ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road

Similar documents
Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

Forsyth County Procurement

ADDENDUM NO. 1 APRIL 24, 2017

Riverside County Transportation Department Summary of Bids

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

CITY OF FARGO SPECIFICATIONS SIGNING

Maine Turnpike Authority

10:00 AM, Wednesday, April 8, 2015

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

Table of Contents for Guide Specifications

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

BID FORM - LUMP SUM BID

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2

DRAFT TECHNICAL SPECIFICATIONS FOR

PRELIMINARY DEVELOPMENT PLAN INFORMATION

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

South Dakota Department of Transportation Average Unit Prices from Low Bids

CIRCLE K SUB-CONTRACTOR BID FORM

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

ADDENDUM NO. 4 CITY OF FREDERICK PURCHASING DEPARTMENT 111 Airport Drive East Frederick, MD (301)

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

SECTION TRENCHING & BACKFILLING

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE

TYPE "A" CATCH BASIN

TOWN OF PARKER, COUNTY OF DOUGLAS, STATE OF COLORADO N.T.S.

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION

***************************************************************************************************************

SECTION A1 EXCAVATION AND BACKFILL GENERAL

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

Alternative No. 1 Total Cost DRAFT

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

CITY UTILITIES DESIGN STANDARDS MANUAL

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

Lump Sum L.S. (15") EA

DIVISION 1100 TRAFFIC

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

STATE AID GUIDE FOR: Updated: December 16, 2005

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

RICHFIELD CITY CONSTRUCTION STANDARDS

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

Addendum No. 1 Page 1 of 2

SPECIFICATIONS - DETAILED PROVISIONS Section Welded Steel Tanks for Water Storage C O N T E N T S


CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

Eastern Sewershed Package IV Project Solicitation Number: CO Job No.: ADDENDUM 1 April 20, 2018

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

SECTION 806 MANHOLE REHABILITATION

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

Project Type: Drainage and Storm Systems

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

CHAPTER VII - MATERIALS ACCEPTANCE AND MATERIALS NOTEBOOK PROGRAM... VII-2

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

Ironton Russell Bridge Project

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

City of Naples Utilities Department Wastewater Collections Division

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Summary of the 2011 Changes

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

HANDHOLES, PULLING VAULTS AND JUNCTION BOXES

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

Hydrodynamic Separation Product Calculator

Request for Proposal: Due October 11, :00 pm

CITY OF MIAMI Capital Improvements Program BID NO.:

Table of Contents. List of Drawings

Ohio Department of Transportation

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

Inlets & Catch Basins

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

Federal Project No.: NONE

CITY OF SANTA ANA PROPOSAL PROJECT NO.: CHESTNUT AVE & BUSH/CYPRESS BIKE LANES FAID#: U58DP005861

Transcription:

Financial Services Purchasing Division 215 N. Mason St. 2 nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road OPENING DATE: 3:00 PM (Our Clock) July 23, 2014 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: 1. The Opening Date has been changed to 3:00 PM (our clock) on July 23, 2014. 2. Additional Information Exhibit 1 Revised Bid Schedule Exhibit 2 Questions & Answers Exhibit 3 Description of Revisions Exhibit 4 Revised Specifications Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 1 of 12

EXHIBIT 1 REVISED BID SCHEDULE BID NO. CONTRACT ITEM NO. CONTRACT DESCRIPTION UNIT TRAIL PLAN STRUCTURAL PLAN TOTAL UNIT COST TOTAL COST 1 201 Clearing and Grubbing LS 1 0 1 $ 2 202 Removal of Trees EA 5 0 5 $ 3 202 Removal of Concrete Sidewalk SY 172 0 172 $ 4 202 Removal of Asphalt Mat SY 282 0 282 $ 5 202 Remove 12" Water Line LF 132 0 132 $ 6 202 Removal of Barricade EA 1 0 1 $ 7 202 Removal of Fence LF 315 0 315 $ 8 202 Remove & Replace or Protect Existing Landscaping LS 1 0 1 $ 9 203 Unclassified Excavation CY 2910 0 2910 $ 10 206 Structure Excavation CY 0 1910 1910 $ 11 206 Structure Backfill (Class I) CY 0 954 954 $ 12 207 Topsoil (4inch) (Remove, Stockpile, Redistribute) CY 2090 0 2090 $ 13 208 Erosion Control LS 1 0 1 $ 14 210 Reset Ground Sign EA 2 0 2 $ 15 210 Reset Gate EA 2 0 2 $ 16 210 Reset Riprap LS 1 0 1 $ 17 211 Dewatering LS 1 0 1 $ 18 212 Seeding (Native) AC 2.7 0 2.7 $ 19 213 Mulching (Weed Free Hay) AC 2.7 0 2.7 $ 20 216 Soil Retention Blanket (Straw/Coconut) SY 580 0 580 $ 21 304 Aggregate Base Course (Class 6) CY 45 56 101 $ 22 403 Hot Mix Asphalt (Grading S)(75)(6422) TON 119 0 119 $ 23 420 Geosynthetic Pavement Interlayer SY 39 0 39 $ 24 503 Helical Piers (40' Bridge) LF 0 40 40 $ 25 503 Drilled 12" Caisson (100' Bridge) LF 0 120 120 $ 26 601 Precast Concrete Underpass System LS 0 1 1 $ 27 601 Precast Concrete Erection LS 0 1 1 $ 28 601 Structural Concrete Coating SF 0 2976 2976 $ 29 601 Structural Concrete Casting (AntiGraffiti) SF 0 2976 2976 $ 30 603 18 Inch Reinforced Concrete Pipe (FES Included) LF 183 0 183 $ Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 2 of 12

