B. All work of the section shall comply with the conditions of the contract, the drawings and any special conditions forming a part of the contract.

Similar documents
Construction Standards PAGE

GUIDE SPECIFICATION SECTION CRYSTALLINE WATERPROOFING

Coatings CSI Format Section 07160

CEMENTITIOUS CRYSTALLIZING WATERPROOFING PART 1 GENERAL

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Dryshake CSI Format Section 07160

SECTION SURFACE-APPLIED CRYSTALLINE WATERPROOFING AND CONCRETE REPAIR

KOSTER AMERICAN CORPORATION

The versatility and effectiveness of the Penetron. System have been demonstrated across a wide spectrum

CSC SPECIFICATIONS SURFACE-APPLIED CRYSTALLINE WATERPROOFING Section

CSI SPECIFICATIONS SURFACE-APPLIED CRYSTALLINE WATERPROOFING Section

RETAINING WALL INSIDE (NEGATIVE SIDE) - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT

SIDER-BASE CONCENTRATE AAC/ MONOSIDERAL AAC THE ULTIMATE OLD-WORLD AERATED CONCRETE-AAC DECORATIVE STUCCO SYSTEM


CSI SPECIFICATIONS SURFACE-APPLIED CRYSTALLINE WATERPROOFING Section

SECTION MOISTURE RESISTANT/WATER-PROOF FLOORING ADHESIVE FOR CONCRETE SLABS

4.16. APPLICATION INSTRUCTIONS Construction Joints & Details

Hydrophilic Crystalline Waterproofing of Concrete-Admixture

SECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified.

SEWAGE/ EFFLUENT TREATMENT PLANT - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT

POLYACRYLATE MODIFIED THINSET TERRAZZO 1

SECTION MORTAR

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving

MS-2A LINER SPECIFICATIONS: for STRUCTURAL REPAIR and SEALING of MANHOLES

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements.

CSI SPECIFICATIONS CRYSTALLINE WATERPROOFING LEAK REPAIR Section

ASH GROVE KOLORSTONE BROOMCOAT MIXING KIT. Spec Sheets Contents: Kolorstone Broomcoat Mixing Spec Sheet Kolorflex Admixture Spec Sheet

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

SECTION SANDSTONE RESTORATION

SECTION EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE

HIGH PERFORMANCE MIX SPECIFICATIONS

profile-mix-plus, Page 1 of 8, Rev

SIDER-POOL. Product Data. Features and Uses

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING

SECTION CAST-IN-PLACE CONCRETE

SECTION BRICK MASONRY ASSEMBLIES

MILANO WATER TREATMENT PLANT

MONOBASE AAC/ SIDER-PLAST THE ULTIMATE EXTERIOR HARD COAT STUCCO SYSTEM FOR AUTOCLAVED AERATED CONCRETE

Jewel Stone. Decorative Concrete Overlay System. Part 1 GENERAL MANUFACTURER S SPECIFICATION

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

Kolorines Glass Mosaic Tiles Project Specification

Waterproofing and Damp-proofing Cementitious Slurry

SECTION EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE

SECTION EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE

3.0 XYPEX SPECIFICATIONS. CSI Format Schematic Drawings

3.0 XYPEX SPECIFICATIONS. CSI Format Schematic Drawings

CSI MASTERFORMAT SPECIFICATIONS. krystol internal membrane (kim ) Section 03 & 07 - Integral Crystalline Waterproofing of Concrete

PERMANENT POOL WATERPROOFING (NEW CONSTRUCTION) PERMANENT POOL WATERPROOFING (NEW CONSTRUCTION) WITH PENETRON INTEGRAL CAPILLARY WATERPROOFING

UFGS (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

ELASTOFLEX ELASTOMERIC TEXTURED ACRYLIC WALL COATING SPECIFICATION

A-9,250 Parking Structure Resurfacing Cement Look

Copyright 2002 AIA MASTERSPEC 05/02

RESILIENT FLOORING: Select Step Wood

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Agrément Certificate 2003/297

A. This Section includes traffic coatings for the following applications:

GUIDE SPEC SECTION Injection Grout (IG10)

BENTONITE WATERPROOFING

THOROSEAL CPB 1. Capillary/Crystallising waterproofing, surface applied slurry for use on concrete and mortar. Description of product. Benefits.

