PLEASE COMPLETE IN BLOCK LETTERS

Size: px
Start display at page:

Download "PLEASE COMPLETE IN BLOCK LETTERS"

Transcription

1 Summary of Service s Summary Shunyi District, Beijing Postal Code: Mar 2014 Compulsory s Service Please tick where required Summary Summary of Service s Compulsory 1 Machinery Layout and Stand Construction Compulsory 1A Shell Scheme Package YES NO 1B Special Design Stand Construction for Single Storey Stand YES NO 1C Special Design Stand Construction for Double Storey Stand YES NO 2 Free Electricity for Lighting and Power Compulsory 2A Additional Electricity for Lighting and Power YES NO 2B Light Fittings and Accessories YES NO 2C Electrical Fittings and Accessories YES NO 2D Electrical Work YES NO 3 Free Water and Drainage Compulsory 3A Additional Water and Drainage YES NO 4 Compressed Air YES NO 5 Hanging / Rigging Points YES NO 6 Stand Security Service YES NO 7 Meeting Rooms YES NO 8 Badge Reader Rental YES NO 9 Telephone, Fax and Internet Access YES NO 10 Exhibitor Badges, Installer Passes and Service Passes Compulsory 11 Overtime Request YES NO 12 Furniture and Floral Decorations YES NO 13 Carpeting YES NO 14 Temporary Personnel YES NO 15 Declaration of Risks Compulsory 16 Removal of Demonstration Waste Materials YES NO 17 Move In Move Out Schedule(Exhibit Only) YES NO 18 Equipment for Set up /Dismantling Period YES NO 19 Additional Equipment for Set Up/Dismantling Period (Stand Building Materials) YES NO 20 Demonstration Consumables Delivery Schedule YES NO 21 Storerooms YES NO 22 Car Parking YES NO 23 Exhibitor Invitation Letter for Visa Application YES NO 1

2 Summary of Service s Summary Mail form to: ITMA ASIA + CITME 2014 Operations Centre Shunyi District, Beijing Postal Code: Mar 2014 Tel: Fax: Compulsory s Service Please tick where required 24 General Regulations for Advertising YES NO 24A Advertising in Exhibition Catalogue YES NO 24B Onsite Marketing Opportunities YES NO 25 Insurance YES NO 26 Intellectual Property Rights Protection Declaration Compulsory 27 Letter of Undertaking Dismantling Compulsory 28 Letter of Responsibility for Safety Construction Compulsory 29 Catering Services YES NO 2

3 Machinery Layout and Stand Construction [Technical Regulation B8, B11] 1 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory TSP: (E) (W) Stand rental does not include stand decoration or fittings, and these must be arranged separately. Please select your stand construction type. OR Shell Scheme Package (Please also fill in 1A) Special Design Stand Construction Single Storey Stand ( 1B) Double Storey Stand ( 1C) Please provide your appointed stand contractor s information below: Stand Construction Company Name: Address: Postal Code: Tel No: Mobile No: Professional Engineer Name*: Tel No: Serial No: Address: Postal Code: 3

4 Machinery Layout and Stand Construction [Technical Regulation B8, B11] 1 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory Remarks: *Exhibitors or their appointed stand contractor must have the drawings endorsed by a Grade A Structural Engineer. (For details on double storey stands, platforms, ascents and bridges, refer to Technical Regulations B11.7 and Service 1C. Note: a. Service 1 is compulsory and should be returned to the Operations Centre by 14 Mar b. A refundable performance bond must be paid by all stand contractors appointed by exhibitors or by exhibitors who are building their own stand. This must be paid by 9 May See Service s 1B or 1C for details. 1. Machinery Layout and Stand Plan The stand plan and machinery layout plan must be prepared in accordance with the example and symbols illustrated on this form. The length, width and height of the machinery as well as quantity should be indicated on the plan. drawing must be submitted with a scale of: 1:20 for stands with an area up to and including 50 sqm 1:50 for stands with an area of 51 sqm and above Please fill in accordingly. Exhibit name Model No. External Dimension (Length x Width x Height /M) Weight (KG) Electrical Consumption(KW) Qty Use separate sheet of paper if necessary. 4

5 Machinery Layout and Stand Construction [Technical Regulation B8, B11] 1 Shunyi District, Beijing Postal Code: Mar 2014 Tel: Fax: Compulsory 2. Requirement of Drawing Submission All plans must contain: a. the number of the form h. date b. company name i. maximum height of stand fitting in c. hall and stand numbers metres and maximum height of d. the stand number of neighbouring stands machinery in metres e. indication of the scale used j. detailed information on stand fitting f. indication of the entrances to the stand materials used g. reference number and legend of exhibits, k. author of any calculations and contact specifying which are to be demonstrated and details in operation l. Location of technical services (electrical, water, compressed air, telecommunications, etc) Example of plan: 5

6 Shell Scheme Package [Technical Regulation B12] 1A Shunyi District, Beijing Postal Code: Mar Stand Package Please tick the appropriate box and indicate the size of your stand. We would like to order the following package for our stand (please see the attached options and prices): Standard Package A ( ) : sqm x RMB per sqm = RMB Premium Package B ( ) : sqm x RMB per sqm = RMB 2. Choice of Carpet Colour (Needlepunch carpet only) For colour selection, please refer to the carpet catalogue We would like the following carpet color (tick one only): Royal blue (0828) Anthracite (0917) Caramel (0303) Grijsfonce (0906) 3. Wall Colour: The standard is white, any other colours are chargeable. Different colour required (PANTONE) panels x RMB840/piece = RMB 4. Company Name for Fascia Board English Name: Chinese Name: 6

7 Shell Scheme Package [Technical Regulation B12] 1A Shunyi District, Beijing Postal Code: Mar Font and Colour of Lettering The standard font for the fascia panel is Arial. If any other font is required, please indicate The standard colour of the fascia board is blue with white text for A1, A2, B1 and B2. A3 and B3 will be provided with white fascia board with blue text. Other text colours are also available. Please tick your preference. white Black Red Green 6. Company Logo Please tick if required We would like our company logo to be printed by the Technical Service Provider on the basis of a quotation. Note: Special service requests must be made by 28 February 2014, and a quotation will be provided to exhibitors by 14 March The approved quotation with full payment must be made upon confirmation. 7. General Terms and Conditions a. Exhibitors can order other stand fittings from the rental catalogue. These services are chargeable. b. During the rental period, exhibitors and their associated personnel are responsible for the rented property and are fully liable for any loss or damage to the structural components or furnishings. The Technical Service Provider should be notified immediately of any damage to the stand structure or theft of any items rented. Damaged walls will be invoiced to the exhibitor at a rate of RMB per sqm. c. Cabins and lockable furniture are not burglar-proof. Exhibitors are strongly recommended NOT to keep valuables inside. d. Exhibitors are not allowed to make any structural modifications to the items rented without approval, nor must glue or nails be used to attach displays to the walls. The walls must not be damaged in any way. Pictures or graphics may only be hung on the walls after consulting the Technical Service Provider. e. In case of unavailability of the items ordered, the Organiser reserves the right to supply equivalent or better items. 7

8 Shell Scheme Package [Technical Regulation B12] 1A Shunyi District, Beijing Postal Code: Mar 2014 f. Exhibitors are supplied with the relevant keys for the duration of the rental period. A fee of RMB will be invoiced to exhibitors for any opening of locks of cabins, etc. due to misplaced keys after taking over the stand due. At the end of the exhibition, keys must be left in the locks concerned. A charge of RMB per key will be invoiced to exhibitors for any keys lost. g. The Shell Scheme Package prices exclude the items in Article A11 of the General Regulations, and exhibitors should order separately for their electrical, water and compressed air connections with Service s 2, 3 and 4. h. Items provided within the exhibition stand are rental items and for exhibitors use during show period only. 8. Exhibitors who have ordered electrical socket will have to submit a plan which clearly marks the neighbouring stand, aisle and socket location. Example of Plan: 8

9 9

10 10

11 11

12 12

13 13

14 14

15 Carpet Catalogue Fire Retardant Needlepunch Carpet 15

16 Special Design Stand Construction for Single Storey Stand [Technical Regulation B8,B11] 1B Shunyi District, Beijing Postal Code: Mar Stand Contractor Qualification In order to maintain a minimum safety standard for the exhibition, only qualified stand contractors are allowed to work in The Venue. The exhibitor s appointed stand contractor must therefore:- a. Submit a photocopy of the business license and the legal representative s ID card to the Operations Centre. b. The appointed contractor must have been established for at least 3 years. c. The appointed contractor must not have any bad safety records. d. During the construction stage, safety measures must be taken, for the setup, show and dismantling period, and the appointed contractor is required to purchase and obtain the relevant insurance (public liability and workmen compensation). A copy of the insurance certificate must be presented in advance to the Operations Centre. 2. Performance Bond A refundable performance bond must be paid by all stand contractors appointed by exhibitors or by exhibitors who are building their own stand. This must be paid by 9 May Details are as follows: 3. Payment Information Stand Area Performance Bond (RMB) / Stand 200 sqm and below 20, sqm to 300 sqm 30, sqm to 500 sqm 50, sqm and above 100, Account no. Bank name Company name Standard Chartered Bank (China) Beijing Pico Exhibition Service Co., Co., Ltd. Beijing Branch Ltd. For Oversea Exhibitors, the performance bond can be paid through Banker s Guarantee. 16

17 Special Design Stand Construction for Single Storey Stand [Technical Regulation B8,B11] 1B Shunyi District, Beijing Postal Code: Mar Requirements for Submission of Drawings Exhibitors or their appointed stand contractors are required to submit the construction drawings to ITMA ASIA + CITME 2014 Operations Centre for approval. No construction of an exhibition stand will be permitted unless prior approval has been given. All related drawings and service forms must be mailed to Operations Centre for approval before 14 March Exhibitors will be notified in writing if their stand design has been approved. Exhibitors whose stands are not approved will be notified and advised by Operations Centre on the steps needed to achieve compliance. Single Storey Stand The following detailed drawing are to be submitted for approval: a. Overall exhibition stand visual drawing (front and all sides) b. Floor layout plans c. Structural drawing (if required see Article B10.1 for full details) d. Exhibition stand materials use, technical data e. Each drawing must be submitted with a scale of 1:20 for stands with an area up to and including 50 sqm 1:50 for stands with an area of 51 sqm and above The following drawings must be submitted for all single and double storey stands, with structure higher than 4.4 metres or having structures that covers more than 50% of the total stand area to be endorsed by a Grade A National Registered Structural Engineer. a. Overall exhibition stand visual drawing (front and all sides), b. Floor layout plans, c. Construction drawings, d. Exhibition stand materials, technical data, e. Front and side elevation drawing, f. Section drawing, g. Structural drawing, h. Location of technical services (electrical, water, compressed air, telecommunications, etc) 17