31 603 24 Inch Reinforced Concrete Pipe LF 50 0 50 $ 32 604 Precast Concrete Area Inlet EA 1 0 1 $ 33 604 Manhole (48inch) EA 2 0 2 $ 34 606 Bridge Rail Type 10 LF 0 128 128 $ 35 606 Guardrail Transition Type 3H EA 1 0 1 $ 36 606 Guardrail Transition Type 3G EA 1 0 1 $ 37 606 Guardrail Straight Flare End Anchor EA 1 0 1 $ 38 606 Guardrail End Type 3D EA 1 0 1 $ 39 607 Wooden Rail Fence LF 269 0 269 $ 40 608 8' Concrete Bikeway (5 Inch) SY 430 0 430 $ 41 608 10' Concrete Bikeway (5 Inch) SY 5537 0 5537 $ 42 608 Access Ramp w/ Truncated Domes EA 2 0 2 $ 43 609 2' Concrete Pan LF 31 0 31 $ 44 609 Hollywood Curb & Gutter LF 80 0 80 $ 45 613 Lighting System LS 0 1 1 $ 46 614 Signs EA 6 0 6 $ 47 619 12 Inch PVC C900 Waterline LF 150 0 150 $ 48 619 12 Inch 45 Horiz. Bend w/ Thrust Block EA 4 0 4 $ 49 619 Air Relief Valve EA 1 0 1 $ 50 626 Mobilization LS 1 0 1 $ 51 627 Pavement Markings SF 108 0 108 $ 52 628 Bridge Girder and Deck Unit (40 foot) EA 0 1 1 $ 53 628 Bridge Girder and Deck Unit (100 foot) EA 0 1 1 $ 54 630 Traffic Control LS 1 0 1 $ 55 631 Pedestrian Bridge Abutment (40 foot Bridge) EA 0 2 2 $ 56 631 Pedestrian Bridge Abutment (100 foot Bridge) EA 0 2 2 $ TOTAL BASE BID $ IN WORDS: Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 3 of 12

EXHIBIT 2 QUESTIONS & ANSWERS (1) Can a four-sided box be used as an approved alternate for the underpass structure? No, please bid according to the contract docs. (2) Is there any way to itemize the Helical Piers for the 40 bridge as its own bid item so it can be measured and paid by the LF? This will help remedy any source of contention down the road since the required depths are unknown to meet the torque specs. A new bid item will be added for the helical piers. (3) Can the 12 caissons also be broken out as its own separate item just in case we need to go deeper than expected? A new bid item will be added for the 12 caissons. (4) There doesn t seem to be a toe wall associated with the box culvert. Is this correct? The toe wall is only required at the wingwalls, see detail D on sheet S04. (5) It is understood that the city will be providing construction surveying. Will the city also be doing the certified as-builts that is needed to meet the floodplain requirements? Yes, the City will be doing the as-built surveying to meet floodplain requirements. (6) To clarify, the bid item Precast Concrete Underpass System is just for the material of the precast concrete and item Precast Concrete Erection includes the setting of this system. Is this correct? Correct, delivery of the materials should be considered incidental to either bid item. (7) Please clarify what is all in the bid item, Concrete Class D (Wall). Other than the bridge abutments (which is way less than 67 CY), I don t see any structural concrete on the plans. The Concrete Class D (Wall) quantity should be zero. The Reinforcing Steel item quantity should also be zero. The wingwalls are included in the Precast Concrete Underpass System item. Topping concrete within the underpass will be included in the 10 Concrete Bikeway item (discussed below in #8). Concrete and reinforcing for bridge rail curbs should be considered a part of the Bridge Rail Type 10 (Special) item. Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 4 of 12