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340

SECTION RESILIENT FLOORING ACCESSORIES

METHOD STATEMENT. BluSeal Tekflex EXTERNAL CEMENT LATEX MEMBRANE

Section Cementitious underlayment

Construction. SikaRepair 223. Application Instructions. Sika Corporation

Construction. SikaRepair 223. Application Instructions. Sika Corporation

SECTION Arisfor WallGuard

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION

EPOXY TERRAZZO 1 REV. 8/02

Construction. SikaRepair SHA. Application Instructions. Sika Corporation

RESILIENT FLOORING: Hot and Heavy - Secoya

DIVISION 9 - FINISHES Section Protective Coatings

3910 E. McKinney Denton, TX P.O. Box Dallas, TX EZ WALL CONCENTRATE, INC

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES

Construction. SikaTop 111 Plus. Application Instructions. Sika Corporation

ITEM NO. 307 CONCRETE STRUCTURES

Conditions of the Contract and Division 1 General Requirements are a part of this section.

CSC SPECIFICATIONS DRY SHAKE CRYSTALLINE WATERPROOFING Section

CSI SPECIFICATIONS DRY SHAKE CRYSTALLINE WATERPROOFING Section

2 COMPONENT LIQUID WATERPROOFING PART 1 GENERAL. A. Two component liquid waterproofing for positive side waterproofing on mineral substrates

1/16 Single Broadcast Polymer Flooring System

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Products

ReCote Finish System over Concrete

DIVISION 7-THERMAL & MOISTURE PROTECTION Section Cementitious & Reactive Waterproofing

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS

ARDEX GUIDE SPECIFICATION ARDEX GPS GENERAL PATCH & SKIMCOAT Trowelable underlayment

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING

Ezarri JointPoint Glass Mosaic Tile Installation in Immersed Installations. 10 Year System Warranty.

TECHNICAL DATA SHEET SIKA RAPID REPAIR MORTAR 25KG

SECTION LITHIUM BASED MOISTURE VAPOR CONTROL CURE SYSTEM AND FINISHING

Section Shotcrete

Construction. One component cementitious mortar fibre reinforced for flexible waterproofing. Product Description. Product Data. Form.

Krystol Internal Membrane (KIM ) Guidelines and Procedures - NZ

***********************************************************************************

1.2 SUMMERY A. Section Includes: 1. High-Performance Polyurethane Resinous flooring systems. 2. Decorative Polyurethane Resinous flooring systems.

Transcription:

SPECIFICATIONS PART ONE - GENERAL ------------------------------------------------------------------------ 1.01 General Description A. The Cementitious capillary waterproofing materials specified herein shall be of the surface applied capillary action type, capable of providing the waterproofing qualities as stated under the guarantee, for all vertical and horizontal applications, at locations shown on the drawings or on the finish schedules. B. All work of the section shall comply with the conditions of the contract, the drawings and any special conditions forming a part of the contract. 1.02 Scope of Work A. Provide all labor, materials, equipment and appliances as required for the proper installation of the cementitious capillary type waterproofing as follows: 1. Prepare all surfaces, as specified herein, to receive cementitious capillary waterproofing. 2. Provide waterproofing at all vertical and horizontal surfaces shown on the drawings or finish schedule. 3. Manufacturer to provide all certifications, test data, affidavits or samples requested by the architect. 4. Perform all installations to comply with local rules and regulations, OSHA requirements for health and safety and EPA statutes complying with environmental protection. 5. Perform all installations in accordance with the approved construction progress schedule or at such time necessary for the orderly and expeditious completion of the work of the project. 6. Upon completion of waterproofing, remove all waste or rubbish resulting from waterproofing operation and all equipment used for same. 1.03- Submittals A. Manufacturer's Literature

