Market Design for High Penetrations of Wind and Solar

Similar documents
Valuation of Utility-Scale Energy Storage in Production Cost Models

Nuclear Energy and Renewables: System Effects in Low-Carbon Electricity Systems

5.2 RPM Auction Timeline

5.2 RPM Auction Timeline

Comments of Powerex Corp. on Intertie Deviation Draft Final Proposal. Submitted by Company Date Submitted

Chapter 1: Purchasing & Supply Management January :10 PM

Manual 11: Energy & Ancillary Services Market Operations Revision History

Resource Adequacy in the Pacific Northwest: Serving Load Reliably under a Changing Resource Mix

Encouraging Green Market Development

Smart and Renewable Power System Transformation Overview, Issues, and Projects

LONG ISLAND LONG ISLAND

Non-Treaty Storage Utilization System Modeling Summary

Canada s Energy Future 2017: Energy Supply and Demand Projections to 2040 Mike Johnson Technical Leader, Energy Supply Team

PJM Manual 11: Energy & Ancillary Services Market Operations Revision: 92 Effective Date: November 1, 2017

PJM MISO Pseudo-Tied Units Operating Procedure RTO-PTU-OP1-r1 Effective Date: 08/14/2017 Review Date: 09/01/ Purpose. 2.

Understanding Ohio's Electricity Markets: Characteristics, Structure and Price

Call for Papers SYSTEMS DO FOR YOU? Portland, OR June 13 15, Submit abstracts to:

Energy Storage Ontario Submission to the Standing Committee on General Government Bill 172, Climate Change Mitigation and Low-Carbon Economy Act

PJM Manual 11: Energy & Ancillary Services Market Operations Revision: 95 Effective Date: June 1, 2018

B. What could be the impact on the financial system of a CBDC, and how could this affect financial stability?

A Solar Storage Microgrid for the Energy City of the Future

Resilient and Renewable Microgrids

PJM Manual 11: Energy & Ancillary Services Market Operations. Revision: 46. Effective Date: June 1, Prepared by. Forward Market Operations

Lecture # 15 Long Run Equilibrium

RunnerStone, LLC. Page1 M E M O R A N D U M

Renewable Energy Project Financing in Mexico. November 2015

PV & Chile. Centre for Innovation and Development of Sustainable Energy CIFES. IEA PVPS-IA 45 th ExCo Meeting. Andrés Bauzá Paris, April 29 th

Renewable Portfolio Standards: Costs and Benefits

NorthWestern Energy Capacity Planning and Resource adequacy

Strategic review outcomes

Revision: 53. Prepared by

PJM Manual 28: Operating Agreement Accounting Revision: 77 Effective Date: November 1, Prepared by Market Settlements Development Department

Kast Distributors Data Synchronization Initiative

COMPETENCIES. People Management Operations Management Customer Relationship Management Leadership and Business Management

CHAIRE EUROPEAN ELECTRICITY MARKETS. Networks in the Clean energy package: welcomed harmonization or excessive standardization?

Principles of Water and Wastewater Rate Setting

Taking Advantage of Combined Heat and Power (CHP)

Efficient access to offshore wind resources

Resource Tracker User Guide

Nuclear Power in the WAPP

PJM Manual 28: Operating Agreement Accounting Revision: 79 Effective Date: April 1, Prepared by Market Settlements Development Department

PJM Manual 28: Operating Agreement Accounting Revision: 80 Effective Date: June 1, Prepared by Market Settlements Development Department

Pre-Scheduling Operations

MGMT2101 Full Course Notes

Principles for Sound Stress Testing Practices and Supervision

SAP standard PS: issues with project lifecycle management

FRAC-MOO: Eligibility and Counting Rules

Power Sector Transformation. Initial Considerations on Utility Compensation. August 15, 2017

Innovative Procurement Models for Renewable Electricity

Network Services and Their Distributors Data Synchronization Initiative Frequently Asked Questions for Suppliers

B&B Food Distributors Data Synchronization Initiative

Oracle Health Sciences. InForm Advanced Molecular Analytics Cloud Service Service Descriptions and Metrics

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 54.

Pre-Scheduling Operations

Hydrogen from Renewable Power Technology outlook for the energy transition

Guidelines on Use of Electronic Data Collection in Censuses: Systems for Management and Monitoring Field Operations

KIDSTON PUMPED STORAGE HYDRO TECHNICAL FEASIBILITY STUDY OPTIMISATION

Business functions performed: Revenue Accounting System / Revenue Analytics / Route Profit Analyzer / Flight Operations / SIS Miscellaneous Billings

DISTRIBUTED SOLAR GENERATION: VALUE AND PRICING

Company Update July, Ultra-Clean Efficient Reliable Power

PROTON ENERGY LIMITED HEALTH, SAFETY & ENVIRONMENT POLICY

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report

DISTRIBUTED SOLAR GENERATION: VALUE AND PRICING A NORTH AMERICAN PERSPECTIVE

The agreement consists of three key elements: a framework agreement, Action Plans for different subsectors or branches and accession documents.

