A. INTRODUCTION PREFEASIBILITY REPORT

Similar documents
PROJECT REPORT FOR AMMENDMENT IN ENVIRONMENT CLEARANCE

Pre-Feasibility Report for Construction of Additional Tankage at POL Terminal Partapur, Meerut, M/s IOCL PRE-FEASIBILITY REPORT

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT

PRE FEASIBILITY REPORT

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

Pre-Feasibility Report For

PROJECT FEASIBILITY REPORT

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal

PRE-FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

PREFEASIBILITY REPORT

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

PRE FEASIBILITY REPORT

EXISTING PROJECT FOR ORDINARY SAND MINING

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

PREFEASIBILITY REPORT

Brief Summary of Project

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

PRE FEASIBILITY REPORT

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

PRE-FEASIBILITY REPORT

Pre-Feasibility Report

PRE-FEASIBILITY REPORT

Accord Energy Corporation India Pvt. Ltd.

Environmental Management Plan

Hind Energy & Coal Beneficiation (India) Ltd.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

Pre- Feasibility RepoRt

PRE-FEASIBILITY REPORT OF AUGMENTATION OF KOYALI-SANGANER PIPELINE PROJECT PROPONENT M/S. INDIAN OIL CORPORATION LTD., PIPELINE DIVISION NOIDA

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

PRE FEASIBILITY REPORT

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

PRE-FEASIBILITY REPORT

KL) Proposed capacity of the. No change similar as existing i.e KL (MS KL, HSD KL & SKO KL) Terminal

TABLE OF CONTENTS. Para No. Contents Page No

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

Hind Energy & Coal Beneficiation (India) Ltd.

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

PRE FEASIBILITY REPORT

Environment Consultant:

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

5. ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

INSPIRE INDUSTRIES PVT. LTD.

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

PRE-FEASIBILITY REPORT

Proposed Terms of Reference for EIA studies

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

M/S. Dain Colour Chem

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT OF JAIPUR-PANIPAT NAPHTHA PIPELINE PROJECT PROPONENT M/S. INDIAN OIL CORPORATION LTD., PIPELINE DIVISION NOIDA

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

Check list for construction Project of EC [Category 8(a)]:

PRE FEASIBILTY REPORT

Municipal solid / hazardous waste

Expansion of Calcutta Riverside (An Integrated Township)

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

PRE-FEASIBILITY REPORT

Hence, the present proposal is classified under Schedule 6(b) & Category B according to EIA Notification 2006 & subsequent amendments.

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

PREFEASIBILITY REPORT

PRE FEASIBILITY REPORT

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE- FEASIBILITY REPORT

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

Details of the proposed project as presented before the committee are tabulated below:

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

ENVIRONMENTAL MONITORING REPORT

SCOPE OF WORK TECHNICAL SPECIFICATIONS

PRE FEASIBILITY REPORT

Transcription:

A. INTRODUCTION a. BRIEF DESCRIPTION OF PROJECT M/s Bharat Petroleum Corporation Limited has set up the Haldia Coastal Installation at HAL-733, Patikhali, Durgachak, Haldia 721602, West Bengal. The Depot receives petroleum product through rail tank wagons and ship tankers, which are unloaded & stored in above ground and underground tanks. The products are dispatched to the end consumers by contracted Tank Lorries through road. MS, HSD, Naphtha, FO & SKO are stored in 20 tanks of various capacities. Total existing capacity of the Haldia Coastal Installation is 94360 KL. Proposed project envisages expansion of capacity by installation of two aboveground storage tanks for Biodiesel (1 X 858 KL) and Ethanol (1 X 250 KL). After expansion the storage capacity will increase to 95468 KL. The current proposal has been submitted to MoEF for issuance of Environmental Clearance for the expansion of storage capacity (95468 KL) through addition of two aboveground storage tanks. b. NATURE OF PROJECT The proposed project is an expansion project for increasing storage capacity of the existing Depot by 1108 KL. After implementation of the project, capacity of the Haldia Coastal Installation will increase to 95468 KL from the present capacity of 94360 KL. Hence, the present proposal is classified under Schedule 6(b) & Category A Haldia is a Critically Polluted Area (CPA). Project within 5 Km, of CPA attracts General Conditions, Hence this project requires Environmental Clearance from MoEF&CC according to EIA Notification 2006 & subsequent amendments. c. PROFILE OF PROJECT PROPONENT Bharat Petroleum Corporation Limited (BPCL) is a fortune 500 oil refining, exploration and marketing PSU with Navratna status. BPCL has multiple refinery units in Mumbai, Kochi, Numaligarh and Bina. Bharat Petroleum s Mumbai Refinery is one of the most versatile Refineries in India. With successful implementation of various projects and de-bottlenecking, our Refineries currently process about 12 Million Metric Tons of crude oil per annum. Page 1

