Pre-Construction Meeting Minutes

Similar documents
(To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet

Interim Turnover Check List

Superintendent Job Description:

PRE-INSTALLATION MEETING RECORD

Scope of Work Bid Package C-4 - West Polished Concrete

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No

A62 PRE-CONSTRUCTION MEETING AGENDA

Manage Deliverables - Construction Step 6 February 2015

Scope of Work Bid Package C-8 - West Overhead Doors

Pre-Construction Conference Discussion Guide

BABIES "R" US- TOYS R US

A62 UT PRE-CONSTRUCTION MEETING AGENDA

INVITATION FOR BID (IFB):

WOHLSEN CONSTRUCTION COMPANY

Generator for Maintenance/Police Complex

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

Construction Administration Process

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

G , Request for Proposal Land Survey

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

PROJECT ITEMS CHECK LIST Project No.

Owner's Representative Scope Matrix - D/B Rev 10/28/2013

Procedure Yes; No; greater than

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION

SECTION QUALITY CONTROL

ENTELEN Design-Build, LLC June 29, 2015 SUBJECT: JOB DESCRIPTION PROJECT MANAGER Page 1 of 6

VANDERBILT UNIVERSITY

Herrington Architects PC 101 Richard Arrington Jr. Blvd. S. Birmingham, AL phone fax

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

Pre-Construction Meeting Minutes

CHARLES COUNTY GOVERNMENT ITB NO GOVERNMENT BUILDING ATRIUM RENOVATION

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

GENERAL GUIDELINES FOR CONTRACTORS AND SUB-CONTRACTORS FOR CARTER PLANTATION COMMUNITY

ATTACHMENT D SCOPE OF SERVICES

Attachment 04 Substantial and Final Completion Approval Form. Project Description Project # Date of Completion Permit # Project Manager Phone #

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program

Project Safety Orientation and Procedures

Activation, Transition & Close Out Step 7. July 13, 2012

EXHIBIT A - INSTRUCTIONS TO BIDDERS

ADDENDUM NO. 3. Item 3 NOTICE OF OPPORTUNITY - REPLACE in its entirety with the attached ***REVISED 08/03/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

B ADDENDUM # 1

WHS Management Plans

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

Cover Page / Revision Status

SECTION CONTRACTOR QUALITY CONTROL

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)

Specific requirements for individual units of work are included in the appropriate sections in Divisions 2 through 16.

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built.

INVITATION TO BID-NEW CONSTRUCTION

TRUMAN STATE UNIVERSITY SITE IMPROVEMENTS, KIRK BLDG, MISSOURI HALL & STUDENT REC CENTER LTD RENOVATIONS

RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC

Scope of Work Bid Package C-6 West Metal Panels

SECTION GENERAL REQUIREMENTS

FURNITURE, FURNISHINGS AND EQUIPMENT BID DOCUMENTS

RFQ WEB Advertisement

Chapter 26. Tim Foster - dba MPC (Maintenance Projects & Construction) Company Policy for Subcontractor Management Plans & Management of Change

VAE VIEW ELEMENTARY WINDOW REPLACEMENT West 1600 North Layton, UT Specifications. Construction Documents

SECTION 1: APPLICANT INFORMATION. 1. Have you contacted your local Chapter regarding their established submission process or procedure?

Town of Bennington, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11)

1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT)

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

OSNI PONCA OFFICE REMODEL

MARYLAND STADIUM AUTHORITY

University Apartments on Brooklyn PROJECT MANUAL

EXHIBIT E GENERAL REQUIREMENTS Revised: 10/17/17

All subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum.

