Managing the supply chain: Challenges and Overcoming in Korean nuclear industry

Similar documents
Countermeasures for the Falsification of Quality Verification Documents

Status of Decommissioning Preparation for Kori #1

Recent Approaches related to Safety Enhancement of Operating NPPs in Korea Tae Eun JIN KEPCO E&C

KOREA HYDRO & NUCLEAR POWER CO., LTD

UAE Selects Korea Electric Power Corp. Team as Prime Contractor for Peaceful Nuclear Power Program

Post-Fukushima Action Plan in Korea. WNU-SI 2011, August 11 Christ Church, Oxford

Overview for a feasibility study

Enhancement of Nuclear Safety

Think Global Jump. Korea Hydro & Nuclear Power Co.,LTD Sustainability Report 2016

Occupational Radiation Protection in Radioactive Waste Management

EPR of Korea and International Assistance

Nuclear Waste Policy in Korea

U.S. and South Korean Cooperation in the World Nuclear Energy Market: Major Policy Considerations

Nuclear Businesses. Sept 10, Session 3 NEA/MDEP Conference on the New Reactor Design Activities

ESCI-61 Introduction to Photovoltaic Technology

SEVERE ACCIDENT FEATURES OF THE ALTERNATIVE PLANT DESIGNS FOR NEW NUCLEAR POWER PLANTS IN FINLAND

APR1400 Safe, Reliable Technology

Isolation Condenser; water evaporation in the tank and steam into the air. Atmosphere (in Severe Accident Management, both P/S and M/S)

NRC Activities. Matthew McConnell Senior Electrical Engineer Office of Nuclear Reactor Regulation

Environmental Qualification of

Technical Working Group on Life Management of Nuclear Power Plants. Feb

IAEA HONG-KONG IAEA APPROACH ON NUCLEAR POWER INTRODUCTION

NUPIC General Membership and Vendor Meetings June Greg Galletti Quality Electrical Vendor Branch Office of New Reactors U.S.

Updating on NPP Life Management, Long Term Operation and post-fukushima Issues in Spain

Country Presentation. Ukraine

Development and use of SAMGs in the Krško NPP

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

COURSE LISTING. Courses Listed. with Quality Management SAP ERP. 15 February 2018 (23:55 GMT) SAP01 - SAP SAP01E - SAP Overview

Power Generation. Ronaldo Jenkins Electrical Engineering Branch Chief Office of New Reactors (NRO)

NRC INSPECTION MANUAL INSPECTION PROCEDURE 35065

Pneumatic control and on/off valves for thermoelectric plants

CNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements

Collection and safekeeping of TRIGA Spent Nuclear Fuel

Jordan s Nuclear Energy Programme

Westinghouse Small Modular Reactor. Passive Safety System Response to Postulated Events

The Westinghouse Advanced Passive Pressurized Water Reactor, AP1000 TM. Roger Schène Director,Engineering Services

Low Cost Building Automation System for Small- and Medium- Sized Commercial Buildings

Pumped hydro Storage Plants

EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS

Enterprise Technology Projects Fiscal Year 2012/2013 Fourth Quarter Report

PJM EIS Generation Attribute Tracking System (GATS)

Texas Hospital. Central Plant Redesign. Central Utility Plant SECOND PLACE HEALTH CARE FACILITIES, EXISTING 2013 ASHRAE TECHNOLOGY AWARD CASE STUDIES

Renewable Energy in The Netherlands

PJM Roadmap for edart

OSART Good Practices OPERATIONAL EXPERIENCE FEEDBACK Utilization and dissemination of operating experience

Global Nuclear Power Development: Major Expansion Continues

SEJONG CORPORATION 2007 COMPANY PROFILE

Module X. Operational safety including operational feedback

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS

Indonesia Experiences and Lessons Learned from the Application of Different Management System Standards in the Nuclear Industry

Annual Report. December 2010 November Bradley Cole 2/7/2012

OperatiOn and safety report Of MOchOvce and BOhunice v2 nuclear power plants

SURVEY OF ANTI-CORRUPTION MEASURES IN THE PUBLIC SECTOR IN OECD COUNTRIES: KOREA

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED

IAEA-TECDOC Managing modernization of nuclear power plant instrumentation and control systems