Kochi Refinery, a unit of Bharat Petroleum Corporation Limited, commissioned in 1966 with a capacity of 50,000 barrels per day. Formerly known as Cochin Refineries Limited and renamed as Kochi Refineries Limited, the refinery was originally established in collaboration with Phillips Petroleum Corporation, USA. Today it is a frontline entity as the unit of the Fortune 500 Company, BPCL. Numaligarh Refinery Limited is a public sector oil company set up in the year 1993, with its 3 MMT refinery situated in Numaligarh, Assam. The Refinery is one of the most technologically advanced and environment friendly refineries in the country. BPCL is the major share holder with 61.65% of the Company s paid up equity capital. Moreover, Bharat Oman Refineries Limited (BORL), a company promoted by Bharat Petroleum Corporation Limited (BPCL) and Oman Oil Company Limited (OOCL), has set up a 6 MMTPA grass root refinery at Bina, Madhya Pradesh along with crude supply system consisting of a Single Point Mooring system (SPM), Crude Oil Storage Terminal (COT) at Vadinar, District Jamnagar, Gujarat and 935 km long cross country crude pipeline from Vadinar to Bina. BPCL has also many POL Terminals spread across the country. BPCL now proposes to expand the capacity of the existing POL Terminal at Haldia, West Bengal by adding two aboveground storage tanks. d. NEED FOR THE PROJECT & ITS IMPORTANCE Demand of petroleum products has increased with urbanization of the places around Haldia. In order to meet the demand and to meet ministry guideline in 10% ethanol doping criteria, BPCL proposes to increase the storage capacity of their existing depot at Haldia. The proposed project is meant for improving supply position of POL products in the villages and small towns around Haldia. e. DESCRIPTION OF CURRENT PROPOSAL The current proposal has been submitted to MoEF for issuance of Environmental Clearance for the expansion of storage capacity from 94360 KL to 95468 KL through addition of two aboveground storage tanks. Page 2

B. SITE ANALYSIS M/s. Bharat petroleum Corporation Ltd has set up the POL Depot at HAL-733, Patikhali, Durgachak, Haldia 721602, West Bengal. The Google map showing the project site is given in Figure 1. The general location of the project area is shown in Figure 2. FIGURE 1 - GOOGLE IMAGE OF PROJECT SITE Page 3

FIGURE 2 - LOCATION MAP OF PROJECT SITE Page 4

a. CONNECTIVITY The project site is well connected by road and rail network. The project site is located at 1.5 km away from Haldia Railway station on north and 7 km away from Haldia Township on East Northeast. The Coastal Installation terminal is well connected to NH41 in 5 km (W). Kolkata International Airport is located at the distance of 61 km (NNE). Map showing the road network around the site is given in Figure 3. FIGURE 3 - CONNECTIVITY MAP b. SITE CHARACTERISTICS Table 1 - Environmental Settings of the Project Site S. No. Particulars Details 1 Latitude 22 3'25.46"N 2 Longitude 88 8'13.81"E 3 Site Elevation above MSL 8 m 4 Topography Plain 5 Present land use at the site Industrial 6 Nearest highway National Highway 41 5 km (W) 7 Nearest railway station Haldia Railway Station 1.5 km Page 5

