SA Happy Island Water World

Similar documents
The proposed AlloyStream Manganese Project at Metalloys, Samancor Meyerton Works. Reference Number: GAUT 002/07-08/N0553

Qualifications and experience for HCV assessors: Draft Guidance for RSPO

VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION

PREMIER GOLD MINES HARDROCK INC. HARDROCK PROJECT TERMS OF REFERENCE. Appendix D: Consultation Plan for the Environmental Assessment

PUBLIC INFORMATION CENTRE May 29, 2017 MUNICIPALITY OF BRIGHTON

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report

POSITION DESCRIPTION. Network Manager. Asset Manager (2) Maintenance Manager (2) PURPOSE OF POSITION

Request for Qualifications

Southwestern Region 3 Carson National Forest Jicarilla Ranger District

BACKGROUND INFORMATION DOCUMENT DMR REFERENCE: Pending

MARINE CONSENTS GUIDANCE

IESBA Meeting (March 2013) Agenda Item

ADVERTISEMENT. HUMAN RESOURCES CONSULTING SERVICES FOR THE DEVELOPMENT OF A STRATEGIC HUMAN RESOURCES PLAN MSI 005/ November 2017

MEDICINES CONTROL COUNCIL

Public record pursuant to s39(l) of the Environmental Protection Act 1986

New Product Approval Process

The BLOOM Performance Review Decision Guide

TAG Training Provider Program

TG 19 SOUTH AUSTRALIAN WATER CORPORATION

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report

Instructions Fee Schedule

Staff currently is evaluating the NOP and developing a list of comments. At this point, staff recommends the following comments be shared with VUSD:

The role of non-animal safety assessment methods in implementation of the new TSCA

A FRAMEWORK FOR GUIDELINES TO MANAGE AGRICULTURE-WETLANDS INTERACTION (GAWI) Spyros Kouvelis

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP

Area Facilities Manager

Framework for Safe and Ethical International Service Work

Certificate in Construction Project Management

Certificate in Construction Project Management

Guidance notes for completing the International Start-up Form

Gainesville Regional Transit System Rapid Transit Study. Public Involvement Plan

A method of securing cellular services information is being implemented under the

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA

REQUEST FOR PROPOSALS FY-2018 RESEARCH ON GLOBAL APPROACHES TO LAND VALUE CAPTURE

Three priority issues have been identified. They are supported by joint projects presented in more detail online at

INTRODUCTION. If additional information is needed, please contact The IIA Research Foundation:

IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL

Curdridge Reading Room Invitation to tender for renewable energy feasibility study

2018 Request for Applications Evidence to Implementation Award

Disciplinary Procedure

Request for Proposal

Lead Adviser, Pacific Bilateral Division Polynesia and French Pacific Pacific and Development Group

STUDENT INFORMATION GUIDE BSB51315 Diploma of Work Health and Safety

Management of Supplier Complaints and Feedback Procedure

Data Protection Officer: Tracy Landon

Data Protection Officer: David Parkes

Customer & Stakeholder Engagement

Data Protection Officer: Phil Oakman

Strategic review outcomes

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

CDM Plan Submission and Review Criteria Rules

Meeting Agenda Project Management and Oversight Subcommittee (PMOS)

Water Body and Riparian Area Boundary Delineation Course

Questions and Answers

TOPIC: Outcome of Grain and Plant Products Export Industry Consultative Committee Meeting 21 February 2018

GUIDE TO TREND MAPPING

Research Officer / Data Analyst

A. Rational for change

Diversity and Inclusion Manager Position Description

Submission on Ausgrid s proposed vegetation management/tree pruning service charter

o Mitigation measures are required to be identified. Soil

1. PURPOSE The purpose of this request is to seek bids for a qualified company to provide Social Strategy & Content Creation Services.

Notice No Closing Date: December 18, 2015

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

Inquiry processing. 1. Purpose. 2. Scope. 3. Description

Kootenai River Restoration Master Plan: Master Plan Overview

Pay policy programme for Lund University

STAFF REPORT. Peter Zielsdorf

Map of Kriegers Flak investigation area

Company Vision Our vision is to be valued as a digital, customer-focused, centre of excellence.

