that each Concession Corrective Action Report is fully closed out by verifying the corrective actions have been successfully implemented. The Concession Corrective Action Report must be reissued to RAQSC once the Report has been closed out. Failure to do so may result in any further Concession applications being denied or even the withdrawal of RA approval of the subcontractor. Box A6 Submitted by/title/date Each Concession Corrective Action Report must be signed by the Subcontractor s approved Delegate this is normally the Subcontractor s Quality Manager or Chief Inspector. The approved Delegate will be identified by RAQSC once the individual has undergone the appropriate training (Refer to Basic Requirements Awareness Training Module X5 Non Conformance Management and Corrective Action ). QSDC NO:Q5B-000 Section 10a Page 3 of 13

4 7 SEGREGATION OF NON-CONFORMING PARTS 7.1 All non-conforming items must be positively identified by a temporary method and retained in segregation until such time as the application is answered. 8 ACTION UPON RECEIPT OF ANSWERED CONCESSION 8.1 The Subcontractor s Quality Manager or his deputy is responsible for ensuring that any restorative or other actions required by the answered Concession Application Workbook are fully satisfied in all respects. 8.2 Where any required action is beyond the scope of the Subcontractor s approval qualification/capacity, the Subcontractor shall arrange through the relevant RA Materials Manager, for such action to be undertaken either at RA or another firm appropriately approved by RAQSC. 9 IDENTIFICATION OF NON-CONFORMING ITEMS 9.1 Non-conforming items shall be identified with the Raytheon Aircraft allocated Concession Serial number (NOT the Suppliers application number) adjacent to the Part Number using the marking method called for by the drawing. This identification shall be carried out for each individual part affected. 9.2 Where a Concession restricts an item to use for Test Purposes Only the item must be identified with: the Concession serial number a 1 wide red painted band, with the words For Test Only painted in white on the red band, unless the Concession specifies a test category and/or test number in which case the latter identification will apply. 9.3 Note: All Concession identification markings must be easily readable after final protective treatment. 10 INSPECTION HISTORY RECORDS 10.1 Where it is a RA requirement for the Subcontractor to provide these documents, the Raytheon Aircraft allocated Concession Serial Numbers are to be recorded in the appropriate section of the Inspection History Records. 11 RELEASE OF GOODS SUBJECT TO CONCESSIONS 11.1 All items subject to the Concession shall be despatched under cover of the appropriate type of release document which shall be clearly endorsed with the appropriate RA Concession Serial Number. IMPORTANT NOTE: RA will NOT accept deliveries subject to outstanding Concession Applications unless prior /written/fax permission has been given by the Quality Manager, RAQSC. In these cases, the Release Document must quote the authority / letter/fax reference and the goods clearly labelled to indicate the special QSDC NO:Q5B-000 Section 10a Page 4 of 13

5 condition, the outstanding Supplier WID Number, Raytheon Aircraft allocated Concession Serial Number (where available) and the Release Certificate number When an answered concession calls for the further work after delivery, the Supplier will clearly mark the affected parts/assemblies with a sticker or label stating Concession Work Outstanding (WO). This sticker/label will clearly state the Supplier WID Number and where applicable the Raytheon allocated Concession Serial Number(s) One hard (paper) copy of each applicable Concession shall be included with the applicable Release documentation. 12 CONCESSIONARY ACTIONS UNDERTAKEN BY MATERIAL REVIEW BOARD APPROVED ORGANISATIONS 12.1 Certain Primary Subcontractors have been approved to undertake the review and disposition of Concessionary or MRB action under the approvals granted to them by Raytheon Aircraft Quality and Engineering authorities (Re RAQSC Approval Category 18b ). The maintenance of this Approval is not only subject to the Approved Organisation providing acceptable means of compliance to meet the requirements of this QAIS, but also conforming to the requirements of the Raytheon Aircraft Company Quality Assurance Instruction No. QAI These requirements are addressed within the individual Subcontractor s specific Material Review Board Quality Plan (see QAIS Q5B- 010D) and are subject to annual on-site auditing by representatives of Raytheon Aircraft Quality and Engineering personnel Should any repair proposal have a potential impact which may cause comment / concern at a later build stage, a copy of the concession annotated suffix C will be forwarded to Mr Greg_Valcoure@rac.ray.com Quality Director Raytheon Aircraft Company, Wichita, And copy to bob_feazell@rac.ray.com a copy also being provided to neil_evans@rac.ray.com Quality Manager, Raytheon Aircraft Quality Support Company Ltd All Subcontractors approved to category 18b must forward completed Concession Applications to the Manager Engineering Liaison, Raytheon Aircraft Company, Wichita; electronic or hard copies of the original are to be retained by the delegate. 13 CANCELLATION OF, OR AMENDMENT TO, AUTHORISED CONCESSION In general, an answered Concession Application, authorised by allocation of a RA Concession Serial Number can only be cancelled or amended by submission of a further application which must make reference to the serial number of the original concession and clearly define the circumstances necessitating the cancellation. QSDC NO:Q5B-000 Section 10a Page 5 of 13

