Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

Similar documents
Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Public Disclosure Copy. Public Disclosure Copy. The World Bank

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

The World Bank Sustainable Land Management Project (P133133)

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

The World Bank Ethiopia: Supporting Open Data Initiative (P156400)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE FOREST PROTECTION AND REFORESTATION PROJECT

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Training Schedule January 2017 to February 2018

Financial Results of PGNiG SA Q August 13th 2008

2017 Training Programmes

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS

India Kothagudem A Thermal Power Station Rehabilitation Project. Field Survey: July Project Profile and Japan s ODA Loan

COMPANY PROFILE 2016

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48170) ON A LOAN

Country Practice Area(Lead) Additional Financing Brazil Water P125829

Administration Division Public Works Department Anchorage: Performance. Value. Results.

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD and IBRD-80330) ON A LOAN IN THE AMOUNT OF EURO MILLION (US$ MILLION EQUIVALENT)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING INDIA - CAPACITY BUILDING FOR INDUSTRIAL POLLUTION MANAGEMENT APPROVED ON JUNE 3, 2010

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000,

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA TF-90325) ON A CREDIT

For Bandon Utilities Commission

World Bank Group Renewable Energy & Energy Efficiency Performance July June2005 Q&A

COURSE LISTING. Courses Listed. Training for Applications with Integration in SAP Business One. 27 November 2017 (07:09 GMT) Advanced

The World Bank Burkina Faso - Bagre Growth Pole Project (P119662)

GIS Hydropower Resource Mapping Country Report for Niger 1

Portfolio Analysis. Making the Most of Our Dollars and Sense

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-10510) ON A GRANT IN THE AMOUNT OF US$ MILLION TO THE ISLAMIC REPUBLIC OF PAKISTAN FOR A

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

ENERGY AND WATER STATISTICS 2016

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA TF-58319) ON A CREDIT IN THE AMOUNT OF SDR 24.7 MILLION (US$35 MILLION EQUIVALENT)

Status Working Group Balancing. Users Group 30/03/17

Sustainable Energy for All. Gearing up for the road ahead

PJM Roadmap for edart

Energy Market Outlook

FOR OFFICIAL USE ONLY

GIS Hydropower Resource Mapping Country Report for Ghana 1

COURSE LISTING. Courses Listed. with SAP Ariba SAP Ariba Procurement. 4 February 2018 (03:51 GMT)

German Equity Forum 2014

South African Milk Processors Organisation

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,000,000.00

Premium Sample Reports

CARIBBEAN DEVELOPMENT BANK LOAN AND PROJECT SUMMARY POWER PROJECT - SURINAME (ELECTRICITY SYSTEM UPGRADE AND EXPANSION)

Internet Protocol version 6 (IPv6) Transition. Presented to the Federal IPv6 Inter-Agency Conference

SREP Operational and Results Report TITLE SLIDE. DATE December 14, 2017 PLACE Washington, DC VENUE SREP Sub-Committee Meeting

HV SHRM Member Survey

IAF Advisors Energy Market Outlook Kyle Cooper, (713) , October 31, 2014

Meter Data Management System (MDMS) Sharing. Ricky Ip CLP Project Manager

Efficient utilization of energy sources

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT. (Grant IDA-H4840) ON A GRANT

Heating the University of Glasgow with river sourced heat pumps. Adam McConkey Andrew Poon-King Zhibin Yu

PJM EIS Generation Attribute Tracking System (GATS)

Energy Market Outlook

Procurement Plan for P (BRICKS)

Management Systems. Linkage. 26 March Text #ICANN49

HIT and Services Strategic Alignment

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Nov ,493,000.00

Designed Overflow For Flood Recession Agriculture Against Flow Control For Hydroelectric Production In An African Context

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404

Measuring Safety Performance

5 Star London Hotels - Example Report

IRP 101. Intro to Integrated Resource Planning. Scott Benson Manager, Resource & Transmission Planning. March 23, 2017