18 Special Design Stand Construction for Single Storey Stand [Technical Regulation B8,B11] 1B Shunyi District, Beijing Postal Code: Mar 2014 Upon approval of the drawings by a Grade A National Registered Structural Engineer, please submit the following drawings to the Operations Center for review. a. Overall exhibition stand visual drawing (front and all sides), b. Floor layout plans, c. Front and side elevation drawing, d. Section drawing, e. Live load, wind load, static load calculation and structural drawings (with national registered engineer endorsement) f. A photocopy of State Qualification Certificate issued by National Registration of Professional Engineer g. Exhibition stand materials, technical data, h. Structural calculations of all build elements, (with national registered engineer endorsement). i. Location of technical services (electrical, water, compressed air, telecommunications, etc) 18

19 Special Design Stand Construction for Single Storey Stand [Technical Regulation B8,B11] 1B Shunyi District, Beijing Postal Code: Mar 2014 Example of Plan (Technical service plan): Stand endorsement fee: Description Endorsement fee (single storey above and excluding 4.4 metres and above) Review fee (single storey above and excluding 4.4 metres and above) Price (RMB) 30/sqm 23/sqm The approval process for such single-storey stands is the same as that of double storey stands. Please refer to Service 1C for the stand approval flow chart for double storey stands. 19

20 Special Design Stand Construction for Double Storey Stand [Technical Regulation B8,B11] 1C Shunyi District, Beijing Postal Code: Mar Stand Contractor Qualification In order to maintain a minimum safety standard for the exhibition, only qualified stand contractors are allowed to work in The Venue. The exhibitor s appointed stand contractor must therefore:- a. Submit a photocopy of the business license and the legal representative s ID card to the Operations Centre. b. The appointed contractor must have been established for at least 3 years. c. The appointed contractor must not have any bad safety records. d. During the construction stage, safety measures must be taken for the set up, show and dismantling period, and the appointed contractor is required to purchase and obtain the relevant insurance (public liability and workmen compensation). A copy of the insurance certificate must be presented in advance to the Operations Centre. e. China-registered stand contractors may apply for Work Permit directly at Shanghai New International Expo Centre (SNIEC) using real-name authentication. Overseas stand contractors may engage a Chinese company or agent to assist in the real-name authentication before applying for the Work Permit. 2. Performance Bond A refundable performance bond must be paid by all stand contractors appointed by exhibitors or by exhibitors who are building their own stand. This must be paid by 9 May Details are as follows: Stand Area Performance Bond (RMB) / Stand 200 sqm and below 20, sqm to 300 sqm 30, sqm to 500 sqm 50, sqm and above 100, Payment Information Account no. Bank name Company name Standard Chartered Bank (China) Co., Ltd. Beijing Branch Beijing Pico Exhibition Service Co., Ltd. 4. Endorsement Fee for Double Storey Description Endorsement fee (Required Operations Centre to provide Structural Engineer endorsement services) Review fee (Stand approved by Grade A National Registered Structural Engineer engaged by Exhibitor) Price (RMB) 60/sqm 30/sqm 20

21 Special Design Stand Construction for Double Storey Stand [Technical Regulation B8,B11] 1C Shunyi District, Beijing Postal Code: Mar Stand Approval Flow Chart for all single and double storey stands, with structure higher than 4.4 meters or having structures that covers more than 50% of the total stand area must submit drawings to be endorsed by a Grade A National Registered Structural Engineer. Operations Centre Stand require Operations Centre to provide structural engineer endorsement services Stand approved by Grade A National Registered Structural Engineer engaged by exhibitor. Verification in Progress Verification in Progress YES In Order? NO Exhibitor will be advised to amend drawing accordingly YES In Order? NO Exhibitor will be advised to amend drawing accordingly Invoice issued Invoice issued Drawing Approved Payment Received Notice of Approval Note: 1. The standard period for stand plan approval is 7 working days. If the submitted drawing is being processed and there is a superseded drawing to be submitted for review, additional inspection fees will be imposed. 2. Total floor area will be based on built-up floor area on upper and lower floors. 21

22 Special Design Stand Construction for Double Storey Stand [Technical Regulation B8,B11] 1C Shunyi District, Beijing Postal Code: Mar If Exhibitors require Operations Centre to provide Structural Engineer endorsement services, please submit the following drawings. a. Overall exhibition stand visual drawing (front and all sides) b. Lower & upper floor layout plans c. Front & side elevation drawings d. Sections drawings e. Structural drawing f. Exhibition stand materials use and technical data g. Location of technical services (electrical, water, compressed air, telecommunications, etc) h. Each drawing must be submitted with a scale of 1:20 for stands with an area up to and including 50 sqm 1:50 for stands with an area of 51 sqm and above 6. For stands approved by Grade A National Registered Structural Engineer, please submit the following drawings: a. Overall exhibition stand visuals (front and all sides) b. Lower and upper floor layout plan c. Front and side elevations drawing d. Section drawings e. Live load, wind load, static load calculation and structural drawings (with national registered engineer endorsement) f. Structural calculations of all build elements, taking into account the maximum floor loading of the exhibition floor (with national registered engineer endorsement). g. Details about the load transmission of pillars to the exhibition floor of any upper decks h. Details about the maximum horizontal impact strength of any walling or handrail element (must be minimum 1kN per m) i. A photocopy of State Qualification Certificate issued by National Registration of Professional Engineer j. Exhibition stand materials, technical data k. Location of technical services (electrical, water, compressed air, telecommunications, etc) as well as the booth number of the neighbouring stand 22

23 Special Design Stand Construction for Double Storey Stand [Technical Regulation B8,B11] 1C Shunyi District, Beijing Postal Code: Mar A brief description of construction materials Total Stand Area: Main Material: Materials model no.: Total Upper Level Area: Main Material: Materials model no.: Total Lower Level Area: Main Material: Materials model no.: Stand area on upper level allowed for visitors : sqm Estimate no. of people allowed in the 2 nd level : pax 8. Requirement of Drawing Submission a. form number g. indication of machines dimensions in b. company name length, width and height in metres c. hall and stand number Plus indication of which machine is in d. stand number of neighbouring operation stand h. Drawing date e. indication of the drawing scale i. Maximum height of stand f. indication of the stand entrances j. Location of technical services (electrical, water, compressed air, telecommunications, etc) 23

24 Special Design Stand Construction for Double Storey Stand [Technical Regulation B8,B11] 1C Shunyi District, Beijing Postal Code: Mar 2014 Example of drawings Drawing title Drawings for reference Visual drawing Lower floor layout plan 24

25 Special Design Stand Construction for Double Storey Stand [Technical Regulation B8,B11] 1C Shunyi District, Beijing Postal Code: Mar 2014 Mobile Phone No.: Telephone No.: Fax No.: Hall No.: Stand No.: Drawing title Drawings for reference Upper floor layout plan Front Elevation 25

26 Special Design Stand Construction for Double Storey Stand [Technical Regulation B8,B11] 1C Shunyi District, Beijing Postal Code: Mar 2014 Mobile Phone No.: Telephone No.: Fax No.: Hall No.: Stand No.: Drawing title Drawings for reference Side Elevation (Left, Right hand side) Sectional Drawing 26

27 Special Design Stand Construction for Double Storey Stand [Technical Regulation B8,B11] 1C Shunyi District, Beijing Postal Code: Mar 2014 Drawing title Drawings for reference Exhibition stand materials used, technical data Structural drawings (2 nd floor) 27

28 Special Design Stand Construction for Double Storey Stand [Technical Regulation B8,B11] 1C Shunyi District, Beijing Postal Code: Mar 2014 Drawing title Drawings for reference Structural calculations (Reviewed by China Registered Qualified Structural Engineer with endorsement) Structural Drawing (Reviewed by China Registered Qualified Structural Engineer with endorsement) 28

29 Special Design Stand Construction for Double Storey Stand [Technical Regulation B8,B11] 1C Shunyi District, Beijing Postal Code: Mar 2014 Drawing title Drawings for reference Qualification Certificate issued by China Registration of Structural Engineer 29

30 Free Electricity for Lighting and Power [Technical Regulation B15) 2 Shunyi District, Beijing Postal Code: Mar Electricity Supply a. The electrical supply for machinery and lighting is provided free of charge in accordance with the rental contract (see Article A11 point 8 of the General Regulations for details on the availability of the intermittent electrical supply), provided this form is returned by 14 March Requirement for connections to air conditioner, compressors, laptops or other domestic use should not be connected to these mains, Exhibitors can use either the 4-amp, 24hour single phase supply included in Article A11 of the General Regulations, or order a separate power connection for this purpose. The Organiser will provide each exhibitor with one lighting and one machinery power connection, each one terminating at a switched isolator. A single phase supply up to 4 amps is available 24 hours/day free of charge to enable exhibitors to run computers, fax machines and fridges, terminated at one 3-pin switch socket outlet for every stand. For additional electrical orders, in addition to the mains provided free of charge, or for 24-hour main supply order for machinery power and lighting, please order through Service 2A. b. Supply Voltage : 380 V(+/- 6%), 3 phase, 5-wire system with neutral point solidly earthed. : 220 V(+/- 6%), single phase, 3-wire system with neutral point solidly earthed. Frequency : 50Hz (+/- 1%) Power Factor : Not less than 0.85 lagging c. All motors must have independent automatic protection against excessive current using one of the following starters: i. Up to 5Hp : Direct on line ii. 5 to 25 Hp : Star Delta iii. Above 25Hp : Auto Transformer/Inverter d. Submission of Distribution Box layout plan For the plan: 5 sets of drawings, complete with outlets, load and location of mains must be submitted with this form. The plan must be drawn with a scale of: 1:20 for stands with an area up to and including 50sqm 1:50 for stands with an area of 51sqm and above 30

31 Free Electricity for Lighting and Power [Technical Regulation B15) 2 Shunyi District, Beijing Postal Code: Mar 2014 e. Requirement of Drawing Submission a. form number g. running load / running current in b. company name kilowatts for each machine c. hall and stand numbers h. kilowatt loading of heater etc d. numbers of neighbouring stands i Position and load of the main electrical e. indication of the scale used supply f. starting load / starting current in j. date kilowatts for each machine k Location of technical services (electrical, water, compressed air, telecommunications, etc) Example of Plan 31