6 APPENDIX A Completing the Concession Application Workbook 1 APPLICATION FOR CONCESSION 1.1 Application may be submitted using electronic Form Number QSDC No and -2 via , see sections 5.2 and 5.7. If the supplier is not able to complete using this format a hard copy will be accepted. See Appendices B1/B2. 2 CANCELLATION/AMENDMENTS 2.1 Reference paragraph 13. Amendment or cancellations are made by resubmitting the original Concession for raise of issue. 3 IDENTIFICATION OF PARTS 3.1 In addition to the requirements of paragraph 9, where further work is to be carried out after delivery or in compliance with the RA Engineering (Design) Office recommendation, the Concession Serial Number will be suffixed WO. All parts must carry an appropriate sticker/label, bearing the concession number and suffix WO. The WO is not to be marked on the part. 4 COMPLETION OF FORM QSDC No Name of Subcontractor applying for concession. 2 Subcontractors Works Inspection Department Serial Number. 3 Raytheon aircraft type; e.g. Hawker 800XP or Hawker 800(U125a). 4 Aircraft Construction Number; e.g or assembly serial number if appropriate. If unknown write DETAIL 5 Purchase Order Number or Operation Number (Backshop). 6 Enter Cause Code as below:- 1. Design Errors 2. Tooling Errors 3. Handling 4. Operator Errors 5. Physical Properties 6. Engineering Methods 7. Breakdown of existing structures 8. Out-of-Stage Working NOTE: Cause Codes are used by the RA Quality and Engineering functions to determine individual trends and appropriateness of any applied corrective actions. It is most important that the Subcontractor carefully consider the Cause Code as part of the overall Root Cause analysis and associated corrective action as QSDC NO:Q5B-000 Section 10a Page 6 of 13

7 required by the Concession Corrective Action Report, appended to each Workbook. Cause Code 1 - Design Errors This code should only be applied once it has been fully determined that the associated Engineering/Design data is in some way discrepant and has led directly to the raising of the Concession Application. To annotate Cause Code 1, the applicant must identify in the Concession Corrective Action Report appended, the root cause as being an Engineering/Design error and the Engineering Query Note and / or Change Request application reference raised to address the anomaly. Cause Code 2 Tooling Errors This code should only be applied once it has been fully determined that the associated anomaly arose due to the use of the tooling provided. To annotate Cause Code 2, the applicant must identify in the Concession Corrective Action Report appended, the root cause as being a Tooling error and the Engineering Query Note and/or Tool Suspense Note reference raised to address the anomaly. Cause Code 3 Handling This code should only be applied once it has been fully determined that the associated anomaly arose due to incorrect or inappropriate handling of the component/assembly. Typically, this cause code will be apportioned to issues such as the item being accidentally dropped, scratched through poor protection, poor storage etc. To annotate Cause Code 3, the applicant must identify in the Concession Corrective Action Report appended, the root cause as being a Handling error and the Corrective Action must clearly define what has been done to prevent recurrence such as improved training, revised storage/routing procedures, better packaging etc.. Cause Code 4 Operator Errors This code should only be applied once it has been fully determined that the associated anomaly arose due to the Subcontractors operators incorrectly conducting some manufacturing operation. Typically, this cause code will be apportioned to irredeemable issues such as over-cutting, over-fettling etc.. To annotate Cause Code 4, the applicant must identify in the Concession Corrective Action Report appended, the root cause as being an Operator error and the Corrective Action must clearly define what has been done to prevent the Operator from causing this issue again. This action must be both positive and well considered; throw away statements such as Operator informed is not, in the majority of cases, considered to be adequate. In all cases informing the incumbent must be supplemented by additional training, Operator competence review etc. In all cases, evidence QSDC NO:Q5B-000 Section 10a Page 7 of 13

8 must exist that the Operator has understood and is now actively employing the training etc imparted to him/her. Cause Code 5 - Physical Properties This code should only be applied once it has been fully determined that the physical properties are in some way discrepant against the approved Engineering/Design data and has led directly to the raising of the Concession Application. To annotate Cause Code 5, the applicant must identify in the Concession Corrective Action Report appended, the root cause which has led to the failure to achieve the required physical properties. This typically may be such causes as bonded structures being under strength, over hardness following heat treatment etc.. Cause Code 6 - Engineering Methods This code should only be applied once it has been fully determined that in applying the prescribed Engineering Method, the resulting component was in some way discrepant against the approved Engineering/Design data. To annotate Cause Code 6, the applicant must identify in the Concession Corrective Action Report appended, the root cause which has led to the Engineering Methods failure to achieve the required product/parameter. This typically may be such causes as poorly written/described instruction planning instructions, incorrect methodology employed etc.. Cause Code 7 - Breakdown of existing structures This code should only be applied once it has been fully determined that in breaking down the existing structures, the resulting component was in some way discrepant against the approved Engineering/Design data. To annotate Cause Code 7, the applicant must identify in the Concession Corrective Action Report appended, the root cause which details why the structural break down caused the anomaly. This type of Concession may be unavoidable for some assembly types where breakdown can cause irrecoverable damage which must be concessioned e.g. when breaking down adhesively bonded structures. In all cases, the Subcontractor should examine why such structures need to be stripped in the first place and take corrective action accordingly.. Cause Code 8 - Out-of-Stage Working This code should only be applied once it has been fully determined that in conducting manufacturing operations outside of the normal scheduled production sequence, anomalies have arisen resulting in the component being in some way discrepant against the approved Engineering/Design data. To annotate Cause Code 8, the applicant must identify in the Concession Corrective Action Report appended, the root cause which details why the out- QSDC NO:Q5B-000 Section 10a Page 8 of 13