Operating Agreement Accounting

Operating Agreement Accounting

Improvement of Power Quality in a Grid Connected Wind Energy Conversion System by STATCOM

EUREC M.Sc. specialization semester on Ocean Energy at Instituto Superior Técnico (IST) Technical University of Lisbon (UTL)

Guidelines on Use of Electronic Data Collection in Censuses: Systems for Management and Monitoring Field Operations

Future Jobs, Future Costs, and Future Usage: Reconciling Higher Costs And Lower Usage

UQ. Paul Meredith Centre for Organic Photonics and Electronics, School of Mathematics and Physics Global Change Institute UQ Energy Initiative

PJM Manual 13: Emergency Operations Revision: 65 Effective Date: January 1, Prepared by System Operations Division

Fiji s NDC Energy Sector Implementation Roadmap ( ) 11 th October 2017

Pacific Timesheet Sustainability Policy

Request for Qualifications

Edexcel Economics AS-level

Pollution Prevention in Enforcement POLLUTION PREVENTION SUPPLEMENTAL ENVIRONMENTAL PROJECTS (P2 SEPs) -Information for companies-

Co Generation Plant at McMaster University Implementation and Lessons Learned

ANNEX 6: FURTHER DETAILS ON OPTIONS TO IMPROVE THE CLIMATE RESILIENCE OF ALBANIA S ENERGY SECTOR

Water Regulation through to 2021 and beyond

Calculator. DRECP Stakeholder Meeting. Sylvia Bender. /

Design Alternatives Sheet: The Objective Function in Capacity Market Clearing

Company Update. November 2017

ECF s Roadmap 2050 project: Overview and key findings in ECF s Roadmap 2050 & Power Perspectives 2030 reports

Increasing System Flexibility Through Market & Non-Market Options

Principle and Procedure of Analytical Test Method Validation for GMP Regulated Industry

ICT for the Smart Grid and its Last Mile

Release Notes. for the Business Function. SAP for Insurance: Collections/Disbursements 5 (INS_FSCD_CI_5)

Week 1 Introduction to Management Accounting:

NREL and the Quality Assurance Framework for Minigrids

Facilities Study Report

January 28, Tonya Modlin Contracting Specialist Department of Veterans Affairs Spotsylvania Ave, Suite 400 Fredericksburg, VA 22408

WORKSHOP GERMANY-BRAZIL

Company Update. September 2017

JOINT REPORT ON THE CASE FOR A SECOND NORTH SOUTH INTERCONNECTOR

PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification)

Release Notes for SAP enhancement package 7 for SAP ERP 6.0, Support Package 2

ICP Linking and Fusing Service Enquiry Procedure

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request

Value of Climate Forecasts for the Management of Lake Lanier

Transcription:

Market Design fr High Penetratins f Wind and Slar Natinal Cnference f State Legislatrs May 29, 2014 Aarn Blm Aarn.blm@nrel.gv NREL is a natinal labratry f the U.S. Department f Energy, Office f Energy Efficiency and Renewable Energy, perated by the Alliance fr Sustainable Energy, LLC.

Variability Variability Variatins in the utput f generatrs r lad Observable Cannt be reduced thrugh study r measurement Everyday examples Observed distributin f human height Temperature ver the curse f the day 2

Lad, Wind and Slar Variability There are many surces f variability, but they differ in magnitude and timing There are tls t address these challenges MW Lad Hurly Average Lad 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 100 90 80 70 60 Pwer (MW) 50 40 30 20 Actual Wind Frecasted Wind (schedule) Average Wind 10 0 12:00:00 12:05:00 12:10:00 12:15:00 12:20:00 3

4 Variability Variability tends t get smther when surces f variability are aggregated Aggregatin f lads frm 1950-1990 Reduced regulatin reserve needs Reduced lad fllwing (ramping) needs Aggregatin f wind and slar reduces ttal variability Reduces regulatin reserve needs Reduces ramping Histrical surces f generatin variability d nt necessarily decrease with aggregatin

Uncertainty Frecast Errrs Frced Outages Difference between frecast and actual Nte difference in scale between graphs! The remval frm service availability f a generating unit, transmissin line, r ther facility fr emergency reasns Occur fr renewable technlgies as well as cnventinal Hwever the cncentratin f cnventinal resurces makes the impact larger, ie. ne large plant r transmissin element Surce: Hdge et al. 2012, A Cmparisn f Wind Pwer and Lad Frecasting Errr Distributins, http://www.nrel.gv/dcs/fy12sti/54384.pdf 5

6 Managing Variability and Uncertainty Plicies Crdinatin and Cllabratin Open Access Transmissin Tariffs Operatinal Practices Unit Cmmitment Ecnmic Dispatch Sub-hurly markets Reserve Prducts Regulatin Reserves Cntingency Reserves Financial Rules Market settlement Hedges Surce: MISO Markets Training Surce: http://www1.eere.energy.gv/slar/pdfs/50060.pdf

