ADDENDUM NO. 1 CITY OF PORT ARANSAS ELLIS MEMORIAL EXISTING LIBRARY RENOVATIONS AND REPAIRS CSP #2016-22 700 W. AVE A PORT ARANSAS, TX 78373 Issue Date: 01/07/2019 The following additions, deletions, modifications, or clarifications shall be made to the appropriate sections of the plans and specifications and shall become a part of the Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid form. BIDDER QUESTIONS / GENERAL CLARIFICATIONS: Q1: Is the fire alarm system itself to be included in this scope? Or will it be provided/installed by owner s vendor? A1: Rough-in only by G.C. Q2: Are the data cabling/drops/faceplates to be included in this scope? Or will it be provided/installed by owner s vendor? A2: Rough-in only by G.C. Q3: The only site work I am seeing is the resealing, striping, and relocation of ADA parking signage at the small 3-car parking area..is this correct? A3: None. Q4: Aside from repair of a leak area and any new penetration through roof, there does not appear to be any roof work is this correct? The roof notes on sheet G100 seem to indicate more to the roof scope, but I m not seeing anything called out on the plans. Is there any warranty still in effect? A4: None. MAKE THE FOLLOWING ADDITIONS, MODIFICATIONS OR DELETIONS TO THE DRAWINGS AND SPECIFICATIONS: MODIFICATIONS TO THE CONTRACT DRAWINGS: NONE. MODIFICATIONS TO THE PROJECT MANUAL - SPECIFICATIONS: TURNER RAMIREZ ARCHITECTS 3751 S. ALAMEDA ST. CORPUS CHRISTI, TX 78411 TRARCH.COM Page 1 of 2
Addition of Front End Specifications to include Cover, Table of Contents, Bidding Instructions, Contracting Forms and Supplements. END OF ADDENDUM NO. 1 DETAIL ATTACHMENTS: FRONT END SPECIFICATIONS. TURNER RAMIREZ ARCHITECTS 3751 S. ALAMEDA ST. CORPUS CHRISTI, TX 78411 TRARCH.COM Page 2 of 2
ELLIS MEMORIAL EXISTING LIBRARY REPAIRS JANUARY 7, 2019 ADDENDUM #01
City of Port Aransas Ellis Memorial Existing Library Repairs 100% Bid Documents 01/07/2019 SECTION 00 01 10 - TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS 1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 01 10 - Table of Contents B. 00 50 00 - Contracting Forms and Supplements 00 01 10 TABLE OF CONTENTS 1 of 1
City of Port Aransas 100% Bid Documents Ellis Memorial Existing Library Repairs 01/07/2019 SECTION 00 50 00 - CONTRACTING FORMS AND SUPPLEMENTS PART 1 GENERAL 1.01 CONTRACTOR IS RESPONSIBLE FOR OBTAINING A VALID LICENSE TO USE ALL COPYRIGHTED DOCUMENTS SPECIFIED BUT NOT INCLUDED IN THE PROJECT MANUAL. 1.02 FORMS A. Use the following forms for the specified purposes unless otherwise indicated elsewhere in the Contract Documents. Samples forms are attached for reference. B. Bond Forms: 1. Bid Bond Form: AIA A310. 2. Performance and Payment Bond Form: AIA A312. C. Post-Award Certificates and Other Forms: 1. Schedule of Values Form: AIA G703. 2. Application for Payment Forms: AIA G702 with AIA G703 (for Contractors). D. Clarification and Modification Forms: 1. Construction Change Directive Form: AIA G714. 2. Change Order Form: AIA G701. E. Closeout Forms: 1. Certificate of Substantial Completion Form: AIA G704. 1.03 REFERENCE STANDARDS A. AIA A310 - Bid Bond; 2010. B. AIA A312 - Performance Bond and Payment Bond; 2010. C. AIA G701 - Change Order; 2017. D. AIA G702 - Application and Certificate for Payment; 1992. E. AIA G703 - Continuation Sheet; 1992. F. AIA G704 - Certificate of Substantial Completion; 2017. G. AIA G714 - Construction Change Directive; 2017. 1.04 INSTRUCTION TO BIDDERS A. Bid Walk-Through: January 4, 2019 at 11am at 700 W. Avenue A, Port Aransas, TX 78373 B. Bid Submission Date: January 11, 2019 at 4pm. Mailed or hand-delivered to City Hall, 710 W. Avenue A, Port Aransas, TX 78373 C. Clarifications: 1. Refer to Interior Demolition Drawings (attached): 2. Start date: Upon notice to proceed from City of Port Aransas 3. Completion time: Two weeks 4. What to do with debris: Contractor to provide dumpster and responsible for removal 5. Where you can put debris bins: Dumpster may be located on paved parking immediately adjacent to building on west side. Coordinate with City of Port Aransas Staff. 6. What needs to be removed: All demolished debris is to be removed and will become the property of the demolition contractor and shall be disposed of in accordance with all applicable local / state regulations. 00 50 00 CONTRACTING FORMS AND SUPPLEMENTS 1 of 2
City of Port Aransas 100% Bid Documents Ellis Memorial Existing Library Repairs 01/07/2019 7. What needs to be protected: Protect all existing structural framing to remain, all exterior finishes and appurtenances. Exterior envelope is to be maintained in existing weather tight condition. 8. Payment info: Payment request shall be submitted on the first of the month in AIA continuation sheet format with all supporting invoices and documentation. Payment will be made within 30 days of approval of submitted pay application. PART 2 PRODUCTS NOT USED PART 3 EXECUTION NOT USED END OF SECTION 005000 CONTRACTING FORMS AND SUPPLEMENTS 2 of 2