Coquille Indian Housing Authority Maintenance Report March 2019

Similar documents
Coquille Indian Housing Authority Maintenance Report October 2017

Kelly Village Apartments 3118 Green Houston, Texas 77020

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 1-AMP Christopher Christopher Repair

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

Address: Contractor: Contractor Phone: Line Item Bid Parts/Labor Labor Only Bid Week Complete (Circle One)

ADDENDUM NO 1 Issued November 21, 2017

Chapter 33 - Checklists

11/1/2016. Smoke detectors will be furnished by MHA and installed by contractor.

Exhibit B Construction Repair Scope of Work Site Address: 1837 E. Sherman

The Inspector. Property Inspection Report

Davis Frame Co., Inc. Construction Budget Considerations

Helms Builders, Inc.

Madison's Home Inspections

Inspection Report. Property Address:

Home Inspection Report

Handyman & Maintenance Cost Estimator

Walnut Creek Mutual Seventy

MUTUAL OPERATIONS. 1) Assurance of the presence of a Contract between all interested parties;

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Plumbing. Division 055 Plumbing Rough

COOL AMENITIES for Modern Living

Rental Inspection Checklist

100 S Ashley Dr Suite 600 Tampa, FL Phone: Fax:

Appalachian Log Structures Construction Cost Estimating Guide

Vacant Unit Turnover Services Invitation for Bid (IFB) Project No

3. Appliances - Free Standing x

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

EXHIBIT B MAINTENANCE MATRIX

OF WORK SCOPE. (a) The contractor shall bid to furnish the following: labor, licenses, material, and equipment.

Property Inspection Report

PLYMOUTH CREEK HOME OWNERS ASSOCIATION

SCOPE OF WORK DEMO: ELECTRIC: 4) The contractor shall bid to remove all switches, outlets and covers.

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

Tru-Quest Home Inspection

STANDARD CONSTRUCTION PACKAGE Addendum A REV SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state author

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

Inspection Report. 1 of 8

Schedule C STANDARD Specifications

A Summary of the Basic Duties of Maintenance, Repair and Replacement for CARRIAGE PARK CONDOMINIUM ASSOCIATION

FOUR CORNERS CUSTOM BUILDERS, LLC


- Preservation and Hud Work Over view

1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) N Richard

Columbia County Health Care Center Added Amenities

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

Inspect Hawaii. Property Inspection Report

SEMINOLE TRIBE OF FLORIDA

NORMAL HILLS BUILDING 8 COSMESTIC UPGRADES PROJECT

NORMAL HILLS BUILDING 6 COSMESTIC UPGRADES PROJECT

Schedule D. RTM Finished Home Specifications

Country Village Maintenance Responsibility Guidelines BUILDING - EXTERIORS AND INTERIORS

3D Home Improvement and Inspection Services, Inc

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No

CENTRAL GREAT PLAINS SERIES

1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) S Pioneer

WEST MICHIGAN HOME INSPECTORS LLC 3134 Chamberlain SE Grand Rapids MI

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Proposal. Lexington, MA. Price Work Description

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

Included Features for The Meadows at Slate Run Single Family Homes - Bridgewater, Chelsey, Ashland

Hogue Home Inspections

CONSTRUCTORA VARGAS NICARAGUA Building Inspection Las Delicias San Juan del Sur - Rivas Nicaragua

Monteleone Homes, Inc Canfield Norridge, Illinois Lot #1 Lot Size: 72 x 100 feet

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Inspection Report. Prepared for: Yaron Sternberg. Property Address: 926 Hemingway Road Stone Mountain, GA. Date: April 15, 2011

678 Ridley Circle Fire Loss Repairs

Atlantic Builders Saratoga Woods Included Features Classic Series Single Family Homes Included Features - Bridgewater II, Griffin, Ashland, Chelsey

WILLIAM LYON HOMES 3-YEAR WARRANTY & SERVICE PROGRAM

Home Inspection Report

Homes at Pine Ridge - NEW CONSTRUCTION SPECS

RSH ENGINEERING, INC. FINAL WALK THROUGH INSPECTION REPORT INSP#: S05092 DATE:08/27/06 PAGE #: 1 Address: 1234 Anywhere St, Anywhere, TX