32 Free Electricity for Lighting and Power [Technical Regulation B15) 2 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory f Main Electricity Supply (each exhibitor is entitled to one main for lighting and one main for machinery). Please refer to the Electrical Mains and Socket images attached. Note: 1. Any requirement for connections which are not for lighting or machine but for domestic use (such as air conditioner compressor, laptop, television, LED screen etc) and where the total domestic appliances power consumption exceeds the 4-amp 24-hour single phase supply included under Article A11 of the General Regulations, should require an order of additional connection for these purposes. 2. Exhibitors air compressors must be placed at designated areas outside the exhibition halls, and installation work must be carried out by the exhibitors themselves. Exhibitors must apply for an electrical distribution box for their own air compressor. Any outdoor electrical installation will incur an additional 50% surcharge. Description Purpose Qty (Lighting or Machinery) SP 4A/220V socket SP 15A/220V Lighting Machinery 3P 15A/380V Lighting Machinery 3P 30A/380V Lighting Machinery 3P 40P/380V Lighting Machinery 3P 60A/380V Lighting Machinery 3P 100A/380V Lighting Machinery 3P 150A/380V Lighting Machinery 3P 200A/380V Lighting Machinery 3P 250A/380V Lighting Machinery 3P 300A/380V Lighting Machinery 3P 350A/380V Lighting Machinery 3P 400A/380V Lighting Machinery Note: Intermittent power supply is as below. If you require an extension to the period covered by this supply, please complete 2A, section 2 for a 24-hour power supply June 2014, hours June 2014, hours 21 June 2014, hours Exhibitors should note that applications of the main electricity supply after 14 March 2014 would be chargeable. 32

33 Free Electricity for Lighting and Power [Technical Regulation B15) 2 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory g. Electrical Contractor Information We will carry out our own electrical installation using our own fittings and will comply with the following: i. Submit a certified single line drawing endorsed by a Licensed Electrical Worker and a copy of the electrical certificate ii. Our appointed Licensed Electrical Contractor is: Contractor Company Name: Electrician Name: Electrician Certificate Number: Contact no. / Mobile: h. Power Availability The following must be completed: i. Date of Power Switch On During Set Up Please indicate your required switch-on date: (between 9 and 15 June 2014, from 0900 to 1800). The exact power-on time is subject to the completion time of on-site electricity inspection and approval. ii. Date of Power Switch Off for Decommissioning on 21 June 2014, end at 1200 hours We would like the intermittent connection to be extended to 21 June 2014, 1800 hours (Chargeable) We would like the 4-amp single phase connection to be terminated on 21 June hours (extended from 1200 hours) Note: If special technical services are required, please contact the Operations Centre. Requests for special technical services quotations must be made by 28 February A quotation will be provided to exhibitors by 14 March The approved quotation with full payment must be made upon confirmation. For extended duration of power supply, please indicate the specifications, quantity and location of the electrical main as well as the specific extended time frame on the technical service plan. 33

34 Free Electricity for Lighting and Power [Technical Regulation B15) 2 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory Electrical Mains and Socket 34

35 Additional Electricity for Lighting and Power [Technical Regulation B15) 2A Shunyi District, Beijing Postal Code: Mar Additional intermittent power supply (in addition to one main for lighting and one main for machinery, e.g.: Air conditioner, computer and other domestic power usage). We would like to order the following additional intermittent supply (chargeable) Please refer to the Electrical Mains and Socket images in 2. Main power for machinery ; Main power for lighting ; Main power for Domestic Description Usage (Compulsory mark) Unit Cost (RMB) Qty Total Cost (RMB) SP 15A/220V Lighting Machinery Domestic 1, P 15A/380V Lighting Machinery Domestic 2, P 30A/380V Lighting Machinery Domestic 4, P 40A/380V Lighting Machinery Domestic 5, P 60A/380V Lighting Machinery Domestic 8, P 100A/380V Lighting Machinery Domestic 13, P 150A/380V Lighting Machinery Domestic 19, P 200A/380V Lighting Machinery Domestic 28, P 250A/380V Lighting Machinery Domestic 33, P 300A/380V Lighting Machinery Domestic 36, P 350A/380V Lighting Machinery Domestic 39, P 400A/380V Lighting Machinery Domestic 58, Total Cost (RMB) 35

36 Additional Electricity for Lighting and Power [Technical Regulation B15) 2A Shunyi District, Beijing Postal Code: Mar hour permanent power supply. Exhibitors are still required to order the electrical main in 2, Part 1f for the entitlement under Article A11 or 2A Part 1 for additional intermittent main and power supply. Description Usage Unit Cost (RMB) Total Cost (RMB) Jun Qty 9 20 Jun Qty 3P 15A/380V 1, , P 30A/380V 2, , P 40A/380V 2, , P 60A/380V 3, , P 100A/380V 5, , Power for 3P 150A/380V 7, , machine 3P 200A/380V 13, , P 250A/380V 19, , P 300A/380V 22, , P 350A/380V 28, , P 400A/380V 34, , SP 15A/220V 1, , P 15A/380V Power for 1, , P 30A/380V Domestic 2, , P 60A/380V 4, , Total Cost (RMB) Note: 24-hour permanent supplies will terminate at 1200 hours on 20 June If exhibitors require extension, please contact the Operations Centre. Please indicate the specifications, quantity and location of the 24-hour electrical main on the technical service plan. 36

37 Light Fittings and Accessories [Technical Regulation B15] 2B Shunyi District, Beijing Postal Code: Mar Electrical Fittings And Accessories (including installation and wiring) Please tick the appropriate box with reference to the Electrical Fitting Catalogue We do not require any light fittings and accessories We would like to order the following light fittings and accessories: Description Unit Cost (RMB) Qty Total Cost (RMB) 150W Halogen Floodlight W Halogen Floodlight W Metal Hi-Lite W Metal Hi-Lite 1, W Spotlight W/12V Track Halogen W Track Spot W Circular Tube W Circular Tube W Circular Tube W Halogen Down Light W PLC Energy Saving lamp W Fluorescent Light W Fluorescent Light W Fluorescent Light W halogen Standing Lamp X40W Standing Lamp Total Cost (RMB) 37

38 Electrical Lighting Catalogue Halogen Floodlight Metal Hi-Lite 100W Spotlight 150W - RMB W RMB 855 RMB W RMB W RMB W/12V Track Halogen 100W Track Spot 22W/32W/40W Circular Tube RMB 425 RMB 425 RMB W Halogen Down Light 113W PLC Energy Saving lamp 2 /3 /4 40W Fluorescent Light RMB 425 RMB 515 RMB

39 Electrical Lighting Catalogue 300W Halogen Standing Lamp 6X40W Standing Lamp RMB 855 RMB

40 Electrical Fittings And Accessories [Technical Regulation B15] 2C Shunyi District, Beijing Postal Code: Electrical Fittings And Accessories (excluding installation and wiring) Please tick the appropriate box with reference to the Electrical Fitting Catalogue We do not require any electrical fittings and accessories We would like to order the following light fittings and accessories: 14 Mar 2014 Description Unit Cost (RMB) Qty Total Cost (RMB) 13A Switch Socket Outlet A Switch Socket Outlet A Three Phase Isolator 1, A Three Phase Isolator 1, A Three Phase Isolator 2, A Three Phase Isolator 4, A Three Phase Isolator 8, A Single Phase Distribution Board/6-way= 6 x 16A S/P/MCB 15A Three Phase Distribution Board/6-way= 6 x 16A S/P/MCB 30A Three Phase Distribution Board/12-way =12 x A S/P/MCB 60A Three Phase Distribution Board/15-way =15 x A S/P/MCB 13A, 3 Pin Plug A, 3 Pin Plug Core 2.5mm² per/meter/run Core 2.5mm² per/meter/run Core 6mm² per/meter/run Core 16mm² per/meter/run Core 25mm² per/meter/run Core 35mm² per/meter/run Step Down Transformer: 5A Single Phase Transformer 220/220V 100/100V A Single Phase Transformer 220/220V 100/100V A Single Phase Transformer 220/220V -100/100V Three Phase Transformer 346/380V -200/220V 2, A Three Phase Transformer 346/380V 200/220V 3, Total Cost (RMB) 40

41 Electrical Work [Technical Regulation B15] 2D Shunyi District, Beijing Postal Code: Mar Electrical Works: Please tick the appropriate box. We will carry out our own connection. We would like to order the following electrical works: Description Unit Price (RMB) Qty Total Cost (RMB) Machine / Equipment Hook up 3P 15Amp / 380V P 30Amp / 380V 1, P 60Amp / 380V 1, P 100Amp / 380V 1, P 200Amp / 380V 3, Lighting Connection Maximum 100W per feature More than 100W SP 15Amp / 220V P 15Amp / 380V P 30Amp / 380V 1, P 60Amp / 380V 1, P 100Amp / 380V 1, P 200Amp / 380V 3, Total Cost (RMB) 41

42 Free Water and Drainage [Technical Regulation B16) 3 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory 1. Main Water Supply Inlet a. Water for stand usage will be delivered through a 15mm hose, and water for machinery will be delivered through a 20mm hose. Water for domestic use during hall opening hours from the beginning of the stand set up period until the end of the stand dismantling period is free of charge. Exhibitors who need water outside these hours need to order and pay for a 24 hour supply. Water supplied is not for drinking b. Water hose will be delivered to the point as specified in the plan. c. Larger hose size is available upon request and quoted separately which is subject to the approval from The Venue. d. A free standard piping connections from the venue s water point to the appointed area at the exhibitor s booth is included. Connections to machines, sinks or other appliances are chargeable. e. Supply of water will be terminated at 1900 hours on 20 June If exhibitors need to extend the supply, please contact Technical Service Provider. 2. Please tick the relevant box We do not require a water supply We would like to order the following free of charge, provided these orders have been submitted by 14 March Description Water for stand usage, water inlet and waste water outlet (main standard connection) inclusive of up to 10m length in piping. Water inlet and outlet: 15mm, Pressure: 4kg/cm2 Qty (Either 1 only) Water for machine, water inlet and waste water outlet (main standard connection) inclusive of up to 10m length in piping. Water inlet and outlet: 20mm, Pressure: 4kg/cm2 42

43 Free Water and Drainage [Technical Regulation B16) 3 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory 3. Water Availability Water will be supplied as follows: 9 15 June hours June 2014, hours 21 June 2014, hours Exhibitors who require an extension to the above should contact the Operations Centre before 28 February A quotation will be provided to exhibitors by 14 March The approved quotation with full payment must be made upon confirmation. 4. Requirement of Drawing Submission For the plan: with the date and location of water supply points indicated must be attached to this form. The plan must be drawn with a scale of: 1:20 for stands with an area up to and including 50sqm 1:50 for stands with an area of 51sqm and above Example of plan 43