9 of stage working was necessary and why such out of sequence working should result in an anomaly. Note: Where the Supplier has used a subtier subcontractor who is responsible for a Concession, the Supplier will ensure: - the Concession Corrective Action Report and Root Cause analysis described above is flowed down to the responsible sub-contractor for them to provide the necessary investigation and CA statements. - the responsible subtier Subcontractor is identified in the Concession narrative (Field 20) 7 Identify if any further concessions have been raised on this particular component. 8 Originator s Name and clock/badge number 9 If above field is NO write N/A; if YES, detail the other RA Concession Serial Nos. and/or Suppliers WID Nos. that have been raised upon the affected component 10 Part Description/Title as per drawing. 11 Applicants department 12 Full part number and issue. 13 Date concession raised and approved. 14 Drawing number of affected Specification. Delete either Drg or Spec as applicable. 15 Originator s Telephone Number. 16 Serial or Batch Number of affected component. If more than one serialised component state See Sheet No. 2 and list continuation sheet Originator s address. 18 Quantity affected 19 Subcontractors approved Delegate Siganture normally the Quality Manager/Chief Inspector, as approved by RAQSC.. QSDC NO:Q5B-000 Section 10a Page 9 of 13

10 20 Clear and concise description of deviation from drawing of affected components. Sketches shall be used to illustrate area affected and provide dimensions. If required, separate Continuation Sheets shall be used. 21 Complete sheet numbering of all sheets etc. one sheet sheet 1 of 1, if two sheets sheet 1 of 2, sheet 2 of 2 etc. Fields A through J are for use by Raytheon Aircraft only and are to be left BLANK by the Applicant. A. Concession Serial Number allocated by Raytheon Aircraft and will be used to reference the Concession and identify the concession on all parts affected. B. Raytheon Aircraft Engineering department s determination and where applicable, the remedial action to be taken. Additional information may be added on the Continuation Sheets. C. Concession Category Category A is a Major Concession and will necessitate the raising of a modification to the Type Certificate data to accommodate the remedial part e.g. specifically designed and machined rib assigned to that particular Aircraft Manufacturers Serial Number. Category B are Minor Concessions which are determined to have no affect to the reliability, fit, form and/or function of the aircraft and as such do not necessitate the raising of a modification. Minor Concessions can be answered locally under the MRB Authority granted by Raytheon Aircraft to appropriately approved MRB delegates such as RAQSC Chester. D. Signature of RAC Engineer undertaking the review of the described anomaly and preparing the remedial action, if appropriate. E. Contact Telephone for above. F. Determination if the components Interchangeability (ICY)/functionality is affected typically, if ICY/functionality IS affected, the resultant Concession by definition would probably have to be classified as Major. G. Signature of appropriately RAC approved Design Engineer (approved to undertake MRB dispositions on behalf of RAC) H. Signature of appropriately RAC approved Design Specialist (approved to undertake MRB dispositions on behalf of RAC) J. Signature of RAC approved Quality Manager (approved to undertake MRB dispositions on behalf of RAC). If not approved Not Approved shall be written in this box before signing. QSDC NO:Q5B-000 Section 10a Page 10 of 13

11 APPENDIX B1 Front Sheet (Form No ) Concession Serial No. A Page 1 of 21 CONCESSION From 1 Supplier WID No. 2 APPLICATION IS HERBY MADE FOR A CONCESSION AS DETAILED BELOW Aircraft Type 3 Construction Number 4 Purchase Order No. or Operation No. 5 Cause 6 Any other Concessions raised on this Component: Yes / No 7 Originators 8 Name & No: Concession No.(s) 9 Part Description 10 Department 11 Part No / Issue 12 Date raised 13 Drawing or Specification 14 Originators Tel No. 15 No. Serial No./ Batch No. 16 Originators 17 Quantity Affected 18 Signature of Sub-Con 19 DESCRIPTION AND/OR SKETCH OF NON-CONFORMITY 20 Chief Inspector: DECISION AND/OR REMEDY CONCESSION CATEGORY A / B C B Important: Mark item with concession number adjacent to part number Prepared By D Tel E Functionality or ICY Affected/Not Affected F Design Approval Date G Form No Issued: 08/95 Revised 8/05 Specialist Approval Date H RAC Quality Manager approval Date J APPENDIX B2 Continuation Sheet (Form No ) QSDC NO:Q5B-000 Section 10a Page 11 of 13

12 CONCESSION CONTINUATION SHEET Concession Serial No. A Page 21 of 21 K Form No Issued: 08/95 Revised 8/05 QSDC NO:Q5B-000 Section 10a Page 12 of 13

13 APPENDIX C Concession Corrective Action Report (Form No. Q7B-557) Concession Serial No. Concession Corrective Action Report Root Cause of Non-Conformance A1 Owner Corrective Actions EDC Close out A2 A3 A4 A5 Form No. Q7B-557 Issue 3 Submitted by Title Date A6 QSDC NO:Q5B-000 Section 10a Page 13 of 13

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

Quality Assurance Manual

Quality Assurance Manual Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

FAA Conformity Inspection Checklist Form N/C 10JAN16

FAA Conformity Inspection Checklist Form N/C 10JAN16 Purpose The purpose of this checklist is to provide a system to assist with the FAA design and installation conformity inspection process. This form is primarily intended to serve applicants for FAA design

More information

Supplier Quality Assurance Requirements

Supplier Quality Assurance Requirements 1 Scope No. 1.1 This document details the requirements to be satisfied by suppliers to Tekdata Interconnections Ltd (TIL). TIL requires each supplier and their sub-tier suppliers to comply with the quality