The Stress Test Process in France (CSA*) Its impact on Research Facilities

Introduction and purpose of this meeting. A New Day in Energy Management

Post-Fukushima Assessment of the AP1000 Plant

Joint ICTP-IAEA School on Nuclear Energy Management. 15 July - 3 August, Lecture Notes. I. Mele IAEA, Vienna, Austria

Nuclear Power Economics and Markets

Pacific Forum CSIS Seminar on Strategic Trade Controls in Southeast Asia August 7-9, 2016 Crowne Plaza Hotel Bangkok, Thailand

WHY NUCLEAR and to share relevant Government decisions with respect to Nuclear Power Development (COD 2025+). Deploying Nuclear Energy for Power

RESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP

FOSH Forsmark Safety Enhancement Project Post-Fukushima actions at Forsmark NPP

The Winning Strategy of the Late-Comer: How Korea Was Awarded the UAE Nuclear Power Contract

Korea Hydro & Nuclear Power: Improving Productivity by 60% with the SAP NetWeaver Technology Platform

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

DESIGN, SAFETY FEATURES & PROGRESS OF HTR-PM. Yujie DONG INET, Tsinghua University, China January 24, 2018

Coal, Carbon, and the Future of the Global Energy Mix

Convention on Nuclear Safety Answers to Questions Posted To Lithuania in 2014 Article General

EA MULTILATERAL AGREEMENT Facilitating cross border trade with reliable goods and services

Implementation of Digital Instrumentation and Control Systems (I&C) for Nuclear Power Plants (NPPs) using FPGA-technology: Benefits and Solutions

Be responsive to customer needs, delivering optimal solutions and valueadded

Being Responsible in Korea

THE PATH TOWARDS A GERMANE SAFETY AND LICENSING APPROACH FOR MODULAR HIGH TEMPERATURE GAS-COOLED REACTORS ABSTRACT

IEA-DSM Task XVII: Country Report Austria

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

Overview of SQUG generic implementation procedure (GIP)

COURSE LISTING. Courses Listed. with SAP Ariba SAP Ariba Procurement. 4 February 2018 (03:51 GMT)

IRP 101. Intro to Integrated Resource Planning. Scott Benson Manager, Resource & Transmission Planning. March 23, 2017

Prospects for Nuclear Energy: Clear Skies or Stormy Weather?

Lockout/Tagout. Company Policy

German Energy Policy: Reactions after the Fukushima Accident ( Energiewende )

Swedish action plan. for nuclear power plants

COMPUTER SKILLS : Windows, MS Office, Internet : EMPAC (Enterprise Maintenance Planning and Control) System

Transmission and Interconnectors

The Nuclear Safety Authority (ASN - Autorité de Sûreté Nucléaire),

Regulatory Issues and Challenges in Preparing for the Regulation of New Reactor Siting: Malaysia s Experience

Improvement and Harmonisation in Nuclear Safety through Peer Reviews Key Note 2 Dr. Anton von Gunten, Mühleberg NPP BKW FMB Energie AG

Contractor Management and Purchasing

NATIONAL REPORT OF POLAND ON COMPLIANCE WITH THE OBLIGATIONS OF THE CONVENTION ON NUCLEAR SAFETY

Profit from a unique partnership As a Siemens Partner for protection, power quality & automation

Harmonized EUR revision E requirements corresponding to currently available technical solutions

Global Top 10 Power Company

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

Country Presentation. Ukraine

Energy Efficiency in Kuwait: Past, Current & Future

DESIGN AND SAFETY PRINCIPLES LEONTI CHALOYAN DEPUTY CHIEF ENGINEER ON MODERNIZATION

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

Transcription:

Managing the supply chain: Challenges and Overcoming in Korean nuclear industry TM on Topical Issues in the Development of Nuclear Power Infrastructure 4-7 February 2014, Vienna, Austria International Cooperation Team Technology Policy & Strategy Department Korea Hydro & Nuclear Power Co.(KHNP)