44 Additional Water and Drainage [Technical Regulation B16] 3A Shunyi District, Beijing Postal Code: Mar Water and drainage orders in addition to the free of charge supply for domestic and machine use Please tick the relevant box We do not require any additional water supply We want to pay for the following additional supply: Description Unit Price (RMB) Qty Total Cost (RMB) Water for stand usage, water inlet and waste water outlet (main standard connection) inclusive of up to 10m length in piping. Water inlet and outlet: 15mm, Pressure: 4kg/cm2 3, Water for machine, water inlet and waste water outlet (main standard connection) inclusive of up to 10m length in piping. Water inlet and outlet: 20mm, Pressure: 4kg/cm2 5, Special Requirement We would like to order larger size hose. Please provide a quotation. Detailed information of Water inlet/outlet pressure is as follows: Note: Request for special technical services quotation must be made by 28 February A quotation will be provided to exhibitors by 14 March The approved quotation with full payment must be made upon confirmation 44

45 Compressed Air [Technical Regulation B17] 4 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory 1. Installation of Compressed Air a. All connections will be terminated in a quick-release coupling with D10mm and D15mm standard. Exhibitors who require other types of connections must provide their own fittings (both male and female) for attachment to the coupling or valve provided by The Venue. b. The compressed air supplied has an average pressure of 4-7 Bar and delivery rate of litre/minute, through a 10mm or 15mm hose, terminating with one quick release coupling placed on the exhibition floor. c. Air is of industrial quality. Filters remain the responsibility of the Exhibitors. Air is subjected to normal control fluctuation. All other compressed air requirements not stated below will be quoted separately. d. According to the regulations of The Venue, the exhibitors are not entitled to use their own electrical compressors unless they are part of the machines or unless The Venue is not able to supply the specific compressed air as per the exhibitor s request. e. Connection from the supplied compressed air to the machine should be carried out by the exhibitor. The TSP can provide this service by quotation if required. f. According to the rules of The Venue, each air compressor is for the use of ONE machine only. Combined use of compressed air is strictly prohibited. Please tick the relevant box We do not require this service We would like the Technical Service Provider to provide us with the following: Motor Capacity Unit Price (RMB) Qty Compressed air 0.4m3/Min & 8~10kgf/cm2 (0.5HP-5HP), Ø 10mm 5, Compressed air 0.9m3/Min & 8~10kgf/cm2 (6HP-10HP), Ø 19mm 5, Compressed air 1m³/Min, (10 Bar) Ø 25mm 7, Total Amount (RMB): Total Cost (RMB) 45

46 Compressed Air [Technical Regulation B17] 4 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory 2. Special Requirement If additional compressed air facilities are required, please tick and complete the following: We would like the ITMA ASIA + CITME 2014 Operations Centre to provide a quotation for our requirements as follows: a. Pressure: Bar/PSI Delivery Rate: LPM/CFM b. Connection Size: Hp / KW c. Other specification / information: We would like the ITMA ASIA + CITME 2014 Operations Centre to provide a quotation for the connection service from the supplied compressed air point to our machines. Detailed specification / information (including connection distance and plan drawing with location): Note: Special requests must be made by 28 February 2014, and a quotation will be provided to the exhibitors by 14 March The approved quotation with full payment must be made upon confirmation. 46

47 Compressed Air [Technical Regulation B17] 4 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory 3. Requirement of Drawing Submission The plan must be submitted with this form. The plan must be drawn with a scale of: 1: 20 for stands with an area up to and including 50sqm 1: 50 for stands with an area of 51sqm and above All plans must indicate: a. form number g. reference number and legend of exhibits, b. company name specifying which are to be demonstrated c. hall and stand numbers and in operation d. the stand numbers of neighbouring stands h. location of the compressed air e. the scale used i. date f. entrances to the stand Example of Plan: 47

48 Hanging / Rigging Points [Technical Regulation B18] 5 Shunyi District, Beijing Postal Code: Mar Hanging Point Services We would like to order hanging points for our stand construction Numbers of hanging points required: We do not require hanging points for our stand construction 2. Standard Price a. Hanging fee for banner (area less than 5 sqm) on the exhibitor s own stand, including one time use of genie lift, it is charged at a rate of RMB1, per side excluding all accessories which may be needed for the hanging materials b. Hanging fee for banner (area larger than 5 sqm) on the exhibitor s own stand, including one time use of genie lift, it is charged at a rate of RMB400.00/sqm, excluding accessories which may be needed for the hanging materials. c. Loading capacity is 200kg per point, and only steel truss structures can be hung from hanging points. d. Hanging fee is charged at rate of RMB1, per point, excluding all accessories which may be needed for the hanging materials. Please refer to Article B18 of Technical Regulations. 3. Note a. Hanging object have to be installed by stand builders and must be pre-approved. The professional staff of The Venue shall conduct the hanging work. b. If the stand is situated close to the walls, no hanging point is allowed on parts near the walls and whether hanging points are allowed on parts away from the walls shall be decided on site. Hanging objects that affect The Venue structure or facilities safety will not be allowed. If a single structure needs hanging, The Venue takes responsibility for installing hanging points and blocks while the Exhibitors and their appointed contractor are responsible for the remaining construction. Hanging advertisements and structural hanging points shall not be placed above public areas unless the Organiser agree to do so with a written approval. Hanging points shall not be used for lifting facilities and for bearing any moveable objects. c. The above cost is based on single-sided banner calculation. Banner with double-sided graphic will be counted as 2 banners. 48

49 Hanging / Rigging Points [Technical Regulation B18] 5 Shunyi District, Beijing Postal Code: Mar 2014 d. The top and bottom edges of the banner shall be fixed by one metal tube without any break or connection points. If the banner has a width of no more than 5 metres and a weight of no more than 25kg, it can be hung by cotton ropes. If not, a hanging block shall be used. Banners wider than 5 metres shall be fixed by lamp holders. e. The above fees may change depending on the final hanging material delivered to the hall. The Venue reserves the right to change the above fees. 4. Requirement and Specifications a. Application method: Layout drawing of hanging points should be sent to the ITMA ASIA + CITME 2014 Operations Centre, with stand number, hanging material, size, weight and contact details of the exhibitor s appointed contractor. Applications will be sent to The Venue for confirmation. The application deadline is 14 March Confirmation of application does not include the quantity of the hanging points, which shall be confirmed on-site by The Venue. b. All hanging materials must arrive at the hall before setting up of machines and laying of aisle carpet. The date for the submission of the hanging materials will be advised closer to the move-in date. c. Only the area above the contracted rental area is allowed for hanging of any materials d. Unless prior written request is submitted to the ITMA ASIA + CITME 2014 Operations Centre, all banners will be destroyed after the exhibition. e. The total number of hanging points is subject to the actual quantity incurred on-site as confirmed by Shanghai New International Expo Center and Operations Centre. 5. Payment a. Payment for the hanging points should be made only when the applications for hanging points has been approved by The Venue. b. Exhibitors should make payment to the ITMA ASIA + CITME 2014 Operations Centre for the total cost incurred after confirmation of the hanging points between Operations Centre and staff of Shanghai New International Expo Center. 49

50 Stand Security Services [Technical Regulation B31] 6 Shunyi District, Beijing Postal Code: Mar 2014 Stand Security General hall security will be provided from 9 June to 23 June Exhibitors can engage the Security Agent appointed by The Venue to provide extra security for their stands. We would like to engage security guards at our stand: Date Start End *No. of Price Per Guard Price Per Guard Number Total Cost Time Time Hours Per (RMB80.00/hour/security) (RMB160.00/hour/security) Of (RMB) Day ( hours) ( hours) People Total Cost (RMB) Note: 1. The number of security guards is limited. All orders are subject to confirmation by the Operations Centre. 50

51 Meeting Rooms [Technical Regulation B29] 7 Shunyi District, Beijing Postal Code: Mar 2014 Meeting Rooms We request the ITMA ASIA + CITME 2014 Operations Centre to contact us with a quotation for the rental of the following meeting rooms : Date of Time of Rental Requirement Rental 9:00-13:00 hours or Qty Style No. of Remarks 14:00-18:00 hours (Classroom / Theatre) pax Note: 1. Meeting rooms and offices are not allowed to be used for other purposes. Furniture and facilities in the meeting rooms are not allowed to be removed. Catering is not allowed inside the meeting rooms. 2. If technical services are required, please contact the Operations Centre. Such requests must be made by 28 February A quotation will be issued by 14 March 2014 for Exhibitor s approval. Full payment must be made upon confirmation of the quotation. 3. Exhibitors must submit their requests by 14 March A surcharge of 25% will be imposed after 14 March 2014 and on or before 31 May A surcharge of 50% will be imposed after 31 May Exhibitors who need to extend their booking hours must apply in writing on the day concerned to the Operations Centre. This is subject to availability. 5. The Operations Centre will not be responsible for any damage to the meeting room facilities caused by the users. 6. The Operations Centre has the final decision for the above-mentioned services and offer. 7. The Venue has limited meeting rooms. These rooms will be allocated on a first-come-first-served basis. 51

52 Badge Reader Rental [Technical Regulation B24.3] 8 Shunyi District, Beijing Postal Code: Mar 2014 Rental of Badge Readers Rental of badge readers is available to Exhibitors during the exhibition. With these readers, exhibitors can scan and record visitors badges in their own stands. Badge readers save time and avoid the need to collect and process business cards. They also help to facilitate your immediate follow-up after the exhibition. Item Price (RMB) Quantity Total Cost (RMB) Badge reader rental 2, Note: 1. Badge readers are supplied by the Organiser appointed supplier, China International Exhibition Centre Group Corporation Information Centre (known as China International Info Centre). 2. This form is for pre-booking only. Rental fees will be payable to the registration company during collection of the badge reader. 3. Exhibitors must bring along a copy of this form to collect their badge reader from the Exhibitor Registration counter located at South Entrance hall from June 2014 and the badge reader must be returned by 1900 hrs on 20 June China International Info Centre will send the information collected from the badge reader (in excel format) together with the scanned copy of the name cards or registration forms to the above contact person via within 21 days after the end of the event. 52

53 Telephone, Fax and Internet Access [Technical Regulation B13.1] 9 Shunyi District, Beijing Postal Code: Mar Telephone and Fax Rental Service starts from 16 to 20 June 2014, 0815 hours to 1900 hours. We would like to order the following: Normal Telephone Services (without internet function) Ref Description Unit Price Deposit Qty Total Cost (RMB)/Line/period) (RMB) PT-08 Local telephone line (LDD) 1, N.A PT-09 Domestic telephone line (DDD) 1, , PT-10 International telephone line (IDD) 3, , PT-06 Fax machine 1, , Total Cost (RMB) Total Deposit (RMB) Note: 1. Domestic and International telephone call charges are excluded from the above pricing. 2. Information on call charges will be available at a later date 3. An application for the above normal telephone services includes rental of a telephone set free of charge. Any damage or loss will be deducted from the deposit based on the actual price of the telephone set If early activation is required, please send in the Special Technical Services request by 28 February A quotation will be provided to the exhibitors by 14 March 2014 Full payment must be made upon confirmation of the quotation. For application of telephone, fax and Internet services received after June , the services will be activated at least two days after the application. 53