More information

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition CEN Keymark Scheme Rules for Thermostatic Radiator Valves 2 nd Edition Content Foreword... 3 Introduction... 3 1 Scope... 4 2 References... 4 3 Terms and Definitions... 4 4 Application... 5 4.1 Product

More information

CHECKLIST FOR PART 145 APPROVAL

CHECKLIST FOR PART 145 APPROVAL Section/division AIRWORTHINESS: AIRCRAFT MAINTENANCE ORGANISATION Form Number: CA 145-03 CHECKLIST FOR PART 145 APPROVAL AMO Number Name of organization Physical address Postal address Postal code Telephone

More information

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

EN39 TUBE ASSESSMENT REPORT. Assessment Summary EN39 TUBE ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With: Assessment

More information

Appendix B Maintenance Control Manual Template

Appendix B Maintenance Control Manual Template Appendix B Maintenance Control Manual Template MAINTENANCE CONTROL MANUAL TELATE OTAR PART 39 SUBPART E OPTION ONE AND TWO The purpose of this Maintenance Control Manual (MCM) Guidance Document is to assist

More information

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document

More information

European Aviation Safety Agency Foreign Part 145 approvals User Guide for Maintenance Organisation Exposition

European Aviation Safety Agency Foreign Part 145 approvals User Guide for Maintenance Organisation Exposition for Maintenance Organisation Exposition - for Maintenance Organisation Exposition Name Validation Date Prepared by: Marc GRAGNOLI Validated 21/10/2015 Verified by: Karl SPECHT Validated 22/10/2015 Reviewed

More information

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT TF N 548 Rev1 2012-03-29 CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT How to draft clauses on Assessment and Verification of the Constancy of Performance (AVCP) in harmonized standards for construction

More information

NEWCASTLE CLINICAL TRIALS UNIT STANDARD OPERATING PROCEDURES

NEWCASTLE CLINICAL TRIALS UNIT STANDARD OPERATING PROCEDURES NEWCASTLE CLINICAL TRIALS UNIT STANDARD OPERATING PROCEDURES SOP details SOP title: Trial Master File & Investigator Site File SOP number: TM 001 SOP category: Trial Management Version number: 03 Version

More information

Maintenance/Repair Organisation Exposition

Maintenance/Repair Organisation Exposition Weston Aerospace CE12 Issue 3 Maintenance/Repair Organisation Exposition Approved by: Peter Rush, Quality Director Date: 14 June 2016 This document is maintained on digital media. The current issue is

More information

Critical 0 Major 0 Minor 0. Certification Body name and address

Critical 0 Major 0 Minor 0. Certification Body name and address Audit Report Global Standard for Agents and Brokers Issue 1: January 2014 1.Audit Summary Company name BRC Site Code BRC Site code 2.Scope Operation Services Scope of audit Product categories Select Operation

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

SUPPLIER DISPOSITION REQUEST

SUPPLIER DISPOSITION REQUEST Contractor CAGE Code: 4V360 3550 General Atomics Ct San Diego, CA 92121-1122 SUPPLIER DISPOSITION REQUEST DR NO.: REV.: PAGE: of (3) PART NOMENCLATURE: (4) DWG/PART NO.: (5) REV.: (6) LOCATION: (7) DATE:

More information

Rules governing the use of the AB mark

Rules governing the use of the AB mark Ministry of Agriculture and Fisheries Rules governing the use of the AB mark ARTICLE 1 - PURPOSE The AB mark may be used for the certification of products and/or for informational purposes. The AB mark,

More information

Aircraft Manufacturing Organisations Certification

Aircraft Manufacturing Organisations Certification Civil Aviation Rules Part 148, Amendment 4 Docket 8/CAR/1 Contents Rule objective... 3 Extent of consultation... 3 Summary of submissions... 3 Examination of submissions... 4 Insertion of Amendments...

More information

QUALITY MANUAL. January PO Box 14659, Zayed Bin Sultan Street, Al Ain, U.A.E.., Tel: , Fax

QUALITY MANUAL. January PO Box 14659, Zayed Bin Sultan Street, Al Ain, U.A.E.., Tel: , Fax January 2009 PO Box 14659, Zayed Bin Sultan Street, Al Ain, U.A.E.., Tel: 03-7640177, Fax 03-7640188 Fittons Engineering Consultancy L.L.C Page 1 INDEX Contents QP0 QP1 QP2 QP3 QP4 QP5 QP6 QP7 QP8 QP9

More information

ISTA Accreditation Standard for Seed Testing and Seed Sampling

ISTA Accreditation Standard for Seed Testing and Seed Sampling INTERNATIONAL SEED TESTING ASSOCIATION (ISTA) Secretariat, Zürichstrasse 50, 8303 Bassersdorf, CH-Switzerland Phone: +41-44-838 60 00, Fax: +41-44-838 60 01, Email: ista.office@ista.ch, http://www.seedtest.org

More information

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100) Effective Date: 04/07/2014 AJR1: Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100) During the performance of this Contract/Purchase Order (C/PO), the seller

More information

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ Quality Manual Quality Manual Issue I Dated 8 th October 2012 Contents Page Section 1 - Introduction 2 Section 2 - Company Details 2 Section

More information

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. REF ONLY-DATA MANAGEMENT: 1 ST (2) PAGES IS NOT PART OF FORM 1135. QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. FORM 1135 QUALITY ASSURANCE CLAUSES