MARYLAND STADIUM AUTHORITY

CHEMICAL CONTRACTORS DC WATER CONTRACTOR SAFETY PROGRAM CONTRACT PROVISIONS FOR CHEMICAL DELIVERIES 1. RESPONSIBILITY FOR COMPLIANCE

RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS Willow Park Drive Suite 200 Naples, FL 34109

RFQ for General Contractor-Construction Manager Page 1 of 11

APPENDIX D CONSTRUCTION PHASE CRITERIA

AWT 9TH FLOOR IMPROVEMENTS CITY OF ANAHEIM, CALL CENTER CREDIT & BILLING DEPARTMENTS, ANAHEIM, CA TECHNICAL SPECIFICATIONS AUGUST 2, 2018

APPLICABILITY/ACCOUNTABILITY:

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

REQUEST FOR PROPOSALS

AGENDA PRE-CONSTRUCTION MEETING

Addendum #1. Fraser Public Schools. Bid Package #BP3 - Mechanical Pre-purchase November 1, Content Included in this Addendum:

AWT 2ND FLOOR IMPROVEMENTS CITY OF ANAHEIM, HOUSING AUTHORITY & WORKPLACE, ANAHEIM, CA TECHNICAL SPECIFICATIONS OCTOBER 24, 2017

LSCC MISC. PROJECTS (PACKAGE D) MILLSAP BUILDING ROOF REPLACEMENT Addendum 3

SUBCONTRACTOR MANAGEMENT PLAN

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSAL

Exhibit A Scope of Work

TRIAD ENGINEERING CONSULTANTS, INC.


REQUEST FOR SEALED BIDS No

University of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no Set no. project manual.

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014

Work Breakdown Structure Element Dictionary Construction

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

Transcription:

Project Name Project # Project Address Tel: Fax: Gilbane Building Company Pre-Construction Meeting Date Start End Next Meeting Next Time Prepared By Company Purpose Location Next Location General Notes OUTLINE Gilbane Field Office List Trade Contractors Attended By Non-Attendees 005 Introduction Project Description and 001-001 Construction of (project description). This is the initial Pre-Construction meeting and will signal the start of construction. Owner Team Members and Roles 001-002 Name of Owner Names and Roles of Owner s Representatives Architect's and Engineer's Team Members and Roles 001-003 For each consultant, list the company name, the company s role (Architect, Civil Engineer, etc.), and the names of individual Representatives Gilbane's Team Members and Roles 001-004 Trade Contractor's Key Personnel 001-005 P.M., Superintendent, and Safety Representative need to be identified and submitted to Gilbane prior to starting construction. 010 Administration Lines of Communication 001-006 a) The Trade Contractor shall communicate through Gilbane only. b) All written correspondence is to be signed and dated. Nextel Phones 001-007 Each Trade Contractor Foreman and Superintendent is to have a Nextel radio compatible with the Gilbane system on the Builder's Network. Prolog Manager Printed on: 3/26/2009 Page 1

RFI Procedure 001-008 a) RFI Flowchart b) RFI Form- discuss submission of RFIs, including Website. c) Gilbane to provide user names & passwords for Website. Submittals 001-009 a) Submittal Schedule (Contract requirement) - need right away b) Submission of Submittals attach cover sheet per Project Manual c) Discuss Substitution policy in accordance with specs Weekly Meetings, including PM, Foreman, and Safety Rep Attendance 001-010 Discuss each weekly meeting, stress mandatory attendance. Includes: Foreman s meeting, weekly Safety meeting, and weekly Trade Contractor meeting. Subcontractor Approval 001-011 a) ALL Trade-Subcontractors must be submitted in writing for approval. ( w/ EMR) b) Trade-Subcontractors shall be bound to the Trade Contractor by the terms of the Contract Documents. Daily Force and Activity Reports 001-012 a) To be delivered by 9:00 am on the next business day. b) Activities related to Schedule c) Material deliveries, tests, and other significant events. As-Built Requirements 001-013 Record Drawings must be updated as work progresses. Will be reviewed monthly as part of the requisition process. Material Report 001-014 To be completed and submitted monthly as part of the requisition process. Permits 001-015 Copies of each application for permit and each permit obtained must be transmitted to Gilbane as soon as it is completed/received. Sign-in Requirements 001-016 All visitors are required to sign-in at Gilbane onsite trailer when entering site, and sign-out when leaving. 015 Safety Submit Safety Program 001-017 Must be submitted prior to mobilization. The Trade Contractor s Safety Plan must be sitespecific, and coordinated with the Gilbane Project Safety Plan. Include -- Hazmat Plan and all MSDS sheets specific to this project. Trade Contractor must complete an updated Emergency Phone Listing (TODAY) Prolog Manager Printed on: 3/26/2009 Page 2