Variable Generatin and the Future f Market Design

High VG and Electricity Markets RTO market participant payment surces Bilaterals Negtiated transactins between knwn parties, can include fixed and variable csts Capacity market Auctin t prvide resurce adequacy and fixed cst recvery Energy market Day-ahead and real-time auctins that ptimize day-ahead scheduling and real-time dispatch based n bid in csts Ancillary Service market functins perfrmed by electric generating, transmissin, and system-cntrl equipment t supprt the reliability f the transmissin system Bilateral Agreements Capacity Market Energy Market Ancillary Services Other Revenue 8

9 Ptential Impacts f Wind and Slar Energy Markets Depressed energy prices because f lw variable csts fr wind and slar, ie. n fuel csts Increased price vlatility Increased need fr flexible resurces Decrease revenue fr cnventinal generatin Ancillary Services Markets May increase perating reserve needs Asynchrnus nature may create additinal need fr frequency respnse Capacity Markets Increase imprtance f capacity markets fr capital cst recvery

10 Actively Discussed Slutins FERC Order 755 Refrms t cmpensatin fr regulating reserves Nn-traditinal resurces Demand respnse and FERC Order 745 Flexible Capacity Prcurement Flexibility requirements in capacity markets Flexible Ramping Prducts New Ancillary Services fr peratins Sub-hurly settlement Financial practice that impacts peratins Multi-perid scheduling Shrt term peratinal price frecasting

NREL Research: Active Pwer Cntrls Electrical frequency Intercnnectin balance f supply and demand. Initial slpe f decline is determined by system inertia (r cumulative inertial respnse f all generatin) Frequency respnse decline 0 s typically, 5-10 s Primary Freq. Cntrl typically, 20-30 s AGC typically, 5 10 min Emergence f electrnically-cupled new technlgies withut PFR capabilities Current markets include disincentives 11

12 NREL Research: Active Pwer Cntrls Lack f incentives might be leading cause t frequency respnse declines (nt caused by renewables) Ancillary service market might be lgical next step with new BAL- 003 Higher penetratins f renewables may limit ability t respnd t such events Culd incentivize wind resurces t install primary frequency respnse capabilities Wind capabilities t prvide active pwer cntrls are very gd! Surce: Ela, E; et al. Active Pwer Cntrls frm Wind Pwer: Bridging the Gaps, NREL Publicatin ID: NREL/TP-5D00-60574 http://www.nrel.gv/dcs/fy14sti/60574.pdf

Average Ttal Regulatin (MW) 13 NREL Research: Flexibility Market Design 10000 9000 Average Ttal Regulatin fr 6 Dispatch/Lead Schedules by Aggegatin (Dispatch interval - Frecast lead time) Faster Faster Faster 8000 7000 6000 5000 4000 3000 2000 10-10 30-10 30-30 60-10 30-40 60-40 1000 0 Ftprint Reginal BAU Large Medium Small Milligan, Kirby, King, Beuning (2011), The Impact f Alternative Dispatch Intervals n Operating Reserve Requirements fr Variable Generatin. Presented at 10th Internatinal Wrkshp n Large- Scale Integratin f Wind (and Slar) Pwer int Pwer Systems, Aarhus, Denmark. Octber

14 NREL Research: Flexibility Market Design There may be several ways t incentivize flexibility Single perid SCED, Multi-perid SCED, Flexiramp Financial Settlement rules may incentivize flexibility Ttal Revenue Ttal Cst Ttal Prfit (Ttal Revenue minus Ttal Cst) Five-minute settlements Hurly average settlements Five-minute settlements Hurly average settlements Scenari 1 $15,208 $13,338 $10,895 $4,313 $2,443 Scenari 2 $17,479 $17,441 $13,373 $4,106 $4,068 Scenari 3 $17,134 $17,134 $13,053 $4,081 $4,081 Ela, E.; Milligan, M.; et al., Electricity Market Design with High Levels f Variable Generatin NREL publicatin ID: NREL/TP-5D00-61765

15 References and Cntact Frthcming Paper Credits Cntact Ela, E.; Milligan, M.; et al., Electricity Market Design with High Levels f Variable Generatin NREL publicatin ID: NREL/TP-5D00-61765 Ela, E; et al. Active Pwer Cntrls frm Wind Pwer: Bridging the Gaps, NREL Publicatin ID: NREL/TP-5D00-60574 http://www.nrel.gv/dcs/fy14sti/60574.pdf Markets t Facilitate Wind and Slar Energy Integratin in the Bulk Pwer Supply An IEA Task 25 Cllabratin. http://www.nrel.gv/dcs/fy12sti/56212.pdf Ela, E.; O'Malley, M., "Studying the Variability and Uncertainty Impacts f Variable Generatin at Multiple Timescales," IEEE Transactins n Pwer Systems, vl.27, n.3, pp.1324-1333, Aug. 2012 Ela, Milligan, O Malley (2011), A Flexible Pwer System Operatins Simulatin Mdel fr Assessing Wind Integratin. http://www.nrel.gv/dcs/fy11sti/50641.pdf aarn.blm@nrel.gv