S. No. Particulars Details 8 Nearest airport Kolkata International Airport 61 km(nne) 9 Nearest town / city Haldia township 7 km (ENE) 10 Water body Hoogly River 100 m (S) 11 Nearest Port Haldia Port 45 km (SSW) 12 Hills / valleys Nil in 10km radius 13 Archaeologically important places Nil in 10km radius National parks / Wildlife 14 Sanctuaries/ Eco sensitive zones Nil in 10km radius as per Wild Life Protection Act, 1972 15 Reserved / Protected Forests Nil in 10km radius 16 Seismicity Zone III according to the Indian Standard Seismic Zoning Map 17 Defense Installations Nil in 10km radius c. RAINFALL & CLIMATE RAINFALL Normal rainfall of the district is 1640mm of which monsoon rainfall for 4 months from June to September contributes 71.5%. Normal monsoon rainfall is 1173mm and normal nonmonsoon rainfall is 467mm. CLIMATE The district experiences a humid sub-tropical type of climate with minimum and maximum temperature varying from 9 C in the winter to 38 C in summer respectively. Highest temperature recorded in June 1998 was 40 C and lowest temperature recorded in January 2001 was 8 C. Relative humidity varies from 52-88%, its being high in the month of August. d. GEOMORPHOLOGY The district is characterized by gently sloping flat alluvial terrain, which gradually merges to deltaic plain towards south. The elevation of land mass ranges from 10m AMSL in northern part to 3-4m AMSL in the coast, after that the land gradually dips into the Bay of Bengal. In the vicinity of coast falling in Ramnagar and blocks a series of sand dunes stretching ENE- WSW direction of present, which are indicative of palaeo shoreline. Page 6

e. SOIL Major part of the district is covered by alluvial soil except a narrow belt along the sea coast in the extreme south where saline soil, saline alkali soil, non saline alkali soil and degraded alkali soils developed. f. INFRASTRUCTURE Since the proposed Project is expansion project within the premises of the Coastal Installation it will use all the infrastructural facilities of the existing Haldia Coastal Installation. INDUSTRIAL WASTE MANAGEMENT Following waste management measures which are in line with the existing practice is conceived in the design to meet the environmental standards and environmental operating conditions for the project: AIR POLLUTION MANAGEMENT The air Pollution mitigative measures conceived for the project is summarized below: Water spraying is conceived to minimize dust Pollution during excavation and earth work (during construction phase). Hydrocarbon is stored in Floating Roof (FR) / Cone Roof to minimize vapour loses. The DG sets have tall stack as specified by CPCB. Greenbelt is also developed along plant boundary to restrict air Pollution. WATER POLLUTION MANAGEMENT Wastewater Management philosophy is based on the following: The wastewater management philosophy is based on Zero Discharge concept. All oily effluents are diverted to Oil Water Separator (OWS). The wastewater from OWS after removal of oil & after testing is used for green Belt development within the Depot. The collected slop oil is disposed off to third party for off-site recovery or recycling. Domestic Sewage generated at the terminal is treated in septic tank and disposed via soak pit. Separate storm water drainage system is provided at the facility. The non-contaminated rain water is discharged directly to rain water harvesting pit within the facility. However, particularly during the monsoon, any oil-contaminated rain water is led to the OWS for treatment prior to discharge. Page 7

NOISE POLLUTION MANAGEMENT The following noise abatement measures are practiced for the Haldia Depot: The equipment, which is the source of noise, has built-in type noise control abatement technology. Greenbelt is already developed around plant boundary and other strategic locations to reduce noise Pollution SOLID WASTE MANAGEMENT Following measure is followed for management of solid waste in Haldia Depot: Tank bottom sludge is generated while cleaning of oil storage tanks. The cleaning of oil storage tanks is done once in five years as per practice of Oil Industry. Total tank bottom sludge along with filters contaminated with oil thus generated is kept in secured, covered impermeable sludge pit located within terminal at a central place earmarked for the purpose prior to disposal via incineration or bio-remediation. The spent or used oil will be stored at a specific location prior to safe disposal through MoEF/ State PCB approved registered recycler. Other hazardous wastes if any like spent batteries, waste oil, empty drums of oil/chemicals, fluorescent tubing etc. is disposed off in accordance with approved safe procedures. C. PROJECT DESCRIPTION M/s Bharat Petroleum Corporation Limited has set up the POL Depot at HAL-733, Patikhali, Durgachak, Haldia 721602, West Bengal. The current proposal has been submitted to MoEF for issuance of Environmental Clearance for the expansion of storage capacity (94360 to 95468 KL) through addition of two aboveground storage tanks. a. LAYOUT OF PROJECT SITE The total land area available in Haldia Depot is around 44 acres. The total land is under possession of BPCL. The Depot layout is represented in Figure 4. Page 8