Gilbane Cares & Safety Program 001-018 Gilbane Cares moment. Review Gilbane Safety Plan in the Project Manual. Review Substance Abuse Program in Safety Plan. Safety Orientation 001-019 All employees are to attend Gilbane Safety Orientation (45 mins) on their first day of work. A Gilbane safety sticker will be issued, and is to be worn on the worker's Hardhat to show completion of the orientation. 10-Hour OSHA Certification 001-020 State law requires that all on-site personnel must have completed the 10-Hour OSHA Certification. Accident Reporting 001-021 Forms attached in Safety Packet. All accidents must be reported to Gilbane immediately. Accident Reports must be submitted by the end of the day, or the next day no later than 9 AM the next day. Principals Meetings are required for Lost Time Accidents and Recordable Accidents. Occupational Health Facility 001-022 Discuss location of Urgent Care Facility. Light duty work is encouraged. Site Utilization / Temporary Services 001-023 Review current Site Utilization. Fenced off areas are prohibited. PPE: Hard Hats, Safety Glasses, Vests, Gloves 001-024 Required to be worn at all times. 100% compliance. Enforced by Trade Contractor's Foremen/Safety Reps. Emergency Procedures 001-025 Established in the Project Manual. Evacuate building upon 3 horn blasts. All workers meet at specified on site utilization plan. Trade Contractors are to review these procedures with their personnel. Six Foot Fall Rule 001-026 Workers are to be tied off with a full harness when working 6 feet or more above the ground. Workers at the perimeter of the building or near shafts also need to be tied off. This safety requirement will be specifically monitored by Gilbane and your own safety officers. 100% compliance required. First Aid / Eye Wash 001-027 Trade Contractors are to supply and maintain their own First Aid Kits and Eye Wash Facilities. Prolog Manager Printed on: 3/26/2009 Page 3

Weekly Tool Box Meeting 001-028 OSHA requirement. Trade Contractors must hold their own toolbox meetings and submit meeting minutes to Gilbane. Provide meeting time for Gilbane Superintendents participation. Trade Contractor Safety Representative 001-029 Designate a Safety Representative prior to construction with notification to GIlbane. This representative is responsible to maintain safety on this site. Full-time requirement if more than 20 employees on site, unless otherwise noted in the scope of work. Job Hazard Analysis / Safety Task Assignment 001-030 JHAs to be submitted to Gilbane prior to starting hazardous work. STAs to be completed daily and turned over to Gilbane Safety Manager or Superintendent Hot Work Permits 001-031 Must be completed and turned in to Gilbane Superintendent daily prior to starting work. Trenching Permits 001-032 Must be completed and turned in to Gilbane Superintendent prior to starting work. Crane Inspection Certification 001-033 All cranes brought on site must have a current third-party inspection. FAA requirements must be met. 020 Quality Quality in Construction 001-034 Quality Plan is to be reviewed and followed. Trade Contractors must adhere to specifications, drawings and submittals Rejection of Non Conforming Work 001-035 Notice of Non-Compliance will be issued. must be corrected; will be added to RCL. Schedule Pre-Installation Meeting 001-036 Discuss any that apply to current Trade Contractor. Gilbane will inform Trade Contractors of any additional Pre-Installation meetings found to be necessary as construction progresses. First Delivery of Material Inspection 001-037 Coordinate inspection of all materials with Gilbane Superintendent for conformance to specifications and submittals. Prolog Manager Printed on: 3/26/2009 Page 4