Inspection Report. James Homeowner. Property Address: 123 Main St Paso Robles CA Murphree Building Inspections

Alabama Home Inspections

Wednesday, November 6, Mrs. x

FIELDS OF NANTERRE. c/o Omega Management, Inc th Avenue North #108 Plymouth, MN MAINTENANCE SERVICE POLICY

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011

1st Defense Home Inspections, LLC

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

PeachStone Capital, Inc. Atlanta s Hard Money Lender When timing is everything, we close! Hard Money Loan Property Worksheet Checklist

SAMPLE Property Inspection Report

The Home Doctor, Inc.

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

x x x x x x x x x x x x x x EXHIBIT "B" MAINTENANCE MATRIX COMPONENT(S) OWNER ASSN.

HOME INSPECTION CHECKLIST

PLANNING FOUNDATION FRAMING

Z & C Construction, Inc. Subdivision:

Sams & Associates York Field Services

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Permit Posting and Inspection Procedures

EXTERIOR DRYWALL B-1 5/8" " X"

The Woods at Spring Ridge from the mid $500 s Frederick, Maryland

Efficiencies in Kitchen and Bath Remodeling

REO Client Safety Hazard Requirements

Mountainview Estates.

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

SCOPE OF WORK. 4) The contractor shall bid to remove all switches, outlets and covers.

Client: Address: Inspection Date: 07/31/2011 Inspection Time: 10:00 A.M. 12:30 P.M. Weather Conditions: Overcast, 65 deg F +-

ESSENTIALS COLLECTION

Transcription:

PERFORMED s 3/4/2019 2601 Performed move out inspection with Dale 3/1/2019 Elders Back cut and primed trim 3/1/2019 Elders Checked on contractor 3/1/2019 Elders Looked into way to trim out back door, cut down and back cut several thicker cedar boards to use for trim 3/5/2019 Elders Helped measure floor for underlayment 3/5/2019 Elders Measured floor for underlayment 3/6/2019 Elders Unloaded lumber from dump trailer and drywall from van, dropped off tools 3/8/2019 Elders Removed tub/shower, capped off water and drain lines 3/12/2019 Elders Unloaded drywall and primer 3/13/2019 Elders Measured for cove base, unloaded doors 3/18/2019 Elders Dropped off dump trailer, reviewed scheduling with Lyman 3/29/2019 Elders Met electricians to move location of heater 3/1/2019 2609 Primed walls, caulked around new doors Cleaned and blew out bathroom vents, rerouted ducting in the attic, 3/4/2019 2609 replaced vent hood, drilled hole in soffit, made drywall repairs in utility room 3/5/2019 2609 Helped measure floor for underlayment 3/5/2019 2609 Measured floor for underlayment 3/6/2019 2609 Primed walls 3/6/2019 2609 Primed, cut in, patched utility room drywall, replaced dryer hood vent, caulked front windows, finished bathroom soffit venting 3/6/2019 2609 Swept floors, caulked around new doors, set nails in trim 3/7/2019 2609 Finished caulking and filling holes around new doors and trim 3/7/2019 2609 Finished priming walls and started painting 3/7/2019 2609 Painted interior 3/8/2019 2609 Mix paint, painted, taped off door hinges 3/8/2019 2609 Painted interior 3/8/2019 2609 Painted interior 3/11/2019 2609 Cut in paint 3/11/2019 2609 Painted interior 3/12/2019 2609 Caulked around bathroom windows, painted interior 3/12/2019 2609 Painted and cut in walls and doors 3/12/2019 2609 Painted interior 3/13/2019 2609 Painted interior, moved unused tools to garage 3/13/2019 2609 Touched up paint, painted doors 3/13/2019 2609 Touched up paint, replaced bathroom faucet 3/14/2019 2609 Painted doors 3/14/2019 2609 Painted, cleaned doors in prep for paint 3/14/2019 2609 Replaced washers on all shut off valves 3/15/2019 2609 Cleaned switches and outlets, installed cover plates and light covers Page 1 of 8