54 Telephone, Fax and Internet Access [Technical Regulation B13.1] 9 Shunyi District, Beijing Postal Code: Internet Services Service starts from 15 June to 20 June 2014, 0815 hours to 1900 hours We would like to order the following internet facilities: 14 Mar 2014 Ref Description Unit Price Qty Total Cost ( RMB/ (RMB) Line/period) PT-13 1M Fiber-based broadband, 1 Public static IP address 4, PT-14 2M Fiber-based broadband, 1 Public static IP address 5, PT-15 1M Fiber-based broadband, 1 Public dedicated IP address 6, PT-16 2M Fiber-based broadband, 1 Public dedicated IP address 7, PT-17 3M Fiber-based broadband, 1 Public dedicated IP address 7, PT-18 4M Fiber-based broadband, 1 Public dedicated IP address 7, PT-19 5M Fiber-based broadband, 1 Public dedicated IP address 7, PT-20 6M Fiber-based broadband, 1 Public dedicated IP address 8, PT-21 7M Fiber-based broadband, 1 Public dedicated IP address 8, PT-22 8M Fiber-based broadband, 1 Public dedicated IP address 8, PT-23 9M Fiber-based broadband, 1 Public dedicated IP address 8, PT-24 10M Fiber-based broadband, 1 Public dedicated IP address 9, PT-25 Public dedicated IP address, (only 2M Fiber-based broadband is available, 5pcs/line is maximum permitted) 2, Total Cost (RMB) Note: 1. The price excludes hub/switch and internet cabling charges. Network will be activated two days prior to show date. 2. If early activation is required, please send in the Special Technical Services request by 28 February Please note that there will be a 50% surcharge. A quotation will be issued by 14 March 2014 for your approval. Full payment of the approved quotation must be made upon confirmation. 54

55 Telephone, Fax and Internet Access [Technical Regulation B13.1] 9 Shunyi District, Beijing Postal Code: Mar Requirement of Drawing Submission All plans must contain: a. number f. indication of the entrances to the stand b. company name g. date c. hall and stand numbers h. location of the telephone, fax and d. numbers of neighbouring stands internet lines. e. indication of the scale used Example of the plan: 55

56 Exhibitor Badges, Installer Passes and Service Passes [Technical Regulation B23] 10 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory 1. Exhibitor Badges Exhibitor badges are valid from 6 to 23 June Complimentary exhibitor badges are provided as follows: Stand Dimension Quantity (nos) Up to 20 sqm 5 21 sqm to 60 sqm sqm to 150 sqm sqm to 300 sqm sqm to 500 sqm sqm and above badges for each additional 100 sqm Please supply exhibitor badges free of charge. 2. Additional Badges We would like to order additional exhibitor badges (in addition to our free quota above) Quantity x RMB 100 per badge = Total RMB Note: Exhibitors should note that should the same exhibiting personnel submit a badge order for both exhibitor and installer badges, only one badge (exhibitor badge) would be issued. Should you require stand hostess, catering personnel and translators etc they would be required to apply for and use an exhibitor s badge 56

57 Exhibitor Badges, Installer Passes and Service Passes [Technical Regulation B23] 10 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory 3. Exhibitor Badge Details (use separate sheet of paper if necessary) Name Title

58 Exhibitor Badges, Installer Passes and Service Passes [Technical Regulation B23] 10 Shunyi District, Beijing Postal Code: Mar 2014 Compulsory 4. Installer Passes Note: We would like to order Installer Passes free of charge (please state quantity). Installer passes are issued for personnel from the exhibiting organisations working during the Set up and dismantling periods. They are valid for entry to the exhibition halls during set up and dismantling periods only. 5. Service Passes Note: We would like to order service passes free of charge (please state quantity. Maximum 3 passes per exhibitor). Service passes are supplied to service providers such as delivery or service staff to allow them to enter the exhibition halls. They are entitled to a short stay only. Service passes are valid from 16 to 20 June 2014, from 0815 hours to 1900 hours. 58

59 Overtime Request [Technical Regulation B9] 11 Mail form to: ITMA ASIA + CITME 2014 Operations Centre Deadline: P Shunyi District, Beijing Postal Code: hours on the day concerned Overtime Charges Exhibitors and/or stand contractors who would like to work before 0900 hours or beyond 1800 hours during the set up and dismantling periods must apply in writing by 1400 hours on the day concerned. The overtime charges are as follows: Working hours Overtime Charge (RMB) hours (one hour at least) RMB 1,100.00/1,000 sqm / hour After 2200 hours to next day 0900 hours (one hour at least) RMB 2, / 1,000 sqm / hour Note : 1. Charges will be based on per hour basis with a minimum extension of one hour. 2. Exhibitors and/or their contractors are requested to pay the minimum rate of 1,000 sqm if their stand space is below 1,000 sqm. 3. Orders for overtime work must be submitted to the on-site Operations Centre in the hall by 1400 hours on the day concerned. Late orders will be subject to a 50% surcharge. Request for overtime work will not be approved after halls closing time. 4. No overtime request will be allowed on 20 June Payment for overtime requests will be made on-site upon submission of order form. Exhibitors and/or their contractors should pay the charge on-site. 59

60 Furniture and Floral Decorations [Technical Regulation B28] 12 Shunyi District, Beijing Postal Code: Mar Rental Of Furniture Exhibitors can order furniture from the Furniture Catalogue attached We would like to order the following furniture: Ref. Description Unit Price (RMB) C01C Leather Armchair -Black C59B Armchair C13 Wooden Armchair C05C Leather Folding Chair Black C15C Wooden Armchair Black C22 Pacific Chair C08B Folding Chair-White C26B Wooden Armchair C03 Secretary Chair BS29B Bar Stool White S11E Single-Seat Sofa S37B Single-Seat Sofa S01C Single-Seat Sofa S02C Double-Seat Sofa 1, S37C Single-Seat Sofa S03C Single-Seat Sofa 1, S04C Double-Seat Sofa 1, S11 Single-Seat Sofa BS11C Bar Stool- Black BS04B White Adjustable Bar Stool BS04C Black Adjustable Bar Stool BS04E Red Adjustable Bar Stool BS11B White Bar Stool BS02A S Bar Stool C04C Conference Chair C32C Conference Chair Qty Total Cost (RMB) 60

61 Furniture and Floral Decorations [Technical Regulation B28] 12 Shunyi District, Beijing Postal Code: Mar 2014 Ref. Description Unit Price (RMB) Qty Total Cost (RMB) C02C Executive Chair RT02D Wooden Round Table RT01E White Round Table RT04E Black Round Table RT05B Aluminum Round Table MT02W Wooden Meeting Table BT01B Wooden Bar Table BT03C Black Bar Table BT04A Aluminum Bar Table MT06E Wooden Square Table ST-01 Conference Table ST-02 System Square Table ST-03 Low Display Cube ST-04 High Display Cube ST-05 High Display Cube ST-06 3-Tier Display Cube ST-07 Semi-Round Counter 1, ST-08 Quarter-Round Counter ST-09 Information Counter ST-10 Lockable Cupboard ST-11 Low Showcase ST-12 Square High Showcase ST-13 High Showcase 1, ST-14 Two-Tier Information Counter ST-15 Sloped / Flat Shelf ST-16 System Catalogue Rack ST-17 Washing Basin 1, M01E Belt Barricade M02E Rope Barricade M05C Black Magazine Rack E15 Coffee Machine

62 Furniture and Floral Decorations [Technical Regulation B28] 12 Shunyi District, Beijing Postal Code: Mar 2014 Ref. Description Unit Price (RMB) Qty Total Cost (RMB) M72 Coat Hanger E14A Fan E04 140L Refrigerator 1, E06 90L Refrigerator M35C Metropol Cabinet 1, Total Cost A (RMB) 2. Floral Decorations Exhibitors can order floral decorations from the Floral Catalogue attached. We would like to order the following floral decorations: Ref. Description Unit Price (RMB) Qty Total Cost (RMB) PT-01 Prosperity Tree PT-02 Hawaii Palms PT-03 Tall Money Plant PT-04 Yellow Palm PT-05 Rhapis Palm PT-06 Cardyline-Dwarf PT-07 Sanseveria Trifasciata Mother in Law Tongue PT-08 Orchids (1) PT-09 Orchids (2) PT-10 Money Plant PT-11 Caladium Green Leaves TF-01 Floral Decorations TF-02 Floral Decoration TF-03 Floral Decoration Total Cost B (RMB) 62

63 Furniture and Floral Decorations [Technical Regulation B28] 12 Shunyi District, Beijing Postal Code: Mar Payment Total Cost (Furniture) + (Floral Decoration) = RMB 4. Date of Delivery We would like our furniture to be delivered on: June, 2014 We would like our floral decorations to be delivered on: June, Note The exhibitor or stand contractor who rents the respective furniture or floral items is liable in the event of damage or loss of these rented items from the time of delivery or transfer to the stand to the time of collection by the rental company. This also applies even if the stand is not occupied. Lost or damaged items will be charged to the exhibitor or stand contractor at the cost of replacement. 63

64 Furniture Catalogue Leather Armchair-Black Armchair - White Wooden Armchair RMB RMB RMB Leather Folder Chair- Black Wooden Armchair- Black Pacific Chair RMB RMB RMB Folding Chair Wooden Chair - White Secretary Chair RMB45.00 RMB RMB

65 Furniture Catalogue Bar stool - White Single-Seat Sofa Single-Seat Sofa RMB RMB RMB Single-Seat Sofa Double-Seat Sofa Single-Seat Sofa RMB RMB RMB Single-Seat Sofa Double-Seat Sofa Single-Seat Sofa RMB RMB RMB

66 Furniture Catalogue Bar Stool - Black White Adjustable Bar Stool Black Adjustable Bar Stool RMB RMB RMB Red Adjustable Bar Stool White Adjustable Bar Stool S Bar Stool RMB RMB RMB Conference Chair Conference Chair Executive Chair RMB RMB RMB

67 Furniture Catalogue Wooden Round Table White Round Table Black Round Table RMB RMB RMB Aluminum Round Table Wooden Meeting Table Wooden Bar Table RMB RMB RMB Black Bar Table Aluminum Bar Table Wooden Square Table RMB RMB RMB

68 Furniture Catalogue ST-01 ST-02 ST-03 Conference Table System Square Table Low Display Cube 1230W x 770D x 760H mm 770W x 770D x 760-H mm 535W x 535D x 500H mm RMB RMB RMB ST-04 ST-05 ST-06 High Display Cube High Display Cube 3-Tier Display Cube 535W x 535D x 760H mm 535D x 535D x 1030H mm 1500W x 535D x 1030H mm RMB RMB RMB ST-07 ST-08 ST-09 Semi-Round Counter Quarter-Round Counter Information Counter 2000Ø x 1030H mm 1440L x 535W x 1030H mm 975W x 520D x 760H mm RMB RMB RMB