1. Submit approved manufacturer's product literature for cementitious capillary waterproofing materials, including all special details and recommended application procedures. B. Warranty 1. The waterproofing applicator shall provide an affidavit stating that all cementitious capillary waterproofing materials were applied in strict accordance with the approved manufacturers recommended procedures. 2. Provide a written warranty that all work executed under this section will be free from defects in materials, workmanship and free of leaks for a period of five (5) years from date of acceptance, unless resulting from structural defects or causes other than the work of this section. Said defects shall be remedied, by the applicator for the period of the warranty, without additional cost to the owner. 1.04- Quality Assurance A. qualifications for Installers 1. The applicator performing the work must have had not less than 5 years experience in this type of waterproofmg and be able to show that he has successfully carried out contracts of a similar nature, size and scope. 2. Provide at least one person who shall be present during execution of this portion of the work and who shall be thoroughly experienced in the installation of this specified products and shall direct all work performed under this section. 1.05 Product Handling A. Protection: Use all means necessary to protect waterproofmg material before, during and after installation and to protect the installed work and materials of all other trades, contiguous to the waterproofed surfaces. Packaged containers shall be stored on wooden skids, 6" off the ground and covered with heavy plastic sheeting which shall remain in place at all times. B. Replacement: All broken containers and the contents of same shall be removed from the premises, discarded in legal fashion and replaced with new materials at no additional cost to the owner. 1.06 Coordination A. Review all drawings and details of installations of other adjoining materials and cooperate with respective trade performing same. B. The applicators particular attention is directed to the requirement to properly prepare surfaces for the attachment of other materials and to chip out and re-pack

surfaces at all attachments. PART TWO - MATERIALS ------------------------------------------------------------------------ 2.01 Materials A. The cementitious capillary waterproofing shall be factory formulated in a design mix to be applied in a slurry paste mixed to the proper consistency with the addition of water in quantities recommended by the manufacturer. B. Pre-mixed factory formulation shall be guaranteed not to contain additives such as chlorides, sulphates, iron oxides or similar deleterious substances. C. All materials used in the formulation shall comply with standards set forth herein, as follows: 1. Cementitious capillary waterproofmg compound shall be composed of specially prepared Portland Cement, fine ovendried Quartz aggregates and moisture active, chemically treated ingredients as manufactured by: ICS/PENETRON INTERNATIONAL LTD. 45 Research Way, Suite 203, East Setauket, NY 11733 Telephone Number: (631) 941-9700 For all applications as specified. Waterproofing compound shall be selected for slurry mix, trowel mix, or mortar mix as follows: a. Slurry Mix - PENETRON powder b. Mortar Mix - PENECRETE powder c. Trowel Application - PENETRON powder or PENETRON PLUS powder. PART THREE - EXECUTION ------------------------------------------------------------------------ 3.01 Preparation A. Prior to commencing waterproofing operations inspect all containers for rips, tears, or holes. Any damaged containers shall be rejected and replaced with new materials.

B. Make sure that surfaces to be treated are free of laitance and other materials which will inhibit the bonding and penetration capabilities of the waterproofing system. Floor hardeners or curing agents should not be used prior to the application. C. Do not apply PENETRON slurry or mortar when the ambient temperature falls below 32 degrees Fahrenheit or 0 degrees Celsius. The temperature should remain above freezing until coating is fully dry. Waterproofing materials shall not be applied to frozen or frosted surfaces, nor during periods of rain or snow. PENETRON PLUS (trowel applied) can be applied in temperatures and general conditions where concrete can be placed. Follow concrete specifications for protection requirements for all horizontal concrete placement D. Surfaces to receive slurry applications shall have a wood float or rough finish and have open capillaries. Concrete will be moist cured only. The use of curing compounds on concrete to receive cementious capillary waterproofrng will not be permitted. Construction joints and visible cracks exceeding 0.01 inch in size shall be routed out 3/4"(1.9 cm). Remove all laitance, dirt, dust and rinse all concrete slabs and cracks with water. The surfaces shall have a dark appearance at the time when the slurry coating is applied. Remove form oil, form release agents and other foreign materials which will inhibit the bond and penetration of the system. Steam clean, acid etch, or brush blast when necessary. Leave tie holes 1" (2.54 cm) back. Segregated areas, honeycombed pockets and faulty construction joints shall be routed out to sound concrete. Construction joints and visible cracks in concrete surfaces exceeding hairline size (larger than 0.01") should be routed out 3/4" (1.9 cm) deep. Construction joints can be formed initially by use of cant strip 1" (2.54 cm) X 3/4" (1.9 cm). E. Clean surfaces to be waterproofed with water. Dampness should be present in the concrete strata to achieve maximum initial penetration of the cementitious capillary waterproofing compound. (See Video in DOWNLOADS at http://www.penetron.com/en/download.htm) 3.02 Mixing Procedures A. Slurry Mix: Use separate containers to measure PENETRON powder and water. Water must be potable. Add 1 1/2 to 2 parts water to 3 parts PENETRON powder; mix thoroughly. Should be mixed to the consistency of thick latex paint. Stir the slurry mixture frequently during the application and prepare only as much as can be applied within a 30 minute period. (See Video in DOWNLOADS at http://www.penetron.com/en/download.htm) B. Mortar Mix: Add water to PENECRETE powder. Work with trowel until medium stiff consistency is reached. Prepare only as much PENECRETE as can be applied within a 35 minute period.