PERFORMED 3/18/2019 2609 Painted and primed inside and outside of front door, moved some items outside 3/19/2019 2609 Cleaned heater covers, cleaned and installed shelving brackets 3/20/2019 2609 Installed smoke alarms in bedrooms, cleaned and reinstalled shelf brackets, installed heater covers, cleaned up, returned tools to van 3/20/2019 2609 Painted doors, bottom of walls, door jamb, new door in bathroom, and cut in paint as needed 3/20/2019 2609 Painted interior doors, cut in around light fixtures, replaced thermostats, mounted doorbell transformer 3/21/2019 2609 Helped install underlayment 3/21/2019 2609 Swept in prep for underlayment, unloaded underlayment into garage, and began installing 3/21/2019 2609 Touched up paint, put light fixtures back together, replaced caulking around backsplash, tub, sink, gathered supplies to replace hose bib 3/22/2019 2609 Installed underlayment, cleaned up 3/25/2019 2609 Cut and installed underlayment 3/26/2019 2609 Cut and installed underlayment 3/27/2019 2609 Finished cutting and installing underlayment 3/27/2019 2609 Installed underlayment, cleaned up 3/28/2019 2609 Painted doors 3/28/2019 2609 Washed and installed shelving brackets, cleaned up 3/29/2019 2609 Cleaned out trash from garage, took cardboard to recycling 3/29/2019 2609 Moved items for flooring installation, installed mirrors 3/11/2019 2670A Cleaned out trash 3/14/2019 2670A Opened unit for former resident to pick up personal items 3/20/2019 2670A Opened unit for former resident to pick up personal items 3/28/2019 2670A Checked unit after former resident picked up items Work Orders 3/21/2019 2616 Work Order Unplugged kitchen sink, ran snake down drain line 3/20/2019 2627 Work Order Installed new blinds in bedrooms 3/25/2019 2627 Work Order Unplugged master bathroom toilet 3/14/2019 2628 Work Order Dropped off dump trailer, checked on contractor, assessed rot 3/14/2019 2628 Work Order Dropped off materials for contractor 3/15/2019 2628 Work Order Checked on contractor, unloaded materials 3/18/2019 2628 Work Order Dropped off materials, talked with resident about blind replacement 3/18/2019 2628 Work Order Dropped off supplies, checked on contractor, hauled off dump trailer 3/19/2019 2628 Work Order Inspected repairs and paint job Replaced blinds in two bedrooms, scraped old caulking from 3/19/2019 2628 Work Order bathroom windows, installed backer rod around windows, and filled with caulk 3/13/2019 2629 Work Order Repaired stove, replaced control panel, wiped down walls and windows in bedroom and bathroom with mildew, checked attic and under home for standing water, found rotten trim on outside corner Page 2 of 8