Desert Locust threat in the Sahel

Managing the supply chain: Challenges and Overcoming in Korean nuclear industry

Predictive Safety s Fatigue Management System: Benefits Realization Report

Portfolio of Highlights PORTFOLIO OF PROGRAMMES

FINANCIAL MARKETS. Loan Solutions. IHS Markit s comprehensive solutions in syndicated and leveraged loans

Introduction and purpose of this meeting. A New Day in Energy Management

EIB Contribution in Renewable Energy Projects Financing in West Africa

FOREWORD 02 ENERGY CONSULTANCY SERVICES 04 FUNDAMENTAL MARKET MODELLING 04 OPERATIONAL MARKET SIMULATION 05 ECONOMIC AND TECHNICAL ANALYSIS 06

Giuseppe Giordano Founder & CEO

International Training Calendar 2018 Pretoria South Africa

Regional Analysis of Policy Reforms to promote Energy Efficiency and Renewable Energy Investments Interaction with National Participating Institutions

Jakarta Water Supply Development Project (Immediate Project of 2nd Stage,

ESCI-61 Introduction to Photovoltaic Technology

Bordei Verde. 8 MW Wind Park Romania.

Italy July August 2016

Facilities Management. FM Key Performance Indicators

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-7142 IBRD-7978) ON A LOAN IN THE AMOUNT OF US$ 80 MILLION TO THE

FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT IN THE AMOUNT OF EUR74.9 MILLION (US$80 MILLION EQUIVALENT) BURKINA FASO FOR THE

Contents. Introduction. Introduction. First Power Plant based on AC Tesla s s principles 1900! Recent Energy Sector Development

Transcription:

Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Project Stage: Implementation Seq.No: 14 Status: ARCHIVED Archive Date: 10-Jun-2014 Country: Africa Approval FY: 2006 Product Line: IBRD/IDA Region: AFRICA Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Key Dates Board Approval Date 29-Jun-2006 Original Closing Date 30-Jun-2010 Planned Mid Term Review Date 21-Nov-2011 Last Archived ISR Date 07-Nov-2013 Effectiveness Date 30-Apr-2007 Revised Closing Date Actual Mid Term Review Date 21-Nov-2011 Project Development Objectives WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Project Development Objective (from Project Appraisal Document) The project development objectives are to (i) augment the supply of low cost hydroelectricity from the OMVS Power System to the national utilities of Mali (EDM), Mauritania (SOMELEC) and Senegal (SENELEC); and (ii) develop a nucleus of a well-functioning, cooperative, power pooling mechanism for the West Africa Power Pool (WAPP) Zone B Organisation Pour la Mise en Valeur du Fleuve Sénégal (OMVS) Countries of West Africa. Has the Project Development Objective been changed since Board Approval of the Program? Yes No losure Authorized Public Disclosure Authorized Component(s) Component Name Component Cost Infrastructure component -Design-Build of felou HEP 176.29 SCADA/EMS & Communications 7.79 Project Cycle Management 8.56 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Implementation Status Overview On the implementation of the project, the construction of the Felou hydropower plant was completed. The Commissioning Certificate for the three 20 MW units was issued by the Owner s Engineer on April 30, 2014. Page 1 of 6

Locations Country First Administrative Division Location Planned Actual Mali Region de Kayes Manantali Mali Region de Kayes Kayes Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Quantity of hydroelectricity supplied by OMVS Gigawatt-hour Value 807.00 1142.00 Power System Operator to the electric utilities (GWh) of the WAPP Zone B OMVS Countries (EDM, SENELEC, SOMELEC) Being estimated and will be Total energy output from provided by the end of the Manantali and Felou in 2013 EDM Gigawatt-hour Value 420.00 594.00 (GWh) SENELEC Gigawatt-hour (GWh) SOMELEC Gigawatt-hour (GWh) Operating rules in place on the basis of sound economic dispatch criteria Intermediate Results Indicators Being estimated and will be provided by the end of the Value 266.00 377.00 Being estimated and will be provided by the end of the Value 121.00 171.00 Being estimated and will be provided by the end of the Yes/No Value No Yes Yes Date 30-Jun-2008 Economic dispatch rules already in place for Manantali and Felou HEPs, as defined in Interconnection Agreement Page 2 of 6

