ADEQ Water NPDES Inspection AFIN: «AFIN» Permit #: «Permit_»

Similar documents
September 22, Lexi Grisham, President Grisham Farm Products 7364 Newkirk Rd. Mountain Grove, MO RE: Grisham Farm Products Hoxie, AR

AFIN: (City of Lake Village) NPDES Permit No.: AR (City of Lake Village)

March 2, Terry McKinney City of Benton P.O. Box 607 Benton, AR RE: SSO near Apache Rd. Dear Mr. McKinney:

October 6, Jerry Qualls, Mayor City of Monette Wastewater Treatment Plant P.O. Box 382 Monette, AR 72447

January 14, Bob Tobey, Chairman Runyan SID #211 # 5 Teakwood Drive Sherwood, AR Dear Mr. Tobey:

April 19, Dear Mr. Handley:

Water Division Permits Branch Water Division Enforcement Branch. January 7, 2010

Please submit your written response (Post Closure Plan) to the Water Division Enforcement Branch of this Department at the following address:

RE: Construction site, Hwy 59m South, Decatur, Arkansas; NPDES Permit No.: No-Permit

Remarks. Section D: Summary of Findings/Comments (Attach additional sheets if necessary)

RE: Grandview Heights Condominiums NPDES Permit Tracking No.: ARR151590

April 22, Mr. Fred Self P.O. Box 2768 Rogers, Arkansas RE: Soil-Disturbing Activities, Hoot Owl Hollow, Garfield

November 4, David Jurgens, P.E., Utilities Department Director City of Fayetteville 113 West Mountain Fayetteville, Arkansas 72701

James Ferrell 10/3/07 Page 2

5/31/12, the telemetry device fails to provide consistent notifications in an emergency. This is a violation of Part III.B.1.of the permit.

No documentation that a Storm Water Pollution Prevention Plan (SWPPP) has been developed for this facility.

If I can be any assistance, please contact me at or

Twin Lakes Quarrys, Inc. P.O. Box 705 Mountain Home, AR (870)

November 8, David Jurgens, P.E., Utilities Department Director City of Fayetteville 113 West Mountain Fayetteville, Arkansas 72701

1. The facility had several thermometers which had not been calibrated in over a year.

March 9, Ken Fratesi, Manager West Helena Water Utilities 92 Plaza Street West Helena, Arkansas RE: Sanitary Sewer Collection System

1. The sludge pump in the pump building was leaking sludge into the pump building.

September 23, Mr. Tony Bass Tri-City Utilities Wastewater Treatment Plant P.O. Box 84 Peach Orchard, AR RE: Compliance Inspection

July 18, Thomas Northern, Owner Northern Mobile Home Park 4078 Hwy. 349 Jonesboro, AR Northern Mobile Home Park Wastewater Inspection

January 29, Jim Morse, Environmental, Health and Safety Ciba Specialty Chemicals Corporation 100 Bridgeport Rd. West Memphis, AR

June 12, Honorable Marion Gill, Mayor City of Dumas P.O. Box 157 Dumas, Arkansas RE: Waste Water Treatment Facility.

NPDES Permit No.: AR , ARR00A412

October 6, Mr. Donny Roberts, Mayor City of Hoxie 400 S.W. Hartigan Hoxie, AR RE: Compliance Inspection. Dear Mr.

May 21, Dale Schoen, Plant Manager Hiland Dairy Foods P.O. Box 3478 Fayetteville, Arkansas 72702

1. The facility did not have any maintenance or operation logs for the pump stations.

September 26, RE: Waste Water Treatment System. Dear Mr. Starks:

2. Patrick Manor Pump Station a. 1 pump had no metal guard around the belt drive.

ADEQ Water NPDES Inspection AFIN: Permit #: ARR152206

RE: NPDES Compliance Evaluation Inspection, West Memphis WWTP

RE: AFIN: NPDES Permit No.: AR

1. There was no Notice of Coverage (NOC) posted at the construction site. This is a violation of Part II, Section A. 2. D of the general permit.

POTW Pretreatment Program. Industrial Site Visit

1. The IU site visit to Quala Wash (Previously PSC Container) revealed:

NPDES Permit No: AR , Routine Compliance Inspection

October 13, Todd Risius, EHS Manager Cargill Pork, LLC P.O. Box 699 Russellville, AR RE: Inspection of Cargill London Feed Mill

3. The stormwater pollution prevention plan (SWPPP) did not contain a site map with all the elements required by Part II, A.4.G of the permit.

2. Erosion control measures are not being properly maintained required by Part II.B.17.A of the permit.

May 14, Keith Capps Stonehenge Subdivision 1315 W. Beebe Capps Searcy, AR RE: Compliance Inspection

1. The Notice of Coverage (NOC) was not posted at the construction site. This is a violation of Part II, Section A. 2. D.