More information

NATO MUTUAL GOVERNMENT QUALITY ASSURANCE (GQA) PROCESS

NATO MUTUAL GOVERNMENT QUALITY ASSURANCE (GQA) PROCESS AQAP 2070 NATO MUTUAL GOVERNMENT QUALITY ASSURANCE (GQA) PROCESS AQAP 2070 (January 2004) I ORIGINAL Page blank II ORIGINAL AQAP 2070 NORTH ATLANTIC TREATY ORGANIZATION NATO STANDARDISATION AGENCY (NSA)

More information

Quality Management System. Manual MASTER COPY

Quality Management System. Manual MASTER COPY Quality Management System Manual MASTER COPY Revisions: Date Summary Rev. July 2010 14 Oct 2010 28 Jan 2011 9 Feb 2011 9 June 2011 6 March 2012 11 July 2013 13 July 2017 Initial Draft Issued Minor changes

More information

Quality and Environmental Business Process Manual

Quality and Environmental Business Process Manual PMC SOIL SOLUTIONS 2 Fountain Court Victoria Square St Albans Hertfordshire AL1 3TF T: 01727 822500 F: 01727 821600 E: headoffice@pmcsoilsolutions.com W: www.pmcsoilsolutions.com Quality and Environmental

More information

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept ALTA Quality Requirements for Suppliers 25 Sept 2017 1 2 3.2. Purchase order information a- When Alta customer is indicated on the purchase order or related engineering documents, customer quality requirements

More information

Licensee Design Authority Capability

Licensee Design Authority Capability Title of document ONR GUIDE Licensee Design Authority Capability Document Type: Unique Document ID and Revision No: Nuclear Safety Technical Assessment Guide NS-TAST-GD-079 Revision 3 Date Issued: April

More information

OPAC EN Operating Procedure for the Attestation of Conformity of Structural Bearings in compliance with Annex ZA of EN 1337/3/4/5/6/7

OPAC EN Operating Procedure for the Attestation of Conformity of Structural Bearings in compliance with Annex ZA of EN 1337/3/4/5/6/7 OPAC EN1337-00 Operating Procedure for the Attestation of Conformity to EN1337 Revision 00 Approved by BT3 on 20050525, by Board of directors on 20050610 Operating Procedure for the Attestation of Conformity

More information

Quality Assurance Policy and Procedures

Quality Assurance Policy and Procedures 650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance

More information

Reporting High Risk Defects

Reporting High Risk Defects Railway Industry Standard RIS-8250-RST Issue One Date December 2016 Reporting High Risk Defects Synopsis This document defines requirements for recording, analysing and reporting safety-related defects

More information

Air Monitoring Directive Chapter 5: Quality System

Air Monitoring Directive Chapter 5: Quality System Air Monitoring Directive Chapter 5: Quality System Version Dec 16, 2016 Amends the original Air Monitoring Directive published June, 1989 Title: Air Monitoring Directive Chapter 5: Quality System Number:

More information

JAA Administrative & Guidance Material Section Two: Maintenance Part Three: Temporary Guidance Leaflets

JAA Administrative & Guidance Material Section Two: Maintenance Part Three: Temporary Guidance Leaflets LEAFLET No.15: JAR-OPS 1&3 SUBPART M CONTRACTED MAINTENANCE TO A JAR-145 APPROVED MAINTENANCE ORGANISATION 1. Note. The material contained in the leaflet has been issued in accordance with Chapter 11 of

More information

Foreword. BABT 340 The Production Quality Certification Scheme for Manufacturers

Foreword. BABT 340 The Production Quality Certification Scheme for Manufacturers BABT 791 A Guide to the TUV SUD BABT Implementation of Module D (Production Quality Assurance) and Module E (Product Quality Assurance) of the Marine Equipment Directive A Certification Body of TÜV SÜD

More information

CSA Group Products, Processes and Services Scheme

CSA Group Products, Processes and Services Scheme 1. CONTACT CSA CSA Group Products, Processes and Services Scheme 1.1 Getting started is easy. There are three ways to contact us: Call 866 797 4272 Email client.services@csagroup.org Complete a request

More information

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES C.A.S.E. 3-A STANDARD DISTRIBUTORS OF NEW AND SURPLUS PARTS QUALITY PROGRAM REQUIREMENTS Section Subject Page 1. Policy.... 2 2. Quality System and Quality Manual.... 3 3. Quality Organization..... 3 4.

More information

UNIVERSITY OF SUNDERLAND STANDING ORDERS TENDERING AND CONTRACT PROCEDURES

UNIVERSITY OF SUNDERLAND STANDING ORDERS TENDERING AND CONTRACT PROCEDURES UNIVERSITY OF SUNDERLAND STANDING ORDERS TENDERING AND CONTRACT PROCEDURES Finance and Development Committee Revised February 2010 UNIVERSITY OF SUNDERLAND STANDING ORDERS ON TENDERING AND CONTRACT PROCEDURES

More information

QUALITY AGREEMENT. 1. ISKRA MEHANIZMI, d.o.o., Lipnica 8, 4245 Kropa, Slovenia, represented by its Managing Director Dr.

