Madison School District. Strategic Five-Year Facility Maintenance Plan

Similar documents
Collins Middle School

Corsicana High School

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015

BUILDING FOR OUR FUTURE

Al Behrman Elementary School

2016 BOND INFORMATION

DENNIS TOWNSHIP FEASIBILITY STUDY

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

Midland Public Schools

Health Life Safety Survey and Master Facilities Plan

Biddeford School Department

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1

Cazenovia Central Schools Proposed Building Project Information Session December 17, 2013

FACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture

POWELL ELEMENTARY SCHOOL

Facility Improvements

Board Work Session Feasibility Study. January 9, 2017

WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y

MCER Study for Little Powder K-8

WILKINSON ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

RAYMOND EDUCATION CAMPUS

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

Facility Assessment Report, Montgomery Independent School District

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting

Coos Bay Best Bond Cost Breakdowns

Cheldelin Middle School

BALLOU SENIOR HIGH SCHOOL

NALLE ELEMENTARY SCHOOL

Cherry Hill School District Building Project Summary. August 8, 2018

Edmonton Public School District No. 7

WATKINS ELEMENTARY SCHOOL

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Prepared by. Christopher La Follette. Fidelis Management, Inc.

LASALLE - BACKUS EDUCATION CAMPUS

DEL MAR UNION SCHOOL DISTRICT BOND PROJECT DESCRIPTION

PLUMMER ELEMENTARY SCHOOL

Frost Technical Center

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

GEORGETOWN ISD 2010 BOND PROGRAM UPDATE. Huckabee APRIL 2012

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

The Report: Priority 1 thru 5 $ 2,933,064 New Construction $ 6,797,031 Less Redlined Items $ 218,060

FACILITY COMPONENTS - MIDDLE SCHOOL

Our Students. Our Schools. Our Future.

Edmonton Public School District No. 7

STUART-HOBSON MIDDLE SCHOOL

Referendum Implementation

CESAR CHAVEZ LANGUAGE ACADEMY

Superintendent Proposed Capital Improvements Program. Fiscal Years

Superintendent Proposed Capital Improvements Program. Fiscal Years

BRUCE-MONROE ELEMENTARY SCHOOL AT PARK VIEW MODERNIZATION HISTORIC PRESERVATION REVIEW

NOYES EDUCATION CAMPUS

FACILITY COMPONENTS - ELEMENTARY SCHOOL

What is a Master Plan

LEWIS ELEMENTARY SCHOOL

Stevens High School Pre Bond Presentation Claremont, NH

GARFIELD ELEMENTARY SCHOOL

James Lick High School

North Tonawanda City School District

HIDDEN VALLEY ELEMENTARY SCHOOL

St. Helens Middle School Facts

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

FULL TEXT BALLOT PROPOSITION OF THE AMADOR COUNTY UNIFIED SCHOOL DISTRICT BOND MEASURE ELECTION NOVEMBER 6, 2018

School Board Proposed Capital Improvements Program. Fiscal Years

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

FACILITIES PROJECTS UPDATE BOARD OF EDUCATION. August 11, 2015

Paulsboro Public Schools

DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016

WELD COUNTY SCHOOL DISTRICT RE-1 04/12/2016 BUILDING ASSESSMENT INTRODUCTION

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.

School Assessment Report

BOYERTOWN AREA SCHOOL DISTRICT February 28, Boyertown West Middle School Renovation Project

Project Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope

Table of Contents Hampton Dumont Community School District November 5, 2013

Birmingham Public Schools

Independence Adult Center

2006 FUSD Bond Information Guide

N o v e m b e r

SCARSDALE PUBLIC SCHOOLS Bond Project Planning

DAVIS ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL

School Assessment Report

Operational Services Facility Innovation & Readiness Stakeholder Team

OBJECTIVE 1.1: To establish the acceptable use and capacity of each building.

Santa Teresa High School

SHEPHERD ELEMENTARY SCHOOL

Owen County School District

MADELEY RANCH ELEMENTARY SCHOOL

Arts Center- Building needs

SYLVAN. inspire MIDDLE SCHOOL. which is to. instruction and programs. in a safe, caring, and. collaborative learning community.