The Table of Contents Supply Chain in Nuclear Industry Challenges and overcoming

Supply Chain in Nuclear Industry

Status of NPPs in Korea Operation 23 Units 20,716MW Construction 5 Units 6,600MW Planning 6 Units 8,400MW Seoul : 5 th & 6 th New site Samcheok Hanul NPP Operation : 6 units Construction : 2 units Planning : 2 units Yeongdeok Operation : 6 units Hanbit NPP Wolsong NPP Kori NPP Operation : 5 units Construction : 1 units Operation : 6 units Construction : 2 units Planning : 4 units 2

5 Electricity Mix Source : KEPCO(Dec.2013) 20,716MW 138,784GWh Others (11.4%) (23.8%) Coal (28.2%) Others (3.5%) Oil (5.8%) (27.0%) Oil (8.5%) Gas (28.0%) Gas (24.7%) Coal (39.0%) Others: Hydroelectric, Renewable, etc. Others: Hydroelectric, Renewable, etc. Nuclear power is used as a base load

6 31 Operating Plants Kori 1,2,3,4 / Shin-Kori 1,2 Hanbit 1,2,3,4,5,6 Wolsung 1,2,3,4 / Shin-Wolsung 1 Hanul 1,2,3,4,5,6

7 Construction Plan KOREA Construction Planning Shin-Kori Aug. 2014 Sep. 2014 Dec. 2019 Dec. 2020 Dec. 2023 Dec. 2024 Shin-Kori 3 Shin-Kori 4 Shin-Kori 5 Shin-Kori 6 Shin-Kori 7 Shin-Kori 8 APR1400 APR1400 APR1400 APR1400 APR+ APR+ Shin-Hanul Apr. 2017 Apr. 2018 Jun. 2021 Jun. 2022 Shin-Hanul 1 Shin-Hanul 2 Shin-Hanul 3 Shin-Hanul 4 APR1400 APR1400 APR1400 APR1400 Shin-Wolsong Jul. 2014 Shin-Wolsong 2 OPR1000 UAE May 2017 May 2018 May 2019 May 2020 UAE 1 UAE 2 UAE 3 UAE 4 APR1400 APR1400 APR1400 APR1400 4

National Networking for NPPs Nuclear R&D Institute R&D of Nuclear technology Development of new technology Regulatory Authority Licensing & inspecting NPP Regulatory guide Utilities Operation and maintenance Construction management Fundamental for industries Government & KHNP Nuclear policy and promotion Planning of nuclear Power Enactment of Nuclear Power Industries Construction, design & A/E Manufacturing of component and equipment Manufacturing of nuclear fuel Universities Society & Associations Education in Nuclear Engineering Education in Science & Engineering B.S., M.S., Phd of Nuclear Engineering Korea Nuclear Society(KNS) Korea Atomic Industrial Forum(KAIF) Korea Nuclear Energy Promotion Agency

Supply Chain for NPPs

Organization for Project Management KHNP NSSC A/E Equipment Supply Construction Start-Up NSSS T/G FUEL BOP KEPCO E&C DOOSAN DOOSAN KNF DOMESTIC & FOREIGN CONSTRUCTORS KHNP NSSC: Nuclear Safety and Security Commission KEPCO E&C : KEPCO Engineering & Construction DOOSAN : DOOSAN Heavy Industries Co. KNF : Korea Nuclear Fuel Co. CONSTRUCTORS : HYUNDAI, DAEWOO, SAMSUNG, DOOSAN, DAELIM, etc.

Challenges and overcoming

Challenges in the Nuclear Industry Fukushima Accident Safety Culture Issue Counterfeit Certificates Corruption Scandals

Safety Culture Issue Cover-up of SBO at Kori #1 Event Station Blackout for 12 minutes in a cold shutdown in Feb. 2012 Not to report the loss of power and classify an emergency Safety Culture Breach Decision by the station manager not to report and instead to delete record of the event Prevention measures 24 Hours Monitoring System by the regulatory body Reinforcement of safety culture and reporting system IAEA s Expert Mission to review the SBO Safety culture advisory service by foreign third party

Counterfeit Quality Certificates CGID Issue In November 2012, KHNP confirmed that some suppliers had supplied items by falsifying the foreign dedication entities' quality certificates for Commercial Grade Items Dedication(CGID), such as fuse, relay, diode, etc.