Indicator Name Core Unit of Measure Baseline Current End Target Commissioning and performance testing of Yes/No Value No No Yes Felou HEP completed on schedule Completed but with 9 month delay. Generation capacity of hydroelectricity Megawatt Value 0.00 60.00 60.00 constructed Works completed. Core sector indicator retrofit Generation Capacity of Hydropower Megawatt Value 0.00 60.00 60.00 constructed or rehabilitated under the project Generation Capacity of Hydropower Megawatt Value 0.00 60.00 60.00 constructed under the project Availability of the power generation units of Percentage Value 0.00 95.00 95.00 Felou HEP Works completed Owner's engineer has been recruited Yes/No Value No Yes Yes Contract has been signed, with satisfactory performance of Owner's Engineer Design-build contractor has been employed Yes/No Value No Yes Yes 15-May-2014 Works complete Adoption of Protocole Tarifaire for Felou HEP Yes/No Value No Yes Yes by the OMVS Power System Operator Felou tariff protocol has been adopted by OMVS States and utilities (EDM, SENELEC, SOMELEC) EDM Yes/No Value No Yes Yes SENELEC Yes/No Value No Yes Yes Page 3 of 6

SOMELEC Yes/No Date 30-Jun-2008 Value No Yes Yes Date 30-Jun-2008 Power sector monitoring and evaluation data of Percentage Value 0.00 0.00 100.00 the WAPP Zone B OMVS Countries collected, analyzed and disseminated by the WAPP WAPP is already collecting data on a regular basis, but a M&E system is yet to be set up. Bidding document being Database at the WAPP level is put in place and Yes/No Value No No Yes power sector M&E data of the WAPP Zone B OMVS Countries are developed WAPP is already collecting data on a regular basis, but a M&E system is yet to be set up. Bidding document being Communication and data aquisition facilities Yes/No Value No No Yes upgraded Bidding document being Necessary software licenses aquired Yes/No Value No No Yes Bidding document being Data on Financial Performance (as of 15-May-2014) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P094916 IDA-42150 Closed 29-Jun-2006 13-Sep-2006 30-Apr-2007 30-Jun-2010 30-Jun-2013 P094916 IDA-42160 Closed 29-Jun-2006 13-Sep-2006 30-Apr-2007 30-Jun-2010 30-Jun-2013 P094916 IDA-42170 Closed 29-Jun-2006 13-Sep-2006 30-Apr-2007 30-Jun-2010 30-Jun-2013 P094916 IDA-46450 Effective 27-Aug-2009 17-Feb-2010 13-Oct-2010 30-Jun-2013 P094916 IDA-46460 Effective 27-Aug-2009 17-Feb-2010 13-Oct-2010 30-Jun-2013 Page 4 of 6

Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P099312 TF-90369 Effective 29-Jun-2007 29-Jun-2007 29-Jun-2007 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P094916 IDA-42150 Closed USD 25.00 25.00 0.00 26.38 0.00 106.00 P094916 IDA-42160 Closed USD 25.00 25.00 0.00 26.36 0.00 105.00 P094916 IDA-42170 Closed USD 25.00 25.00 0.00 26.40 0.00 106.00 P094916 IDA-46450 Effective USD 42.50 42.50 0.00 35.85 6.05 84.00 P094916 IDA-46460 Effective USD 42.50 42.50 0.00 16.00 26.15 38.00 P099312 TF-90369 Effective USD 42.50 (0.01) 3.03 0.00 0.00 0.00 Disbursement Graph Key Decisions Regarding Implementation This is an important milestone in the final stages of the project. Going forward, SOGEM needs to ensure that the constructor submits the French translation of the operating manual and that the spare parts are supplied during and at the end of the two year warranty period. A supervision mission is scheduled for May 26-30, 2014. Restructuring History There has been no restructuring to date., Level two Approved on 11-Sep-2012, Level 2 RVP Decision on 28-Jun-2013 Related Projects Page 5 of 6

P099312-OMVS Felou Hydroelectric Project, P114935-Additional Financing for the Felou Hydroelectric Project (WAPP APL2) Page 6 of 6