(8) Are the bridge abutments incidental to the bridge bid items or they included in the Concrete Class D (Wall)? A new bid item will be added for the bridge abutments. (9) In regards to the cast in place concrete topping inside the box, in what bid item is this getting paid? The concrete topping inside the box shall match the 10 Concrete Bikeway and that quantity is included with that item. (10) On Sheet C13, there is a reference to a Bentonite Blanket. Where does this get paid and what are the specs? The Bentonite Blanket will not be required. (11) Is a 404 permit required for this project? Yes, the Owner has acquired a Nationwide Permit No. 14 for the project. The CONTRACTOR is responsible for 100% compliance of all work accomplished in accordance with the terms and conditions of the nationwide permit. (12) Does asphalt need Flyash? No (13) Will CDOT be reviewing and approving the bridge drawings? No Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 5 of 12

I. Revisions to the Plans/Bid Tab: EXHIBIT 3 DESCRIPTION OF REVISIONS A. BID TAB - The bid schedule has been amended as follows: ADDED item 503 Helical Piers (40 Bridge) ADDED item 503 Drilled 12 Caisson (100 Bridge) DELETED item 601 Concrete Class D (Wall) DELETED item 602 Reinforcing Steel ADDED item 631 Pedestrian Bridge Abutment (40 foot Bridge) ADDED item 631 Pedestrian Bridge Abutment (100 foot Bridge) DELETED F/A Erosion Control C. SHEET C3 Summary of Approximate Quantities has been revised and attached. D. SHEET C13 has been revised. Bentonite blanket note has been removed. E. SHEET S05 has been revised. Note 7 has been revised to include concrete and reinforcing for the bridge rail curbs. II. Revisions to the Project Contract Documents: A. The Project Special Provisions table of contents has been updated B. A new project special item has been added to the project under section 631: Pedestrian Bridge Abutment This Special has been ADDED. It is intended to apply to both of the pedestrian bridges abutments. Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 6 of 12

Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road CHECKED BY: MPO DESIGNED BY: SMB SCALE (V): NA SUMMARY OF QUANTITIES FOSSIL CREEK TRAIL UNDERPASS AT TRILBY ROAD PROJECT NAME Park Planning & Development 215 N.Mason Street Fort Collins, CO 80522 970-221-6360 PREPARED FOR Description Revisions By SUMMARY OF APPROXIMATE QUANTITIES SCALE (H): NA DATE: 02/14/14 No. Date EXHIBIT 4 - REVISED SPECIFICATIONS PROJ. NO. 1096-012-54 C3 Page 7 of 12

Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 8 of 12

Revisions No. Date Description By 7. PAYMENT WILL BE MADE UNDER ITEM 606, BRIDGE RAIL TYPE 10 (SPECIAL) FOR ALL POSTS, POST ANCHORS, BASE PLATES, BACKING PLATES, ANCHOR BOLTS, MISCELLANEOUS BOLTS, NUTS, WASHERS, TUBES, END PLATES, END TRANSITION, CORED HOLES, GROUT, REFLECTOR TABS, AND CONCRETE AND REINFORCING FOR BRIDGE RAIL CURBS. 8. PRIOR TO FABRICATION OF THIS ITEM, THREE SETS OF WORKING DRAWINGS WHICH COMPLY WITH THE REQUIREMENTS OF SECTION 105, SHALL BE SUBMITTED TO THE ENGINEER FOR INFORMATION ONLY. 9. STRUCTURAL STEEL: AASHTO M 183 (ASTM A 36) fy=36,000 psi ASTM A 588 fy=50,000 psi ASTM A 847 fy=50,000 psi 10. REFLECTOR TABS SHALL BE LOCATED ON EACH POST. SEE M 606 1 FOR DETAILS. OMIT REFLECTOR AT BEAM TERMINAL SECTION. Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 9 of 12