Section 7: INTERGOVERNMENTAL COOPERATION

Independent scientific review of claims by qualified bodies;

CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Process and Checklist

Lawyer. Referral Service

Call for Expression of Interest

Fact Sheet: The Global Net Zero Carbon Buildings Commitment in Australia

Additional Guidelines for Performance Presentation and Speaker Events

Notice to all Participants, 9 March 2017

Managing Immigration Risk

Nomination for Merit Award or Contribution Points

The Government of Alberta s Guidelines on Consultation with Metis Settlements on Land and Natural Resource Management 2016

Vacancies for Program Manager, Research Assistant, and Research Interns

COLD LAKE EXPANSION PROJECT 24 AUGUST 2016 COLD LAKE OPEN HOUSE ROUND #2 SUMMARY

Standing Orders/Continuations in Voyager

The E-Recruitment Process - Guide for Line Managers

Customer Charter & Customer Action Plan

ECNG Energy Group. Performance Review Plan

JOINT REPORT ON THE CASE FOR A SECOND NORTH SOUTH INTERCONNECTOR

NZATD Education Trust Awards elearning Award Guidelines for Entrants

BSc (Hons) Civil Engineering Part-time Course content

LINKING THE ACCOUNTING FRAMEWORKS OF THE SEEA AND THE TSA

Application Procedure

Career Entry and Development Profile Companion Guide. A Guide for ITT Tutors and Induction Tutors

Direction for simplification and streamlining of the CDM

Falmouth Harbour Commissioners Vision, Aims and Objectives

Fraser Grain Terminal

2018 SQF INTERNATIONAL CONFERENCE Presentation Proposal Guidelines

Model Drought Contingency Plan for Irrigation Districts

Points to consider: Does the degree of discrepancy in the data require an intervention? If yes: o o o o

Transcription:

SA Happy Island Water Wrld Rad K6 Cnstructin Backgrund Infrmatin Dcument INTEGRATED ENVIRONMENTAL AUTHORISATION FOR THE PROPOSED DEVELOPMENT OF A WATERPARK, RIETFONTEIN, MOGALE CITY Purpse f Dcument The purpse f this dcument is t: Prvide all ptential Interested and Affected Parties (I&APs) with infrmatin abut the prpsed envirnmental authrisatin applicatin. Intrduce, explain and initiate the Public Participatin Prcess that is prescribed by the Natinal Envirnmental Management Act (NEMA), 1998 (Act N. 107 f 1998) and assciated Envirnmental Impact Assessment Regulatins, 2014. All I&APs are invited t cmment n: The envirnmental (bi-physical) and sci-ecnmical envirnmental and/r cnsideratins. The prpsed Public Participatin Prcess t be fllwed. The prpsed Applicatin Prcess being fllwed. Any ther suggestins, cmments r recmmendatins. Date f Publicatin: 12 April 2016 Applicant: Suth Africa Happy Island Water Wrld (Pty) Ltd EAP: Prism EMS CC GDARD Ref N: Gaut: 002/15-16/E0273 Prject Descriptin and Lcatin Suth Africa Happy Island Water Wrld (Pty) Ltd prpses t apply fr envirnmental authrisatin fr the cnstructin and develpment f a waterpark fr the purpse f recreatinal activities. Prperty lcatin: Prtin 169, 170, 173 and 174 f the farm Rietfntein 189 IQ, situated within the Mgale City Municipality. Crdinates f the Prperty Access Rad: Latitude: 26 2'23.98"S Lngitude: 27 53'38.35"E The site falls within the jurisdictin f the Gauteng Department f Agriculture and Rural Develpment (GDARD) and Department f Water and Sanitatin (DWS). The develper is planning t cnstruct a waterpark n Prtins 169, 170, 173 and 174 f the farm Rietfntein 189 IQ. The site is situated east and adjacent t Lake View Drive and west and adjacent t Valley Drive, in the Muldersdrift area. Access is easiest gained fr Mulderdrift Rad, via Valley Drive. The ttal prpsed area measures apprximately 25,858 hectares in extent and is currently develped with residential units and sme utbuildings. Prism EMS Prject Ref. N.: 21613 April 2016 P a g e 1 GDARD Ref. Ns.: Gaut: 002/15-16/E0273