69 Furniture Catalogue ST-10 ST-11 ST-12 Lockable Cupboard Low Showcase Square High Showcase 975W x 520D x 760H mm 975W x 520D x 1030H mm 520W x 520D x 2000H mm RMB RMB RMB ST-13 ST-14 ST-15 High Showcase Two-Tier Information Counter Sloped / Flat Shelf 975W x 520D x 2000H mm 1030L x 535W x 1030H mm 1000L x 300W mm RMB RMB RMB ST-16 ST-17 System Catalogue Rack Washing Basin 1000L mm 975W x 520D x 760H mm RMB RMB

70 Furniture Catalogue Belt Barricade Rope Barricade Magazine Rack-black RMB75.00 RMB75.00 RMB Coffee Machine Coat Hanger Fan RMB RMB RMB L Refrigerator 90L Refrigerator Metropol Cabinet RMB RMB RMB

71 Floral Catalogue PT-01 PT-02 PT-03 Prosperity Tree Hawaii Palms Tall Money Plant RMB 160 RMB 180 RMB 200 PT-04 PT-05 PT-06 Yellow Palm Rhapis Palm Cardyline-Dwarf RMB 180 RMB 180 RMB 180 PT-07 PT-08 PT-09 Sanseveria Trifasciata Orchids (1) Orchids (2) Mother-in-Law Tongue RMB 180 RMB 180 RMB

72 Floral Catalogue PT-10 PT-11 TF-01 Money Plant Caladium Green Leaves Floral Decorations 1 RMB 180 RMB 180 RMB 150 TF-02 TF-03 Floral Decoration 2 Floral Decoration 3 RMB 220 RMB

73 Carpeting [Technical Regulation B19.2] 13 Shunyi District, Beijing Postal Code: Contact Person: 14 Mar Order of Carpeting Exhibitor can order carpeting from the Carpet Catalogue attached. We wish to order carpeting based on: Type of Carpet : (please indicate reference number stated on carpet catalogue) Length: m x Width m Area: sqm x RMB per sqm = Total Cost (RMB) 2. Date of Carpet Fitting We would like the carpet to be fitted by: Date: Time: Note: In accordance with authority regulations and the Shanghai New International Expo Centre s relevant provisions, carpets used in the halls must be of minimum Grade B1 standard. 73

74 Carpet Catalogue Class B1 fire retardant Needlepunch Carpet (RMB 30 per sqm) 74

75 Carpet Catalogue Treffer Carpet ((RMB 50 per sqm) 75

76 Carpet Catalogue Velour Fantasy Carpet (RMB 150 per sqm) 76

China International Hardware Show 2017 October 22-24, 2017 National Exhibition and Convention Center (Shanghai) 1. SPACE APPLICATION FORM

China International Hardware Show 2017 October 22-24, 2017 National Exhibition and Convention Center (Shanghai) 1. SPACE APPLICATION FORM 1. SPACE APPLICATION FORM We wish to participate in China International Hardware Show 2017: Postal Code / City: Country: I am a Manufacturer Agent / Distributor representing the following brands at CIHS

More information

exhibitor information pack

exhibitor information pack exhibitor information pack Please read the following information carefully. This manual contains all the relevant information to assist you in the preparation of your display. Should you have any questions

More information

exhibitor information pack

exhibitor information pack exhibitor information pack Please read the following information carefully. This manual contains all the relevant information to assist you in the preparation of your display. Should you have any questions

More information

exhibitor information pack

exhibitor information pack exhibitor information pack Please read the following information carefully. This manual contains all the relevant information to assist you in the preparation of your display. Should you have any questions

More information

Milton Exhibit Service Manual & Forms

Milton Exhibit Service Manual & Forms Milton Exhibit Service Manual & Forms Asia Pacific Dental Congress 2017, Macau Official Contractor ALAMEDA DR. CARLOS D ASSUMPÇÃO NºS 181-187, JARDIM BRILHANTISMO A13, MACAU Fax: (853) 2888 3871 ICRS 2018

More information

Important Exhibitor Information

Important Exhibitor Information CORINTHIAN Important Exhibitor Information Exhibition: 11 th International Pragmatics Conference 12th 17 th July 2009 : The Dear Exhibitor, Your show is approaching fast. In order for us to build your

More information

Form 1: Official Catalogue Entry

Form 1: Official Catalogue Entry Form 1: Official Catalogue Entry For your official Free Catalogue Entry, please supply the following: Address Website Social Media Fax: Email Logo of your company (Highest resolution possible) to rathul@tradearabia.net

More information

SPACE ONLY STAND FORM (To be filled by the Exhibitor)

SPACE ONLY STAND FORM (To be filled by the Exhibitor) SPACE ONLY STAND FORM (To be filled by the Exhibitor) FORM # 1 Company Name: Stand No.: Tel: Mobile: Fax: Website: We advise that the following contractor has been appointed to erect the above stand at

More information

SPACE ONLY STAND FORM (To be filled by the Exhibitor)

SPACE ONLY STAND FORM (To be filled by the Exhibitor) SPACE ONLY STAND FORM (To be filled by the Exhibitor) FORM # 1 Company Name: Stand No.: Tel: Mobile: Fax: Website: We advise that the following contractor has been appointed to erect the above stand at

More information

SPACE ONLY STAND FORM (To be filled by the Exhibitor)

SPACE ONLY STAND FORM (To be filled by the Exhibitor) FORM # 1 SPACE ONLY STAND FORM (To be filled by the Exhibitor) Company Name: Stand No.: Tel: Mobile: Fax: Website: We advise that the following contractor has been appointed to erect the above stand at

More information

SPACE ONLY STAND FORM (To be filled by the Exhibitor)

SPACE ONLY STAND FORM (To be filled by the Exhibitor) SPACE ONLY STAND FORM (To be filled by the Exhibitor) FORM # 1 Company Name: Stand No.: Tel: Mobile: Fax: Website: We advise that the following contractor has been appointed to erect the above stand at

More information

Official Contractor Manual & Forms

Official Contractor Manual & Forms SECTION 9: OFFICIAL CONTRACTOR INFORMATION & FORMS Official Contractor Manual & Forms AD Target Exhibition Services Limited Tel: (852) 3165 6726 / (852) 3165 6734 Fax: (852) 2564 0983 Attn: Ms.Yandy Wen/Mr.Calvin

More information

VIENNA JUNE 2017

VIENNA JUNE 2017 EXHIBITION STANDS SPACE ONLY STANDS The space contracted refers solely to the floor and its perimeter. Therefore, exhibitors must decorate this surface area in accordance with their needs. The Organiser

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

Asian Attractions Expo 2018 HKCEC, Halls 3B-3G 6 8 June 2018

Asian Attractions Expo 2018 HKCEC, Halls 3B-3G 6 8 June 2018 HKCEC, Halls 3B-3G 6 8 June 2018 Basic Shell Scheme Booth Specification Each 9m² Basic Shell Scheme Booth will be provided with: Fascia Board Wall Panels Furniture Electrical Items Approx. 370mm height,

More information

Stand construction regulations

Stand construction regulations Stand construction regulations This overview contains the following parts: Part 1: The design process, Part 2: The approval process, Part 3: Specific requirements for working in the United Arab Emirates.

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

Please return all requested forms and provide all information by the following deadlines:

Please return all requested forms and provide all information by the following deadlines: EXHIBITION MANUAL Responsibilities of the exhibitor The exhibitor must observe and comply with all rules stated in these guidelines, and must assume responsibility for any acts performed by his/her employees,

More information

7 th World Cargo Symposium

7 th World Cargo Symposium Exhibitor s Manual Incorporating: General Information & Technical Regulations General Information & Technical Regulations All exhibitors are to comply and adhere to the guidelines stipulated in this Exhibitor

More information

COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS

COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

EXHIBITION PACKAGES. Total DECOM 5th Annual flagship event Grand Networking Dinner Exhibition & Conference. GRAND NETWORKING DINNER 23 April 2018

EXHIBITION PACKAGES. Total DECOM 5th Annual flagship event Grand Networking Dinner Exhibition & Conference. GRAND NETWORKING DINNER 23 April 2018 EXHIBITION PACKAGES Total DECOM 5th Annual flagship event Grand Networking Dinner Exhibition & Conference GRAND NETWORKING DINNER 23 April 2018 CONFERENCE 24 & 25 April 2018 Keynote Conference 121 Networking

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT   COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

All electrical equipment must be tagged and tested by a professional and must not create any hazards to others when installed.

All electrical equipment must be tagged and tested by a professional and must not create any hazards to others when installed. Custom Stand Guidelines When building a custom stand, there are a number of rules and regulations that you must comply with. The attached document details them all for you. To get you started, here are

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

Relevant issues of booth construction

Relevant issues of booth construction Relevant issues of booth construction 1. Assembly If you have large equipment, you must advise the Technical Director of the fair in advance, because the transportation and handling of packages and/or

More information

EXHIBITORS GUIDE FEBRUARY Specific Rules for Participation. Security. Safety and health at work. Defense.

EXHIBITORS GUIDE FEBRUARY Specific Rules for Participation. Security. Safety and health at work. Defense. 20-23 FEBRUARY 2018 ORGANISED BY Fire safety and emergency Security Safety and health at work EXHIBITORS GUIDE Specific Rules for Participation www.sicur.ifema.es Defense 1 HOW DO I BECOME AN EXHIBITOR

More information

Travel & Adventure LA Job # V 500 WATTS (5 AMPS) 1000 WATTS (10 AMPS) 2000 WATTS (20 AMPS) V 10

Travel & Adventure LA Job # V 500 WATTS (5 AMPS) 1000 WATTS (10 AMPS) 2000 WATTS (20 AMPS) V 10 WHEN ORDERING ELECTRICAL SERVICES: 1. Check rating plate(s) on item(s) and order outlets accordingly. 2. Lighting outlets supplied with one (1) connection per outlet ordered. 3. Motor outlet supplied with

More information

METHOD OF PAYMENT FORM

METHOD OF PAYMENT FORM METHOD OF PAYMENT FORM Advance Payment Deadline Date: 10/27/17 EXHIBITOR INFORMATION COMPANY NAME: ADDRESS: PHONE: FAX: CITY: ST: ZIP: COUNTRY: EMAIL: CELL: METHOD OF PAYMENT All transactions require a

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

Hi-Tech Electric is going green!