Mock-ups, Benchmarks, and Follow-up Benchmarks 001-038 Discuss any specified mock-ups for work. Discuss benchmark procedure; to be done at start of work. Follow-up benchmarks will be done randomly by Superintendent during normal course of construction. Closure Inspections 001-039 Below-grade, below-slab, in-wall and above-ceiling inspections. Call Gilbane Superintendent when work is complete for inspection; 48 hrs notice required. Rolling Completion List (RCL) 001-040 Gilbane will issue weekly at Trade Contractor meetings. Trade Contractors must correct these items in a timely manner. Third-party Testing Agency 001-041 Need 24 hour notice before any inspections or testing, coordinate with Gilbane Superintendent. Non-conforming/failing tests must be remedied immediately. Building Official Sign Offs 001-043 Fire Marshall Certification Letter 001-044 Trade Contractors are to submit a letter certifying that work was completed in accordance with the contract documents and all applicable codes. Final Inspection and Acceptance 001-045 Trade Contractors are to notify Gilbane in writing when substantially complete and ready for final inspections for acceptance by A/E and Owner. 025 Site Utilization Site Security Program 001-046 Site Security Program is contained in Project Manual. Construction site is secured during nonworking hours; however, Trade Contractors are responsible for the security of their own material, equipment and tools. Use of Entrance Roads 001-047 All asphalt roads are 25 MPH, all site roads are 10 MPH. Material / Equipment Storage 001-048 Coordinate with Superintendent as to material and equipment storage on the site. Prolog Manager Printed on: 3/26/2009 Page 5

Trade Contractors Office, Telephone, Electricity, etc. 001-049 Gilbane office and phone system are for Gilbane use only. Trade Contractors are responsible for all systems within their field office. Sanitary Facilities 001-050 Portable Toilets have been supplied for your convenience. Construction Electricity 001-051 Construction electricity is supplied at locations throughout the site at no charge. Water 001-052 Water is supplied at locations throughout the site at no charge. Trade Contractors must supply drinking water for their employees. Dust Control Plan 001-053 The project Dust Control Plan is found in the Project Manual. If required, individual Dust Control Plans are to be submitted to Gilbane prior to starting work. Forestry Management 001-054 No trees or forest material is to be removed without prior approval of Gilbane. Owners Facility is Off Limits 001-055 Occupied buildings are prohibited areas. In the event that entrance of an occupied building is required, procedures outlined in the Site Security Program shall be followed. Employee Parking 001-056 Employee Parking is located along the sides of the construction access road. Gravel area adjacent to Gilbane trailer is for Gilbane personnel and visitors only. Cars parked in prohibited areas will be towed at the employee s expense. Dumpsters 001-057 Dumpsters are supplied at locations throughout the site at no charge. Dumpsters are for construction waste only, and must be separated as labeled on the dumpsters. Cleanup 001-058 Housekeeping by each individual Trade Contractor is mandatory. Working Hours 001-059 The working hours for the project are 7:00 am to 3:30 pm, Monday through Friday. Any hours necessary outside of these are to be approved by Gilbane prior to working. Prolog Manager Printed on: 3/26/2009 Page 6

030 Schedule Gilbane Milestone Schedule 001-060 Established in Contract. Discuss milestone dates. Trade Contractor Schedule 001-061 Sequencing and duration of work are to be discussed with Gilbane prior to Trade Contractors submitting their schedules. 2-Week Look Aheads 001-062 Provide at Weekly Trade Contractor Meetings. Forms are attached. Manpower 001-065 035 Changes No Work without Authorization 001-066 Request for Quotation (RFQ) or Change Request Authorization (CRA) can direct work. Allowances must have signed T&M for authorization. Requests for Change Quotations (RFQs) 001-067 5 working days to return RFQ. Also by Contract, 10 days to notify Gilbane if an RFI response involves cost. 5 days for any other instruction that involves cost. Change Request Authorization (CRA) 001-068 This will authorize to proceed and submit pricing later. Trade Contractor Contract Amendment 001-069 Formal change to the Contract. Time and Material Changes 001-070 T & M Slips must be submitted daily. Must be priced 2 weeks prior to pencil requisition. Backup is required for all T&M Pricing. Allowances 001-071 Priced bills/invoices are required 2 weeks prior to pencil requisition. Alternates 001-073 Prolog Manager Printed on: 3/26/2009 Page 7

