Request for 4M change self management strengthening

Similar documents
Animal health requirements for natural casing to be exported to Japan from the exporting country

Process Innovation in Upstream Process of Manufacturing

Tentative translation (as of March 1, 2016) March 1, 2016

Real-time Monitoring Solution to Detect Symptoms of System Anomalies

Japan s Climate And Energy Policy and the Status of Coal Power

Animal Health Requirements for steamed leather meal to be exported to Japan from Taiwan

ISA95 と OPC-UA と KPI

Standards for the slaughter of cattle and processing of beef and beef offal eligible for export to Japan

Home Energy Report Pilot: Large-scale look at consumer behavior in Japan

The 8th EMAK Workshop Jakarta, February 3, 2017

The Microsoft Conference 2014 ROOM F

G 絶対最大定格 ( 指定のない限りT c = 25ºC) Parameter Symbol Conditions Limits Unit 尖頭逆方向電圧 V RM Duty V 直流逆方向電圧 V R 直流電圧印加時 30 V

Nuclear Emergency Preparedness Training Guidelines

Establishment of the JSCE Recommendations for Design and Construction of Post-installed Anchors in Concrete

PV in Japan, Current status And The way to go

Ecosystem Services and Cities: Case of Yokohama City and Kanagawa River Basin

System Dynamics Modeling and Simulation of Disaster Recovery Process of Interdependent Infrastructure Systems. Shojiro Kataoka 1

EU Declaration of Conformity

Material Flow Cost Accounting

Graduate School of Systems and Information Engineering University of Tsukuba College of Science and Technology Nihon University Graduate School of

Development of High Density Cold Energy Network

Copyright Yasuhiro SHODA, The Japan Textile Importers Associations. All Rights Reserved.

Indicator for Manufacturing Execution System

Tentative Translation. Outline of Long-term Low-carbon Vision

General Policy for Approved Organizations

英文 和訳対比表 内容一覧 TABLE OF CONTENTS

Tokyo Gas and Osaka Gas Begin Smart Energy Network Demonstration Project

ISO IS Eco Eco--Efficie Effic nc ISO/TC ISO /TC 07

XXXX Z X X X X 金屬材料銲接程序規範書及其檢定 - 電弧銲接之銲接程序規範書 中華民國國家標準 CNS 前言 適用範圍 引用標準 用語及定義 銲接程序規範書之技術性內容 通則...

東京理科大学 火災安全科学研究拠点 Tokyo University of Science Research Center for Fire Safety Science

EU Declaration of Conformity

NAGANO MONOZUKURI EXCELLENCE 2014

are 1 things, 2 cloud servers, and 3 open channels of communication (Figure 1). Terminal equipment Management servers Information network Past Limited

Amendment to Legal Inspection Requirements of Ventilators/Exhaust Hoods

協定規則第 134 号水素燃料車 (HFCV) の安全関連性能に係わる自動車およびその構成部品の認可に関する統一規定目次規則 1. 適用範囲 2. 定義 3. 認可申請 4. 認可 5. パートⅠ: 圧縮水素貯蔵システムの仕様 6. パートⅡ: 圧縮水素貯蔵システムに関する固有構成部品の仕様

Lesson 8: Office Procedures (SOP)(20-25 minutes)

<< ATMOsphere Japan 2017 >> LAWSON s Efforts for Non-Freon

Green Procurement Guidelines

Toyota Environmental Challenge 2050

Cyclic Innovation for Clinical Empowerment. (CiCLE)

商業ビル省エネルギーサービス. Introduction of PowerU and its Energy Saving Solutions and Services. 江源富北京佩尔优科技公司 Jiang Yuanfu, Beijing PowerU Tech Ltd

Toan Cau Building Materials

A Consideration on Design and Analysis of a Reverse Logistics Network System: A Case Study of Discarded Motor Vehicle Tires

201X Elo Touch Solutions, Inc. All Rights Reserved.

Explanation Note for GI Application Process

4[C] Desert Power etoc のレッスン以外で使用禁止 10.2(4C)A2E. around the. ways to cut the amount. of carbon dioxide ~ した. companies have 提供 ( ていきょう ) する

シリコン MOS 形集積回路 /Silicon MOSFET type Integrated Circuit. 記号単位定格 /Ratings. B. 電気的特性 /Electrical characteristics 測定条件 /Measure condition (Tc=25 ±2 )

Developing Business Continuity Management in Kobe City Waterworks Bureau

Higashimatsushima Organization for Progress and Economy, Education,

Validation of a new air sampler for rapid environmental monitoring

Results of the Fourth Airborne Monitoring Survey by MEXT

The Act on Promotion of Private Finance Initiative (PFI) (Act No. 117 of 1999)