QUALITY AGREEMENT. 1. ISKRA MEHANIZMI, d.o.o., Lipnica 8, 4245 Kropa, Slovenia, represented by its Managing Director Dr. QUALITY AGREEMENT concluded between 1. ISKRA MEHANIZMI, d.o.o., Lipnica 8, 4245 Kropa, Slovenia, represented by its Managing Director Dr. Marjan Pogačnik (hereinafter referred to as: Customer) and 2. xxx

More information

Supplier Quality Assurance Requirements

Supplier Quality Assurance Requirements Supplier Quality Assurance Requirements Supplier Quality Assurance Requirements ARQM 005.3 Issue Date: 17/12/2013 1 1 Table of Contents 1. Table of Contents...2 2. Purpose.3 3. General Requirements 3 4.

More information

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS 1. Introduction 1.1 Scheme for type approval of products of Indian Register of Shipping (IRS) is an impartial certification system based on a design review

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

Health and Safety Management Standards

Health and Safety Management Standards Management Standards Curtin University Sept 2011 PAGE LEFT INTENTIONALLY BLANK Management Standards Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Documents... 4 2. Management System Model...

More information

Internal Audit Report

Internal Audit Report Internal Audit Report Key Financial Controls Accounts Payable and Accounts Receivable December 2017 To: Deputy Chief Executive Director of Finance Head of Finance Finance Manager Copied to: Operations

More information

Invitation to Tender. Development Legal Services. August 2015

Invitation to Tender. Development Legal Services. August 2015 Development Legal Services August Contents 1. Important notices... 3 1.1. Confidentiality... 3 1.2. Accuracy of information and liability of SLH... 3 1.3. Canvassing... 4 1.4. Non-collusion... 5 1.5. Copyright...

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Quality Manual ISO 9001:2000

Quality Manual ISO 9001:2000 Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10

More information

Plastics and Concepts of Connecticut Inc. Quality Manual

Plastics and Concepts of Connecticut Inc. Quality Manual Plastics and Concepts of Connecticut Inc. Quality Manual Nature of Changes For This Issue: 1. Initial Release 8/14/2000 2. Reformatted and grammatical errors corrected 6/11/02 3. Minor grammatical errors

More information

UFI s Auditing Rules January 2017

UFI s Auditing Rules January 2017 UFI s Auditing Rules January 2017 For the Statistics of UFI Approved Events and UFI Approved International Events 1. Introduction...1 2. Terminology...1 3. Basic principles...3 4. The Audit...4 5. The

More information

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary BS2482 TIMBER BOARDS ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With:

More information

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items REVISION RECORD The latest issue to this document is the version that is available on the Lockheed Martin

More information

THE COMPLETE GUIDE TO ISO14001

THE COMPLETE GUIDE TO ISO14001 THE COMPLETE GUIDE TO ISO14001 1. Introduction... 3 Plan Do Check Act... 5 2. Requirements... 7 Environmental Policy... 7 Environmental Aspects... 7 Legal and Other Requirements... 8 Objectives & Targets...

More information

Procurement Procedure. (Standard Operating Procedure)

Procurement Procedure. (Standard Operating Procedure) Procedure (Standard Operating Procedure) Procedure Policy : Executive Summary: Policy The Procedure provides guidance on the appropriate procurement process to all Trust Staff and Budget Holders involved

More information

Humantech Environmental Management System Manual

Humantech Environmental Management System Manual Humantech Management System Version 1.0 March 2014 Humantech, Inc. Humantech Management System Revision No.: 1 Date : 03-10-14 Prepared by: Approved by: (EMR) President Revision History Revision Date Description

More information

4-OF AS9102 FAIR Forms and Instructions (SC)

4-OF AS9102 FAIR Forms and Instructions (SC) A FAIR package consists of the following required documents: a) Completed AS9102 Forms 1, 2, and 3; or equivalent, b) Material/process certs, c) Performance test results, and d) A design record or balloon

More information

SHELTON INDUSTRIAL PATTERN INC.

SHELTON INDUSTRIAL PATTERN INC. Defintions: Seller : Supplier of materials, parts and or services that support production Supplies : materials, parts that support production FOD : Foreign Object Debri / Damage 1. Quality Management System

More information

QUALITY OPERATIONS STANDARD

QUALITY OPERATIONS STANDARD QUALITY OPERATIONS STANDARD TITLE: GUIDELINES FOR SUPPLIER PREPARATION AND PROCESSING OF SUPPLIER MATERIAL REVIEW REPORT (SMRR/WT) Standard Number: QOS 0035 Revision Letter: L Effective Date: July 31,

More information

SA 210 (REVISED) AGREEING THE TERMS OF AUDIT ENGAGEMENTS (EFFECTIVE FOR ALL AUDITS RELATING TO ACCOUNTING PERIODS BEGINNING ON OR AFTER APRIL 1, 2010)

SA 210 (REVISED) AGREEING THE TERMS OF AUDIT ENGAGEMENTS (EFFECTIVE FOR ALL AUDITS RELATING TO ACCOUNTING PERIODS BEGINNING ON OR AFTER APRIL 1, 2010) Part I : Engagement and Quality Control Standards I.53 SA 210 (REVISED) AGREEING THE TERMS OF AUDIT ENGAGEMENTS (EFFECTIVE FOR ALL AUDITS RELATING TO ACCOUNTING PERIODS BEGINNING ON OR AFTER APRIL 1, 2010)

More information

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1. PROBUILD SUBCONTRACTOR QUALITY MANAGEMENT GUIDE Section Two Project Specific Quality Management Plans Version No 1. PREFACE This document has been developed to assist subcontractors to meet Probuild s

More information

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production

More information

POLICY ON MANAGING POLICIES, PROCEDURES AND GUIDANCE DOCUMENTS

POLICY ON MANAGING POLICIES, PROCEDURES AND GUIDANCE DOCUMENTS POLICY ON MANAGING POLICIES, PROCEDURES AND GUIDANCE DOCUMENTS Version: 6 Date Ratified: February 2017 Review Date: February 2020 Applies to: Senior Managers and staff who produce procedural documents.