Hi-Tech Electric is going green! Welcome to Hi-Tech Electric! We are pleased to be your electrical, plumbing and rigging services provider for your upcoming event. Hi-Tech Electric is going green! In support of saving the environment

More information

Rules & Regulations Highlights :

Rules & Regulations Highlights : Rules & Regulations Highlights : 1. All promotions outside the contracted stand area are prohibited. 2. The use of sound amplifier and excessively loud activities are prohibited. 3. Over the Counter cash

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM ELECTRICAL ORDER FORM Advance Payment Deadline Date: 11/15/16 E M FACILITY: Long Beach Convention Center FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120 VOLT POWER

More information

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM ELECTRICAL ORDER FORM E M FACILITY: Anaheim Convention Center FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120 VOLT POWER DELIVERY The cost of 120-Volt outlets includes

More information

FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT

FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT ELECTRICAL ORDER FORM Advance Payment Deadline Date: 03/09/17 E M FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120 VOLT POWER DELIVERY The cost of 120-Volt outlets includes

More information

DEADLINES FOR EXHIBITORS

DEADLINES FOR EXHIBITORS GENERAL INFORMATION DEADLINES FOR EXHIBITORS Description Deadline 1. Application for Admission and Rental Contract for Space and Exhibitor 15 April 2013 Manual (General Regulations and Index of Products)

More information

EXHIBITORS GUIDE Specific Rules for Participation

EXHIBITORS GUIDE Specific Rules for Participation International HVAC&R Exhibition 26 Feb./ 1 Mar. 2019 MADRID ORGANISED EXHIBITORS GUIDE Specific Rules for Participation cr.ifema.es IFEMA - Feria de Madrid (+34) 91 722 30 00 cr@ifema.es 1 HOW DO I BECOME

More information

TOTAL EXHIBITOR: BTH # EVENT: CLEO:2018. FACILITY: San Jose McEnery Convention Center. DATES: May 2018 EVENT #058007SF

TOTAL EXHIBITOR: BTH # EVENT: CLEO:2018. FACILITY: San Jose McEnery Convention Center. DATES: May 2018 EVENT #058007SF ELECTRICAL ORDER E M FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS INLINE AND PENINSULA DELIVERY The cost of 120-Volt outlets includes delivery to one location at the

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Step 2 Complete the Method of Payment This form must be completed

More information

EXHIBITORS GUIDE INTERNATIONAL FASHION TRADE SHOW FEBRUARY

EXHIBITORS GUIDE INTERNATIONAL FASHION TRADE SHOW FEBRUARY FEBRUARY INTERNATIONAL FASHION TRADE SHOW EXHIBITORS GUIDE 1 HOW TO BECOME AN EXHIBITOR 2 SPACE CONTRACTING AND MORE INFORMATION 3 MODULAR STAND DESCRIPTION 4 RULES FOR FREE DESIGN STANDS 5 ADVERTISE AND

More information

FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT

FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT ELECTRICAL ORDER FORM Advance Payment Deadline Date: 04/04/17 E M FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120 VOLT POWER DELIVERY The cost of 120-Volt outlets includes

More information

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM ELECTRICAL ORDER FORM Advance Payment Deadline Date: 01/17/17 E M EVENT: FACILITY: FIREHOUSE WORLD SAN DIEGO CONVENTION CENTER FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS

More information

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM ELECTRICAL ORDER FORM Advance Payment Deadline Date: 6/9/17 E M FACILITY: BALTIMORE CONVENTION CENTER FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120 VOLT POWER DELIVERY

More information

STAND LAYOUT AND INSTALLATION

STAND LAYOUT AND INSTALLATION STAND LAYOUT AND INSTALLATION VINEXPO HONG KONG 2018 will take place at The Hong Kong Convention and Exhibition Centre (HKCEC) in the Exhibition Halls on Levels 1 and 3. The documents, ACCESS REQUIREMENTS

More information

13-15 EXHIBITORS GUIDE. Specific Rules for Participation.

13-15 EXHIBITORS GUIDE. Specific Rules for Participation. 13-15 June 2018 España ORGANISED BY EXHIBITORS GUIDE Specific Rules for Participation www.genera.ifema.es IFEMA - Feria de Madrid Tel. 902 22 15 15 (34) 91 722 30 00 genera@ifema.es 1 HOW DO I BECOME AN

More information

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM ELECTRICAL ORDER FORM E M EVENT: American Traffic Safety Services Association FACILITY: San Diego Convention Center FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120

More information

METHOD OF PAYMENT. Advance Payment Deadline Date: 02/09/18 FINANCIALLY RESPONSIBLE COMPANY METHOD OF PAYMENT CHECK AND CREDIT CARD INFORMATION

METHOD OF PAYMENT. Advance Payment Deadline Date: 02/09/18 FINANCIALLY RESPONSIBLE COMPANY METHOD OF PAYMENT CHECK AND CREDIT CARD INFORMATION METHOD OF PAYMENT FINANCIALLY RESPONSIBLE COMPANY COMPANY NAME: ADDRESS: PHONE: CITY: ST: ZIP: COUNTRY: CELL #: EMAIL: METHOD OF PAYMENT All transactions require a credit card on file with proper authorization.

More information

hktdc.com Small Orders Promotion Package 2018/2019 Important Events and Dates

hktdc.com Small Orders Promotion Package 2018/2019 Important Events and Dates hktdc.com Small Orders Promotion Package /2019 Important Events and Dates Important Events\ Fair with hktdc.com Small Orders product display zone Advertisers to submit hktdc.com Small Orders Promotion

More information

Please or Fax orders to Gulf Coast Event Services. FAX

Please  or Fax orders to Gulf Coast Event Services. FAX Please email or Fax orders to Gulf Coast Event Services. office@gcevents.biz FAX 225-673-2142 Return form to: 17257 La Hwy 44; Unit 2 Prairieville, La. 70769 Ph 225-673-2943 Fax 225-673-2142 Email: office@gcevents.biz

More information

TOTAL. Advance Payment Deadline Date: 04/27/18 ELECTRICAL ORDER E M EXHIBITOR: BTH # EVENT: SPU FACILITY: San Francisco Marriott Marquis

TOTAL. Advance Payment Deadline Date: 04/27/18 ELECTRICAL ORDER E M EXHIBITOR: BTH # EVENT: SPU FACILITY: San Francisco Marriott Marquis ELECTRICAL ORDER ELECTRICAL EXHIBITION SERVICES 129 Sylvester Road, So. San Francisco CA 94080 Phone: (650) 225-0900 Fax: (650) 225-0950 sanfrancisco@edlen.com E M Advance Payment Deadline Date: 04/27/18

More information

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM E M ELECTRICAL ORDER FORM ELECTRICAL EHIBITION SERVICES Email baltimore@edlen.com FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120 VOLT POWER DELIVERY The cost of 120-Volt

More information

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM ELECTRICAL ORDER FORM E M Phone: (210) 662-9450 Fax: (210) 662-9640 FACILITY: Henry B. Gonzalez Convention Center FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120 VOLT

More information

SHOW TIMETABLE 09:00 18:00 09:00 20:00 09:00 22:00

SHOW TIMETABLE 09:00 18:00 09:00 20:00 09:00 22:00 SHOW TIMETABLE BUILD UP: Saturday 2 nd December Sunday 3 rd December Monday 4 th December 09:00 18:00 09:00 20:00 09:00 22:00 Space Only Exhibitors Space Only Exhibitors All Exhibitors Please note: SHELL

More information

FLOOD & COAST 2018 EXHIBITION MANUAL

FLOOD & COAST 2018 EXHIBITION MANUAL FLOOD & COAST 2018 EXHIBITION MANUAL VENUE: Hall 1 at Telford International Centre http://www.theinternationalcentretelford.com/ DATES: 20 to 22 MARCH 2018 (inclusive) This manual is intended to make your

More information

DEADLINES FOR EXHIBITORS

DEADLINES FOR EXHIBITORS DEADLINES FOR EXHIBITORS TECHNICAL REGULATIONS Description 1. Application for Admission and Rental Contract for Space, General Regulations and Index of products issued Deadline 19 June 2017 Invoice for

More information

Sponsorship and advertising opportunities

Sponsorship and advertising opportunities Sponsorship and advertising opportunities (A) Package options P01 Package option 1 Include following items: 1. Catalogue run-of-page advertisement 2. Logo (single unit, B/W) beside catalogue entry 3. One

More information

Remote-controlled flying objects are not permitted in the exhibition booths.

Remote-controlled flying objects are not permitted in the exhibition booths. Information and Guide for Exhibitors Animals Live animals and pets are not permitted in the exhibition booths. Where an animal is approved and/or is part of the event, the owner must comply with the Wildlife

More information

COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS

COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed

More information

Allocation of floor space ESA Partners have priority choice and booking of space until 31 October 2017.

Allocation of floor space ESA Partners have priority choice and booking of space until 31 October 2017. The Trade Exhibition The trade exhibition has been designed to allow both large and small companies with interests in the field of anaesthesiology to participate. The exhibition area is located close to

More information

TOTAL. Advance Payment Deadline Date: 02/07/19 ELECTRICAL ORDER E M EXHIBITOR: BTH # EVENT: ASCO-SITC Clinical Immuno-Oncology Symposium

TOTAL. Advance Payment Deadline Date: 02/07/19 ELECTRICAL ORDER E M EXHIBITOR: BTH # EVENT: ASCO-SITC Clinical Immuno-Oncology Symposium ELECTRICAL ORDER E M FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS INLINE AND PENINSULA DELIVERY The cost of 120-Volt outlets includes delivery to one location at the

More information

PTAK WARSAW EXPO TERMS AND CONDITIONS CONSOLIDATED TEXT

PTAK WARSAW EXPO TERMS AND CONDITIONS CONSOLIDATED TEXT 1. GENERAL PROVISIONS 1. The PTAK Warsaw Expo site manager and administrator is PTAK WARSAW EXPO sp. z o.o., Al. Katowicka 62, 85-030 Nadarzyn, Wolica 114D, hereinafter referred to as the "Administrator".