PERFORMED 3/14/2019 2629 Work Order Replaced exterior corner trim, reinstalled down spout 3/19/2019 2629 Work Order Primed bedroom, spackled, cleaned up 3/10/2019 2631 Kitchen sink backed up, took apart, snaked drain and line, put back Work Order together but still leaked Picked up p-trap in town, snaked drain and clean outs under house, 3/11/2019 2631 Work Order flushed drain line with hose, put back together, replaced p-trap under sink, cleaned up, replaced vent screens 3/20/2019 2631 Work Order Looked into window issue, installed new blinds in bedrooms 3/20/2019 2636 Work Order Installed new blinds in bedrooms 3/20/2019 2638 Work Order Installed new blinds in bedrooms 3/29/2019 2650 Work Order Helpped replace bedroom blinds 3/29/2019 2650 Work Order Installed blinds 3/18/2019 2659 Work Order Spoke with resident about bathroom wall and trim repairs 3/18/2019 2660 Replaced cabinet door hinge, secured front door jamb, removed, Work Order replaced, and caulked interior trim, checked exterior trim 3/22/2019 2664 Replaced washer under leaking kitchen sink, replaced rubber stopper, Work Order cleaned gutters, removed and unplugged down spout 3/27/2019 2664 Work Order Helped repair kitchen sink leak 3/27/2019 2664 Work Order Replaced sink basket that was leaking Routine Activities 3/1/2019 Housing Area Routine Dropped off rug cleaner for resident use 3/1/2019 Office Routine Brought mail to office, completed paperwork 3/1/2019 Office Routine Completed paperwork 3/1/2019 Office Routine Reviewed cabinet and door quotes with Lyman 3/1/2019 Shop Routine Cleaned out van, picked up supplies 3/1/2019 Town Routine Picked out and ordered flooring 3/4/2019 Housing Area Routine Checked lights in mailbox structures, ran water in vacant units 3/4/2019 Housing Area Routine Gathered fuel slips from vehicles 3/4/2019 Housing Area Routine Reviewed work to be done in vacant units with Lyman 3/4/2019 Office Routine Checked oil in backup generator, brought mail to office, completed paperwork 3/4/2019 Office Routine Completed paperwork 3/4/2019 Office Routine Ordered doors and cabinets for Elders house, made phone calls, procured supplies, watered plants, completed paperwork 3/4/2019 Shop Routine Checked fluid level in golf cart 3/4/2019 Shop Routine Cleaned out and organized van, put away unused tools and building supplies 3/4/2019 Shop Routine Cleaned out trash, unneeded tools, and supplies from van 3/4/2019 Shop Routine Cleaned out van, put away tools 3/4/2019 Shop Routine Loaded propane tanks, listed grounds equipment needing service 3/4/2019 Town Routine Dropped off grounds equipment for servicing 3/5/2019 Housing Area Routine Picked up rug cleaner after resident use 3/5/2019 Housing Area Routine Replaced solar light and panel at the midway mailbox structure Page 3 of 8

PERFORMED 3/5/2019 Office Routine Brought mail to office, completed paperwork 3/5/2019 Office Routine Made phone calls, completed paperwork 3/5/2019 Office Routine Ordered supplies and underlayment, organized desk, procured additional supplies, completed paperwork 3/5/2019 Shop Routine Helped lube garage doors and unload items from dump trailer 3/5/2019 Shop Routine Lubed garage door hinges, rollers, chains and rails, helped unload siding and lumber from dump trailer, worked on supply order 3/5/2019 Town Routine Picked up lumber for Elders house ramp 3/6/2019 Housing Area Routine Picked up rent from elder 3/6/2019 Office Routine Brought mail to office, completed paperwork 3/6/2019 Office Routine Worked on storage lot layout with Dale, completed paperwork 3/6/2019 Town Routine Picked up dishwasher 3/6/2019 Town Routine Picked up materials 3/7/2019 Office Routine Brought mail to office, completed paperwork 3/7/2019 Office Routine Completed paperwork 3/7/2019 Office Routine Researched ADA stove options, completed paperwork 3/8/2019 Office Routine Brought mail to office, completed paperwork 3/8/2019 Office Routine Watered plants, checked lights 3/8/2019 Town Routine Dropped off grounds equipment for servicing, picked up completed items 3/11/2019 Housing Area Routine Checked lights in mailbox structures, ran water in vacant units 3/11/2019 Office Routine Checked oil in backup generator, brought mail to office, completed paperwork 3/11/2019 Office Routine Completed paperwork 3/11/2019 Playground Routine Helped load trash can from playground to take to dumpster 3/11/2019 Shop Routine Checked fluid level in golf cart 3/11/2019 Shop Routine Cleaned up tools and hose, cleaned out van, prepared supply order 3/11/2019 Shop Routine Unloaded grounds equipment that had been serviced, moved some first aid supplies to emergency supply shed 3/12/2019 Office Routine Completed paperwork 3/12/2019 Office Routine Completed paperwork 3/12/2019 Office Routine Completed paperwork 3/12/2019 Shop Routine Put away supplies, recycled cardboard 3/12/2019 Shop Routine Unloaded and put away supplies 3/12/2019 Town Routine Dropped off grounds equipment for servicing 3/12/2019 Town Routine Picked up supplies, dropped off flooring contract 3/13/2019 Office Routine Completed paperwork 3/13/2019 Office Routine Completed paperwork 3/13/2019 Office Routine Completed paperwork 3/13/2019 Shop Routine Met Home Depot delivery truck, unloaded van 3/13/2019 Town Routine Dropped off grounds equipment for servicing, picked up completed items 3/13/2019 Town Routine Picked up doors, had primer tinted, picked out flooring Page 4 of 8