Counterfeit Quality Certificates CGID Issue KHNP shut down Hanbit #5, 6 to replace the components with the forged quality certificates NSSC formed the government-civilian joint investigation team which investigated falsification of certificates of the items supplied to KHNP Comprehensive inspections expanded to all Q-class QVD(Quality Verification Document) of the items supplied to KHNP over the past 10 years for all of the Korean NPPs while investigating certificates for CGID All parts with falsified certificates were replaced and NSSC gave permission for the restart of the NPPs after safety check in January 2013

Counterfeit Quality Certificates CGID Issue KHNP 1 Purchase Order Supplier Forged 2 Request for Dedication 3 Notification of Result Dedication Entity 4 Delivery KHNP

Counterfeit Quality Certificates EQ Issue In May 2013, It was found that the falsification of equipment qualification(eq) certificates of control cables supplied to Shin-Kori #1, 2, 3,4 and Shin-Wolsong #1, 2 Safety function verification in severe environment such as LOCA, Fire, Melting accident, etc. Test results in the EQ were falsified by local certified testing institutes. KHNP immediately shut down affected NPPs to replace related parts NSSC s investigation was expanded to all NPPs certificates for EQ The component with falsified certificates were replaced or retested. NSSC permit restart of the plants in January 2014

Counterfeit Quality Certificates EQ Issue Tolerated KHNP 1 Purchase Order Testing Institutes Verification Agency 4 Request for Verification 5 Approval of Result Supplier 2 Request for Qualification 3 Notification of Result Testing Institutes Forged 6 Delivery KHNP

Counterfeit Quality Certificates EQ Issue

Counterfeit Quality Certificates EQ Issue

Counterfeit Quality Certificates Scope Counterfeit Items CGID QVD EQ Forged Quality Certificate Reuse of past Certificates Issue of Fraudulent Certificates Changing Test Results Changing Test Results Changing Test Condition (Boric Solution Normal water) Changing Test Report of Laboratory by Supplier buzzer, diode, transformer power supplier, switch, fuse relay, rectifier, magnetic contactor pressure gauge, blower pully, fan, motor pump, bushing, nut, bolt heater, tool set sleeve, actuator filter, valve disk control switch module control rod position transmitter radiation monitoring sensor AHU 600V control cable fuel tank

Corruption Scandals in supply chain The investigation began after a tip-off from a citizen in September 2011 Prosecutor's Office launched investigation on corruption related to nuclear power plant items Vendor, test institute, verification agency, and KHNP has been implicated The main cause was the disadvantage when the supply was delayed Prosecutor's Office and NSSC collaborated in reviewing the safety of nuclear power plants and confirmed that there was no item directly related to safety As a result of the investigation, 97 persons were prosecuted on a charge of corruption

Prevention measures 1 Strengthening quality control, 2 Improving procurement system 3 Eradicating corrupt relationships in supply chain Strengthening quality control system Establishment of a procedure for monitoring quality control by a third party Reinforcement of legal liability of quality accreditation organizations Introduction of NPP equipment certification management institution, etc. Improving procurement system Strengthening Independence of procurement department in KHNP Enhancement of bidding system transparency Organizing a committee to improve NPP procurement, etc. Eradicating corrupt relationship Prohibiting the re-employment of retirees in nuclear related companies Hiring outside personnel in KHNP, etc.

lessons learned Not to be overconfident and complacency Excellent performance of NPP operation for long period of time Export of a NPP at the first time in Korea s nuclear history To be transparent and open in quality and procurement activities Nuclear industry is easy to be closed due to the nature To encourage anonymous reporting The counterfeits and scandals was revealed by an anonymous tip-off To cooperate with international agencies, WANO, IAEA and foreign companies IAEA Expert Mission, WANO Corporate Review, Third party inspection

Strategy to overcome Public Trust Restoration & High Performance Safety First Policy Safety culture Equipment Reliability Engineering Competency Innovation Organization Personnel management Corporate culture Integral System Quality control Procurement system Corruption prevention

Thank You! Korea Hydro & Nuclear Power Co.(KHNP)