Skiver Development of Arkansas, in

1. The site map does not contain a pre-construction topographic view as required by Part II,A.4.F.1 of the permit.

March 1, Jim Jez Jez Commercial Development Wandering Ridge Subdivision 2308 E. Kiehl Sherwood, AR RE: Compliance Inspection

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY

June 15, Ms. Belva Plumlee, Wastewater Utility Manager Bentonville Wastewater Treatment Plant 1901 N.E. A Street Bentonville, Arkansas 72712

Remarks. Met with Sonia Parham (Safety) during the inspection. Ms. Parham walked the facility grounds with me.

May 4, John Rimmer, General Manager City of West Memphis Utilities P.O. Box 1868 West Memphis, AR RE: City of West Memphis WWTP

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Washington, D.C NPDES Compliance Inspection Report. Section A: National Data System Coding

August 20, Jeff Horn, Plant Manager - NAES Plum Point Energy Station P.O. Box 567 Osceola, AR Plum Point Energy Station Inspection

Inadequate certification and calibration of laboratory thermometers. The last certification documentation available was dated April 25, 2006.

2. According to Jerry Spillers, Operator, and Donnie Tedford, Operator, the plant overflows and plant flooding are due to the following conditions:

Routine Compliance Inspection AFIN: , NPDES Permit No s: AR and ARR00A251

September 15, Phillip Foot, Water Utilities Manager City of Hazen P.O. Box 564 Hazen, Arkansas RE: Waste Water Treatment Facility

For additional information you may contact the Enforcement Branch by telephone at or by fax at

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted.

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted.

Custom Wood Recycling, Inc. Inspection (Yell Co) Permit No.: AR and ARR000421

Municipal Separate Storm Sewer System (MS4) Inspection AFIN: , NPDES Permit No.: ARR040023

1.) A copy of the site-specific Nutrient Management Plan (NMP) was not available upon request per Part of the permit.

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted.

NPDES Permit Tracking No.: AR

WATER DIVISION INSPECTION REPORT

February 22, Randy Coats, Director of Operations PJ'S Tank Wash 2201 Hwy 82 West Crossett, AR PJ'S Tank Wash Inspection (Ashley Co)

If I can be of any assistance, please contact me at or (479) extension 16.

May 9, Honorable Jean Pace, Mayor City of Mammoth Springs P.O. Box 185 Mammoth Spring, AR Mammoth Springs WWTP (Fulton Co)

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted.

If you have any questions please contact Richard Healey, Enforcement Branch Manager, at or

ARR No violations were noted at the time of the inspections. Please refer to the attached inspection reports for any comments.

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted.

RE: AFIN: Permit No.: 5024-W

RE: Viskase Companies Inc., Osceola, AR - NPDES Compliance inspection

November 13, Ron Alexander Hackney Ladish, Inc. 708 S. Elmira Ave. Russellville, AR Industrial Stormwater Inspection (Pope Co)

March 27, Rob McDaniel, Timber Ridge Ranch Neuro Rehabilitation Center, Inc Timber Ridge Lane Benton, AR 72019

RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County

Inspection Report: Blytheville - West WWTP, AFIN: , Permit #: AR FACILITY TYPE: 1 - Municipal FACILITY EVALUATION RATING:

RE: Union School Inspection (Union Co) AFIN: NPDES Permit No.: AR

April 20, Justin Sims, Superintendant Alotian Club, LLC 101 Alotian Drive Little Rock, AR Alotian Club Inspection. Dear Mr.

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted.

January 30, Harry Makridakis, Plant Manager Viskase Companies, Inc East State Highway 198 Osceola, AR 72370

The drain chutes in each bay were filled with solids. The solids need to be removed and properly disposed.

Tyson Poultry, Inc. - Berryville Industrial User Inspection (Carroll Co)

For additional information you may contact the enforcement branch by telephone at or by fax at

September 16, Mr. Terry Downey XTO Energy, Inc. 210 Park Avenue, Suite 2350 Oklahoma City, OK RE: Complaint Investigation

WATER DIVISION INSPECTION REPORT

If I can be of any assistance, please contact me at or (501)

FACILITY TYPE: 2 - Industrial FACILITY EVALUATION RATING: N

April 14, Tim Nyander, Utilities Director City of Fayetteville 113 W. Mountain St. Fayetteville, AR Paul R. Noland Wastewater Inspection

April 5, Susan McClendon, Chief Financial Officer Drew Foam Co., Inc Highway 278 East Monticello, AR 71655

Placing waste is a location likely to cause pollution to the waters of the State.

Inspection Report: El Dorado Chemical Company, AFIN: , Permit #: ARR FACILITY TYPE: 2 - Industrial

July 7, Jason Barnes, Facilities and ESH Manager Facilities and ESH manager Baxter Healthcare Corporation Mountain Home, AR 72653

February 17, Jon Myhre Enerco Operating Corporation 6237 Tulip Lane Dallas, TX Fouke # D-3 SWD System Inspection (Miller Co)

June 11, Ms. Kata Savic Mill Pond Village #1 Preakness Drive Hot Springs, AR Mill Pond Village Inspection (Garland Co) Dear Ms.