040 Payment Procedures Schedule of Values 001-073 Must be submitted for approval prior to billing. Must include MBE, Safety, Cleanup, Closeout, and all Allowances as separate items. Sub-jobs must be separated. Schedule of Values must be approved by Owner and A/E. Surety 2000 is to be used for insurance. Monthly Requisition Cycle 001-074 Pencil copy submitted by 15th of each month; final copy must be completed by the 25th of each month. Incomplete requisitions will be returned for processing next month. Billing Procedure and Format 001-075 See Billing forms. Retainage 001-076 Retainage will be 10%. Retainage reduction to 5% must be requested and will only be considered after 50% completion of work, and no substantial RCL items. Payment for Materials Stored Off-site 001-077 Can be arranged; see requirements in front end documents. -Schedule A Bill of Sale. -Surety 2000 Sworn Statements / Waivers 001-078 See attached forms. Gilbane In-House Payment Procedure 001-079 Interim payment checklist will be used to review Trade Contractor compliance with Contract Terms at requisition time. s such as Safety, RFQ response and submittal status will be reviewed. Bonds, Insurance, Contract Waivers, etc. 001-080 All paperwork must be in order. Includes Certificate of Tax due. 045 DBE / EEO Disadvantaged Business Enterprise Utilization Plan 001-081 Submit all requirements, including fully executed contracts and all certifications to Gilbane prior to first requisition. Report Requirements 001-082 Prolog Manager Printed on: 3/26/2009 Page 8

050 Insurance NO INSURANCE CERTIFICATE -- NO WORK -- NO EXCEPTIONS 001-083 Certificates to be in place prior to mobilization. Follow sample insurance form in the Project Manual for description of additional insured. Report Requirements 001-084 055 Construction Issues Mobilization 001-085 Closely coordinate with Gilbane Superintendent about trailers etc. Break trailers are to be provided by Trade Contractors. Concrete Pour Cards 001-086 48-Hour Notification for Shut Downs 001-087 Testing and Inspection Procedure 001-088 24 hour notice is required before any type of inspection or testing. Winter Protection 001-089 Must be maintained. Provide Delivery Schedules 001-090 Closely coordinate with Gilbane Superintendent. 060 Project Close-Out O & M Manuals 001-091 Must be approved prior to equipment turnover and final copy submitted to Gilbane with equipment as a requirement for payment. Warranties / Guarantees 001-092 Must submit sample prior. Attic Stock / Spare Parts 001-093 As-Builts 001-094 Will be reviewed monthly at requisition time. 065 General Discussion Contract Signing 001-095 Complete with Purchasing Agent ASAP. Must be signed before work starts on-site. Prolog Manager Printed on: 3/26/2009 Page 9

Additional Documents 001-096 Required Information- General 001-097 a. Certificate of Insurance b. Executed subcontracts c. CADD waiver Required Information- Safety 001-098 a. Trade Contractor and Trade Subcontractor Safety Deliverables List b. Competent Person List (Appendix D) Required Information- Quality 001-099 a. Person responsible for Trade Contractor Quality (full-time) Attachments 001-100 a. Gilbane Directory b. Trade Contractor contact sheet c. Trade Contractor Safety Task Assignment (STA) notice d. Trade Contractor Force and Activities report e. Material and Equipment Report (MESR) f. Sample RFI g. Sample RFQ h. Sample CRA i. Submittal Cover sheet j. 2-week Look Ahead Cc: Company Name Contact Name Copies Notes Prolog Manager Printed on: 3/26/2009 Page 10