More information

Addendum No. 1 to the CSTBat Certification Reference System: Connection hoses

Addendum No. 1 to the CSTBat Certification Reference System: Connection hoses CERTIFICATION Addendum No. 1 to the CSTBat Certification Reference System: Connection hoses Identification No.: QB 10 Addendum No. 1, approved by the CSTB Technical Management on: 02/08/2016 Application

More information

Approved Supplier Guidance

Approved Supplier Guidance Approved Supplier Guidance Administrative Office: 2420 W. R. Larson Rd. San Antonio, Texas 78261 (210) 384-3484 FAX (830) 438-2309 D&D Machinery and Sales Inc. Approval by: Original copy retained in D&D

More information

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 RUSSTECH PURCHASE ORDER CLAUSES RPOC 1000 EARLY DELIVERY OK "Time is of the essence for performance under this Purchase Order. Seller

More information

Vehicle Certification Fee Review Consultation Document

Vehicle Certification Fee Review Consultation Document Vehicle Certification Fee Review Consultation Document December 2013 Prepared by The Access and Use Group Page 1 of 13 Contents 1. INTRODUCTION AND OVERVIEW...3 2. PRINCIPLES AND APPROACH...4 3. CURRENT

More information

IECEE OPERATIONAL DOCUMENT

IECEE OPERATIONAL DOCUMENT IECEE OD-G-4001 Edition 1.3 2013-06-20 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Guidance for Factory Inspectors

More information

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017 Exterior Alterations and New Office/ Warehouse for All Weather Shelters Northwest Business Park, Building 5, Bay 3 13459-149 Street Edmonton, AB Issued for Tender: Site Visit: Available upon request. Closing

More information

Quality Management System

Quality Management System Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material

More information

CARRIAGE OF DANGEROUS GOODS BY AIR

CARRIAGE OF DANGEROUS GOODS BY AIR IRELAND SAFETY REGULATION DIVISION IRISH AVIATION AUTHORITY The Times Building 11-12 D Olier Street Dublin 2 Tel +353 1 6718655 Fax +353 1 6774068 AFTN EIDWYOYX CARRIAGE OF DANGEROUS GOODS BY AIR AERONAUTICAL

More information

Design-Builder Peformance Evaluation (DBPE)

Design-Builder Peformance Evaluation (DBPE) Design-Builder Peformance Evaluation (DBPE) There are five (5) major components of the DBPE document. Each component has multiple categories to facilitate performance evaluation for the Design-Builder,

More information

An advisory circular may also include technical information that is relevant to the standards or requirements.

An advisory circular may also include technical information that is relevant to the standards or requirements. Advisory Circular AC21-8 Appendix A Revision 0 Project Specific Certification Plan Template General Civil Aviation Authority advisory circulars contain guidance and information about standards, practices,

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity

More information

1. PURPOSE 2. GENERAL INFORMATION. 2.1 Contact the Airworthiness Inspectorate First

1. PURPOSE 2. GENERAL INFORMATION. 2.1 Contact the Airworthiness Inspectorate First Section/division: AIRWORTHINESS Form Number: CA-AMO-P1 Telephone number: 011-545-1000 Fax Number: 011-545-1013/1461 Physical address: Ikhaya Lokundiza, 16 Treur Close, Waterfall Park, Bekker Street, Midrand,

More information

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined

More information

Quality Assurance Agreement for MonLog GmbH suppliers Gewerbepark Aunkrichen Aunkirchen / Vilshofen

Quality Assurance Agreement for MonLog GmbH suppliers Gewerbepark Aunkrichen Aunkirchen / Vilshofen Page 1 of the Quality Assurance Agreement between MonLog GmbH and Suppliers Quality Assurance Agreement for MonLog GmbH suppliers Gewerbepark Aunkrichen 4 94474 Aunkirchen / Vilshofen The following Quality

More information

Work Instruction PUI Supplier Request for Nonconforming Material (Rev 2)

Work Instruction PUI Supplier Request for Nonconforming Material (Rev 2) 1.0 Purpose To provide Insitu suppliers a method to request Insitu s authority to supply/ship nonconforming material (NCM). This document defines how the Supplier Nonconforming Material Request (NCMR)

More information

6. Procedures for Maintenance of Inventory Records by School/Centre Responsible Officer 5

6. Procedures for Maintenance of Inventory Records by School/Centre Responsible Officer 5 August 2016 Management Circular No. 54 Glasgow City Council City Chambers 40 John Street Merchant City GLASGOW G1 1JL To Heads of all Schools* Dear Colleague Inventory Procedures 1. Introduction 2 1.1

More information

Page 1 / 11. Version 0 June 2014

Page 1 / 11. Version 0 June 2014 Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning

More information

FAA REPAIR STATION NO.: OGYR627Y

FAA REPAIR STATION NO.: OGYR627Y EASA Supplement To The OTTO Quality/Repair Station Manual OTTO 2 East Main Street Carpentersville, IL 60110 FAA REPAIR STATION NO.: OGYR627Y This supplement does not form part of the FAA FAR-145 Repair