Hampton Township School District High School Feasibility Study. Final Feasibility Study Presentation. VEBH Architects

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

Hartsville Area Schools - Building Evaluations

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

Chino Valley Unified School District Monthly Construction Update

Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014

SECTION ALTERNATES

Transcription:

Madison School District Strategic Five-Year Facility Maintenance Plan 2016 2020

Dear Madison Stakeholder, Throughout the past twenty years, Madison School District has experienced tremendous growth. Since 1994, at least one project took place almost every year to accommodate enrollment and to further educational opportunities for students attending Madison Schools. Adding areas to the facility has significantly increased the physical size of the school, and at the same time, provided new and expanded educational opportunities for students. We are extremely grateful that the residents of the Madison School District have supported the school and its students over the years. There has been, and will continue to be, a focus on academic achievement, the performing arts, and the opportunity to strengthen student leadership through athletics and other extra-curricular activities. Students at Madison enjoy a facility that aligns well with the high level of academic achievement attained over the years. Members of the Madison Family are committed to sustaining the high standard of excellence that Madison students expect and deserve. Currently, many areas of the school - some built in the 1950 s - require updating and preventative maintenance. Critical areas of the facility, such as the roof, parking lots, lighting, roof top heating units, and restrooms - if maintained - will continue to serve the District well into the future. With this in mind, a Five-Year Strategic Facility Maintenance Plan has been established to lead efforts regarding the facility now through 2020. We refer to this as Madison s 2020 Vision. Details of this plan have been established over the past two years through collaborative efforts of students, faculty, administrators, parents and alumni of Madison Schools. Madison School District is committed to a Five-Year Strategic Facility Maintenance Plan that will: provide a progressive, innovative, and safe learning environment to enhance student instruction and performance. allow the District to function in the most efficient and cost-effective manner possible. utilize technology to manage aspects of the facility to lower unnecessary expenses. improve branding and marketability of the District through progressive, innovative, yet cost-effective enhancements. A plan to implement the maintenance and renovation of Madison School District Facilities: The Madison 2020 Vision

TABLE OF CONTENTS PROJECTS TO CONSIDER: ROOF 3 EXTERIOR WALLS 4 BRICKS AND MORTAR 4 COURTYARD WINDOWS 4 HEATING, VENTILATION, AND AIR CONDITIONING 5 LED LIGHTS 5 MIDDLE SCHOOL T-12 CLASSROOMS 5 ELEMENTARY CLASSROOMS 6 MIDDLE SCHOOL LOCKER ROOMS 6 ELEMENTARY & MIDDLE SCHOOL RESTROOMS 6 MIDDLE SCHOOL GYMNASIUM 7 SCIENCE LAB 8 ENTRANCE SECURITY 8 SIDEWALKS & PARKING LOTS 9 ELEMENTARY TRAFFIC FLOW 9 FUNDING: BUILDING & SITE SINKING FUND 10 INFORMATION FOR HOMEOWNERS 10 The foundation of education is a partnership that includes two-way communication between family, school, and community... The Madison Family

Madison School District Mission Statement Madison School District, in cooperation with our community, will enable each student to develop his or her full potential to be successful in an ever-changing world. Madison School District Vision Statement Developing individual excellence through rigorous academics, innovative technology, and personal attention

Madison Strategic Five-Year Facility Maintenance Plan PROJECTS TO CONSIDER: Roof Replacement Replacement of roofs will occur beginning with portions that exceed the manufacturer s 10- or 15-year warranty. There are 12 separate sections of our roof that were installed as additions. They were added to the facility from 1994 through 2013. Through an assessment of the roof, including a thermal scan and insulation core samples, it is advised that the district replace portions as they deteriorate and exceed warranty. Roof replacement planned for 2016 includes 68,275 square feet covering a portion of the Middle and Elementary buildings. An additional, optional area of 8,700 square feet, covering the Middle School Gymnasium, may also be included. Top: It is estimated that the current roof covers approximately seven acres. Above left: Sections of the rubber roofing material are threadbare and require frequent patching. Above right: Interior ceiling tiles sustain water damage due to roof leaks. Madison School District www.madisonk12.us 3