FIGURE 4 - SITE LAYOUT Page 9

b. DETAILS OF ALTERNATE SITES CONSIDERED Siting of the Project No alternative site is considered, as it is an expansion of an existing Coastal Installation in which all infrastructure facilities exist. The site has been selected mainly with the following considerations: Availability of existing infrastructural facilities for Coastal Installation No additional land acquisition is required for the expansion project. The total land is under possession of BPCL. Availability of water Technology / Process The project site will only deal with receipt, storage and distribution of petroleum product (viz. MS, HSD, SKO and Ethanol). Thus from technology / process point of view, there is no scope of consideration for alternatives. a. SIZE & MAGNITUDE OF OPERATION Present storage capacity of Haldia Coastal Installation is total 94360 KL. After expansion the storage capacity will increase by 1108 KL Aggregate capacity after expansion will be 95468 KL. Table 2 - Tank Details S.No. Tank No. Tank Type Product Capacity (KL) 1. TK01 FR MS III 2950 2. TK02 FR MS III 2950 3. TK03 CR SKO 2950 4. TK04 CR HSD 12500 5. TK05 CR HSD 12500 6. TK06 CR FO 2950 7. TK07 CR FO 2950 8. TK08 UG SPEED 200 9. TK09 UG HSO/SKO 45 10. TK10 UG SLOP 45 11. TK11 IFR MS IV 10500 12. TK12 IFR HSD 10500 13. TK13 CR SKO 2900 14. TK14 CR SKO 2900 15. TK15 CR FO 6900 16. TK16 CR FO 6875 17. TK17 FR NAPTHA 13500 18. TK18 UG HI-SPEED 200 19. TK19 AG ETHANOL 250 20. TK20 AG BIO-DIESEL 858 Page 10

b. PROCESS DESCRIPTION The Coastal Installation Terminal at Haldia near Haldia Railway Station is operated by BPCL. The terminal functions primarily as Petroleum products storage and distribution facility. The depot operations are categorized as, 1. The Product are received through rail tank wagons and ship tankers 2. Unloading of different products in their designated tanks through TWD Pumps 3. Storage in Aboveground & Underground Tanks 4. Loading in Tank Trucks through TLF and TWF Pumps 1. Receipt of product Petroleum products are received through: Rail tank wagons and Ship tankers. 2. Unloading and Storage Products are unloaded from Tank Wagons through TWD pumps and store in designated above ground and Underground tanks. 3. Loading & Dispatch Empty tank Lorries which report to the depot are sent to tank lorry filling bays. They are filled through loading arms fitted in the bays. Products come to the loading arm from the products tank through pump provided in pump house. The quantity filled in the tank lorry is measured by flow meters fitted in the bay. After Checking the right quantity the tank lorry is sent to retail outlets. e. PROCESS DESCRIPTION Figure 5 - Process flow chart Page 11

f. RAW MATERIAL REQUIREMENT & MATERIAL BALANCE Depot is only for Storage and Distribution of POL and no processing is carried out, hence no Raw material is required. g. POWER REQUIREMENT & SOURCE The power requirement for depot operations is HT power of 11 KV comes to BPCL Haldia from WBSEB. In absence of supply from the grid, power requirement is met through captive DG sets only. D.G sets are used & their specifications are detailed below, Table 3 - Details on D.G sets Capacity Stack height Stack S. No. Number Fuel used (KVA) (m) diameter (in) 1 1250 1 HSD BS III 12 2 350 1 HSD BS III 12 9.5 3 250 1 HSD BS III 6 4 125 1 HSD BS III 6 h. MANPOWER REQUIREMENT Total manpower available in present depot is 50 Nos. No additional manpower is required for Expansion. i. WATER REQUIREMENT, SOURCE & WASTEWATER GENERATION The maximum consumption of water for the existing project will be 4.25m 3 /day. Capacity expansion of the plant is as follows: The maximum water consumption (m 3 /day) during operation (considering) Sl. No. Particulars Quantity (m 3 /day) 1 Domestic Use (Drinking & Flushing) 2.25 2 Canteen 2.0 Total 4.25 Greenery / landscape Development (canteen water will be reused for Green belt) 2 Total water requirement for the Depot is 4.25 KLD. Water balance table & diagram for the Depot are given in below Table and Figure. This includes domestic consumption, washing., etc No additional water requirement is envisaged for the proposed expansion. Page 12