船舶保安計画のセルフチェックリスト. Self Checklist for SSP

NEW ERA OF A HYDROGEN ENERGY SOCIETY

我が国の先進的な治水技術 - 運用しながらのダム再生 -

ROOT CAUSES OF THE FUKUSHIMA DAI-ICHI NUCLEAR PLANT ACCIDENCTS AND STUDY OF ITS CLIFF-EDGE

Opportunities and Challenges in China s Energy Development Energy Efficiency and Conservation

Facilitating SMEs Internationalization - Identifying Infrastructure Required-

IEEJ:June 2016 IEEJ2016 IEEJ 50 th / APERC30 th Anniversary Joint Symposium Lessons from Japan s Energy Mix Debate and its Relevance to the World Asia

記号 / 定格 /Ratings. ドレイン電圧 1 DRAIN Voltage VD -0.3 ~ 700 V 下記パルス幅以内での 保証とする 2 VCC Voltage VCC -0.3 ~ 45 V (It is guaranteed within the pulse as below.

Quick Hydrogen Sensor: Seeds-Innovation-Type Technology Transfer

ISO/TC 25 N 467. 日本の JIS G 5505 の球状化率の導出式に対する WG10 Convenor のスティーブ ドーソンの意見. 原文 ISO/TC 25 Cast irons and pig irons

CURRENT SENSING RESISTOR KRL SERIES- Susumu Co. Ltd. Thin Film Innovator

簡介 竹棚架工作平台安排指引 ( 第二版 ) 擬稿

JFS s ESCO Business in Japan:

Full Acquisition of Yusen Logistics Co., Ltd.

サウジアラビア国電力省エネルギーマスタープラン開発調査 ファイナルレポート要約

Food Product Traceability

Certificate of Accreditation

放射性炭素測定によるバイオベースト製品の バイオマス濃度試験報告書

FY2015 Financial Results. ended March 31, 2015

Ab-Match Assembly Human Elafin (SKALP) Kit

First-principles Calculation on the Diffusion of Hydrogen along a Screw Dislocation Core in BCC Iron

Innovation for Low Carbon Society IT Supports Your Objective

Purchasing. Purchasing. Revision 16. EFFECTIVE DATE : 1- Jun Tokai Eastern Rubber (Thailand), Ltd. Purchasing Section

Documents to be submitted to PMDA when applying for its pre-approval GMP inspection or periodic post-approval GMP inspection of drugs or quasi-drugs 1

Compact Oxygen Sensor for Motorcycles Concept of Simple Heaterless Sensors *

EU Declaration of Conformity

Air-Conditioning Control of HEMS and BEMS toward CEMS

Execution Status of Law concerning the Evaluation and Regulation of Manufacture, etc. of Chemical Substances (CSCL) (2006)

PSLT - Adobe Audience Manager (2017v1)

Strategies for Realization of Low Carbon Buildings

PREQUALIFICATION DOCUMENTS

No. 14 The Application of the Principles of GLP to in vitro Studies in vitro GLP INTRODUCTION

Introduction Part II. Scoring Criteria... 54

炭素繊維複合材ケーブル. Carbon Fiber Composite Cable

Form of Procurement Contract under JICA s Grants

Fastening Your Innovations

バイオマス発電設備への間伐材等の利用による生物多様性の保全

Contents 1. Corporate Profile 2. At the Outset 3. Energy Management System 4. Results of the Five Years 5. Success Factors of the Energy-Saving Initia

4. Printing-related Products. Office-related Products

Introduction of FETI

Outline of the Draft New Regulatory Requirements for Nuclear Fuel Facilities, Research Reactors, and Nuclear Waste Storage/Disposal Facilities

Practical Experiences for Medical safety measure in PMDA

Message from the Major Operating Officer

Outline of the study

量子ドット ナノシートを用いた色変換素子の開発

Residential Behavior-based Energy Efficiency Programmes and Activities in Japan

<Translation of Japanese Sixth Edition>

Open Project on Stock Sustainability Management

Transcription:

Request for 4M change self management strengthening 1.Aug.2016 Device engineering Dep. Partner management Dep. Sony Global M&O Corp. 1

Request for 4M change self management strengthening Past cases of Sony TV market announcement of October 12, 2013 Of the rear cabinet material is assumed Degraded above, when external force is applied, is that it may lead to rarely damaged was found. Deterioration of the resin butadiene (rubber component) The added components influence as a coloring agent Often until the abnormal component content (Silent change)

2015 4M change the results and problems Change the number of applications (Japan) Parts D-Cost analysis 43 29 20 17 13 19 14 5 5 Apr May Jun Jul Aug Sep Oct Nov Dec FY14 FY15 2015 FY14 vs FY15

Re thorough partner self-management item 14% 17% 7% D-COST Content 30% 36% Equipment management Jigs and tools management Die management US$38,000 Working instruction management US$ 460,000 Worker management US$ 24,000 D-Cost Defect cost 5 item of the autonomous management strengthening