FOSSIL CREEK TRAIL UNDERPASS AT TRILBY ROAD PROJECT SPECIAL PROVISIONS TABLE OF CONTENTS SPECIFICATIONS PROJECT SPECIAL PROVISIONS Item Description Date Page Index Pages (September 17, 2013) I-ii Revision of Section 101 Definition of Terms (September 17, 2013) SP-1 Revision of Section 107 Performance of Safety Critical Work (September 17, 2013) SP-3 Revision of Section 202 Removal of Tree (September 17, 2013) SP-5 Revision of Section 202 Removal of Concrete Sidewalk (September 17, 2013) SP-6 Revision of Section 202 Removal of Asphalt Mat (September 17, 2013) SP-7 Revision of Section 202 Removal of 12 Water Line (September 17, 2013) SP-7 Revision of Section 202 Removal of Barricade (September 17, 2013) SP-9 Revision of Section 202 Removal of Fence (September 17, 2013) SP-10 Revision of Section 202 Remove and Replace or Protect (September 17, 2013) SP-11 In Place Existing Landscape Revision of Section 207 Topsoil (September 17, 2013) SP-12 Revision of Section 208 Erosion Control (September 17, 2013) SP-13 Revision of Section 209 Dust Palliatives (September 17, 2013) SP-14 Revision of Section 210 Reset Riprap (September 17, 2013) SP-15 Revision of Section 216 Soil Retention Blanket (Straw/Coconut) (September 17, 2013) SP-16 Revision of Section 601 Precast Concrete Underpass System (September 17, 2013) SP-17 Revision of Section 604 Precast Concrete Area Inlet (September 17, 2013) SP-18 Revision of Section 604 Manholes and Inlets (September 17, 2013) SP-19 Revision of Section 607 Wooden Rail Fence (September 17, 2013) SP-20 Revision of Section 608 Sidewalks and Bikeways (September 17, 2013) SP-21 Revision of Section 608 Concrete Curb Ramps (September 17, 2013) SP-22 Revision of Section 609 2 Concrete Pan and (September 17, 2013) SP-25 Hollywood Curb and Gutter Revision of Section 619 Water Lines (September 17, 2013) SP-26 Revision of Section 628 Bridge Girder and Deck Unit (September 17, 2013) SP-27 Revision of Section 631 Pedestrian Bridge Abutment (July 15, 2014) SP-34 Utilities (September 17, 2013) SP-35 Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 10 of 12

FOSSIL CREEK TRAIL UNDERPASS AT TRILBY ROAD PROJECT SPECIAL PROVISIONS REVISION OF SECTION 631 PEDESTRIAN BRIDGE ABUTMENT Section 631 is hereby added to the Standard Specifications for this project as follows: DESCRIPTION 631.01 This work consists of the construction of the pedestrian bridge abutments as detailed in the construction plans. 631.02 Materials shall meet the requirements specified in the following subsections: Concrete Class D 601 Reinforcing Steel 602 All materials used in the construction of the bridge abutments shall also follow the guidelines detailed in the plans. METHOD OF MEASUREMENT 631.03 Pedestrian bridge abutments will be measured by the complete Pedestrian Bridge Abutment installed and accepted. BASIS OF PAYMENT 628.08 The accepted quantity shall be paid for at the contract unit price for the pay unit listed below. Payment will be made under: PAY ITEM Pedestrian Bridge Abutment (40 foot) Pedestrian Bridge Abutment (100 foot) PAY UNIT EACH EACH Payment shall be full compensation for all work necessary to complete the item, which shall include all materials, tools, equipment, and labor. The bridge girder and deck unit shall be measured and paid for separately. Helix pier will be measured and paid for separately under item 503. 12 caissons will be measured and paid for separately under item 503. Anchor bolts and other hardware shall be included in Item 631. SP-34 Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 11 of 12

FOSSIL CREEK TRAIL UNDERPASS AT TRILBY ROAD PROJECT SPECIAL PROVISIONS UTILITIES The following Utilities are known to be within the project limits: Utility/Agency Contact Person Phone Number Xcel Energy (gas) Stephanie Rich (970) 225-7828 Fort Collins Loveland Water District Terry Farrill (970) 226-3104 South Fort Collins Sanitation District Terry Farrill (970) 226-3104 COFC Stormwater Glen Schlueter (970) 224-6065 COFC Light and Power Mike Hergenreder (970) 219-8367 COFC Fiber Optic Clint Reetz (970) 221-6326 Comcast Communications Don Kapperman (970) 567-0245 Century Link Bob Rulli (970) 988-2120 Paragon Point HOA Irrigation Scott Gablehouse (970) 539-0890 The work described in these plans and specifications will require full coordination between the Contractor and the Utility Companies, in accordance with Subsection 105.06 and while performing their respective operations, so the utility work can be completed with minimum delays to all parties concerned. In accordance with the plans and specifications, and as directed by the Engineer, the Contractor shall keep the utility company(s) advised of any work being done to their facility, so that the utility company(s) can coordinate their inspections for final acceptance of the work with the Engineer. The Contractor shall be responsible for protecting, supporting, and if necessary, shoring existing utilities while constructing the trail, pedestrian bridge, and associated work. The Contractor shall submit to the City and the individual utility companies plans of how the utility lines will be supported and protected during construction. NOTE: The Contractor shall be required to provide written notice to each utility company, with a copy to the City, immediately prior to any utility work expected to be coordinated with construction. The following utility work shall be performed by the Contractor: Storm sewer system modifications, water main relocation SP-35 Addendum 1 7664 Fossil Creek Trail Underpass at Trilby Road Page 12 of 12