More information

DEADLINES FOR EXHIBITORS

DEADLINES FOR EXHIBITORS GENERAL INFORMATION DEADLINES FOR EXHIBITORS Description Deadline 1. Application for Admission and Rental Contract for Space and Exhibitor 11 April 2011 Manual (General Regulations and Index of Products)

More information

All registration paperwork should be mailed to: CPQG Vendor Coordinator. PO Box 55. Stafford TX Dear Prospective Vendor:

All registration paperwork should be mailed to: CPQG Vendor Coordinator. PO Box 55. Stafford TX Dear Prospective Vendor: Dear Prospective Vendor: Coastal Prairie Quilt Guild of Texas is proud to announce the fifth biennial quilt showcase. We have great expectations for our Coastal Prairie Quilt Showcase 2018, A Decade in

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

METHOD OF PAYMENT FORM

METHOD OF PAYMENT FORM METHOD OF PAYMENT FORM 16110 NW 13th Avenue, FL 33169 FACILITY: Fontainebleau Miami Beach COMPANY NAME: ADDRESS: EHIBITOR INFORMATION METHOD OF PAYMENT PHONE: CITY: ST: ZIP: COUNTRY: SIGNATURE: EMAIL:

More information

CIRCULAR. Ref: MMPRC-MKS/CIR/2018/9

CIRCULAR. Ref: MMPRC-MKS/CIR/2018/9 EMAIL CIRCULAR To: All tourism related companies Date: 02 nd April 2018 From: Marketing Department Ref: MMPRC-MKS/CIR/2018/9 Re: ATM 2018- Dubai, UAE Reserving Designated Meeting Tables Total No. of pages

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

Visa MasterCard Amex Account Number: Exp. Date: Check enclosed #: Amount:

Visa MasterCard Amex Account Number: Exp. Date: Check enclosed #: Amount: IF PAYING BY CHECK RETURN THIS FORM TO: PCCA/SMG ORDER PROCESSING 1101 ARCH STREET PHILADELPHIA, PA 19107 EMAIL COMPLETED FORM TO: utilities@paconvention.com 215-418-2190 ELECTRIC SERVICE & ELECTRIC LABOR

More information

DEADLINES FOR EXHIBITORS

DEADLINES FOR EXHIBITORS Description DEADLINES FOR EXHIBITORS Deadline 1. Application for Admission and Rental Contract for Space, General Regulations and Index of products issued 10 June 2015 2. Deadline for Return of Application

More information

Deadline!"31/3/2010 HONG KONG CONVENTION & EXHIBITION CENTRE!"#$% 27-30/10/2010 Part I! Company Information=!

Deadline!31/3/2010 HONG KONG CONVENTION & EXHIBITION CENTRE!#$% 27-30/10/2010 Part I! Company Information=! (FOR HONG KONG EXHIBITORS!"#$) HONG KONG CONVENTION & EXHIBITION CENTRE!"#$% 27-30/10/2010 Deadline!"31/3/2010 www.hktdc.com/hklightingfairae Please submit completed application form, photocopy of HK Business

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

EXHIBITOR TEMPLATES A Division of Regional Facilities Auckland Ltd An Auckland Council Organisation

EXHIBITOR TEMPLATES A Division of Regional Facilities Auckland Ltd An Auckland Council Organisation EXHIBITOR TEMPLATES Level 3, Viaduct Events Centre, 161 Halsey Street, Auckland 1010. PO Box 5749, Wellesley Street, Auckland 1141, New Zealand. T +64 9 307 5498 F +64 9 307 5499 E events@aucklandconventions.co.nz

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

2018 Exhibitor Manual Rules and Regulations Fort Wayne Home and Garden Show Allen County Memorial Coliseum March 1-4, 2018

2018 Exhibitor Manual Rules and Regulations Fort Wayne Home and Garden Show Allen County Memorial Coliseum March 1-4, 2018 2018 Exhibitor Manual Rules and Regulations Fort Wayne Home and Garden Show Allen County Memorial Coliseum March 1-4, 2018 This packet contains important information. Please read as we do enforce these

More information

You reserved a Bare Stand

You reserved a Bare Stand You reserved a Bare Stand The following is included in your exhibit space rental fee: Floor marking of your space; A wooden partition (2.50 m high) covered with beige brushed cotton fabric (except for

More information

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM ELECTRICAL ORDER FORM E M FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120 VOLT POWER DELIVERY The cost of 120-Volt outlets includes delivery to one location in island

More information

FREEMAN DISPLAY LABOR

FREEMAN DISPLAY LABOR P. O. Box 14210 Orange, CA 92863-1610 714/254-3400 Fax: 714/490-0801 FreemanAnaheimES@freemanco.com NAME OF SHOW: COMPANY NAME: BOOTH#: CONTACT NAME: PHONE#: FAX #: Straight Time- 8:00 A.M. to 5:00 P.M.

More information

Tulsa Women s Living Expo EXHIBITOR KIT

Tulsa Women s Living Expo EXHIBITOR KIT Tulsa Women s Living Expo EXHIBITOR KIT WELCOME! Your Exhibitor Kit contains information necessary for planning your participation in the Expo. Should you have any questions please contact us so we may

More information

Dear Exhibitors, Sincerely, Edlen Electrical Exhibition Services COMPANY: BTH # EVENT: DEL MAR HOME IMPROVEMENT SHOW FACILITY: DEL MAR FAIRGROUNDS

Dear Exhibitors, Sincerely, Edlen Electrical Exhibition Services COMPANY: BTH # EVENT: DEL MAR HOME IMPROVEMENT SHOW FACILITY: DEL MAR FAIRGROUNDS EVENT: DEL MAR HOME IMPROVEMENT SHOW FACILITY: DEL MAR FAIRGROUNDS Dear Exhibitors, Please note that your booth comes with (1) 500-watt, 120 volt outlet. If you require more than 500 watts for your booth,

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS EVENT: St. Louis Boat and Sports Show FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment

More information

Exhibitor s Manual Foreword

Exhibitor s Manual Foreword Foreword 2016 China Yiwu Imported Commodities Fair will be held on May 13 th -16 th in Yiwu International Expo Center in Zhejiang. And in order to simplify preparation for participating in the fair, the

More information

COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS

COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed

More information

HONG KONG REGULATIONS

HONG KONG REGULATIONS HONG KONG REGULATIONS VINEXPO HONG KONG 2018 will take place at The Hong Kong Convention and Exhibition Centre (HKCEC) in the Exhibition Halls on Levels 1 and 3. The documents, ACCESS REQUIREMENTS (document

More information

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM ELECTRICAL ORDER FORM E M FACILITY: SAN DIEGO CONVENTION CENTER FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM ORDER INSTRUCTIONS 120 VOLT POWER DELIVERY The cost of 120-Volt outlets includes

More information

EXHIBITOR MOVE-IN EXHIBITOR MOVE-OUT

EXHIBITOR MOVE-IN EXHIBITOR MOVE-OUT Visit our website to view our on-line catalogue SERVICE CONTRACTOR CONTACT GLOBAL CONVENTION SERVICES Phone: 1-902-425-1400 Fa: 1-902-423-4129 Halifa, NS B3J OB7 info@globalconvention.ca BOOTH EQUIPMENT

More information

Name of Exhibitor: Booth No : as our appointed contractor for our booth

Name of Exhibitor: Booth No : as our appointed contractor for our booth FORM 11A Return to: AMC (Exhibits) Limited Hall W1 Hall W3 Ms Janet Chan, Mr Decko Lee Ms Tracy Ng Email:Janet.Chan@arconmarketing.com Email:Tracy.Ng@arconmarketing.com Email:Decko.Lee@arconmarketing.com

More information

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS ORDER INSTRUCTIONS FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT WWW.EDLEN.COM COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS Step 1 Complete the Method of Payment This form must be completed and returned

More information

EXHIBITORS LOGISTICS GUIDE ALGERIA LIBYA EGYPT. 25 & 26 March March March March March 2018.

EXHIBITORS LOGISTICS GUIDE ALGERIA LIBYA EGYPT. 25 & 26 March March March March March 2018. 8 th NORTH AFRICA PETROLEUM EXHIBITION & CONFERENCE Oran International Convention Centre, Algeria 25-28 March 2018 EXHIBITORS LOGISTICS GUIDE ORAN TUNISIA MOROCCO WESTERN SAHARA ALGERIA LIBYA EGYPT NAPEC

More information

Exhibitor Order Form Package

Exhibitor Order Form Package Calgary Stampede Event Services 2018 - Exhibitor Order Form Package Box 1060, Station M Calgary Alberta T2P 2K8 Phone: 403-261-0377 Fax 403-261-0144 Email: eventservices@calgarystampede.com Advance Pricing

More information

Technical Manual for exhibitors

Technical Manual for exhibitors Technical Manual for exhibitors SCHÜTTGUT SOLIDS Basel 2016 Messe Basel - Hall 2 16 th November 2016 9 am 5 pm 17 th November 2016 9 am 4 pm 1 Dear exhibitors, We are pleased to welcome you in Dortmund.

More information

San Mateo Event Center

San Mateo Event Center ELECTRICAL ORDER FORM E M 129 Sylvester Road, So. San Francisco, CA 94080 COMPANY: BTH # EVENT: Norcal Landscape & Nursery Show 2019 FACILITY: San Mateo Event Center FOR YOUR CONVENIENCE PLACE YOUR ORDER

More information

EXHIBITOR GUIDE. Specific Rules of Participation. 28 February to 3 March 2017 Madrid - Spain. Trade Fair for Innovative Water Management Solutions

EXHIBITOR GUIDE. Specific Rules of Participation. 28 February to 3 March 2017 Madrid - Spain. Trade Fair for Innovative Water Management Solutions Trade Fair for Innovative Water Management Solutions 28 February to 3 March 2017 Madrid - Spain ORGANISED BY: EXHIBITOR GUIDE Specific Rules of Participation IFEMA - Feria de Madrid (+34) 91 722 30 00

More information

FREEMAN installation & dismantle labor

FREEMAN installation & dismantle labor 901 E. South St NAME OF SHOW: STRATEGIES IN LIGHT WITH THE LED / FEBRUARY 28 - MARCH 2, 2017 COMPANY NAME BOOTH #: CONTACT NAME: PHONE #: E-MAIL ADDRESS DISPLAY LABOR (One Hour Minimum per Worker) Straight

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION TECHNICAL INFORMATION Table of Contents Event details... 3 Build up... 3 Exhibition... 3 Dismantling... 3 EWMA Secretariat... 4 Contact information... 4 Exhibition Sales Team... 4 Registration Team...

More information

Exhibitor Electrical and Distribution of Power Information

Exhibitor Electrical and Distribution of Power Information Exhibitor Electrical and Distribution of Power Information Below is the standard 10 x 10 exhibitor booth layout. All 10 x10 booth packages include: o 8 High Draped Back & 3 High Side Walls (white) o 1

More information

EXHIBITOR GUIDE SCHAUMBURG JANUARY 11-13, Schaumburg Convention Center Schaumburg, IL. Phone: Fax:

EXHIBITOR GUIDE SCHAUMBURG JANUARY 11-13, Schaumburg Convention Center Schaumburg, IL. Phone: Fax: EXHIBITOR GUIDE SCHAUMBURG JANUARY 11-13, 2019 Schaumburg Convention Center Schaumburg, IL PO Box 73 Excelsior, MN 55331 Phone: 952-471-1192 Fax: 952-471-0051 LOCATION Schaumburg Convention Center (847)

More information