S. No. Domestic water requirement (KLD) Table 4 - Water balance table Canteen water requirement (KLD) Domestic sewage generation (KLD) 1 2.25 2 2 Total 4.25 Septic tank Soak Pit * Note Wastewater generated from tank farm if any will be primarily oily water with suspended solids. After flow through OWS, this water will be released to Strom Water Drain. Total water requirement (4.25KLD) Domestic requirement 2.25 KLD Canteen requirement 2 KLD 2 KLD Septic Tank/Soak Pit Greenery / landscape 2 KLD Figure 6 - Water balance chart 2 KLD e. INDUSTRIAL WASTE GENERATION & DISPOSAL METHODS Tank bottom sludge will be generated while cleaning of oil storage tanks. The cleaning of oil storage tanks will be done once in five years as per practice of Oil Industry. Sludge thus generated will be kept in secured, covered impermeable sludge pit located within Haldia Coastal Installation at earmarked place for the purpose prior to safe disposal through MoEF/ State PCB approved registered recycler. Other hazardous wastes like spent batteries, waste oil, empty drums of oil/chemicals, fluorescent tubing etc. will be disposed off in accordance with approved safe procedures. All biodegradable waste (food and kitchen waste) at the Haldia Coastal Installation will be collected and disposed off into vermin culture pits within the installation area as per well- established practice. Page 13

B. INFRASTRUCTURE REQUIREMENTS The lists of equipments present at the Haldia Coastal Installation are Table 5 - List of equipments / facilities & number S. No Equipment Total Number Capacity 1 HSD TLF Pump 4 150 2 SKO TLF Pump 2 150 3 MS TLF Pump 2 150 4 HSD TWF Pump 3 450 5 SKO TWF Pump 1 450 6 MS TWF Pump 4 450 7 NAPTHA Pump 1 120 8 FO TLF Pump 2 120 9 FO TWF Pump 2 450 10 HSD TLF Pump 2 150 11 SKO TWD Pump 2 450 12 HSD TWD Pump 3 450 13 MS TWD Pump 2 450 14 Naphtha TWD Pump 3 450 a. AIR POLLUTION CONTROL MEASURES No emissions will be generated during the operations as the entire process will be carried out through close circuit piping from storage area to TLF gantry. The only point source of emissions is D.G sets. D.G sets have been fitted with stacks of adequate height to disperse the pollutants. Table 6 - Details on existing APCs S. No. Source of emission Control measure Material of construction Top diameter (m) Height above GL (m) 1 1 x 1250 KVA 1 x 350 KVA 1 x 250 KVA 1 x 125 KVA Stack height as per CPCB guidelines MS Pipe 12 & 6 9.5 Page 14

b. WASTEWATER TREATMENT METHOD From the Depot, 2 KLD sewage will be generated, which will be disposed through septic tanks & soak pits having dimensions 2 m x 1.5 m x 1.5 m. Washing water generated from tank farm washing will be diverted to oil water separator and clarified waste water will be reused for gardening etc. FIRE FIGHTING & PROTECTION SYSTEM The list of fire protection equipments is shown in Table 7 and fire hydrant layout is shown in Figure 2.7. Table 7 - Fire Protection System at Storage Tanks S.NO. TANK NO. TYPE FOAM SYSTEM COOLING SYSTEM RIM SEAL 1. T1 FR EXISTING EXISTING EXISTING 2. T2 FR EXISTING EXISTING EXISTING 3. T3 CR EXISTING EXISTING NA 4. T4 CR EXISTING EXISTING NA 5. T5 CR EXISTING EXISTING NA 6. T6 CR NA EXISTING NA 7. T7 CR NA EXISTING NA 8. T11 IFR EXISTING EXISTING NA 9. T12 IFR EXISTING EXISTING NA 10. T13 CR EXISTING EXISTING NA 11. T14 CR EXISTING EXISTING NA 12. T15 CR NA EXISTING NA 13. T16 CR NA EXISTING NA 14. T17 FR EXISTING EXISTING EXISTING TANK FARM WISE FIRE FIGHTING EQUIPMENT LIST S.NO. TANK FARM NO DH WFM HVLR MEFG FIXED PORTABLE 1. TANK FARM-A 11 08 02 00 02 2. TANK FARM-B 19 17 03 02 02 3. TANK FARM-C 23 21 04 02 02 Page 15