PROJECTS TO CONSIDER Brick and Mortar Areas of bricks and mortar in need of repair will be replaced. These areas are accessible from the roof and include brick walls adjacent to the gymnasiums as well as the two brick chimneys. Brick has fallen off or is loose, allowing moisture to enter the building. These areas will be covered by rubber roofing material. Courtyard Windows & Exterior Walls Classroom windows facing the courtyard will be replaced with energy efficiency and thermal comfort within the classroom in mind and an exterior material, such as Dryvit, will be installed on exposed areas of exterior block. Windows facing the courtyard are outdated and provide minimal insulation between the interior and exterior conditions, thus allowing for energy loss which makes it difficult to maintain classroom temperature. Dryvit, a siding and insulation product, was installed on portions of the building providing energy efficient qualities, moisture drainage performance, and a restorative finish. Future renovation projects, including exterior walls facing the courtyard, call for use of the Dryvit cladding system. Coupled with replacement windows, these updates will allow for a more energy-efficient and comfortable learning environment. Above and inset left: Single-pane, courtyard-facing windows will be replaced with double-pane windows allowing for less energy loss and more comfortable classrooms. 4 Madison School District www.madisonk12.us

HVAC Units Replacement will occur of outdated Heating, Ventilation, and Air Conditioning (HVAC) units. There are currently 53 HVAC units on the roof of the school, four of which are approximately 40 years old. The District replaced an outdated unit last year at the cost of $137,000. Fortunately, the District received a Balanced School Year (BSY) grant to cover the replacement cost. The four other similar units will be replaced over the next ten years. Madison Strategic Five-Year Facility Maintenance Plan Lighting Fixtures & Classroom Renovations Left: Middle school classrooms will receive new paint, flooring, and ceilings. Below: T-12 lighting fixtures throughout campus will be replaced with energy-efficient LED lighting. Outdated lighting fixtures will be replaced with new, energy-efficient LED fixtures and some elemetnary and middle school classrooms will receive renovations and aesthetic updates. The update of approximately 1400 fixtures, will be accomplished through self-install LED replacement troffers. The District will also contract the installation of approximately 1100 LED light fixtures in rooms with outdated and inefficient T-12 light bulbs, as well as exterior lighting. It is estimated that the payback from electrical and maintenance costs is seven to eight years. The new LED troffers, updates, and upgrades will provide more attractive, energy-efficient fixtures and better lighting for learning environments. In addition, some elementary and middle school classrooms will receive a fresh coat of paint, updated flooring, and drop ceilings. Madison School District www.madisonk12.us 5

PROJECTS TO CONSIDER Elementary Classrooms Three small elementary classrooms will be combined to create two larger classrooms. Two of our elementary classrooms are not large enough to accommodate a full class of students. Similar to previous elementary classroom renovations, three classrooms will be merged to create two classrooms. The computer lab adjacent to this space will be renovated to provide support and interventions for elementary students. Restroom Facilities s Middle School restrooms and the restrooms near the Elementary main entrance will be renovated. Boys and girls restrooms will have new toilet fixtures and partitions installed. All fixtures including toilets, sinks, and hand dryers will be automatic to ensure proper hygiene for students. ADA compliance will also be maintained. Middle School Locker Rooms Middle School boys and girls locker rooms will be updated. The Middle School locker rooms will receive new lockers, a drop ceiling, fresh paint, and renovated storage areas. LED lighting will be included as a part of the project. 6 Madison School District www.madisonk12.us

Madison Strategic Five-Year Facility Maintenance Plan Middle School Gymnasium The Middle School gymnasium will receive updates to structural features. The green tile surrounding the gym floor will be replaced with rubber flooring. Wooden bleachers would be replaced with a new bleacher system similar to those already in place along the east wall of the gym. Madison School District www.madisonk12.us 7

PROJECTS TO CONSIDER Science Lab An Innovative Science Lab will be constructed in the Elementary. The new state-of-the art, hands-on science lab will fundamentally change the way science instruction is provided to our elementary students. Students will engage in science concepts aligned with Next Generation Science Standards (NGSS) and Michigan State Science Standards through a co-taught classroom setting. An Innovative Science Lab, similar to those illustrated in this sample photo, will be installed in the elementary school to allow for hands-on science exploration and learning. Main Entrances Main entrances at the Elementary, Middle, and High schools will receive security upgrades. A vestibule or secure doorway will be constructed at each main entrance. A buzzer system with camera will be installed for visitor access to the building during the school day. Staff will use access cards for entry. 8 Madison School District www.madisonk12.us