Prism EMS Prject Ref. N.: 21613 April 2016 P a g e 2 GDARD Ref. Ns.: Gaut: 002/15-16/E0273

Be an Integral Part f the Envirnmental Impact Assessment Prcess Public invlvement is an essential part f any envirnmental assessment prcess. All cmments will be captured, cnsidered and incrprated int the relevant impact assessment reprts. As a registered Interested and Affected Parties (I&AP), yu will receive updates and be prvided with pprtunity t cmment at the varius phases f the prject prcess. Parties wishing t register as I&APs, wh wish t participate by cntributing cmments, r require additinal infrmatin, shuld register and/r submit their cntact details and crrespndence in writing t Prism EMS, using the attached Cmment Sheet. Listed Activities Natinal Envirnmental Management Act (NEMA), 1998 (Act N. 107 f 1998) The fllwing listed activities are triggered in terms f the EIA Regulatins, 2014: Listing Ntice 1: GN R 983 f 4 December include: Activity 12: The develpment f - (i) canals exceeding 100 square metres in size; (ii) channels exceeding 100 square metres in size; (iii) bridges exceeding 100 square metres in size; (x) buildings exceeding 100 square metres in size; (xi) bardwalks exceeding 100 square metres in size; r (xii) infrastructure r structures with a physical ftprint f 100 square metres r mre; where such develpment ccurs - (a) within a watercurse (i.e. wetland). Activity 27: The clearance f an area f 1 hectares r mre, but less than 20 hectares f indigenus vegetatin. Listing Ntice 2: GN R 984 f 4 December 2014, include: Activity 15: The clearance f an area f 20 hectares r mre f indigenus vegetatin Listing Ntice 3: GN R 985 f 4 December 2014, include: Activity 14: The develpment f (i) canals exceeding 10 square metres in size; (ii) channels exceeding 10 square metres in size; (iii) bridges exceeding 10 square metres in size; (iv) dams, where the dam, including infrastructure and water surface area exceeds 10 square metres in size; (v) weirs, where the weir, including infrastructure and water surface area exceeds 10 square metres in size; (vi) bulk strm water utlet structures exceeding 10 square metres in size; (vii) marinas exceeding 10 square metres in size; (viii) jetties exceeding 10 square metres in size; (ix) slipways exceeding 10 square metres in size; (x) buildings exceeding 10 square metres in size; (xi) bardwalks exceeding 10 square metres in size; r (xii) infrastructure r structures with a physical ftprint f 10 square metres r mre; where such develpment ccurs (a) within a watercurse (i.e. wetland). Natinal Water Act, 1998 (NWA), 1998 (Act N. 36 f 1998) Sectin 21 water uses f the NWA include: (a) taking water frm a water resurce; (b) string water; (c) impeding r diverting the flw f water in a watercurse; (d) engaging in a stream flw reductin activity cntemplated in sectin 36; (g) Dispsal f waste (i.e. effluent frm sewage wrks) in a manner which may detrimentally impact n a water resurce; (i) altering the bed, banks, curse r characteristic f a watercurse; and (k) using water fr recreatinal purpses. Envirnmental Assessment Practitiner: Prism EMS Prism EMS is a multi-disciplinary Envirnmental Management cnsulting firm. With a visin encmpassing a hlistic understanding f integrated envirnmental management in cmbinatin with sustainability, the cmpany prides itself n excellent service and value-added slutins t a range f clients. Envirnmental Assessment Practitiner: Candis Lubbe Qualificatin: BSc. Hns Eclgy, Envirnment & Cnservatin Experience: 9 Years Prism EMS Prject Ref. N.: 21613 April 2016 P a g e 3 GDARD Ref. Ns.: Gaut: 002/15-16/E0273