PERFORMED 3/13/2019 Town Routine Picked up doors, supplies, cabinet, and cove base samples for 2606 3/14/2019 Office Routine Completed paperwork 3/14/2019 Office Routine Researched flooring materials, completed paperwork 3/14/2019 Shop Routine Picked through trim stock, cut trim to size, planed, primed, and painted trim 3/14/2019 Shop Routine Unloaded grounds equipment that had been serviced, aired tires and checked oil in S-10 3/14/2019 Town Routine Dropped off samples 3/15/2019 Housing Area Routine Dropped off lawn equipment for resident use 3/15/2019 Office Routine Brought mail to office, completed paperwork 3/15/2019 Office Routine Made phone calls, watered plants, checked lights 3/15/2019 Office Routine Researched parts, completed paperwork 3/15/2019 Shop Routine Assisted with cedar trim, hauled materials to 2628 3/15/2019 Shop Routine Planed, cut, and primed trim for repairs at 2628 3/15/2019 Town Routine Picked up materials 3/18/2019 Housing Area Routine Checked lights in mailbox structures, ran water in vacant units 3/18/2019 Office Routine Completed paperwork 3/18/2019 Shop Routine Loaded supplies and tools, cleaned trash from van, looked into issues with cement mixer 3/18/2019 Shop Routine Loaded supplies, worked on cement mixer, cleaned up water haul tanks and moved them into warehouse 3/18/2019 Town Routine Picked up materials, paint, and painting supplies 3/19/2019 2611 Routine Helped SCINT install truck box 3/19/2019 Housing Area Routine Dropped off lawn equipment for resident use 3/19/2019 Office Routine Brought mail to office, completed paperwork 3/19/2019 Office Routine Completed paperwork 3/19/2019 Shop Routine Cut down and primed trim for 2660 3/19/2019 Shop Routine Emptied trash can from back of van 3/19/2019 Shop Routine Unloaded supplies 3/19/2019 Town Routine Picked up supplies, exchanged paint mixed wrong color 3/20/2019 Office Routine Completed paperwork 3/20/2019 Office Routine Completed paperwork 3/20/2019 Office Routine Lowered flag to half staff 3/20/2019 Shop Routine Unloaded and put away materials, loaded supplies and blinds 3/20/2019 Town Routine Dropped off grounds equipment for servicing, picked up completed items 3/21/2019 Housing Area Routine Picked up and cleaned lawn equipment after resident use 3/21/2019 Office Routine Completed paperwork 3/21/2019 Office Routine Made phone calls, completed paperwork, met with Lyman, attended Board meeting 3/21/2019 Office Routine Made phone calls, ordered supplies, attended Board meeting, completed paperwork 3/21/2019 Playground Routine Picked up trash, blew off basketball court and sidewalks Page 5 of 8