Madison Strategic Five-Year Facility Maintenance Plan Sidewalks & Parking Lots Select areas of sidewalk and parking lots will be replaced or expanded to accommodate student and visitor traffic. A three-year maintenance cycle is established to fill cracks, seal, and stripe parking lots on campus. The high school and Performing Arts Center, the middle School, and elementary School parking lots each receive preventative maintenance every third year. Some areas of cement pedestrian walkways require replacement or addition based on current pedestrian traffic levels. Elementary Parking & Traffic Flow Elementary parking lots will be redesigned for improved safety and traffic flow. The gravel parking lot south of the elementary gym will be expanded and paved for faculty parking. The front row of parking nearest the entrance will be eliminated, allowing for proper traffic flow for morning drop off. A gate will be installed limiting this area to pedestrian traffic for student pick up in the afternoon. Expanded sidewalk areas will help decrease congestion during these peak times. Madison School District www.madisonk12.us 9

PROJECT FUNDING Building & Site Sinking Fund Throughout the years, additions to the current facility were funded primarily through the Building & Site Sinking Fund and the General Fund, with only the High School Activities Center and Performing Arts Center financed by bonds approved by District voters. Whenever feasible, Madison has used the Building & Site Sinking Fund, rather than a school bond, thus maximizing the return on each dollar provided by our taxpayers. The current 1.25 mill Building & Site Sinking Fund is set to expire in 2016. A school bond yields large sums of revenue, but the district must pay it back with interest, similar to a home mortgage. The sinking fund provides revenue that can be used annually as it is received. There is no borrowing and no interest. Every tax dollar is utilized for the repair and maintenance of our facilities. The Building & Site Sinking fund can only be used for major repairs and facilities - not salaries or other operational expenses. Every dollar collected through the Building & Site Sinking Fund is used for building repairs, updates and improvements. Information for Homeowners Property values have decreased over the past several years. 1.0 mill of tax generated $198,000 in 2009. That same mill only generates approximately $175,000 today. Between the decreased value of homes and the phasing out of the industrial personal property tax, the District collects less tax revenue today than it did five years ago. Year Taxable Value 1 Mill Revenue 2007 $193,006,560 $193,007 2008 $189,055,405 $189,055 2009 $198,586,640 $198,587 2010 $190,690,856 $190,691 2011 $187,366,371 $187,366 2012 $178,056,138 $178,056 2013 $173,388,825 $173,389 2014 $172,022,581 $172,023 2015 $174,929,975 $174,930 10 Madison School District www.madisonk12.us

Madison Strategic Five-Year Facility Maintenance Plan The 1.25 mills currently in place through 2016 produces approximately $218,750 annually. Approval of the Building & Site Sinking Fund millage will ensure that we can continue to properly maintain and repair our buildings. The Board is requesting an additional 0.25 mill at the May 3, 2016 election to offset the decrease in taxable value and help address some of the major maintenance and renovation issues detailed here. An additional $43,730 would be collected annually if residents approve the additional millage. The additional 0.25 mill would cost a taxpayer approximately: Value of Home Taxable Value Yearly Cost Monthly Cost $50,000 $25,000 $6.25 $0.52 $100,000 $50,000 $12.50 $1.04 $200,000 $100,000 $25.00 $2.08 The potential renewal of the current 1.25 mills and the addition of a.25 mill would generate approximately $262,500 each year; totaling $1,312,500 over the course of the five-year levy. The 18 mill Operating Millage, which is assessed on businesses and those with a second home (non-homestead), expires in 2017. To eliminate the cost of holding an election in 2017, the Board is requesting that the Operational millage be renewed at the May 3 election. We are extremely grateful that the residents of the Madison School District have supported the school and its students over the years. ~ Kyle Ehinger, Board President Madison School District www.madisonk12.us 11