RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent
AGENDA 2 Project Location General Information Existing Conditions Structural Considerations Building Organization Recent Construction Project Educational Enhancements Project Schedule Overview Questions
VICINITY MAP 3 Lansdowne H.S.
PROJECT LOCATION Regional Map Location 4 295 I-95 I-695 Lansdowne H.S. I-895
PROJECT LOCATION Neighborhood Location Map 5 Lansdowne E.S. Lansdowne M.S. Lansdowne H.S.
GENERAL INFORMATION 6 Lansdowne High School - Renovation Enrollment Information Existing SRC 1,420 Current Enrollment 1,346 (as of 10-27-2017) Regional Programs Finance Arts & Communications Health Human Services Science Engineering and IT English Students of Other Languages School Construction History Original Building Construction 1963 Additions 1967, 1971, 1973 Major Renovations 2000 (science labs only)
EXISTING CONDITIONS - Lobby 7
EXISTING CONDITIONS Media Center 8
EXISTING CONDITIONS - Corridor 9
STRUCTURAL CONSIDERATIONS 10 PHASE I Feasibility Study Review of existing drawings & visual observation Findings/Recommendations February 2016: Evidence of building settlement Recommended crack monitoring of the music room wall Recommended repair/replacement of the music room slab Further investigation as design progresses PHASE II Additional Investigation Preliminary Update Enhanced building inspection Installed crack monitors monitoring current through October 2017 Scheduled geotechnical testing near music classroom and new elevators Findings/Recommendations July 2016: No evidence of any portion of the building moving towards the pond Needed results from geotechnical testing for final analysis PHASE III Additional Investigation Continued enhanced building and site inspection Performed geotechnical testing (borings and test pits) Findings/Recommendations August 2016: Proposed the installation of structural piles under the music wall and slab Reported all structural concerns are correctable and will be rectified in the renovation. PHASE IV Construction Documents 2017 Include repairs of settlement issues, crack locations, and bowing wall.
STRUCTURAL MODIFICATIONS AND NEW ELEVATORS 11 Lansdowne Road New Elevator New Elevator Music Room Slab Repair & West Wall Structural Piers (Proposed) 2016 Soil Investigation Location South Wall Structural Piers (2001)
SCOPE OF WORK - CURRICULUM 12 Original Project Renovate every classroom: new technology, TV monitor, marker boards, flooring, doors, ceiling and millwork Classroom designed for 1 to 1 tablet use by students Renovate library / media center including new digital learning classroom Renovate all art classrooms, food / nutrition lab Renovate administrative, guidance offices, health suite Renovate girls locker rooms Renovate technology education classrooms New TV studio 100% ADA accessibility throughout the building at every level New auditorium seating and flooring. Expanded Scope of Work Add two classrooms Auditorium upgrades including new theatrical lighting and sound system, acoustical panels, and new exterior metal panels New dance studio and sound system New recording studio New gymnasium sound system Add photovoltaic solar panel with teaching display Renovate boys locker room
SCOPE OF WORK - SAFETY 13 Original Project Modify main entrance to create security vestibule Install new sprinkler system Upgrade security system New security cameras throughout the building and on building exterior New door access control New Elevators Expanded Scope of Work Add emergency generator Expanded bus loop Enclose exterior stairs
SCOPE OF WORK - BUILDING 14 Original Project Roof replacement Install new HVAC system to include air conditioning Replace interior and exterior domestic water piping Replace interior and exterior lighting with LED lighting Repair floor settlement Repair exterior wall cracks Replace kitchen equipment Expanded Scope of Work New building entrance and lobby Corridor upgrades including new flooring and lockers New gymnasium flooring New exterior metal wall panels at auditorium New divider in activity room
SCOPE OF WORK - SITE 15 Original Project Site work at new elevators Site work at new chiller Temporary classroom related site work Expanded Scope of Work Expanded bus loop to better isolate bus and car traffic Add six (6) parking spots near main entry Repave parking lot and add new LED lighting Create 40 new parking spaces at stadium lot New bleachers, press box, and toilet rooms / concessions building at stadium New track running surface and field event areas New tennis court surface and nets
PROJECT LOCATION Aerial Map 16 Site Work Enhancement New Entrance / Addition
EDUCATIONAL ENHANCEMENT Existing Bus Loop and Entrance 17
EDUCATIONAL ENHANCEMENT New Entrance with Expanded Bus Loop 18
BUILDING ORGANIZATION Proposed First Floor Plan 19 Administration ADA Ramp at Gym Entrance Elevator to Locker Rooms ADA Ramp Main Entrance Guidance Health Media Center Classrooms Food Service Physical Education Auditorium ADA Lift Elevator Dual Entrance Connects Four Levels ADA Lift
BUILDING ORGANIZATION Proposed Second Floor 20 Classrooms Auditorium
EDUCATIONAL ENHANCEMENT Existing Entry/Administration 21
EDUCATIONAL ENHANCEMENT Proposed Entry/Administration 22 Main Entrance Main Entrance
EDUCATIONAL ENHANCEMENT Existing Building From Parking Lot 23
EDUCATIONAL ENHANCEMENT New Entrance Addition 24
EDUCATIONAL ENHANCEMENT Existing Building From Bus Loop 25
EDUCATIONAL ENHANCEMENT New Entrance Addition 26
EDUCATIONAL ENHANCEMENT Existing Media Center 27 Group Instruction Area Work Room Book Area Office Learning Area
EDUCATIONAL ENHANCEMENT Existing Media Center 28
EDUCATIONAL ENHANCEMENT Proposed Media Center 29 Group Instruction Area Group Instruction Area Soft Seating Collaborative Learning Area Digital Learning/ Maker Space
EDUCATIONAL ENHANCEMENT Proposed Media Center 30 Architectural Rendering
EDUCATIONAL ENHANCEMENT Proposed Media Center 31 Architectural Rendering
EDUCATIONAL ENHANCEMENT Typical Classroom - Existing 32
EDUCATIONAL ENHANCEMENT Typical Classroom - Proposed 33
EDUCATIONAL ENHANCEMENT Typical Classroom - Proposed 34
EXISTING GYMNASIUM 35
RENOVATED GYMNASIUM 36
EXISTING AUDITORIUM 37
PROPOSED AUDITORIUM 38
EXISTING STADIUM 39 Softball Field Field Event Area Existing Bleachers Existing Storage Buildings
PROPOSED STADIUM PARKING / CONCESSION BUILDING / BLEACHERS 40 New Parking New Bleachers Press Box New Concession Building / Toilet Rooms
STADIUM ENTRANCE / CONCESSION BUILDING 41
PROJECT SCHEDULE OVERVIEW 43 Phase/Activity Date Original Desk Kick-Off December 2015 Design Restart June 2017 Board Approved the Project Under State Capital September 2017 Improvement Program Submission Community Engagement December 2017 Advertisement for Bid January 2018 Board Approval April 2018 Notice to Proceed May 2018 Site Package Advertise to Bid July 2018 Site Package Board Approval October 2018 Substantial Completion August 2020
Thank You 44