Public Participatin Prcess The key bjective f Public Participatin is t assist stakehlders t identify issues f cncern and suggestins fr enhanced benefits, and t cmment at varius phases f the applicatin prcess. The Public Participatin Prcess is an integral part f the impact assessment and is undertaken in the fllwing systematic apprach by the Prpnent/ EAP: 1. Applicatin Phase Identify and ntify ptential I&APs f the prpsed develpment and prvide an pprtunity t register within the 30 day ntificatin perid. Submit applicatin fr Envirnmental Authrisatin (EA) t GDARD after the ntificatin perid. GDARD t acknwledge receipt f applicatin within 10 days f submissin f the EA applicatin. Infrmatin available t I&APs: Newspaper Advertisement; Site Ntices; Written Ntificatin and/r BID. An I&AP Register will be pened and maintained t recrd I&APs parties that wish t be invlved. Any cmments, respnses, and/r enquiries frm the ntificatin phase will be recrded in the cmments and respnse reprt and maintained thrughut the prcess. 2. Scping Phase Applicant/EAP t submit Scping Reprt t GDARD within 44 days (inclusive f 30 day cmment perid) f acceptance f the applicatin fr Envirnmental Authrisatin. GDARD 1 t acknwledge receipt within 10 days f submissin f the Scping Reprt. GDARD t accept/refuse the scping reprt and plan f study within 43 days f receipt f the Scping Reprt. Public will receive 30 days t give Cmment n scping reprt. Any cmments, respnses, and/r enquiries frm the ntificatin phase will be recrded in the cmments and respnse reprt and maintained thrughut the prcess. 3. Envirnmental Impact Assessment Phase EAP t submit the EIA Reprt within 106 days (inclusive f 30 day cmment perid) f acceptance f the Scping Reprt. GDARD t acknwledge receipt within 10 days f submissin f the EIA Reprt. Public will receive 30 days t give Cmment n EIA reprt 4. Envirnmental Authrisatin Decisin and Appeal Phase GDARD t make a decisin t refuse/grant authrisatin within 107 days f receipt f the EIA Reprt. GDARD t ntify Applicant/EAP f the decisin within 5 days f making a decisin. EAP/Applicant t ntify I&APs within 14 days receipt f the decisin frm the GDARD. I&APs t appeal the decisin within 20 days f the ntificatin f the decisin frm the EAP/Applicant. Prism EMS Prject Ref. N.: 21613 April 2016 P a g e 4 GDARD Ref. Ns.: Gaut: 002/15-16/E0273

Suth Africa Happy Island Water Wrld (Pty) Ltd Integrated Envirnmental Authrisatin I&AP Cmment and Registratin Frm GDARD Ref N: Gaut: 002/15-16/E0273 Prism EMS Ref N: 21613 Name: Title: Organisatin / interest: Pstal / Residential Address Surname: Initials: Capacity (e.g. Chairpersn): Area: Cntact Details Tel: ( ) Fax: ( ) Mbile: ( ) Email: Cde: Please mark with an X t indicate whether yu wuld like t participate in the prcess: Yes N Preferred Methd f Cmmunicatin Email Fax Pst Date Cmmented ( DD / MM / YYYY ) What is yur main area f interest with regard t the prpsed prject? What are yur pints f cncern r supprt fr this prject? Please indicate in which aspects yu wuld require mre infrmatin Please indicate the cntact details f any I&APs whm yu think shuld be cntacted Name: Surname: Tel: ( ) Fax: ( ) Mbile: ( ) Email: In rder t be registered as an I&AP fr this prject, fax, mail, r e-mail the cmpleted registratin frm t Prism EMS: Cntact Persn: Candis Lubbe Tel: (087) 985 0951 Fax: (086) 601 4800 Email: candis@prismems.c.za Pst: PO Bx 1401, Wilgeheuwel, 1736 Thank yu fr yur participatin. Prism EMS Prject Ref. N.: 21613 April 2016 P a g e 5 GDARD Ref. Ns.: Gaut: 002/15-16/E0273