The above items require your immediate attention. Please submit a written response to this finding to the following address:

August 17, Robert E. Miller Quick Lay Pipe, LL Highway 71 South Fort Smith, AR RE: Complaint Investigation. Dear Mr.

RE: AFIN: PERMIT: 5006-WR-2

Transcription:

November 5, 2009 Mr. Charles Clark, Vice President Smackover, AR 71762 RE: Compliance Inspection AFIN: 70-00039 NPDES Permit No.: AR0000591 Dear Mr. Clark: On 10/15/2009, I performed an inspection of the facility in accordance with the provisions of the Federal Clean Water Act, the Arkansas Water and Air Pollution Control Act, and the regulations promulgated thereunder. This inspection revealed the following violations: The facility had an unpermitted discharge from the storm water retention pond which was a result of excessive rainfall. This unpermitted discharge was reported to the NPDES Enforcement Section in Little Rock. Since this unpermitted discharge was reported as required, no response to this letter is needed at this time. If I can be of any assistance, please contact me at 870-862-0680. Sincerely, District 8 Field Inspector Water Division cc: Water Division Enforcement Branch Water Division Permits Branch

Form Approved OMB No. 2040-0003 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Washington, D.C. 20460 NPDES Compliance Inspection Report Section A: National Data System Coding Transaction Code NPDES Yr/Mo/Day Inspec. Type Inspector Fac. Type 1 N 2 5 3 A R 0 0 0 0 5 9 1 11 12 0 9 1 0 1 5 17 18 R 19 S 20 2 Remarks Inspection Work Days Facility Evaluation Rating BI QA -------------------------------Reserved------------------------------ 67 69 70 N 71 N 72 N 73 74 75 80 Section B: Facility Data Name and Location of Facility Inspected (For industrial users discharging to POTW, also include POTW name and NPDES permit number) Smackover, AR Entry Time/Date 10:59 /10/15/2009 Exit Time/Date 11:47/10/15/2009 Permit Effective Date 7/1/2006 Permit Expiration Date 6/30/2011 Name(s) of On-Site Representative(s)/Title(s)/Phone and Fax Number(s) Charles Clark, Vice President, 870-725-3611 Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Charles Clark, Vice President, 870-725-3611 Smackover, AR 71762 Yes Contacted No Section C: Areas Evaluated During Inspection (S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated) N Permit N Flow Measurement N Operations & Maintenance N Sampling N Records/Reports N Self-Monitoring Program N Sludge Handling/Disposal N Pollution Prevention N Facility Site Review N Compliance Schedules N Pretreatment N Multimedia N Effluent/Receiving Waters N Laboratory N Storm Water N Other: Section D: Summary of Findings/Comments (Attach additional sheets if necessary) This inspection was performed due to excess rainfall that the area has received. The facility reported to Little Rock that the storm water pond on the site was endanger of overtopping which would result in any oil on the pond to float out into Smackover Creek. There was also a danger that the creek would overtop the levee and push the oil into the backwater of the stream. The facility reported that it was pumping storm water from the holding pond to the back waters of Smackover Creek, resulting in an unpermitted discharge. On the date of the inspection, the facility had a 4 inch pump which was discharging into the backwaters of Smackover Creek. The area had experienced above normal rainfall and the 9 acre storm water retention pond was within 6 inches of overtopping the levee. The facility had pumped the water down about 1 foot. Smackover Creek was still rising and had already flooded the lube plant loading rack. I advised Mr. Clark to take samples of the water from the pump for the same parameters as the storm water outfalls. Name(s) and Signature(s) of Inspector(s) Agency/Office/Telephone/Fax AR Dept. of Environmental Quality/ El Dorado 870-862-0680, Fax 870-862-3509 Date 02 November 2009 Signature of Reviewer Agency/Office/Phone and Fax Numbers Date NPDES Report Page 2

1 Of 6 Date: 10/15/2009 Time: 11:41 Lube plant loading rack, flooded by Smackover Creek 2 Of 6 Date: 10/15/2009 Time: 11:43 Smackover Creek flooded into refinery NPDES Report Page 3

3 Of 6 Date: 10/15/2009 Time: 11:46 Storm water retention pond, showing oil on pond, pump station pumps to WWTP and also pump used to pump water out of pond, unpermitted discharge. 4 Of 6 Date: 10/15/2009 Time: 11:46 Showing detail of oil on pond NPDES Report Page 4

5 Of 6 Date: 10/15/2009 Time: 11:46 Water being discharged from pump into backwater of Smackover Creek 6 Of 6 Date: 10/15/2009 Time: Showing lowest portion of pond levee. Level in pond got within 6 inches of overtopping pond NPDES Report Page 5