More information

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015 for Inspecting and Certifying Buildings and Works Building Control Regulations 1997 to 2015 September, 2016 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1

More information

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers A. PURPOSE To define the Orbel quality assurance provisions for inventory materials received from strategic suppliers. This document is intended for use by Orbel strategic suppliers to aid in the quality

More information

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock 1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles

More information

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM 1 QA.101 rev. 3-2012 PURPOSE OF THIS STANDARD Fairfield is committed to continuous product quality improvement. Our management team is convinced that only with

More information

QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE MANUAL QUALITY ASSURANCE MANUAL REVISION 1.0 JANUARY 12, 2014 DYESS AVIATION, INC. 2000 W. BEND DR. GEORGETOWN, TX 78626 Dyess Aviation, Inc. Quality Assurance Manual Policy & Procedures Quality Management Introduction:

More information

INS Records Requirements (including Lifetime Records)

INS Records Requirements (including Lifetime Records) Specification ssue: 1 Date: 20/3/17 NS Records Requirements (including Lifetime Records) UNCONTROLLED WHEN PRNTED Author: J Cooch AUTHORSATON Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual Document No. F-PM010 Rev 3 Owner Supplier Quality Page 1 OF 11 TABLE OF CONTENTS 1.0 Purpose 3 2.0 Scope... 3 3.0 Quality System Requirements... 3 4.0 Approved Supplier List (ASL).

More information

Supplier Quality Agreement

Supplier Quality Agreement Supplier Quality Agreement Clyde, OH Poplar Bluff, MO Brampton, Ontario Jeffersonville, IN Page 1 of 15 TABLE OF CONTENTS Table of Contents 1. Administrative Elements... 4 1.1. Scope... 4 1.2. Parties

More information

Supplier Quality Manual

Supplier Quality Manual ALLIANCE ELECTRONICS DISTRIBUTOR Supplier Quality Manual 22412 Gilberto Rd. Rancho Santa Margarita, CA 92688 INTRODUCTION Welcome to Alliance Electronics Distributor (AED) Alliance Electronics Distributor

More information

General Guidance for Developing, Documenting, Implementing, Maintaining, and Auditing an SQF Quality System. Quality Code. SQF Quality Code, Edition 8

General Guidance for Developing, Documenting, Implementing, Maintaining, and Auditing an SQF Quality System. Quality Code. SQF Quality Code, Edition 8 General Guidance for Developing, Documenting, Implementing, Maintaining, and Auditing an SQF Quality System Quality Code SQF Quality Code, Edition 8 October 2017 2014 Safe Quality Food Institute 2345 Crystal

More information

Guide to Quality System for General Sale Wholesale Distributors

Guide to Quality System for General Sale Wholesale Distributors Guide to Quality System for General Sale Wholesale Distributors IA-G0038-5 20 DECEMBER 2017 This guide does not purport to be an interpretation of law and/or regulations and is for guidance purposes only.

More information

NON-CONFORMING MATERIAL

NON-CONFORMING MATERIAL NON-CONFORMING MATERIAL AND NONCONFORMING MATERIAL REPORTS 1.0 SCOPE This document describes the procedure used in determining the disposition of nonconforming items associated with MIT/CSR parts, materials,

More information

ASSET CREATION DEVELOPER PROCESS INSTRUCTIONS TO DESIGNERS - MAJOR WORKS

ASSET CREATION DEVELOPER PROCESS INSTRUCTIONS TO DESIGNERS - MAJOR WORKS ASSET CREATION DEVELOPER PROCESS INSTRUCTIONS TO DESIGNERS - MAJOR WORKS INSTRUCTIONS TO DESIGNERS CONTENTS 1. INTRODUCTION 3 2. ROLE OF THE WATER SERVICING COORDINATOR 3 3. ROLE OF THE DESIGNER 3 4. DESIGN

More information

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy. Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page

More information

Materials and Qualification Procedures for Ships

Materials and Qualification Procedures for Ships Materials and Qualification Procedures for Ships Approval of a Works for the Manufacture of Steel Forgings for Semi- Built and Continuous Grain Flow Crankshafts Revision 3, January 2015 Page 1 of 14 Lloyd

More information

ITER Quality Assurance

ITER Quality Assurance US ITER Central Solenoid Vendor Meeting ITER Quality Assurance by John Mashburn USIPO QA Manager 1 QA Topics ITER s Nuclear License Graded Approach Proposal QA Items Quality Plan Specific to Contract Manufacturing

More information

CUSTOMER AND SUPPLIER ROLES AND RESPONSIBILITIES FOR 21 CFR 11 COMPLIANCE ASSESSMENT. 21 CFR Part 11 FAQ. (Frequently Asked Questions)

CUSTOMER AND SUPPLIER ROLES AND RESPONSIBILITIES FOR 21 CFR 11 COMPLIANCE ASSESSMENT. 21 CFR Part 11 FAQ. (Frequently Asked Questions) 21 CFR Part 11 FAQ (Frequently Asked Questions) Customer and Supplier Roles and Responsibilities for Assessment of METTLER TOLEDO STARe Software Version 16.00, including: - 21 CFR 11 Compliance software

More information

IM Scope of Work for Contracts

IM Scope of Work for Contracts IM Scope of Work for Contracts Information Management Version 3.0 Released 6 th June 2014 Document Owner Document Author Knowledge Manager Information Analysis Manager Review Date 6 th June 2016 Document

More information