LIST OF EXTINGUISHER S. TYPE OF NO. OF LOCATION/AREA NO. EXTINGUISHER EXTINGUISHER 1. Lube godown 10kg-DCP 02 PPH at site-1 Up to 50HP (7Nos.) 10kg-DCP 04 2. Beyond 100HP (8Nos.) 25kg-DCP 02 Above 50HP (4Nos.) 25kg-DCP 01 3. FO Barge Loading Pump house at site -1 Beyond 100 HP (2Nos.) 25kg-DCP 01 4. TL Unloading Pump House upto 50HP (2 Nos.) 10kg-DCP 01 5. Blending unit PH at site-1 Pumps for Class- Excluded Petroleum (2Nos.) 10kg-DCP 01 6. OWS Pump House at Site-1 upto 50HP (3Nos.) 10kg-DCP 02 7. VT Pump House at site-1 upto 50HP (3Nos.) 10kg-DCP 02 8. RWH Pump Site-1 upto 50HP (1No.) 10kg-DCP 01 9. Fire Water PH at Site-1, Fire Pumps-8Nos. & Jockey Pump-2Nos. 10kg-DCP 05 10. TWD Pump House at Site-2 Beyond 100 HP, (10Nos.) 25kg-DCP 03 10kg-DCP 01 11. TWD Pump House at Site-2 Beyond 50 HP, (1Nos.)TTL & Unloading gantry 10kg-DCP 75kg-DCP 07 01 Tank Wagon Loading & Unloading Gantry 10kg-DCP 75kg-DCP 12 01 12. Tank Farm A 10kg-DCP 08 25kg-DCP 03 13. Tank Farm B 10kg-DCP 10 25kg-DCP 04 14. Tank Farm C 10kg-DCP 10 25kg-DCP 02 15. UG Tank Farm 10kg-DCP 02 16. Admin Building 10kg-DCP 04 17. DG Room 10kg-DCP 02 4.5kg-CO 2 01 18. Store House 10kg-DCP 01 19. Substation/Main switch Room 02kg-CO 2 03 9ltr sand buckets 03 20. OCB Room 02kg-CO 2 02 9ltr sand buckets 02 21. Security Cabin 10kg-DCP 02 22. Workshop 10kg-DCP 01 02kg-CO 2 01 23. Canteen 10kg-DCP 02 24. Laboratory 10kg-DCP 01 4.5kg-CO 2 01 25. Oil Sample Storage Room 10kg-DCP 01 26. Car Parking 10kg-DCP 01 27. Transformer 10kg-DCP 01 28. UPS/Charger Room 02kg-CO 2 02 29. Engineering Store 10kg-DCP 01 30. Haldia Installation Foam compound Trolley Capacity 200/210ltr. 03 Page 16

Figure 7 - Fire Fighting Layout Page 17

C. CORPORATE SOCIAL RESPONSIBILITY As BPCL strongly believes that it is a part of the larger community where it operates, the company has, therefore, taken cognizance of the cultural ethos and socio economic environment of the locality where its plants are located. With this approach, BPCL shall consider the following general measures for the socio economic upliftment of the nearby villages Providing Job Opportunity Vocational Training to Local Youth Education Providing Medical Assistance Infrastructure Development Social Afforestration Games, Sports and Culture D. Project Cost The total project cost for the proposed expansion is around Rs. 624 Lakhs. Page 18