PERFORMED 3/21/2019 Shop Routine Cut materials for screens, cleaned out back of van, put away tools, took out trash 3/21/2019 Shop Routine Loaded underlayment, put away tools and supplies 3/22/2019 Housing Area Routine Dropped off lawn equipment for resident use 3/22/2019 Office Routine Completed paperwork 3/22/2019 Office Routine Completed paperwork 3/22/2019 Shop Routine Built window screens, worked on gate to extend antenna for better signal 3/25/2019 Office Routine Watered plants, checked lights 3/26/2019 Housing Area Routine Dropped off and picked up lawn equipment for resident use 3/26/2019 Office Routine Made phone calls 3/26/2019 Office Routine Organized paperwork and desk area 3/27/2019 Office Routine Cleaned desk area, organized office, researched products 3/27/2019 Office Routine Completed paperwork 3/27/2019 Shop Routine Cleaned out van, put away tools 3/27/2019 Shop Routine Unwrapped and loaded underlayment, took trash to dumpster 3/28/2019 Housing Area Routine Delivered pest control notices 3/28/2019 Housing Area Routine Dropped off lawn equipment for resident use 3/28/2019 Office Routine Completed paperwork 3/28/2019 Office Routine Met with Lyman 3/28/2019 Office Routine Ordered supplies, completed paperwork 3/28/2019 Office Routine Raised flag to full staff 3/28/2019 Shop Routine Replaced gate wheel, moved boxes 3/28/2019 Shop Routine Worked on gate antenna for better signal, cleaned out back of van, made list of supplies to order 3/28/2019 Town Routine Ordered lights, fueled van, filled grounds fuel cans, rescheduled flooring install at Elders house, picked up mirrors 3/29/2019 Housing Area Routine Dropped off lawn equipment for resident use 3/29/2019 Office Routine Completed paperwork 3/29/2019 Office Routine Product research for parts and lights, completed paperwork 3/29/2019 Office Routine Watered plants, checked lights 3/29/2019 Shop Routine Extended antenna for gates for better signal, unloaded tools from van, helped unload stove from van Groundskeeping 3/1/2019 Housing Area Grounds Trash pickup 3/4/2019 Housing Area Grounds Trash pickup 3/4/2019 Housing Area Grounds Trash pickup 3/6/2019 Housing Area Grounds Trash pickup 3/7/2019 Housing Area Grounds Trash pickup 3/8/2019 Housing Area Grounds Trash pickup 3/11/2019 Housing Area Grounds Trash pickup 3/12/2019 Housing Area Grounds Trash pickup 3/13/2019 Housing Area Grounds Trash pickup Page 6 of 8

PERFORMED 3/14/2019 Housing Area Grounds Trash pickup 3/15/2019 Housing Area Grounds Trash pickup 3/19/2019 Housing Area Grounds Trash pickup 3/20/2019 Housing Area Grounds Trash pickup 3/21/2019 Housing Area Grounds Trash pickup 3/22/2019 Housing Area Grounds Trash pickup 3/27/2019 Housing Area Grounds Trash pickup 3/28/2019 Housing Area Grounds Trash pickup 3/29/2019 Housing Area Grounds Mowed common areas 3/29/2019 Housing Area Grounds Trash pickup Admin Support 3/1/2019 Town Admin Courier run 3/4/2019 Town Admin Courier run 3/4/2019 Town Admin Courier run 3/4/2019 Town Admin Took Felton to emergency room after injury 3/4/2019 Town Admin Went to emergency room 3/6/2019 Town Admin Courier run 3/7/2019 Town Admin Courier run 3/8/2019 Town Admin Courier run 3/12/2019 Town Admin Courier run 3/13/2019 Town Admin Courier run 3/14/2019 Office Admin Completed contractor employee interviews 3/14/2019 Town Admin Courier run 3/21/2019 Town Admin Courier run 3/22/2019 Town Admin Courier run 3/26/2019 502 Admin Performed annual inspection 3/26/2019 2660 Admin Performed annual inspection 3/26/2019 2670C Admin Performed annual inspection 3/27/2019 512 Admin Performed annual inspection 3/27/2019 2664 Admin Performed 90-day inspection 3/27/2019 Town Admin Courier run 3/28/2019 707 Admin Performed annual inspection 3/28/2019 2634 Admin Performed annual inspection 3/28/2019 2677 Admin Performed annual inspection 3/28/2019 2620C Admin Performed annual inspection 3/28/2019 2646B Admin Performed annual inspection 3/28/2019 Town Admin Courier run 3/29/2019 Town Admin Courier run Staff Time Off 3/5/2019 Part day PTO 3/6/2019 Part day PTO 3/14/2019 Part day PTO 3/15/2019 Part day PTO Page 7 of 8

PERFORMED 3/18/2019 PTO 3/19/2019 Part day PTO 3/22/2019 Part day PTO 3/22/2019 PTO 3/25/2019 PTO 3/25/2019 PTO 3/26/2019 PTO Page 8 of 8