(See Video in DOWNLOADS at http://www.penetron.com/en/download.htm) C. PENEPLUG: Pour a handful into a small mixing (bow/pail) container. (Gloves must be worn) Add just enough water (drops) to form a mix that is (dry pack/dry earth) consistency. Quickly form into a wedge and force it into leak. Apply as much pressure as possible by standing on and or tapping with a wedge of wood. After leak has stopped, fill void to surface with PENECRETE. 3.03 Safety Measures A. For maximum safety, hands should be protected with rubber gloves whenever cementitious capillary waterproofing materials are being used for an extended period of time. During spray or overhead applications, goggles should be worn. 3.04 Application Procedures A. Cementitious capillary waterproofing coating shall be applied with stiff masonry brush/broom or normal hopper fed spray equipment. Dry shake PENETRON PLUS (trowel applied) on concrete slabs when it has reached initial set. B. Horizontal Concrete Surfaces: Dry Shake and Power Trowel, Wood Float or Bull Float Application: 1. Dry shake PENETRON PLUS when horizontal concrete slab is in plastic state. Apply 1.0 lbs. (0.45 kg) per sq. yd. Trowel or float surface to specified finish. 2. Slurry Mix; PENETRON at 2.0(0.9 kg) to 2.5 lbs. (1.13 kg) per sq. yd. in one (1) coat. Construction joints and pour joints should be treated with PENETRON at 2.0(0.9 kg) to 2.5 lbs. (1.13 kg) per sq. yd. in slurry consistency immediately prior to placing of concrete. 3. Install PENECRETE mortar strip 3/4" (1.9CM) x 1" (2.54 CM) at all construction joints. Installation of reglets and cant strips at time of forming is recommended. C. Vertical Concrete Surfaces 1. Honeycombed areas, faulty construction joints, cracks and tie holes, apply PENETRON slurry at 2.0 lbs. (0.9 kg) per sq. yd. and fill with PENECRETE mortar. 2. Coat interior/exterior surfaces of concrete walls at 2.0 (0.9kg) to 2.5 lbs. (1.13 kg) per sq. yd. in two (2) coats of slurry mix. 3. Apply coating of PENETRON then fill reglets, construction joints, and junction of wall and slab with PENECRETE mortar. 3.05 Protection and Curing

A. Protect the freshly treated surface from rain or freezing until completely dry and set. B. Vertical surfaces: Except for extremely hot weather and very low humidity, curing of the PENETRON system is not required. C. Horizontal surfaces: PENETRON applied as a coating in slurry form. Wet area down once approximately 24 hours after time of application. D. PENETRON PLUS (trowel applied): Follow concrete specifications for curing procedures. 3.06 Backfilling Backfilling can take place the day following the application of PENETRON. 3.07 Neutralization A. Treated surfaces to receive paints or other protective coating should be neutralized with a vinegar water solution or a muriatic acid water solution (1 to 10). Rinse all treated surfaces thoroughly with water. The neutralization procedures should follow direction of product labels. B. For application on cisterns and drinking water reservoirs, follow EPA requirements. Special tanks, aquariums and industrial or processing installations, please consult company. 3.08 Cleaning Upon completion of all waterproofing operations, remove all equipment and debris resulting from work of this section.