Case 1 Working instruction management Paint peeling problem of repair D-Cost US$30,000 occurred Undercoat Filled putty Putty shine Air blow Undercoat painting When turned on again after the repair, Work instruction is poor Step jump Step jump Peeling in the tape test Topcoat painting Character print Topcoat painting Character print Inspection Pass Fail Shipping Repair Inspection Pass Shipping 5

Case 2 Die management Die abrasion problem D-Cost US$7,400 occurred Die OK NG Die management Maintenance and verification methods are poor abrasion occurs Die Matches the criteria dimension Larger than the criteria dimension 6

Sony's change management rules 1. Production site Plant 2. Manufacturing method and conditions Method/procedure Conditions Process equipment Change or addition of production plants and sites (including subcontractor and parts partner of first tier partner ) Mechanical Electric Semiconductor PWB Approval Approval Approval Approval Change in the work environment (temperature, humidity, cleanness, lighting, etc.) * * * * *6) Content of change Change in the production method (e.g. from batch from cell or vice versa) Application Application Application Change of lines (e.g. from line A to line B) or deletion Application Application Application/* Change in the work procedure (work sequence/work addition or deletion) Application Application Application Maintenance of work standards * * * Shift change * * * Approval/ Change in the work conditions (e.g. SPM, painting conditions, soldering conditions, etc.) Application * Comply with Application STM-0028 Change in the program (NC/drill) Application * Application Switch between manual and automatic, between manual and tool-based, and between singleaxis and multi-axis Change to different equipment (press machine, molding machine, etc.) Application * Category Change category *2) Approval Application Application Addition of equipment of the same type Application * * Occurrence of and recovery from equipment failure * * * Change in the maintenance interval or method and implementation of maintenance * * * *4) *1) Approval/ Application *3) Approval Re-approval sample submission Application 4M change application submission partner autonomous management 7

Purpose Partners in a portion other than the "approval", "application" of change management category of 4M change application guidance for the "autonomous management" item, will promote the strengthening of the quality management system. change management category of 4M change application guidance 大項目 中項目 小項目 機構 電気 半導体 PWB 生産場所 工場 生産工場の変更検定検定検定検定作業環境の変更 * * * * 生産方法の変更 申請 申請 申請 ラインの変更 申請 申請 申請 /* 方法 手順 作業手順の変更 申請 申請 申請 作業標準書の変更 申請 申請 申請 シフトの変更 申請 申請 申請 製造方法 手順 条件 工程設備 作業条件の変更申請 * STM- 0028に従う 検定 / 申請 プログラムの変更 申請 * 申請 工程設備の変更 検定 申請 申請 異なる設備への変更 申請 * 申請 /* 同型設備の追加 申請 * * 設備の故障発生 復帰時 * * * メンテナンス頻度 方法の変更 メンテナンス実施時 * * * 設備の追加 廃止 修理 改造 変更 * * * * 周辺設備例 : 取り出し機 レベラー加工補助剤加工補助剤例 : 申請 * * * FY16 focus item: strengthening 金属加工油 離型剤 of autonomous 治具の追加 廃止 修理 改造 変更申請 * * * 治工具工具の変更 * * * * management item of partners タップの変更 ( 転造 切削 ) 検定 * * * autonomous management item 8

all 22 items Items medium items No. small items The configuration of the guideline 1.Operation Change 1.1 Operation Standard Book 1.1.1 Making 1.1.2 Operation Instructions 2.Change of People 1.1.3 Temporary Operation 1.1.4 Change Management 1.2 Confirm Operation 1.2.1 Confirm Operation Content 1.3 Change Operation Conditions 1.3.1 Change Operation Conditions 1.4 Traceability 1.4.1 Traceability 2.1 Change of Operators 2.1.1 Advanced Education(Basic Education) 2.1.2 Operator Instruction 2.1.3 Confirm Final Results 2.2 Change of Quality Controller 2.2.1 Manager Training 2.3 Charge Instead 2.3.1 Act Operation Instead Description of Failure case and root cause To analyze the past of failure cases, it describes the portion that is not possible for the ideal scheme. 3.Change of Mold and Die 4.Equipment Change 5.Fixture Change 2.4 Traceability 2.4.1 Traceability 3.1 Mold and Die Management 3.1.1 Regular Maintenance 3.1.2 Daily Spot Check 3.1.3 Abnormality Dealing 3.2 Traceability 3.2.1 Traceability 4.1 Equipment management 4.1.1 Regular Maintenance 4.1.2 Daily Spot Check 4.1.3 Abnormality Dealing 4.2 Traceability 4.2.1 Traceability 5.1 Fixture management 5.1.1 Regular Maintenance 5.1.2 Daily Spot Check 5.1.3 Abnormality Dealing 5.2 Traceability 5.2.1 Traceability Description of self-management content as an ideal scheme Including "the operation of the actual Sony site" Explain the correct operation at the moment Ideal scheme = ultimately aim scheme We will consider a scheme that can be managed with close scheme. 9

10